Thanks for holding, everyone, and welcome to the Northern Star Resources September 2022 Quarterly Results. Everyone joining is in listen-only mode for now. After a presentation, we'll move into a question-and-answer session. <<operator_script>> At this point I'll turn the conference over to Mr. Stuart Tonkin, Managing Director. Go ahead, please.

Stuart Tonkin

executive
#2

Good morning, and thank you for being with us today. Joining me are Chief Operating Officer Simon Jessop and Chief Financial Officer Ryan Gurner. First, I want to acknowledge the two fatalities that occurred recently in the Western Australian gold industry, and to express my heartfelt condolences to the families, friends, and colleagues of those workers. Our industry collaborates closely to strengthen safety and well-being for employees across the sector. We remain dedicated to continuing the sharing of best practices so that harm can be eliminated from our industry. I also want to acknowledge the sudden passing of Peter Bradford, Chief of IGO. Throughout his career, Peter was an outstanding leader in innovation, cultural change, and the promotion of diversity within the resources sector. Making a difference was his purpose, and his positive legacy will be remembered for decades ahead. Turning now to our quarter one results. September quarterly production came in at 369,000 ounces, with an all-in sustaining cost of A$788 per ounce, which was slightly below plan, and some of the delayed production is expected to be recovered in future quarters. We made significant progress on our growth projects during the quarter, and we maintain full year guidance, with widening in the second half. Our safety performance is sector leading, with an LTIFR of 0.7, but numerous incidents are occurring, which has led to an increased focus on training, competency, and safety leadership.

Stuart Tonkin

executive
#3

The industry is facing a real challenge here, with recovery hampered by a state skills shortage and elevated staff turnover. So I'll turn to the Australian operation in a moment. At Pogo, though, we are achieving a mill throughput rate of 1.3 million tonnes per annum, with a major shutdown finished in quarter one, and development ore grades are part of why produced ounces came in lower there. The quarter closed with 13,000 ounces of gold in circuit, and we will bring that down over the next quarter. Following the Gold Forum America's Conference last month, we hosted an investor and analyst visit to Pogo, and it was a pleasure to showcase the substantial improvements achieved at Pogo, which form the foundations for the growth ahead. We are also very enthusiastic about the exploration upside both within the mine and regionally, which continues to be explored and extended. Ryan will cover the financials. One highlight in the quarter, though, was the announced A$300 million share buyback, 15% of which we have completed during the quarter. So, with our first quarter done, I am extremely pleased with how our growth projects have progressed, the simplification of our operations and the outlook for the opportunities ahead.

Stuart Tonkin

executive
#4

I'll hand things over to Simon now. Appreciate it.

Simon Jessop

executive
#5

Thanks, Stu. At the Kalgoorlie production center — that includes KCGM, Carosue Dam, Kanowna Belle and South Kalgoorlie — we sold 215,000 ounces of gold, with Australian all-in sustaining costs of A$1,762 per ounce. That's slightly above gold sales in the June quarter and 2% lower on costs. This production generated miner operating cash flow of A$170 million, and we also invested A$91 million in significant growth capital projects. Within that major growth capital project, A$60 million alone went to KCGM open pit mine development. At the KCGM open pit, material movement rose 29% versus the June quarter, reaching 20.4 million tonnes. Tracking hours were also up 21%, as our training and recruitment plans keep succeeding. The rate at the mine was low — it came down because of planned growth control drilling and limited access into Golden Pike South. The pleasing out compete physicals show we're on track to deliver — and in fact are now delivering — into our strategic goal of 80 million tonnes to 100 million tonnes of annualized movement. Progress in the Oroya period <<inaudible>> continued as planned. When we commence mining through the historic 2019 failed zone during quarter two. This key growth area remains on track for reestablishing FY 2024 access back into Golden Pike North low cost ounces.

