Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary
October 8, 2020
Earnings Call Speaker Segments
Brian Shore
executiveThanks a lot, Shannon. This is Brian Shore speaking; Brian here; and joining me, like always, is Matt Farabaugh, who serves as our CFO. Glad to have you on our second quarter investor conference call. We released earnings this morning, I believe around 6:30 New York time. You'll want to get ahold of that. The earnings release also contains directions for finding the presentation we're about to walk through. We strongly suggest having that presentation open in front of you. It'll make this call far more useful. Also, just so you know, there's supplemental financial information included with the presentation as an Appendix 1, I believe that's the label. So a quick opening remark. On the Q4 and Q1 calls — those being the fourth quarter of last year and the first quarter of this one — I went into a lot of detail about how Park and the aerospace sector were hit by the virus and the economic downturn. Those topics will come up again today, but we're not going to go back over and repeat the whole thing. That would just be too much. The goal with these calls is to keep things a bit different each time. We don't try to cover every single point. Getting through these presentations takes a lot of time as it is. So we can't — we don't really — my aim is to hit every item, to keep things varied, like I said. But as soon as the presentation is done, we'll of course open it up for questions. Go ahead and ask about any subjects you want. We'll start the presentation now, and like I said, right after it ends we'll go directly to Q&A. Just a quick note before we begin: I think the presentation itself is going to take a minimum of thirty minutes, so get comfortable. Let's jump in. Please turn to Slide 2. That's where you'll find our forward-looking disclaimer language. If anything there raises questions, let us know. You can always get in touch with us after the call. Now to Slide 3, where we get started with the fiscal '21 Q2 results. You'll see them highlighted in the column on the far right with the yellow marking. What we're showing here is how the aerospace downturn has played out, particularly in commercial aircraft. So looking at the top line, we're at $9,250,000. Our gross profit has declined. The gross profit margin has also fallen, and it's now under 30%. That's not the outcome we'd hoped for, and EBITDA came in at $1,418,000. Now, what did we communicate regarding Q2 back on our Q1 investor call? What were our words? We projected roughly $9 million in sales and around $1 million in EBITDA. So the actual result landed somewhat above what we'd anticipated, though still inside the range. The reason we use that "ish" qualifier is that, as we pointed out when we walked through these indications, or forecast, there was a great deal of uncertainty. So we included that "ish" simply because we want it to be obvious that there's some guesswork involved on our end with these items, given how much uncertainty exists in the market and the industry. We simply give it our best effort. So the "ish" is included not as a joke, but to illustrate a point. As for how we approach forecasts, I believe we bring this up nearly each quarter. We simply want to remind everyone that when we provide a forecast, we are sharing what we expect will occur as best we can, on the assumption that we're working hard and doing what's required; these aren't simple forecasts, and that's exactly the point. We don't issue a forecast so we can look like heroes by beating it and appearing to have done a wonderful job. We realize it's a widespread practice; but we sort of believe that wouldn't be appropriate for Park, since integrity ranks among our core principles, and that means being truthful. So we won't say anything to you other than what we actually believe. We might be mistaken, but whenever we say something, we'll say what we believe. I simply wanted to remind everyone of that. All right. Moving along to Slide 3. Our top 5 customers, listed alphabetically. AAE Aerospace. I believe they show up in the top 5 fairly frequently. One important initiative we've been involved in through AAE Aerospace involves the PAC-3 missile — we supply rocket nozzles for it. You can see a picture of the PAC-3 missile system there. Its purpose is intercepting enemy missiles before they land, and it's deployed by the United States as well as, in certain situations, our allies. GKN serves as a major contractor. Another significant program we support through GKN relates to Sikorsky, covering aircraft structures; in the lower right you'll see an image of the Black Hawk, a truly iconic aircraft. I'm sure nearly everyone here knows the Black Hawk. Now let's move on to the next one, Kratos Defense & Security systems. They show up in the top five quite frequently these days. I believe during the previous quarter, we displayed a picture of the Valkyrie, which is a tactical drone. This particular company manufactures drones; the BQM-167A here is a target drone, and we made — our materials are used in making the structures for these drones. From what I gather, we are the — well, they've informed us that we're the main provider of prepreg materials for all of their drone programs. Meggitt is another significant contractor. We've collaborated with Meggitt on several programs. The EA-18 Growler, pictured in the lower left, is one of them. It's a variant of the F/A-18. I'm certain you know the F/A-18. This one is an electronic warfare jamming aircraft. And Park supplies specialized radome materials for that initiative. Middle River Aerostructure Systems. Everyone here is familiar with them, so we'll skip the explanation right now, even though we'll get into them afterward. I'd also like to note that Middle River used to sit under GE Aviation as a subsidiary, but these days it's owned by ST Engineering Aerospace, a big aerospace player headquartered in Singapore. Now let's turn to Slide 5. All right. So this brings us to those pie charts that have been appearing recently. I have a bit of a liking for them because, the way I see it, they tell a story. The chart at the top just shows the previous fiscal year. The one underneath, however, strikes me as a really interesting point of comparison. The lower — comparing is fascinating: the upper pie chart covered last year, while the lower pie chart covered the initial 6 months of the current year. What's evident is this: military has grown considerably bigger, commercial aircraft has shrunk, and business aircraft has shrunk too. Military is bigger not merely on its own merits, but also since commercial aircraft has fallen so far. Consequently, expressed as a percentage, military rose. Business aircraft. The main program we have in business aircraft is in fact the Global 7500 — Bombardier Global 7500 via — available through both MRAS and GE Aviation. That program has been somewhat subdued; however, we anticipate it will genuinely be climbing.
