Northern Star Resources Limited (NST) Earnings Call Transcript & Summary

January 18, 2023

Australian Securities Exchange AU Materials Metals and Mining earnings 44 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone being on the line, and we’re glad to have you join Northern Star Resources’ conference call covering the December 2022 quarterly results. Everyone attending is currently muted and can only listen. After a presentation, we’ll hold a question-and-answer session. Should you want to raise a question, please press the star key and then the number 1 on your phone’s keypad. At this point I’ll pass the conference to Mr. Stuart Tonkin, Managing Director and CEO. Over to you.

Stuart Tonkin

executive
#2

Good morning, and thank you for being with us today. Chief Operating Officer Simon Jessop and Chief Financial Officer Ryan Gurner are here alongside me. I'm happy to share the results for the December quarter, which puts us at the halfway point of FY23. We've kept making substantial headway on our growth projects, consistent with our strategy of profitable growth toward 2 million ounces per annum. Production for the December quarter came in at 404,000 ounces, with an all-in sustaining cost of AUD 1,746 an ounce, which shows we can operate at 1.6 million ounces per annum. In the second half, we expect stronger forecast production to push unit costs down, as Thunderbox brings on expanded nameplate capacity and grades improve at Pogo. Our full year guidance stays at 1.56 million-1.68 million ounces, with an all-in sustaining cost of AUD 1,630-AUD 1,690 an ounce. On safety, our performance leads the sector, with a lost time injury frequency rate of 0.9. We still see numerous incidents, so we're maintaining a concerted focus on training, competency and safety leadership. This pattern shows up across the sector, where staff turnover and skill shortages keep making safety improvement a challenge. Simon will discuss the Australian operations shortly. At Pogo, we keep hitting the mill throughput rate of 1.3 million tonnes per annum, and a greater share of stoping tonnes now makes up 72% of the blend.

Stuart Tonkin

executive
#3

On a quarter-over-quarter basis, the overall grade got better. We did see some stope mining dilution along the edges of the deposits, which brought down the average mill grade. For the quarter, ounces sold came to 65,000, with an all-in sustaining cost of US dollars $1,362 per ounce. At Pogo, the focus for the second half is on lifting mined grade so we can deliver our full year guidance. It is very pleasing to see unit costs improve at Pogo, and the operation generated mine operating cash flow of $30 million in the quarter; we still have more optimization work to do at Pogo for the remainder of the year. During the quarter, we put out an exploration update highlighting continued new discoveries as well as in-mine extensions across the group. The new Joplin Deposit at Kanowna Belle Underground extends mine life there, and regional drilling at Red Hill discovered a significant mineralized system that provides growth optionality for the Kalgoorlie region. The Wonder North and Golden Wonder discoveries sit in close proximity to the newly expanded Thunderbox plant. In Alaska, we continue to extend the Goodpaster deposit beyond the existing high-grade resource. Our financial position remains very strong, which Ryan will talk to shortly. We are well leveraged to capitalize on the strengthening gold price, with fully funded growth commitments advancing.

Stuart Tonkin

executive
#4

Our cash earnings are increasing, and that gives us room to allocate capital sensibly—putting money into organic growth, paying dividends, and buying back shares—with everything aimed at delivering superior returns for shareholders. As for the Fimiston mill expansion study, our team keeps assessing the strongest design choices and the steps that would reduce execution risk, so that we can make the case ahead of a final investment decision. I'll now hand things to Simon for the Australian operations.

Simon Jessop

executive
#5

Thank you, Stuart. Turning to the Kalgoorlie production center — that includes KCGM, Carosue Dam, Kanowna Belle, and South Kalgoorlie — we sold 210,000 ounces of gold at an Australian all-in sustaining cost of AUD 1,738 an ounce, which is down on gold sales from the September quarter, while cost was AUD 24 an ounce lower. This production delivered a mine operating cash flow of AUD 177 million, while we spent AUD 99 million on significant growth capital projects. Of this major growth capital total, AUD 62 million went toward KCGM open-pit mine development. At KCGM, open-pit material movement rose to 21.1 million tonnes, in line with our material movement plan. Pleasingly, truck hours increased 13% as we take advantage of the new open-pit fleet. Grade of mined ore was higher due to increased volumes and higher grade ore from Golden Pike South. The open-pit physicals have now delivered 41.5 million tonnes of total material movement for H1, which is delivering into our strategic goal of 80 million tonnes-100 million tonnes per annum of annualized movements. This is an amazing effort from the team. Progress in the East Wall remediation area continued and remained on track for reestablishing FY24 access back into Golden Pike North's higher-grade ounces.