Simon Jessop

executive
#6

In the Kalgoorlie region, underground mining held steady versus the June quarter at 1.52 million tonnes, though it came at a higher grade, yielding 119,000 ounces. Physicals at KCGM's Mt Charlotte operation were flat, while Carosue Dam posted gains in underground ore tonnes and grades as starting volumes came in better. At Kanowna Belle and South Kalgoorlie, Kalgoorlie operations delivered reduced volumes at 5 grades, since the focus at the South Kalgoorlie operation was grade quality rather than volume. Processing volumes across the Kalgoorlie region totaled 4.7 million tonnes, a 3% decline from the June quarter, reflecting a planned major shutdown at KCGM and the placement of the South Kalgoorlie mill into care and maintenance. Maintenance work tied to the KCGM shutdown wrapped up successfully early in the quarter. Looking ahead, all ore mined at South Kalgoorlie will be processed at Kanowna Belle on a campaign basis. Staff from the South Kalgoorlie mill, along with some mine personnel, have been redeployed into KCGM and Kanowna Belle. Those moves were finished during the quarter, with a new operating model now successfully embedded. At our Yandal production center, which includes Jundee, Thunderbox and Bronzewing, we sold 102,000 ounces of gold at Australian all-in sustaining costs of A$1,584 an ounce — 18% lower on gold than the June quarter and 12% higher on cost.

Simon Jessop

executive
#7

This production generated A$81 million in mine operating cash flow, and we invested A$67 million in growth capital projects — a decrease of A$27 million quarter-on-quarter as we get closer to completing the Thunderbox mill expansion. The mill expansion itself accounted for A$11.4 million of major growth capital spending during the quarter. At Jundee, the operation kept up a strong development performance of 6.2 kilometers, with an average mine ore grade of 4.3 grams per tonne. The remaining underground mine, currently run by Northern Star's Mining Services Division, set a new quarterly development record for the operation at 1,609 meters with one chamber, and all stoping commenced by quarter's end. Total jumbo development also set a new Jundee record of 8.1 kilometers for the quarter and will remain a key enabler both for drill platforms and for expanding stoping areas. Processing throughput rose 28% back up to 747,000 tonnes and nameplate, as less open pit Julius supply material fit into the blend. The Thunderbox underground operation continues to expand the stoping mining front, with 450,000 tonnes of ore mined, up 2% on the June quarter. Ore tonnes mined from both underground and the open pits totaled 1.32 million tonnes, which was 100% above the actual quarter mill tonnes of 670,000 tonnes.

Simon Jessop

executive
#8

Our mine ounces came in at 54,000 as well, holding flat from the prior quarter, against recovered gold of 27,000 ounces. We built up ore tonnes on the stockpiles along with ounces as we get ready for the expanded mill project. At the Thunderbox mill expansion, the major toggling was finished and milling got underway on the new SAG mill and the existing Ball mill right at the close of the quarter. Despite plenty of hurdles across the past 18 months, the project has stayed in line with expectations, and it will ramp up systematically through quarter two. It's encouraging to see some early commissioning data deliver nameplate metrics across every area. We expect to hit the 9.6 million tonnes per annum run rate in the second half of FY 2023. This project stays a key focus for us until we deliver consistent throughput, with the added gold volumes going to the Yandal region and a reduction in overall processing costs. I'll now hand things over to Ryan, our Chief Financial Officer, to talk through the financials.

Ryan Gurner

executive
#9

Thanks, Simon, and good morning everyone. Today's quarterly results show that Northern Star continues to hold a solid financial position. Our balance sheet is still strong, as table three on page seven illustrates. Cash and bullion stood at A$473 million as of 30 September, and we remain in a net cash position of A$173 million after paying A$155 million in stamp duty and A$132 million in dividends, with A$300 million drawn in bank debt from our corporate facilities. Happily, our assets produced positive free cash, and capital expenditure was fully funded. Figure six on page eight lays out the company's cash movements for the quarter, with the main elements including A$301 million of operational cash flow recorded by the company. For the quarters ahead, this is expected to rise as TBI mill commissioning is completed in Q2 and Pogo delivers a stronger margin contribution over the rest of the year. Quarterly investment in sustaining capital, growth capital and exploration is tracking to plan, and with regard to the plan expansion at Thunderbox as of 30 September, roughly A$30 million is still owed on the project, to be paid out over the months ahead. As for stamp duty on the merger, as previously indicated, A$155 million was paid during the quarter.

