Northern Star Resources Limited (NST) Earnings Call Transcript & Summary
April 26, 2022
Earnings Call Speaker Segments
Operator
operatorAppreciate everyone being on the line, and thanks for joining Northern Star's March 2022 quarterly results call. <<operator_script>> At this point I'll pass things over to our Managing Director, Mr. Stuart Tonkin. Please go ahead.
Stuart Tonkin
executiveGood morning, and thank you for being with us today. Joining me are Simon Jessop, Chief Operating Officer of Australia, and Ryan Gurner, our Chief Financial Officer. We've turned in yet another foundational quarter as we advance our growth projects at Kalgoorlie, Yandal and Pogo. Through this capital investment, we will expand cash flows and deliver returns to shareholders in the near term. Our safety results, which lead the sector, continue to stand out, even as we responsibly handle the effects of COVID disruption throughout our operations. I want to thank our team — our people and our team — for their ongoing hard work and focus on keeping our teams and communities safe. During the March quarter, we sold 380,000 ounces at an all-in sustaining cost of AUD 1,656 an ounce. Our Australian operations remain on track to meet full year production and cost guidance. Pogo, meanwhile, has elevated costs, while we raised mining physicals to match the expanded 1.3 million tonne per annum mill capacity in FY '23. Our full year group production guidance of 1.55 million to 1.65 million ounces is unchanged. However, given lower production and higher costs at Pogo, we now raise our FY '22 group cost guidance to AUD 1,600 to AUD 1,640 an ounce, up from $1,575.
Stuart Tonkin
executiveIt's encouraging to see the investment at Pogo paying off, with gold sold rising 26% versus the prior quarter. Development during the quarter averaged 1,450 meters per month, including a record March at 1,650 meters. Maintaining development above 1,500 meters per month is essential for reaching new and multiple stoping zones. To boost those development physicals, we've added 2 jumbos, bringing the fleet to 7 and giving us extra capacity. Once operating restrictions ease, we'll cut costs by right-sizing the fleet to sustaining levels. Our second-half progress at Pogo this financial year set us on an annualized production rate of 240,000 ounces per annum. With underground physicals continuing to rise, we're well placed to reach the 1.3 million tonne per annum mill capacity in FY '23. So while unit costs at Pogo are elevated right now, that's heavily driven by the denominator of gold sold. As production grows to a steady rate and we optimize the fleet, we'll expand margin at Pogo. Simon will now speak to the Australian operations, which are performing well and which underpin significant organic growth in the near term.
Stuart Tonkin
executiveAppreciate that, Simon.
Simon Jessop
executiveThanks, Stu. Turning to the Kalgoorlie production center, which takes in KCGM, Carosue Dam, Kanowna Belle and South Kalgoorlie. Gold sales came to 213,000 ounces, with an Australian all-in sustaining cost of $1,659 per ounce, which is 14% lower than gold in the December quarter. That production generated mine operating cash flow of $179 million, and we also invested $83 million in significant growth capital projects. Within that major growth capital, $34 million went to open pit mine development and $7 million to long-term tails dam works at KCGM. At KCGM, open pit material movement reached 16.4 million tonnes, 7% above the December quarter, with mining of the Golden Pike South area a key focus when available. It was also pleasing to see good progress -- good mining progress and preparation works underway for when we commence mining through the historic 2018 failed zone. This key growth area remains on track to reestablishing FY '24 access back into Golden Pike North's low-cost ounces. The open pit fleet replacement program is tracking extremely well. We have now successfully commissioned 24 of the new 793F open pit mining trucks, or approximately 75% of the fleet has been changed out.
