Operator
operatorThanks for holding, and welcome to the Northern Star September 2025 Quarterly Results Call. <<operator_script>> At this point I'd like to pass the conference to Mr. Stuart Tonkin, Managing Director and CEO. Please go ahead.
Stuart Tonkin
executiveGood morning, and thanks for being with us today. Joining me on the call are our Chief Financial Officer, Ryan Gurner, and our Chief Operating Officer, Simon Jessop. As we announced this morning, during the September quarter we sold 381,000 ounces of gold at an all-in sustaining cost of AUD 2,522 per ounce. It was a mixed quarter across the portfolio in terms of performance, though our Kalgoorlie production hub did very well, led by KCGM, where elevated production and development rates were maintained. Another pleasing point is that costs came in better than forecast for the quarter, which reflects our work to contain spending and our ongoing focus on capital discipline. Even with the mixed production results this quarter, we are well placed to meet our full year guidance of 1.7 million to 1.8 million ounces of gold sold at an all-in sustaining cost of AUD 2,300 to AUD 2,700 per ounce. The KCGM mill expansion is still on track for commissioning in early FY '27, and considerable progress is being made on this exciting step change for the operation. This week we obtained ministerial approval from the WA government for the Fimiston South project and its associated infrastructure, which will support higher throughput in the future and long-term cost efficiency at KCGM, delivering sustainable, high-margin ounces.
Stuart Tonkin
executiveWe've also observed a steady rise in production rates at KCGM, from both the open pit and underground operations, and Simon will speak to that shortly. With steady primary ore feed plus those significant 3 million ounces of stockpiles sitting ready for processing, we remain on track to maximize mill utilization and hit our production growth targets there. Group underlying free cash flow of AUD 14 million reflected investment outflows tied to the KCGM mill expansion project, shareholder returns of AUD 416 million in dividends, and AUD 67 million in tax installments. Our investment-grade balance sheet stays strong, with a net cash position. And with the KCGM mill expansion now in its final build year, we're positioned for higher production and lower spending. At the same time, our hedge delivery schedule declines and gives us greater leverage to spot gold prices. That outlook is very favorable for growing cash flows in the near term. Turning to operations: earlier this month, 2 separate events took place at our Jundee and South Kalgoorlie operations, and they will have an estimated impact on December gold sales of up to 20,000 ounces. The affected volumes will be scheduled for processing over the remainder of the year, and Simon will give further detail on both events shortly.
Stuart Tonkin
executiveI also take pride in how quickly the team responded to bring operations back safely at the earliest opportunity. As I mentioned earlier, the company is still well placed to meet our full year guidance, with stronger grades anticipated at KCGM during the second half, together with better volume and grade performance throughout the wider portfolio. Alongside increasing leverage to gold prices and a continuing emphasis on costs, we are closely aligned with our purpose of generating superior returns for our shareholders. At this point I would like to pass things over to Simon Jessop, Chief Operating Officer, who will cover the operational highlights.
Simon Jessop
executiveThanks, Stu, and good morning to everyone. It was a strong quarter for the Kalgoorlie Production Center. Production at KCGM, our biggest asset, came in as expected, and costs were significantly lower than anticipated, which speaks to how disciplined the team has been on both cost and capital management. Underground ore volumes hit an annualized run rate of 2.9 million tonnes, and grades were lower, which we attribute to a step-up in development activity. The Northern Star Mining Services team completed 8.7 kilometers of development this quarter, compared with 7.5 in the June quarter — an outstanding effort from that team. Open pit ore volumes and grades matched expectations and were ahead of last year. Productivity should improve further now that Golden Pike North is back to one level — one mining level ahead of schedule — which strengthens our confidence in hitting KCGM's FY '26 production target of 550,000 to 600,000 ounces. KCGM mill tonnes reached an annualized run rate of 11.6 million tonnes, even with a major planned shutdown during the quarter. For FY '26, we forecast mill throughput of 12 million tonnes, with mill grades expected to lift over the rest of the year. As Stu noted, we had an event at South Kalgoorlie earlier this month. Following 60 millimeters of rain, a wall slip occurred in the historic open pit, which temporarily affected infrastructure for the underground mine.