Ryan Gurner

executive
#10

As we shared alongside the FY 2022 financials, the company kicked off an on-market share buyback. Over the quarter, 6.1 million units were repurchased, amounting to A$45 million across the 11 trading days available. Our plan is to resume the buyback program once the company's blackout period ends at market close today. Also during the quarter, the company paid its final FY 2022 dividend of A$0.115 per share, which came to A$132 million net of our dividend reinvestment program. Turning to other financial matters, depreciation and amortization came in as expected, sitting at the top of the guidance range at roughly A$700 per ounce sold, while non-cash inventory charges to the Group for the quarter were A$56 million. As noted before, most of these non-cash inventory charges stem from milling acquired stockpiles at KCGM. On costs, we keep applying sharp focus and pushing cost saving initiatives by leveraging our supply chain and supplier relationships to source the lowest cost items and secure the best terms, and the company is not seeing shortages or material disruptions in its supply chain. Finally, regarding hedging, table four on page eight lays out the company's committed hedge position as at 30 September, with the overall book standing at 1.3 million ounces at an average price of A$2,600 per ounce.

Ryan Gurner

executive
#11

In the quarter, the company added one more year to its hedging policy, so commitments may now be placed as far out as four years, where before it was three years. Under the further policy, the minimum hedge commitment for that fourth year is nil, while the maximum stands at 20% of annual production. Related to this, during the quarter the company placed 200,000 ounces in FY 2026 at an average price of A$2,815 per ounce. I’ll now hand back to actually for the Q&A session. Thank you.

Operator

operator
#12

Thank you. <<operator_script>> Our first question is from Al Harvey at JPMorgan. Go ahead, please.

Alistair Harvey

analyst
#13

Morning, everyone. To pick up on the hedging point, I’d simply like to understand what mainly accounts for pushing that out to 4 years. Is there some specific project that worries you, and do you figure that after we move past that growth phase, you’d probably bring it back down to a 3-year horizon?

Stuart Tonkin

executive
#14

Sure. Honestly, it looks pretty good in year four, I have to say — zero to 20% of production. And what we found was that we could place some hedges at A$2,950 and A$2,900. We clearly added A$200 at that 28 — a bit above A$2,800. So that reflects what we see on CapEx coming in the next couple of years, but we're also going to make a call regarding the mill expansion the following year, and taking that into account leads us to that kind of time horizon we're considering. So, yes, some of the highest-cost mines, obviously, such as Kanowna Belle and South Kalgoorlie, we're mindful of — we can't necessarily hedge the costs, we're really just giving ourselves a bit of — a kind of error margin in each profile, so there are no light shocks across the business, and we can keep going and finish our current growth plans.

Alistair Harvey

analyst
#15

Alright, thanks. And regarding the Super Pit expansion, could you remind us when that's scheduled to begin and whether there are any new updates on how we ought to be thinking about it?

Stuart Tonkin

executive
#16

Yeah. Internally, for the next quarter, we're still wrapping up some finalization and really just examining the scope and the risk side of things. So getting, let's say, numbers at that feasibility level, for the case expanded to 24 million tonnes — this is a 70% renovation, I suppose. That's the scenario we're really zeroing in on. We'll provide an update in the second half with findings on that, but no investment decision date has been committed to at this point. We want to see the Thunderbox mill running at full tilt, we want to see Pogo's production delivered at that rate, a simplified portfolio before we commit to that.

Alistair Harvey

analyst
#17

Thanks. And Stu, just one final question regarding Carosue Dam underground — could you help us understand how ore splits between open pit and underground, and what effect that might have on the grade profile, say, across the coming year or two?

Stuart Tonkin

executive
#18

Yeah. I think the — the profile stays fairly steady as we move ahead. So when one mine begins to wind down, we get started on a different underground operation. So in quarter two, the quarter we're in now, we expect to have all three underground operations underway. So going forward, you'll see steady volumes from the Carosue Dam underground operations.

Alistair Harvey

analyst
#19

Much appreciated. And once more, thank you.

Operator

operator
#20

Daniel Morgan from Barrenjoey has the next question — go right ahead.

Dan Morgan

analyst
#21

Hello there. Oh, apologies — I'm just unmuting myself. To start with, perhaps a broader conceptual question for the Group as a whole: which parts of your business are currently outperforming your plan or expectations, and which parts might be lagging somewhat? Thank you.

