Northern Star Resources Limited (NST) Earnings Call Transcript & Summary
July 24, 2024
Earnings Call Speaker Segments
Operator
operatorAppreciate everyone joining us. This is the Northern Star conference call covering our June 2024 quarterly results. Everyone is muted for now. We'll go through a presentation, and after that there will be a Q&A session. Should you want to pose a question, press the star key and then the number one on your phone's keypad. At this point I'll pass things over to Mr. Stuart Tonkin, our Managing Director and CEO. Over to you.
Stuart Tonkin
executiveGood morning, and thank you for being with us. Joining me on this call are our Chief Operating Officer, Simon Jessop, and our Chief Financial Officer, Ryan Gurner. I'm happy to report a standout June quarter that brings FY2024 to a close. Thunderbox and Pogo were both standouts for us, posting record results, and the rest of the portfolio kept performing strongly as well. During FY2024, our people achieved record gold sold along with record net mine cash flow. That speaks to the quality of the asset portfolio spanning our three production centers, and it shows the value our investment is creating to unlock future ounces that are low-cost and high-margin. I'm especially proud of our people, who delivered safely against our FY2024 commitments. Thank you for everything you've done, and those efforts are carrying into FY2025 as we push ahead with our profitable growth strategy. In the June quarter, we sold 439,000 ounces at an all-in sustaining cost of AUD 1,815 an ounce, which generated underlying free cash flow of AUD 189 million, up 32% from the March quarter. For the full year, underlying free cash flow came to AUD 462 million, up 29% from last year. As our results show, Thunderbox and Pogo were the quarter's standouts, with record mill throughput and, in turn, record gold ounces.
Stuart Tonkin
executiveAll of our production sites continue to generate positive net mine cash flow, so each one funds its own expansion. At the group level, our balance sheet stays resilient, with a net cash position of AUD 359 million. That financial strength lets us cover every growth investment, exploration program, and capital management initiative, including dividends and share buybacks, as we showed during FY2024. At the KCGM mill expansion, on-site construction is tracking to both budget and schedule. Seeing this work underway at KCGM is exciting, since it will double the plant's throughput to 27 million tons per annum and raise output to 900,000 ounces per annum by FY2029. Next Sunday, investors and analysts will get the chance to visit KCGM and see firsthand the significant progress achieved ahead of the Diggers and Dealers Conference. We also issued FY2025 guidance today. We expect to produce 1.65 to 1.8 million ounces of gold at an all-in sustaining cost of AUD 1,850 to AUD 2,100 an ounce, into a very healthy gold price environment that currently sits around AUD 3,500 an ounce. As in previous years, planned major shutdowns will take place across all three production centers in the September quarter, so FY2025 delivery will be second half weighted.
Stuart Tonkin
executiveWe're now more than halfway through our five-year strategy for profitable growth. Under that plan, production rises to two million ounces by FY2026 and, even more significantly, it lets us deliver greater free cash flow. Having put three years into our growth investment, we've generated AUD 1.3 billion in free cash flow, and that validates why we believe this strategy creates value. For FY2025, we expect capital expenditure of between AUD 950 million and AUD 1 billion, plus AUD 20 million, along with KCGM mill expansion CapEx of AUD 500 million to AUD 530 million, now in the second year of its build phase. Before I pass things to Simon for the Australian operations: Pogo in Alaska had an outstanding quarter, setting a record for gold sold at 91,000 ounces with an all-in sustaining cost of $1,091 an ounce, which produced record mine operating cash flow of $107 million and record net mine cash flow since Northern Star took ownership. That speaks to the team and to the strength of the asset, and it also set a record for annual gold sold of 278,000 ounces at the top of the guidance range. I'd remind listeners that Pogo holds a gold resource of nearly seven million ounces at above 10 grams per tonne, which shows we'll be producing strong US dollar cash flow for the next decade plus.
Stuart Tonkin
executiveThat's a tremendous accomplishment — congratulations to Team Pogo. Simon will now cover the Australian operations.
Simon Jessop
executiveThanks, Stuart. Turning to the Kalgoorlie Production Centre — that covers KCGM, Carosue Dam, Kanowna Belle, and South Kalgoorlie — gold sales came to 221,000 ounces, a decline of 2%, with an Australian all-in sustaining cost of AUD 1,712 per ounce. That output generated mine operating cash flow of AUD 335 million, which is 10% higher quarter-over-quarter. The region also invested AUD 264 million in significant growth capital projects. Within that, AUD 101 million went to the KCGM mill expansion, AUD 52 million to the KCGM open pit mine development, and AUD 24 million to underground mine development. We've also begun commissioning successfully the new tailings storage cells E and F at KCGM, and together they hold 147 million tonnes of total capacity. At the KCGM open pit, material movement reached 16.6 million tonnes, since we gave priority to partial access mining of Golden Pike North, where an additional 43,000 ounces were mined during the quarter. Work on the east wall cutback carried on, as did Oroya Brownhill and Fimiston South. Over the full year, we mined 72 million tonnes of ore and waste, with the open pit team continuing to juggle competing priorities. We're still on track to get back full access to Golden Pike North in quarter two of FY2025.
Simon Jessop
executiveFor the Kalgoorlie region, underground mining volumes rose 3% to 1.55 million tonnes, while grade climbed 12% to 2.8 grams, delivering 143,000 ounces. That better grade came from the Kalgoorlie operations, the South Kalgoorlie mine, and the Carosue Dam mine sequence. At KCGM, underground operations lifted development by another 11% quarter-on-quarter, reaching 4.2 kilometers. Those development meters will keep stepping up each quarter from here, as two new jumbo fleets arrive at the end of the financial year. All of the Carosue Dam underground mines did well, producing 54,000 ounces during the quarter. Open pit movements were up 16% to 1.3 million BCMs, even though steady rain weighed on these positive results. Underground mines at the Kalgoorlie operation raised both mined ore volumes and grade, which rose 36%, helped by South Kalgoorlie's mine averaging 5.4 grams a tonne across 37,000 ounces in the quarter. Processing volumes at the Kalgoorlie production centre were up 13% quarter on quarter, since KCGM ran a smaller planned shutdown and Carosue Dam delivered solid milling performance. KCGM's head grade fell as less high-grade ore was available from Golden Pike North, and that was offset by lower-grade stockpile ore. KCGM recovery took a hit from a float circuit and Gidji losses, and both are being dealt with in the first quarter shutdown of FY2025.
