Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary

January 9, 2020

New York Stock Exchange US Industrials Aerospace and Defense earnings 52 min

Earnings Call Speaker Segments

Brian Shore

executive
#1

Thanks, operator. Morning, everyone. Brian here. As always, I'm joined by our CFO, Matt Farabaugh, and we're glad you could join our Q3 conference call. And a Happy New Year to everyone as well. I'd like to let you know about a presentation we've put up on our site, and it's available on a live webcast too; it would really help you to have it open on your screen or iPhone, since we'll be walking through it, and having it in front of you will make this call much easier if you haven't pulled it up yet. Instructions for accessing the presentation, if you haven't already, appear in Paragraph 2 of the earnings release. I should also note that supplemental financial information is included with the presentation as Appendix 1. So at some point you might want to take a look at that; and just a few other opening remarks before we dive into the presentation. Now, we don't cover identical items on every call, though we do try to address things we consider meaningful, interesting and relevant, but tell us what you think, and let us know if there are other items you'd like us to address on these calls; so, these calls are for you. Our purpose here isn't to promote or hype up our company; these calls are for you and not for us, so just let us know what you think. Is there anything else you'd like us to cover, any other focus you'd like us to consider? Let us know. This is your time, not our time. So we'll go ahead now and go through the presentation. Matt and I will do that for you. And then once the presentation ends, probably take over half hour, just want to warn you, so brace yourself, then we'll be happy to take questions, alright? So why don't we just skip over to Page 2 of the presentation; that's our forward-looking disclaimer language, so just let us know if you have any questions about that later on. And Matt will take over for a few minutes to cover slides 3 and 4. So, go ahead, Matt. The ball is in your court.

Matt Farabaugh

executive
#2

All right, thank you, Brian. On January 8, our Board of Directors declared a special dividend totaling $1 per share for our shareholders, with payment scheduled for February 20, 2020, going to shareholders of record on January 21. That special dividend comes to roughly $20.5 million in total. Once you add in this special dividend plus the regular quarterly dividend of $0.10 per share, which gets paid on February 4 to shareholders of record on January 2, Park will have distributed approximately $536 million, or $26.15 per share, in cash dividends from the start of our fiscal year '05 onward. Since 1985, Park has paid out its regular quarterly cash dividend each and every year — that regular quarterly cash dividend has been paid — never once skipped or cut. Now let's turn to Slide 4. I'd like to take you through how we tend to view our cash balance. Our balance sheet does show $144.2 million as of the close of our third quarter, but a portion of that cash is genuinely tied up for future obligations. When the tax law changed back in December of '17, a transition tax became payable across a span of eight years. We're now a couple of years into that. That leaves $17.7 million in remaining installment payments on the transition tax, which must be paid out over the next seven, six years. The Newton expansion we've discussed previously has gotten underway. So the payments still to come for that expansion — while not legally committed, barring some sort of major event this is the amount we will need to pay out. It represents our best estimate of what we'll have to pay to finish that expansion. And naturally, there's the $20.5 million we just mentioned for the special dividend payment. So here's how we view the cash: even though it's $144 million on the balance sheet, it's really about $91 million that we see as remaining and available for whatever purposes we identify going forward. Alright. I believe I've covered what I needed to cover here.

