Northern Star Resources Limited (NST) Earnings Call Transcript & Summary
January 21, 2026
Earnings Call Speaker Segments
Operator
operatorAt this point, I'd like to pass the conference call to Mr. Stuart Tonkin, our Managing Director and CEO. The floor is yours.
Stuart Tonkin
executiveGood morning, everyone, and thanks for being with us today. Joining me are Ryan Gurner, our Chief Financial Officer, and Simon Jessop, our Chief Operating Officer. As we previously announced, gold sold in the December quarter came to 348,000 ounces, with an all-in sustaining cost of A$2,937 per ounce. This softer result stemmed from a number of one-off operational events across our assets, and those events required us to revise our FY26 production and cost guidance. Now that these events are behind us, our team stays firmly focused on driving productivity improvements and strengthening cost discipline so we can deliver a stronger second half for our shareholders. Our FY26 outlook sets revised guidance of 1.6 to 1.7 million ounces of gold sold at an all-in sustaining cost of $2,600 to $2,800 per ounce. Today we are also providing further detail on production and AISC guidance by production center. In addition, we have updated our capital expenditure forecast across the portfolio. Guidance for operational growth capital remains unchanged at $1.14 billion to $1.2 billion. KCGM's growth capital expenditure in FY26 consists of several projects designed to prepare the operation for commissioning of the newly expanded mill from FY27. Two aspects I'd like to highlight are the KCGM mill expansion project, where FY26 capital expenditure is now expected to be in the range of $640 to $660 million, and this reflects targeted increases in labor to ensure the commissioning in early FY27.
Stuart Tonkin
executiveOn the KCGM tailings dam work, we're actually running ahead of plan, and FY26 spend is now projected at $240 to $260 million. FY27's forecast is lower, at $100 to $120 million, and that works out to roughly a 10% cost reduction across the whole tailings dam project. Over at Hemi, the forecast sits at $165 to $175 million, which reflects further optimization of the engineering and design work there. Northern Star keeps collaborating closely with state and federal regulators, key stakeholders, and the wider Pilbara community. With the gold price now above A$7,000 per ounce, this is a fantastic moment to be producing and discovering gold in the stable, low-risk jurisdictions of Western Australia and Alaska. Our balance sheet is still in a net cash position, and as the hedge book shrinks, greater exposure to spot gold, together with rising production, sets us up for very strong growth in cash flows ahead. I'll now pass things to Simon Jessop, our Chief Operating Officer, who will walk through our operational highlights.
Simon Jessop
executiveThank you, Stuart, and good morning. Two main problems caused the Kalgoorlie Production Centre to post a weaker quarter than we had anticipated. The first of those problems was the partial suspension of mining at our South Kalgoorlie operation that we announced earlier. Over a span of nine weeks, a new escapeway was mined and put in place. Mining at Cal Ops has been back to normal operations since mid-December. The second big problem was the processing result at KCGM, which came in below what we expected. Throughout the whole quarter the mill fell short on throughput volume — both rate and runtime — and the primary crusher failed in December. From the 5th of January onward, the crushing circuit has run in line with normal expectations, and across 20 days we have crushed more than 700,000 tonnes, compared with December's full-month crushing performance of 600,000 tonnes. KCGM's overall mining performance was an outstanding result, with 207,000 ounces mined in the quarter — a new record for the site under Northern Star Resources' ownership. Open pit total material movement came to 22 million for the December quarter and 45 million for the first half, which sits at the top of the 80 to 90 million tonne annual guidance range. The open pit for Q2 mined 163,000 ounces at 1.5 grams per tonne, with Golden Pike contributing 117,000 ounces at 1.7 grams per tonne.
Simon Jessop
executiveDuring the quarter, the KCGM underground operation advanced 8.7 kilometers and extracted 819,000 tonnes of ore. Underground ore mined for the first half came to 1.55 million tonnes, which is above the annualized target of 3 million tonnes per annum. Because of the processing throughput issues, KCGM ended the quarter with 1.3 million tonnes at 1.9 grams per tonne and 81,000 ounces of high-grade ore sitting on the ROM pad. Carosue Dam delivered results in line with expectations for both the quarter and the half. To close on the Kalgoorlie Production Centre, I'll repeat that the KCGM mill expansion kept progressing well through the Christmas-New Year period with a workforce of around 350 people. The project has ramped back up to 800-plus personnel, and over the remaining six months it will finalize construction and transition into commissioning and ramp-up planning, with the project still on time for an early FY27 ramp-up. Moving to our Yandal Production Centre, both Jundee and Thunderbox had a challenging quarter and first half. At Jundee, the previously announced localized structural failure of the crushing circuit works has progressed well, though it has taken longer than anticipated. The coarse ore stockpile tunnel has been excavated, rebuilt, and reburied, with ROM pad loaders feeding the bin again as normal.