Stuart Tonkin

executive
#22

Thanks, Dan. I wouldn't claim we're dramatically ahead of where we expected to be. Things are proceeding as planned. We always anticipated a back-half-weighted year, and the growth initiatives, I suppose, will pick up pace over the course of this quarter. So, as Simon pointed out, on volumes we've moved 20 million tonnes at KCGM, at least — that's the 80 million per annum run rate. So we're quite happy with the volume at this point. We're also very happy with how the four remediation items are progressing — a large, fast class was done and that first step down on top of that stop was rectified. So that, I'd say, was genuinely ahead of plan, though it remains on plan. Then there's the Thunderbox mill expansion — it's operational now, and it's really achieving improved down consistency, along with range testing to ensure we've properly bedded things in and can sustain consistent output through the second half of the year. So it's good to see that hasn't slipped. At this point it's really about keeping that volume steady at the 6-plus million tonnes per annum level, which we've shown we're achieving. It's just a matter of the feed on that. At Pogo, we're holding the 1500 meters a month, which is excellent given all the additional jumbo capacity out there, but we still want to bring down total costs at that site.

Stuart Tonkin

executive
#23

That's where our attention is. We're simply somewhat wary of bringing that forward too soon and then slipping back again. As a result, you'll see grades shaped by development, with additional development still pending ahead of them in the schedule — roughly 4.3 grams grade. Much of the material that has been put through to produce a 6 gram quarter is development ore all being included. So we'd still likely acknowledge that we're somewhat behind where we'd like to stand with Pogo, yet we have confidence that the system quality, the ore body, the reconciliations, and the stoping grades we're observing mean the second-half waiting comes in at the exit rate needed to advance into a 300,000 ounce plan is there. So, things are generally up and down; I wouldn't claim we're ahead of plan on anything, but we're pleased with the progress we're seeing so far and fewer things moving at the moment.

Dan Morgan

analyst
#24

All right, thanks so much.

Operator

operator
#25

Levi Spry from UBS has the next question — go right ahead.

Levi Spry

analyst
#26

Morning, and thanks for making the time, Stuart and the team. There's clearly a lot of attention on cash margins, I suppose. So, Ryan, I think you've sort of covered this already, but perhaps you could walk us through that waterfall once more and tell us what to expect over the remainder of FY 2023 when it comes to operating cash flow margins expanding, maybe with CapEx tapering off somewhat, and what else might fill the gap left by the stamp duty payment you had in that quarter — anything we should be aware of across the next three quarters? I have another question after that.

Ryan Gurner

executive
#27

Yeah. Thanks, Levi. Yeah. So if you — I suppose looking forward, and taking this quarter again as an example, yeah, we'll be getting more material from Golden Pike. So low cost ounces, a low strip ratio, and higher grade, so that helps, and there'll be — this next quarter. Obviously, we had the shutdown at KCGM and Pogo. So, we've also had, as Stu mentioned, some hold up in gold at the Pogo circuit. So that will come through. TBI is ramping up and I remind, there — at Jundee, Simon sort of alluded to as well, we'll start. So there are a few things there that, when you talk about margin, and I guess, contributions, that's what we expect to see over the coming sort of quarters. In terms of sort of bigger hips are outstanding, so outstanding is all paid. So that's done. Now, that's an interim assessment. So we're still on our balance sheet and other sort of A$70 million potentially that could be paid, but we're unsure about when that'll be, because the opposite of that revenues got to assess that that could be in years time. So we're sort of holding that. Other than that, cash, which is asked a lot about, we don't expect there to be large balancing payments in the second half of this financial year, we will likely go back to some tax installments, they're not going to be large.

Ryan Gurner

executive
#28

That's — well, that will likely fall more around April through June of this fiscal year, and apart from that, there aren't any major vessels, so to speak, affecting cash flow.

Stuart Tonkin

executive
#29

One more thing I’d mention, Levi, regarding realized gold prices at just below A$2,500 during that quarter, since we’re bringing in some of those cheaper hedges. You can see the hedge profile on page eight. It begins to average upward, and we make sure to use the lowest hedges first, then average it up. So part of the cash flow here isn’t realizing that spot price this quarter — we’ll draw on our lowest — lower hedges, which probably affects that A$20 million, A$25 million quarter.

Levi Spry

analyst
#30

Yes, thank you, everyone. Those were solid responses. I appreciate it.

Stuart Tonkin

executive
#31

Appreciate it.

Operator

operator
#32

The following question is from Kate McCutcheon at Citi. You have the floor.

Kate McCutcheon

analyst
#33

Morning, Stu and Simon. Could you walk me through Jundee a bit? So you've wrapped up the Julius pit — is that right? As far as guidance for this year goes, what does the feed look like across the underground and open pit mining areas? Thanks.

