Pan African Resources PLC (PAF) Earnings Call Transcript & Summary

February 15, 2023

London Stock Exchange GB Materials Metals and Mining earnings 46 min

Earnings Call Speaker Segments

Jacobus Loots

executive
#1

Good morning, everyone, and a very warm welcome to the Pan African Resources interim results presentation. Thank you very much for taking time out of your schedules to join us this morning. Right at the start, I have to say that, in terms of our underground safety and also the production from our Barberton underground operations, the last half year has been a challenging one for Pan African. It is, however, important to contextualize these 2 issues. We are comparing ourselves to what was a year of record production and profits in 2022. Also, we are implementing concrete measures to improve safety and production from the Barberton underground. These initiatives should see a much improved performance in the second half of the financial year. Pan African is also now benefiting from a rand gold price in excess of ZAR 1 million per kilo, which is very attractive. Our strategy is to position ourselves as a safe and sustainable, high-margin and long-life gold producer. I believe that the next slides demonstrate very tangible progress in terms of delivering into this strategy. We will keep the presentation fairly brief with an opportunity for questions afterwards. Joining me and presenting today will be Deon Louw, our Financial Director.

Jacobus Loots

executive
#2

Feel free to consult our SENS and RNS announcements, along with the supplementary information posted on the Pan African website, if you need details that today's presentation doesn't cover. Kindly take note of the disclaimers and the information on forward-looking statements found on Slides 2 and 3. Slide #4 gives an overview of the presentation. We'll begin with several key features from the half year just past, our health and safety results and the operating environment, including how we are handling issues specific to South Africa — in particular, the electricity constraints we currently face. The presentation then goes into more detail on our distinctive portfolio of surface remining and underground assets, how these various operations have performed, and also specifically how we are turning the corner at the Barberton underground. Within this section, we'll cover the group's all-in sustaining cost performance and outlook, and how we keep reinvesting in our mining assets through capital spend so as to ensure their sustainability into the future and also to grow future gold production. I look forward to taking a couple of minutes to discuss progress on our ESG initiatives, where our aim remains to go beyond compliance. Deon will analyze our interim financials. Despite lower production in the half, we still generated significant operating cash flows.

Jacobus Loots

executive
#3

Then we'll wrap up the presentation with an update on our growth and exploration projects and show that Pan African is squarely committed to keep generating value for every one of our stakeholders. Slides #6 and 7 cover some of the key highlights for the half year. Pan African is broadly recognized for meeting the production guidance we set for the group. Admittedly, output was on the light side over the last 6 months. We'd have preferred to close the half at 95,000 ounces or better, with roughly 105,000 ounces in the second half. That said, apart from Barberton underground, the rest of our portfolio came in as expected. The operational restructuring now underway at Barberton ought to deliver meaningful improvement over the next 6 months and in the years beyond that as well. On costs, all-in sustaining unit costs landed somewhat above what we had hoped for, again reflecting the lower production in the half. The weaker rand dollar exchange rate did help cushion the impact to some degree. We keep encountering the inflationary pressures that all global miners are facing. It's worth noting that over 85% of our group gold production came in at an all-in sustaining cost under $1,150 per ounce.

Jacobus Loots

executive
#4

Our surface segment truly delivered strong results in this period. Bringing an operational Mintails into the portfolio over the coming 18 months ought to help the group further when it comes to lowering production unit costs. Guidance for group all-in sustaining costs is now roughly $1,250 per ounce across the full year, assuming an average exchange rate of ZAR 17 to the dollar. Turning to Slide #7. Earnings came in lower, reflecting reduced gold output, once again measured against a record-setting 2022. Even so, we paid shareholders attractive dividends and became the first in the mining sector to launch a rand-denominated sustainability bond, with our inaugural issuance oversubscribed. That bond's success shows market confidence in how we deliver on our growth projects, and in particular the Mintails opportunity. On ESG. We take real pride in what we have achieved there, especially in renewable energy and water recycling. Slide #9, safety performance and the journey to zero harm. During the reporting period our surface assets did very well. Regrettably, underground operations went backwards from an industry-leading safety showing in the prior year. We have since sharpened our safety initiatives so that we do considerably better going forward.