Brian Shore

executive
#3

Thanks, Matt. That's great. All right, I'll just chime in or make a remark, I suppose — so what's the figure? What was it Matt shared with us? Since fiscal 2005, $536 million in cash dividends, $536 million. On top of that, we carry no debt and hold $144 million in cash. In my view, that's a substantial sum for a modest business like Park — founded by two individuals with, as I recall, roughly $50,000, $60,000 back in 1954 — to have distributed. That's simply my take, but I felt it was worth mentioning. So let's turn to Slide 5. Matt mentioned the expansion in Newton, Kansas, and that work is definitely underway at this point. The photo in the upper right is roughly one month old, so regrettably we weren't able to obtain an aerial shot showing a more up-to-date view of that area. In fact, considerably more has been finished over the past month. The initial budget stood at $20.5 million, and the spending, as Matt noted — pardon me, Matt discussed the amount still remaining to be spent, $15.1 million, meaning roughly $5.4 million has been spent thus far. Completion is now anticipated at the close of this calendar year, calendar 2020, and that represents a delay. It's a delay of about four or five months, which doesn't please us much, brought about by a couple of significant factors: governmental approvals, where the process proved more complicated and drawn out than we had expected. The governmental approval in question is really the FAA. This may come as a surprise, but constructing a factory at an airport means you must secure FAA approval, and that turned out to be more intricate than we had anticipated. Beyond that, considerably more time than expected was needed to wrap up contracts and other construction-related arrangements. I'm not sure — perhaps we lacked sufficient urgency. Yet we've been through this three times already, so we figured we more or less had the system figured out, and we were somewhat taken aback; this isn't what we expected. So maybe for us the third time isn't a charm — three occasions involving our original building, which I believe had its groundbreaking around 2008, and then a couple of years afterward we completed our first expansion of that building, the rear portion if you look at a picture. So this marks our third attempt at it, and we still aren't getting it quite right. That's disappointing, but it amounts to roughly a four month delay, which means the facility is — pardon me, expected to be qualified in their production by the end of calendar 2021, particularly for our large customer MRAS, ST Engineering. The expansion is now projected to deliver $55 million to $60 million in additional hot-melt composite material manufacturing capacity. We'll get into capacity a bit later, since I believe there's some confusion surrounding capacity, but we did raise that figure. During our previous discussion, I believe we mentioned a figure of $50 million, but we increased that amount, and then raised it further by realistically boosting our uptime projections—though we felt this step was necessary. As a result, we're now referring to somewhat greater capacity that the new facility will produce. Let's turn to Slide 6 and dive straight into estimated manufacturing capacity. Following our Q2 call, we received questions and feedback that made it clear there was some misunderstanding regarding our manufacturing capacity. So we wanted to present it more clearly and offer a more thorough breakdown. Starting at the top on Slide 6—on that slide, we need to distinguish the various key elements, the parts of our manufacturing setup, so we can have a more informed conversation about capacity. First, let's discuss hot-melt treated composite materials. The 60-inch film and tape line is our primary line for making hot-melt materials. In the prior quarter, I think we stated it—we had $45 million in capacity from that line. There are also 24-inch film and tape lines, contributing $8 million in capacity. Before moving on, I must address something crucial—I apologize for omitting it earlier. There's a small asterisk, a footnote directly under the caption. Notice what it states: manufacturing capacity varies greatly and is heavily influenced by product mix. It's vital to stress this, because our capacity will be—manufacturing capacity will be an approximation, and it's substantially affected by product mix, not just by a few million dollars, but potentially by far more. So you should keep that in mind, those major variables. Sorry to rewind a bit. But let's continue: 24-inch film and tape line, $8 million currently. The premise here, indicated by the double asterisk, is that this tape line and the 24-inch line are used solely for the GE9X Containment Wrap Program we've talked about before. I want to remind you that in our program, we have purchase orders for it through the end of this year, but we haven't won this program yet. It's a GE Aviation program, not an MRAS one; so recall that with MRAS, we have a long-term agreement extending to 2029. This isn't part of that long-term agreement, as we've clarified previously. I just wanted to jog your memory on that; so for this analysis, we're assuming we use the 24-inch line only for case containment wrap output, $8 million, but we aim to shift all case wrap production off the 60-inch line, which will free up more capacity there. So I suppose we'll cover that on the following slide of this deck. Turning to solution treated, that includes composite materials at $55 million; we don't spend much time on it since we're nowhere near using all the capacity of our solution treating equipment. As for composite parts fabrication and assembly, we honestly don't even consider it that way, because that isn't how we view the composite parts business. That's not the approach we take to running it. When you think about our composite parts business as a niche business, we pursue niche opportunities for parts. Filling up the factory isn't our goal. That's not what we do at composite parts. Every bit of work we take on in composite parts will carry good margins and will be niche business things that benefit Park. We're quite lucky, as we were just saying earlier, in that our composite parts operation sits in the same facility as our composite materials operation, since that gives us the ability with composite parts not to have to fill up the factory. We're able to take business that's good for us, or decline business that isn't good for us. That's a fairly unique and special thing we have. Many other composite parts companies don't really enjoy that luxury.