Simon Jessop

executive
#34

Yeah, thanks — this is Simon. Yes, we wrapped up the Julius open pit during the last quarter. Even so, we'll continue to have stockpiles of that material for the coming couple of years. And in parallel, in the second half of FY 2022, we kicked off the Ramone underground. So stoping has just begun at Ramone, which was formerly an open pit, mined a few years back, and is now well developed, and we're moving into the stoping phase there. So, looking ahead, the main Jundee mines stay consistent, and then we have Julius stockpiles for the next couple of years, and after that it's really just Ramone stoping from then on.

Stuart Tonkin

executive
#35

Also, roughly 180,000 ounces sit in stockpiles at Yandal, and those demonstrate that feed materials are able to be blended through.

Simon Jessop

executive
#36

Sure.

Kate McCutcheon

analyst
#37

Alright, then — moving ahead, we're looking at Jundee underground as well as stockpiles.

Simon Jessop

executive
#38

That's right. Yeah.

Stuart Tonkin

executive
#39

We’ll be feeding from the mine, the Jundee Complex, and Ramone, and then simply replenishing stockpiles over the coming few years, so the production profile stays fairly steady.

Simon Jessop

executive
#40

The approach is consistently scientific: one-third of the pit involves underground feed of 2 million tonnes, with an additional million drawn from stockpiles, open pits, and regional satellite pits.

Kate McCutcheon

analyst
#41

All right, that context is useful. Thanks.

Operator

operator
#42

Matt Greene from Credit Suisse has the next question. Go ahead, please.

Matt Greene

analyst
#43

Hello there. Good morning, everyone. I trust all of you are doing fine. I have a few questions regarding KCGM. Regarding your remarks on the faster movement of weights, it seems some catching up is involved. So how ought we to view that overall material movement between 80 million tonnes and 100 million tonnes? For the rest of the year, where do you anticipate the operation will sit?

Ryan Gurner

executive
#44

Yeah. Thanks, Matt. It's really right on plan. So this year we're aiming for 80 million tonnes to 85 million tonnes of movement from KCGM. Last year, we achieved 66 million tonnes. So we've been building up, we did the fleet replacement over the last 12 months and we really completed that in quarter four. So quarter one is the first genuine quarter where we've had the full new fleet as one integrated large plate really beginning to move a lot of material. So we're really, really pleased with the large teacup of 21% more material movement at the KCGM and it's right on in line with our plan. So that's what we're targeting this year, 80 million to 85 million. If we look at quarter one, it's an 82 million tonne run rate and we'll keep seeing more optimization and more benefits from the new fleet going forward. So we're very, very pleased with KCMG open pit material movements.

Matt Greene

analyst
#45

Right, thanks for clearing that up, Ryan. So, just regarding those new trucks — I mean, you folks have previously highlighted the productivity gains you anticipate, haven't you? How does that kind of come through across a year — obviously, I mean, we've already seen a portion of it. But are we actually seeing the complete benefit of the remaining number of quarters yet, and when would you expect that to come through fully?

Stuart Tonkin

executive
#46

Right, no. We've observed a 5% decrease in diesel use and roughly 15% better speed when heading up the rank. So basically, once we get back into Golden Pike South at the pit's bottom, that's the longest haul of all. That is really where the benefits of the new fleet begin to show up against trucks that are 20 years old, overheating and carrying high maintenance costs. So, yes, we're quite excited about the optimization of that new fleet as we move forward.

Matt Greene

analyst
#47

That's great. And staying on cost, Ryan, you brought that up again earlier this quarter. You expect to be mining from that for the rest of the year, and then just on diesel prices, what are you seeing with the new flag, because previously it was A$70 an ounce — are you still seeing costs roughly at that level?

Ryan Gurner

executive
#48

Yeah. Regarding Golden Pike South, it's intermittent — last quarter we extracted a modest quantity of ore there, and then we ran a substantial growth control program at the pit base, which really delayed us before we got back to mining in Golden Pike South. So it fluctuates based on the cycle down in Golden Pike South; mining there isn't continuous. As for the other piece, around diesel and cost — we incorporated the quarter four cost into our budget. So compared with what we assumed for costs in the FY 2023 budget, the diesel price we've seen has probably been fairly consistent.

Matt Greene

analyst
#49

Appreciate that, Ryan — that’s really useful.