Simon Jessop

executive
#6

In the Kalgoorlie region, underground mining volumes rose 5% versus the September quarter, delivering 115,000 ounces. At KCGM's underground Mt Charlotte operation, volumes went up 19% to 470,000 tonnes as access to more stoping areas became available. That was really encouraging, and it's part of expanding this operation to 3.5 million tons per annum by FY26. Carosue Dam saw higher ore tons, though grade was lower because of sequence constraints at Karari. The porphyry underground mine started up during the quarter and is well established after three months of development. Kalgoorlie Operations, Kanowna Belle and South Kalgoorlie delivered steady volumes quarter on quarter, while all-in sustaining costs fell AUD 114 an ounce, with a focus on margin a key driver for the team. Processing volumes in the Kalgoorlie region came to 4.8 million tons, or 2% above the September quarter, even with no processing activities at the South Kalgoorlie Mill, which was placed into care and maintenance during quarter one. The revised processing strategy of three plants in the Kalgoorlie Production Center has been successfully put in place. Grade and recovery held steady quarter on quarter. At our Yandal Production Center, including Jundee, Thunderbox and Bronzewing, we sold 128,000 ounces of gold at an Australian all-in sustaining cost of AUD 1,591 an ounce, up 26% on gold from the September quarter and flat on all-in sustaining costs.

Simon Jessop

executive
#7

This production generated mine operating cash flow of AUD 112 million, which is a 38% increase over the September quarter. Growth capital projects accounted for AUD 56 million of spending, which is AUD 11 million less than the prior quarter. During the quarter, Bronzewing allocated AUD 8 million to major growth capital as we build out this mine for the expanded process plant. At our Jundee operation, we set a new quarterly record for underground ore mined, with a 39% rise in ore at an average mine grade of 4.1 grams per tonne. Consequently, mined ounces rose by 93,000 ounces in the quarter, a 31% gain versus the September quarter. Total jumbo development at this operation held steady at 8 kilometers for the quarter and will remain a key enabler for both drill platforms and expanded stoping areas. Processing throughput remained steady at 740,000 tonnes, back to nameplate volumes. The Thunderbox underground operation keeps expanding its stope mining fronts, with 503,000 tonnes of ore mined during the quarter. Ore tonnes mined from both underground and the open pits climbed to 1.7 million tonnes, up 30% on the September quarter and 50% above the processing volume. Open pit mining volumes more than doubled, reaching 4.6 million BCMs mined in the December quarter. This substantial lift in material movements is very pleasing and will give us future access to all sources at Thunderbox.

Simon Jessop

executive
#8

Mined ounces totaled 62,000 ounces, which is up 15%. In the Yandal region, processing volumes rose considerably versus the prior quarter, reaching 1.95 million tonnes. As noted earlier, Jundee held steady, with the throughput gains driven by the Thunderbox mill expansion. The new process plant kept ramping up successfully, milling 1.2 million tonnes during the quarter. We'll be steadily increasing processing volumes as we get the new plant running consistently through the second half. It's encouraging that sprint capacity is already at or above the nameplate run rate of 6 million tonnes per annum. Our priority is embedding the new operational processes for this expanded plant. Thunderbox stays a major area of attention in the second half, since steady throughput will bring costs down. I'd now like to hand things over to Ryan, our Chief Financial Officer, to go through the financials.

Ryan Gurner

executive
#9

Thanks, Simon, and good morning, everyone. Today's quarterly results show that Northern Star continues to hold a solid financial position. As table 4 on page 8 sets out, our balance sheet is still strong, with cash and bullion of AUD 495 million as of 31st December. We continue to carry a net cash position of AUD 145 million, alongside corporate bank debt of AUD 350 million. For the first half of FY23, the company has posted strong cash earnings, estimated at between AUD 460 million and AUD 475 million. As a reminder, our dividend policy is set at 20%-30% of cash earnings. Encouragingly, positive free cash flow was generated at all three production centers, and capital expenditure was fully funded. Figure 6 on page 9 lays out the movements in the company's cash and bullion and investments for the quarter, with the main items including AUD 354 million of operating cash flow recorded by the company. For the quarters still to come, this figure is expected to increase, with TBO set to run at an annualized rate of 6 million ton capacity over the second half of FY23, and with a stronger margin expected from Pogo thanks to greater higher grade stope contribution over the rest of the year. Investment in sustaining capital, growth capital and exploration on a quarterly basis is proceeding in line with plan.

