Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary

January 7, 2021

New York Stock Exchange US Industrials Aerospace and Defense earnings 62 min

Earnings Call Speaker Segments

Brian Shore

executive
#1

Thanks, Katherine. This is Brian speaking. Everyone, welcome. Joining me is Matt Farabaugh, who serves as our CFO. Happy New Year, everyone. So, the first item: we put out our earnings this morning. You're likely already aware of that. I'd suggest looking at the earnings release, since it contains directions for accessing the presentation we're about to walk through; I strongly encourage you to do so, because following along with the presentation will make this discussion far more meaningful. A supplemental financial data set is also included as Appendix 1 to the presentation, so you may want to review that as well. As you're aware, we do this regularly. Our purpose with these presentations isn't to promote or hype the Company. What we aim to do is address matters that, in our view, will interest you and offer perspective that we believe will help you, our shareholders, in understanding our company and its dynamics. Unfortunately, we can't get to everything every quarter; that's simply not feasible. So we need to be somewhat selective; even so, we have a lengthy presentation. It might run 45 to 50 minutes; so I just want you to be prepared and brace yourselves. Several items need a bit more discussion, since they aren't so apparent on the surface. Then, once we've finished walking through the presentation, we'll of course gladly take any questions you may have. So let's begin, and let me move to Slide 2. Slide 2 is our forward-looking disclaimer. Should you have questions about it, simply let us know. You can always call us afterward. Let's go straight to Slide 3, all right, where we get into the numbers, with plenty happening on that slide. Let's work through it. So in the third quarter, sales, as you can see, came to $10,372,000, gross profit was $2,553,000, and gross margin was just 24.6%. That's low, as history shows, and we'll get into that in just a moment, and our EBITDA was $1,380,000. Looking at the top line across the first three quarters, it clearly reflects the impact of the commercial aircraft downturn as well as the destocking we've discussed for quite a while now. So what can we say about this quarter, Q3? On our conference call last quarter, we indicated our sales estimate was $10 million-ish and our EBITDA estimate was $1 million-ish; we aren't trying to be cute or clever with that "ish" wording. When we say "ish," we're telling you we truly don't know. There's substantial uncertainty, and we don't want to convey more confidence than we actually have in what we're telling you. We're glad to share our thoughts. We want you to understand how much confidence we have in what we're telling you. All right, so it appears we landed inside the range on both the top and bottom lines — we hit our sales and EBITDA figures, possibly slightly above, though let's just say inside the range. Keep in mind how we approach forecasting. We discuss this regularly, but going through it once more seems worthwhile regarding our guidance. We aren't doing what we refer to as deliberately handing you a small figure, one beneath what we actually expect, just so we can surpass it. When we provide a forecast, we're sharing our belief about what's going to occur; we might get it wrong, yet we're still telling you what we believe will occur. No rounding upward, no rounding downward; this represents what we believe will occur, to the best of our ability; so let's move along to the next — let's proceed to the following item. Several factors impacting Q3, and they'll impact Q4 too, affecting sales and margins. Let's get into that. Turning to the GE sales, we'll address this afterward during the presentation, just $1.8 million; this calls for a bit of a recap of items we talked about in earlier quarters, and we'll reach more specifics afterward in the presentation. Keep in mind, we said last quarter that we'd arrived at an arrangement with MRAS, our primary customer — or biggest customer, I should say — a subsidiary of ST Engineering in Singapore, formerly a subsidiary of GE Aviation; we had an arrangement through which we turn out a set minimum quantity for them each month. The reasoning being that dropping beneath that quantity would seriously harm our capacity to ramp back up, and we do need to ramp back up and feel quite confident that we would reach — that the day would arrive and it has arrived, we'll get to that too. But it's — that minimum quantity is measured in units, not dollars. Therefore the dollar figure will shift depending on our mix, but it's been somewhere between $700,000 and $900,000 per month, quite a small figure, yet that's what we say we require to preserve that critical mass and the capacity to ramp up. Keep in mind, I noted last quarter that in September, however, we wouldn't run our hot-melt line since we're taking it down for major maintenance that had been overdue. So during Q3, we ran only two of the three months. Instead of one month times three, perhaps 700, 900 tons three, 700, 900 times two. So we had just $1.8 million of GE programs revenue, as you'll see afterward in the presentation for Q3. And you'll also see that compares with Q2's $2.9 million when we had three to four months of production at that minimal level. So that impacted, clearly, our top line and consequently the bottom line. So here's another thing that's somewhat complicated. We need to walk you through it, so you have the perspective. In Q3, we recorded roughly — sales came to around $2 million for a key part utilized in missile initiatives that are extremely vital missile initiatives. Those sales went to the OEMs, the defense contractors. This part is in fact manufactured abroad, and an ally makes it. It's a friendly nation, yet even so, the OEMs, these defense contractors, got a bit uneasy. They're looking to secure a supply of this essential part. We hold the relationship with the supplier. Keep in mind, this gets intricate, but stay with me. So they came to us asking that we purchase this item, and that's what we did. After that, resell it back — or rather, sell a package back — to these OEMs, these defense contractors. That way a dependable source of supply exists for this essential part. And that's what we carried out. So we sold this part to those contractors. It belongs to them at this point; they're free to do anything they wish with it; however the anticipation is, obviously, that it will get used beginning, say, in the next fiscal year, to make the capacity materials for those missile initiatives; that's how it goes. Still, once more, it's their product. They're free to do anything they wish with it.