Jacobus Loots

executive
#5

Independent audits have been commissioned as well, so we can pinpoint further areas needing improvement. Then, if we move on to an overview of the operating environment and our operations, beginning on Slide 11. There are few mining jurisdictions that don't come with challenges. South Africa certainly isn't an exception. So it's crucial to hold quality assets and to have a responsive management team that is experienced and equipped to handle problems and issues. We're always looking for ways to make our business less vulnerable to adverse external impacts in South Africa. Now, a few matters worth highlighting regarding our operating environment over the last year include the following. Our reliance on Eskom, the South African electricity utility, keeps coming down. The group plans to have no less than 30 megawatts of its own generating capacity within the next 24 months. As for the regulatory environment, I'd expect additional concessions from government fairly soon, which ought to make it even simpler to generate one's own power or buy electricity from independent third parties. Pan African's assets have long lives, with extended mining rights. The Evander complex' rights remain valid until 2038, and those at Barberton until 2051. Regarding Mintails, we expect to secure all of the required permitting to start production within the next 6 months.

Jacobus Loots

executive
#6

Looking at security, we're still working hard to protect our employees and our operations, and to lessen the effects of illegal mining and criminal activity. We keep introducing new technology-driven solutions so that our measures work better and our security expenses come down, and we've built stronger relationships with local law enforcement. Over the past 12 months, we've certainly observed an improvement in the illegal mining situation at Barberton, and that's encouraging. Tailings management remains a vital area of focus for mining companies. All of our large tailings facilities have been independently audited, and we're working toward compliance with new international standards. Lastly, when it comes to engaging with stakeholders, we put substantial investment into our social license to operate. Pan African's mines deliver a meaningful positive impact in the communities where we operate. So, to wrap up on this slide, Pan African's track record shows that we're able to operate and grow in South Africa, and to do so very successfully. Turning to Slide #12, here's some information about our energy strategy. Pan African will keep leading the way when it comes to becoming more independent of Eskom. We have convincingly proven the operational and financial viability of renewable energy, and we'll keep expanding this footprint in the years ahead.

Jacobus Loots

executive
#7

Additionally, we've put money into extra diesel generation capacity so that we can handle extended stretches when Eskom power isn't available at our underground operations. Slide 14, an overview of our operations. A distinctive combination of surface and underground assets makes up our portfolio. With Mintails added, we will now operate 3 large mining complexes in South Africa. Surface operations bring down unit costs and convert legacy liabilities into profits, while the underground gives us long mine lives, solid returns thanks to the very large sunk capital base, and also attractive optionality, which we are factoring in as shown by the progress we've made at the Evander underground. Now to the following part of the presentation, where we'll take a couple of minutes on how each of our core assets performed operationally. On Slide #16, Elikhulu. Output over the 6 months held steady in spite of some difficult weather conditions. The Leslie/Bracken pump station has now been fully commissioned, which positions us for the next 5 years of remining. Elikhulu continues to be a flagship asset for our group, with a long life and really attractive margins. It stands as proof that large mining projects can be built successfully in South Africa, and we will take all of the lessons from constructing and operating Elikhulu across to Mintails when construction begins.

Jacobus Loots

executive
#8

Slide 17. Once again, the BTRP delivered a strong result in the current half year, with the asset producing $7 million in EBITDA. We're able to sustain that production level at the BTRP for roughly 18 months more. That said, as we've noted previously, processing ore from Royal Sheba is where the BTRP's future lies. We'll devote a little more time to the Royal Sheba project when we get to future growth. Mintails, on Slide #18. We've now achieved some very good progress on this project, and we'd hope to begin full-scale construction by June of this year, subject, of course, to securing funding and then permitting as well. Mintails satisfies a number of criteria for Pan African and for our investors. It will substantially expand — effectively doubling — our surface mining business, giving us proper scale in what is a highly attractive space. From an ESG standpoint, it will rehabilitate an area in serious need of remedy, both socially and environmentally. Execution risk on the project is relatively low. It will be Pan African's fourth large-scale gold tailings retreatment venture. Once again we've assembled our Elikhulu project team to execute into Mintails as well. And Mintails' economics are highly attractive, with rapid repayment of upfront capital, a long life of more than 20 years, including the Soweto cluster, and gold produced at an all-in sustaining cost of sub-$1,000 per ounce.