Ryan Gurner

executive
#10

When it comes to growth capital investment in the quarter, that covered waste material movement at KCGM, the establishment of Porphyry underground at CDO, Ramone underground at Jundee, Aurelia open pit development, Otto Bore pit development, and the TBO mill expansion. Turning to the company's on-market share buyback: during the quarter, 9.4 million Northern Star shares were purchased and canceled, totaling AUD 82 million. Since initiation, 42% of the 300 mill program has been completed, with 15.5 million units purchased at an average of AUD 8.21 per share. That 12-month program stays open until September 23rd. On other financial matters, depreciation and amortization are in line with the company guidance provided of AUD 600-AUD 700 per ounce. First half depreciation sits at the upper end of the guidance range, at approximately AUD 680 per ounce. For the quarter, non-cash inventory charges for the group are AUD 57 million, or AUD 140 per ounce. As mentioned previously, the majority of these non-cash inventory charges relate to the milling of acquired stockpiles at KCGM. For FY23, this charge will likely be approximately 50%-60% higher than FY22. In respective costs, our business, like all others, is experiencing pressures. The size, scale, and flexibility within our portfolio positions us to maximize efficiencies and productivities in the business, which provide opportunities to reduce costs.

Ryan Gurner

executive
#11

Beyond that, the investment we’ve made in the fleet at KCGM, together with the planned TBO expansion — which is finished now — leaves us in a solid position to handle today’s tough cost conditions. We’re still confident that the second half will be stronger for both output and costs, driven by holding mining and processing volumes steady at Pogo while concentrating on high-grade stope delivery, lifting Thunderbox throughput to 6 million tons per annum, increasing ore volumes from Mt Charlotte, and getting a bigger contribution from the lower-cost ounces at Golden Pike at KCGM. Finally, on hedging, table 5 on page 9 lays out the company’s committed hedge position as at 31st December. Over the quarter, the company delivered 174,000 ounces into contracts and placed 145,000 ounces in FY26 at an average price of AUD 2,954 per ounce. The total hedge book stands at 1.28 million ounces at an average price of AUD 2,673 per ounce Australian. I’ll now pass it back to Ashley for the Q&A session. Thank you.

Operator

operator
#12

Thank you. Should you want to pose a question, kindly press star one on your phone and hold until your name is called. To withdraw your request, press star two instead. Those using a speakerphone should lift the handset before asking. Our first question is from Levi Spry at UBS. Please proceed.

Levi Spry

analyst
#13

Good morning, good morning, all. Happy New Year. Appreciate you joining the call. I've just got one question about the FID for the KCGM plant expansion. Could you give us an update on the timing there, and remind us — I believe in the last presentation you said it was a three-year build from FID? Has anything changed regarding the timing and scope on that?

Stuart Tonkin

executive
#14

Thanks, Levi. Yeah, we're still putting the finishing touches on it. There are two parts to that: one is getting the engineering final designs much more solid for the expanded case, along with tighter accuracy on the pricing. The second piece is that de-risking element for the execution phase — making sure some of the long lead items and/or pre-works could be advanced or progressed. We haven't given a date for when FID would be reviewed, but we're certainly in the second half charging ahead with the information provided to our board for consideration. I think it's more likely that in the next guidance year we'll look at what we're doing there, but it's still very compelling, and, you know, we're still advancing it.

Levi Spry

analyst
#15

Thanks, Drew. Just regarding the South Kal mill — a few clients have been telling me gold is heading much higher over the coming months. Where does that stand at the moment? Is the issue staffing, or if you're confident gold will be $200 an ounce higher by year-end, could you bring it back online? Is this really a matter of optimization, or are people still the binding constraint?