Simon Jessop
executiveThe rest of the truck fleet is going to be commissioned during the June quarter, and that makes it possible for an optimization phase to get underway in FY '23. Underground mining across the Kalgoorlie region came in 12% below the December quarter, at 1.42 million tonnes for 105,000 ounces. The biggest hit to the lower underground mine physicals came at Carosue Dam, where fewer stoping fronts were on offer. As that asset ramped up output, drilling resources were brought online so that volumes and optionality could be restored at the mine going forward. Ore tonnes from Mt Charlotte underground were also a touch lower than in the December quarter, at 344,000 tonnes, with bank constraints weighing on trucking capacity as we keep growing and advancing this exciting reserve base. A new raisebore hole bench shaft is well along and will lift the pressure intake for the Mt Charlotte mine. At Kalgoorlie Operations, the Kanowna Belle mine keeps targeting the bulk mining areas as a top-up to the high-grade ore sequence. That mine also set a new monthly record since Northern Star acquired the asset in 2014, producing 150,000 ore tonnes and 930,000 tonne kilometers, which sets a fresh benchmark for that operation. Processing volumes in the Kalgoorlie region were 4.6 million tonnes, or 12% below the December quarter, driven by mechanical availability at KCGM, crushing and conveyor issues at Carosue Dam, and a block tails line at the South Kalgoorlie operations.
Simon Jessop
executiveWhen it comes to the production center's weaker throughput this quarter, the main cause was at KCGM, where the Fimiston milling circuit was affected — both run time and throughput rates — because of problems with ball mills downstream. Most of those problems were fixed during the recent Q4 shutdown, though certain items with longer lead times are going to be swapped out over the course of FY '23. Over at our Yandal production center — that covers Jundee, Thunderbox and Bronzewing — we sold 110,000 ounces of gold at an Australian all-in sustaining cost of $1,444 an ounce, which is 7% higher on gold than the December quarter and 5% lower on all-in sustaining cost. That production generated mine operating cash flow of $116 million, and we invested $73 million in significant growth capital projects. The Thunderbox mill expansion on its own accounted for $38 million of major growth capital in the quarter. Our Jundee operation delivered yet another strong underground result, with 5.9 kilometers of development and a mined ore grade that came in 18% higher quarter-on-quarter. The Ramone underground mine reached 1,200 meters of development in a partial quarter of work; it is run by Northern Star's mine — the Northern Star Mining Services in-house division — and it will bring production options forward into FY '23. Jumbo development across Jundee totaled 7.1 kilometers for the quarter and will keep being a key enabler, both for drill platforms and for more areas in which to produce stope ore tonnes.
Simon Jessop
executiveThe Thunderbox underground operation kept expanding its stope mining fronts, with 407,000 tonnes mined during the March quarter. That marks 2 quarters running above 400,000 tonnes apiece, which works out to an annualized run rate of 1.65 million tonnes per annum. We expect more ore tonnes out of the underground mine as we keep opening up additional parts of the ore body, building toward more than 2 million tonnes per annum. At the open pit D Zone mine, further ore continues to be exposed, and the strip ratio is coming down, with 18,000 ounces mined in the quarter. The Thunderbox mill expansion is moving along nicely, and commissioning is still anticipated in the first half of FY '23. Most of the civils work and the coarse ore stockpile are finished. SAG mill shells have been delivered and installed, and work to erect the related steel work and electrical infrastructure is well advanced. This material growth project stays on track and on budget as a key project within Northern Star's 5-year strategic plan. At this point I'd like to hand over to Ryan, our CFO, to join the -- to talk through the financials.
Ryan Gurner
executiveThanks, Simon, and good morning everyone. Today's quarterly results show that Northern Star is still in a very strong financial position as we head into the final quarter of FY '22. As set out in Table 4 on Page 8, our balance sheet remains solid, with cash and bullion of $533 million at 31 March. We also remain in a net cash position of $433 million, which is up from $288 million last quarter. Figure 7 on Page 9 shows the company's cash movement for the quarter, and the key highlights include the company recording $541 million of operating cash flow, which included the FY '21 corporate tax refund of $163 million. As we mentioned in previous quarters, the company is currently anticipating new monthly tax installment obligations for the remainder of the calendar year. After deducting sustaining and growth CapEx of $232 million and $25 million in exploration investment, quarterly free cash flow generation was a very healthy $284 million for the quarter. On the back of this strong free cash flow result, $200 million of corporate bank debt was repaid, which resulted in the company having only $100 million of drawn bank debt at 31 March. And during the quarter, the company paid its interim FY '22 dividend of $0.10 per share, totaling $111 million.