Brian Shore
executiveThus, the share for business aircraft ought to rise. I won't claim it should return to 18%, yet an increase is warranted. That, I believe, addresses all the points on Slide 5 we intend to discuss. Let's proceed. Slide 6. All right. As I mentioned, we're now getting to the pie charts, and it's going to be nonstop pie charts. Still, in my view, they present a fairly clear narrative in a format that's simple to follow. This one is a fresh pie chart. We've never shown this one previously. We're looking at military, and it comes from the initial 6 months, which is — return to Slide 5, that lowest pie chart, military, which sits at 51%. We take that figure and say, fine, now let's dissect that 51% across the identical timeframe, the opening 6 months of this fiscal year. This is compelling since military is a priority area for us. Let's go through a few of these items. Special mission. These tend to be aircraft that have been modified for particular military missions. Rocket nozzles. These are ablatives made to endure extremely high heat, naturally. When such rockets launch, extremely high heat must be endured. Drones. I assume everyone knows what drones are. Then aircraft structures — that category is spread across many areas. Radomes are specialized coverings for radar antennas. It matters greatly that the covering lets signals pass through, without scattering the signal. It must not warp the signal. When it come — we produce radome materials for commercial planes too. Yet for military use, things are far more exotic, and the materials are far more exotic. So, for enjoyment, let's check out a few of the images. Park is fond of niche military programs — we certainly are. In most of these programs, we concentrate on our niche. Once more, if you revisit that pie chart, all of these are niche categories apart from aircraft structures, which might lean more toward volume, though even within aircraft structures, we concentrate on what leans more niche. We aren't pursuing, say, the F-35 structures. Regarding the V-22 Osprey, components made by us are incorporated into specific airframe sections. That Doomsday plane — we touched on it before. As a matter of fact, we turn out some rather distinctive components for that jet, and we can't really get into the details. As many of you probably know, this is a 747 that's been adapted. My understanding is that there could be 4 in existence, which is worth pointing out. We've heard that if the — and pardon me, this demonstrates a special mission, given that the 747 has been altered for special mission use. We've been told that if the commander-in-chief ever boards one of these planes, it's likely not a good day, because one purpose of these planes is to control and direct military operations during a nuclear war. So you might place this under the heading of a major deterrent against something truly — again, something truly terrible occurring. The Global Hawk. That is a drone, clearly. You can tell just by looking. And this might ring a bell, since one of these got shot down by the Iranians a short while back. So — and that is, I suppose, positive news for Park; it means replacements will be needed, and more Park materials will go into them. The structure of the Global Hawk aircraft incorporates our materials. All right, moving on to Slide 7. We're going to go into our 3 market segments in a little more detail now, but before that, on the left there's a great picture, and it was provided to us by David Clark Company; as nearly every pilot knows, David Clark is famous for its headsets. I bought my very first David Clark headset in 1986, when I was only beginning my career as a pilot. Yet it's obvious they also produce these suits for aircrews, for NASA and the Air Force. So this company is genuinely innovative and wonderful. These suits might be intended for — actually, I'm fairly confident they are for — the Orion space program, and also for the U-2. I don't know if you realize this, but the U-2 continues to fly even now. If you want a reference point on the U-2, you can search for Gary Powers. During the era when the SR-71 Blackbird was operational, our materials went into that aircraft, the WB-57 — which is the Canberra, an extremely old plane still flown for very-high-altitude missions. The important takeaway is the shared thread running through all of these: suits built for extreme altitude. We provide the substances that go into making the helmets, and on top of that, we handle something called kitting for this particular company. They wanted to know whether we'd be able to assist with kitting, and our answer was, "Sure." That's a perfect illustration of a specialized program, a specialized buyer, and a specialized military use case for us. The volume isn't large, yet we truly enjoy collaborating with customers of that kind; now let's shift to military aerospace. These specialized programs and possibilities remain a priority for us; Park has made this a heightened area of emphasis, which came about partly because the commercial aircraft sector fell off so sharply. So what does that actually involve? What's taking place? You're likely sick of hearing this by now, but before COVID, on calls like this one we'd describe how much pressure we felt trying to stay on top of programs that were climbing so rapidly. Our expansion wasn't operational at that point. It still isn't, and we're applying tremendous pressure to get there. We never fell short, and we never left a customer stranded — MRAS in particular — but keeping pace back then required a great deal of raw effort and sheer manpower. Some months, I'd say, found us completely maxed out, with zero spare capacity to stretch any further. So it demanded enormous labor and proved quite taxing. The flip side, though, was that we simply lacked the resources to devote attention to areas such as military, which genuinely deserves that focus. We just couldn't make it happen. So given the commercial side has softened, that's created a chance for us to put more emphasis on military, and for Park that's genuinely a solid market since it tends to hand us more niche openings than the big commercial builds do. And when we can, we as a company prefer to aim at niche programs and openings. One more thing I'd like you to grasp: for us, military being niche carries a different cadence than commercial does. Take a commercial program such as the A320 — we simply keep it going, week in and week out, month in and month out. You just keep going and going and going. Military work doesn't operate that way. Certain quarters it'll be busier than others, perhaps busy for 1 quarter, perhaps sitting idle for a couple of quarters; none of that signals a problem; it's simply the tempo and, more than that, the cadence of military programs. So where military is concerned for us, our quarter-to-quarter results can leap around, and that isn't true on the commercial side. Typically commercial stays reasonably steady, whereas with military we might post a strong quarter, then the following quarter it might slide. The quarter after that, it might climb.