Stuart Tonkin

executive
#16

This likely ties back to what you asked first: if we shift Fimiston from 13 up to, say, 24 million tons, then the extra capacity SCO provides to cover that additional million will be absorbed fast, correct? That's not really about—

Levi Spry

analyst
#17

That’s right.

Ryan Gurner

executive
#18

We’d be starting it up at 1 million tons while sacrificing some margin and cash, since that facility was among the higher-cost mills we have in the region.

Levi Spry

analyst
#19

Correct.

Ryan Gurner

executive
#20

And regarding your question about personnel, we’re back down to 3 mills at Kanowna, Fimiston and, clearly, Carosue; we have excellent stability, complete crews, and solid focus. The approach was the correct one, you know. It has worked, and we’re pleased with it. When it comes to divesting it or doing something else, it’s fine for it to remain there, not operating, because it doesn’t compete with us either. It is definitely adding to cash generation in the region, and we aren’t inclined to switch it on at any point soon.

Levi Spry

analyst
#21

Understood. Appreciate it, friend. Thanks for making the time. Thank you.

Operator

operator
#22

The following question is from Daniel Morgan of Barrenjoey. You have the floor.

Dan Morgan

analyst
#23

Hello, Stuart and everyone. You just mentioned that access at Golden Pike is being regained gradually during FY24. Will that matter significantly when it comes to ore access, or is it simply a gradual increase from FY25 onward? Thanks.

Stuart Tonkin

executive
#24

Absolutely, I’ll take that question. Appreciate it.

Simon Jessop

executive
#25

Appreciate it, Daniel. This is Simon speaking. As for getting back into Golden Pike North, that fits within our ounce growth at KCGM, reaching 650,000 ounces by FY26. Over the coming years, Golden Pike North stands as a primary contributor to those added ounces. Regarding the wall, we continue on schedule with the capital needed to bring it down. Access into Golden Pike North will begin to be restored during FY24. All of this sits within the current plan, just as we laid out alongside the growth ounces at KCGM.

Dan Morgan

analyst
#26

Alright, thanks a lot. Moving over to Pogo, and the grade — you know, it came in at 6.6 for the quarter. I realize it was signaled that you'd be considerably weaker in the first half and then stronger in the second. What do you expect for grade over the next couple of quarters? If you could address that, please.

Stuart Tonkin

executive
#27

Yes. Thank you, Daniel. So, above 8 grams per tonne is clearly the reserve grade of 8.5, and that is where we ultimately intend to land. Given what the near-term plan shows, there is some mining dilution within those stopes, and we are dealing with it through certain legacy development work at that site. Yes, we are definitely taking another look at where that stands. Under our present plan, we forecast being able to deliver into the guidance set out for the full year in order to reach that figure. There is a bit of capacity to mill harder than 1.3, which ties more to the timing of shutdowns, and essentially anything above 8 grams delivers that. Yes, the emphasis really is on quality rather than quantity. What is genuinely impressive at Pogo is that unit costs continue to decline, and there remains ample opportunity to optimize that further in the second half, which the team is concentrating on.

Dan Morgan

analyst
#28

Alright, thanks. A question on the accounting side. In your definition of cash earnings, one component is cash tax paid — I’m assuming stamp duty payments, which I believe were made during the September quarter, are excluded from that. Could you confirm that?

Stuart Tonkin

executive
#29

Correct, Dan, that's right. Yeah. For this portion, it isn't part of the cash earnings.

Dan Morgan

analyst
#30

Alright, thanks so much.

Stuart Tonkin

executive
#31

Appreciate it, Dan.

Operator

operator
#32

Al Harvey from J.P. Morgan has our next question. Go right ahead.

Alistair Harvey

analyst
#33

Hello, Stuart team. A brief question about Thunderbox. Regarding the route toward that rate of 6 million tons per annum, will we reach it essentially from now, or is that rate more likely in the final quarter of 2023? Perhaps you could give us an estimate of the exit rate as we close out 2022.

Simon Jessop

executive
#34

Yeah. Thanks. Thanks, Al. This is Simon. Clearly, in the last quarter we began the commissioning and changeover work and completed the major tie-in. That was a significant quarter for us. Over the second half, we'll ramp up the process plant progressively. It's really about bedding everything in to consistent high utilization and high run rates. Our plan is for the FY23 exit rate to be at known quote.