Simon Jessop
executiveThe primary access route for underground activities is still unaffected, and we anticipate getting back to normal stoping within this quarter. I'd like to wrap up on the Kalgoorlie production center by saying how happy I am about the KCGM mill expansion progress. Construction has moved forward considerably in recent months, and the project has now entered electrical and piping installation. For the rest of FY '26, we will shift into the last construction phases, covering finishing works, fit-outs, and commissioning and testing. Moving on to our Yandal production center. The September quarter's standout was milling at Thunderbox, where we hit an annualized record throughput of 6.7 million tonnes per annum — surpassing the 6 million tonne per annum nameplate capacity for a second quarter in a row. Across Yandal, the cost environment is still difficult, and we keep pursuing cost initiatives wherever we can to ease those pressures. At Jundee, gold sales of 55,000 ounces fell short of plan because of lower stope grade ore at both Jundee and Ramone, which lower recovery also affected. We anticipate comparable grades during the December quarter, with improvement expected in the second half. Development at Griffin is running ahead of schedule, with first ore now underway, opening up future access to higher-grade stope tonnes — a great effort from our Northern Star Mining Services team.
Simon Jessop
executiveAs Stu said, earlier in this quarter there was a localized structural failure in the crushing circuit at Jundee. The team responded quickly, and that allowed operations to restart within 2 weeks. At Thunderbox, the mill's performance has me very pleased, beating nameplate for a second consecutive quarter. That strong throughput helped offset lower grades from the Orelia open pit, and those grades are scheduled to improve in the second half. In the meantime, open pit mining at Bannockburn ramped up significantly, with first ore expected to feed the mill in the second half of FY '26. Finally, let's turn our attention to Pogo. At Pogo, during the September quarter the underground mine and mill ran at an annualized run rate of 1.4 million tonnes per annum despite a planned major mill shutdown — a fantastic effort by our U.S. team. Mine grade was affected by sequencing, but it is expected to improve over the remainder of the year. The mill continues to focus on recovery optimization, achieving 87% recovery despite lower head grades. Development of the 2 new portals is progressing well, unlocking access to the Central Veins and Goodpaster systems. Most supporting infrastructure is nearing completion, and the portals are also set to improve ventilation and haulage efficiency across other areas of the mine.
Simon Jessop
executiveOur mine development came in at an average of 1,664 meters each month, which is above the 1,500-meter goal we set. In closing, let me restate that we remain on course to meet our group production guidance of 1.7 million to 1.85 million ounces. The June quarter should prove the strongest, since our key growth projects are reaching completion. Throughout the business, cost and capital discipline stay a sharp focus for our team, and that continues to be the case. At this point I'd like to hand things over to Ryan, our Chief Financial Officer, who will take you through the financials.
Ryan Gurner
executiveThank you, Simon, and good morning, everyone. This company sits in an excellent financial spot. At 30 September, our balance sheet is still solid, showing a net cash position of AUD 616 million, alongside cash and bullion of AUD 1.5 billion. Measured on a net mine cash flow basis, the business brought in AUD 183 million, helped by stronger gold prices and careful cost control. Figure 8 on Page 10 lays out how cash and bullion moved during the quarter, and the main pieces are operational cash flow of AUD 751 million recorded by the company, net of AUD 67 million paid in income taxes. Once we subtract CapEx of AUD 614 million tied to plant and equipment and mine development, plus AUD 59 million for exploration and AUD 64 million for equipment finance and lease costs, free cash generation for the quarter came to AUD14 million. Going forward, operational free cash flow should climb as production grows at KCGM from Golden Pike North and underground production ramps up. We also expect continued solid throughput at TBO with planned higher grade, along with greater throughput and grade at Pogo. In addition, during the quarter the company paid its FY '25 final dividend, which totaled AUD 416 million. Our growth projects and exploration plans are progressing well.
Ryan Gurner
executiveSignificant capital put toward operations growth covers KCGM, plus open pit work at Great Boulder and underground advancement at Fimiston and Mount Charlotte — all of which will let us raise output across the years ahead. Also at Thunderbox, there's open pit development at Orelia and Bannockburn. Turning to the KCGM growth project, AUD 196 million went in during the quarter, with big strides on structural and mechanical installation. As Simon noted, electrical and piping work is now under way, and final construction fit-outs plus commissioning will follow through the rest of this year. Spending is expected to taper across the financial year as procurement wraps up, with forecast personnel along with plant and equipment demobilizing starting in the second half. At Hemi, AUD 41 million went toward moving process plant design forward, locking in long lead time items and making headway on nonprocessing infrastructure. On other financial matters, Q1 costs came in line with plan, and our teams stayed disciplined on cost and capital decisions. Q1 depreciation and amortization sits inside the full year range we gave of AUD 875 to AUD 975 per ounce, and noncash inventory charges for the group show a credit of AUD 34 million, driven by low-grade stockpile build and higher ore stocks and golden circuit at KCGM and a higher ore stock value at Jundee.