Jacobus Loots

executive
#9

Deon is going to cover where Mintails' funding stands during his part of the presentation. That said, Slide 19 shows our project execution timeline is largely on schedule. Moving to Slide 20. Pan African is constructing a world-class tailings retreatment business that will extend many years into the future — safe, predictable and high margin, in effect a gold annuity. Slide 21. The Evander underground team delivered as expected despite electricity constraints, producing just under 20,000 ounces for the half year at an all-in sustaining cost of $1,050 per ounce. We are developing a new underground mine at Evander, and several highlights from the half include: the successful commissioning of Phase 1 of our new underground refrigeration plant; the start of stoping of the F line on 24 Level; the start of development for our subvertical hoisting shaft; and also the dewatering of the Egoli decline, which will be finished before this financial year ends. We are investing substantial capital in Evander underground over the next 2 years, but after that it will be a long-life asset making a material contribution to our future production profile. Slides 22 to 24 give further detail on the Barberton underground operations. On Slide #24, we have carried out a great deal of solid work at Barberton in recent years, expanding development to build more operational flexibility and optimizing logistics.

Jacobus Loots

executive
#10

This is a long-life operation with appealing grades. That said, cost inflation on top of a deeper mine and infrastructure that is constrained has made things harder and more costly at the operation. A reset was needed, and during our earlier presentation we made a commitment to restructure Barberton underground. We are now delivering that turnaround strategy, as engagements are complete and agreements with our representative labor unions have at last been signed. Importantly, no large-scale retrenchments result from our strategy, which makes it a win-win for everyone. How is this restructuring taking shape? Essentially, Consort is being turned into a contractor operation aimed at cutting overheads and mining areas of higher grade. Looking ahead, breakeven gold production at Consort for us will be under 30 kilograms of gold each month. Exploration and development of new mining areas at Consort will carry on. Full ramp-up of the contractor is expected by April of this year. Staff in excess at Consort have been relocated to Fairview and Sheba to supplement our existing staff complement for continuous operations. Shifts now run 10 hours instead of 8 hours, while still permitting planned maintenance time. In the months ahead, we expect to transition to 2 blasts per day in higher grading and development areas.

Jacobus Loots

executive
#11

Being able to mine additional tonnes and carry out more development will likewise affect our cut-off grade, which means lower-grade orebodies are now also accessible for mining. On top of that, switching to renewable power over the coming year, along with infrastructure upgrades like the subvertical shaft, ought to deliver further unit cost savings in the years to come. We're looking forward to reporting a much better performance from the Barberton underground over the next 6 months. Turning to Slide 26, the section covering all-in sustaining costs. Over 85% of our portfolio produced at an all-in sustaining cost below $1,150 per ounce. At Fairview, Sheba and Consort, we expect unit costs to come down in the second half of the financial year, as we benefit from the turnaround plans now being implemented. Slide 27 shows that our cost performance on core operations remains very much in line with the global sector average. Slide #29, group capital projects. We keep investing in our assets, and our guidance on capital investments for the year is unchanged. In the next financial year, Elikhulu's capital will drop right down. The bulk of our capital is still being spent at Evander underground, where, as we've said, we're effectively building a new mine on 25 and 26 Levels.

Jacobus Loots

executive
#12

Moving to Slide 30, which covers environmental, social and governance plus our beyond compliance approach. Greater emphasis on ESG in recent years has meant our group needed to look into ways of bettering how we operate and making sure our business is future-proofed. As we detailed earlier in this presentation, we keep growing our renewable footprint. We're also bringing a large water retreatment plant at Evander into commission before this month ends, which pretty much removes any use of potable water. We work together to safeguard the sustainability of the distinctive ecosystems at Barberton, and through unique ventures like the large-scale blueberry operation at Barberton, we also generate employment and economic opportunity. Pan African is furthermore now rolling out independent assurance over our ESG activities and reporting. I'll now hand over to Deon, who will give an overview of the financial results for the interim period.