Alistair Harvey

analyst
#35

Thanks, Simon. Turning to the buyback, the pace clearly accelerated during the quarter. I just wanted to get a sense of whether that rate is sustainable. I assume there are a few blackout periods around reporting. Just how are you thinking about, I suppose, the returns from a buyback. I mean, clearly the average price you've achieved so far has been pretty good, and the stock is now trading a fair bit higher. You know, what other options exist for deploying that capital? I know you have the stated dividend policy, but, you know, is there any upside from special dividends or anything else we should consider from a capital management perspective?

Stuart Tonkin

executive
#36

Thanks. You're correct that 42% of that buyback has been finished. The average price we achieved was AUD 8.21. Yeah, we continue to examine every one of these tools with an eye toward, you know, better-than-average returns. Once we stack it up against precisely that — your dividend set at 20%-30% of cash earnings, you know, choices coming later in the year regarding the Fimiston expansion, how we allocate capital, that sort of thing — we take it all into account. Yeah, right now we're in a blackout period on the buyback. It stays open until September of this calendar year. You know, these matters also depend on the current gold price and where valuations stand. It's one tool in the kit. We'll keep it active and keep assessing what it returns.

Alistair Harvey

analyst
#37

Absolutely, Stu — appreciate it.

Operator

operator
#38

Our following question is from Matthew Greene at Credit Suisse. You have the floor.

Matt Greene

analyst
#39

Hi there. Yeah. Morning, everyone. Simon, I have a few questions about Thunderbox. First off, could you give us some indication of what volume and grade profile you expect from the open pit in the second half?

Simon Jessop

executive
#40

Thanks, Matt. It's been pretty steady. You won't see — obviously volumes are rising, so there aren't major shifts in the grade profile. The reserve profile at the Thunderbox operations is 1.6 grams per tonne. Last quarter we milled 1.5. That won't move much over the journey. It's more about a growing contribution from the Thunderbox underground. At D zone, we're beginning to reach somewhat better grade as we go deeper into the pit there. It's roughly in line with what we delivered in the last quarter.

Matt Greene

analyst
#41

That's useful, thanks. And second, you said you're testing the mill's sprint capacity while commissioning it. Has that provided any early signal about the throughput rates you believe the mill might settle at on a more sustained footing, compared with the 6 million tonne nameplate?

Simon Jessop

executive
#42

Oh, look, we've definitely had brief stretches when we're above 6 million tons. What we're really focused on is simply, you know, achieving that consistency at that rate. And then obviously, as with most process plants, over time you optimize things and step by step push it higher. For us in FY23, the first priority is just to bed it in at the exit rate at nameplate. Then across the next 6 months, we'll really stress test that as we head into FY24 and beyond.

Matt Greene

analyst
#43

All right, that's great. My final question just moves on to Pogo. Stu, you said that with maintenance you could take that mill past 1.3 million tons. I suppose in the last few quarters you've managed to hit, you know, the nameplate of the expanded mill. Do you think that's the output capacity, or will it get pushed harder provided you can deliver the higher mining rates? If that's the case, what does that entail regarding permitting and any kind of upgrades ahead of the mill? What would you be looking to do? Or do you really see 1.3 as the sweet spot here?

Stuart Tonkin

executive
#44

Right. We haven’t. There really aren’t any permitting limits on, you know, tonne throughput, the kinds of things you see in Canada and elsewhere. In that respect, it’s available, you know, dry stack tailings capacity. All of those things are in place to run it. It really comes down to the fact that I don’t necessarily want to fill it up at 1.4 or 1.5, you know, at a lower grade. The reserve grade’s 8.5. We’re focused on the quality that would get us the best unit costs. That’s really key. I guess we’re giving the confidence that for the second half, part of it can be throughput, part of it can be grade, but it’s around timings of shutdowns and that uptime on that plant. We kind of know where its Achilles heels are so that, you know, when things where its bottlenecks basically stop it from that throughput. Some of the things are oversized, some of the things are right at the limit, in pumps and motors and those type of rating side of things.

Matt Greene

analyst
#45

All right, that’s useful. Thank you so much, everyone.

Operator

operator
#46

The following question is from David Radclyffe of Global Mining Research. You have the floor.