Simon Jessop
executiveCarosue Dam's processing wrapped up the year with a fresh annual record: 3.9 million tonnes put through, and that's a huge tribute to the team. Over the quarter, the KCGM mill expansion used AUD 101 million, engineering progress overall stands at 44%, and the major equipment package is 42% complete. At the close of June, concrete pouring sat at 9%, whereas right now, as we sit here today, it's at 18% poured, and the biggest single pour — 1,600 cubes — was finished in early July for the ball mill raft. We're really happy with what's happening on the ground in construction, and we're eager to showcase how the KCGM mill expansion project is advancing during our upcoming KCGM site tour. The project is still on schedule and following the plan. Over at our Yandal Production Centre, which takes in Jundee and Thunderbox, we sold 127,000 ounces of gold at an Australian all-in sustaining cost of AUD 2,109 per ounce. That output generated mine operating cash flow of AUD 155 million, and we invested AUD 81 million in growth capital projects, mainly at the Orelia open pit and Wonder underground. At Jundee, development advance came to 7.6 kilometers, a rise of 10% quarter-over-quarter, with 796,000 tonnes of ore mined and 88,000 ounces, which is up 20% quarter-over-quarter.
Simon Jessop
executiveThroughput came in below nameplate capacity because of a fire at a fixed plant that hit the gold room and the rear section of the processing facility, necessitating substantial electrical rectification work. The consequences of that May fire had been remedied by the close of the quarter, and a sizable accumulation of gold in circuit occurred, while gold sales were softer owing to fewer mill tonnes. At Jundee, the renewable initiative — a 16 MW solar farm paired with a 12 MW battery system — is now in its last commissioning stages, and partial renewable power is already being exported successfully to the grid. In addition, one of the four wind turbines has been erected, with the crane progressing through the program before commissioning of that stage commences. The Thunderbox underground mines, Thunderbox and Wonder among them, delivered 613,000 tonnes of ore for 35,000 ounces at a head grade of 1.8 grams per tonne. The Wonder underground mine kept ramping up ahead of plan, with 1,508 meters developed using one jumbo during the quarter. Credit goes to the Northern Star Mining Services team, who are building this mine alongside the Thunderbox technical team ahead of plan at low cost, which in the end delivers high-grade ore feed to the Thunderbox mill sooner. During the quarter, the underground and open pit operations mined 1.5 million tonnes of ore successfully, which matches the expanded mill's quarterly nameplate.
Simon Jessop
executiveOver at the Thunderbox processing plant, we hit nameplate on a quarterly average basis — 1.5 million tonnes milled — and sold 63,000 ounces of gold, which is up 40% quarter-over-quarter. Mill throughput came in at an impressive average of 795 tonnes per hour during the quarter. Availability also set a fresh quarterly record at 85%, and those figures include a significant shutdown that took place in April. Across the first full financial year of processing, we reached 87% of nameplate throughput. We keep working on availability in the crushing circuit as well as milling stability by fixing known wear points. That final quarter is a terrific outcome for the Thunderbox team, who keep unlocking the full value of this major plant expansion. I'd now like to hand things over to Ryan, our Chief Financial Officer, to talk through the financials.
Ryan Gurner
executiveThanks, Simon. Good morning, everyone. Today's results show that the company is in a strong financial position. Following an excellent quarter, we've increased our net cash position to AUD 359 million and increased our cash and bullion to AUD 1.25 billion. The company has generated record full year cash earnings of approximately AUD 1.8 billion, and as forecasted, we've delivered a material uplift in the second half, driven by higher production, lower unit costs across the business, and higher gold prices. A reminder that the company's policy is to pay 20% to 30% of cash earnings in dividends. Figure 9 on page 11 presents the cash, bullion, and investments movement for the quarter, key highlights being operating cash flow of AUD 688 million, a 31% lift on the prior quarter, and underlying free cash generation of AUD 189 million, bringing FY2024 underlying free cash flow to AUD 462 million, up 29% from prior year. Importantly, all production centres are delivering strong net mine cash flows, which totaled AUD 686 million for the full year. As Stu mentioned, Pogo, an absolute standout, delivering a record contribution of AUD 238 million for FY2024. Growth capital investment during the quarter related to key growth projects, including at KCGM, Fimiston South cutback, and East Wall remediation works, development at Porphyry Underground and Wallbrook Open Pit at CDO, development Orelia Open Pit, Wonder Underground, and remediation works at Thunderbox processing plant, and approximately AUD 100 million for the KCGM plant expansion was incurred during the quarter.
Ryan Gurner
executiveSpending on the project across FY2024 came to roughly AUD 350 million in total. The lower figure stemmed from the timing of certain procurement packages reaching finalization. Even so — and this matters — critical milestones, the schedule, and the budget should all remain unaffected. Turning to other financial items, full year depreciation and amortization came in at AUD 703 per ounce, which sits within the AUD 650 to AUD 750 per ounce guidance range, while non-cash inventory charges reached AUD 34 million in total, most of which relates to milling of stockpiles at KCGM. Under the company's continuing capital management program, the on-market share buyback carried on through the quarter. A total of 305,000 shares, amounting to AUD 4 million, were bought back and cancelled. Since the program began, 19.5 million shares have been acquired at an average price of AUD 8.85 per share. AUD 128 million is still outstanding, and the program stays open until September this year. As a reminder, our blackout period applies until the FY2024 results come out in August. After a strong Q4, the company is well positioned to deliver FY2025 production and cost guidance. Sustaining capital expenditures are forecast to stay inside our present range of $200 to $250 per ounce sold. FY2025 growth capital, excluding the KCGM expansion project, is guided at a midpoint of AUD 985 million.