Gideon Louw

executive
#13

Thanks, Cobus. On Slide 33 you'll find a summary of how the group performed in the interim period of the 2023 financial year. It's clear that revenue measured in U.S. dollars fell 19%, which reflected both reduced production and a 5% drop in the U.S. dollar gold price. In rand terms, though, revenue was down just 7%, since the rand weakened 15% against the dollar over that 6-month period and the rand gold price rose 10% to ZAR 956,000 per kilogram. We report in U.S. dollars, but the rand is our functional currency, given that our costs are mostly rand-based and all of our debt is rand-denominated, and the inverse relationship between the dollar gold price and the rand-dollar exchange rate generally lends support to our revenue line even when the dollar gold price falls. Sadly, as is true for any mine carrying a large, fixed cost structure, lower revenue hits margins disproportionately, and a 19% revenue decline — or 7% in rand terms — once translated into U.S. dollars, produced a 25% drop in EBITDA to $57 million and a 37% fall in attributable earnings to $29 million. Net debt rising 90% to $54 million is what we expect while the group carries out its capital development programs, bearing in mind that most of that spending is expansionary in nature, aimed either at enhancing existing production or at bringing new production online.

Gideon Louw

executive
#14

On slide 34, we summarize the group's cash flows for the interim reporting period. Once all operational costs, taxes, finance costs and a net dividend of $20 million had been paid, the operations produced surplus cash of $11.6 million. Of the $51 million we spent on capital, roughly 80%, or $41 million, went into expansionary capital, as I mentioned earlier, while sustaining capital was fairly muted at about $10.5 million. Apart from $3 million, capital expenditure in this half year was funded from the group's term debt facilities, which explains why net debt rose to $54 million. We ended the interim period with a cash holding of $34 million. And as of the date of this presentation, the group's immediate liquidity and undrawn bank facilities totaled ZAR 1.1 billion, or approximately $62 million. Slide 35 illustrates the group's debt structure, covering both existing and future debt facilities. The first column shows our core debt facilities, made up of the existing revolving credit facility of ZAR 1 billion, or approximately $59 million, and a general banking facility of ZAR 140 million, and these are designated for bridging capital expenditure and working capital funding. The second column shows our project-specific debt, whose maturities are matched to the cash flows from the projects they fund, similar to the original Elikhulu senior debt facility, and it comprises the ZAR 800 million or ZAR 47 million -- $47 million, domestic medium-term note facility and the ZAR 1.3 billion or $76 million Mintails term facility, both facilities being sustainability instruments and a demonstrable commitment to our ESG imperatives.

Gideon Louw

executive
#15

All told, senior borrowing capacity currently stands at ZAR 3.3 billion, roughly $194 million. If that were fully drawn — including the ZAR 1 billion RCF — and measured against existing EBITDA alone of about ZAR 2 billion, or $180 million, the debt-to-equity ratio comes out at approximately 1.7x, comfortably below the 2x covenant compliance threshold. On top of that, so the debt-to-equity ratio stays solid while Mintails is being built, the project-specific debt of $76 million will be left out of the denominator when this ratio is calculated over the construction period. Once construction at Mintails gets underway, project senior debt will rise correspondingly to around ZAR 2.1 billion, and we expect it to amortize in full comfortably inside the 4-year redemption term — particularly given prevailing rand gold prices of about ZAR 1,070,000 per kilogram versus the ZAR 872,000 per kilogram that the original feasibility study assumed. Slide 36 shows the redemption profiles for the group's future capital structure. I'm pointing to the future capital structure specifically because some facilities are still in the process of being implemented. In particular, we extended the ZAR 1 billion RCF and the ZAR 1.3 billion Mintails senior debt facility, which together with the ZAR 800 million domestic medium-term note program make up the senior debt funding for the Mintails project.