David Radclyffe

analyst
#47

Hello there, and good morning to you, Stuart, and everyone on the team. What I'd like to ask about is really those costs that have been trending for the business, and whether in your view they've now peaked. Then, how sticky do you expect elevated industry costs to prove, and are you yet seeing any downward pressure in any of the cost elements of the business? Perhaps as part of that, you could give us some color, I suppose, on WA labor pressures as well as current staffing levels.

Stuart Tonkin

executive
#48

Yeah. Thank you, David. The sole expense category where we're actually observing a decline would likely be fuel. Everything else remains quite firm, quite resistant to change. Honestly, it hinges on, I suppose, what every commodity is doing within that same arena. We are noticing a bit of easing in staff turnover and steadiness in that area following the reopening of borders after COVID, sort of. We definitely have not. Each quarter we'd ask ourselves whether, you know, we've hit the ceiling? Is it declining? We aren't seeing meaningful indications that it will. Those per-unit costs to decrease. Yeah, we've reassessed in light of our strategy, which is to grow profitably through per-unit costs achieved via economies of scale from bigger plants, you know, on an unchanged fixed cost foundation. That's genuinely the way we're bringing our per-unit cost down. On inputs, we haven't witnessed any easing, with, you know, either your materials and/or your labor.

David Radclyffe

analyst
#49

All right, thank you. I might have a comparable question, actually, regarding Thunderbox and how the profile looks from here. To be specific, perhaps on the open pit material side, since right now you're processing roughly a gram, whereas the reserves at Otto and Aurelia are considerably higher. Is it still accurate that we ought to begin seeing that open pit material grade heading into the mill, as that's presumably the bigger part of the expanded capacity starting to rise and come up?

Stuart Tonkin

executive
#50

David, Simon, as you access different sections of the pit, you'll notice the grade beginning to rise. Otto Bore, you know, carries a higher grade. At Thunderbox, the D zone shows improved grade at depth. Aurelia's grade will start contributing around FY24 and afterward. Yes, as we go deeper into the open pits, you'll see somewhat better grade coming from them. It won't shift things materially given the large volume. Over certain quarters or halves, you might observe changes of 0.1 or 0.2 g.

David Radclyffe

analyst
#51

All right, many thanks. That's where I'll stop.

Operator

operator
#52

Andrew Bowler from Macquarie has the next question. Go right ahead.

Andrew Bowler

analyst
#53

Hello everyone. I have a few questions regarding Jundee. You mention upgrades to the power plant, or a possible upgrade, delivering fairly substantial cuts in emissions by 2030. Should we also expect that to lower power costs? Or is it strictly an ESG initiative?

Stuart Tonkin

executive
#54

Sure, it ought to. It really could deliver that saving, and it hinges on where energy costs go. I believe we're dealing with the existing energy supplier that gives us the gas-fired power. We'll have the ability to alternate between that gas serving as backup and then solar paired with battery storage, and in time wind turbines. That will take the risk out of energy costs. Right now it's roughly neutral on operating costs. Given how gas prices have moved, it will definitely shield us from energy cost escalation. Keep in mind that capital there is limited. All of it ties to the PPA and to this specialist provider supplying that capital.

Andrew Bowler

analyst
#55

That's fine. Clearly, regarding the output from the mine at Jundee, there was a significant quarter-on-quarter increase and, as you know, that's a record for that operation itself. Is this simply down to scheduling, or does it mean that roughly 2 million tonnes per annum of underground output now looks a bit on the low side, or will it move back toward that 2 million tonnes per annum before long? Cheers.

Stuart Tonkin

executive
#56

Honestly, that was a great outcome for the team. Andrew, you know how Jundee has spells where there are lots of headings and plenty of stoping fronts, and clearly the crew is ready to execute and deliver, and we stockpile material for milling later on. Basically it mirrors the earlier question about Thunderbox. Down south, these two hubs stay at roughly 300,000 ounces — Jundee up north at 300,000 ounces, Thunderbox in the south, giving that 600 for Yandal. All those varied sources, underground and open pit, feed into the mine plan and the milling throughput. Yes, 2 million tons out of Jundee underground, with another 1 million to 1.5 million of open pit material added on top, keeping it at 300,000 ounces from satellite pits. Same situation at Thunderbox — different sources, different grades, but in the end operating at 6 million tons delivers 300,000 ounces, and that is the plan going forward.