Ryan Gurner
executiveOn the tax side, our guidance for full-year cash tax stays unchanged at AUD 700 million to AUD 835 million, and we expect 2/3 of that to be paid in the first half. Landholder duty relating to the De Grey and Saracen transactions is estimated at AUD 200 million to AUD 300 million, with payment expected to occur over the next 6 to 18 months. Also, as a reminder, the company will make its semiannual coupon payment and pay its annual insurance premiums during the next quarter. Lastly, as of 30 September, the company's committed hedge position stands at 1.275 million ounces at an average price just over AUD 3,300 per ounce. I'll now hand back to Harmony for the Q&A. Thanks very much.
Operator
operatorDaniel Morgan of Barrenjoey has the first question.
Dan Morgan
analystMy first question is really about costs. You mentioned that costs came in below what you had planned, and they also appear to be under market expectations. How much of that is just lumpiness in spending, given that on sustaining CapEx you're running at $576 million against guidance of $750 million? CapEx obviously can be lumpy. So I'm just wondering how much — which initiatives actually drove this cost result? How sustainable is it? And how much of it is simply lumpiness?
Stuart Tonkin
executiveYes. Thank you, Dan. One thing we're determined to avoid is holding back essential sustaining capital that could create problems later on. So it's a delicate balance. What it really comes down to is a very tight focus on spending — the spending that's necessary and that clearly also underpins the full year guidance. So yes, it's good to see that effort paying off, and good to see where costs landed even in a quarter with low ounces, and we see that those unit costs got better as the year went on, which helped in holding that cost position while also expanding the production base. We see the capacity to keep unit costs where they are and to improve them further. There's a major structural shift in that cost base once we turn on Fimiston in the next financial year, but what matters is that this year is another year of investment. So it's very important that we maintain that disciplined focus on optimization across all of them.
Dan Morgan
analystThen regarding the production plans—you mentioned a 20,000-ounce effect in the December quarter. From what I can see in the notes, it looks like you believe part of that will be recovered over the course of the year? Or could you perhaps elaborate on the production effects and whether they're recoverable?
Stuart Tonkin
executiveYes. So basically, what the operational effects amounted to was some downtime, but we were able to carry out other productive work and simply resequence the mine plans. The team has done a fantastic job of managing that. Mining activities kept going. So really, it's only mill disruption at Jundee, and we can absolutely make that up. That's why we've scheduled it into the second half of the year. Down at South Kalgoorlie, its contribution is low volume, high grade, along with some development activity, and ground support is continuing while we get the second egress reestablished, after which production comes back on. So at this point, we've guided up to 20,000 in this quarter, but essentially, it simply gets deferred, not lost.
Dan Morgan
analystAnd for the final question, I just want to look at the main drivers across the business regarding production results over the coming quarters. What are those main drivers? And what's the expectation for the December quarter, with the key drivers being tonnes and grade? Obviously, aside from what you flagged at Jundee this quarter, you won't have any mill outages. Could you just walk through that?
Simon Jessop
executiveYes. Thanks, Daniel — this is Simon. The main thing, the biggest factor, is bringing Golden Pike North down to the 1 bench. It took us Q1 to get down to the 600 bench at Golden Pike North. So at this point the East side and the West side are both at a single level. We're on top of the areas where the ounces really come through and that low strip ratio for the remainder of the year. Even at KCGM down in Golden Pike, we averaged a strip ratio of 5:1, and that's only going to come down as the rest of the year goes on. But the hard work is essentially finished. So we're positioned for the jump. What makes me really pleased is that the team got it done ahead of schedule. That puts us in a really, really good position for the jump over the next few years, not only for the quarter, in terms of higher gold production at KCGM. So that's the biggest lever. Looking at the rest of the group, Yandal really has some higher-grade ore arriving from open pit sources in the second half, along with a higher grade contribution at Thunderbox from the undergrounds. And at Pogo, it's coming back to roughly the reserve grade average.
Simon Jessop
executiveWhen you combine quarter 4 with quarter 1, we land right at the reserve grade. Quarter 1 came in lower. So really, at Pogo, things are returning to some stronger zones, mainly during the second half. Those, then, are the main levers we see throughout the business.
Dan Morgan
analystMy apologies — I'd expect Golden Pike to lean toward or be concentrated in the latter half of this fiscal year.