Simon Jessop
executiveWork on the tunnel is fully scheduled to be finished again around the middle of February. That very big task has been carried out by the Jundee crew in a safe and professional manner. In under fourteen days, the Jundee airstrip should see its inaugural flight, and it stays on schedule to deliver flight cost reductions plus fewer weather-related disruptions ahead. Two problems stood out at Thunderbox during the quarter. The first was lower throughput caused by tank troubles, which additionally hit recovery by five percent. There was also less ore mined from Wonder, along with hauling of the high-grade material to the mill. Regarding the processing side, every tank was running again by the close of the quarter, and fixes are scheduled for H2 that will rotate through all seven tanks. Second, at Wonder, the resource is behaving differently than the model predicted in the high-grade sections of the ore body. To handle the necessary adjustments to mining methods, better mining, and cost savings, we have already cut the fleet from seventeen trucks down to eleven. From this point forward, the strip ratio at the Wonder open pit declines. Wonder carries an expected mine life of twenty-one months and should produce 215,000 ounces grading 1.4 grams per tonne. In the meantime, open pit operations at Bannockburn increased substantially, with the first ore stockpiled before milling in H2, giving Thunderbox another feed source near its mill.
Simon Jessop
executiveNow, moving on to Pogo — the decline in gold sales there came from a head grade that was roughly 0.5 to 1 gram per tonne lower, driven by a mix of stope dilution and over-loss. Ore volume was down by around 30,000 tonnes as well, because of East Deeps vent constraints affecting scheduled high-grade sections of the ore body. On top of that, roughly three days were lost in December when temperatures dropped below minus 40 degrees Celsius. In early January, we've observed mined grades improving to above 6 grams per tonne, along with more stope ore fires. Processing in Q2 performed very well, with availability averaging 92% year-to-date. Recovery came in at 86% for the quarter, which is 5% above what we expected. Development at Pogo kept getting better, reaching 5.2 kilometers in the quarter — a monthly average of 1,731 meters. Gold sold for the quarter was affected by several major events across the portfolio, and that has led us to bring our annual gold guidance down to between 1.6 and 1.7 million ounces. We head into the second half of the year in a far stronger position. Operations at KCGM and South Kalgoorlie are back to normal. Jundee still has a few outstanding issues, which we expect to resolve over the course of this quarter.
Simon Jessop
executiveThunderbox is doing better now, and over at Pogo, the stronger head grade we saw in December has carried on through January. At this point I'd like to hand things over to Ryan, our Chief Financial Officer, so he can walk us through the financials.
Ryan Gurner
executiveThank you, Simon, and good morning everyone. Today's quarterly results show that the company is still in an excellent financial position. Our balance sheet is strong, as shown in table four on page 10, with cash and bullion of $1.18 billion, and at 31 December we remain in a net cash position of $293 million. The company has posted strong cash earnings for the first half of FY26, estimated in the range of $1.06 to $1.11 billion. As a reminder, our dividend policy is based on 20% to 30% of cash earnings. Q2 was a challenging quarter, but all three production centers delivered positive net mine cash flow, with capital and exploration fully funded. Figure eight on page 11 shows the company's cash and bullion movement for the quarter, with the company recording $738 million of operating cash flow, which included semi-annual coupon payment on the notes of $18 million US and approximately $30 million annual insurance premiums. Also, during the quarter, the company paid $370 million of income tax, bringing the first half tax payments to $437 million, lower than the first half cash tax guidance. Major operational growth capital investments include at KCGM, open pit development at Great Boulder and underground development at Fimiston and Mount Charlotte, which will enable us to lift production over the coming years, and at Thunderbox operations, open pit development at Wonder and Bannockburn.
Ryan Gurner
executiveRegarding the KCGM growth project, we invested $180 million during the quarter, and we've made major progress on structural and mechanical installation, including advancement on SAG and ball mill installation. Electrical and piping installation is moving forward, and final construction and fit-outs will follow throughout the second half. The project stays on track for commissioning early in FY27. At Hemi, we spent $20 million to advance process plant design, secure long lead time items, and progress non-process infrastructure. Turning to other financial matters, Q2 group all-in sustaining costs included roughly $20 million of additional costs tied to the disruption events across Jundee, Cal Operations, and KCGM during the quarter. Half one depreciation and amortization sits at the top end of the guided range of $875 to $975 per ounce and should decline over the second half as forecast production increases. Non-cash inventory charges for the group in the December quarter are a credit of $93 million, driven by low-grade stockpile build and higher ore stocks at KCGM and stockpile build at Thunderbox. On the tax side, with the update to second half production, we lower our second half group cash tax forecast to $230 to $270 million.
Ryan Gurner
executiveWe haven’t made any revisions to the estimated amount or the timing of landholder duty related to the De Grey and Saracen transactions. During the quarter, 158,000 ounces were delivered as the company keeps working through the unwinding of its hedging commitments. As of 31 December, total commitments amount to 1.1 million ounces, with an average price a little above $3,300 per ounce. At this point I’ll return the call to the moderator for the Q&A session. Thank you.
Operator
operatorThanks. To ask a question, hit star one on your phone and wait until your name is called. To withdraw your request, press star two. Should you be using a speakerphone, lift the handset before posing your question. Our first question is from Levi Spry of UBS. Go ahead.
