executiveGood morning, everyone, and thank you for attending our FY '23 Half 1 Results Presentation. Joining me today is Chief Operating Officer Simon Jessop; Managing Director Stu Tonkin is currently at our Pogo operations for a routine visit, before he attends a North American Global Mining Conference. I'll now walk you through the results presentation, which was filed with the ASX this morning. Please take a moment to read the standard disclaimers on Slide 2 yourselves. I'd like to start on Slide 3. As you'll observe in our results, and across this presentation, we have kept delivering superior returns for shareholders. Our emphasis stays on operational excellence and on a disciplined, mature approach to investing shareholder funds. Northern Star keeps going from strength to strength. That comes from our simplified portfolio of 3 large-scale production centers in Tier 1 jurisdictions, producing 1 commodity: gold. I'm especially proud of our people and their dedication to safety and to sustainably executing our value creation strategy. Moving to Slide 4. Despite the challenges the resource sector presently faces with cost pressures and labor constraints, the strength and resilience of our assets was demonstrated by the company delivering a strong underlying EBITDA of $633 million during half 1 of FY '23.
Ryan Gurner
executiveKeeping capital discipline strong and capturing tax synergies from the merger through the first half generated substantial cash earnings of $467 million. That figure, encouragingly, came in above the first half of FY '22. As a reminder, cash earnings is the measure of underlying earnings that supports returns to shareholders, profitable growth investments, and balance sheet management. You'll find a reconciliation at the back of the presentation. Thanks to these robust first half cash earnings, the Board has declared a record fully franked interim dividend of $0.11 per share. That is a 10% increase over the FY '22 interim dividend and sits near the top end of our dividend payout policy. The company anticipates roughly $32 million in income tax refunds during the second half of FY '23. After those receipts and once the FY '23 interim dividend is paid, the company's available franking credit balance will be about $3 million. The company does not anticipate generating franking credits for at least 18 months, because synergies from the merger are temporarily lowering the taxable income of its Australian operations. As a result, we expect the company's next new dividends to be unfranked, subject to future profitability.
Ryan Gurner
executiveRegarding the company's $300 million share repurchase, the program has advanced nicely over the first half, and it stayed open, subject to blackout periods, through September. With our solid balance sheet — including a $145 million net cash position at December — we are still well placed to achieve our near-term organic growth profile, which carries low capital intensity. Now turning to operations on Slide 5, all of which have kept delivering in a challenging environment. At all 3 production centers, we remain on track to hit FY '23 guidance. Over the first half, as this slide outlines, each production center has made great strides under our low-risk 5-year profitable growth strategy aimed at becoming a 2 million ounce gold producer by FY '26. Flipping to Slide 6. As shown, positive cash earnings continue to be generated at all 3 of our production centers. Significant cost improvements are coming through from key growth projects at Pogo and Thunderbox. In the second half we will keep a sharp focus on costs, which, together with the expected lift in production, should further build cash and maintain the company's strong financial position. Moving on to Slide 7.
Ryan Gurner
executiveEarlier, I discussed how we focus on and take a disciplined approach to managing shareholder funds. This slide brings out the core parts of our capital management framework, along with how vital our balance sheet and risk management are for maximizing shareholder returns over the long term. We're still in a strong financial position, with $1.1 billion in liquidity at 31 December, and we keep up our sensible, consistent approach to mitigating risk given external conditions so that delivery of our strategy is supported. Moving now to Slide 8. Before I hand things to Simon, who will speak to our operations on the next few slides, I want to say that as a team, we're really pleased with the progress achieved in the first half of FY '23. And we're very proud that on a total shareholder return basis over the past 12 months, we are the best-performing senior global gold stock. Across the Northern Star journey, and counting our declared interim dividend of $0.11 per share, we have now returned more than $1.1 billion to our shareholders.