Operator

operator
#50

Peter O'Connor from Shaw and Partners has the next question. Go right ahead.

Peter O'Connor

analyst
#51

I've got three questions. First, on hedging: given how the forward curve sits compared with spot, and what you said about putting a fourth year of hedging into your book, what kinds of discussions has the Board had about altering or raising the hedging profile so it's more robust in light of that backdrop and opportunity?

Stuart Tonkin

executive
#52

Honestly, that came down purely to adding the fourth year, and it could amount to nothing at all. The floor was zero percent, while the ceiling sits at 20% of the forward production outlook. Given a mine life supported by a 10-year reserve — 20 years or more once resource conversion is factored in — we're taking the long view, and we're building <<inaudible>> around the Thunderbox mill expansion. Construction will take a couple of years. We want to be certain the payback lands once we've kicked that off. <<inaudible>> That's simply a picture of what we'll be drawing on, roughly.

Peter O'Connor

analyst
#53

Therefore, the curve’s shape in those early years stays the same, and what accounts for that gap versus the full mine curve for the product?

Stuart Tonkin

executive
#54

Right, so when we look at consumption each quarter, you're taking out roughly 100 ounces in that period. Then you're putting that back — you replace it and it comes out again three or four years later. So the profile stays consistent, and obviously we have a band we operate within. Pricing matters a lot here too. We've watched that contango on the forward curve rise by about A$100 per year, so this isn't simply about kicking off the SAG in the first four months and stripping out A$2,800 or A$2,900 by layering in hedges in year three. When our all-in sustaining cost forecasts come down, that's a fairly positive mine expansion perspective on part of the payback for the — what we're doing around the valuations behind these investment decisions, and that's genuinely giving us more confidence from those costs.

Peter O'Connor

analyst
#55

Could that be because of the repurchase program and how it's paced — to a casual observer it would look like your buyback is slow — so could you lay out the strategy for buying, what percentage could go, or what measures you use when repurchasing stock, and what should we expect going forward; is the last quarter a reflection of that process?

Stuart Tonkin

executive
#56

Right. So that gets handed to a third party to handle within that space. But I think what wasn’t clear to people from the announcement is that we had to provide 14 clear days to advise the market of it. So after we have those full year results, we’ll unfortunately be in blackout for 14 days. That meant we couldn’t be buying. So really we only got 11 days of buying done in the quarter. And in that we achieved A$45 million of buybacks across 11 days, and we set somewhere between 8% and 12% of the daily volume. So we can’t move. There are fairly rough rules — percentage daily rules — and we’ve given instructions to the third party who’s buying. So it has to be open and transparent so shareholders understand that, and that’s 11 days of buying A$45 million, and we’ll turn it back on, as I call it, tomorrow, 24 hours after this announcement today.

Peter O'Connor

analyst
#57

Regarding that, would a subscription rate of 8% to 12% serve as a reasonable guide for the purchasing pattern ahead?

Stuart Tonkin

executive
#58

On a typical day, 20% — yeah, 10% is pretty reasonable. But yeah, we can dial that up or down; it's really the paywall not shifting, not changing in any meaningful way, or functioning without that paywall, that drives it.

Peter O'Connor

analyst
#59

Therefore, in the event that your goal is to reach zero guidelines, you would make a purchase each day.

Ryan Gurner

executive
#60

No. Third pay, correct. So there's a cap on what we're able to purchase depending on — we can't purchase when the five-day prior exceeds 5%. So, yes, we are constrained. There's a rule, as Stu mentioned. So we've been in the market somewhere between to 10% or 8%, I guess, percent — to be exact, 8% to 12%. So it's just a — it's purely mechanical. So we plan to begin tomorrow and resume it.

Peter O'Connor

analyst
#61

Got it. And that option exists as well, but since I’m telling you that we purchase daily, what you’d be doing is acquiring a set of days in a random pattern.

Stuart Tonkin

executive
#62

No. Since we must operate within those constraints, whenever it becomes possible for us to purchase, we will purchase—but restrictions already apply to us. Moreover, a key premise underlying all of these buybacks is that the company ought not to be able to sway—materially sway—the share price. What this involves is using our own cash, which is shareholders' money, to repurchase our own shares and secure that return, since we regard ourselves as trading at a discount relative to their corporate models. So the point isn't to try to compete with everyone else out there who is buying and selling; the point is a sensible approach to returning capital—shareholders' capital—before purchasing and cancelling those shares at a discount.