Brian Shore

executive
#2

What we expect, though, is that this capacity will be used to produce those materials for the initial programs. The thing is, the margins tied to that $2 million are incredibly slim, because we buy the material and then apply a markup before selling it on to those defense contractors at a very narrow spread. Actually, though, that's a positive development, since once we move into actually manufacturing the preprint materials — the composites — the margins look pretty strong. That said, you've got $2 million in Q3 revenue carrying very weak margins. Which brings us back to that 24.6% gross margin figure. And that's likely the broad explanation for why — for the reason that number comes in lower. If you go back to the previous quarter, revenue came in at $9.2 million with a gross margin of 28.6%. Now, say there's nothing we're happy about at a 30% block — even so, when you check Q3, margins are actually worse while sales are bigger, and that's the reason we felt it needed explaining. I apologize for using up a bit of your time, but I wanted to be certain this dynamic came across clearly. Moving along to Slide 4. Our top five customers — we make a point of always walking you through those five. AAE Aerospace along with Aerojet Rocketdyne are each tied to the Patriot missile system; there are images linked to these five accounts, and we've already discussed this PAC-3, which is the earlier missile system. This is the Patriot missile — the newest generation, the most recent version of Patriot. GKN is one of Sikorsky's contractors, and they work with plenty of other customers too. In the lower right corner, though, you can see a picture of the Sea Hawk, a program we supply into, and that's the next item down on the list. Kratos has sat at the top of our list by a decent margin over the past year or so, I'd say. There's also an image of the Valkyrie — as you'll recall, we've brought it up before — and we think we're the primary materials supplier across all of their drones, both the tactical ones and the target ones. What's interesting about Valkyrie is it appears they landed a cratered award from the U.S. Air Force tied to the Skyborg program. Alright, so that's a pretty good one for us to have gotten. Then the final item would be what we refer to as MRS, the middleware air structure system, along with subcontractors. Once more, this is a subcontract under SD Engineer, Aerospace — the customer that's biggest for us. You can see a photo there featuring a 747-8; honestly, I'd say the tire rework came out great, and I should mention I snapped that picture myself; what you're looking at is an anchorage. The aircraft was touching down — you can see the gear lowered in landing configuration — that was a little more than a year back, and I believe that's correct. Every runway except one runs near here since just a single runway handles departures and arrivals; as a result, I'd always end up taking off once that plane had come down. Moving along to Slide 5 now. We've been showing you these pie charts over the past several quarters, and personally I find them quite interesting. Hopefully they provide you with some helpful insight as well. Let's start with the previous fiscal year, fiscal year 2020, when revenue came in at $16 million. You can see the breakdown right here. Then we move forward to this year, the year-to-date period, Q3 year-to-date, and these supply charts have changed considerably. Military makes up 58%, while a year ago it was 35%. Commercial dropped to 35%, versus 47% during the same period last year. Let's do a quick calculation here, just for the fun of it. If we look at last year's total revenue of $60 million and apply the 35% military portion, that gives us roughly $21 million, right? Then for this year, with $31.8 million in revenue, we multiply by 50% and annualize it. Let's assume, as I've been saying, that this holds. To annualize, we treat Q4 as at least on par with the first three quarters. That yields an annualized $24.6 million, so what does that indicate? Even in a down year, the aerospace business has clearly grown, and grown substantially — likely not due to product actions, since we chose to focus, as I mentioned, on military. Looking back, I'd call that an aerospace error. Even during a year of decline, our military segment grew, and as we've discussed across the past two or three quarters, we made the decision to focus on military. So, shall we keep going? We'll continue pressing ahead here; like I mentioned at the outset, there's a lot left to cover on Slide 6. Alright. At this point we're talking about our specialized military aerospace programs. As I just said, we made the choice to zero in heavily on retention within military. And my sense is that so far, things are going reasonably well. There's still plenty of ground to cover, but up to this point, things are going reasonably well. Here's a look at a handful of the programs we're part of — the images just illustrate a few of them, and they aren't meant to suggest anything about size. They're simply the ones we found worth highlighting. Every quarter, I believe, we go through a few of the programs we're working on, including military ones. The one in the upper left corner is pretty fascinating. It's a program where we're in qualification — a standard missile three system, and that missile moves incredibly fast. I think it hits Mach 16 and Mach 18, which is unbelievably quick. Take the SR-71 — you're familiar with that aircraft, the quickest one around. As far as I know, nothing faster has ever been built; it gets to roughly Mach 3.3. So this missile is extraordinarily, extraordinarily fast. And we're actually in qualification on it as well. Additionally, we're involved in qualifying a rocket system that's utilized by the SM-3 and SM-6. With the Boeing KC-10 Extender, it's quite a specialized situation — a unique mission type, since you're able to observe which aircraft is receiving fuel. Typically, though, it would service B-52s and F/A-18s military planes. This one involves six stores. I'll aim to go through it fast, particularly regarding material, and we also make components for this initiative. So how did we secure this work? We're an established supplier. This isn't a completely new aircraft that they chose to drop. It's just too difficult to deal with. Okay, go ahead and include us. We're going to take that on. Hearing about things like that is great. And when someone believes another company's project is a headache, go ahead and sign us up, since those are exactly the types of programs we enjoy. So let's continue on to the Grumman E2-D Hawkeye. As you can see, this is a carrier-based early warning aircraft. You'll notice the large antenna up top; we produce structural parts with our material. For that aircraft, and we've also got the Predator right here. I believe during the previous quarter, we showed you the Global Hawk; this is a different drone, clearly meant for military use. Our products go into structural parts as well as rate home materials. That pie chart is visible to you. It's derived from a military segment covering this year, the third quarter on a year-to-date basis, and it breaks things down among those subcomponents. One thing that stays the same for us: we lean toward specialized military programs, and at this point we're looking to expand into bigger ones, like structures for the F-35 and similar work. Handling niche programs is what we'd rather do.