Simon Jessop
executiveThanks, Ryan. Now, if you turn to Slide 9, at the halfway mark of FY '23 we've sold 773,000 ounces of gold, which works out to 48% of the guidance midpoint. In Australia, all-in sustaining costs came in at $1.766 an ounce — that's 106% at the midpoint of guidance. We're still on track to hit the full-year guidance we laid out: gold sales of between 1.56 million and 1.68 million ounces, with Australian all-in sustaining costs of 1,630 to $1,690 an ounce. As we've said before, guidance is weighted toward the second half, reflecting the commissioning of the Thunderbox process plant, the open pit and sequence timing at KCGM, and Pogo transitioning into higher-grade stopes. Moving to Slide 10, you can see our profitable 5-year organic growth strategy mapped out through FY '26. I want to stress that this growth path offers low-risk delivery and can be executed within our existing assets. We've made significant progress so far this year. At KCGM, across the first half we achieved a pleasing annualized movement rate of 84 million tonnes per annum, which sits within our stated strategic goal of 80 million to 100 million tonnes per annum. The new fleet is performing very well, and we keep looking for further optimization.
Simon Jessop
executiveDuring the second half, Thunderbox should run comfortably at its 6 million tonne per year nameplate capacity, and it stays a major source of the added ounces coming out of the Yandal region. With the process plant expansion now installed, Thunderbox moves from 3 million tonnes per annum up to a nameplate capacity of 6 million tonnes per annum. Over at Pogo, we've kept the mill running at the expanded rate of 1.3 million tonnes per year. Our attention remains on optimization work at the mine, especially the contribution from higher grade stopes. We're firmly on track with our profitable growth plan, which targets 2 million ounces per year by financial year '26. Moving now to Slide 11. We remain in an enabled position, with a substantial mineral resource base of 56.4 million ounces alongside reserves of 20.6 million ounces. Our exploration programs are highly effective and efficient, as demonstrated by the addition of ounces to the resource base at $24 an ounce last year. Across FY '23 we've dedicated $125 million to exploration within our high-quality geological systems, aiming to replace and profitably grow our mine life. Now to Slide 12. This chart illustrates the visibility we have for improving renewable projects at each of our assets and for cutting our carbon footprint.
Simon Jessop
executivePlanning and implementation for these projects are already underway, which will support a 35% cut in Scope 1 and 2 carbon emissions by 2030, along with a net 0 goal by 2050. Turning to Slide 13, right now we are still assessing whether to grow milling capacity at KCGM, given the substantial stockpiles left sitting at surface from prior mining. Although there are many advantages to the project, the existing 13 million tonne per annum milling capacity remains an option on the table. As a reminder, that possible expansion is not part of our 5-year strategy aimed at reaching 2 million ounces by FY '26. We discussed capital management discipline earlier. Because of our deep knowledge and understanding of the KCGM ore body, we view technical and geological risk as low when it comes to committing to a project like this. We are continuing to watch external pressures while working to derisk the execution elements of any expansion, and a decision point will arrive during the 2023 calendar year. Thank you, and I will now hand back to Ryan.
Operator
operator<<operator_script>> Our first question this session is from Daniel Morgan at Barrenjoey.
Dan Morgan
analystI suppose I have a couple of quick questions about the operations and how things have been going since your last update. So first, regarding the Thunderbox mill, how is that ramp-up progressing? As of today, are we consistently achieving that 6 million tonne per annum run rate? Or is that still to come later in this financial year?
Simon Jessop
executiveYes, thank you, Daniel — this is Simon. As we mentioned during the quarterly call, we anticipate reaching the 6 million tonne run rate in H2. So we keep working through plant commissioning and ramp-up, with consistency across all plant elements, primarily crushing and milling. But happily, we definitely see the spring capacity available for 6 million tonnes per annum. So at this point it's just a matter of bedding in the new SAG mill along with the crushing components of the plant.
