Northern Star Resources Limited (NST) Earnings Call Transcript & Summary

July 18, 2023

Australian Securities Exchange AU Materials Metals and Mining earnings 43 min

Earnings Call Speaker Segments

Operator

operator
#1

Appreciate everyone being on the line, and thanks for joining us for Northern Star's June 2023 quarterly results. <<operator_script>> At this point I'll turn the call over to Mr. Stuart Tonkin, our Managing Director and CEO. Go ahead, please.

Stuart Tonkin

executive
#2

Thank you, and good morning, and thanks for being with us today. Joining me are Chief Operating Officer Simon Jessop and Chief Financial Officer Ryan Gurner. I'm delighted to share our outstanding June quarter results, which helped us meet group production and cost guidance for FY '23. In the June quarter, we achieved sales of 426,000 ounces at an all-in sustaining cost of AUD 1,700 per ounce. I want to say a huge thank you to our teams and contract partners who made this remarkable outcome possible — one that, across the full year, came to 1.563 million ounces at an all-in sustaining cost of AUD 1,759 an ounce. We have now finished year two of our 5-year profitable growth plan toward 2 million ounces per annum, and meaningful progress has been made at every asset, which provides the foundation for continuing to generate superior returns for shareholders. In the quarter, we announced our decision to expand the KCGM processing plant to 27 million tonnes per annum, lifting output there to 900,000 ounces per annum while bringing costs down to $1,425 an ounce. Under a modest gold price assumption, that produces an IRR of 19%. It is funded from cash flows and pays back in under 5 years.

Stuart Tonkin

executive
#3

With this investment in KCGM, we're going to bring costs down, lengthen the mine's life, and open the door to future opportunities that drive superior shareholder returns — positioning it among the top 5 gold mines globally. As of today, we've laid out our FY '24 outlook covering production and costs, with guidance for cost of gold sales ranging from 1.6 million to 1.75 million ounces, at an all-in sustaining cost between AUD 1,730 and AUD 1,790 per ounce. Growth capital spending will come in between $1.15 billion and $1.25 billion, and that figure includes the KCGM plant expansion. As for exploration activity, we've set aside $150 million. Listeners, I want to remind you that we can keep up these growth investments thanks to our strong operational cash flows and balance sheet, while at the same time continuing to pay dividends calculated at 20% to 30% of cash earnings. Simon will walk through the Australian operations in a moment, but first let's turn to Alaska, at the Pogo mine. Pogo turned in an exceptional June quarter, with gold sales of 80,000 ounces — an annualized production rate above 300,000 ounces per annum. Happily, that uplift came from consistent monthly performance in both mining and milling metrics. Development averaged more than 1,700 meters per month. Stope production accounted for 2/3 of the ore mined.

Stuart Tonkin

executive
#4

Milling throughput came close to an annualized pace of 1.4 million tonnes per annum. And, quite impressively, mine operating cash flow during the quarter reached USD 61 million. It's a real pleasure to mark these milestones together with the Pogo team, and I appreciate their work so far in showing just how exceptional this long-life asset is. And I think the market will begin assigning greater value to Pogo, given its performance along with the substantial resource and exploration upside. Now I'll hand things over to Simon for the Australian operations.

Simon Jessop

executive
#5

Thank you, Stu. Turning to the Kalgoorlie production center — that includes KCGM, Carosue Dam, Kanowna Belle and South Kalgoorlie — gold sales came to 224,000 ounces, which is 18% higher, at Australian all-in sustaining costs of $1,666 an ounce. From that production we generated mine operating cash flow of $280 million, and during the same period $112 million went toward significant growth capital projects. The largest portion, $57 million, was directed at KCGM open pit mine development and new tailings storage facilities. At KCGM, open pit material movement reached 21.8 million tonnes in the quarter, and we also set a new quarterly record of 66,000 trucking hours as we keep optimizing the load-and-haul fleet. That quarterly movement, taken together with the prior 3 quarters, came to 83 million tonnes moved for the year — a new record — and it aligns with our total annual material movement. Both mined ore grade and volumes rose, giving us the highest quarterly volumes of FY '23. Underground mining volumes across the Kalgoorlie region held steady once more at 1.56 million tonnes, while grade was up 5% versus the March quarter, with Kalgoorlie ops and Carosue Dam driving that to deliver 130,000 ounces. At KCGM's underground Mt Charlotte operation, production stabilized, with 1.04 million tonnes mined in the second half — above our annualized 2 million tonne per annum target run rate.