Simon Jessop
executiveOkay, so on Golden Pike, we're actually a little bit ahead of schedule — at the mining level. So the big contribution in ounces from Golden Pike North, which took us many years to reach, is now here, and that's a good thing.
Operator
operatorThe following question is from Levi Spry at UBS.
Levi Spry
analystPerhaps I could follow up on that Golden Pike North topic, Simon. So should we expect meaningfully better grades to begin emerging from the KCGM open pit during this quarter? Or are they already showing up now?
Simon Jessop
executiveYes, that's right, Levi. Grades are going up, but volume matters too, not only the grade. The grade was always present, yet we lacked the volume component alongside it. So at this point we're seeing the strip ratio simply come down. We're back to a single efficient bench on each side of the pit. And yes, at KCGM you will see the grade rise. At the site visit, I believe we guided Q1 grade process at 1.2 to 1.4 grams per tonne, and for the quarter we averaged 1.4. So at KCGM you're beginning to see that grade step up.
Levi Spry
analystYeah, great question. Could I ask something about Hemi? Maybe you could restate the timelines you're anticipating. I believe there may have been some remarks about a build of roughly 2.5 years — did I hear that right? How should we view the next steps there later in the financial year?
Stuart Tonkin
executiveYes, thanks, Levi. Yes, the 2.5-year build is essentially—I guess that's the commentary from the DFS, and it's accurate; we basically state 6 months of engineering and work and then really 2, 2-plus years of construction. What's happening right now, obviously, is that approvals are still pending, and we're working with all stakeholders to advance whatever needs exist. We expected that in the March quarter approvals could be met, and then we were going to refresh pricing to make sure we update all the pricing with all the counterparties and put that in front of our Board for a final investment decision during this end of this financial year. So I think what I'd explain was that the build likely—we want to see KCGM turned on contributing, production increasing there, a sort of seamless ramp-up and without the CapEx spend, and then neatly dovetail in the commencement of Hemi construction. Things can overlap as far as approvals, long lead items, expenditure, preparations, design, et cetera. But it's probably important that the transfer of knowledge from KCGM goes with the Hemi build. So yes, it's the second half—late in the second half updates on that. But really, we still need approvals before we can advance on turn and earth and doing things up there.
Operator
operatorThe following question is from Matthew Frydman at MST Financial.
Matthew Frydman
analystI have a few questions about the various underground operations. First, perhaps, at Jundee, Simon referred to the disappointing grades for the quarter, which came in around 2.5 grams per tonne, while I believe your reserve grade is nearer to 4 grams per tonne. That asset appears to have pretty consistently fallen short of the reserve grade, at least across most of the recent quarters. Could you point to anything, perhaps recent grade control drilling or otherwise — I suppose what gives you confidence that those grades will pick up in the second half of the year, as Simon alluded to?
Simon Jessop
executiveYes. Thanks, Matt. So the reason we're seeing grades begin climbing back to a higher figure at Jundee really comes from the Griffin area up to the north, and work in that section of the mine is in fact ahead of schedule. So that's genuinely encouraging. It gives us access to some better stope grades. So it's mostly the average stope grade in Q1. We simply didn't have access to the right zones to get that usual lift in grade that we see at Jundee. So that's one area. And the other area really is a site called Plutus, where we've been drilling over the last few years, which has some very good grade that we're speeding up our mine plan toward. So it's a mix of a number of different areas across Barton, Nimary and Gateway. And it's just about getting those average grades up as some of those higher-grade sources come in. So everything else was fine when it comes to the development plan. Ramone is on plan. That's nearing the end of its life. So we'll complete that project during FY '26. But it's just the timing of when those higher-grade stope tonnes come through to bring the average back up.
Matthew Frydman
analystUnderstood — that's quite clear. Maybe a similar question, then, about the underground at KCGM. You mentioned that the run rate of roughly 3 million tonnes per annum was reached during the quarter, though the grade was naturally somewhat lower given the share of development. When does that mix change? Put another way, when do you get to that inflection point on development where you're achieving both the tonnage and the grade from the KCGM underground?
Simon Jessop
executiveYes. So, um — honestly, the thing that stood out to me was the development we achieved this quarter: 8.5 kilometers, or 8.7 kilometers. That's squarely in line with our plan of 36 to 40 kilometers of development for the year. The grade is going to rise as Fimiston begins delivering more stoping. So we're still heavily focused on development, both waste and ore. But as the stoping contribution grows, which it did over the course of the quarter, you'll see that average grade begin to climb. And beyond that, it simply depends on where we're mining at Mount Charlotte. There are plenty of different areas there. But at the core, it will come back to the average grade with volume — the stoping contribution and the ramp-up at Fimiston are the key things that will start to lift it.