Levi Spry
analystHey there. Good day, Stuart and everyone. I’ve got a few questions, I suppose, about CapEx, then KCGM, and after that Hemi. Just so I’m clear on the higher CapEx for the mill expansion, is that mostly because of additional personnel? Is it because of higher-caliber personnel? Or is it because you’re paying more, just so we can get a sense, I suppose, of where things stand in the industry?
Stuart Tonkin
executiveThanks, Levi. So this is focused and intentional, and the aim is making sure we hit that FY27 commissioning timetable. It means additional staff, and it reflects, I suppose, the output we've been getting from the crew already in place — which isn't a judgment that they're strong or weak, just an acknowledgment that with everybody operating in that crowded area, certain items simply haven't moved forward as we'd like. Our plan was for roughly 600 individuals across the construction phase. As Simon mentioned a moment ago, we kept 3,350 on over Christmas, when typically we'd be in a shutdown, and beyond that we've operated some back shift and night shift across the past 6 months, and we've now reached 800 headcount assigned to that project. It's focused, it's intentional, and it comes at a cost — clearly there's an uplift of roughly $110 million across this year, a big portion of which has already gone out in the first half. There's a bit of a second-half tail from all the electrical and cable runs, but the key thing is hitting the schedule on time, achieving that commissioning, and getting the cash box working.
Levi Spry
analystUnderstood — thanks for providing that additional detail. Could you give us a bit more on the Gantt chart, I suppose? What actually happens between now and then — which activities specifically — and what, I guess, is needed in order to reach 23 million tonnes in 2027
Stuart Tonkin
executiveTwenty-seven? Actually, the nation ranks higher than that. As we mention in those bullet points, on page five of the quarterly, at 90% — 90% — structural steel is finished, and mechanical installations stand at 80% complete. Now we're returning to the electrical tie-ins, the cable runs, and essentially the testing and energizing of those systems. Naturally, some portion of getting everything into position has to happen before any of that live testing can begin, and it really comes down to the final coupling of all the piping. We're well past the bulk of it, and the sequence is right. Nothing, I'd say, is behind, but we recognize the work remaining simply requires extra labor, which we're sourcing alongside contractors, just as we were doing before Christmas. In December, we began raising headcount. We carried on with what I wouldn't describe as a skeleton crew — it was definitely 350 people across the Christmas period. Ultimately it comes down to that last tie-in, all the piping, pressure testing, the cables, dead testing of cables until we're set to energize things. The goal is to be ready to power up in June. The question is whether we want the disruption during the latter part of June.
Stuart Tonkin
executiveUsually, that additional gold won't be recovered, since it has to pass via the float circuit and afterward through concentrates and so on; we might be ramping up other things at the same time, but ideally the mill is operating in July. 23 million tonnes corresponds to a 27 million tonne per annum plant that gets switched on and then intentionally switched off so bolts can be re-torqued and simply visual inspections of wear rates and similar items can be done. That is intentional scheduled downtime across the year, which reduces it from 27 to 23. While it is operating, it will operate at 27 million tonnes per annum. I believe that addressed part of your questions.
Levi Spry
analystAppreciate that. One last thing about Hemi. Permitting remains a fairly complex topic on our end. Could you walk us through a little more of where it stands at present and what the following steps look like?
Stuart Tonkin
executiveBasically, the EPA approvals are still working their way through the system. For this financial year, we don't see any genuine path to speeding those regulatory processes up, and it makes sense for the regulators to take their time. Alongside that, we're doing the water trials and dewatering testing, and that's the engagement we currently have with traditional owners and similar parties, but everything there is moving along as usual. As you'd expect, it's the hot season weather-wise. Laying pipe and carrying out works becomes somewhat of a derated activity, the way it is in the Northern Territory. The Northern Pilbara gets quite hot at this point in the year, so some of that activity is simply us sensibly laying pipe and getting the bores ready across these months. At the core, we're aiming for the end of this calendar year to be in a position where we can put numbers together for the FID. The additional spend relates to the optimization work — continually testing the flow sheet and making sure we have options, and that when the data goes into the FID papers we've thoroughly considered all those combinations, and with this kind of thing you just keep looking, you keep finding options and you can find better works.
Stuart Tonkin
executiveIn that respect, they are putting the time to good use.
Levi Spry
analystMuch appreciated. I appreciate the specifics.
Operator
operatorThanks. The next question we have is from Ben Lyons at Jarden Securities. Go ahead, please.
Ben Lyons
analystThanks. Morning, Stu and Simon. I'd like to go back over what's really driving the recent revisions to production, all-in sustaining costs, and, I suppose, CapEx guidance as well — those three cuts in a row we've seen over the last couple of weeks. And maybe, while we're at it, make the case for the company disclosing a bit more too. Take one of the explanations offered for the production reduction: Thunderbox coming in below expectations, which is now being framed as a 250,000-ounce mining center instead of a 300,000-ounce one, and in particular those weaker grades you're encountering come out of the Wonder open pit. I've been plowing through that 600-page resource and reserve report, and nowhere in it can I locate a straightforward outline of tonnage, grade, and strip ratio for the key ore sources such as Wonder, such as Bannockburn. It's the same story at Carosue Dam and Jundee — the actual ore sources sitting behind those mining centers. Simon's comments in his opening remarks do help, they give us a few of the pieces, but I'd really just like a basic outline of the ore sources behind the mining centers, or at minimum a detailed investor day where we can take some deep dives on these assets too.