Brian Shore

executive
#4

We'll continue. When it comes to estimated total capacity for making composite materials, I believe we just ran the numbers — I pulled out my pocket calculator — and it comes to $108 million, which of course leaves out composite parts. Now, there's an issue tied to the $45 million in hot-melt materials manufacturing capacity that comes from the 60-inch film and tape line. So let's walk through the issues; there are a couple of points you need to work through to reach the punch line. The GE program's business accounts for a large majority of the hot-melt business as it stands today. When we discuss hot-melt, it's mostly the GE program. We do make hot-melt product for other customers, but the GE programs consume the bulk of it. The GE programs business has seen considerable short-term variability, with peaks and valleys. This part is key. For those of you who haven't been with us for some years, remember we had the burn down roughly five years ago — inventory rose, then it fell; and then, if you recall, in fiscal '19, during the first couple of quarters, destocking was taking place, followed by restocking in the fourth quarter. As I recall, we've taken you through this narrative previously. During Q4 of 2019, the volume we shipped for GE-related programs reached triple the level seen in Q1. That spike stems not just from those programs expanding and increasing output, but additionally from fluctuations in inventory — meaning there's substantial inconsistency, with high points and low points. Production of hot-melt material totaled roughly $9.5 million during the fiscal year — pardon me, that figure applies to Q3 alone, only the third quarter. My apologies for that. Now then, let's work it out. If we multiply 9.5 by 4, what result do we get? Would that be $38 million? Fine. That ought to be manageable, since it falls below $45 million. Correct? So I'm simply using a run rate — suppose we performed at that level. Now, let's move on to the next item, since the hot-melt materials manufacturing operations generated at an annualized run rate of $45 million during the month of October and November. What caused that? It happened because we fell behind the power curve in September, and we'll get into that later. So the key point is that this won't be a flat, steady thing; to operate our business, we need additional capacity because of the peaks and valleys relative to the average production during the year, if you're tracking what I mean. As I mentioned, my goal here is to offer a deeper view of how we see capacity rather than just surface-level details. Moving to Slide 7. Let's turn to Slide 7, which covers capacity in greater depth. Because of near-term fluctuations — and we've discussed the ups and downs of the GE programs business — those peaks could be hard to manage given that we have $45 million in hot-melt materials manufacturing capacity. Does that make sense? Now, let's move on to the next point: the extra hot-melt materials manufacturing capacity that expansion would bring won't be ready or qualified for two years. We've already covered this, so it doesn't sound great, does it? For the next two years, our capacity stands at $45 million. Not wonderful, but how do we address that? What we're doing is raising our hot-melt — 60-inch hot-melt manufacturing — the 60-inch film and tape line, I mean — hot-melt manufacturing capacity from $45 million up to $55 million. In our view this is quite achievable, quite doable. There are two things we must accomplish. Like we said earlier, all GE9X production has to be shifted onto the 24-inch film and tape line, which isn't finished yet, and clearly we also need to coordinate that with our customers. That effort is underway — in process, rather. Beyond that, we're boosting the uptime on the 60-inch film and tape lines by 10%, again lifting uptime. Uptime is basically the portion of time when a machine is actually producing product. Over a full day, product is really flowing through it. So sure, if you get 12 hours of uptime, that's 50%. Using those same made-up numbers, 18 hours would come out to 75%, correct? That's what uptime means; and — one last thing, necessity is the mother of invention. What's that getting at? You won't really push hard for something unless you genuinely need it, and what we're talking about here is manufacturing capacity. We dealt with this over a great many years in electronics during the earlier era as well. So for us, this isn't something new. To repeat, I think hitting that $55 million mark is a pretty achievable goal for us, so there are a good number of those. Turning to Slide 8 now. Alright, so what does this cover? We're now looking at Q3 and what happened during that period. Earlier quarters are included so you can see the fuller picture. Let's dig into Q3. Revenue was $15.847 million, gross profit slightly above $5 million, gross margin $31.7 million — we'll get into gross margin because it is narrowing somewhat, right? And then EBITDA came to $3.622 million. Moving to the first arrow point: what did we tell you about Q3 during our previous quarterly conference call? We had told you our revenue guidance — I'm going quickly since there's a lot of ground to cover, so I might be speaking too fast. Between $14.75 million and $15.75 million, that's the figure we gave. That was the guidance we provided to you, and it was also our own internal projection. For EBITDA, the range we stated was $3 million to $3.5 million. So on both the top line and EBITDA, we came in slightly higher than the upper end of the range. Looking at sales, if you run the calculation, that's $97,000 more than the high end, and for EBITDA it's $120,000 more than the high end — only a modest amount; so that's the reality for Q3. And of course, we're not going to stop there. Moving on, let's turn our attention to Q3, which brings us to Slide 9. As before, what we're trying to do is give you some background — the kinds of things taking place behind the scenes, the specifics that lie under the numbers. Starting right at the top: carbon fiber supply — excuse me — is still incredibly tight, and sure, by this point that probably sounds like a broken record. Within the system, there's almost no buffer or flexibility at all. At Park, the amount of carbon fiber we have on hand, together with fabric raw material, is at historically low levels — just enough to get by. Because of that, supply is limited, and what we're able to keep in inventory is limited too. So you can probably guess where this is going. Now, keep in mind that third point, which takes us back to the call for our second quarter. During Q2 we encountered problems involving distorted carbon fiber weave as well as wrinkling of polyurethane film, and rework was tied to that, yet it persisted into September — this past September of Q3 — and because of that, Park took on extra rework expense during Q3. That has an effect on gross margin, and as I mentioned, gross margins are getting squeezed. Moving to the following point: carbon fabric being unavailable, plus resources pulled away from production operations toward rework operations, which in turn caused production in September to drop significantly. During September we fell behind the power curve, especially for — there it is — hot-melt product.