Gideon Louw

executive
#16

So Rand Merchant Bank is the lead arranger on the senior debt for Mintails, and they've underwritten the ZAR 1.3 billion facility. We're looking to have that wrapped up by mid-April, ahead of Mintails construction starting in June. That green line you see is the drawdown and redemption profile for this facility. The graph uses the contractual 2-year drawdown period, but in practice we're expecting an 18-month construction window, then a 4-year redemption term — a loan structure that's nearly the same as the ZAR 1 billion funding originally raised to build Elikhulu. The golden line shows the ZAR 1 billion capacity of the extended RCF, with a bullet repayment coming in 2026, assuming it isn't repaid or extended once more at that point, given that it's revolving in nature. We needed the existing RCF extension so we could steer clear of refinance risk in mid-2024, which is when the Mintails debt will likely be close to fully drawn. On the domestic medium-term note issue, it's made up of a 3-year tranche of ZAR 585 million, or $35 million, plus a 5-year tranche of ZAR 215 million, or $12 million, and it's allowed the group to diversify its funding base by tapping the deeper debt capital markets.

Gideon Louw

executive
#17

We've also made substantial progress on refinancing the current Evander solar facility on better terms, as part of the largest solar funding facility, which will also cover funding for Barberton's solar facility. Once these facilities are in place, for the next 2 years the group's principal debt redemptions will consist solely of the annual redemption of roughly ZAR 30 million, or $1.7 million, on the existing solar facility, which allows us to complete the capital expansion programs already embarked upon without adversely impacting discretionary cash flows and the group's ability to keep distributing dividends to shareholders. Thank you.

Jacobus Loots

executive
#18

Thanks, Deon. Beyond the operating assets we have now and the Mintails project, Pan African holds further near-term growth projects that are exciting, in particular Royal Sheba at Barberton. Slide #38. Through the reporting period, development at Royal Sheba moved along well. To recap briefly, Royal Sheba is a world-class Greenstone Belt deposit, with strike length confirmed at 850 meters and mineralization taking place across what averages 10 meters. Mechanized massive mining methods will be used to extract it. Royal Sheba has always seemed somewhat overlooked within the Barberton portfolio, because our other orebodies carry higher grades. Measured and indicated mineral resources by themselves come to more than 800,000 ounces of gold, with meaningful upside at the open down-dip extent. When modeling BTRP capacity only, Royal Sheba shows an 18-year life of mine, steady-state production, 25,000 ounces a year. We also have extra processing capacity at our Sheba and Consort metallurgical facilities that could raise this production figure. Our bulk sampling project at Royal Sheba was completed successfully, with results beating our expectations. A full project plan is now being finalized, and we will release it to the market before the end of March of this year. On Slide 40, information on our exploration venture in the Sudan.

Jacobus Loots

executive
#19

Over the past 6 months, we've achieved some really solid progress. Our sample testing lab is now completely commissioned, and the results have been very encouraging — in fact, excellent grades came out of our exploration program. Construction is also finished on our first exploration camp at Block 12A, which sits inside our concession area. If we can wrap things up on Slide 41, Pan African's focus over the coming 6 months is on delivery. The key imperatives are as follows. Through a focus on health and safety initiatives, we'll keep up our proactive journey toward zero harm. We'll raise our production run rate and carry out the turnaround of the Barberton underground successfully. We need to execute into the capital projects so that future gold production is sustained and increased. Our costs are well controlled. Even so, we'll keep mitigating inflationary pressures via optimization and other initiatives. Full-scale construction of the Mintails project is something we plan to commence. Our ESG focus will continue through programs that support sustainable host communities, greater use of renewable energy and recycling initiatives, and we'll concentrate on maintaining our approach to capital allocation decisions — one centered on sustainable stakeholder and shareholder returns — creating value for all. Thank you very much for your time this morning. As always, we look forward to mining for a future in the months ahead.

Jacobus Loots

executive
#20

We're now ready to take any questions you may have.