Ryan Gurner
executiveTurning to a few other financial items. Regarding the stamp duty owed on the merger, our present expectation is that payment will occur in the first half of FY '23, and we have booked an estimated $225 million in the accounts. Depreciation and amortization came in as expected, sitting at the top end of the guidance range at roughly $700 per ounce sold, and for the quarter the group recorded noncash inventory charges of $30 million. As noted earlier, the bulk of those noncash inventory charges stem from milling acquired stockpiles at KCGM, which were written up to fair value at the time of acquisition. On the cost side, Northern Star, like the rest of the industry, is — is currently seeing cost escalation in certain areas of our business. We keep a sharp focus and continue driving cost savings initiatives, leveraging our global supply chain and supplier relationships to source the lowest cost items and secure the best terms. At present the company is not facing shortages or disruptions within its supply chain. Input cost increases seen during the quarter were notably in diesel fuel. Certain processing reagents, notably cyanide, caustic, consumable parts, ground support and freight, have all raised production costs during the quarter.
Ryan Gurner
executiveOn the fuel side, the cost rise we saw versus what we had expected in quarter 3, and have reforecast for quarter 4 — so across the second half — is expected to contribute roughly $15 to $18 per ounce to the group's all-in sustaining cost for the full year. That figure sits within the revised group FY '22 cost guidance of $1,600 to $1,640 per ounce sold. FY '22 growth capital guidance for the company is still $682 million, with no change. Accounting standards require that receipts from preproduction gold sales be treated as an offset against capital spent. Preproduction sales at Thunderbox came in below budget during the first half — a result of the acceleration to commercial production at TBO underground and D Zone — and that has led to reduced preproduction receipts for the year. Exploration guidance for FY '22 is likewise unchanged. Lastly, on hedging, Table 5 on Page 9 lays out the company's committed hedge position as at 31 March. The hedge book overall now totals 1.1 million ounces at an average price of $2,446 per ounce, representing about 20% of our forward 3-year production profile. Quarter-on-quarter, the average hedge book rose $41 per ounce. I'll now return the call to Harmony for the Q&A session.
Ryan Gurner
executiveI appreciate that.
Operator
operator<<operator_script>> Peter O'Connor of Shaw and Partners has our first question.
Peter O'Connor
analystIf I could, I’d like to probe a bit further into the cost remarks you just made, and first get a handle on diesel. You mentioned the full-year guidance change driven by fuel expense. But could you provide a bit more detail on what percentage shift that represents for the half—either the second half or the first half? And in the same way, regarding your other elements of ground support and freight, how significant are they within that cost increase you just guided to?
Stuart Tonkin
executiveThanks, Peter. Stuart here. So, look, the rerate, or that cost increase, is tied more to Pogo and what Pogo actually achieved during the first half. What we'd really like is to see the run rate in the second half and the gains being made there. But for the group, fuel isn't the only thing behind the change to group cost guidance. Right now the fuel effect comes to almost $40 an ounce. Across the year, I believe it's around 18 for the group, yet that isn't what caused the recut of the cost guidance. We definitely had buffer inside the Australian operations, within the guidance, to absorb it. It's really the shift at Pogo and where we had expected things — it's the current overinvestment in Pogo to catch up on the physicals, now that we have some easy restrictions on bringing people and equipment in there. So yes, fuel at the moment is — we don't — we view it as fairly short-lived, but it's roughly $40 an ounce. With gold prices higher, royalty too adds about $8 an ounce to the current cost base.
Peter O'Connor
analystTurning to the remaining items, ground support and freight, how large a role do those play in the Australian cost base, and what has shifted there?
Ryan Gurner
executiveYeah. Look, Peter, they aren't. Like I said, I brought up reagents as well when it comes to processing — cyanide and caustic being examples. In terms of how those elements affect Q3, it's probably around $10 an ounce. So it isn't significant. Diesel has been — as Stu mentioned, diesel has been the bigger shift and the single stand-alone element there. So the other pieces together aren't huge, but they have added to the cost base.
Peter O'Connor
analystAnd Stu, about COVID — the signals we've been getting from the WA companies over the past week or 2 have been inconsistent when it comes to reporting the impact. From what you said, it sounds like things are getting better for yours. Is that how I should read your comment?