Brian Shore
executiveHowever, the timing and the way these initiatives operate explain that. As I mentioned, during certain quarters, it might be active. A given program might sit inactive for two quarters, and then it becomes active once more. Moving to Slide 8. Carrying on with our focus on end markets, business aircraft. Our intention is to keep backing the GE Passport 20 engine program for the Bombardier Global 7500 along with other business aircraft programs that are qualified at present, and likewise to keep concentrating on creating fresh niche business aircraft possibilities. So growth should come to this segment. Regarding the Global 7500, things are quiet. During Q1 and Q2, that program is quieter. Yet we've heard that at this point it's being accelerated. Additionally, what's interesting is that the business aircraft sector isn't doing so badly. Business aircraft sales are in fact maintaining fairly well. We discussed this during earlier quarters. I won't dive into specifics regarding how the business aircraft industry's dynamics compare with commercial, but I simply wanted to point that out for you. Commercial aircraft — that's essentially the major one for Park. So let's discuss it. Nearly everything you come across is negative. The news appears to be entirely bad. You can hardly find many positive articles regarding the commercial aircraft industry, commercial aviation, or commercial airlines, yet is everything bad for Park? At the end of the day, that's a really important thing for us to think through. Are all commercial aircraft programs created equal? Maybe not. So when you look at GE Aviation's commercial aircraft jet engine programs, they make up about 70% of Park's commercial aircraft revenues for the current fiscal year-to-date, fiscal '21, and Q2 year-to-date. We're talking specifically about the GE Aviation commercial aircraft piece here, because for GE Aviation, keep in mind, we also supply into that Global 7500 program, which is tied to this aircraft — we don't include that in our commercial aircraft segment. I think that 70% would have been higher last year, so the takeaway is that a big chunk of our commercial aircraft business is linked to GE Aviation programs. With that in mind, let's turn to the jet engine programs at GE Aviation that Park supports, to give some context on where Park sits in the commercial aircraft industry. Moving on to Slide 9, which you've seen before. It's just a refresher, since GE Aviation is coming up again. Keep in mind that we hold a firm pricing LTA with MRAS that runs through 2029. As you know, MRAS is a subsidiary of ST Engineering. We're building a redundant factory to support that program. We'll have more to share on the redundant factory a little later. And as you know, all of this is material we've covered before. So via those GE Aviation programs, we ended up as the only supplier for the initial four items — that would be the A320neo family, and every one of those uses a LEAP-1A engine. Then comes the 747. After that, we've got the COMAC919 along with the ARJ-21. The ARJ-21 is a regional jet. As for the 919, it's still being developed, and then obviously you have the Global 7500, something we've covered a handful of times already. That's on the upper right portion of Slide 9. One more thing worth noting: in the case of the Global 7500, a primary structure was produced by us for the Passport 20, and that sits outside the MRAS LTA. That particular piece actually belongs to GE Aviation. So let's continue on to Slide 10 — excuse me — Slide 10. Let me walk through where each of these programs stands so you can see the full picture. This is pretty important. So first, we already talked about the A320neo family, which uses LEAP-1A engines. What's Airbus said about it? Based on what I've gathered, they announced they're taking A320 production down from 60 a month pre-COVID to 40 a month — that's a one-third cut. Will Airbus make another move? People are speculating a lot about what Airbus might or might not do. But we don't have that answer. All we have is what they've told us so far. And keep in mind, Airbus isn't Boeing. Boeing just recently announced they're lowering their figures even more. Boeing and Airbus do go head-to-head, but from where we sit, they occupy quite different places in the commercial aircraft market. So going off our current knowledge and what we've been informed, the A320 line is seeing a reduction of one-third. Now, the Global 7500 — right, we keep coming back to it. Actually, the update here is fairly encouraging. Three months ago, I called it the single largest unknown across GE Aviation's programs, but this news is good. Our understanding is that Bombardier wants to lift this program beyond where it stood before COVID, since they're gaining — well, this is just my guess — they're gaining traction for this plane in the marketplace. The certification is done, and they're eager to move forward—that's my take on the reason, at least. From what we've been told, though, they're clearly attempting to accelerate it. From 747 up to 8. Regrettably, Boeing said they will stop building the Queen of the Skies two years from now, in 2022. What matters most to us, however, is that until that point, no shifts in production rates are anticipated. There won't be any gradual reduction. Their output stands at 6 annually, which equals 24 engines each year. It's our hope that a few buyers will step forward and choose to purchase additional units of these aircraft. As things stand right now, though, the 747 sits at a steady level for us when measured against where it was before COVID. The COMAC919 is the narrow-body jet that goes head-to-head with the A320 and the 737. It hasn't entered service yet. If you check the COMAC website, you can see their projected timeline for getting that aircraft certified and into production. For Park, this could turn out to be a really significant program, though it likely won't have much impact — actually, let me put it this way: apart from a handful of units built for development purposes, it won't matter at all this year. Regarding next year, I can't say for certain — we'll have to wait and see. I'm referring to the next fiscal year here. Moving on to the COMAC ARJ21: that's a regional jet, and it's being manufactured right now. The program is solid and progressing well. Let me point out that COMAC operates differently—unlike Western plane makers, from what I gather, they aren’t cutting output whatsoever. My understanding is they’re actually attempting to increase it. In my view, Chinese commercial aviation has largely bounced back. So where does that leave us? When it comes to the Global 7500 and the ARJ, those two need to strike agreements with GE Aviation to ramp up those efforts, since GE Aviation would need to build the engines—that’s what’s driving those 2 programs. So take a step back and look at the full picture. We have—let’s turn to the A320 shortly—but the Global 7500, this is in comparison to pre-COVID, attempting to ramp up. The 747 is level versus pre-COVID. The COMAC919, attempting to ramp up, though it likely won’t matter this fiscal year or possibly the next one. The COMAC ARJ21, attempting to ramp up toward pre-COVID levels. And the A320 is down by 1/3. So you could say, fine, just average all of that out.