Simon Jessop

executive
#6

We're going to keep expanding this operation to 3.5 million tonnes by FY '26. Development carried on at the Carosue Dam porphyry underground mine, which is the next big underground source of ore, averaging 390 meters per month for 1 jumbo. At Kalgoorlie operations, ore volumes and grade volumes at Kanowna Belle and South Kalgoorlie underground were steady quarter-on-quarter, demonstrating strong cash flow margins from these assets. Processing volumes at the Kalgoorlie production center came back to planned levels, and with higher grade that produced an 18% uplift in gold sold, by 224,000 ounces. The Carosue Dam processing plant milled 1 million tonne during the quarter, a new record for the site, and ended with more than 70,000 ounces sold — an outstanding result for the team. At our Yandal production center, which includes Jundee, Thunderbox and Bronzewing, we sold 122,000 ounces of gold at an Australian all-in sustaining cost of $1,647 an ounce. That production generated mine operating cash flow of $124 million, while we invested $61 million in growth capital projects, mainly $26 million on the Orelia open pit and new tailings storage facilities. Our Jundee operation set a new underground mine record of 829,000 tonnes of ore, up 21% on the March quarter. Development stayed consistent at 7.8 kilometers, for an annual total of 31.5 kilometers developed.

Simon Jessop

executive
#7

So mined ounces came in at an impressive 101,000 ounces for the quarter. Processing throughput also set a new quarterly record of 789,000 tonnes, and for FY '23, Jundee milled more than 3 million tonnes, which is 11% above the prior record. Those exceptional mining and milling physicals produced 320,000 ounces of gold sold along with over $300 million in free cash flow generation. The renewable project at Jundee that we announced recently is exciting, since we've begun work on 24 megawatts of wind and 16 megawatts of solar generation, and it will also include a 12-megawatt battery storage component. That forms part of our carbon reduction goal of a 35% reduction by 2030, with Jundee representing an important first major step forward. The Thunderbox underground operation remained the high-grade ore source for the mill, with 525,000 tonnes mined in the quarter and the highest physicals to date. Across the full financial year, the underground and open pit operations successfully mined 6.5 million tonnes of ore, which is above the nameplate of the newly expanded process plan. We'll keep bringing on life-of-mine ore sources so we can provide high-grade feeds to the newly built 6 million tonne per annum process plan. The new Thunderbox process plant achieved 1.03 million tonnes for the quarter, reflecting the first major reline and shutdown activities, which were completed successfully.

Simon Jessop

executive
#8

At Thunderbox, we also experienced 2 separate downtime events, each lasting 1 week, in order to complete an electrical repair on a variable speed drive. Since that final repair in June, we have not had any additional downtime. Throughput tonnes per average for the quarter rose to match the design nameplate, which was very pleasing. Recovery likewise improved 3% versus the prior quarter, as the gravity circuit problems were fixed late in the quarter. During FY '23, Thunderbox successfully built, commissioned and milled 4 million tonnes, which is a new step forward as we look ahead to a full 12 months of run time in FY '24. I would now like to hand over to Ryan, our Chief Financial Officer, to talk through the financials.

Ryan Gurner

executive
#9

Yes. Thank you, Simon, and good morning everyone. Today's quarterly results show that Northern Star is still in a very strong financial position as we head into FY '24, which looks set to be another exciting year for the company. As set out in Table 4 on Page 10, our balance sheet remains strong, with cash and bullion of $1.25 billion at 30 June. And following a great performance this quarter, we have added to our net cash position, which now sits at $362 million. The company produced record full year cash earnings of $1.22 billion to $1.24 billion, and pleasingly, we saw a material uplift in the second half as we keep focusing on cost optimization and reducing sustaining CapEx across the business. As a reminder, company policy is to pay 20% to 30% of cash earnings in dividends. After a very strong final quarter, we met our full year group sales and group cost guidance. In line with our profitable organic growth strategy, we keep investing capital across the business wherever we see positive returns. During the quarter, work programs moved ahead of expectations in 3 key areas: early works and procurement of long lead time items for our recently approved KCGM expansion project; additional resource drilling at Jundee; and commercial production being declared later than planned at the Otto Bore open pit operation at Thunderbox.