Ryan Gurner
executiveThis investment focuses on our organic growth options that prioritize returns. At the Kalgoorlie production hub, most of the capital goes toward projects that will provide mill feed and infrastructure for expanding the KCGM plant. Those projects cover development and ramp-up at the Mount Charlotte and Fimiston underground mines, open pit material movement, and infrastructure needs. At Yandal, the bulk of the capital investment involves advancing existing Thunderbox mill feed sources at the high-grade Wonder underground and Orelia, plus development of the Bannockburn open pit. At Jundee, mine development will begin at Cook-Griffin, a recent exploration success, and carry on at the main Jundee ore body, with additional infrastructure planned. At Pogo, mine development and resource drilling represent an ongoing capital requirement to open new mining areas and raise the number of available headings. In early FY2025, major infrastructure works will be carried out to maximize plant utilization and availability, including rebuilding the ball mill motor and replacing the trunnion. FY2025 milestones for the KCGM expansion project include delivery and installation of major equipment, along with commissioning of service infrastructure. We are guiding FY2025 spend for the project at AUD 500 to AUD 530 million.
Ryan Gurner
executiveFor FY2025, exploration spending is expected to reach AUD 180 million. Mine exploration investment will concentrate on KCGM and Jundee, while at Pogo we plan extra drilling at the Star Discovery. A key point: thanks to the company's solid liquidity of AUD 2.7 billion, our profitable organic pipeline and exploration work are completely funded. Lastly, on hedging, table 5 on page 11 lays out the company's committed hedge position as at 30 June. The total hedge book sits at 1.8 million at an average price of $3,122 per ounce. I'll now hand things back to the moderator for Q&A. Thanks very much.
Operator
operatorThanks. If you'd like to pose a question, hit star one on your phone and hold until your name is called. Should you want to withdraw that request, just press star two. When using a speakerphone, kindly lift the handset before asking. Our first question is from Mitch Ryan at Jefferies. Please proceed.
Mitch Ryan
analystMorning, Stu and everyone. My first question is about the $2 million of production you've restated for FY2026. How are we meant to interpret that figure? Does it represent the bottom end of a guidance range, closer to a midpoint, or a stretch goal for your FY2026?
Stuart Tonkin
executiveThanks, Mitch. So, what we released today, I suppose, is the FY2025 guidance outlook, and I'd like to restate that this represents a checkpoint on the growth path toward two million by FY26, and after that comes the expanded Fimiston plant, which adds 250,000 per annum across FY2027 through FY2029. So yes, FY2025 is yet another year of growth, and the pledge, as we've maintained in our five-year strategy, is to expand to that profitable two million in FY2026, and we are a majority of the way through that plan, with a great many of those actions already delivered. So yes, we're very happy with how we're tracking. It isn't a straight line. Let me remind everyone about our planned shutdowns. They take place in quarter one, so the year is second half weighted, and quarter one will be the softer quarter of the year. So yes, it isn't a straight line, but we remain on our growth trajectory, and it's performing well in cash generation.
Mitch Ryan
analystAll right, so the goal there is AUD 2 million, is that right?
Stuart Tonkin
executiveThat's fiscal 2026 — FY2026. I haven't issued guidance for FY2026, but that's the five-year strategic plan of ours for delivering two million ounces out of the three assets in FY2026. So what we guided today is the FY2025 checkpoint, and that's 1.65 to 1.8 million ounces.
Mitch Ryan
analystRight, so that figure isn’t an exit rate — it’s a production number covering the whole of FY2026.
Stuart Tonkin
executiveYeah. So really, the last remaining component needed for that to be achieved is the grade from Golden Pike, which lifts KCGM from 450,000 to 650,000 per annum, with the other assets sitting in a steady state as a complement. So Pogo at 300,000, Yandal at $600,000, and of course the balance being Kalgoorlie, but KCGM represents the big step change in that final year, and Simon has given an update on the progressive access of the East Wall remediation, along with access to that high grade and destacking those benches within the better graded gold pipe.
Mitch Ryan
analystAll right, that's great. Thanks a lot. I appreciate you clearing that up. My follow-up question is just about — yes, again, you mentioned that September quarter, the shutdowns, and that it will be the weakest quarter. The magnitude is sometimes roughly somewhere in the range of 7% to 15% versus the June quarter. Is that a reasonable range, or could you share any size of the size of those shutdowns?
Stuart Tonkin
executiveYes. The middle mass looks solid. That seems about right. If you look at quarter one of last year, that was our lightest quarter. It came in sub-400. What we'll highlight here, I think, is that Pogo's mill is basically down for five weeks at a derated throughput, and that's for substantial project work, which has started and is tracking well at Pogo right now. So Pogo is probably the weakest site in terms of performance, coming off a strong 91,000 ounces. It drops right back down with five weeks out of the quarter, and then those other planned major shuts across Yandal and Kal happen as well. So for the full year, the run rate from the last three quarters is a very good indicator that gives us confidence about how we move into FY2026, and most of that expected step back relates to the impacts in quarter three. It's planned work, work that's well run. We're always asked to design it differently, but this is how the overall plan has unfolded each year, and the strong quarter four was delivered. We're not falling off a cliff in quarter three. It's planned work in this first quarter, but it's simply the work that has to be done to secure these assets over the years ahead.
Mitch Ryan
analystThat's great. I appreciate it, and I'll share it with the team. Thanks.