Ben Lyons
analystI believe that would help us get a better sense of how predictable this business is and how much we can rely on the forecasts we've been given — just a set of figures from you folks at the head office level, really digging into these assets. Is there anything I'm overlooking in that 600-page resource report that might assist with these fairly basic metrics?
Stuart Tonkin
executiveNo, but I'll treat that as a remark rather than a question, Ben.
Ben Lyons
analystAlright, thanks. So the next question — you've faced quite a bit of scrutiny over your continuous disclosure obligations. Why wasn't the market told right away about the crusher failure at KCGM? I'd have thought that was a significant event on its own. If I paraphrase what you told the ASX, it was essentially that we didn't receive the data until the 1st of January. How often do updates come from site to head office in Subi? I'd have assumed you're getting daily updates on basic metrics like production and sales, but is it weekly? Monthly? It surely isn't quarterly. Surely you didn't have to wait until the 1st of January to learn you were getting a downgrade?
Stuart Tonkin
executiveBen, there's a pretty full reply to an aware letter from ASX. There's a quite straightforward single-page disclosure regarding production on 2 January, plus a really detailed answer to the ASX about that query. I believe that covers it.
Ben Lyons
analystAll right. I’ve gone through it a number of times now, and from where I sit, I don’t find it good enough. My expectation would be that you receive sales data in real time — at minimum every week or every month, rather than once a quarter. That said, I’m glad to take another look. Thank you.
Operator
operatorThanks. Our following question is from Hugo Nicolaci at Goldman Sachs. You have the floor.
Hugo Nicolaci
analystMorning, Stu, Simon, Ryan. I’ve just got one question on the updated cost guidance. It’s clearly encouraging to see the revised guidance landing at the prior top end, given the higher gold price and the royalties tied to that. If I look at it in nominal terms, you’ve essentially narrowed the range, and the midpoint of costs is pretty much the same, even though earlier this month you flagged that the operational effects would create a number of cost impacts. So I suppose my question is: which operational and sustaining costs have you managed to push into next year so that cost guidance could stay flat?
Stuart Tonkin
executiveThanks, Hugo. I believe the main point here is that the one-off items and those events now sit behind us, and we understand what their impacts and effects were. They are finite and they are complete. Naturally, we have disclosed some of the ongoing matters that fell in week one of January and that are now behind us as well. Really, this reset, together with how we now view forecasting for where the sites are operating and for the cost bases, has let us tighten the guidance range, since we have 6 months ahead rather than 12. That is really the position there. The second half is considerably stronger. When you look at what that second half will deliver, there is a significant step up in production from quarter three. You can see our realized gold price improving, yet it remains a long way off spot, given the hedge — the hedges are unwinding quickly — and then, clearly, we are delivering into a higher spot. Combined with rising production, gold sales serving as the denominator of all-in sustaining costs, and that exposure to spot, the cash generation across the coming two quarters and the run rate as we exit this financial year — plus another structural step change as Fimiston is turned on — put the company in a very strong position.
Stuart Tonkin
executiveYes, it's predictive — it's forecasting, it's examining what lies ahead of us. We'd request that people look at quarter three in isolation. We've supplied highly detailed information about the events that were unforeseen or, well, some fall outside our control, and some involved risk balancing around maintenance events. In the end, those have been dealt with. The team has performed absolutely brilliantly in managing through that stretch and in addressing those items. That's what gives us confidence to set the forecast. For the full year, yes, costs step up and production steps down. If you look at second-half run rates, it's a very, very strong, healthy business on that measure, and it can't reverse what happened in the first half, but in the end we have a very confident outlook.
Hugo Nicolaci
analystThanks, Stu. Clearly, we’re taking the first half and the unforeseen impacts as they came. To go a bit deeper on that, your AISC range now sits at $4.4 to $4.5 billion for the year. It had been $4.25 to $4.6. You’ve called out $40 an ounce of that, or roughly $64 million at the low end, as coming from royalties. But where have some of those other cost savings come from as we look ahead? Should we expect those costs to carry into FY27?
Stuart Tonkin
executiveI believe this is Ryan speaking. The costs are clearly present, and in the near term, every cost is fixed. You're right to run the numbers on the total, I suppose, of the checks written across the business. What we're saying is — and as Simon mentioned when he spoke — many of those disruption problems that led to production issues now sit behind us. We have confidence in the grade guidance at Pogo and Jundee. Simon discussed the high-grade material resting on the ROM pad at KCGM. You've observed the grade improvement there. And then there's also the confidence around throughput in this second half. All of these help keep us aligned and help narrow that cost range. Even with those expected royalties you mention, we're confident that within that range — 2,600 to 2,800 — we land with that lower production profile. Any discretionary spend will also be deferred and pushed back, since it's not just about dollar millions, but in terms of activity and distraction, making sure the team has a very clear, simplified list of activities. That's what we'll do. Now, does that extend into FY27? We'll assess it at the time.