Ryan Gurner

executive
#10

Moving to Page 10, we lay out the company's cash, bullion and investment movements for the quarter. Key highlights include operating cash flow of $557 million, which is 50% higher than the prior quarter. After deducting CapEx of $223 million for plant and equipment and mine development, plus $34 million in exploration, quarterly free cash flow generation came in at a company record $300 million. Proceeds from the successful 144A bond issuance during the quarter went toward paying down corporate bank debt, resulting in a net cash inflow. Counting cash and bullion and undrawn facilities, the company had $2.2 billion in available liquidity at 30 June. All 3 production centers generated free cash flow, with capital expansion fully funded. Kalgoorlie contributed more than half of the group's free cash flow performance. And pleasingly, Pogo's strong quarterly performance contributed over $70 million in net mine cash flow, the highest contribution since acquisition, reflecting delivery of the Pogo team's optimization plans at the asset. Group net mine cash flow for the quarter was $302 million. On other financial matters, depreciation and amortization are in line with company guidance of $600 to $700 per ounce.

Ryan Gurner

executive
#11

For the whole year, depreciation and amortization lands at roughly $670 per ounce, placing it in the middle-to-upper portion of the guidance range. Turning to the quarter, noncash inventory charges across the group came to $12 million. As noted earlier, the bulk of those noncash inventory charges stem from milling acquired stockpiles at KCGM, and they form part of EBITDA. You'll find a complete reconciliation of all-in sustaining cost to EBITDA at the back of our half year financial results presentation. Regarding the company's on-market share buyback, the market purchased no further shares after the company's Q3 release. The buyback program stays open through September this year, with a blackout period in effect until our FY '23 results come out in August. Given the strong Q4 performance delivered, the company is well positioned to meet production and cost guidance for FY '24. On the whole, total capital expenditures for FY '24, encompassing sustaining, growth and exploration investment, are expected to be broadly in line with FY '23 levels, once the KCGM mill expansion capital is excluded. As for growth capital expenditure, we are guiding FY '24 to $1.15 billion to $1.25 billion, including the $525 million tied to the KCGM mill expansion. Figure 5 on Page 4 sets out the main areas of growth capital activity across the production centers so we can deliver our profitable project pipeline.

Ryan Gurner

executive
#12

For FY '24, exploration has a $150 million allocation, with the investment emphasis on in-mine exploration at KCGM and Jundee, which includes drill drive development. At Pogo, we're planning additional drilling at the Star discovery. A key point: given the company's strong liquidity position, both our capital projects and exploration investments are fully funded. Last, on hedging, Table 5 on Page 10 lays out the company's committed hedge position as of 30 June. The overall hedge book is 1.457 million ounces at an average price of $2,811 per ounce. With that, I'll return things to Melanie for the Q&A session. Thank you.

Operator

operator
#13

<<operator_script>> Our initial question is from Alex Barkley at RBC.

Alex Barkley

analyst
#14

I just have a quick overall question about KCGM for FY '23. It doesn't seem to be shaping up as expected compared with what you said in your guidance, even though there wasn't really a major problem at any point during the year. Would it be fair to describe it as having underperformed? And how do you see that changing as we head into FY '24?

Simon Jessop

executive
#15

Yes. Thanks, Alex — this is Simon. If I think about Q4, we got KCGM back to normal processing. Q3 was a tough quarter for us, but it was really pleasing to see Q4 recover and the mine plan being executed at the end of the year. So processing really was the challenge for us across FY '23, but we came out of FY '23 back at nameplate and things settled down as usual.

Alex Barkley

analyst
#16

Alright, so there's no kind of effect carrying into next year. Just a quick question about Thunderbox. Thanks for the remarks on Q4. At what point should we anticipate that sustainable 6 million tonnes per annum or more coming through next year — perhaps from the second quarter onward? Or how should we frame that?