Stuart Tonkin
executiveWe're taking the exact same hit as everybody else, with Kalgoorlie mostly in the firing line and plenty of absences. And I suppose we do have contingency plans, and we've got solid stockpiles. We're putting immediate works first and working our way through that. So yes, we're softening those issues, and the controls we have in place are really robust given what we learned at Pogo over the past 2 years. So those challenges don't leave us untouched. It's just that it isn't the cause of the impact across the quarter. We've had some downtime on the mill at KCGM that Simon pointed out, and we're in a growth phase pretty much across the board. So yes, we're still seeing that labor pressure, the cost pressure, some COVID effects. But those aren't the causes — the fundamentals of our business are very, very strong, and we're still prioritizing our growth plans and delivering to them.
Peter O'Connor
analystAnd Stu, could you say something about how heated things are in the WA labor market? Is it becoming tighter and hotter?
Stuart Tonkin
executiveIt's interesting — we thought this would actually become easier, yet in our view the easing of border restrictions and the resulting outflow of capital from Western Australia has likely been making that problem worse. Right now we're sitting at the smallest share of vacant positions we've ever recorded, though we still have a lot of openings. So anyone keen to get on a rig beneath Kalgoorlie — there's plenty of work waiting.
Operator
operatorLevi Spry of UBS has the next question.
Levi Spry
analystLet me ask about the problems at the KCGM mill. Simon, I think you said the shutdown has mostly taken care of those issues. What still needs doing? Could you walk us through that, and then maybe connect it to the mill expansion studies, which I believe are due this quarter. What should we expect there?
Stuart Tonkin
executiveYes. Thanks, Levi. So, looking at KCGM, most of the problems were on the Fimiston side of the circuit, and that's where the bulk of the tonnes milled at KCGM comes from. We had some ball mill <<inaudible>> problems on one of the ball mills, and that held back that section of the circuit in terms of tonnes and throughput off and on through the quarter. Most of those problems, in terms of contamination getting into the system and so on, we'll all deal with recently in the Q4 shut. The only sort of item still outstanding is some downstream Trunnion bearing housings, and those will be swapped out early in FY '23. So we're pretty confident we've sorted that issue over the quarter. On KCGM and the mill expansion, look, it's moving along and certainly on track. We've looked at all the options from sort of 15 million tonnes through to 23 million tonnes. I suppose the high-level comments: any expansion we put in there, we do see as technically low risk. The geology is well understood. We have a large stockpile in reserves of over 120 million tonnes already mined sitting on the surface ready for processing. And right now we're completing all of the detailed front-end engineering designs just to really get a handle on the various capital costs and the timing for all of those options.
Stuart Tonkin
executiveI'm quite enthusiastic about the KCGM mill expansion. There are still a few more obstacles for us to clear, but the project is still on schedule for a market update at some point during this quarter.
Levi Spry
analystAny others? <<inaudible>>. That seems fairly significant...
Simon Jessop
executiveThanks, Levi — that covers everything for the quarter through June 30.
Levi Spry
analystOkay, that makes sense. And Ryan, about the lower development figure <<inaudible>> — I just want to make sure I've got it right: was all of that tied to Thunderbox? Is any part of it simply less material being hauled to the pit — in other words, how much reflects doing less while spending more, versus just getting to commercial production faster?
Ryan Gurner
executiveYeah. Look, there is a small amount over at Kalgoorlie, Levi — that's a good catch. I wasn't aware of it since it wasn't material. But yes, so it depends on where Simon is directing the traction and what they're doing — naturally that matters there. So there's likely less at KCGM, but the vast bulk has come from us speeding up production, or commercial production I suppose, at the underground and D zone at TBO. But all of it is ounces. It arrives with cash flow. So I guess it's really just an accounting change.
Levi Spry
analystRight, right. So there's no inflation component in that at all?
Ryan Gurner
executiveCould you repeat that?
Levi Spry
analystIs there nothing related to inflation included in that capital figure?
Ryan Gurner
executiveNo.
Simon Jessop
executiveLooking at it broadly, that capital stays in place.
Levi Spry
analystRight, got it. One last thing about Pogo. Regarding exit run rates tied to that 300,000-ounce production for FY '23 — could you speak to that for a moment, Stuart? You noted the second half was running at 240,000. What should we expect there during this quarter?