Dan Morgan
analystAll right, moving on to Pogo — has the underground productivity come in where you expected, and are you beating that 1,500 meters per month target on a consistent basis this quarter? And on dilution, is it in line with what you anticipated? I'm just curious how the operation has been trending year-to-date.
Simon Jessop
executiveYes. Thanks, Daniel — Simon here again. Pogo is tracking well with that second-half weighting, especially as the high-grade stocks start coming through, and that dilution is a big focus for us. We're just trying to remove waste from the stoping sequence and really give the mill that expanded grade profile — because we know that when we reach 1.3 million tonnes per annum at the right grade, we can deliver 300,000 ounces per annum. So Stu is over there — he was there over the weekend. His team spent a week on site with the team there. So we'll come back well informed about where Pogo stands. But right now, Pogo is second-half weighted, with higher grades coming through in the stoping sequence.
Dan Morgan
analystAnd finally, on the buyback — I believe you may have thought you were in a blackout period earlier this year. Will you be activating the remainder of the buyback now?
Ryan Gurner
executiveDan, Ryan here. Yeah. So yeah, we’ve clearly made fairly solid progress. We had to buy blackout. So look, we’ve got another — what is it — 9 months left. So yeah, the program is open again.
Dan Morgan
analystOn that point, do you expect to make buyback purchases at a pace similar to what you were doing before the end of the December half year? Or what are your thoughts there?
Ryan Gurner
executiveYeah. Look, the way I'd put it is that we have 9 months left on this. I believe Stu's wording captures it well. So that covers everything regarding Northern Star in those. It's never fixed in place. So we constantly examine where we stand, including the destinations for our funds, be that capital deployed in the <<inaudible>> or, as here, putting it to work in this instance. So what I'd say is that we're always eager to look over every option available to us, and we will consistently direct the money toward the highest returns. There are another 7 months still open. Yes, let's watch and see how things develop.
Operator
operator<<operator_script>> Our following question is from Danielle Le Mazura with the West Australian.
Analyst
analystI'm not certain I'm the right person to address this, but I was simply wondering what your view is regarding costs and inflation. How much longer do you anticipate that some of the inflationary pressures we've observed will keep affecting Northern Star's operations? I believe you mentioned it would remain a focus in the second half. So I'm just curious what your thoughts are on that.
Ryan Gurner
executiveDanielle, I appreciate the question. This is Ryan speaking. Yes. Well, honestly, it remains genuinely difficult. We aren't observing meaningful decreases in costs, even though a modest amount of relief is showing up. For example, that shows in what we pay for energy, especially diesel. And likewise with certain input expenses tied to steel pricing. We're experiencing a bit of easing on costs, and that's both useful and encouraging. On the whole, though, the remaining input costs — clearly, labor is a major expense in our industry, just as it is across the whole mining sector. Those costs are still running high, and then there are other inputs linked to commodities, in our reagents and similar items. So they are definitely still with us. This is exactly where, I suppose, scale and size come in handy, since you can bring your supply chain to bear on these cost decreases, or at minimum try to secure competition and volume, and that does assist unit costs. From our side, we're aiming — essentially aiming to accomplish more while using less, exploring methods to consume less. So price in the processing. We're seeking to consume fewer reagents while achieving the identical result. So by being more efficient that way, trimming the scope of work in order to actually take cost out of the business.
Ryan Gurner
executiveSo that's essentially the position we find ourselves in going into the second half. That's the approach we're taking.
Analyst
analystIf I could just squeeze in a quick follow-up: what portion of that cost impact played into the drop in net profit?
Ryan Gurner
executiveApologies, Dan — could you repeat the tail end of what you asked regarding the...
Analyst
analystApologies — I only just noticed that net profit had fallen fairly sharply. So I was simply curious as to what portion of that hit came from the board.