Matthew Frydman
analystIs there any specific timing on that? I mean, clearly, you've mentioned 3 million tonnes of volume for this year and 4 million tonnes for next year. Is that roughly at reserve grade? Or, yes, what kind of timing surrounds that?
Simon Jessop
executiveIt's only incremental, because as that mine continues to expand, output won't be exactly 3 and then leap precisely to 4 and leap once more precisely to 5. So once the stoping zones and the mine truly begin to open up, you'll simply see incremental expansion in both production and grade as more stoping happens. Ultimately, it's the stope dirt that we're after at KCGM.
Operator
operatorMitch Ryan of Jefferies is the next person to ask a question.
Mitch Ryan
analystTo start, could we take a bit of time on Jundee? I'd like to get a clearer picture of how the crushing circuit has been affected. You've reconfigured it into the SAG mill — what would it cost and how long would it take to bring it back to the kind of design flow sheet you had?
Simon Jessop
executiveYes, thank you for that. Processing at Jundee is up and running once more. We had roughly 2 weeks during which operations were paused and halted. Access to the infrastructure failed for the conveyor belt that feeds the SAG mill. So feeding is now going again, and we've isolated the coarse ore stockpile area. We can now take our time to get that rectified, probably across the rest of this quarter. Fixing it will likely take a couple of months. As far as crushing goes, we can still crush crusher material at the front end of the circuit, and we can still mill material through a revised change to the conveyor set up at the back of the circuit. That particular area is now isolated, and we'll work on the fastest fix we can for that infrastructure.
Mitch Ryan
analystAll right, so that accounts for the 10,000-ounce effect, and on top of that there could be a modest squeeze on operating costs across that same stretch.
Stuart Tonkin
executiveYeah. Right now the operating cost issue is the engineering rectification and remediation effort on the coarse ore stockpile infrastructure, and that's going to be somewhat uncertain, but we're talking $5 million to $10 million — it's not $50 million or hundreds of millions, right?
Mitch Ryan
analystYes. Yes. Cool. Then my next question has to do with Hemi, and obviously you've provided us a bit of an update on that. But specifically regarding the talks with the traditional owners, how are those going? Do you have an approximate timeline for when you'd anticipate them wrapping up?
Stuart Tonkin
executiveSo, yeah, we've got engagement happening with every stakeholder group. Again, the traditional owners are absolutely still involved and we're working together well, but it's the same across all stakeholders there. And we laid that out in the March quarter — basically all of the feedback loops had happened for regulators to take into account all of those things and any conditions tied to approval. So yes, that's all on track, and we're being pretty patient through all of it to make sure it gets done properly.
Operator
operatorOur following question is from Hugo Nicolaci at Goldman Sachs.
Hugo Nicolaci
analystI'd like to examine KCGM's costs a bit further. It seems open pit mining expenses have begun returning to roughly $8 per tonne. Underground spending is running at approximately $40 million each quarter. Could you give some directional guidance on what those rates ought to be for the remainder of the year? Should open pit costs keep getting better, and should underground costs rise as you carry out additional development?
Ryan Gurner
executiveRyan here, Hugo. Yeah, so looking at it, total operating costs per tonne are slightly lower than that. Right now they sit at about $6 a tonne — actually just under, at $5.95. As Simon mentioned, we'd probably expect — at that one bench at GP North, we expect efficiencies to get better there. And then once we move into Ivanhoe, with the approvals in hand now, the cost per tonne there is even lower still. So we expect those to improve. And like Simon said, with the incremental gain from the ramp-up on the underground — and I think costs are going pretty well there — we should see some improvement there as well.
Simon Jessop
executiveYes. Hugo, this is Simon. What you're going to observe, I believe, is that the run rate at the open pit has settled, and we've mined 22.5 million tonnes across 2 quarters. So we're achieving greater efficiencies there, but that works out to a 90 million tonne annualized run rate. We view that as roughly the level where we'll remain. And now that we have the Section 38 approvals, we'll steadily draw additional volume from Ivanhoe, which clearly involves a shorter haul, a lower powder factor, and so on. So volumes should hold near that $90 million, yet we're seeing favorable momentum in the efficiencies at KCGM. As for the underground, it's somewhat similar to the earlier discussion. As stoping dirt adds more contribution, you'll definitely begin to see the average cost per tonne for the underground decline, since we're obtaining cheaper tonnes from the stope dirt across Fimiston especially. So we're fairly pleased with where we stand right now.