Jacobus Loots

executive
#21

Thanks once more for being with us today. Now let’s check whether anyone on the phone lines has a question.

Operator

operator
#22

Right now, we aren't getting any questions from the lines.

Jacobus Loots

executive
#23

Great. So shall we move on to the questions that came in by e-mail or through the platform?

Speaker

unknown
#24

We have a few questions from Edward Smyth, a private shareholder. First, what does the company expect in terms of lowering AISC at Barberton with FULCO, considering the favorable mix and the shift away from Consort, more productive face time, and less overtime? And which operational targets are being established?

Jacobus Loots

executive
#25

Thanks, Ed. So Consort is a bit different from Sheba and Fairview. The contract at Consort is on-site. They should be pretty much ramped up by April, and really, the first aim at Consort is to make sure that operation carries its own — pays its own way, which is about 28 to 30 kilograms of gold to be produced per month. And certainly, as we've said, we'll continue to explore and open up new orebodies. There's still quite attractive ground at Consort, certainly at the PC Shaft bill and other areas also. So that's the focus on — at Consort. In terms of Fairview and Sheba, some of the studies that we've done indicate that we could increase face time by as much as 40% by these measures that we've put in place. Clearly, it takes a little bit of time to ramp up. But I think as a base case, we would hope to increase underground production by somewhere in the area of 15% to 20%. And I think that would be a very good achievement for Fairview and Sheba, and just make sure that we can consistently achieve that target.

Speaker

unknown
#26

Ed's second question is whether the company still holds hope that Sudan could deliver compelling results.

Jacobus Loots

executive
#27

We’re quite optimistic, I have to say. And as you’d have noticed, the release laid out some appealing grades from our exploration at Block 12A — that’s 1 of the 5 blocks we hold. Obviously, exploration does take some time. You can’t get it done in 6 months or so. So I think we should allow ourselves 12 or 18 months to firm up on what we have. And our geologists are extremely enthusiastic. It’s not the simplest operating environment, but that was to be expected. So yes, we’re quite hopeful about what we’ll find. I mean there is certainly a lot of gold in Sudan, and that’s a fact. It comes down to proving up an economic deposit and then working out how one can mine it and extract value. We’re extremely excited about Sudan.

Speaker

unknown
#28

Ed’s next question is about funding. Apart from an equity raise at under 4x 2024 PE, what other options are there for closing the $23 million funding gap on Mintails?

Gideon Louw

executive
#29

That is — Ed, that is a good question, though. That is something we have been working on for some time now. We have already funded a sizable portion of that deficit with the acquisition of the surface areas as well as infrastructure that has already been built on site. There is still a deficit of a couple of hundred million rand and we are looking at a number of ways to do so, which involves either a derivative product, a forward sale of gold by way of example, gold loan by way of example. It is slightly small for a royalty award or stream, but there are — there are alternatives to the equity raise, and in due course, we will be able to give more — shed more light on that.

Jacobus Loots

executive
#30

To build on what Deon said — take what’s happening at Mintails, for example, which we’ve pointed to in this presentation: it genuinely is a remarkably appealing opportunity. It’s something we have to begin constructing. We’ve got an entire team in place that has already begun working. So Mintails has us very enthusiastic, and when it comes to funding that shortfall we need in order to move forward, we don’t want to exclude any option.

Speaker

unknown
#31

And Ed's final question: does that annual output goal of 195,000 to 205,000 ounces, at the lower end, factor in the effect of load shedding? Could you walk us through the AISC guidance for the full year? And what will drive it?

Jacobus Loots

executive
#32

I think our initial guidance for the year assumed production at roughly a similar level to 2022, which was, again, a record year. So the guidance we've released does assume the same level of electricity restrictions as what prevailed in the first 6 months, not anything more. And then on AISC, I think we're guiding to $1,250 at a ZAR 17 exchange rate. Generally, Pan African is very good at controlling our costs. So if you look at our profile in terms of the actual absolute spend, we haven't overspent and we won't overspend on costs. It's a product of ounces. So clearly, if we produce more ounces, then that unit cost will go down. So that really is the focus, is producing these additional ounces safely.