Brian Shore

executive
#3

When we believe we bring something distinct, something extraordinary, something no one else can match — and we also believe we can safeguard the business, since what we're doing is different and unique — the KC-10 illustrates this well. Let's continue to Slide 7; now we'll discuss commercial this quarter, and as I mentioned, we can't get to everything. We touched on military a bit, so let's cover commercial. Business aircraft won't be addressed, at least not in this presentation. If you have questions on that this quarter, just reach out. Turning to commercial; this slide resembles the one presented during the prior quarter. So there's some recap here as we discuss single-aisle against wide-body aircraft. These trends were already established, benefiting aircraft, and that predated the pandemic. What's the reason? People prefer flying nonstop. They'd rather skip the hub-and-spoke approach whenever possible. The single-aisle plane, being smaller, can serve more regional, smaller airports, while wide-bodies head to the major hub. So to travel from point a to point B, you'd need to pause at point C, I suppose, where the hub sits, and no one wants that, not necessarily. With the pandemic now, in our view, that sped up the shift toward single-aisle. A single-aisle market will bounce back ahead of wide-body. Yeah, I think it's — we pose it as a question, but honestly it's just obviously the case, and again, what's happened with the pandemic and the downturn has really accelerated movement in the direction of single-aisle, so single-aisle comes out ahead of wide-body. So from where we sit, you'd want to be in commercial aircraft, and that's exactly what we are — we never wandered away from that, incidentally, even with all the bad headlines about commercial aircraft over the last year; our view was that this is a strong place to be. If your goal is to be a commercial aircraft player like us, then single-aisle is where you'd want your emphasis. That's our perspective. Three major single-aisle programs exist: the Airbus A320 family aircraft and LEAP-1A engines. We're involved in one of those initiatives. It's a massive, massive, massive initiative — one that matters a great deal. Being involved in it is wonderful. Turning to the next one, the 737 MAX: that aircraft has, as you know, gotten its certification back. It's flying passengers once more, so congratulations to Boeing and here's hoping for their success. That initiative isn't one we're part of — our content there is essentially, I believe, nothing; I shouldn't call it essentially nothing, since as far as I'm aware we have none on the 737 MAX. Then there's the third single-aisle, the Comac 919. Development of that plane is still ongoing. According to Comac, they'll finish certifying it — at minimum inside China — during this year, with handovers to customers starting at the year's close. Whether that actually happens remains to be seen. Even so, we see that as a potentially very important move down the road. So looking at it from our perspective, we're checking two or three of those boxes. With the A320, those are the boxes we're trying to check. In our opinion, that plane is the clear leader by a wide margin. Plus, the A320 arrived with a lot of variety and spanned a great deal of ground. We looked at the larger variant, so they offer a lot of unique options, which is unfortunate, because as we see it, Boeing is now far behind thanks to the MAX problems. So single-aisle aircraft are where you want to be—those are two boxes worth checking, and check them we do. Okay, turning to Slide 8. We'll do a program spotlight on the Airbus A321XLR, which belongs to the A320 family. This is a really compelling project we're talking about — a narrow-body jet with excellent range, about 5,400 statute miles, and it can seat as many as 244 passengers, so quite a lot of seats in a high-density layout. Service entry is anticipated by the end of 2023. That's only two years away, which really isn't long. Will it change the game? There's been plenty of media coverage and lots of articles written about it. Many believe the answer is yes — it will be a game changer. But why? Since this plane can handle routes that normally require larger aircraft—say, flying from North America over to Europe—it will serve as a substitute for those wide-bodies, though at a significantly reduced expense. That's why there's so much enthusiasm surrounding this initiative, and we're certainly glad to be involved. Sadly, Boeing lacks a real counter to this jet; it resembles the older 757 in some ways—a narrow-body aircraft, yet packed with modern technology, essentially an elongated take on the 737, if you think of it that way—but extending the MAX beyond its current length isn't possible for them. As a result, they are unable to leverage a MAX as a foundation for taking on this XLR. And regrettably, Boeing possessed an MMA aircraft that was somewhat aimed at this segment. Yet from what I understand, they have paused further work on that for the time being, since their attention is on the MAX. In our view, Park sits in a perfect spot — possibly due to chance, perhaps largely due to chance, within the commercial and aircraft sector. Regardless of the cause, we believe our position is perfect, and this luck will carry it. No issue on our end. Slide 9, let's move on to Slide 9. Here is a slide that we — that we review nearly every quarter. Let's quickly go over the GE Aviation jet engine programs and explain our involvement in them. The reason we're on these programs is that MRAS, which is a major customer of ours, was a subsidiary of GE Aviation until a couple of years ago. These days, it operates as a subsidiary of ST Engineering, based in Singapore, which is a big aerospace company in that country. So, let's move through this fast. Our pricing under the long-term agreement with MRAS, or Middle River Aerostructure Systems, remains fixed through 2029. In addition, we've finished reworking the factory — there's been some advancement on that front, and we'll cover it afterward in this presentation. So, what's the situation? Look at the next item, which states that we will be the sole source provider across every one of these programs. Now, for a big aerospace OEM, a sole source arrangement isn't something they'd be at ease with — a long-term sole source arrangement, that is, for materials of this kind, these critical materials, where just one facility exists. That's too risky. Should anything happen to our facility, it would create a genuine problem for these OEMs, since qualification time frames for these materials are extremely, extremely long. So it would be a genuine problem. So it's sort of built into our arrangement with MRAS. We entered into this long-term agreement. We said, absolutely, we'll construct a redundant facility for you; the good news now is that we need it for capacity regardless. As some of you may remember—at least a handful of you—roughly over twelve months ago, before COVID-19 hit, we had already started talking about how our current plants were nearing their limits. That's actually a positive. We're going to require that space for capacity as well.