Hugo Nicolaci
analystGreat. On the cost side, everything looks favorable. Then, regarding processing, it appears those costs have remained around $41 a tonne, matching last quarter. My recollection is that roughly 6, 12 months back, the figure was closer to the low to mid-$30 a tonne range. Is that simply the current rate going forward as the mill nears the end of its life? And how should we view this once the expansion is up and running? Historically, you've mentioned a $7 a tonne reduction. Should we expect that figure might end up being larger?
Simon Jessop
executiveYeah, that's a very fair point. For the quarter at KCGM, we came in at roughly $33 to $34 per tonne on average. That said, as we approach the finish of that life, the mill and process plant have taken a beating structurally. So I genuinely can't wait to get the new processing plant in place. And I truly believe that gap has grown considerably since we released the original KCGM feasibility final investment decision. We've seen costs rise across the group for things like cyanide and other items. But when it comes to maintenance costs and running that 30-year-old plant at KCGM, the gap has widened as it enters the final year of its life.
Hugo Nicolaci
analystYes, it does seem like there could be a fair amount of room there. If I could just ask one more, though, about the corporate overhead line — that appears to have gone up across most of the assets compared with the run rate over the last 12 months. Could you speak to what's behind that, and should we expect it to normalize from this quarter onward?
Ryan Gurner
executiveYes, Hugo — Ryan here. Look, clearly, bringing on our De Grey teams probably accounts for part of that. And then we've added somewhat more around the technical side and some of the operational piece within the business. From a per-ounce standpoint, it will come down, since this quarter is our lowest in ounces. But on a fixed-cost basis, it's probably — it will likely carry on through the quarters ahead, though at a lower cost per ounce.
Operator
operator<<operator_script>> Our following question is from Andrew Bowler with Macquarie.
Andrew Bowler
analystI have just one question about costs. If I recall correctly, Northern Star operates a staff incentive plan tied to the gold price. I was wondering whether the recent increase in the gold price can be absorbed within the guidance for this year? And if it can, should we expect any unevenness in those payments across the year that could be meaningful for us?
Stuart Tonkin
executiveYes, thanks, Andrew. The — it did go stale while gold surged through $3,000, $4,000, $5,000, and $6,000 an ounce. So for several years now, that has run pretty much at full tilt. So I suppose there isn't compression, or bounces, when gold pulls back right now. So it's quite sticky and baked in — though it's a very strong reminder of what we're benefiting from at levels still above $6,000 an ounce. But yes, this isn't a spring tied to any of those pullbacks. Still, what we're benefiting from — looking back at our resource reserve pricing and the overall cost structure — really comes down to our productivities, our production increases, the capital wind-down, and the structural change with KCGM that will make the big difference in moving us down the cost curve. It won't come from chips and savings on unit labor costs. It will come from efficiency of that labor, productivity of that labor, rather than the unit cost of it.
Andrew Bowler
analystGot it. Perhaps just one more question regarding the workforce. Clearly, some pieces have been published about how strong the gold sector is in Western Australia, though obviously certain other resource industries are struggling somewhat too. Could you offer any general observations on the current condition of the industry and on how you are finding the availability of skilled staff? Is a further degree of tightness on the way, or is it largely being offset by weakness in other areas?
Stuart Tonkin
executiveYes. I don’t believe those labor markets being that tight are creating wage pressure. What I observe is that the cost of living is shaping expectations and making people feel pressure in general, and that applies not only here but in Alaska as well. It’s good to see, clearly, efforts to strengthen ties with the U.S. in order to generate new growth in the metals business. A great deal of time will be needed before any pressure emerges from those new markets, assuming there is growth and investment during that phase. What we must do, though, is restore Australia’s appeal as an investment destination. So that is quite encouraging on that front. At the same time, however, we are not in the same lane as gold right now, and our focus is on matters within our control.
Operator
operatorThat brings us to the end of the Q&A. I'll turn things back over to Mr. Tonkin now for some closing remarks.
Stuart Tonkin
executiveThanks so much, everyone, for being with us on this call. I really appreciate the interest you're showing in our company today, especially since it's such a busy day. So thanks again, and enjoy the rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Northern Star Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Northern Star Resources Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northern Star Resources Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.