Brian Shore

executive
#5

Therefore, the need arose to run hot-melt production across October and November at a $45 million annualized run rate — excuse me, that is to say, operating hot-melt production in those two months at a $45 million annualized run rate became necessary. Bear in mind, that number reflects the manufacturing capacity we have publicly stated. Right now, the 60-inch hot-melt film and tape lines at Park max out at that capacity ceiling; so let's proceed to the following arrow item. Running hot-melt right up against those limits for all of October and November, along with carbon fiber and fabric stockpiles at record lows, took relentless concentration and sheer hard work from the people making our products — our wonderful manufacturing crew — and the result was efficiencies in manufacturing, added expenses, and reduced gross margins. Why did that happen? Well, since — we're still stretched, we're bringing on more capacity, and that's not a matter of two weeks but two full months; it becomes truly tough to plan operations for peak efficiency, given shorter production runs, more frequent changeovers, and diminished predictability. So we're going full throttle — I know that sounds a bit ridiculous, but I can't come up with anything better. Full throttle, charging hard through a pair of months. Anyone lacking courage or resolve shouldn't attempt this, and on the production side, the third quarter presented real difficulty. Maybe certain people look at it and think things went well. The way we see it, results were solid, though the period was demanding; calling it simple wouldn't be accurate. Running right up against the maximum you can handle for eight weeks straight—that is genuinely hard to pull off. Like I mentioned, this isn't something suited to the faint of heart or those lacking determination, yet our manufacturing crew — that outstanding manufacturing crew of ours stepped up and completed the task; so I'd just like to say that the Q2 shortfall genuinely irritated us, it genuinely wore on us, and once we got behind in September, we simply were unwilling to fall short of our Q3 targets; therefore we took the necessary actions. And just so you know, in case you're wondering, every person at Park received a $250 bonus tied to Q3 and we believed that was thoroughly earned. Let's move on to — we've already touched on Park's personnel somewhat. Let's move on to Slide 10. Park's people count. So during Q3 we hired 10 additional production and lab people, and actually I should say we probably began in Q2. One reason is to keep up with the fourth shift hot-melt operation. Recall we discussed that last quarter, and then for other manufacturing and lab functions. That hot-melt tape line operation, the 24-inch hot-melt tape line operation, is now running 24/7, which obviously leads to right. Handling Park's people count is somewhat of a trial and error process. What do we mean by that? We're kind of in new territory at this point; we began with absolutely nothing, I suppose we broke ground back in 2008, and we're sort of figuring things out as we move along. We're on a steep ramp. So I guess we're making it up as we go a little. We've always had a tendency to operate lean, Park has always tended to operate lean, that's simply the way we do things, and that traces back to 1954. Park tries to accomplish more with less, always. That's the way we compete, always. That's sort of part of who we are, and we'll never change that. So we're really hesitant to add staff carelessly. We add staff members in a measured, thoughtful way as we move forward. Letting employees go is something we always hope to avoid. Here in Kansas, we have never had to conduct a layoff. I am not able to promise that will hold true forever—I am no deity—but eliminating jobs is something we firmly oppose. What's the reason? We want the people who work for us to feel they can create a long-term career at Park. And if we cut people loose as though they were just inventory, that's exactly how they will end up feeling about whether a future with us is possible. That matters enormously to us. Large corporations—and I want to be clear I'm not knocking them, just highlighting a contrast—constantly hire a thousand employees and then cut a thousand employees like it means nothing. That approach doesn't describe how we operate. We add team members deliberately, since we're unwilling to expand headcount unless we feel certain those individuals will remain with us over the long haul. Naturally, those additional team members do weigh on our gross margins—that's just reality—and we currently have 135 employees, meaning 135 people received that $250 bonus. There were also other things that weighed on Q3 EBITDA gross margins. I know I sound like a broken record. And you can expect to see the same dynamics show up in Q4. We've got expenses from external labs for generating data on a product that should come out soon. Keep in mind, there's only so much room in our own lab. Ideally we'd handle that testing ourselves, but we were falling behind on it. So what happened was — we've been handing the work off to an outside lab, and it costs a fortune. Then there's the GE9X program's manufacturing trial and development expenses. That program — those trials are seriously draining our P&L. There's a ton of work and effort going into it, and right now it doesn't bring back much, I mean when it comes to financial returns. A portion of what we built does get sold, while some is trial output that never gets sold. Still, the economics just don't work right now. Obviously, our hope is that we land the program — at which point we'd be pleased, the economics would make sense, and it ought to hold up for quite a while. As things stand today, though, it's costing us. The trials for film adhesive manufacturing, along with development costs, continue. Running a 24-inch hot-melt line isn't cheap — that's the expense we carry, and there's a cost tied to that as well. On the legacy costs front, those should conclude in Q4, but we're absorbing them in Q3 and probably in Q4 too. Turning to Slide 11; we've already covered what took place in Q3, so now let's discuss Q4. Q4 is the highlighted one. The column on the right side is merely an addition — that's the fiscal year, simply summing the columns: one, two, three, four, going across; so let's zero in on Q4. Here's the Q4 forecast. Revenue between $15 million and $16 million. EBITDA from $3.1 million to $3.6 million. There are a few items I'd like to flag about Q4, since we're already into it, naturally. By January 3 — which I think was the Friday before last, if I'm not mistaken — the total of what we've already sent out this quarter plus the orders scheduled to go out during the same period added up to about $13 million. So there's still a distance to travel to hit that $15 million to $16 million revenue figure. And unfortunately, to borrow the words of that famous thinker Yogi Berra, it feels like deja vu all over again. We've had a slow start to December. There are two explanations. One is an extended downtime for major maintenance. Our factories have been running so hard that we just haven't had any opportunity to do the major maintenance.