Brian Shore

executive
#4

Exclusive provider of composite materials for engine nacelles, thrust reversers, and inner fixed structures across several MRAS programs — that covers the A320 family, with the first four items listed at 747, and we've consistently shown you that image. That applies not only to nacelles and thrust reversers but to the inner fixed structure as well. Then there's the Comac 919, which we've discussed. Next is the Comac ARJ-21, a regional jet performing rather well and sold primarily in China. After that comes the Global 7500, powered by Passport 20 engines — top right — and it notes that we also produce a different component for the Passport 20 program, though that goes through GE Aviation. The picture displayed is a 747-8 engine nacelle. This image is a favorite of mine since it demonstrates just how large these structures are. You're able to spot the individual in the background. These are extremely, extremely large structures built from our materials, so it's an excellent program for Park to be involved in, given the substantial amount of nacelle structure content tied to Park. Moving to Slide 10. Now for an update regarding GE Aviation jet engine programs. We've provided this during the past couple of quarters, so here's another one. To start, regarding the A320neo aircraft family and those LEAP-1A engines, what has Airbus stated? Until recently, their position was that they'd build 40 airplanes per month, and interestingly, plenty of analysts wondered whether they could actually keep that up. It nearly felt as though everyone was arriving at the realization that numerous analysts doubted Airbus's ability to maintain 40 per month, with considerable pessimistic coverage surrounding commercial aircraft broadly and the A320 program's situation as well. Then Airbus essentially responded, yes, I suppose you're correct — we won't keep 40 per month, we're moving to 47. I can't tell if you were answering the analysts' view on Airbus, though I did observe that they shift to 47 at some point this year and lift their monthly aircraft build rate to 47. Maybe more important, though, is that Park just got a forecast from our customer MRAS that shows a big jump in units for calendar year 2021. Now let's look at the Global 7500 with the Passport 20 engine. It's the same story — we just received a customer forecast indicating a sizable unit increase for calendar year 2021. That's also the following program where our lightning strike materials have qualified. As for the Comac ARJ21, that's the regional jet being manufactured in China. Park recently obtained a forecast from the customer pointing to a substantial unit increase during calendar year 2021. You can see the pattern forming here — next is the A321, pictured, the 321, a tremendous seller and a very successful aircraft, or planned, for Airbus. Moving to Slide 11, where we continue looking at the various programs: the Comac 919, powered by LEAP-1C Engines. Comac has stated that the aircraft will be certified and deliveries will begin before the close of 2021, and our lightning strike materials are already in use on that program. What this tells you is that it's an NPI — a new product introduction. So they are already building some units, attempting to get ahead on production ahead of any certification of the airplane, and also to work through the certification programs. The 747-8. Yes, to me it's a special airplane. But Boeing has announced that production of the Queen of the Skies will end next year, though there's no change to rates before then; so the rates are not coming down. Boeing is saying they can keep building this airplane until the program ends. That is to say, the rate holds until the program ends. I guess you could call me a dreamer, and perhaps this won't happen, but I'm still holding onto some hope that somebody might come forward with an order — perhaps one or more fairly large freight carriers, like UPS buying more units before we stop production, though that's likely a long shot — that's our thinking. Moving to Slide 12. So what got us to this point with GE Aviation and GE Aviation Jet Engine Programs? Obviously, the commercial aircraft sector took a serious hit in the first part of calendar 2020 — everyone's aware of that — because of the pandemic along with the worldwide economic crisis. Just about every piece of news about commercial aviation was bad, really bad. In my view, that's basically a case of following the crowd — little real belief behind it, and maybe not a lot of nerve either. A couple or three of those analysts covering the industry start turning extremely bearish, and then everyone piles in behind them. Sure, okay. For me, that's usually a clue to go examine what's happening on the flip side. When you get that kind of surrender. Everybody's throwing in the towel now, the mood is so dark, or perhaps something is being overlooked by somebody. So moving on to the next point, but we didn't — we weren't fully convinced by all of that gloomy reporting. Still, as far as Park is concerned, it hardly makes a difference, since here at Park we adapt as we go and just keep pushing ahead. Honestly, that's the only thing we know how to do. There's a line attributed to Winston Churchill about how, if you find yourself in hell, the thing to do is push onward. We aren't analysts — that's not our role — so we simply stay focused and press ahead, tweaking things whenever tweaks are called for. Even so, we never turned our back on commercial airplanes, on commercial aircraft. That was something we simply rejected; we rejected much of what industry analysts were putting out there. Alright. Let's continue. Park put things in place; we covered this on the first slide. We reached an understanding with MRAS Park that keeps a floor in place for monthly production at a critical-mass minimum, which protects Park's capacity to increase output whenever necessary — something that matters enormously to both Park and MRAS. The timing of this probably landed around June — actually, let me correct that, July — we were doing a lot in June, but I'd say July was likely the first month we began falling in line, or purchasing under this kind of setup. The figure comes out to roughly $700,000 to $900,000 each month, depending on — as I mentioned, the whole thing really is — the minimum, and the whole thing is tied to units. The unit count and dollar figures will shift depending on what's in the mix. Still, my understanding is that the deal we signed was in the range of $700,000 to $900,000 each month, and it stayed in force through December, which was the previous month. Moving along, let's turn to Slide 13. How did we arrive at this point, continued? I apologize, but to give you the right context, we need to go back over this — we discussed it at length on our Q1 and Q2 investor calls. The key issue is a major gap and lack of alignment between the minimum monthly baseline production volumes we agreed to — the ones we just mentioned — and what the end market currently demands for the GE programs we're involved with at Park, specifically those particular programs. Again, there's plenty of news out there about the MAX and other things I can't speak to, but our attention is on the programs we actually participate in. So — let's walk through a few of my figures.