Andrew Bowler

analyst
#57

That's everything on my end—no problem at all. Appreciate it.

Operator

operator
#58

Kate McCutcheon from Citi has the next question. Go ahead, please.

Kate McCutcheon

analyst
#59

Hello there. Morning to you, Stu, Simon, and Ryan. I have one brief question, and it's directed at Ryan. Could you remind me again what our approach should be when considering cash tax for the half? Is there still a portion of receivables or refunds that we expect to come through?

Ryan Gurner

executive
#60

Hi Kate, yeah, so for the half it should be fairly light. We're in the process of working through our FY22 tax return at the moment. It looks like it'll likely be neutral to a small refund. You won't see, yeah, so there isn't much cash tax payable this half.

Kate McCutcheon

analyst
#61

Alright, that's great — very clear. Thanks. For Stu or Simon at KCGM, on the 80 to 100 million ton target, that was a superb effort getting TMM above 80. What are the main levers to pull now in order to push higher? Is it just face access for utilization and optimization?

Stuart Tonkin

executive
#62

Right, thanks Kate. The main thing is really about unlocking the Simpson South zone. Since we're flattening out that section of the open pit, the benches are becoming larger and access is improving, which means efficiencies rise on our digging side too, along with putting the new fleet to work. Moving material from Golden Pike South, the deepest section of the pit, consumes a lot of trucking hours. That work will wrap up during FY23, and through FY24 we'll steadily build up into Golden Pike North. Essentially it comes down to improved access to bigger bench areas, higher up in the pit. With the new equipment in use, we'll see material movement go up, based on where we sit in the schedule across the coming few years.

Kate McCutcheon

analyst
#63

Right, yeah. That’s clear. By now you have the whole new fleet, isn’t that right? That part is finished.

Stuart Tonkin

executive
#64

Right, yeah. That wrapped up at the close of FY22. We've really had about 6 months now with the entire fleet embedded, and it just keeps going—you know, pushing those trucking hours higher, moving more material, and, you know, capturing the efficiencies that come with a fleet that's new instead of 20 years old.

Kate McCutcheon

analyst
#65

Yeah. All right. That's everything I had. Thanks, Simon.

Operator

operator
#66

Mitch Ryan from Jefferies has the next question. Go right ahead.

Mitch Ryan

analyst
#67

Thanks, team. I’ve just got one brief question for you. It concerns the KCGM mill study. My understanding is that work is still in progress. I had assumed we would already have it by this point. Could you remind me of the due date? Does the fact that you are still studying it mean the return metrics don’t stack up, which would rather surprise me? Is it that you are waiting for certainty that inflation has peaked, or is there some third factor I haven’t considered?

Stuart Tonkin

executive
#68

Thanks, Mitch. We had not anticipated that it would be complete at this point. The real focus is the effort required during this year, and work continues on those last engineering designs. We are genuinely getting down into the details of the final design and having the engineering firms provide firm figures for all of that work. Relative to what came out last June, that was at a pre-feasibility level. Now we are moving all the way to feasibility level so that a final investment decision can be made. That work is ongoing right now. There has been no pullback when it comes to schedule or the effort to complete this as carefully as possible. Clearly, we are monitoring market developments concerning other projects as well as timing and execution risk. Right now, we do not view that as a justification for not proceeding. The financial results remain highly attractive if the risk is reduced by the substantial stockpile that is in place. We have excellent visibility into mine planning as we move forward. It is a very significant enabler, although at present it is not part of our five-year plan. A decision on what we will do there will be made this year.

Mitch Ryan

analyst
#69

Thanks — I appreciate that.

Operator

operator
#70

The following question is from Neil Watkinson of Kalgoorlie Miner. You have the floor.

Neil Watkinson

unknown
#71

Morning, gentlemen. I’d like a bit more detail on the underground situation at Mt Charlotte here in Kalgoorlie. You have a project of some kind underway to increase output from underground. Could you share a few specifics on how far along it is and when you expect it to hit its goals? What output number are you targeting for it?