Peter O'Connor

analyst
#63

All right, that confirmation is clear to me. And finally, the skills problem and the WA problem? Over roughly the last week or so, other companies have made acquisitions. How does that unfold? Right now you can plainly fill positions for more money. But the skills aren’t necessarily in place. Raising skill levels is simply a process spanning multiple periods, and does that mean industry productivity will be held back over an extended stretch?

Stuart Tonkin

executive
#64

Sure, it takes years before people reach a level of competency. But for them to work at full efficiency and full speed — and for many of our key frontliners, reaching that frontline average takes decades. So what we have going for us is the Internal Mining Services division, where we've maintained a very stable team that performs at very high quality and high safety. But those difficulties affect the whole sector, where a skill shortage existed and there has been dilution across the sector in that respect for everyone. So we have to put in more effort, energy, focus, training, and supervision, and sometimes things simply halt, because you're not willing to move ahead in that respect — so that's when you're dealing with COVID impacts, which are minimal now, you're essentially triaging your daily activity. You're not simply telling people to do more with less, recycle, or cut corners. So I think those are the things people need patience with; raising overall competency will take a number of years. I think, Dan — Dan's question from the beginning asking, are we ahead on the plan?

Stuart Tonkin

executive
#65

No, we are unplanned, and a few items are running behind. But we have deliberately decided, don't do it and <<inaudible>>, let's say, if something is lagging, it has been more or less an intentional shifting of resources so that we do fewer things well, in recognition of what we will get.

Peter O'Connor

analyst
#66

Does that mean the process of normalizing toward lower costs, or toward a single normal cost, is slower as a result of that?

Stuart Tonkin

executive
#67

It absolutely shows up in written form—you'll notice that in terms of expensing spend, we can't secure rigs, we can't bring in outside contractors. So overall spend will indeed come down. But that isn't automatically a positive, since activity isn't getting completed. So you will see that. But we're back to roughly 15,000 ounces this quarter for us, and our costs have returned within the reported guidance. Much of that returns to the plan in upcoming quarters, so it doesn't get pushed back out of line. So it's not significantly off track, and we have the flexibility, and it's quarter one. So I'd say this is about fully adapting, changing, and modifying as we go. But right now, we're still committed to what we set out to achieve. I think the standout items include things like the volumes at KCGM. Just one quarter ago, we still hadn't commissioned the new trucks. We were still losing 20, 40 truck drivers to the iron ore players in a quarter, and still hadn't reduced vacancy across our workforce. In a quick three months, we've actually hit the volumes, caught up on the trucks, and are meeting those metrics.

Stuart Tonkin

executive
#68

So yeah, with attention, it can shift back fairly quickly.

Peter O'Connor

analyst
#69

Thank you. Many thanks, Stu.

Stuart Tonkin

executive
#70

Thanks, Peter.

Operator

operator
#71

Al Harvey from JPMorgan has our next question. The line is yours.

Alistair Harvey

analyst
#72

Yeah. Following up, guys. Just on Kal Ops, I suppose — it seems like we're seeing some efficiency gains come through quarter-on-quarter? Is that simply a result of turning off the Jubilee meal, or is it those efficiency benefits from moving personnel around? And I guess, are today's figures of roughly 40,000 ounces at A$2,100 an ounce kind of the run rate going forward, or do you think you can push that further, particularly on the cost side?

Simon Jessop

executive
#73

Yeah. Thanks, Al. Simon. And yeah, look, it's good to see some costs — cost reduction at Kal Ops. We probably see that improving somewhat going forward. We've made the changes, turned off a very high-cost mill at HKO <<inaudible>>, and even when tracking costs we're ahead of or trading that ore over at Kanowna Belle. Plus, it's using — rather, it's being shorter, two process plants on people and personnel. We've now filled a lot of vacancies across the board. And the reason we decided to do that was a 30,000 ounce reduction to the Kalgoorlie Ops region, but at the end of the year we'll be A$20 million better off in cash flow. So that's the processing side. Obviously in quarter one, we were still running for sort of half the quarter the South Kalgoorlie process plant, and then we turned it off, and there are some care and maintenance costs at the back of the quarter. So we've pretty well executed that now. So going forward it will be just proved Kanowna Belle. The other side of the coin is on the mining side, so really focused on quality and grade at South Kalgoorlie and pulled a jumbo and associated equipment and manning out of that operation and redeployed to Mt Charlotte where we see huge underground growth going forward, as well as some pretty interesting areas around Kanowna Belle higher up in the mine.