Simon Jessop

executive
#17

Yes. Regarding Thunderbox — quarter 4 marked the first time we undertook the complete major shutdown, and we also finished redesign work on a few areas plus strengthened wear packages in certain sections of the plant as we gain more operating experience there. So happily, we came through that shutdown quite well, and we see some optimization from that moving forward. Really, the only issue we had during the quarter was the variable speed electrical problem. But after that fix, we've observed tonnes per hour at nameplate, and we're very confident going forward at Thunderbox because we still see sprint capacity above nameplate. Now it's just about stabilizing the plant.

Operator

operator
#18

The following question is from Daniel Morgan of Barrenjoey.

Dan Morgan

analyst
#19

Simon, perhaps a brief follow-up on that earlier question regarding Thunderbox throughput. Many of the matters you just addressed have now been settled, but I wasn't quite sure whether you'll be operating at 6 million tonnes across the entirety of this year. Or does some shortfall remain — will you fall below that figure for this fiscal year?

Stuart Tonkin

executive
#20

Yes, Dan. So those rates are what we're operating at right now. The question is whether we'll keep that up for all of FY '24. But I think the key thing you and Daniel are likely attempting to work out backwards is the ounces. For FY '24, we've guided 520 to 570 koz as the Yandal contribution. And that includes a bit of a buffer at TBO for ramping up, ramping down, and grade sequencing. So the full-year guidance is weighted toward the second half, and that factors in some planned mill shutdowns in quarter 1, as is our usual practice. But it also reflects some range testing and the ramp-up of that plant. Still, we managed to run TBO today at those 6 -- plus 6 million tonne per annum rates. We've just had some commissioning setbacks over the last year, obviously.

Dan Morgan

analyst
#21

All right. So you've flagged several shutdowns for the September quarter. Could you break that down for us — which ones are they, and does Thunderbox figure in that list for any rectification work? Or is it something you'd see at the end? Or is the Jundee mill the one with a shutdown?

Stuart Tonkin

executive
#22

Yes. So the majority of those are tied to the primary mill relines, and normally we complete 2 significant shutdowns each year, just based on wear rates — as you can appreciate, it's driven by wear, not by time. So we keep a close eye on them. And on occasion they happen in 5 months rather than 6, which means you've actually pushed more throughput through during that window, so that works in your favor. So unfortunately — or fortunately — by design, every mill is receiving a shutdown this quarter. We've factored that into our guidance, and that's where we've stated 1.6 million to 1.75 million, treat that as roughly the entry rate and the exit rate across the year, along with the second half weighting of production given that planned maintenance.

Dan Morgan

analyst
#23

And here's what I think is a fairly straightforward question about the total CapEx guidance. If I add everything up, does it come to roughly $1.7 billion — have I got that math right? Is that about right?

Stuart Tonkin

executive
#24

Does that figure include sustaining? So we're looking at growth of $1.15 billion to $1.25 billion, and that takes in $525 million for the KCGM mill expansion in year 1.

Dan Morgan

analyst
#25

Right, so that $1.7 billion — does it cover growth, sustaining, and exploration? Is that right? $1.7 billion is....

Ryan Gurner

executive
#26

Which figure was that, Dan — $1.7 billion? No, it would come in below that, Dan. Lighter by a couple hundred million, I'd say. I mean, you have — well, the midpoint of our guidance sits at $1.2 billion. All in — exploration, if you care to include it, depending on whether you do or not, $150 million. And then, looking at — I believe I mentioned in my remarks that our CapEx, sustaining included, would be comparable to this year. Our sustaining CapEx runs roughly $200 an ounce. So we have slightly more ounces this year. So if you apply that $200, $220 an ounce sustaining CapEx and you look at our ounce profile, taking the midpoint, you should be able to work the math to arrive there.

Stuart Tonkin

executive
#27

Right. So if you take growth and sustaining at $200 per ounce and add exploration — which I believe you've factored in — that brings you to roughly $1.7 billion.

Operator

operator
#28

Levi Spry from UBS has the next question.