Brian Shore

executive
#6

What I'm referring to isn't the usual preventive maintenance tasks — it's the kind of work that eats up a couple of weeks. Take our flooring, for example: it had gotten pretty rough, and finding a window to replace it was impossible. So we decided to just go for it and do the job during the holidays, even though that meant a fairly lengthy shutdown. While the floor work is happening, the plant obviously can't run, and there were other big maintenance items too. We concluded we had to just go ahead and deal with these things, since they'd been deferred because the factory was running so hard there was no opportunity to handle them. Then there's the carbon fiber shortfall — you're likely hearing about this as well. I know I am. Our supplier couldn't deliver what we'd forecast, so we flew fiber in from Japan this week, and now we're working to close the gap. So once again, we find ourselves behind the power curve, and December was a slow month. That means January and February will have to make up for it — it feels like deja vu all over again. Alright, so that's what we wanted to say regarding a broader view on Q4. Even so, that forecast stands. Obviously, everything we've just mentioned gets factored in when we put the forecast together. Let me remind everyone that sandbagging isn't something we do. When we hand you a forecast, what are we telling you? We're telling you what we believe will happen. We don't lowball it just so we can beat it — some folks think that's a smart approach, but that isn't how Park operates; what we give you is our honest best effort at the truth. We might miss, but it represents our best attempt to tell you what we expect. Okay, let's move on. Factors. Actually, there's no need to read them aloud, since they're identical to the factors we covered for Q3, correct. Those items are still with us: the expenses for testing done outside, the GE9X initiative, the film adhesive trials, the 24-inch line, and legacy-related costs. As I said earlier, those should conclude by the end of Q4. Hopefully, next quarter's presentation won't include that line item. Also, I should note that last year's Q4 ran 14 weeks, which is unusual. Our Q4 this year will be 13 weeks, in line with what we normally have. Every fourth year, we have a quarter with 14 weeks to keep things aligned with the calendar. Let's go to Slide 12 now. How are we on time? Running a little behind. Slide 12. So, a little more about our forecast. Factors affecting predictability of short-term forecasts — actually, that's not entirely accurate. These factors don't only impact short-term forecasts; they impact the long-term forecast too. Every major jet engine company program, the GE programs aside from the 747 to 8, my favorite airplane, is either ramping or in development. It becomes really hard to make projections, since in a steady state you can sort of anticipate things more reliably. Yet once activity is climbing, the uncertainty becomes: will it climb that quickly, or a bit quicker, or a bit slower? Particularly for near-term projections, it's far tougher to grasp what's going to occur while programs are climbing, above all climbing sharply, since once again you're in territory nobody has charted. A heavy strain on the aerospace supply chain, not a fresh subject but one that persists, is extremely current, extremely tangible, and it renders everything quite tough, since no matter what we state, no matter what our customers state, they have other vendors, and should those other vendors fail to beat the schedules, satisfy needs, honor commitments, it can hold everything back; that's something we find very hard to foresee. Owing to constrained production capability for making carbon fiber and fabric raw material inventory, plus constrained carbon fiber supply, the system holds hardly any buffer or margin, which makes bouncing back from supplier output gaps difficult. To phrase it another way, if we get behind, we have to catch back up; that's not easy because we still have to find raw materials, the carbon, and we need to have the manufacturing capacity to get it done in order to catch back up. So, we already covered what happened in Q3 and we were going full throttle for two straight months and hot-melt. Just so you know, we're not going to, we're not updating or long-term forecast today. That's going to happen on January 15, during the Needham conference, and I'll be there in person. Later in the presentation, we might share a bit more detail, and that's when you'll get a look at our updated long-term forecast. We're still putting the finishing touches on it, so we'll roll it out then. Moving to Slide 13. Alright. This next part is probably a bit more engaging and enjoyable. Here's where things stand with the big jet engine company programs — those are the GE Aviation efforts. The Boeing 747 hasn't changed. How much longer will the Queen of Skies keep being built? My wish is that it continues indefinitely, though plenty of folks figure that's probably unlikely. As I mentioned, that plane is my personal favorite. If they were to stop making it, I'd find that a rather bittersweet milestone personally. Still, that initiative holds a special place for us. It was also the very first one we ran. Our inaugural GE initiative, in fact. That gives it an emotional significance too, for that reason. As I recall, the initial delivery happened on February 28, 2014, and it went toward the 747. Moving to the second point. Absolutely, this matters a great deal. Turning to the A320neo family. We're talking about the 321neo and the 321XLR, which are performing very well and continue to climb. Among the GE programs we provide parts for, that one is essentially the biggest prize; however, it isn't the only one. There's also the Bombardier Global 7500, powered by Passport 20 engines, which is increasing at a solid pace. The ARJ21 regional jet from COMAC, equipped with CF34-10A powerplants, is increasing production at a solid pace. Those developments are all positive. As for the COMAC 919, which is fitted with LEAP-1C engines, getting its output up to speed remains a while away. And then we have the 777X, which runs on GE9X engines. Yes, that program has been delayed. You likely aren't surprised by this, since there's plenty of coverage about the 777X and schedule delays and various complicated matters involving Boeing at the moment; so what we're focused on now — and naturally this comes from our customer's side, from our perspective — is the development effort, and once more I'd point out that the 777X — pardon me, the GE9X, which belongs to GE Aviation's program, isn't part of the MRAS LTA. Our top five customers appear in alphabetical order. Let's go through each of them. AAR — they've been showing up in the news lately. That covers several programs, mainly interior structures. GKN Aerospace — that's chiefly for Sikorsky and GE Aviation programs. When it comes to Kratos Defense and Security Systems, my understanding is that we've described ourselves as — actually, this is something they've communicated to us — the main supplier of prepreg materials, which go into all of their target and tactical drones. That covers the Valkyrie, which they unveiled not long ago. As for Lockheed Martin, I should note this concerns a classified initiative, a development effort kept under wraps, and I seriously doubt we'll ever be able to disclose any details to you regarding it, other than confirming that it is indeed a confidential development program. Turning to Middle River Aerostructure Systems.