Stuart Tonkin
executiveWe’re going to weigh the risk balance between planned maintenance and unplanned maintenance, etc. Some items had been budgeted, and those we’ll simply remove from the list—they won’t be spent in the second half.
Hugo Nicolaci
analystUnderstood. I suppose the question concerned which items those are and what portion of the spend they represent, though perhaps we can return to that later. Moving on to the upward revision of Hemi CapEx: you cited a more thorough review of engineering design work as the reason CapEx this year is $25 million higher. The studies had initially been intended to support an FID by the end of FY26. Is this simply pulling forward detailed engineering work that would have been required in any case, or were those studies not sufficiently detailed at the outset for the FID timing as originally planned? I suppose how should we think about that against market expectations for Hemi CapEx, which now sit at roughly $2.5 billion? Should we keep expecting that there may be some creep there?
Stuart Tonkin
executiveOkay, so I’d frame it as a reset on the total CapEx figure. If we end up spending more during this year, that additional amount gets deducted from the total CapEx number. This is definitely work that is moving forward, that would be necessary, and that we would be carrying out—but I would also factor in work where we look at it and say, all right, that was duplicative, and we swapped it out for fresh study work that delivers a better operating result or a better flowsheet result. I think we need to be cautious about claiming that any extra money spent this year reduces the total. There are definitely long lead items we invested in, paid for, and purchased that we would also say we might resell and repurpose, then substitute with bigger, simpler kits. That is something we have done over time. All of that will be captured in a final FID paper, with explanations on that point. There are no material structural changes to the overall flowsheet. What we have examined is synergies with the remainder of our operations so we can have common parts and common spares—something that was not taken into account when this was a standalone asset inside a single-asset company. We have assessed it through the lens of the Fimiston mill expansion, including some items that could be replicated to save on engineering since we have already completed it, but we do actually have to spend on the parts to achieve commonality so we are derisked in the future when running two sister plants of that kind.
Hugo Nicolaci
analystOkay, I understand, and I'll hand that along before circling back to you. Appreciate it.
Operator
operatorThanks. We'll take the next question from Matthew Frydman at MST Financial. Go ahead, please.
Matthew Frydman
analystSure, thank you. Good morning, Stuart and team, and happy New Year. I have a couple of questions, please. First, maybe I can take the main point of what Ben Lyons said and turn it into a question that hopefully you can actually answer on this call. In the release, you state that CapEx spend has been reduced at Pogo and Kalgoorlie, while spending at Yandal has been increased to support the regional hub strategy. May I just ask what the regional hub strategy at Yandal is? Could you summarize it in terms of production ounces, life, unit cost, and how much capital needs to be spent to deliver it? Because I'm not really clear on any of those things, and it sounds like other analysts may not be clear either, so that would be appreciated.
Stuart Tonkin
executiveMatt, up north there's a plant called Jundee that handles 3 million tonnes per annum, and down south there's one called Thunderbox at 6 million tonnes per annum. Ore with higher grade goes to Jundee, while the lower grade material goes to Thunderbox. Jundee will be running at roughly 300,000 ounces per annum. Thunderbox will be at approximately 250,000 ounces per annum. The hub, known as Yandal, is going to produce around 550,000 ounces per annum. That differs from the 600 we mentioned, but we've explained that 550 is likely the sweet spot it will land at. It could swing between Jundee at 250 and Thunderbox at 300, though on the whole that Yandal belt, in our view, can run at about 550. We have the reserve statements. They contain all the grades and ore sources — Bannockburns, Wonder — you have every piece of data underpinning that. That is essentially more than what any company offers, and what it gives is the materiality of what that asset delivers for the group. What we don't like about those assets right now is the costs. The point of the economies of scale from growing Thunderbox was to meaningfully bring down the all-in sustaining cost. Likewise the growth at Jundee was meant to hold costs down.
Stuart Tonkin
executiveLooking at Yandal’s costs this quarter, with that lower ounce profile, they are really high. We’re asking ourselves, “What does the overall life-of-mine outlook look like?” We have to make this better so it keeps contributing the way it has for 10 years in our business as a foundation asset, and we can give more perspective and detail on what those improvements could be. They are still developing new high-grade mines, and development rates continue to add to that. Singling out Wonder and discussing fractional grade numbers for something that hasn’t even supplied a third of Thunderbox’s feed for several years is immaterial. I want to keep the focus there. It’s immaterial in the over —
Matthew Frydman
analystRight, Stuart, I hadn't named Wonder specifically, and you've addressed it by talking about ounces and life. As you note, I suspect the real disconnect lies more in unit costs, expectations, and, I'd add, the capital needed to reach that point. I guess what the market is likely asking is this: how much capital will you spend to bring costs down to a given level, and what does that look like? I suppose we're wondering aloud how you make those investment calls when visibility seems poor on both the cost target and the overall CapEx quantum.
Stuart Tonkin
executiveGuidance for production and costs is something we give on an annualized basis each July. That has been our practice for quite some time, and it is what we will continue to do at Yandal. A paste plant has been installed, and it is reaching the high grade at Jundee. Some of the grade will be restored as a result. Everything discussed around this asset reflects the growth of Wonder down south, which delivers better grade into Thunderbox, along with the new Bannockburn operation. Right now you are working through the stripping, moving into primary ore. As for the questions, we will not be answering them on a quarterly call. Let's put it that way.