Levi Spry

analyst
#29

Some of us are likely concentrating somewhat on the FY '24 guidance, especially for Yandal, which differs a bit from mine. So I think you covered the production side, but could you walk us through AISC and then explain where the growth capital is headed into that hub over the next year or 2?

Ryan Gurner

executive
#30

Yes. Levi, it's Ryan here. Yes. So clearly, you guys have already discussed production. I think if you look at it from the standpoint of ounce weighting, Thunderbox carries a somewhat higher cost than Jundee. And so that weighting, obviously, has an effect on the group's overall AISC. Look, there's no question that, broadly speaking across the business, we still face cost challenges throughout our operations, in the sector we operate in and in the wider industry. So that accounts for some increases in costs across certain items in our business. But broadly, I think it comes down to the fact that Thunderbox is a higher-cost operation compared with Jundee, and it's obviously delivering more production. From a CapEx standpoint, most of the investment relates to that preproduction of the Orelia open pit and the establishment of the Wonder underground there, which are high-grade feed sources for the Thunderbox mill.

Stuart Tonkin

executive
#31

On page 4 of the liquidity section, you'll find a percentage breakdown of those CapEx spreads. And with AISC, Yandal — clearly Jundee stands out as impressive — while TBO carries a higher cost since we don't yet have the throughput. That's what brings the average to roughly $1,655 to $1,700. So once throughput rises and the ounce profile at TBO increases, it rebalances the entire Yandal operation, pushes it past 600,000 ounces per annum, and pulls AISC lower — but that happens beyond '24.

Levi Spry

analyst
#32

Yes. Yes. All right. Let me take that just a bit further. So what does gross capital look like over the next few years, and are we getting the 600,000 next year?

Stuart Tonkin

executive
#33

No, we don't have any guidance yet for '25.

Operator

operator
#34

The following question is from Al Harvey of JPMorgan.

Al Harvey

analyst
#35

I'd like a little further clarification regarding the growth CapEx. Figure 5 does show that 20% of group CapEx goes toward sustaining waste—maybe I was simply seeking some clarity on that categorization. Obviously, it sits in the growth bucket, but...

Stuart Tonkin

executive
#36

Yeah, so on that "sustaining" point — we're continuing, not sustaining CapEx. It's continuing. That was a poor choice of the word "sustaining" there, but what it really means is continuing waste movement at those levels so we can get that southern cut back and open up those reserves to the south and <<inaudible>>, so it's continuing — but it does count as growth expenditure.

Al Harvey

analyst
#37

Okay. So there’s not really anything to pull out, it seems. From what you’re saying, it probably isn’t able to extract anything from our sustaining CapEx figure to serve as a bit of an offset there?

Executive

executive
#38

No, that's not right.

Al Harvey

analyst
#39

That's fine. And quickly, on the hedge book, it decreased by 125,000 ounces during the quarter. I'd just like to understand how you're viewing risk management for the KCGM expansion right now?

Stuart Tonkin

executive
#40

Yeah, so that policy isn’t really being changed — we’re keeping it in place. So when we use hedges during the quarter, we usually add them back. Obviously, spot prices moved higher again, and you get 3,300-plus ounces toward the back end of the plan once KCGM is turned on. So we only did — the IRR was at $2,600 an ounce. It came in at 98%, and at that point you can hedge at roughly $3,300 an ounce. So that policy isn’t being changed, but we’re definitely maintaining it at around that sub-20% production level across those 4 years.

Operator

operator
#41

The next person to ask a question is Matthew Frydman from MST Financial.

Matthew Frydman

analyst
#42

Sure. I had a few questions to dig a little deeper into the FY '24 outlook. The first concerns the Kalgoorlie hub specifically. If we look at the production growth implied year on year, that's really the one hub where you aren't saying — or where you are saying there won't be much growth compared with the prior year. But you've also pointed out that KCGM will obviously be moving into the Golden Pike North area during the second half of FY '24. So I would have expected KCGM to deliver a fairly material increase there year on year in terms of output for that hub. So how should I read that? Does it mean you're suggesting that perhaps Kal could be somewhat of a drag year on year, or maybe Carosue Dam? What's the breakdown for that hub in terms of production growth?