Brian Shore

executive
#7

That’s the Holy Grail; no remarks from us are needed on those. I believe you’re aware of who they are. Turning to Slide 14, recent developments. These represent some significant items and perhaps a few of interest, sort of a mix. A major private space company, NRE is underway; beyond that we can’t say anything, but it’s a very exciting program for Park to be involved in. Extremely pleased about it. We are qualified at a new — pardon me, an initial low natural low rate production. Apologies for that. New EVTOL program, you read about these fairly often. At times they’re referred to as urban air mobility, air taxis. This is for a large OEM. So we’re hopeful regarding that program. We’re qualified at the new Hypersonics program, and we received original POs for it, and we aren’t able to discuss that right now. Here’s a nice one. DC-10, KC-10 aircraft. The KC-10 is, I believe, the tanker variant of the DC-10; it’s a large three-engine airplane that Douglas developed. It’s no longer in production, but we’re producing a niche component, these are, I suppose you’d call them spares, using Park materials, and that’s really crucial because at times when we make components or parts, we’re using materials from somebody else; this is Park’s proprietary material. So it’s a very nice thing. This won’t be a very large program. But we love these programs, we love it. What happened? It is too difficult, too much of a problem, too much trouble for everybody else. What we do, we love that kind of stuff and we sort of raise our hands and yes we’ll do it. That’s sort of our — this is how we’re doing business, modus operandi. Northrop Grumman. So we’ve been on this program for a while, but they recently announced plans to increase the Global Hawk and Park materials are qualified in those programs. So that was in the news recently, for the Global Hawk because that was the type of drone that the Iranians shot down; so this next item, yes there was a Wall Street Journal article, December 20, 2019 recent article reporting a deal for CFM manufacturing. CFM is a JV between San Fran and GE Aviation, the LEAP engines. CFM International produced increased volume of LEAP-1A engines that’s for the A320neo family of aircraft, that’s the Big Kahuna for Park. So in addition to that, there has been — so there’s a couple of things going on here. This is actually a market share thing; this doesn’t relate — this one doesn’t relate to the problems with the 737. I think more market share has been given to this the LEAP-1A as compared to the Pratt — the October plan. The A320neo family shares has two engines that are qualified, certified. First, there's the Pratt engine, and then there's the LEAP engine. Through MRAS, we participate in the LEAP program, and it appears — as that article suggests — that CFM has a deal in place to capture additional market share for its engine. Beyond that, recent reports indicate that, given the troubles with the 737 MAX, Airbus is in fact working to boost output of its A320 family of aircraft. So what does that mean for Park? That's tough to answer, since the real question becomes whether the supply chain can keep up with such increases. Perhaps it can, but we're just a single component on an aircraft. And the question is whether the supply chain can keep pace with these increases. As I mentioned, the supply chain is already under a great deal of pressure, so we'll find out. Clearly, this is a favorable turn of events for Park, though it's difficult for us to truly grasp what it will amount to. It's a positive development, yet quantifying it isn't something we can do. Moving to the next item. Single-aisle against wide-body aircraft. The paradigm shift. There's considerable coverage of this too, suggesting the trend favors single-aisle aircraft over wide-body ones. Many factors drive that, related to the dynamics of air travel, which we won't get into right now and you can find plenty of articles on the subject; that's not something I'm bringing up. But the key point is that single-aisle — from all appearances, it's nearly a consensus among industry analysts — seems to be where the future lies, the single aisles; and it appears we're nicely positioned in single-aisle with the A320 family of aircraft and the Comac 919 aircraft. So that's quite good for Park. The other big single-aisle competitor is the Boeing 737, the 737 MAX aircraft; and to our knowledge, we hold no content on that third platform. So I want to be clear: this is sheer luck. It's not as though we possessed some strategic vision to concentrate on single-aisle, having predicted that single-aisle would rise while wide-body would fall. Nor is it simply a matter of looking at being on the A320 and the Comac 919 versus the 737 MAX. Naturally, we didn't — we didn't anticipate the troubles with the 737 MAX, so in both instances it's purely luck. Still, we continue to feel well positioned in the single-aisle segment, which appears to be the growth area for commercial aviation. All right, we're nearly finished. Thank you for staying with us so long. Slide 15. So Park remains deep in the fight against challenges tied to steep program ramps, continuing severe strain on the aerospace supply chain, a tight supply of raw materials, running with lean raw material inventories, and limits on our own manufacturing capacity. Yet we don't give up, we don't retreat, or ease off, that's simply not how we operate. One final item—like I said before, we’re going to be presenting at the 22nd Annual Needham Growth Conference. That presentation is scheduled for 12:00 noon Eastern Standard Time; I believe that’s Wednesday, January 15. And you’ll be able to access our presentation through a webcast on our Park’s website. So we recommend that you tune in and take a look at that presentation. I think we have attended every single Needham conference since the very first one. So for us, this is 22. And that brings our presentation to a close; we’re on the Thank You slide, Slide 16; so, operator, if anyone is still listening in, we’d be glad to take some questions.