Stuart Tonkin
executiveYes, absolutely. And look, I’ll address the question you didn’t ask, which concerns the capital. What we’re doing is aiming to keep capital within the full-year guidance, and that comes from having locked in those long lead items, the fleet vacation, and the engineering execution TBO expansion. So those long lead items are fully in hand, secured and pinned down, and that’s the reason there’s no inflation in those capital figures — very low risk. As for why we’re devoting that much time to the front-end engineering and to the capital assumptions behind the Fimiston mill upgrade study, it’s because the environment differs from the one we secured a year ago when we committed to those capital projects. So we want to be very thorough in grasping what all the options are in that Fim study, and I want to use every bit of the time available to make sure our movements <<inaudible>> on that are well understood, because the technical risk is low, as Simon highlighted, but it really comes down to fixed hard money costs and the execution phase of building that. So we’re working hard to understand it. So on the Pogo. Look, very, very pleased with where we landed in the quarter 3 and month-to-date in April at Pogo, absolutely with the second half being at 240,000 and quarter 4 being much stronger than quarter 3.
Stuart Tonkin
executiveWe are therefore putting a lot of effort into investing beyond what is strictly required, completing the development work, and bringing the stopes into operation so that we can hit 1.3 million tonnes in FY '23, which in the end gets us to 300,000 ounces. If you take a look at the tables toward the back of the report on Page 16, Pogo is off to a solid start in terms of seeing the physicals filled in. Going back to the December quarter, we mined just 200,000 tonnes and milled 250,000, since we were feeding those low-grade development stockpiles into the mill. Then you can see development — sorry, ore produced or mined from underground rose 21% to 258,000. And clearly we are working to raise that to 325,000 tonnes in a quarter so the mill is filled. Milling, then, is steady. The grade is up, as you can see, because the low grade is no longer in it. Ounces, obviously, are consequently up 26% quarter-on-quarter. But in the end we have to raise the mining physicals by a further 25% out of the mine and feed that mill directly, and that in the end delivers the uplift over last quarter's ounces and gives you a 75,000 ounce run rate, which is that 300,000. So the signs and signals we are seeing there please us very much.
Stuart Tonkin
executiveWe're paying more to do this, since we're adding sprint capacity at the mine—both people and equipment—so we can catch up now that the activity is there. The important point is that when I visited in February, we had roughly 40 to 50 development headings ready for the jumbos. Our goal is more than 100 development headings, which simply opens things up and allows more meters to be developed there. So — and since the beginning of the year we've managed to get the expats moving away and not back home from Australia. So all those signs and signals indicate that Pogo's exit run rate will be strong. It also affects all-in sustaining costs, pushing them down. But when you compare all-in cost with all-in sustaining cost, we still have a very healthy cash U.S. dollar margin at Pogo, and we're not there yet. So we're pretty pleased with what we're seeing.
Operator
operatorDaniel Morgan of Barrenjoey has the next question.
Dan Morgan
analystPerhaps you could say a bit more about Pogo specifically. Could you bring us up to date on the number of mining fronts you currently have and what number you need to reach? Also, regarding the new equipment you're adding, is there a way to use all of it fully without causing congestion in the mine?
Stuart Tonkin
executiveIt does run counter to how people usually think—adding more gearing and more physicals when you've got congestion—so you're right about that, but we've structured it so that we do have that rig capacity. So again, as we've said, what we're aiming for is 100 working areas, 100 working headings, more than 10 per jumbo, and ideally we want to target more meters than the 1,500 meters a month, or else cut back the jumbos, bring down the cost and hold—keep that 1,500. So right now, I believe we're at roughly nearly 70 working fronts, somewhere between 70 and 80. And again, we simply need to approve designs. We have new resource and reserve statements coming out next week covering those newly defined reserves. You'll see once more the areas that can now be planned, designed, marked up, set up with power vent, et cetera, to supply those additional headings. So that's the technical side—the bottlenecks in that technical planning. And please also bear in mind that this year, the reduced drilling owing to COVID and getting those rigs staffed up has had an impact on that growth element. So getting the drilling and the information in front of us, the backbone of assays, all of those things represent a bottleneck for technical to get those plans and those headings opened up and designed.