Brian Shore

executive
#5

Once more, it's somewhat painful to revisit all this material. But for context, I believe it matters. During fiscal '20, our GE programs brought in $28.9 million — roughly $29 million — in revenue, so if you do a quick back-of-the-envelope calculation, that works out to around $7 million each quarter. As we mentioned, I believe, during the prior quarter, we believed the programs we were involved with had likely declined somewhere between 25% and 30%, judging by what end market usage was telling us. The programs themselves — the aircraft programs themselves. So we figured, fine, if we start with that $7 million figure and cut it by 25% or 30%, we land at roughly $5 million per quarter; yet we're running at under half of that. Check our past two quarters — under half of that, again based on that floor amount. So what's really happening here is, obviously, inventory destocking. And we sensed something wasn't right, the numbers weren't reconciling, it made no sense. We said, again, looking back, that we think a lot of companies across the aerospace supply chain had become demoralized and focused on survival, or weren't paying attention to the need to ramp up production while destocking was occurring — we're quite worried about that, and still are. We also stated on those calls that we think the aerospace supply chain might be pushing inventories down to perilously low levels. That troubles us greatly, since the supply chain is playing defense and operating in survival mode, not considering the future, not considering, hold on, something here doesn't add up. Eventually we'll need to ramp up — that wasn't really entering the thinking, in my view, among certain supply chain participants; so as we said last time, a sudden and sharp ramp-up by the supply chain might become necessary once inventory destocking finishes. Is this a ticking time bomb? Possibly, but one thing is certain: if you run the numbers, inventory cannot rise below 0. There's a hard ceiling on how far inventory can be cut. How much destocking can happen, correct? It can't go below zero. So let's continue — apologies, 14. Alright, so how did we arrive here? And now the potential need for a steep and abrupt ramp up gets compounded, because of that mismatch the forecasted units for calendar year '21 across all GE Aviation programs have risen, in certain cases dramatically, apart from 747, which stayed flat. We just walked through the program by program discussion. We said everything has increased significantly, except for 747; so we have the stocking mandate. We have inventory sitting low, and then the programs rise. You can see the dynamic at work. So now what? What comes next is likely a problem the industry faces — at least our slice of the industry. This is the Global 7500 we've been discussing, with the Passport 20 engines. Slide 15. So the ramp-up is here, or at least that's what we believe. In most of the supply chain tied to Parks and GE Aviation programs, destocking is finished — inventories were taken too low in certain cases, in our view. We'll get into this more later, but the reason I say "in most cases" is that we also work with some subcontractors on these GE Aviation programs. Roughly 20% of our revenues go to subcontractors; they're carrying a bit — sorry, a bit of excess inventory, maybe around $1 million. But the main supply line to MRAS, no. We actually think it's low. So as explained, just a little review here: rates are being pushed up, and the ramp looks pretty steep. Just for perspective, GE program sales for the following periods work — now, before we get into the numbers, I want to point out that we're talking about calendar years here. And I apologize for having to confuse things. Normally we talk fiscal years; but for this purpose, we did talk calendar year because we have a forecast from GE Aviation — sorry, from MRAS. For calendar year '21, we don't have a forecast for next fiscal year. So we have to do the calendar year comparisons. This is just for perspective anyway: calendar year '19, $29.3 million GE Aviation sales; calendar year '20, last year, last calendar year, $15.8 million; but importantly, calendar year '20, the last six months, $5 million. That's during that period. We're running minimum production from July to December, I guess. Obviously, we can do that math — six months, $5 million, that's a $10 million run rate. Right, $10 million, and that adds approximately $800,000 per month baseline minimum. $10 million, so we've got $29 million, $10 million in the last six months. Let's keep going; now we get to the forecast. The calendar year — sorry, '21 forecast for GE Aviation program sales, based on the forecasted rates we recently received from the customer, MRAS, approximately $24 million — $10 million, $24 million. Get the numbers. I see what I'm talking about in terms of this steep ramp-up; this is basically not — this isn't six months from now, nine months from now, $24 million. What does this mean? Okay? So let me explain what we're talking about. What we received from our big customer is a forecast by unit and by unit number. So this money for this program this month, that month, they don't give us — not dollars, it's, okay, this month, we're going to build eight of these units. We're going to build nine of those units. We're going to build 20 of those units, month-to-month for 12 months; so it's a pretty detailed forecast. For us, it's very easy to convert that to dollars, since we know very well how much material goes into each unit; and we know what the peril saw for is — it's very easy to convert that to dollars. So we’re saying it’s roughly $24 million, and while we do have a more exact figure available, the number we’re working with is around $24 million—that’s the basis for how we’re treating it. What this does not mean is that it’s a Park forecast. That’s something we aren’t ready to provide yet. We aren’t at that point just yet. What we’re doing is giving you information so that you can get a sense of the ramp we’re describing, but at this time we aren’t giving you a Park forecast. And over the next couple of pages, we’ll walk through that—there are still certain items we’re uncertain about. We lack sufficient confidence to give you a forecast for the next year, so that’s not something we’re doing right now. So let’s continue. Let’s move to Slide 16. So what are the risks and factors that could potentially affect that $24 million forecast? Inventory subcontractors—we discussed that—it’s probably around $1 million; and that would likely be absorbed and normalized by, let’s say, the April time frame, the May time frame, and certainly by the close of our first fiscal quarter. This ought to be something in the rearview window. This is a subcontractor. There’s no excess inventory, as we see it, in our direct to MRAS.