Sarkis Sherbetchyan

analyst
#8

Morning, Brian and Matt, and I appreciate you letting me ask something here. Given that many significant programs are scaling up at the same time, I'm wondering whether your group has come up with or put in place a more repeatable approach for certain of those trouble spots that you brought up?

Brian Shore

executive
#9

All right. In a sense, I'd say it's simply ongoing suffering, though that would come across as too much of a wise guy. The finest way I can put it is that we pick things up along the way and we keep improving at handling these matters over time. I won't claim that some sort of official procedure exists, yet I do believe we keep getting better at handling these matters over time. Obviously, we've found ourselves in territory nobody has mapped, particularly across the past 2 years when activity began truly accelerating hard. Still, one point I want to stress: this isn't only about us, it's the entire sector. And perhaps — perhaps I'm mistaken on this, perhaps saying so sounds conceited, but my hunch is that we're likely performing better than the majority when it comes to our capacity to scale and stay on top of the scaling timelines, and the basis for that claim is what I hear from supply chain folks and our clients, who are struggling considerably with certain of their other vendors and have barely managed to keep pace.

Sarkis Sherbetchyan

analyst
#10

Honestly, I'd say you folks handled the offloading of a portion of that projected production capacity quite well. So, taking a step back, once that plant is up and running, what sorts of things are you approaching differently there, or intend to approach differently there, such that it might relieve some of this pressure or trouble spot?

Brian Shore

executive
#11

Are you referring to the new plant?

Sarkis Sherbetchyan

analyst
#12

Yes.

Brian Shore

executive
#13

Alright, well, that's a fair question about the equipment. Take the facility we have now. If we had the chance to start from scratch, the equipment would be engineered in a different way. That machinery was laid out quite a while ago, if I recall correctly in 2008, and back then the AFP program simply wasn't something we were paying much attention to. What we've since ordered was built around what's needed now. That makes it far better suited to today's production requirements. You may have also picked up on the fact that we're targeting an even greater capacity output. We've incorporated certain elements into the machine design — some of which we'd rather keep under wraps — that let the machines operate at higher speeds, allowing them to run faster too. These units, being more continuous-process machines, are central to boosting productivity, and naturally that number goes up. Run speeds matter just as much, though. So my sense is this factory will end up far more optimized. Honestly, we do run into some difficulties with the current equipment, simply because it wasn't built with our present-day work in mind. Naturally, we don't lean on that as an excuse — we find a way to make it function regardless — but the new machinery was engineered around what's required today, not what was required in 2008. So I expect it'll be considerably better. On top of that, there's going to be significantly more capacity. That means we won't be forced to operate at maximum capacity, and that gives you a much more efficient use of your operation. You're able to plan ahead, run things for longer stretches, and you gain far greater predictability — your operation becomes much more efficient because of all that.

Sarkis Sherbetchyan

analyst
#14

Alright, and one final item from my side, after which I'll rejoin the line. I'm aware that you mentioned a recent development involving a major private space company, with NREs currently underway. Has there ever been any discussion about what that NRE covers, or what role you're playing in it?

Brian Shore

executive
#15

No — I believe we're likely already at the edge of what we can say by having shared what we did, and we chose to do so because we feel our shareholders deserve to have some awareness regarding this matter. However, I'd be hesitant to disclose anything further right now. Perhaps, as I mentioned, we'd be stretching things too far, in terms of what the OEM would consider acceptable.

Christopher Hillary

analyst
#16

With a few of the decelerations we're seeing across the wider aerospace supply chain, I was curious whether you believe that could ease some of the shortages you ran into over the course of 2019?