Stuart Tonkin
executiveAnd yes, right now we have close to 80 headings, and you saw a March figure of 1,650 meters. With the jumbo crews, we’ve been reaching somewhere between 50 and 70 meters per day at present. So those are really strong signals. When the work is put in front of them, they can get it done. So what we need is to build that consistency into the plan, and after that begin optimizing and taking cost out.
Dan Morgan
analystAlso, during March we hit more than 1,600 meters — has that level held up in April? From what was said earlier, it sounds like it has.
Stuart Tonkin
executiveRight, so the main issue for us was that the borders opened in February, and we weren’t able to bring expats in to work. Some of them had been living over in the U.S. But when it comes to freedom of movement—getting those jumbo operators in, and getting the new equipment delivered and commissioned—those 2 extra jumbos came in at the start of quarter 3. So all of those people and the equipment are on site right now. And on certain days, I think they’ve definitely broken some records—70-odd meters in a day is a record, and they’re consistently hitting 50, which is what you need for the 1,500. So really it’s about removing the trough. So yes, we’re very pleased with what we’re seeing in April today, there’s still a lot left to run, and we’re setting ourselves up well for FY ’23.
Dan Morgan
analystNow turning to Yandal. At Thunderbox, you'll shortly have additional milling capacity once the expansion is complete. Could you lay out how confident you are that you'll have enough ore to feed that mill? What will the supply be? Which projects are involved, and what is productivity delivering on the mining side so the milling capacity gets filled?
Stuart Tonkin
executiveAbsolutely, and thank you, Daniel. So one major factor behind filling the mill is the steady ramp-up of the underground operation at Thunderbox, which of course involves work in the processing plant. Another significant contributor is D Zone, where we've now been mining for probably 18 months or more. We've gotten past the hardest part of the stripping there and are really at the point of producing substantial ore from D Zone. Those 2 are the primary ore sources. The remaining areas are <<inaudible>> across the road, and we're just beginning that particular project. And Raleigh in FY '23 — we'll commence the pre-strip at Raleigh, so we're working through the budget process for that. But yes, things look good regarding D Zone underground feed. We have plenty of stockpiles at Thunderbox serving as surge capacity, but it's those 2 main ore sources and then Raleigh, getting set up for Raleigh, which is the longer lead project.
Operator
operatorThe following question is from Kate McCutcheon at Citi.
Kate McCutcheon
analystRegarding KCGM, you mentioned that the rest of the new 793 units are scheduled to arrive during this quarter. Is there anything on the product side or any cost measures you could discuss that you anticipate as a result of a new fleet being part of that outlook?
Stuart Tonkin
executiveLook, we definitely are seeing those trucks move at a quicker rate. What makes it difficult right now is that our fleet is a mix of C Zone trucks, or C class trucks, and F class trucks. So the speed is likely 10% to 15% quicker. But what we truly view as a massive benefit is that having the new fleet means we need fewer fitters per hour in a labor market that's really tight. So instead of running fitter-intensive trucks from the current fleet that we're replacing, we're shifting to something much like what Northern Star Mining Services has with new equipment, which requires fewer fitter hours, costs less and delivers greater efficiencies. So really, FY '23 is when we'll have one consistent fleet in the open pit, and our shovel fleet also had a birthday. So we will see improved efficiencies really coming through in FY '23. But it's early days in terms of -- the truck data shows some very good improvement, particularly on the longer hauls.
Kate McCutcheon
analystRight, right. So turning to Pogo now — recoveries have come down from the levels you had in '21. Are you managing some kind of throughput trade-off there? Or which levers are you working to keep in balance? And going forward, how ought we to view the recovery?
Stuart Tonkin
executiveAbsolutely. That's a fair observation, since we're seeing the same thing, and we do anticipate — well, in the end, we anticipate an improved recovery. A significant amount of gold is reporting to the back. So it really comes down to consistency across the float plants. As long as we hold that steady consistency, we can manage that float tail far better. So right now, it's something we're watching. It isn't the top priority we're focused on. It's still the plant. Throughput as such doesn't come at the expense of recovery. It's entirely a matter of consistency through that plant. So right now, whenever there are surges in room of hand to mouth mine to mill at the moment, those peaks and troughs wreak havoc across the circuits when it comes to meeting and catching up on the recovery side. So we're very conscious of it. We see it as another chance to optimize. There are a few percent in there that we think we can recover. So yes, please don't treat those as the averages going forward. The end goal is 1.3 million tonnes at 8 grams at 85%, and on each of those we see opportunities to capture some additional benefit.