Ryan Gurner
executiveWhat I’d really do is direct everyone to this: take a look at our costs on a half-on-half basis. Go back to the quarterly reports we published — they contained fairly solid detail. On a per-ounce basis, our cash costs are roughly $200 greater. Most of that rise comes essentially from cost inflation, which is pretty much across the sector — I’ll say as of this point last year. So half-on-half, yes, you can kind of see that reflected in our cash costs.
Operator
operatorOur following question is from Matt Greene at Credit Suisse.
Matt Greene
analystSimon, trust you're doing well. Simon, I'd like to ask you one question, if that's all right, about the KCGM expansion. From this point forward, what has to shift on the execution front in your view? You've flagged this as the main risk where maintaining discipline is concerned. For you to feel more at ease with moving forward on this project, what needs to change here?
Simon Jessop
executiveYes. Thanks, Matt. What we keep doing is examining the execution components, and those are mainly centered on the scope of work and the detailed <<inaudible>> engineering across the different options. The more effort we put into that, the more precise our pricing will be, and also the variants you might potentially obtain absent that engineering phase. So that is genuinely where we're focused — on those execution elements of the mill expansion. So we'll keep watching pricing in the market, what we're observing on steel pricing and build slots and that kind of thing. But honestly, the majority of our attention is on getting the engineering right, getting the design right, and then we've lowered the execution risk here of having to alter things as you potentially go wrong. So that really is our central focus for the KCGM plant expansion. As I mentioned, we certainly are — we certainly see low geological mining reach because of the stockpiles, which sit in front of us, so the 120 million tonnes. So that's a great position to be in. It really is around the processing side and the engineering to be in that <<inaudible>>.
Matt Greene
analystAppreciate that, Simon. What I’m hearing is that the main task is simply to lock down this project’s scope—less about outside issues like whether we need to see labor come off, or possibly permitting, or anything along those lines. It’s more contained when it comes to defining the project’s scope...
Simon Jessop
executiveYeah. I believe that's the right frame, Matt. And look, if we took no action and kept milling at 13 million tonnes per annum, we'd still have 21 years of processing ahead of us without adding to resources and reserves. So the case is quite compelling. We simply want to complete the work upfront and get it right.
Operator
operatorAl Harvey with JPMorgan has our next question.
Alistair Harvey
analystTurning to the Super Pit expansion once more. Last week, as I recall, one of your competitors pointed to a pretty lengthy construction period for an expansion in the Kalgoorlie area that is far smaller. You've noted that operations could keep going at 13 million tonnes per annum. I'm just trying to gauge whether you too are encountering that kind of pressure on long lead items, and how long the study could sit on the shelf before you decide to pull the trigger.
Simon Jessop
executiveYes. Thanks, Al. I'd say it's a large-scale project. So plenty of parties want to be involved in something substantial like this, and it will be built over a few years. So having time on one project is, in some cases, better than doing 2 or 3 lots of small projects. So we're still seeing a lot of interest from groups who would like to be involved in the case of gen mill expansion. And yes, core comment on others in others in the area. But we'll just continue to do the engineering work, get the scope right and then bring it to a decision point. We're seeing changes in sort of steel pricing and things, which is pleasing to see. But really, our focus is on the returns the project can deliver and taking out that execution risk.
Alistair Harvey
analystAnd right after that — typically you release your resource and reserve update in March. Should we expect some news on those higher-grade underground opportunities? And could that end up being a swing factor for the expansion, to help show off some of those low-grade stockpiles?
Simon Jessop
executiveYeah, I believe we'll be refreshing the resource and reserves during the June quarter. That remains on schedule, business as usual. And we recorded meaningful growth from the underground share of reserves at KCGM sale in the prior year, reaching almost 1.2 million ounces. So the more drilling we do at KCGM, it seems the more gold we keep discovering — you can see that reflected in exploration cost of $24 per ounce. So there's strong long-term upside benefit there, and that forms one of the strategic elements we'll keep examining within the KCGM mill expansion. Clearly, a reduced cost per tonne milled will definitely convert into better margins, whether the feed comes from underground or open pit. But we — last year's reserve stood at 280 million tonnes. That's a substantial reserve base to process at KCGM without putting in any additional holes.