Brian Shore
executiveThe A320 will represent the largest share, so it carries more of that weighted average. So, what does the average come out to? What reduction does it average? You won't land on one-third, since the A320 alone sees a one-third cut. Every other item is either rising or holding steady, so I honestly can't say. If you want to stay conservative, let's call it a 30% reduction, or perhaps 25%, okay? These are simply the facts available to us, and it matters that whenever we discuss commercial, we mean Park commercial specifically, not commercial in general. So let's continue, since we're following a theme here, Slide 11. We're picking up the update. As we mentioned on the previous call, there's an agreement in place with MRAS that requires us to maintain minimum monthly production baselines. This keeps Park in a position where we can increase output again whenever the need arises. It matters a great deal to Park, and to MRAS as well. Also, you should know that MRAS and Park agreed to push December's production into a later period, which allowed Park to perform significant maintenance on one of our critical manufacturing lines — something the program required. That line is our hot melt tape line, and it was in need of major servicing. In fact, that work had been delayed for quite some time, probably longer than it should have been. What stands out, though, is that this minimum baseline works out to about a third of what we were producing before COVID — a third, right? Keep that number in your head — one-third — because we're going to pull all of this together in just a bit. Moving on to the next item. Revenue from our key aviation program came to roughly $29 million, which works out to an average of about $7 million each quarter over the past year. That $7 million per quarter represents the pre-COVID level. So when we stack that up against — well, one-third of it, that is, one-third of it, pardon me. Remember, the deal we have with MRAS brings us to one-third of where we stood before COVID. So what does that come out to? Do the math, and it lands near $2.3 million. Just take $7 million and divide by 3, and you get approximately one-third, which is about $2.3 million, right? So hold that number — keep it in your mind. And now, here's the key question. According to analysis, for the specific GE Aviation programs Park supplies into, what revenue should Park expect in order to support those programs? Well, right on the previous page, that included possibly, for us, our average GE Aviation program end market being down 25%, perhaps 30%. So if we take $7 million and cut it by maybe 25%, 30%, let's round it, perhaps we ought to be looking at $5 million per quarter. $5 million per quarter. Yet we had that figure of $2.3 million based on the minimum we agreed to with MRAS. That's half of it, isn't it? Under half. So what's happening here? Something isn't lining up. Let's continue. Turning to slide 12, let's try to bring everything together by walking through the quarters. The first quarter came in at $4.1 million, which falls short of the $5 million mark, though Q1 represented a transitional period — it started off reasonably well and then lost momentum as the quarter went on. These are fiscal quarters we're talking about. In Q2, we saw $2.9 million. Why did it land above $2.3 million? The reason is that our deal with MRAS didn't get wrapped up until the end of June. Because of that, our June shipments ended up beating that average. If you take $2.4 million and divide it across a quarter, you get about $800,000 per month — roughly $800,000 each month, yes, if you run the math. That's what accounts for Q2 arriving at a somewhat higher level. Now for Q3, keep in mind we didn't produce during 1 of the 3 months. So under normal circumstances it would be roughly $2.3 million to $2.4 million per quarter under the arrangement we have with MRAS, but it will only amount to 2/3 of that since September had no production — we're only producing in October and November. So for Q3 we're looking at just $1.5 million, only 2 months of the quarter, approximately $1.5 million. These figures are approximations. They're ish-type numbers. There's actually a question mark there, because a lot of uncertainty surrounds some of these forecasts. Regarding the fourth quarter — that's a three-month span — we should land somewhere around $2.3 million to $2.4 million, based on the minimum arrangement in place, meaning the minimum production deal we've got with MRAS, right? So where's the discrepancy? $2.4 million? Weren't we just talking about $5 million? How does that not line up? Let's keep going. Now looking at the GE Aviation program forecast for Q3, Q4, and past that — what's going on? There are major deviations, plus a disconnect, between the minimum monthly baseline production volumes we agreed to and what the end market currently demands for GE Programs with Park is on. That figure is approximately, as a rough guess, a $5 million estimate against $2.3 million, $2.4 million. That's an enormous gap. So at some point, something's got to break. The phenomenon in front of us is destocking of inventory. In the aerospace sector, you've likely encountered a lot of coverage of this. It's quite substantial, and quite large in scale. From our perspective, a number of businesses throughout the aerospace supply chain feel beaten down. Their only focus is making it to the end of the week. Forward thinking isn't happening. Survival is the mode they're in, and they aren't giving adequate consideration