Stuart Tonkin

executive
#72

Thanks, Neil. So basically, when we bought Mount Charlotte, its mine life was quite short, and it was turning out roughly 1.2 million to 1.4 million tons annually. We've been pushing it toward 2 million tons a year, operating it around the clock and expanding the volumes, re-establishing drill platforms on the lower levels, and really confirming how far the mineralization extends within that system. It's a substantial operation, and we see a big opportunity to grow Mount Charlotte's volumes to 3.5 million tons per annum over the coming couple of years. Right now the plans involve continuing exploration, drilling, converting that resource into reserve, the development work needed to open those stoping fronts, and clearly beginning to raise volumes that get trucked to the Super Pit and then hauled by the big trucks to the mill.

Neil Watkinson

unknown
#73

What's your expected timeline for reaching 2 million tons per annum?

Stuart Tonkin

executive
#74

So basically, at the 2 million mark those rates apply right now, and obviously everything moves by truck, so the real volume ramp-up comes over the next couple of years.

Neil Watkinson

unknown
#75

Should we go up to 3.5?

Stuart Tonkin

executive
#76

That's right.

Neil Watkinson

unknown
#77

Yeah. So how does that feed into the broader Super Pit-style operation — how does it slot in with what's going on in the open pit? You're clearly expanding there too. It all ties together, I suppose — did I get this right that you're targeting roughly, what was the figure? Around 650,000 ounces from that entire… Does that cover just the Super Pit, or does Mt Charlotte count as well?

Stuart Tonkin

executive
#78

Yeah, and that covers the entire operation we refer to as KCGM—

Neil Watkinson

unknown
#79

Sure.

Stuart Tonkin

executive
#80

By FY26, we expect that range of 650,000 to 700,000 ounces.

Neil Watkinson

unknown
#81

Sure.

Stuart Tonkin

executive
#82

Right now it's at 480,000 to 500,000 ounces. By FY26, we're looking to grow that to 650,000 to 700,000 ounces.

Neil Watkinson

unknown
#83

That's right.

Stuart Tonkin

executive
#84

Basically, the source is the Super Pit, Mount Charlotte underground, and the stockpiles. That's the answer.

Neil Watkinson

unknown
#85

Oh, that's correct.

Stuart Tonkin

executive
#86

There's a big opportunity we see in expanding Mt Charlotte. Right now, it lacks an underground at the super pit. That presents a chance, and it's among the things we're weighing as we assess the Fimiston Mill expansion study for those new portals and drill drives we installed a couple of years back. What we're establishing there is 5 million ounces of inferred resource beneath the super pit, and that could become a substantial underground operation down the road.

Neil Watkinson

unknown
#87

Absolutely, certainly. That’s great. I really appreciate it.

Stuart Tonkin

executive
#88

Much appreciated, Neil.

Operator

operator
#89

If you'd like to pose a question, just press star 1 on your phone once more. Our next question is from Sean Smith of The West Australian. You're up.

Sean Smith

unknown
#90

Hello, gentlemen. I'm curious, Reid—you'd have a better handle on this than I would—but mining safety in WA in particular has turned into something of a community and political matter. I'm wondering whether you might expand a little on why that safety record still isn't where you'd like it to be, and perhaps whether it's more about how people are trained? You can't get the people you want. You've had to look further afield for staff. Any kind of comment would be appreciated. Thanks.

Stuart Tonkin

executive
#91

Thanks, Sean. So, our lagging indexes are roughly at or under 50% of the state averages. We feel good about that result. It did get worse on a quarter-over-quarter basis. We continue to see high potentials and near misses there, which reflects diluted skills, elevated turnover, and ultimately the vacancies over the past couple of years. Restoring that will take a number of years. Until then, it's about more supervision, patience, and prioritizing and slowing operations down to ensure work gets done properly, right the first time, and safely. Those are the things the entire industry is focused on so that we aren't, you know, hurting people, so.

Sean Smith

unknown
#92

Appreciate it.

Operator

operator
#93

That brings us to the end of the question-and-answer session. At this point, I'll return the floor to Mr. Tonkin, who may offer some closing comments.

Stuart Tonkin

executive
#94

I appreciate everyone being on the call today. As was announced this morning, the expansion initiatives are advancing nicely and should yield robust output in the second half, while we are already lowering unit costs as we bring growth at Pogo and Yandal in the near term and, clearly, at KCGM across the years that follow. Take care.

Operator

operator
#95

That brings today’s conference to a close. We appreciate everyone taking part. You’re welcome to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Northern Star Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Northern Star Resources Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northern Star Resources Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.