Stuart Tonkin
executiveThank you, Mitch.
Operator
operatorOur following question is from Kate McCutcheon at Citi. You have the floor.
Kate McCutcheon
analystMorning, Stu. Regarding the Super Pit, you’d previously shared some material movement guidance, and I believe 2024 was meant to be the peak at 85 to 95 million tons, but it appears that fell short. Could you speak to how stripping looks this year and next year, and then what share of that stripping is the guidance portion for KCGM this year?
Stuart Tonkin
executiveYes. Thank you. I’ll hand it over to Simon to respond. Yes. Thanks, Kate. We’ll take a look and give a solid update on the KCGM movements and where things stand for the site visit in a couple of weeks. So, as we’ve previously guided on strip ratios and similar items, we’ll review that during the site visit just before diggers. But for the overall year, quarter three was especially difficult because of rain—substantial rain across the quarter. So what we did was simply prioritize where we worked in the pit during that quarter. We therefore reduced some material movement, which we can make up in the Fimiston South area, and really focused on the high-value OBH areas and the East Wall remediation, since that is the largest value driver. You also saw us gaining access to Golden Pike North, with partial access somewhat ahead of plan. So we pulled some of that forward, which clearly means longer haul distances for the trucking fleet. So no concern at all. We still guide to $80 to $90 million ton, and that is where we will consistently be going forward.
Kate McCutcheon
analystAll right, understood. And remaining on CapEx — from where we sit, it's tough to get a clear read for modeling the ongoing CapEx needed to open up some of those ore sources at Yandal, for instance. So I believe there's an additional AUD 50 million this year to open up some of those pits, and you've provided some detail on Thunderbox in your slide decks. How should we think about that CapEx going forward? I realize we only have 2025 guidance as of today, but does it step back next year, or what kind of detail can you offer regarding when additional pits need to come in? I mean, opening up Cook-Griffin, for example — unless I missed it — wasn't really something I had on my radar as CapEx that had to be spent this year. So just, if you could walk through some of those mining areas that come in.
Stuart Tonkin
executiveSure, thanks Kate. I'd say I agree — it doesn't necessarily have to take place. Our aim is to consistently bake contingency into the plan so that we're able to give steady guidance across the forward outlook. So whenever we're in a position to take things through approvals and speed them up, and the cash flow supports it, those projects do get brought online, which gives us that diversification of production centres, and so on, so that we can handle weather events or approvals timelines slipping or other issues. So yes, Cook-Griffin, a great opportunity. We're kicking that off underground with Northern Star Mining Services. We did something very similar last year, obviously with Yandal getting started early, I suppose ahead of the timing. And then the other CapEx increase is probably the TSF down at Kalgoorlie arriving early because of the expanded mill plant. These items sit in our life of asset plan. They're all scheduled and sequenced, but ideally our objective is to de-risk. So when the cash flow is there and the budget is there, we've got sequence and priorities, but we will pull these things forward early. We're glad to — it isn't an oversupply, but certainly de-risk it, develop it, build stockpiles close to our mills so that on any given day we have that blend of ore that we can send in.
Stuart Tonkin
executiveI do recognize that in FY2025 CapEx has come in above what consensus expected. I also think that, directionally, we move past this hump, and we have taken out risk while building golden stockpiles and golden circuits. My understanding is that it now stands above 3.5 million ounces, and that benefits investors: it secures forward earnings, it secures material near our plants, and we always aim to remain ahead of that investment. I would also describe it as discretionary. Should conditions shift, we can in fact scale back a portion of this investment, but under current conditions, we are pushing as hard and as fast as we can to build in that contingency. So I know you want to see the returns behind it. I am confident that we examine it through a returns lens, that we are observing multi-digit IRRs, and that our choices in this area are lifting our margins and lifting our overall returns. That is the lens through which we view these organic investments. And that is against a question that will likely arise on the call about M&A: our organic opportunities take precedence over everything else we have been examining, since this is our business, this is our work, and this is what complements shareholder returns.
Kate McCutcheon
analystAll right, that clears things up. Thanks, Stu and Simon.
Stuart Tonkin
executiveAppreciate that, Kate.
Operator
operatorOur following question is from Levi Spry at UBS. You have the floor.
Levi Spry
analystHello, Stu and everyone. I have a couple of questions, if I may. First, regarding Thunderbox — apologies, I'm juggling several callers at once here. Could you walk us through what made it so strong? It looks as though things are back on track. Perhaps a little more detail on that, please, Simon.
Simon Jessop
executiveYes. Thank you, Levi. Really, what we concentrated on during the quarter was that availability — specifically raising the availability of the crushing circuit so we could bring stability to both the process plant and the milling. You saw the result of that in the 795 tons per hour average for the quarter. Nameplate is 750 tons per hour. Even in June we saw sprint capacity — the whole of June averaged 820 tons per hour. So we keep working away at availability. We still think there's another five or six% of availability we can eke out of that infrastructure. And we know which areas to focus on, so the points are known, but I'm really pleased with the team in terms of just constantly working through the areas that fail and then putting long-term rectification pieces in place. It was a big year for the team, but really pleased to get 1.5 million tons for quarter four and to start FY2025 in a strong position from a process plant perspective.
Levi Spry
analystYeah. Great. Thank you. Thanks, Simon. So maybe just regarding the capital question, and building a bit on those quick questions asked earlier, how are you able to help us over the sort of three to five-year timeframe, Stu?