Alistair Harvey
analystAnd one last thing for Ryan, maybe just around capital management — franking credits are looking pretty thin at this point, and the buyback seems more or less neutral on my numbers and on consensus price targets. So I'm just curious how we should be thinking about inorganic options, given that right now we're sitting at the lower end of that 3 to 5 hub target you laid out in your presentation.
Ryan Gurner
executiveYes. Thank you, Al. Yes. Well, clearly, as we expand toward roughly 2 million ounces, we have strong alternatives inside our existing portfolio. So when it comes to returns, we consider them highly attractive. And beyond that, there are a number of questions about the potential additional uplift from the KCGM expansion, should approval come through. So I suppose — returning to the M&A-type question — we believe we present an appealing proposition, I'd say, in this sector, given our organic growth and the returns generated within our own operations. So we aren't — at this point, we don't feel much pressure to pursue that route. We're continuously reviewing opportunities, yet we're very pleased with what we hold today and with what we foresee over the coming few years.
Operator
operatorOur following question is from Nick Evans with the Australian.
Analyst
analystComing back to the mill, the KCGM Mill. I believe it was June of last year, when the pre-fees came out, that you mentioned roughly 3 options: a bolt-on that would raise it to 17, a full refurbishment to 24, and starting from scratch with a brand-new build. Have you reached a decision among those 3 options? Are all 3 still being considered? And could I get a bit of clarity on roughly when you expect that decision to be made? Did the presentation say within 2023 or FY '23?
Simon Jessop
executiveYes. Thanks, Nick and Simon. During calendar year '23, what really matters is simply getting that engineering work finished, priced appropriately, and the execution risks taken out. That's where we're focused. We did have the free options of a 7 million, 8 million tonne kind of bolt-on expansion, and a 22 million tonne per annum full rebuild — the latter would require some permitting and take longer to reach that outcome, I suppose, compared with just the build. And our preferred case right now is the 24 million tonne, which effectively replaces more than 70 percent of the current plan. The existing plant has been bolted on over many years. It has 5 mills, so it would mean less processing and fewer components running through our process plant, as well as positioning it for the next 2, 3 decades that we sort of see ahead of us. So I suppose, of all the options, the 24 million tonnes is the one we prefer at the moment, and it's just a matter of working through that scope and engineering phase.
Analyst
analystYes. And going back to costs, I know you gave Danielle an answer on the labor market, but there seems to be something of a divide emerging between the more junior single mine companies and the bigger players like yourselves and the big iron ore guys. You seem a bit more comfortable with where the labor market stands, while the smaller mines still appear to be struggling. Is that a fair assumption about what's happening in the market right now?
Ryan Gurner
executiveNick, it's Ryan here. Honestly, I can't really comment on the smaller players. For Northern Star, I suppose it comes back to what we're offering. We'd like to believe we can give our staff a solid career with various routes, purely because our operations are diverse. So yes, I think finding quality people is hard right now, but what works for us is that the long mine life we have lets us draw people in. We're able to demonstrate the career growth available within our company. That, I believe, was a help. And perhaps that's what separates the majors in terms of what they offer both prospective and current employees.
Operator
operator<<operator_script>> Right now, I see there are no more questions. I'll give the conference back to Ryan so he can offer any closing remarks.
Ryan Gurner
executiveThanks, Travis, and I really appreciate you being with us today. The results make it obvious that our strategy is generating solid returns, as shown by our financials and the strength of our balance sheet. We’re eager to keep you informed about how we’re progressing over the course of the year. Have a wonderful day.
Operator
operatorThanks. That brings today’s conference to a close. We appreciate everyone taking part. You’re free to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Northern Star Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Northern Star Resources Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northern Star Resources Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.