Speaker

unknown
#33

This next one is really more of a request, actually, from Mark Bentley at Share Society. He asks that, should you raise equity capital, you please allow retail investors to take part — for instance, by using the REX platform from Peel Hunt.

Jacobus Loots

executive
#34

I'd say we hear that point, and once more, at this moment we wouldn't want to rule anything out.

Speaker

unknown
#35

Donna Slater of Mining Weekly asked whether we could please give more detail on the solar PV ambitions, that is, what is the value of the 30-megawatt project? How does Pan African plan to roll out solar across its various sites? How much is being saved each month in electricity payments thanks to the solar PV plant already installed? And how much will be saved monthly once the 30-megawatt plant is online? What effect is the solar energy plant having on Pan African's need to curtail power consumption from the grid during load shedding? And finally, what does the return on investment into renewables look like, the payback period?

Jacobus Loots

executive
#36

That's a lot of questions, but we'll do our best to get through them. So yes, we have 10 megawatts running at Evander, as we've mentioned on numerous occasions before. No other mining company had commissioned a plant at that scale before us. The project we're doing next is 8.5 megawatts at Barberton. We'll break ground before the end of June, and at the latest it will be at steady-state and producing early in the new calendar year. That project's capital cost comes in at somewhere between ZAR 180 million and ZAR 200 million. And we're working on facilities to fund that expansion. Then comes the next phase -- that's Phase 2. Phase 3 would involve expanding what we're doing at Evander to subsidize the underground. So that one will be anywhere from 12 to 15 megawatts. You can assume a similar level of costs. Returns are attractive. Payback, assuming an aggressive rate of electricity price escalations as has been the case in the past, is anywhere between 4 to 5 years on these plants. So on the first 10 megawatts, we're saving in the order of 2.5 to -- anywhere from ZAR 2.5 million to ZAR 4 million per month.

Jacobus Loots

executive
#37

From that angle, it looks really appealing. So yes, and beyond that, we're reviewing quite a few other options. There isn't a single perfect fix for the problem we're up against with Eskom, which is exactly why we aren't staking everything on one approach. And I think, hopefully, we'll soon be in a position to share some further announcements as well regarding additional expansion of that renewables footprint.

Speaker

unknown
#38

Our final online question comes from Arnold at Nedbank. He's asking about the one-time expenses tied to the restructuring at Barberton.

Jacobus Loots

executive
#39

That's the nice part about it, Arnold — there won't be any. What I mean is, we aren't doing any major retrenchments. So we're taking the excess people from Consort, and roughly 300 staff members are being shifted over to Fairview and Sheba purely to top up the staff complement already there, which lets us move to FULCO. And the good thing is there's no once-off fee or costs involved. There will be a cost in the form of a monthly payment to employees' shift allowance. But based on our calculations, we'll be saving money on a net basis, because the overtime we're paying at present should come down. So all in all, even looking at it from a cost angle, we believe it's a very good move.

Speaker

unknown
#40

Online, we've run out of questions, but I think there's one waiting on the conference call, so let's shift over to that if we can.

Operator

operator
#41

Richard Hatch from Berenberg has a question.

Richard Hatch

analyst
#42

What I'm really asking about is costs and where you believe the business can be taken, especially at Barberton and Evander. You mentioned work to reduce costs through productivity gains at Barberton, which I follow, and it would help if you could give us some sense of what you think that operation can be run at. Much the same applies to Evander as we consider the medium-term production profile while you advance through 23, 24, 25, and 26 Levels. That's my first question.