Stuart Tonkin
executiveWell, we don't provide guidance that far out, but here's what I'd say: growth CapEx is what delivers growth. So at two million ounces for FY2026, you can see the capital needed to deliver Fimiston. This year is the second year of that, with AUD 530 million being spent this year. So you've got the tail end of that CapEx carrying into 2026, and then a small portion in 2027 on Fimiston, so another AUD 500 million in 2026 there. But the rest of what's needed to hold that two million ounce profile across those assets is essentially an open pit or an underground coming online each year, and then TSF adds to that, with multi-year increases, so whether it's dollars in a given year that get amortized over the future life of the asset and things like that. I'd also add that we're seeing an enormous amount of opportunity. So we're going to raise our exploration spending, from AUD 180 million to AUD 200 million this year. If that unlocks things such as the Hercules discovery, just under 20 km from the Fimiston plant, capital will come quickly to develop that into a mine and get that gold into the mill. So there's still, I suppose, for analysts and investors, it's difficult to say, "Well, you don't have visibility out five years and you're talking about things we've never heard of." We're still discovering things like Hercules this year that I will prioritize and fast track, and it will draw capital, but it will draw superior returns because of the success of the exploration team.
Stuart Tonkin
executiveSo please be patient with us somewhat, because sustaining capital is needed to keep up 200—sorry, two million ounces annually, and usually we are a year in advance. The capital we spend runs a year ahead of when output actually arrives. We will build a stockpile. Develop a mine, build a stockpile close to one million, and those ounces will arrive the following year. That is just how it works. But yes, as we recognize, FY2025 remains a year of very heavy lifting on the capital side.
Levi Spry
analystYes. Appreciate it. Thanks, Stu. Perhaps I could just slip in a question about assets. So how should we think about that alongside the volume growth?
Stuart Tonkin
executiveOkay, so again, we've provided an AISC range of AUD 1,850 to AUD 2,100, and that takes into account the current gold price, the costs it brings along, and the behaviors it encourages. I'm also considering, against the backdrop of reductions in nickel and lithium, and even some gas coming out of iron, that there's potentially some cost plateauing or perhaps even some retraction savings when it comes to energy and labor. So we haven't incorporated that into anything across our costs in dollar millions. And then, as you mentioned, economies of scale or the denominator of gold sold — just as a see-through on Pogo, it delivered AISC of $1,090 an ounce in the quarter. So you've got a margin of over 100% between the US price and AISC, and on a dollar millions basis, it's still sitting at over $30 million per month US. I sort of mentioned that we still have the new trucking fleet to bring in, going from around 10 trucks to 6 trucks, and to reduce labor and cut maintenance costs around that fleet. So there are some improvements we're seeing that will make true step-down changes. And then, as we've lowered stripping ratios across the business and get into the primary ore of these pits, we're also seeing some benefit there.
Stuart Tonkin
executiveI might, though, have been somewhat cautious when it comes to pulling costs lower, right? If we look across the peer group in consensus, we're likely observing that same pattern, and expecting that standing pat is a positive in this kind of environment. We will continue moving down the cost curve, but we need to see how most others report on AISC.
Levi Spry
analystAll right. Thanks. I appreciate you taking the time. Thank you.
Stuart Tonkin
executiveAppreciate that, Levi.
Operator
operatorDaniel Morgan of Barrenjoey has the next question. Go ahead, please.
Dan Morgan
analystHello, Stu and the team. My question concerns Pogo — specifically the outage, or the mill maintenance period, that you're carrying out, I suppose, right now as we speak. How does that affect accommodation? I'm thinking ahead: once it's finished, will constraints on accommodation cause development rates and mining rates to take a hit for a while as an aftereffect? Thank you.
Stuart Tonkin
executiveOh, thank you, Dan. So a few things occur over the course of the year that let us sort of decouple the activities, since we're really hand-to-mouth there. A lot of the great work the team's done means that when the mill's off, we don't halt mining the way it used to sort of back up within a day or two. So obviously, the ore passes in this season, surface temporary stockpiles can be built, prioritizing of waste development and grade. But in the last quarter, we averaged more than 1,600 meters a month, so we're ahead on the development rates, and a lot of good work's going into doing that. So I don't see any mining impacts throughout the five weeks. That means that we're behind the game. In fact, we'll build contingency up to be ready to turn it on well. And we're also running on a SAG-only case, we're at about 30% to 35% of the general throughput, which is good for gold production, but it's better that you're keeping all the rest of the plant running so that it's not sitting idle. And yeah, so just keeping it all moving and keep the team employed in that period. So that's all useful.
Stuart Tonkin
executiveAnd the significant project work that's happening at the moment really future-proofs this asset. So that motor which failed in February of last year — we've obviously completed a full rewind on it and have a replica spare on hand. Then there's a lot of work on the ball mill, plus all the project work surrounding coarse ore bins and fine ore bins, to ensure these don't cause us problems for the rest of the year. So yeah, accommodation and that kind of thing, the construction crew — they're all on site. All of that will be wrapped up, finished, and demobilized within four weeks, and then we'll be back on. So yeah, a pretty impressive outcome. I really can't stress enough: 91,000 ounces at $1,090 AISC US$ an ounce, $107 million — and reminding everyone that we paid $260 million for this asset five years ago, and here we are with a multi-decade outlook. So it's a fantastic asset. So it's worth investing in.
Dan Morgan
analystNo. Thanks a lot for sharing your views.
Operator
operatorOur following question is from Matthew Frydman at MST Financial. You have the floor.
Matthew Frydman
analystSure. Thanks. Good morning, Stu and team. Could I pick up where Levi left off with his questions about the business's all-in sustaining cost base? And I suppose really framing things more in dollar million terms, you spent roughly AUD 3 billion on all-in sustaining costs in FY2024. Your guidance suggests that will rise to around AUD 3.4 billion in FY2025, so roughly a 15% increase. Could you walk us through what the high-level drivers across the business are that are producing that increase? Stu, you mentioned labor costs, energy, consumables — all of those have gone up, and there may be some conservatism in your guidance around those. But to my mind, that doesn't really account for a 15% increase to the sustaining cost base. My interpretation is that it's more driven by, I suppose, increased material movements across the business, bringing on new feed sources, perhaps a larger proportion of higher cost underground tons as well. Is that a fair assessment of what FY2025 looks like? And then looking beyond that, should we expect that your sustaining cost base will keep growing ahead of, I guess, what we would consider to be industry cost inflation in order to deliver that two million ounce target?