Matthew Frydman
analystNo, that's fine. I suppose the underlying theme is that I do appreciate the one-year guidance you provide, but it's clear that the effect on how the market views the company—coming from, arguably, some of these near-term letdowns from one quarter to the next—may well be made worse by the fact that, for certain of these parts of the business, we lack a longer-term, multi-year sort of picture. Naturally, whatever you can do down the road simply to shed light on that would be appreciated. I'll leave that line of questioning there. Maybe we can, Matt,
Stuart Tonkin
executiveBefore getting into that, the key thing is that KCGM in the first half is what has really, really shifted this, and mill throughput is what has genuinely affected the overall capacity to deliver. Every other combination of the smaller pieces, judged against a materiality threshold, is negligible. The actual the straw
Matthew Frydman
analystYou're right, Stu. That's the reason I keep emphasizing that when your guidance covers just one year, the problem gets worse. Matt,
Stuart Tonkin
executiveLet me just complete this response. The key thing everyone should be watching is that asset, KCGM, where 82,000 ounces of high-grade ore are already stockpiled on the ROM pad, ready to be fed through the plant. That plant — the newly expanded one — comes online in under six months. If people prefer to dig into smaller details across the whole portfolio, we accept that it was a weak quarter. We know the factors behind it. There were plenty of them. We know the steps taken to fix it and what the outlook looks like from here. I hear the frustration in the questions, and I hear it from investors and analysts who find this hard to model. Quarter two is done, and the second-half outlook is strong. We'll work extremely hard to deliver on that. Our positioning entering FY27 is excellent. I'd simply stress that we're getting into fine details that are behind us and don't matter at a materiality threshold. Focus on what actually moves the needle. KCGM is a critical asset. That's where attention and effort sit right now. It isn't on these satellite operations — small, short-life things — but those too are producing meaningful cash flow that is in fact helping fund the capital spend at our long-life, high-margin assets.
Matthew Frydman
analystYeah, and I apologize for that. Thanks for the answer — sorry for interrupting you there, Stu. I'd note that the Yandal hub will still represent a third of your business; I'm not sure I'd call that minutiae, but regardless, thank you for the response. My second question concerns the KCGM mill expansion and, I suppose, the higher capital guidance for it. You went into quite a bit of detail about where that money is going and why holding to the schedule matters. Is there a risk that, I guess, putting in more money and more people doesn't actually fix the productivity problem you're facing? You mentioned that the space your teams are working in there is fairly tight. I suppose what I'm asking is why you're confident that spending more is the right approach rather than simply taking longer to finish the project? Thanks.
Stuart Tonkin
executiveThat doesn't fix the productivity problem. Adding heads is the reason you do it. You bring on more people because 600 people can't get it done, so you throw 800 at it. That's the response to productivity. You're spending more to accomplish the same work. That's the reason an additional $110 million is being spent this year to deliver that. The most important piece is getting the plant running, getting ore through it, and step-changing the asset's cost base and its revenue. With KCGM, time is of the essence, not capital, unfortunately, at this point. Capital isn't the sensitive factor. We don't casually spend $110 million unnecessarily. We want to see this plant operating and beginning to contribute.
Simon Jessop
executiveYeah. Okay. Thanks, Stu. Matt, if I could just tack a little onto that. The next four months really represent the peak manning period for us. We've ramped up beyond what the original plan called for, as Stu mentioned, and that progression began during Q2 in terms of accelerating the work. We still have many work fronts at the moment, and we still have that opportunity to put those people in there. Three, four months from now those work fronts start to wind down, and we're very, very focused on the critical path, which is stage one, which is first ore into the new mill. While we've still got the opportunity, we've taken it, and the project team has, to put the extra people in there, get the work actually completed, and that's the picture right now, which gives us the ability to remain on schedule for FY27, ready to go in sort of June. If we didn't put those extra people in, then the work fronts start to dry up and then it genuinely will be delayed. The project is in really good shape. It's focused on stage one, and that is first ore into the mill. Stage two is moving Gidji back down to KCGM.
Simon Jessop
executiveThat can occur during the months following our processing of the ore.
Matthew Frydman
analystUnderstood. Appreciate the extra detail on that, Simon, and thanks as well for your answers, Stu. Cheers.
Operator
operatorMuch appreciated. Daniel Morgan of Barrenjoey is our next caller with a question. The floor is yours.
Dan Morgan
analystHello, Stu and the team. Clearly, one major theme of today's call has involved adding considerably more people to the project so it stays on schedule. Given the gold price and the project you're working to keep on track, I can see why that would make sense. Are you still anticipating a July turn-on? Has the turn-on date not slipped? Considering recent guidance and market disclosures, wouldn't it be sensible to begin easing market expectations regarding the turn-on schedule, or is the expectation that this additional budget will preserve the July schedule? Thank you.