Brian Shore

executive
#17

I don't quite see how that reasoning works. In what way would this deceleration...

Christopher Hillary

analyst
#18

Given the halt on the 737 MAX, might that allow you to secure additional raw materials where you've recently encountered renewed scarcity?

Brian Shore

executive
#19

All right. We discuss carbon fiber fairly often, and I'm quite confident the carbon fiber we utilize isn't also employed on a 737 MAX. Yet naturally, the supply chain involves many distinct parts. I doubt that will benefit us near term. Over the long haul, that's a separate matter. Should the 737 MAX never truly return to the levels originally planned, then the supply chain might realign, you know, to wherever the demand sits. But near term, qualification timelines are lengthy — to qualify a supplier that formerly supplied, or presently supplies, into the MAX on a legacy program takes a great deal of time and practically speaking it sort of doesn't add up, because six months from now, or whenever, the 737 ramps back up and what will they do. The long term is a different matter, as I mentioned. A fundamental realignment of the entire supply chain could occur if the share — say, the market share among the MAX, the 320, and the Comac shifts — but near term I don't believe it will assist us very much.

Christopher Hillary

analyst
#20

All right. And then clearly you've got a really impressive history when it comes to returning capital, which you mentioned before. I figured this could be a good moment to ask whether you're seeing a lot of chances to make bolt-on kinds of purchases that would sort of expand your portfolio or provide additional assets to support you through this period of growth?

Brian Shore

executive
#21

There are a few items we're evaluating. Some projects are also on our radar. For the past 2 quarters, we didn't bring it up. Keep in mind, we've been discussing a possible JV in Asia, and that remains something we're continuing to examine. So at present, many different irons are in the fire for us. On top of that, we're hoping valuations might begin to decline somewhat as well. That's why we'd like to hold onto some dry powder. Our view is that valuations could still be somewhat unrealistic, and I'm not — M&A and business valuations aren't my area, but I've had people tell me, folks who work in that area, that perhaps before too long, certain valuations will shift to align more closely with what could be more realistic or suitable. So nothing is imminent for us; that's the reason we want to keep — Matt running the numbers, such as the $90 million of cash, yet we still want to hold onto some dry powder, since we believe opportunities exist and will keep emerging over the next 2 years, but we'll see. We won't — I think you're aware of this regarding us. We won't make an acquisition merely for the sake of making one; that's not how we operate — it must be right for Park, and right for Park is complicated. Right for Park, in my view, exists on many different levels: it must be the right type of company, it must be the right type of location, it must be the right type of product, right type of technology, the right type of culture, and naturally it must be up for sale at the right price; so we're not simply out there phoning bankers and saying, look, we want to pursue this broker or that broker, this process or that process. A couple of processes have involved us, but we don't particularly like them. I know this may be too much detail in answering the question. Our dislike of them stems from bankers pushing you to move quickly and, clearly, their aim of driving the price higher. But making an acquisition is a serious matter for us. We want to proceed at our own pace. We want to invest time with management. We truly want to grasp that it's simply the right thing for Park. When we make an acquisition, our mindset is that we'll be holding onto it for two decades. So perhaps others feel pressured to reach a decision quickly, but once we're in these processes, there are moments when we simply step away and state that we can't handle distribution, we can't — you aren't giving us the access we require.

Christopher Hillary

analyst
#22

And then I suppose for the final question, looking further out, what do you think about how your production capacity is shaping up? Do you believe the existing plans cover what you expect over — with roughly the five-year window you mentioned, or do you — given all the growth you've already booked across some of those development programs, are you beginning to get the sense that you may need to start planning to expand the footprint once more?

Brian Shore

executive
#23

Everything currently on our plate is accounted for. But I'm not certain you recall this. I believe we went over it, though I might not remember exactly, a few quarters back when we initially began discussing the expansion. There was, if I recall, a remark — I think it's actually included in our company presentation, which will be refreshed following the Needham presentation — that by putting an extra $45 million into this enlarged factory, we could deliver roughly another $15 million in capacity. So the new factory actually has room for one more line. That means it would be fairly straightforward to boost our capacity for either hot-melt or solution, whichever direction you choose to pursue, by a meaningful amount. It wouldn't be comparable to constructing a brand-new factory; it's more like placing an order for equipment — we already understand how to operate it — and getting that equipment installed; so that flexibility does exist for us. We designed it in for exactly — I think that's the point we're making. Not certain — what we currently have, we know we can cover. What we'll have down the road, we're not sure.

Brian Shore

executive
#24

Alright. Thanks to our operator, and I appreciate all of you joining us. It’s been a pleasure. Whenever you like, ring Matt and me if anything else comes up; and finally, naturally, may your year be excellent. We’re wishing you and your loved ones the very best. Best of luck in 2020. That’s all for now.

Operator

operator
#25

Everyone, that brings us to the end of today's conference call. We appreciate you joining us. You are free to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.