to the requirement to scale up after destocking of inventory concludes. Consider this: when someone is just trying to make it through the coming week or 2, thoughts about 3 to 4 months down the road won't really be present, since their response would be, what's the point of concerning myself with that? If we can't survive until two weeks from now, what happens three months down the line doesn't matter much. Many businesses throughout the aerospace supply chain find themselves stuck in exactly that bind. Luckily, that isn't where Park stands, and we went over this during the prior quarter. I believe we raised the possibility that maybe it was simply good fortune, and I think we shared a few observations on whether good fortune explains it or not. Yet here's the catch: this situation cannot continue indefinitely. You can't have inventory drop beneath zero — the math simply doesn't allow it. It's basic arithmetic, and perhaps it amounts to a ticking time bomb. Eventually, the destocking will have to stop. Let's turn to Slide 13. Once inventory destocking wraps up, the supply chain might need to ramp up suddenly and sharply. It's key to grasp that such a ramp-up would depend on inventory stocking coming to an end, which does not hinge on or follow from a recovery in the commercial aircraft industry. Based on the program analysis we walked through a couple of pages back, we're stating this is what's real. We're not saying we're holding out for — this is the reality regardless of any commercial aircraft industry recovery; that's a separate issue. Now, should Airbus drop another shoe and cut their forecast further, they'd have to return and redo the math. We're discussing what we know at present, the reality of what we know at present. For Park, the more pressing question isn't when a commercial aircraft industry recovery will occur, but when the industry supply chain inventory will get back to normal and when inventory destocking will come to an end. When will that happen? That's the truly good question; and we don't have the answer to it. But my view, and it's only partly a view.
Brian Shore
executiveWe lack sufficient data — we simply don't possess enough information to provide a definitive response, and that means it really cannot extend beyond the close of our fourth quarter. From what we do know, that just doesn't appear feasible. There's plenty of data available to us. What's missing is the complete picture. So, drawing on the considerable data in our hands — I'm not referring to aerospace supply chains broadly. What I mean is the specific supply chain we participate in that serves these programs. It's conceivable this inventory reduction wraps up by the close of the calendar year, yet I fail to see any way it stretches beyond the fiscal year's end. So the answer eludes us. Clearly, that will shape our quarterly guidance, which we'll address shortly. In our view, the supply chain might be drawing inventories down to perilously thin levels. Be careful, since that leaves zero buffer when the moment of reckoning arrives. Hold on — our stockpiles have shrunk to extremely low amounts, and now we must begin meeting end-market demand at the levels the end market requires; what options do we have? There could be a bit of panic. Another issue to weigh is that certain supply chain participants might lack the capacity to react, might not be prepared, since they're stuck in that sort of discouraged, lethargic frame of mind. Park, though, is different — Park is striving hard to be prepared; still, things could get quite intriguing. And they could be dramatic, they could be sudden; we simply don't know. We say could because certainty is absent. GE Programs — I just want to return to this — is running at under 50% of what's needed to sustain the end market programs. That's significant; and the arithmetic plainly indicates this cannot continue indefinitely; it must halt eventually. And once it halts, what will unfold? Will it be fairly sudden? Will it be fairly sharp? Will the supply chain be prepared? We don't know, but we will be ready. At minimum, that's what we're striving very hard to achieve; and likewise collaborating with our suppliers too, to ensure we aren't left exposed. Let's continue. I believe we more or less covered that analysis, and I apologize it required multiple pages to assemble. Slide 14, merely a brief recap slide, single-aisle against wide-body. The trend favoring single-aisle is already established; that predated COVID as well. Industry experts and analysts, whatever their opinions are worth — pardon the sarcasm — held the belief that the market for single-aisle aircraft would bounce back ahead of the wide-body aircraft market. This — look, I'm acquainted with these individuals, they're paid substantial sums to serve as analysts. It isn't rocket science. When you examine commercial aviation, things are doing a bit better if we're talking about domestic flying within the U.S., perhaps within Europe, and short-haul routes in Asia. What is taking a beating is international travel. Domestic travel hasn't fully bounced back yet, but it's much improved. Talk to folks who take domestic flights, and they'll tell you, "Hey, those planes are quite full." The airports are quite full too — perhaps not as full as before COVID, but full nonetheless; international flights, on the other hand, are practically nonexistent. So what's the takeaway? Domestic routes use single-aisle jets, while international routes use wide-body jets; therefore there's very little need for wide-body aircraft right now. And that's the reason — you can hire an analyst to give you an opinion, but that's the reason it's fairly clear that single-aisle is bouncing back faster than widebody. The major single-aisle programs. There are three big ones: the A320, 737 MAX, and the 919. We're involved in two of those three. Those are the two of the three that we believe we want to be part of. The A320, excellent program, tremendous program. The 919, keep an eye on that one because they're catching up, the Chinese, but a great deal of prestige is tied to this aircraft. It matters greatly to them to bring the plane to market and succeed. The MAX, hopefully they'll — Boeing will figure out a way to get things straightened out and bounce back. But I suppose even there — Boeing is signaling that things will be quite difficult for them for quite a while. So we parked — sorry, yes, Park. We