Jacobus Loots

executive
#43

Thanks, Richard. Yeah, so Barberton as a complex ought to deliver — and that figure includes the BTRP — 80,000 ounces annually — sorry, 100,000 ounces, with the BTRP included, 80,000-plus coming from underground. I believe we're aiming to stay fairly conservative regarding what we expect the new restructuring to deliver when it comes to productivity gains. As we've mentioned previously, with an underground mine, roughly 80% of your costs are fixed. That makes it hard to provide precise guidance, beyond saying you may assume output will rise and unit costs will fall as a result. At Barberton — as we've stated, at Barberton as a complex — costs on an absolute basis are well controlled: wages, electricity, reagents, mining costs and all the rest. That isn't the problem. The problem is simply producing more units, and that is truly where the focus lies. Now, where Evander is concerned, I think the team is genuinely performing very well. I mean, over the last 6 months, I believe, we're producing at an all-in sustaining cost of $1,050 an ounce. That's highly attractive. There's very limited room to push that much lower. Obviously, too, the effect of renewables ought to feed through over the medium term.

Jacobus Loots

executive
#44

The goal is to generate as much renewable energy as possible and then subsidize power costs, which should also help on the cost side. Right now, roughly 25% of your total costs are tied to electricity. So clearly, to the degree you can bring in renewables and carry a capital cost along with, obviously, the repayment of that capital, that ought to have a very favorable effect on your electricity cost over the medium to longer term. And those are really the areas of focus.

Richard Hatch

analyst
#45

Thanks, I appreciate that. And the second thing is just about Royal Sheba — it sounds interesting, what you think you can do with that project. Again, are you able to start talking, or at least give some guidance on where you think costs might land? Would that be more in line with some of the other underground operations you have there, above? Or is it — what's the view on costs there?

Jacobus Loots

executive
#46

Yes, Richard, I believe we'll have a solid project plan ready for Royal Sheba by the end of March this year. The team's efforts have been quite strong. As things stand, our current thinking is that the best approach for Royal Sheba would involve building a crushing and mining circuit directly on-site there, and from there pumping the material through our underground workings. Only around 500 meters of development—actually less—is needed, and then it goes via Fairview all the way to the BTRP. That's essentially how we're viewing the logistics side of things. Then mechanized—as we've mentioned, very few people, 50 to 60 underground, massive mining methods, long hole open stoping. So looking at it—again, it's early and I wouldn't want to commit, but we'd certainly like to aim for an all-in sustaining cost on a project like that of, say, $1,200 or below. This is a long-life project. It's open at depth. Right now, as far as the presentation goes, we were citing 25,000-odd ounces. But with a project like that, we'd want to add more tonnes, perhaps 40,000 to 50,000 tonnes once developed, which would make it attractive from our standpoint.

Jacobus Loots

executive
#47

Like we've mentioned, it differs from everything else underway at Barberton—the grade there is lower—but the nice part is that this operation is mechanized right from the surface. That ought to help on the cost side, no question.

Richard Hatch

analyst
#48

Yeah, that makes sense. All right, so the final item is just about Mintails. I mean, you touched on permitting a bit and said you're comfortable there. But could you remind us what the main gates are that have to be cleared when it comes to permitting at Mintails, and what we need in order to get that operation up and running?

Jacobus Loots

executive
#49

There are really 2 primary permits — well, 3 permits in total. The first one is environmental authorization, and that is currently in progress. We have to acknowledge that, up to this point, the authorities have been extremely supportive considering the situation in that region. They understand that Pan African needs to come in and clean things up so that all parties benefit. So that's the environmental authorization. Then there's a water use license, and we hope to have those permits finalized before the end of June. If we want to begin construction, a water use license actually isn't required. And after that, you need a permit from the nuclear regulator, since there is some radioactivity on site — nothing major. That's another item we're working on. So we don't expect permitting to become a problem. It's an interesting situation, because South Africa gets a lot of negative publicity when it comes to the mining sector. And certainly, there are difficult issues. But if you look at the permitting side, where else in the world could a project like this get permitted in 12 months? So we consider that very attractive. We're working very hard to get it done so that we can start construction.

Jacobus Loots

executive
#50

Obviously, the economics have shifted since we completed that feasibility study, given how the gold price has risen. So Mintails has us very excited, and we're eager to get moving on it. Great. Thank you, and thanks to everyone for joining.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Pan African Resources PLC transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Pan African Resources PLC earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Pan African Resources PLC or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.