Stuart Tonkin
executiveWe're in quarter one. What I expect is that early in quarter one, the plant will be brought up in parallel. This isn't about what the market expects. It's about what we've disclosed regarding a three-year build that's on time and on budget as we've stated, and the cost overrun on that spend because we're putting more labor into it. We're not sitting here trying to game this, Dan. We're here to explain where things stand 2.5 years into a three-year build. As Simon has also expressed confidence about, we're very, very happy with how progress is going. We're collaborating very closely with the contractor handling construction and seeking any chance to complete this not just on time, but sooner. Part of that combined approach involves adding headcount. We're not adding people just so they stand around holding stop signs. Those people are on site performing productive work that contributes toward that deadline. That's the goal we're pursuing. It's quite exciting. I believe the team that toured the plant at Diggers & Dealers witnessed an enormous step change year-on-year. If you visited again today, you'd ask, "Well, why can't you switch it on now?" That's what you'd see visually. It's similar to building a house — you're waiting on your carpets and your flyscreens, but all the cabling, all the tiling, all those final elements, it appears as though it's been completed and it appears as though it's just sitting there doing nothing, yet it's that last bit of finishing to make sure that once we get it switched on, the quality standard is achieved and the work is finished so we don't need to shut it down or we don't need to repeat those lessons we learned from the Thunderbox expansion.
Stuart Tonkin
executiveWe went through 12 months of highs and lows and fixing some of those issues. We want to see all of that dealt with before we turn this on and commission it. That's the path forward for the second half.
Dan Morgan
analystThank you. I suppose it's clear there's a great deal of attention on this call, and naturally, concern regarding several matters. Perhaps turning things around and shifting direction somewhat, just across the roughly last 6 months, what's different in the business that you can observe which, in a very favorable light, is something you would point out to investors where change has been underway or something improving, whether that's exploration or a site? What's shifting within the business in a positive way that you could flag for the market?
Stuart Tonkin
executiveWe do see that our share price has lagged behind peers and the global majors, and we acknowledge it. We also acknowledge how that reflects the short-term misses on production and on costs, and we have been very clear about the events behind those misses and the steps we have taken to fix them. Just look at the run rate in the second half on its own — a very, very strong uplift in production. Look at the shrinking hedge book, the realized gold price with growing exposure to spot, and the step change in the business as the KCGM mill expansion comes online in FY27, plus the uplift again, a step change in the production profile for the group. Those are the things so close to us, the opportunity for investors now to take positions, and that is the confidence in the outlook. I see the point people are focused on here now in terms of concerns, they are looking at relativities. That creates the opportunity to understand the long-term value creation that Northern Star is doing.
Dan Morgan
analystMuch appreciated, Stu.
Operator
operatorThanks. Our following question is from Milan Tomic of J.P. Morgan. You have the floor.
Milan Tomic
analystHello, Stu and the team. I appreciate the call. I just have one question about the Hemi permitting side. Could you give us perhaps a bit more detail on how that process is moving along? Have any issues come up — specific issues — that the Indigenous nation groups in that area have flagged, or I guess I'm just wondering whether you could offer a little more color on any concerns that may have been raised up to this point?
Stuart Tonkin
executiveNo, Milan, there aren't any significant issues on that front. The main thing is that we need to get the dewatering trial underway, and that will most likely happen at the beginning of quarter four. In an ideal scenario, we'd have kicked that off in quarter two, but things were held up while the infrastructure was being put in place during the hot season. Once it's ready and we have a plan that's acceptable, the trial will get going. It runs for roughly 3 months, and what we learn from it feeds into our 5C water license for dewatering the pits before production. That's an item that has probably slipped. It has no bearing on the broader state and federal EPA approval licenses, which are moving ahead. At the end of the day, that's likely the operational piece we'd have preferred to see start before summer, and it's going to begin in March or April, likely under the sort of modified scheme we've negotiated, or are in the process of negotiating, with the traditional owners there.
Milan Tomic
analystOn the optimization work you're doing, are there any significant changes around mine plan sequencing and the like that you could share—things that differ somewhat from how that project was first envisioned?
Stuart Tonkin
executiveOn scheduling, the first thing we’ve focused on is the first gold pour, and even if startup timing slips, we want to understand what that means for that date. As for the actual flow sheet, we’ve reviewed many scenarios and alternatives and came back to the primary flow sheet using high-pressure grinding rolls at the front rather than SAG mills—that remains sound. Resizing certain gear, mills, and so on is likely something we’ve done, with room to expand afterward, on a simpler plant. Every autoclave and all of that is already progressing toward construction, and long-lead items of that kind are being built. That all holds up. The mining sequence again, mainly around water management, borrow pits, and getting that ready—there we have options and scenarios rather than the single plan the prior owners had. We simply have several scenarios that could follow different routes to reach the same outcome. That’s what the team is doing while approvals are in progress—iterating and iterating, which is what they do best as engineers.
Milan Tomic
analystYeah, thanks a lot. If I could just fit one more question in about Jundee. Reaching 300,000 ounces would require a fairly substantial rise in grades versus at least the past couple of quarters. Could you perhaps give us some insight into how that grade increase comes about? Are you heading into a higher-grade section of the ore body, or is there another factor we ought to be thinking about there? Thanks.