Matthew Frydman
analystIs this situation one where you still have to add higher-cost feed sources to hit those figures, or is that rise something fairly specific to FY2025? Are there any factors worth flagging that are somewhat unique? Thanks.
Stuart Tonkin
executiveThanks, Matt. There's a lot in that question, but I'll take it on. So obviously our exit rate for the year was 1.621 million ounces delivered at mid-$1,850 AISC. And then looking ahead, as we say, the bookends are 1.65 to 1.8, with AISC at $1,850 to $2,100. I understand the point that if you take the midpoints, it looks like a big step up from what we've just delivered. A couple of things factor into that. We have visibility on renewed contracts with escalation. So there are some known costs from long-term contracts we've negotiated with major suppliers who are doing a fantastic job, and with valid cost impulse, we've recrossed those contracts. So we've got that. We also see the elevation in what the gold price is doing flowing through to costs around royalties and other things it attracts. We'll also see the introduction of things like traditional NSR royalties that start to come in more earnestly this year. So they're impacted in there. We've got a higher escalation, or view, of where some energy input costs are for the year. We may not see those, and we may enjoy a reduction of those, but yet to plan.
Stuart Tonkin
executiveI'd prefer to err somewhat on the cautious side relative to what history has shown us in that area. There are still certain grade-related factors in the interim before reaching that full state. So you noted that these are higher-cost tons, higher-cost underground tons. I suppose that isn't quite it. What it is, is that lower-grade material has now become materially profitable. And I won't say ignore the margin, but I will say that the grade determines it. So when you reduce it by decimal points, your AISC will rise. But with gold at $3,500 an ounce and your reserves set a bit above 2,000 and your resources around 2,500, there's considerable headroom for profitable material located in and around the operations we're mining. It can alter strip ratios. If you have mill capacity, it can alter cash flows, all of those things. So we're also mindful of those grades and the incremental material that can be milled, even though at a higher AISC, yet producing meaningful cash flow from those tons. So a portion of that incremental material sits in that plant. And then, yes, look, this is a checkpoint along the path toward the sustaining long-term component. So Simon discussed Thunderbox, achieving stability, but we still have 5%+ availability to extract from that.
Stuart Tonkin
executiveWe've loaded it up with maintenance labour. We'll bring it up, get it stable, then we'll begin pulling some of those resources away. So there are some costly ounces right now simply because we're building in contingency. But if you look across the sector, I think we're still pretty healthy compared to the average of increases that you're starting to see. So I'm not saying we're the best of the worst bunch. I'm just saying it is what happens when the gold price goes up. It drags the costs up as well. So yeah, midpoint is still sub $2,000. And when you start looking at the margins to that, it's very strong. So hopefully, comprehensive answer to your comprehensive question, Matt.
Matthew Frydman
analystNo. I appreciate that, and thanks. It's clearly multifaceted, so I appreciate the extra detail. Maybe just quickly, could I ask about the buyback? I know Ryan mentioned this in his remarks, but obviously you guys have been quite judicious in exercising it. You've obviously been constrained by blackout periods as well. Can you just remind us, I suppose, how you think about when you decide to enter the market with the buyback? Obviously, you're sort of recutting your view of the value of the business based on gold price movements, et cetera, et cetera. But I mean, broadly, in a gold price environment, all else being equal, should we expect that you would re-enter the buyback at similar levels if blackouts weren't constraining you?
Ryan Gurner
executiveYeah, Matt. Look, this is opportunistic, mate. I mean, I mentioned earlier that we've purchased close to 20 million units at an average price below AUD 9. So I suppose we're not simply saying, "Lock that in and just buy out the remainder." We're aiming to be opportunistic. Obviously, there's volatility in our own share price, and there's competing capital as well. So I think the best way to frame it going forward is that it's a board decision whether we extend the buyback, raise it, or step away from it entirely at this point. But that will be considered within the context of the next few years, the outlook, and all those factors. So I guess in short, we're opportunistic about it, and I think it's worked well so far.
Matthew Frydman
analystThanks, Ryan. Thanks, Stu.
Stuart Tonkin
executiveI appreciate that.
Operator
operatorAs a reminder, if you'd like to pose a question, just hit star one on your phone and hold until your name is called. Our next question is from Hugo Nicolaci at Goldman Sachs. You're up.
Hugo Nicolaci
analystGood morning, Stu and the team. Appreciate the update today. Starting with my first question, as I look more closely at POGO, could you give us some additional detail on what drove such a solid quarter? How much of it would you attribute to pushing the mill hard during the major shot, versus possibly some plant-level optimizations that you might be able to sustain going forward? Then I'll follow up with my second question. Thanks.
Stuart Tonkin
executiveYeah, so look — to produce that strong quarter, I’d say everything was firing really well. Mining physicals were running ahead of plan. Mill throughput came in above nameplate and stayed very consistent across the quarter. Grade, obviously, was achieved pretty consistently throughout the quarter as well. So all of those factors — controls and stability — produced that exceptional result. You can see our costs in dollar millions remain elevated while we’re transitioning the fleet and also getting change management settled and stability embedded. So there’s still room to bring down overall input costs. But we’re also putting in hard work on all the planning and preparation to manage this plant shutdown and refurb on the plant during this quarter. So a lot of thought went into that. So yeah, I wouldn’t frame it as there being just one single thing. I think the entire team across every department absolutely nailed what they did. They’ve done it before — just not for 90 days in a row. So I’d give the credit as we’ve always seen the highlight of a week, a month, two months. Then something would come along — either due to age of fleet or some other hand-to-mouth issue — which sort of eroded, impacted a week or two, or the mill motor failure, those kinds of things which, when you zoom out, looks like a low average.