Park — we checked — Park checks two of the three single-aisle boxes. And our view is that if you want to be in single-aisle aircraft, those are the two boxes you want checked. We think single-aisle is where you want to be in the commercial aircraft industry. And we think we're perfectly positioned on those two most appealing single-aisle programs. Let's turn to Slide 16. A brief update on Park here, how we're progressing. But first, let's discuss the expansion. The total budget, roughly $18 million. Spending so far of approximately $11.25 million. Remaining spending, if you do the math, roughly $6.75 million, $6.75 million. Completion anticipated in the first half of calendar year 2021, possibly around March. This has been pushed back somewhat, a slight delay, partly due to weather, lots of wind, which you'd say, "Boy, what's wrong with you? How could you — that's breaking news? There's lots of wind in Kansas." I agree. And also — but here's another factor, COVID crowd restrictions. That's actually an issue for us because much of the equipment is very sophisticated, elegant equipment that we're having installed. It's not something you order off the shelf. It's all specially designed for Park. So it's really crucial that the manufacturer come in when the equipment is being installed and we're bringing it up and bringing it online. A number of these suppliers aren't based in America — they're located abroad, in Europe. Getting those folks over to the States is really tough. So that's causing us a bit of a headache. We're attempting to sort it out. That said, this is the reason we believe there may be some slippage when it comes to completion. At what point will the plant be qualified and genuinely producing for MRAS? Keep in mind, this is a redundancy plan for MRAS; other uses will exist for it, yet the aim is redundancy for MRAS, the MRAS programs and GE, too, I suppose. Well, that truly hinges on MRAS and the speed at which they wish to proceed with a qualification, how much focus and how many resources they dedicate to it, since qualification is something we both must work on; it's sort of a joint effort involving MRAS and Park. My hunch is they might be somewhat distracted at the moment. As a result, they may not treat this as their top priority. Clearly, capacity isn't something they require it for right now. So we can't say for certain. Clearly, we'll nudge them. We'd love to have it qualified by year-end, though perhaps a more realistic scenario is the start of calendar year '22. All right. So let's move on to Slide 17. Park remains fully operational all through the pandemic. Our New York office is open.
Brian Shore
executiveOur Kansas plant is still up and running. It has been running since day one. You recall how we mentioned receiving those 25 letters from military contractors telling us that we're expected to stay open. Not simply that we're essential — I realize we can remain open — we are expected to remain open. If you consider a few of the programs we brought up earlier during the presentation, perhaps you can see the reason for that. The customer flexibility program has played a key role in enabling Park to adapt effectively and swiftly to a shifting and unpredictable business climate, with participation right now at 81%. It's similar to a cross-training initiative, and a big share of our workforce takes part in it. Park's exceptional employees keep performing very well despite tough conditions. Over on the right, you'll see a treater crew. This is our first — one of our earliest shift solution treater crews. It's actually interesting, since one of these individuals isn't usually part of that crew. One of these individuals — his regular role is hot melt, hot melt film, as I recall. Yet because of the customer flexibility program, he transferred over to this solution crew. So I simply want to tell you, we currently have 111 people. So these are 4 out of 111. They're my heroes. These are unsung heroes. They show up for work each day and carry out their duties. There's no fooling around, no whining, no complaining. And keep in mind, we're working, particularly on solution for these military programs, a few of which we covered at the start of the presentation and a few of which we can't discuss, these programs protect us and our allies. These are extremely important programs. These individuals are there daily, day in and day out, no whining, no complaining; and that's the entire group, 111 of us at present; so I just want you to know that we paid out to all 111 of our folks, including Matt and me, a $125 bonus for Q2; it wasn't a great quarter, but we hit our objectives and the bonus was paid to these 4 guys along with everyone else. Let's move on to our final slide, 18. So our summary slide. The world has been badly damaged and is a very troubled place right now. I won't go into what that means because I believe we all understand what it means. But at Park, we keep moving forward, not feeling sorry for ourselves. We're not hiding away and waiting for the world to get better. We're not letting up. Others may falter, but we are not going anywhere. Park is a strange and unusual company. We are not like others. We play for keeps; we don't give up; we don't quit; we're here to fulfill our destiny. Last item of interest is that Park went public on November 17, 1960. So this November 17, we will have been public for 60 years. Interesting little footnote is that — sorry, November 17 is my birthday. It hadn't been my knowledge that Park's IPO happened on the date of my birth. I arrived in this world before that, in '51, yet November 17 marks my birthday. Upon joining Park's staff in 1988, while sorting through a few ancient documents, I came across — inside one of those files — what amounted to a tombstone advertisement, its borders even left uncut, with torn — uneven edges. Into a hermetically sealed, I'm not sure what you'd call it, container we placed it, so that it wouldn't deteriorate any more or grow even more faded. Reading it over, I told myself November 17 — no one had ever mentioned to me that the firm's public offering fell on the day I was born; that, then, is how the discovery reached me. The revelation came not during 1960, but during 1988; so our presentation concludes here, and I'm very grateful that you tuned in, that you stayed with us. I'm aware these calls grow quite lengthy. But operator, we're now ready for questions.