Stuart Tonkin
executiveIt's a combination of the two. At the primary level, throughput isn't shifting, so yes, the average grade that gets delivered to the plant has to be maintained. It has been maintained previously. We definitely have isolated pockets with different grades across various mining sequences. We've recently added a paste plant, and that lets us return to the upper levels and regional high-grade areas to extract those high-grade zones that had been sterilized since they're just open voids. Throughout the mine's history — 30, 30 years — there was never any paste in the mine; it has never had paste backfill. Now that the paste plant is installed and we're beginning to fill those voids, we're able to go back and extract those high-grade pillars from the upper levels. There are areas of that kind — Cook, Griffin mining zones — coming back with better grade. Every one of those factors contributes, but on the whole it's a focus on grade rather than a focus on throughput.
Milan Tomic
analystExcellent — thank you so much.
Operator
operatorThanks. We’ll take the next question from Adam Baker at Macquarie. You have the floor.
Adam Baker
analystHey Stu — I've just got a single follow-up, and it's about Hemi. I see in your remarks that May '26 is when the optimized resource and reserve are coming. So I'm curious whether there's anything we might be able to observe that would show a quantum shift in the resources or the reserves — taking into account things like gold price assumptions and so on — and similarly on the reserves side, around cut-off grade and the like, as you fold this into the Northern Star reserve and resources. Thanks.
Stuart Tonkin
executiveThanks, Adam. Well, I won't get ahead of what's happening with R&R — there's still quite a lot of work to be done over the next several months before we get there — but essentially we'll put out Hemi within a Northern Star perspective on R&R, alongside the group's R&R. I'd note that Hemi carried a higher gold price assumption in what was put out previously. We'll aim to bring that in line with the group as a whole in terms of where we set those gold prices for resources and reserves. Those assumptions are nearly immaterial relative to where spot sits right now, and we're watching what peers do with gold price assumptions for resources and reserves. That in turn flows back into cut-off grades and into this whole question of what's valued and whether you can actually combine pits, remove saddles, and make a bigger, lower-grade resource that's economic overall. That's the thing we have to weigh up. I'd just say we probably take a stricter, more heavily scrutinized view of what's in and what's out. If anything, a more robust, closely examined look at that resource is more likely than material growth. If you consider the drilling and the data taking place there, all we've really done lately is redirect some rigs to do a bit of trueing work.
Stuart Tonkin
executiveSince taking control of that Hemi region, we haven’t carried out any meaningful growth drilling.
Adam Baker
analystMuch appreciated — that’s excellent.
Operator
operatorThanks. Just a reminder — to ask a question, hit star one. Our next question is from Mitch Ryan at Jefferies. Go ahead.
Mitch Ryan
analystGood morning, Stu, and to the whole team. Stu, you made a few remarks about Hemi. You described it as a sister plant to KCGM, and you mentioned the chance to resize the mills. Does that possibly imply a shift in the scope of mill size compared with the design numbers disclosed earlier? Could you help us get a handle on that?
Stuart Tonkin
executiveRight. Ideally, items such as the crusher and the mills would be the same as what we have at Fimiston, and that is our current line of thinking. Some mills have already been bought, and they are sitting in a shed, packaged up in Port Hedland. I have actually watched them being unloaded from the truck. Looking at them, I say they will handle the job of a 10 million tonne per annum plant. To reach a 15 million tonne per annum plant, a third one would be needed. Would I consider, rather than doing that, having two large mills today that match Fimiston? Usually the answer is yes. These are the kinds of considerations we are working through, to say, regardless of owning some hardware sitting there in a shed, would we start again and say two large mills that match Fimiston? What is the logic behind that? When it comes to reselling these things, there are options available. When it comes to redundant expenditure, you can recoup the costs because you have not installed them and they are ready to freight. That is the type of thinking that, if you were in a hurry to build a mill, they would have got built, and then when you want to expand, you add a new mill.
Stuart Tonkin
executiveSo when we look at that now, with the benefit of time, we say, "Well, let's not just build something simply because we have the parts on hand. Let's think about what we'd do starting from a clean sheet." That's the example. It's the same situation with the crushing circuit — we could replicate the Fimiston design exactly, tightly, and ask whether that's something you could install here, something oversized that matches the parts, and so on, rather than going with something designed specifically for the throughput rate at Hemi. And if we move to something that is the sister plant to Fimiston, that means if we run into issues like the ones Simon had in December at KCGM, we could be fast-tracking the knowledge, the skills, and the parts across the business — things that would happen at one of those large crushing units every three or four years.
Mitch Ryan
analystYeah, thanks. That’s helpful context.
Operator
operatorThank you. That brings us to the end of the question-and-answer session, as we have no more questions right now. I'll turn things back over to Mr. Tonkin, who has some closing remarks.
Stuart Tonkin
executiveOkay, thanks for being with us on today's call. We appreciate your interest, and it's been a busy day for everybody. We're looking forward to a strong second half and to growing from here. Appreciate it. Thank you.
Operator
operatorThat brings today's conference to a close. Thanks for joining us. You can disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Northern Star Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Northern Star Resources Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Northern Star Resources Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.