Stuart Tonkin
executiveHowever, we consistently looked at the key indicators of mine development, stoke grades, milled grades, mill throughput, and run rates. So it's good to see that holding very steady, which clearly has produced a run rate of more than 360,000 ounces per annum. That's the way I think people should view this asset — we're aiming to bring it to a steady 300. It just achieved a 363 run rate during the quarter. So that's not what we're asking of it.
Hugo Nicolaci
analystThanks — that added detail is helpful. My second question returns to the FY2025 cost element. Could you give a bit more clarity on what portion of the all-in sustaining cost guidance could be affected by inventory adjustments, perhaps through things like shutdowns? And any further detail on what you mentioned about royalties rising at certain assets this year from items such as native title and similar matters?
Ryan Gurner
executiveYeah. So a few of those items related to gold price effects would come in at under $50 per ounce, I'd say. And I'll never reveal what they are, but combining state and third-party contributions, it'll land in roughly that magnitude. But looking at inventory adjustments, there's no trickery or manipulation when it comes to AISC or growth capex or anything like that. You simply trace through our cash flow and observe where the money has gone. Ryan, would you mind covering how the 5-week Pogo is being handled? Yeah. I suppose, yes. So I mean, Pogo will carry, yeah, its cost will be elevated since it will be bearing the cost during the mill shutdown. But regarding the inventory adjustments, I think across the year, we'll probably build a larger stockpile than, well, build a larger stockpile since we'll be mining more than we mill. And essentially what that means is it does carry somewhat more cost, I suppose you could say, in AISC, because the operating costs, while they get backed out, the capital obviously that flows through each month and that we spend on the business does not. So when you're denominating fewer gold ounces sold, you've still got that capital spend sitting there.
Ryan Gurner
executiveThat covers part of it. What I'm really getting at is cost — the macro picture, plainly, is that we continue to face rising costs, as Stu noted. If you compare the midpoint with where we ended up this year, in all-in sustaining cost terms it comes to 3% per ounce. So yes, difficulties remain. My hope, as Stu kind of hinted, is that as some other unlucky sectors wind down, perhaps some openings will emerge for us. Still, we can't count on them before they actually happen.
Hugo Nicolaci
analystThanks, Ryan. One more question about the costs tied to the reprice contracts. I just want to confirm that those still have rise and fall provisions, most likely. Should costs throughout the sector begin to decline, you'd be able to gain from that quite substantially.
Stuart Tonkin
executiveYes. Those have rise-and-fall provisions built in. I’m not sure a fall has ever actually happened for us—I tend to call them rise and rise. It’s clearly tied to the index, obviously. And Hugo, on that point, what I’d say is we’re extremely lucky to have Northern Star Mining Services inside the business, since we aren’t seeing the same cost escalation, I suppose, that our third-party contractors are handing us.
Ryan Gurner
executiveYes, that is a really good point.
Stuart Tonkin
executiveAt least that's a point we're genuinely delighted about. They're expanding — I suppose you could say they're increasing the activity within our business. That's truly beneficial in that respect.
Ryan Gurner
executiveRight. We generate well above AUD 1 billion. So across our operations, underground work probably comes to close to AUD 1.5 billion. In-house Northern Star Mining Services carries out more than half of it. And results like the ones Simon mentioned are still coming — 500 meters a month for jumbo, Wonder. Unit costs are dropping substantially and we're reaching ore bodies faster. The two finest contractors in the country, Northern Star Mining Services and Byrnecut, handle the primary work for us.
Hugo Nicolaci
analystAppreciate that, Stu and Ryan.
Operator
operatorOur following question is from Neil Watkinson of Kalgoorlie Miner. Go right ahead.
Neil Watkinson
unknownMorning, and thanks for making time for those of us joining from Kalgoorlie. My first focus is FY2024 guidance: Kalgoorlie has hit, Pogo has hit, and the overall has hit, yet Yandal is just a little down. Was that chiefly because of the fire at Jundee, or did a series of factors slightly constrain Yandal in FY2024?
Stuart Tonkin
executiveYes, thank you, Neil. We sort of remember getting stuck by flooding on an island out there in Kalgoorlie early in the year.
Neil Watkinson
unknownYeah, it was a little wet, that's true.
Stuart Tonkin
executiveYeah. So I’m not sure whether you received it, tinny, but you would have needed it. For a large part of that year, the Goldfields were flooded. So across the gold sector, a lot of haulage of open pit material to mills was substantially impacted. Throughout that period, we utilized stockpiles that were close to our mills, which were obviously at different grades to our primary plan, but we were able to keep going through that. That was obviously Kalgoorlie, but also Carosue, including the Northern Yandal mines of Jundee, pulling Orelia material down to a Thunderbox, etc., plus Wonder being trucked up. So that was probably the primary impact. The secondary was this throughput run rate of TBO, which is now being delivered at six million ton nameplate for quarter four. We’re very pleased with that. There were certainly impacts related to the gold room thermal event at Jundee, and the team did a fantastic job getting that back online. But in that process, we were able to utilize other infrastructure that we had to continue to produce gold from that carbon, loaded carbon. So yeah, it certainly had impact for the team to get that contained and rectified in great order.
Stuart Tonkin
executiveSo yeah, Northern Yandal came in a bit lighter on that overall guidance this year. That's really the strength and the beauty of having diversified production centers, flexibility within the business plan, and contingency production sources that we execute reliably. We're pushing pretty hard, and as a group we're able to restore and deliver into that guidance. And it's great when sometimes all those cylinders fire together. Sometimes they fire at different times. But Pogo really shone for us this quarter, and that has offset some of the setbacks we got with the seasons here as well. So I think it's just pleasing to see the portfolio as a whole, with this contribution and no passengers across the group.