Brian Shore

executive
#6

Turning to the possibility of stockpiling tied to rent right now: within the chain that feeds MRAS directly, there's hardly any inventory at all. In our judgment, it's probably far below what's needed — sized for a $10 million business, not a $24 million one. So a buildup of that inventory could very well happen. For us, that cuts the other way. Obviously, if inventories expand, revenue goes up, at least while that buildup is underway. Will it actually happen? We can't say. I'm just putting these points in front of you to weigh. Now for some negatives: one risk is that the worldwide economic rebound could lose momentum. Naturally, that would have consequences for the commercial aerospace sector. Should the worldwide economic rebound persist, flying demand will follow. And of course, dangers tied to the pandemic, uncertainties around vaccines, plus political complications and hazards are present — the current climate is highly fluid and intricate, and we aren't offering commentary on it. Political analysis isn't our role; we'll simply point out that considerable unpredictability exists, which generates exposure. That's the only thing we're highlighting. We aren't taking a stance either way. We're merely identifying those as hazards. There are risks around geopolitics and global commerce—fairly unpredictable matters—and not only involving China but also Europe. So, you can never really be sure about all of it. Still, I want to point out that these are consistently sources of concern and problems given the kind of operations we run. In nearly every instance—aside from, as I mentioned, perhaps the 747 being somewhat of an outlier—our business likely depends heavily on cross-border trade. Also, U.S. export restrictions aimed at China could potentially impact the Comac ARJ21 and 919; that possibility genuinely exists. These might influence what we're projecting. It's something that happened recently—I believe there was some development last month, in December—but nothing has been finalized, and we're simply bringing it to your attention. However, if the U.S. Strict, severe export restrictions were put in place, and those really might have an impact on the ARJ21 as well as the Comac 919, along with their utilization of engines manufactured in the West. Let's proceed to item 17 then. My apologies for how long this is taking; I'm attempting to move through it as fast as I can. So the ramp-up is right in front of us, picking up from where we just left off. Okay, what we have here are simply additional elements — further risk considerations, potential delays or problems tied to particular initiatives that Park is involved with. It's possible the OEMs will delay what they've projected. Alternatively, the OEMs or the buyers might raise their projections. I'm not simply making things up randomly here. There's discussion about possibly expanding this particular program, or that one. There isn't anything we're ready to discuss, though people are talking about it from both angles. One possibility involves supply chains tied to GE Aviation programs, and Park—Park is having a hard time increasing output. That's a genuine worry, and it's possible that MRAS and its suppliers can't boost production fast enough. So we're really looking at two categories of issues. The first covers suppliers that ship straight to MRAS. Beyond that, there are suppliers spread across the whole aerospace supply chain. So for a reason—and let's assume nothing involving MRAS or Park—specific parts that GE Aviation buys, or that Airbus buys, could end up affecting the whole program. That's simply a thing to watch for whenever programs get sped up really fast, really forcefully, with an extremely sharp increase, and maybe a supply chain that isn't as committed to scaling production as it ought to be—following the crowd. The result is that sometimes you wind up with a bandwagon effect where everyone feels pessimistic, and other times everyone feels optimistic. Right now it looks like things are turning optimistic; from where we sit, that means we have to stay vigilant and keep watching, rather than being carried along by the crowd. All right. This is the ARJ, the regional jet built in China. Let's go to Slide 18. All right. In what way will Park react to the ramp-ups, these significant ramp-ups? The key factor here is our workforce, and that's where we currently have a gap. At present, we have 107 employees. To manage the ramp-up, we're planning to add about 15 to 20 individuals. Since we haven't let anyone go, every single new person we bring in requires training. We've been bringing people back. So it takes time, and we want to get it right. We've stated that we didn't lay anyone off—doing so runs completely counter to our values. It genuinely goes against everything we believe in. Of course, whenever I say that, I feel compelled to add that we aren't gods, so we can't guarantee a layoff will never happen. Still, it's something we oppose very, very, very strongly. We just don't hold with that idea. And what's the reason behind that? The reason is that we want our team members to genuinely sense and trust there's a long-term future here with us. Yet if you tell folks they can go anywhere and do anything, and then you cut a large number of staff, people start wondering what happens to that future. That matters greatly to Park, it matters greatly to our employees, and in my view it's also simply smart business. So at Park, we never bring on new hires lightly. When we consider someone, we think: we're bringing this individual on for the long haul. That means we have to be cautious—we won't just casually bring aboard twenty people in some reckless rush and then ask whether it's working out, only to let ten of them go. That's simply not something we'll do. So we've got to think hard about the pace at which we add staff. Bringing on too many and then having to cut them loose isn't what we want. You hear about—you notice businesses bringing in a thousand workers, then turning around and letting a thousand go. That approach doesn't fit who we are. It really doesn't. And it shouldn't—these are real human beings. They're the folks who genuinely move the needle for an organization; when you've got a workforce that's fully committed, you've got an organization with serious strength. When workers are merely showing up to get through the day, I'm not sure. Regardless, that's not the path we're taking. Getting the timing right matters a great deal. To put it another way, our approach isn't simply to bring on board 15 or 20 individuals right away; that process is already underway, and we are adding some staff. This has to be handled with a great deal of intelligence. We must stay attentive as we proceed — that matters greatly. Were we to take on 20 people at this moment, it would be pure chaos; as we can see, all those individuals need training, and that alone would generate chaos, as I mentioned, so being extremely flexible and agile is essential. Here at Park, we tweak things on the fly while continuing to push onward. We aren't halting here, group. So stopping is not what we'll do. Okay, let's spend a month or two sorting this out — no, we promptly devise a plan, then proceed with that plan, and we tweak things on the fly, since regardless of our planning, the circumstances will shift to some extent. Therefore, being very agile, paying close attention, and tweaking things on the fly is necessary; that's the Park way of operating. Regarding Park's customer flexibility program, which I brought up earlier, our Asia hole — our present level of participation stands at 83%. This represents something truly great for Park. Having this program is simply wonderful. It's a cross-training program.