Simon Jessop

executive
#74

So I'd say looking ahead, that figure is a fair representation of our ounce output from last quarter, though we ought to see costs come down going forward out of Kalgoorlie Ops — and it's a solid step forward on the decision we took in July regarding the mill and the mine.

Alistair Harvey

analyst
#75

Thanks, Simon. I’ve got one more as well: the A$37 million spent on exploration during the quarter clearly runs above the A$125 million guidance when annualized. Is that simply because of access at Pogo, or are there other factors? And is there anything especially exciting on the exploration side that you’d like to highlight?

Stuart Tonkin

executive
#76

Yes. Thank you, Al. Roughly 300 geologists come out of the blocks quite enthusiastic in July, so much of that reflects the seasonal spending pattern. So you will notice that. Of course, the winter period at Pogo surface begins under difficult conditions, and then you will observe again, with the loss of 10 mines, a few of those situations where we simply cannot get onto the ground. So yes, it is somewhat weighted toward the front, but we still have A$125 for the entire year at that point.

Alistair Harvey

analyst
#77

Thanks as well.

Operator

operator
#78

Neil Watkinson from Kalgoorlie Miner has the next question. Go ahead, please.

Neil Watkinson

unknown
#79

Yes. Morning, gentlemen. I’d like to focus specifically on where things stand with the East wall remediation at Super Pit. Could you tell me how far along in that process you are, when you expect it to be finished, and once it’s done, what impact that will have on production at the Super Pit?

Simon Jessop

executive
#80

Yes, thanks, Neil. This is Simon. Regarding the East wall remediation, we've moved roughly 60% of the material through the wall at this point. So we're genuinely happy with the progress made over the recent period. Looking ahead, we still have approximately 12 month-ish remaining to complete it, but as we work lower down the East wall, we'll regain further access into Golden Pike North. Our plan has been consistent throughout with FY 2024 — to reestablish access back into Golden Pike North, which sits at the northern end of the pit bottom. So, yes, on track for really 1.2 million ounces at Golden Pike North, with a very low strip ratio and high grade. That's been a key focus for us across the last few years, but roughly 60% is done and yes, on track for FY 2024 to reestablish access once more. And…

Stuart Tonkin

executive
#81

And that sounds like that final mill was, you know, excellent — the kind of stats showing remote firing and remote access drawn last, and obviously you can see that from the lookout as huge progress on that first mine shot coming back down through that scar. So it's a fantastic achievement; it took a lot of work to get to that point for the…

Neil Watkinson

unknown
#82

Was that only the last one I mentioned that had just left, or not?

Stuart Tonkin

executive
#83

That's right.

Neil Watkinson

unknown
#84

Yes. Of course.

Simon Jessop

executive
#85

Sure.

Neil Watkinson

unknown
#86

Have you run into any surprises along the way so far, as you've been handling the wall remediation?

Stuart Tonkin

executive
#87

It's not something, sorry, that you'd find laid out in a textbook—nothing beyond that. So the team really has to step in to assess the risks, rework things, go back over all the details, and proceed one step at a time. Again, they've followed that method, and it's paying off. But this isn't just routine work. So a great deal of brainpower is going into solving this. I'm very pleased with how much progress has been achieved.

Neil Watkinson

unknown
#88

Great, I appreciate it a lot.

Operator

operator
#89

That brings us to the end of the question-and-answer session. I will now return the floor to Mr. Tonkin, who may offer some closing comments.

Stuart Tonkin

executive
#90

Thanks. Appreciate everyone being with us today, and as this morning made clear, we're moving our growth projects forward to deliver a strong second half, with work to cut costs already in progress, as we achieved growth across Pogo and Yandal in the near term and at KCGM over the years that follow. We're keeping to a profitable growth strategy reaching 2 million ounces by FY 2026. At the same time, we gauge success by maximizing returns for shareholders through disciplined and responsible investments. Have a good day. Thank you.

Operator

operator
#91

That brings today's conference to a close. We appreciate everyone joining us. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Northern Star Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Northern Star Resources Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northern Star Resources Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.