Kate McCutcheon
analystYes. All right, got it. And then one final thing — when is the updated group resource and reserve statement expected? Did you mention next week? Or point me toward that.
Stuart Tonkin
executiveYes. So we moved it to align with our March year-end, and next week we'll be putting out the updated resource and reserves.
Operator
operator<<operator_script>> The following question is from Trent Allen at CLSA.
Trent Allen
analystI want to ask about Carosue Dam. Right now it's a profitable mine, so it ran at all-in sustaining costs of AUD 80 and AUD 85 for the quarter. But when you look at an expanded Kalgoorlie, it's fairly small — around 200,000 ounces, with grades of about 1.2. You probably have stockpiles at KCGM at those grades. Would you think about trucking some other stockpile ore up the road, 100,000 to Carosue? That's my first question. And also, does it remain a core asset? Or is the time approaching when you pass it to a smaller operator who would give it more attention?
Stuart Tonkin
executiveRight. Thanks, Trent. So, you know, that forms part of the plan we have to reach 2 million ounces, and right now it accounts for roughly 15% of what we produce. If you look back at the year to date, the all-in sustaining cost figure from last quarter was an anomaly, driven by some of the disruptions that occurred, so from an all-in sustaining cost standpoint it will come back to the average, at 1,600. You're correct that the synergies at Kalgoorlie don't necessarily extend to all of the ore. We have a 4 million upgraded plant, which is now capable of achieving around 4 million tonnes per annum. We used to send the Kundana ore — the free-milling ore — as overflow out there, and that would give you some synergies. But obviously, we sold Kundana. As we see it, it's currently being filled from its own sources. There's a new underground being developed at porphyry next quarter. So it has multiple sources in the pipeline, plus really good exploration success that we're seeing up and down the belt, and you'll see that again in the resource/reserve outlook next week. So in that respect, it remains a meaningful, significant contribution to the team and to group production. It's generating good cash flow, which obviously is funding the growth at KCGM, Yandal and Pogo.
Stuart Tonkin
executiveSo absolutely, it's definitely playing a part, and right now it's a meaningful asset.
Operator
operatorDaniel Morgan of Barrenjoey has the next question.
Dan Morgan
analystOne more question to follow up on that. If I caught what you said right, you mentioned Pogo and the figures over the longer term, the recovery for milling grade — did I get this right, an 85% recovery in — that strikes me as somewhat below a number of the recoveries you've seen historically.
Stuart Tonkin
executiveLook, calling it 85% was us being cautious. I actually anticipate a higher figure, since there's genuinely a lot of gold sitting at the back. So with a float circuit, and given the float tail you get, we face a constraint: cyanide-contacted material has to be filled with paste and backfilled underground. And clearly, the whole float tail is routed to the dry stack — it gets filled abreast, trucked up, and placed in the dry stack tailings down in the valley. So that differs from a scenario where you'd intensively <<inaudible>> leach or ultrafine grind and take a finer cut of it, the way we do at Fimiston. So reaching the 90s isn't necessarily achievable, though with some plant improvements we can definitely get into the high 80s. But right now, the focus is on building — the largest gain and win at present is a 25% increase in our underground mining physicals, getting those physicals stable through the plant, and then working on optimizing through the plant.
Dan Morgan
analystRegarding the recovery figure you mentioned, that comes purely from optimizing the plant—so it isn't a forecast about the grade from here on.
Stuart Tonkin
executiveSee, if you land on a better head grade, then with a tail that stays fixed, you're able to achieve bigger percentages. But if you look back, during the 13 years Northern Star had ownership, the head grade stood at 13 grams, so recoveries holding near 88%, 89% came mainly from that head grade while the tail was fixed. So when the head grade is 8 grams and the tail is similarly fixed, certain percentages become hard to pull out.
Operator
operatorMitch Ryan of Jefferies has the next question.
Mitch Ryan
analystI just wanted to make a quick comment about the Thunderbox mill expansion. You've said that it's on track for the first half of '23. I was just wondering if you could share any additional detail on that, and whether you're seeing any effects from tightness in labor and the supply chain.