Brian Shore

executive
#7

Nearly everyone has a hand in this. It provides tremendous adaptability and greatly improves our capacity to react quickly and scale up. Take a 300-person crew—suppose it's four individuals plus 300 crew—that's an extremely intricate operation to manage. We bring in people and simply say, alright, here's one week of training, best of luck. No, that's not how it works. It takes three months, and after that the newcomers must be folded into a crew that already has experience. You can't simply grab four fresh hires, put someone we want as a treater, and expect it to work even after three months. So what's fantastic for us is the customer flexibility program. We did scale up—say one department, while another department isn't as busy. Those workers are cross-trained. They can begin today in that department. Zero training needed. They're already certified. They do get certified. In fact, folks receive a slight bump in wages. There's a modest pay premium once they're certified for an additional job function. But they must train. They must pass a test. So these individuals are set to go. It's an excellent program at Park—extremely flexible, extremely nimble. And in the end, our outstanding personnel are our races overall. That's—we're incredibly, incredibly lucky, truly unique, truly honored to have such wonderful people, such committed people. It really sets Park apart from what some other companies might be capable of. Let's turn to Slide 19, which covers our financial forecast. Starting with GE Aviation — to sum up, the opening three quarters clearly show where things stand. For Q4, our projection is between $3.9 million and $4.4 million. The $3.9 million figure reflects what's already booked, so that's our starting point, and while there's uncertainty, we expect it to come in somewhat higher. That's why we're talking about a range of $3.9 million to $4.4 million. Looking back at the two preceding quarters, Q2 and Q3, we were genuinely running at a pace of $800,000 to $900,000 each month. Remember that the third quarter only includes two months of production. What's interesting is that back on our Q2 call, we projected about $1.5 million for Q3, but the actual figure came in at $1.8 million. It's simply that—it's—we're not getting any recognition for that, just because of how events played out. On that same Q2 call, we expected somewhere around $2.3 million to $2.4 million for Q4, and now we're much higher, with what's left sitting at $3.9 million or $4.4 million. Even so, that's still short of the $24 million figure—$24 million—let's do the math, that works out to about $6 million a quarter, right, dividing by $4 million. We're a long way from that $6 million. So bear in mind, our forecast is broken down by month. It's not just for the full year. So there's some ramp-up that's involved. Yet based on the projection we've been given, we're going to reach that mark — that $24 million mark — which works out to, what, $2 million per month, correct, come April. Whether that materializes, we'll have to wait and see. All the risk factors were laid out for you. I can't say with confidence that it will. On top of that, there's the inventory held by subcontractors. Keep that in mind as well; though once more, that ought to be largely back to normal by the close of the first quarter — the first fiscal quarter; so let's continue. Let's discuss before — the projection for the entire company. You've already gone through the background we're laying out here. For Q4, we're projecting between $14 million and $14.5 million in sales, along with EBITDA of $2.3 million to $2.8 million. So again, we should stop and spell things out, because there are particular factors that will impact both Q4 sales and EBITDA. First off, you can see that revenue tied to the GE program has climbed a lot compared with prior quarters, and we already walked through those details; still, keep in mind we mean the critical part we sold to defense contractors for missile programs in Q3, and I think we said it was about three points — sorry, about $2 million in Q3, then roughly $3.5 million in Q4; that lifts the top line, remember, while carrying a fairly thin margin on those sales; we buy the item from an overseas supplier and then sell that component to the contractor in a small market. The real profitability shows up only after we get to the point of actually making those materials. That's the key thing to understand. If you just glance at the figures, you might say, wow, compared with Q1, say, the revenue is way higher, yet the profit at the bottom isn't proportionally larger. That's exactly why I need to walk everyone through the specifics. Turning to Slide '20 now. Park's financial forecast estimates continued; as you're aware, we did give a longer-range outlook, if you recall, on our Q4 conference call — the investor call — last year, on May 14. As for when we can put that out again, I can't say for certain. When we report our fourth-quarter results, we might be in a position to hand you guidance covering the upcoming fiscal year, fiscal '22. Whether we'll feel confident enough to offer something like a three- or four-year outlook — or perhaps just the single year — I'm not sure yet; we'll find out. I won't make any commitment on that, though it's our hope that we can get there. Regarding that long-term outlook of ours, our view is that the underlying fundamentals remain intact. The only difference is that everything has shifted later. So you'll go back to that projection and wonder: at what point do we get back to those numbers? I'm uncertain about the extent of the delay to the right. However, another point I'd like to bring up is that the single positive development is that instead of merely returning to the projection, we now place greater focus on military. So, if you examine, say, the pie chart in the lower right, purely as a point of reference, the commercial aircraft segment—that will expand as the commercial aircraft programs increase, as we talked about, that will grow. That isn't truly something we're propelling; that's something the end market is propelling. We're simply fortunate to be involved in the correct programs. Perhaps some—slightly more than fortune, yet much of it is fortune, we're involved in the correct programs; but regarding the military portion, that's something we are propelling. Therefore, we plan to continue driving that upward, continue driving it upward, driving it upward; we aren't seeking the huge grand slam with military, seeking instead more specialized programs. So it's numerous programs, not a couple, plenty of programs, they'll drive that figure upward, but we feel extremely positive about that. So, I believe that addresses the long-term projection. Let's move on to Slide 21, just a brief update on—apologies that we're taking so long on our expansion. Overall budget $18 million, expenditure as at the close of Q3, $12 million, roughly $6 million remaining.

Brian Shore

executive
#8

We anticipate wrapping this up in the opening six months of this calendar year. You can look at those updated images. When we initially presented a photo showing the facility's interior, that was actually the zero-degree freezer. I believe the technical name for it is enormous. It's quite large. Slide 22. All right, moving to a different subject. We brought this up a while back. From a balance sheet standpoint, cash perspective, and acquisition perspective — cash dividends. We've issued a cash dividend across 36 straight years without interruption. Those were skipped a dividend, they reduced the dividend. Starting in fiscal 2005, we've distributed $542 million in cash dividends — $542 million — amounting to $26.45 per share; and my view, I suppose, is that represents quite a bit of money for a company of Park's small size. So let's move to the following item. Keep in mind, we've done this cash reconciliation previously. So we're stating, all right, we begin with $117 million in our cash and marketable securities going into Q3; but then we deduct $16 million, which — apologies, that's the leftover transition tax installment payments. That connects to bringing foreign cash back; it gets paid across five years. We are the final — it's an obligation to the IRS, we're saying, all right, that money is already committed: $6 million left on the Kansas expansion; so we subtract both those figures, and that brings you to $95 million. Naturally, this is merely a sort of conceptual exercise; it's the way we view things internally. So we're passing it along to you. Naturally, numerous factors move cash daily in both directions. So we aren't providing any cash flow forecast or similar guidance. We're stating, here's how we assess our cash position. Park additionally carries long-term debt. So what about M&A? What about acquisitions? Where do we stand? So the big chances to purchase businesses at distressed valuations didn't truly appear in calendar 2020, in our view. We'd said we thought it might — here's what occurred. So based on what we're told, we believe the Fed is central to this. So why is that the case? Businesses that were distressed managed to survive. They didn't — they weren't compelled to sell. They could survive since they could obtain money so inexpensively, surviving until conditions improved; so if they chose to sell, they could get a higher price. A quite small number of businesses came through banker led or managed processes — in fact, none that I can recall over the past year that we were engaged with. What's the possible outlook? Apologies, what possible acquisitions did we examine during the last calendar year? We actually examined several, and with some we got quite serious—we performed due diligence. They didn't only arrive via banker-led processes or from all sorts of niche companies; a few were fairly small and reached out to us through industry connections, or in one instance a customer contacted us and pointed us toward a business we might want to evaluate. Still, none of them suited us. Nothing worked out. And as I mentioned, we conducted due diligence, even extensive due diligence in a single instance. Yet ultimately, we concluded it simply wasn't right for us; it didn't work out, so we moved on. What about the 2021 outlook? Bankers claim activity will be far greater than in 2020, though valuations will rise. So I'll have to wait and see what unfolds. Let's proceed to our final Slide 24, Park's reflections on a troubled world. The world has suffered grave harm and occupies a troubled place right now. Here at Park, we too have endured our portion of devastating loss. Yet at Park, we never quit, we never surrender, we never ease up. We keep grinding and pushing ahead; that's truly the only thing we understand how to do. Park is an odd and uncommon company, full of truly wonderful and exceptional individuals. And we differ from the rest. We aren't messing about here; at Park we aren't merely trying to scrape by, we play for keeps. And the final item I'll briefly mention is this is our shipping and receiving crew, I believe, from roughly the last quarter, when we highlighted one of our stronger crews. From left to right, there's Lucas, Jon Moon, Ramundo, Ms. Mile—Jon Moon serves as a supervisor—a genuinely excellent crew; and what I can say regarding them is that we're fortunate to have them. If anything requires shipping, it will be shipped. So, given how late we're running, I think what we'll do is send the remaining remarks and move to questions. So operator, thank you, everyone, for staying with us. To whatever extent you have, operator, we're prepared to take questions now.