Neil Watkinson
unknownWhat was the cause of the fire?
Stuart Tonkin
executiveCould you repeat that?
Neil Watkinson
unknownWhat started the fire? What caused it to begin?
Simon Jessop
executiveYeah. Yeah, Neil — this is Simon. It was a scrubber unit located behind the gold room. So when you look at it, that piece of infrastructure is quite small. And the team did a great job keeping it contained in roughly an hour and a half. But it was only that section of the plant. There are plenty of electrical cables there, so rectifying it took some time.
Neil Watkinson
unknownOne more thing about KCGM. Gold sales fell during the quarter — was that anticipated? And how confident are you that you can ramp up to 650,000 over the next financial year? 650,000, sorry.
Stuart Tonkin
executiveYeah, I think your point about timing is a good one. When you compare gold produced with gold sold, there's clearly more overproduction of gold in that case. So timing matters a great deal. Typically there's a 2- to 3-week lead time at a refractory plant for getting gold through concentrates and then through ultrafine grinds back into gold rooms and gold bars, and so on. So unless the grade moves through three or four weeks ahead of a quarter's end, you won't see it reflected in a gold bar sold at the back end. And that accounted for some of the effects we've experienced with power, etc., across the Goldfields. And timing matters a great deal. So there are events. What was the other question?
Neil Watkinson
unknownYeah. It really seems like KCGM is the crucial one.
Stuart Tonkin
executiveOh, six hundred fifty thousand.
Neil Watkinson
unknownOn hitting your guidance for this financial year, ramping up to 650,000 ounces — how confident do you feel about actually delivering that in the coming financial year?
Stuart Tonkin
executiveI remain confident at all times, Neil. With the plan and guidance in place, we know exactly how the mine sequence runs. It is clearly shaped by material coming from Golden Pike, by the grade from the pit bottom, and by additional feed coming from growth at Mount Charlotte and the Fimiston underground. So the low-grade stockpile always serves as the backstop. Across the group, 3.5 million ounces sit in stockpiles at and around our processing facilities. Most of that tonnage is located at KCGM. That gives us many years of secure supply ahead. So what matters is how quickly we mill and produce it. On the 650,000 ounces, we have essentially moved from 450 up to a midpoint of about 550. Then 650 is the final step toward reaching that grade. That figure is still just a checkpoint for when the expanded mill starts operating at 27 million tons per annum and ramps from 24.5 up to 27 across two years. That will lift KCGM to 900,000 ounces per annum. So that is the end goal. 650 is a checkpoint. And by FY 2029, KCGM would be producing more than 900,000 ounces per annum, which takes in the open pit contribution, the large underground operations carrying on at Mount Charlotte, and new underground mines at Fimiston, along with the supplemented low-grade stockpile, to deliver that major top five global gold boom.
Neil Watkinson
unknownThat’s great, gentlemen. I really appreciate it.
Stuart Tonkin
executiveAppreciate that, Neil.
Operator
operatorJarrod Lucas of ABC News has the next question. The line is yours.
Jarrod Lucas
unknownMorning, everyone. I’m looking forward to the Diggers site trip. I just wanted to expand a little on what you touched on regarding how the nickel environment is changing labor markets. With the closures we’ve had so far this year in nickel, have you seen that reflected in the labor market yet, or is that flow into the market still to come?
Stuart Tonkin
executiveSure. Our vacancy rate has already come down. So being able to bring staff on — turnover has dropped too, since obviously there aren't jobs out there to move to. And we expect to see, again in September and October, a wave of available labor. That doesn't automatically carry through into cost changes or labor cuts, unit rates, that kind of thing. But it does relieve some of that pressure. Sad to say, we benefit from that pullback. It was also unusual that every cycle hit its peak simultaneously, when we had — with the border shut for two years — iron ore firing, lithium firing, nickel firing, and gold firing all at once, with no way to bring in imported labor. And the state was 25,000 resource workers short. That's the reason you saw cost escalation. So this is the other side of that hill. Once more, we've approached those people directly to say we're keen on our growth trajectory, and gold is cleaner and greener and a nicer place to work in the Goldfields, as you know, Jared, than the Pilbara. So we're urging people to take a look at our business and our multi-decade outlook and lock in their own homes at Kalgoorlie and relocate there.
Jarrod Lucas
unknownAppreciate that, Stuart. I can confirm it felt like an island for a stretch. And if you'll allow me just one more question about the Jundee renewable project, could you say a bit more about how it's coming along? I noticed the first of the four wind turbines has been erected. And once it's running, will that meaningfully affect your cost base at Jundee on electricity, obviously?
Stuart Tonkin
executiveRight. So the solar-wind-battery combination overall will replace roughly 55% of the power inputs at Jundee. And in the end, the unit cost is similar or better. That's given we amortize the project and have a power agreement, but the key thing is having the solar fully up, running, and connected. One of the four wind towers is finished. And come December, all four will be erected, commissioned, and contributing. So yes, quite happy with the progress being made. And in the end, this ties to our commitment of a 35% reduction by 2030. And this is a major contributor toward that. So we already have the large solar field at Carosue. Now this is large solar in, plus the wind coming. And then, obviously, we're assessing the wider Goldfields project, which will feed KCGM as well as Thunderbox.
Jarrod Lucas
unknownThanks, everyone. I appreciate that. Looking forward to catching you at Diggers.
Stuart Tonkin
executiveAppreciate it, Jared.
Operator
operatorThank you. At this point we have no more questions. I'll turn things back over to Mr. Tonkin for his closing remarks.
Stuart Tonkin
executiveAlright. Thank you. Thank you everyone for being with us on this call. And I appreciate — obviously, it was quite a busy morning. We look forward to bringing all of you up to date as we keep moving our profitable growth strategy forward. Thank you, and good morning.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Northern Star Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Northern Star Resources Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northern Star Resources Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.