Stuart Tonkin
executiveHonestly, Mitch, we're extremely pleased with the way things are going. This marks GRES's fourth project alongside Northern Star, and we're collaborating with those folks very closely indeed — they keep assigning the right amount of labor to it and, at present, they're managing it both on schedule and within budget. So, as for the previous quarter, we were still awaiting delivery into Australia of certain mill parts and motors, among other items. All the major components have now arrived here in Australia. So at this point it's moving forward toward completing the construction. To be sure, the civils — 5,000 cubes of concrete that we poured — are entirely finished and form part of the project, which had been a genuine bottleneck when it comes to commissioning new projects. Every bit of that civil work and concrete is now done. So we're feeling quite good about where all of that stands. It's now a matter of execution through to the wet commissioning stage.
Operator
operatorMatt Greene of Credit Suisse has the last question.
Matt Greene
analystTwo things from me. First, on Pogo. Regarding the remarks about productivity picking up, the cost profile going forward, and the temporarily elevated cost structure — I just want to confirm, Stu: is that entirely about adding jumbos and simply reaching the 100 working headings? Or should we be aware of any other costs coming from the businesses?
Stuart Tonkin
executiveSee, that's where most of the elevated costs are sitting right now. I've got 10 jumbos sitting there and only need 5, and the reason we're doing that is not just to train up additional U.S. operators so we have the ground support and those pieces in place, but also to saturate it. While we're able to bring labor in, we try to have that sprint capacity available to catch up, because we get disrupted and have been disrupted over the last year. So instead of simply having a ceiling cap on people and equipment, we've got more than that. So if we do have a burst for a week — and when we achieve that, you see 1,650 meters delivered in March. So look, that's the thing there. There are other things at the moment when it comes to trying to get more rooms and can and elevate cost, just in controls around splitting down crew sizes to mitigate the knock-on effect of COVID. So there's absolutely USD 1 million plus a month across all of those actions which, in time, we see stabilizing that pullout. So we really see a focus on growing physical first, then optimizing once we've demonstrated we can achieve those physicals.
Matt Greene
analystThat's useful. And then, apologies, just regarding the KCGM mill expansion, I understand you're still finalizing your numbers at this point. But do you have any sense of the timing specifically on some of those lead items? And how long that might take, in a relative sense, I suppose, compared with a more normalized timeline?
Stuart Tonkin
executiveThe whole project might take 2 to 3 years to build. So from a cash flow standpoint, and from the standpoint of service from current operations, that's fine. It's about making sure it doesn't disrupt the stay-in business activity that's already happening there. It's about understanding where you house and accommodate the construction teams and where you build them, and understanding what those long lead items are. So there's no major difference from what we're seeing with all the large mills or motors or the various gear that goes into it. Nothing there is artificially changing the time line. It's just -- it's a significant project to add 10 million tonnes per annum to an existing 30 million tonne per annum plant. So we're just going through and really making sure that the assumptions that are based in that and the business case around that and the returns for investors are sound before we kind of move much further forward. So that's the work that's underway. We'll share that with the market once we've got that there. Simon said it's technically simple, and it's a very compelling opportunity that's organic but pretty -- not many companies would have 120 million tonne stockpile of derisk mined or 3 million ounces sitting on stockpile adjacent to an existing operation township.
Stuart Tonkin
executiveWe're genuinely examining what options we have for unlocking that value.
Operator
operatorThat brings the Q&A portion to an end. I'll now return the floor to Mr. Tonkin, who will offer closing remarks.
Stuart Tonkin
executiveAlright. Thank you very much, and I appreciate everyone being with us on today's call. As you've already heard, we are producing quite robust cash flows, and those are supporting the strength of our balance sheet, our organic growth initiatives, our ongoing exploration work, and our higher dividend payments. I'm looking forward to sharing our resource and reserves report next week, and to continuing to update you on the important milestones that will take our growth to 2 million ounces per annum and bring down our costs in order to keep delivering solid financial returns for shareholders. Thanks, and enjoy the rest of your day.
Operator
operatorThat brings today's conference to a close. Thanks for joining us. You're welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Northern Star Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Northern Star Resources Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northern Star Resources Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.