Brad Hathaway
analystJust one fast point of clarification. It's possible I missed this, but regarding Slide 15, did you go over the Q3 and Q4 expectations at all?
Brian Shore
executiveHonestly, that part slipped past me. My apologies — I went straight past it. Let's return to Slide 15, then. That slide must have been skipped by me. There's a printout sitting right in front of me, and somehow that slide just got overlooked. I'm sorry about that. So I really appreciate you pointing that out to us. Right. So for Q3, what we're discussing is roughly $10 million; and once more, we say "roughly" since there's considerable uncertainty tied to the matters we've been covering, especially destocking and the timing of when destocking finishes. And regarding EBITDA, we're discussing approximately $1 million, which had been our projection for Q2. Our Q2 projection was $9 million and $1 million. So the obvious question is going to come up, or at least it would from me, which is, why is that figure — the EBITDA figure somewhat lower in Q3 given that the revenue figure is somewhat higher? The answer is that product mix is somewhat less favorable during Q3 relative to Q2; that isn't a trend. Product mix rises and falls from one quarter to the next depending on which programs are active right now. Possibly somewhat above approximately $1 million, but that's our current thinking; as for Q4, we do have internal figures, yet we won't share them right now since we'd truly just be guessing. There's excessive uncertainty. Once again, the main uncertainty, well, it's 2 items. First is how the market performs overall, but here's the crucial one. The enormous driver is that destocking — when it concludes, it could have a dramatic effect on the top line and on the bottom line too; and once more, I really appreciate you pointing this out to us. I regret that I missed this, but allow me to discuss our long-term forecast for a moment as well; so we — returning to Slide 15, we laid out our long-term forecast on — during our Q4 May 14, 2020, investor call. And the cause was that we simply sensed there was excessive uncertainty, and we'd only be guessing, and we didn't believe we were doing anybody any favors by merely producing a guess. It simply doesn't help anybody to do that. And we still aren't prepared to reissue our long-term forecast. We think the fundamentals that existed alongside the earlier long-term forecasts remain broadly intact. The issue is how far to the right things shift. And that doesn't mean we're waiting. We're sitting around waiting for things to improve; that isn't the case at all. We're working hard on everything within our control, which is plenty. However, we aren't at a point yet where an update to the long-term guidance would carry any real meaning, and we don't want to simply make a guess at it. Then at the bottom of Slide 15, you'll see our present thinking on that long-term forecast. More broadly, we've brought back our pie charts to offer a bit of perspective. The takeaway here, I suppose, is that the commercial aircraft side will be shaped partly by that destocking dynamic. We keep pursuing commercial aircraft programs that are more niche in nature. On business aircraft, it's the same story. Military, though, strikes us as the major opportunity today, and that's where a great deal of our attention is going. So none of this puts numbers behind the long-term forecast, yet as I said on the slide before this one, it's actually a positive in the sense that with the commercial aircraft industry down, we get the chance to concentrate on the things we want to concentrate on, the ones that are strategic for Park over the long haul. And once more, Brad, I truly apologize for skipping that. I have no idea how it occurred. What I believe occurred, though, is that 2 pages were stuck together and I simply turned past them. So I'm very glad you raised that question. Had I failed to cover this slide, it would have been terrible, since it's a fairly important one.
Brad Hathaway
analystNo worries there. For a second I was a bit alarmed that I'd zoned out for a while, so it's a relief to know it wasn't only me. Anyway, here's another item for you. On the topic of M&A, I believe the previous occasion we chatted — or the previous occasion you mentioned it during last quarter's call — you noted that you had somewhat better clarity regarding what the M&A environment could look like come September and October. So I'd love to know whether there's anything new on that front, and how you view the set of opportunities available for deploying some of your capital.