Stuart Tonkin

executive
#43

No, with CDO and the Kal — and the Kal contribution clearly comes from South Kal and Kanowna — it stayed fairly level all year. And KCGM definitely had a stronger year than this one, since quarter 3 isn't in there. A great deal of work remains at KCGM before it climbs back to that 650,000-plus ounces in FY '26. So from '25 onward — production-wise, this is still a flat year. So yes, the entire Kalgoorlie range is guided at 820 to 900 koz. That's probably not much different from what we've said or planned. All the growth hinges on KCGM, and it arrives late in the 5-year plan.

Matthew Frydman

analyst
#44

Yes. Understood. All right, that makes sense. So even though you'll be accessing Golden Pike North during the second half of FY '24, that doesn't really mean a significant jump in ounces until what may be a later date.

Stuart Tonkin

executive
#45

No. Right now, what really shifts the ounce profile up to that 13 million tonnes per annum is the grade driver behind mill throughput. Then, clearly, the following year we sort of reach that 650,000 to 700,000 ounces, and the expanded plant's contribution adds another 250,000 ounces. So that's it — for KCGM, on the ounce profile, we're capped out when it comes to grade sequencing. And you'll see that AISC is obviously tied quite tightly to — the connection with AISC depends heavily on gold sold, the denominator. So once we achieve that, we secure that improvement toward the back end of the 5-year plan.

Matthew Frydman

analyst
#46

Yeah. Yeah, that's fairly clear. It also sets up my next question, and Ryan did offer some remarks there, which I suppose were probably more tied to the Yandal hub specifically. But obviously, you're increasing output at the group level as you move into FY '24, yet you're guiding to all-in sustaining costs that stay flat, at least at the midpoint. So clearly, having costs hold steady is a pretty solid result, but it does suggest that some costs are creeping up and aren't being offset by the denominator or by the added production. So I'm just wondering whether there's anything specific worth flagging at the group level. Or is that being pushed by more stripping at certain assets, maybe? Or is it more a matter of general industry-wide cost inflation along with labor costs, consumable costs, and so on, as Ryan appears to suggest.

Stuart Tonkin

executive
#47

Yeah. So having costs stay flat is what we planned for. On certain levels, we actually expect they've maxed out, and there may be — we might see some relief. We just haven't built that into guidance. But we, similar to what you're seeing, they're at an elevated level and probably don't like it, same as you, but there aren't concrete actions in there saying here's a qualified reduction in certain costs. But a lot of the labor cost is under our control. So we understand what they're doing. Obviously, consumables energy costs are very high right now. So we don't believe they'll persist at those levels, but we were careful not to guide cost improvements without concrete actions behind that. Even when you look at — always looking at AISC here, but some of the all-in costs are very impressive. The gap between AISC and AIC is narrow. And the cash margins these assets generate are significant. And going back to the strength of the balance sheet, net cash position, all of that growth is fully funded. When you look at all-in costs at mines like Kanowna and South Kalgoorlie, it's sub-2,000 all-in costs, say, AUD 2,900 gold price.

Stuart Tonkin

executive
#48

These operations are throwing off substantial cash, and that's helping to finance the growth plan. So AISC, I think, is one metric — clearly it's standardized — but the point is also to grasp the actual cash flow those assets are producing.

Matthew Frydman

analyst
#49

Yes, absolutely, Stu — that's a completely reasonable point. And it's encouraging to hear you see at least a degree of conservatism embedded in that cost guidance. Perhaps one last quick question on the Strickland's deal. Clearly, you likely haven't had much opportunity to discuss it with the market yet. What I'd note is the price tag of $67 million. That represents almost half of your FY '24 exploration budget, and what you've acquired is the 340-ish thousand ounce resource. That works out to nearly $200 an ounce paid for that resource. So I would have expected that the discovery cost coming out of that exploration budget — you'd be hoping for a stronger discovery cost than that from your exploration spend. So I'm just wondering whether you could perhaps elaborate on the rationale for that acquisition and, I suppose, where it fits within Jundee and why that purchase was an attractive one.