Brad Hathaway

analyst
#9

I want to ask briefly about M&A. If you don't mind, I'd appreciate a bit more detail on why certain deals were turned down over the past year. What made them unsuitable for Park, and could you walk us through how you assess opportunities and conclude they don't work?

Brian Shore

executive
#10

Sure, let me discuss a pair of them, since the causes differed. The first initially appeared quite appealing because it occupied a very specialized niche. Digging deeper, though, we saw that the market was extremely closed, leaving almost no room for expansion. It clearly called for investment—perhaps not just timely, and maybe that was partly priced in, which didn't bother us; we were glad to commit funds and invest. What truly stalled us was the potential upside. We simply couldn't find it. That market was quite closed. The second, a smaller bid, was an intriguing company, yet we worried that customer concentration was extremely high. On top of that, the owner's expectations struck us as rather steep, and that's the owner's prerogative—they may set whatever valuation they wish—but it produced a significant mismatch, which is why talks stopped. Neither was an auction or part of a process; both were one-on-one discussions. A few other targets are still under review, but these serve as illustrations. In each instance, the decision to walk away stemmed from different causes.

Brad Hathaway

analyst
#11

Got it. That's helpful. So you brought up what lies ahead in calendar '21, and there's a hint that additional companies will be available, yet at the same time, valuation expectations are going to rise. Given those two factors together, does that leave you feeling more hopeful or less hopeful about securing a possible deal in 2021?

Brian Shore

executive
#12

Yeah. That's a really good question, since I'd say it's both yes and no; clearly we're hopeful, because greater activity is a positive development. The cautious valuations and we discussed that herd mentality. Well, if everyone is jumping in with a sort of outlook that things will go extremely well down the road, not only in aerospace, say, but the broader economy, then perhaps a bit of that irrational exuberance starts to work its way into how people think. We definitely believed we witnessed that previously, or pricing that truly didn't add up for us. So time will tell. Our plan is to stay active. The cash is there. Our plan is to stay active. However, for Park, we always aim to keep our head on straight and avoid getting swept up in the mob mentality or herd mentality, where everyone else is doing it; so, we don't perceive the value, yet everyone else apparently does. So, we ought to get on board. We have to be overlooking something. We're quite hesitant to embrace that way of thinking.

Brian Glenn

analyst
#13

Hey Brian, once again I really appreciate how clear your walk-through always is, and happy New Year.

Brian Shore

executive
#14

Happy New Year to you too, Brian.

Brian Glenn

analyst
#15

You brought up making adjustments in real time earlier in the presentation. I'd just like to hear if you could spare a minute, two, or three to discuss company culture as a competitive edge. Specifically, two items came to mind as I thought about it — some of the niche programs you folks concentrate on. My understanding is they see volume swings from one month to the next or one quarter to the next? Then the other item is what you're doing at present and have done across the last few years, which is securing a place or squeezing into some of those programs that are still being developed? And I realize the aerospace sector may be — I'm not sure what's typical, six to eight weeks for prototype turnarounds. I realize that's an oversimplification. And perhaps it ties back to your electronics background, but from what I gather, you simply operate at a different tempo when it comes to handling those kinds of things and delivering them back to a customer, be it a commercialized product or development work?

Brian Shore

executive
#16

That's quite a question, our culture. Yes, well, I suppose there's plenty we could say regarding culture; we're a small company. Bureaucracy isn't part of who we are. Our people carry a great deal of passion, a great deal of dedication, commitment, and we act fast. We steer clear of politics. Taking sides isn't something we do—otherwise you'd see factions forming within the organization. Really, we operate as one unified team: everyone here is chasing the same objective, which is making things better for Park. That gives us a real ability to move quickly. Alignment happens, people lock in, and they're off working on different fronts in no time. If a change is needed, no problem—we go that route. So I'd call it a genuine strength, this adaptability and speed that comes from who we are. And we can keep pushing hard, too. On those six to eight weeks for aerospace qualification cycles — honestly, I'm not sure that's right. It might take much longer than that. It varies, though: some take significantly more time, and others can go faster depending on what's involved. Take allocation 10, for instance — it's a small program, sure, but that's beside the point. We're happy to have it. You hear competitors saying they're not interested because it's too hard, too tiny, or too much hassle. Our attitude is: sign us up, we're in. It's striking to me how some of the bigger companies we compete with will just abandon a program. They stick with it for a while, then decide they no longer want to back it. How can you say you're no longer willing to back it? When we commit to a program or a customer, it's much like bringing on an employee — we don't assume the worst; it's a lifelong commitment; we never turn our backs on customers. Abandoning programs isn't something we do; it's simply not in our nature. There have been situations where perhaps a component of ours. Because we can't get more supply, the only paths forward are qualifying something else or sourcing an alternative part. Even then, we don't just drop programs and announce we're done with them — as though we had bigger priorities to deal with. That isn’t the case for us; our goal is for each customer to believe they matter more than any other.

Brian Shore

executive
#17

Appreciate it, operator, and thanks to each of you for staying with us. I believe we ran past 60 minutes there. That likely sets a record. So we appreciate your patience. Wishing a Happy New Year to everyone, and feel free to ring us whenever you'd like — we're always glad to speak with our investors. Thanks, and enjoy the rest of your day. Goodbye.

Operator

operator
#18

That wraps up the conference call for today, everyone. We appreciate you joining us. You're free to hang up now. Have a wonderful day, all.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.