Brian Shore
executiveThat's a really intriguing thing to ask. Well, we've been busy. We've been searching, and here's a somewhat amusing little story. Roughly twelve months back, or shall we say, during the prior fiscal year, I believe it happened at some point in the previous calendar year. We examined a few businesses that bankers were running through an auction process. And we placed bids for them. And our bids were roughly half of the amounts they ultimately went for. And we — I found out what they went for since public companies acquired them, so the figure was made public; and honestly we were absolutely shocked by it; we truly pushed ourselves to reach our figure. Looking back now, perhaps our figure was on the high side. So the bankers informed us that we weren't going to succeed in that auction; we replied, fine, no problem, and we moved on. Yet we were shocked to discover that those businesses genuinely went for the amounts the bankers had hinted at to us. They told us, "You need to reach roughly this amount." You're familiar with their methods. And well, we weren't willing to do that. And then those businesses did indeed get acquired for more or less those amounts, or within that band; now jumping ahead; we examined a different business, shall we say, roughly two months back or thereabouts, possibly during this summer, which a banker was also handling the sale of. This one was smaller in size. And we did submit a figure; we did submit an initial offer, which they refer to as a nonbinding bid. And the banker responded, "Well, your figure is insufficient." And we replied, all right, well — and he provided a figure that we supposedly had to reach, you know the way they operate with this sort of thing. And we told him, "Well, we don't — we aren't raising our figure. This figure is one we believe is the right one." The key distinction is that this business never got sold. Not merely did it fail to sell at a greater figure, it never sold whatsoever; so I believe the business was pulled off the market. And I found that quite fascinating, because during the prior year, everyone, just about anybody, was submitting bids for such businesses. This year, perhaps not, or at minimum, during this particular window, perhaps not. Perhaps — but we aren't facing nearly as much competition. When all is said and done, the offer we put forward—a preliminary, nonbinding one—is something we're pleased with. In our view, it reflected an appropriate price. Still, it was notable that no other party acquired it for double what we offered; in fact, nobody acquired it at all. Right now we're also examining a different company, and it isn't an auction process. A major client of ours brought it to our attention. They informed us of a business they know about that could potentially be available for purchase. As a result, we reached out straight to the owners, and discussions are underway. Whether it goes anywhere remains uncertain; time will tell. Even so, we've stayed busy while remaining prudent. Simply pouring cash into any opportunity isn't our approach. At present, compared with a year ago, our situation looks far stronger when it comes to securing fair worth for both our company and any deal we pursue. That means what we judge to be fair worth, in contrast to—as I mentioned—a year ago. So I appreciate that you raised this point. At least from our narrow vantage point, there appears to be a fascinating shift taking place in the M&A landscape.
Brad Hathaway
analystUnderstood. Excellent. Would it be alright if I posed one additional question?
Brian Shore
executiveOf course. Ask however many you'd like.
Brad Hathaway
analystOkay, so I suppose what I'm really asking is whether there's an opportunity for the business to pick up share in the medium term, since the rest of the supply base — and possibly some of your rivals — seems pretty demoralized. Given the relative strength you have, do you think there's a chance to uncover additional niche programs that Park could serve during that stretch? Does that get you excited?
Brian Shore
executiveWithout a doubt. That's what we're aiming for. As I mentioned, we aren't going to rest. We aren't sitting around feeling sorry for ourselves. We're pushing ahead. As they say, get a kick in the engine — and we're out there hunting for business. Sadly, at this moment, we can't visit most customers face to face. They simply don't want us on site. And you're familiar with how that goes — because of COVID, naturally. So much of it happens over the phone, and we make pests of ourselves; but we aren't disappearing and we continue seeking new opportunities, new opportunities, new opportunities. Yes, our salespeople have to be motivated, since that's the whole point. And we truly want to capitalize on this moment when perhaps others aren't focused or perhaps feel defeated, while we don't. So without a doubt, without a doubt. One item you brought up — new programs — that I ought to mention is this: when it comes to military, and we've discussed the military a fair amount. An interesting thing has emerged: there are just 2 domestic suppliers of composite prepreg materials within the U.S. So Park is one of those 2. There's another, bigger competitor. Every remaining competitor is foreign-owned, held by companies overseas; and we're curious and actually hopeful that this might benefit us; we believe it ought to. But clearly, we'll seize anything that comes our way; so I figured I should throw that in.
Brian Shore
executiveThanks, operator, and thanks to all of you for tuning in. It means a lot to me that I get to walk through a quarter with you each and every quarter; and if you've got any feedback on our presentation, just let us know. As I mentioned, we aren't — we don't aim to address every single item. What we do aim to address is whatever we figure might be worth your attention each quarter, and that will shift from one quarter to the next too. And naturally, if anything comes up, give us a ring. Matt and I are reachable today, and we'll be here and free to talk. So once more, thank you. Have a wonderful day; and we hope we get the chance to speak with you before long. Take care.
Operator
operatorEveryone, that brings us to the end of today's conference call. We appreciate your participation. You're free to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.