Stuart Tonkin

executive
#50

Yes. I won’t discuss that transaction, since it isn’t complete. But I’ll just say that a resource or reserve we already have is a very different prospect from one you spend exploration money to find. Looking back, you can put a value on a discovery. Still, something already in resource or reserve is a different prospect in that respect from putting $150 million into an area with solid planning and good geos trying to identify one.

Operator

operator
#51

Hugo Nicolaci from Goldman Sachs has the next question for you.

Hugo Nicolaci

analyst
#52

Perhaps as a follow-up regarding costs and digging a bit into some of the assets. Maybe just looking at the Kalgoorlie operations and how costs performed there during the quarter, and marginally the somewhat lower mined volumes with production and milled tonnes up proportionately. I'm just wondering what the cost pressures might have been there in the quarter? And how far do you see those cost pressures potentially carrying on into FY '24, both at the asset and then across the group?

Ryan Gurner

executive
#53

Yeah. Hugo, appreciate the question. So, specifically regarding Kalgoorlie, the item I'd probably highlight is that power costs came in above what we had anticipated during this quarter. That's likely the biggest thing I would point to at that asset. Yes, Stu talked about costs on a broader level. Well, we aren't — as Stu essentially indicated, we aren't factoring any cost relief into our guidance. On the whole, the costs we're seeing have leveled out. I've said this before — we are seeing, and will continue to see, certain costs running higher in some areas of our business. So without question, those will — be it labor or contractors, we're expecting some increase there. But on a broad basis across our overall cost basket, we're anticipating things to be roughly flat. However, the power cost at that Kalgoorlie asset during the quarter was the primary source of those elevated costs this quarter.

Hugo Nicolaci

analyst
#54

Yeah, great. So on that power item specifically, does it mostly involve your electricity contracts and perhaps reflect domestic gas prices in WA? Or does it tie to something else in particular regarding power?

Ryan Gurner

executive
#55

Most likely yes. In a way, no — I suppose everything ties together, since what we're really covering is a balancing price. So that would trace back to infrastructure at the state level. And then clearly, gas prices have gone up, yes. I mean, at other sites of ours such as Jundee and Thunderbox, where we have gas contracted, those contracts run over a medium term. So those aren't assets where we witness big pricing swings. But at Kalgoorlie, when we're drawing from the grid across South Kal, KB and KCGM, variable pricing does show up.

Hugo Nicolaci

analyst
#56

Thanks, that's useful. Maybe just one more, if I may, on the growth capital side. I know you've mentioned it somewhat across the assets, but you noted that 82% of growth capital goes toward the major growth projects. So I was wondering whether you could add a little more detail on whether the remaining 18%, or roughly $200 million, is being spent in FY '24.

Ryan Gurner

executive
#57

I mean, on the whole, it's mostly drill-driven mine development. As you can see throughout the business, and that really is spread, Hugo, across the asset. So wherever we're opening up new areas and addressing declines right across the underground operations, that's essentially where the spending sits. What we've aimed to do here is simply lay out the bigger components, especially KCGM — obviously the waste stripping, a multiyear project that unlocked the high-grade Golden Pike North and Fin South. Clearly, Yandal will really be a pit, and Wonder, which I've mentioned, feeding the Thunderbox mill. And then you've also got Porphyry and Wallbrook open pit feed for Carosue Dam. So broadly, they're there. I'd just say that throughout the business, it's simply mine development — as I said, getting into new areas is what I would highlight.

Operator

operator
#58

<<operator_script>> Our following question is from Kate McCutcheon at Citi.

Kate McCutcheon

analyst
#59

On the M&A question Matt raised — you have substantial liquidity, yet there's also plenty on the horizon with KCGM and so on. How are you viewing the portfolio at this point? You've described having 3 to 5 assets as a strategic goal. Are you actively evaluating anything further? Or is the near-term focus, I suppose, on organic growth for now?

Stuart Tonkin

executive
#60

Yes. Thanks, Kate. Look, we’re seeing some of the strongest returns among our organic opportunities. And clearly, that — that gives us confidence to commit to things such as the Fimiston mill expansion. We do have strong liquidity and a strong balance sheet. We always evaluate opportunities, but we’re picky, and obviously we don’t need to do anything. So we still expect to see that sort of lower end of the small cap space, with lots of jostling and collaboration or consolidation at that end. But that’s not typically the space that materially changes our well. So we just — we’ll keep that for you in our long-term strategy around having that sort of 3 to 5 assets and maintaining the lowest cost portfolio we can attain. So we’ll always evaluate opportunities as they come up.

Kate McCutcheon

analyst
#61

All right, understood. It was also great to see the Pogo Q4 figures. What has mainly been behind that improvement, or the step change that made the quarter-on-quarter increase possible? Stoping tonnes appear flat, yet you regained those development meters. The second part of my question looks ahead. So what operational goal comes next at Pogo? Is it still about taking costs out? Or is there further head grade upside to reserve to pursue?

Stuart Tonkin

executive
#62

Absolutely, and thank you, Kate. I had actually been hoping someone would ask about Pogo following 20 quarters <<inaudible>>. For everybody on the call, 80,000 ounces is a truly exceptional outcome. What's impressive is that it didn't come from grade alone. We aren't even mining at reserve grade yet, since development ore still accounts for one-third of the ore feed. And clearly, the stoping grade runs higher. So I'd say this really speaks to how consistently we've been advancing development meters. We stated we'd exceed 1,500 per month, and in the quarter we averaged 1,700 per month, opening up these new mining fronts and giving the mine plan greater flexibility, so you're not operating hand-to-mouth and you have capacity available. Then there are the underground ore bins and achieving steady feed to the plant. Of course, during quarter 3 we experienced the mill motor failure. That was fixed. But it also gave us a chance to review the main flowsheet and the critical elements of that aging plant and reinvest in them. So for us, the task is about stabilizing — holding and stabilizing at these levels. As everyone knows, we've guided 260,000 to 280,000 ounces at Pogo for this year, with emphasis on optimizing costs and inputs. That means resourcing levels for equipment, people, and reagents consumables.

Stuart Tonkin

executive
#63

One thing that really matters here: in the last quarter, all-in sustaining cost came in at USD 1,250. We're putting a lot of effort into bringing that unit cost lower, and then the growth sits on top of that. But you've got a resource of more than 7 million ounces, and tremendous exploration success, including targets like Star that we still need to drill out. I genuinely believe the quality of this asset, along with over USD 60 million in operating cash flow for the quarter, is something people will focus on. That will increasingly become a factor for people when they assess the valuation.

Operator

operator
#64

The following question is from David Radclyffe of Global Mining Research.

David Radclyffe

analyst
#65

I have a quick question about KCGM and then about recoveries. Obviously, mill tonnes went up during the quarter, and grade did as well, but despite the higher grades, the trend of lower recoveries overall over the last year is still continuing. So I'm really just trying to understand what's going on there and what the expectation is going forward. Is this the new level until the new sort of mill is in place?

Simon Jessop

executive
#66

Yes. Thanks, David. This is Simon. Definitely not. Don't drag right on quarter 4 in terms of recovery. If you look at the year, early in the year, we were 86% -- 85% to 86%. And then in quarter 4, we had some float circuit issues and gravity circuit downtime, which really, they're the 2 things that hurt us on recovery at KCGM. They've since been rectified and fixed and moved back to normal recovery. So over the full year, we averaged around that 84%, and that's consistent for KCGM. So certainly quarter 4 was not -- was the low quarter for us over FY '23 and historically. But now back to normal levels of recovery at KCGM.

Operator

operator
#67

Thanks. At this point we don't have any more questions. I'll turn things back over to Mr. Tonkin for some closing comments.

Stuart Tonkin

executive
#68

Alright, thank you for being with us on this morning's call. It's really gratifying to finish FY '23 on a strong note and to stand in a position of strength as we head into FY '24. I'm looking forward to bringing you updates as we keep moving forward with our strategy of profitable organic growth. Have a good day.

Operator

operator
#69

With that, we’ll wrap up today’s conference. Thanks for joining us. You’re welcome to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Northern Star Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Northern Star Resources Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northern Star Resources Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.