Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary

May 13, 2021

New York Stock Exchange US Industrials Aerospace and Defense earnings 62 min

Earnings Call Speaker Segments

Brian Shore

executive
#1

Thanks a lot, operator. Everyone, welcome to Park’s call for the fourth quarter. Joining me, like always, is our CFO, Matt Farabaugh; earlier this morning we put out — published our earnings release. So if you haven’t taken a look at it, you’ll want to. Inside the earnings release, you’ll find directions on, I suppose, how to get into the presentation; we’re just about to walk through our presentation. It’s also available on our website, but you truly want that presentation in front of you so this call makes more sense. If you don’t have the presentation with you, it could get a bit confusing; beyond that, supplemental financial information is included as Appendix-1 with the presentation. Matt used to read it aloud for us, but since these presentations now run so long, we’ve stopped doing that, though please access it whenever you like, and ask whatever questions you have about it. As you know, we bring this up from time to time, in fact on nearly every call, that covering all of it isn’t possible. These presentations are already feeling lengthy. We have to sort of pick what we believe will interest you and help you understand our company. We do our best with that, and perhaps on the next call we’ll cover something different. The call could run 45 minutes. So as you can see, we really can’t — covering everything isn’t possible. We're aiming to keep this to 45 minutes. That 45 minutes applies to the presentation portion, after which you can take as long as you want for Q&A. When the presentation wraps up, I'll turn things back over to you, and you're free to ask anything at all — about the presentation or about Park more broadly, even topics we didn't cover. All right, let's get started. Moving to Slide 2, you'll find our forward-looking disclaimer language there. If anything about it is unclear, please reach out. On Slide 3 — we'll actually spend a bit more time on Slide 3 and Slide 2. There's a great deal going on with Slide 3; it's quite busy. Let's start by examining the revenue figures across the four quarters of fiscal 2021 — Q1, Q2, Q3, and Q4. The trend is obvious: commercial aerospace fell sharply, and as we mentioned, there was a destocking effect at one point that partially reversed in Q4. But before we go further, I want to circle back to a point we raised last quarter, or possibly the one before that — it concerns a critical part used in rockets and missile systems, namely our ablative product line. As you'll recall, this key component is procured from abroad, and we maintain a partnership with that supplier. Okay, so this is a real worry for the OEMs — these missile programs are absolutely essential. They approached us with a request: buy the component ourselves, then turn around and sell it to them, just so they'd know they had a guaranteed stock of it. Without that part, there's no way to build the product. And that's exactly what we do. We buy the component and we sell it — well, "back" isn't the right word — we sell it to the OEM, to the customer. They never had title to it to begin with; it's their product, and presumably they're free to do whatever they want with it. But the expectation is that this component ends up in the ablative materials — the composite ablative materials — for those rocket and missile programs. This matters for two reasons. It hits our top line, and it hits our bottom line too. Our markup on it is small. That means the margins are pretty thin. And the material content on these sales runs quite high. So I simply wanted you to be aware — to remind you of this as background: during Q2, pardon me, during Q3, those component sales totaled roughly $2 million, and during Q4, sales came to $3.5 million, which we had predicted. I believe that was on our Q3 call, so this shouldn't catch you off guard, but I want to bring it up again since it does have some effect on the figures. Let's turn to the fourth quarter we just reported — fiscal 2021 Q4 — with sales of $14.441 million. You can see those numbers rising, though within that total, $3.5 million came from selling that critical component at low margins. Gross profit reached $4.326 million. Gross margin stood at 30%, which is the level we prefer. We don't like it — well, let me put that another way — when it falls below 30%, we're unhappy; in fact, this surprised us, since that critical component, that essential component, carries fairly low margins, so we were surprised gross margins came in at exactly 30%; that isn't a number we engineered, that's not how we operate. It's just the arithmetic. It came in at 3.0%, and adjusted EBITDA was $3.257 million; so that caught us a little off guard. Before we dig further into discussing the numbers, let me remind you of our forecasting philosophy. When we hand you a forecast, we're telling you what we believe will occur, based on working extremely hard and doing everything required to make it occur, but we're telling you what we believe will occur; we don't hand you a sandbagged number so we can beat it. We consider that sort of silly; we're aware many other companies do it, the biggest ones are all the same; we think it's kind of — I don't know, a waste of your time to do that. If we tell you something, we're telling you what we believe will occur. We might be mistaken, but we're telling you what we believe will occur. So, all right. Okay, so keeping that in mind, let's go over what actually took place during Q4. During our Q3 conference call, what did we tell you about Q4? Our stated sales projection ranged from $14 million to $14.5 million. As it turned out, we landed inside that band — okay, perhaps slightly toward the upper end, but still inside it, no issue. We also told you adjusted EBITDA would be somewhere between $2.3 million and $2.8 million. As it turned out, we posted $3.257 million, so considerably beyond the ceiling of that guidance. That isn't the outcome we had anticipated. What occurred was that our Q4 estimate failed to properly account for the margins on ablative products. No, I'm not referring to the essential component. I mean sales of ablative materials tied to rocket and missile programs. The margin there is very good, and we simply didn't fully account for those margins. That falls on us. This wasn't some deliberate move on our part to hand you a low figure; we could be zero. We don't — like I said, that's simply not how we operate, not the way we do things. Let me think, is there anything else worth addressing on the numbers? No, I don't believe there is.

Brian Shore

executive
#2

However, there's one more significant thing we need to address on this page—if you scroll down, you'll find special items. At the bottom, it mentions "before special items." So, in Q4 there was a substantial special item: $1.570 million, and that was tied to what we refer to as a pioneer plant—a facility in Singapore that we launched in 2008; it's a composite material plant. This happened right as we were entering aerospace. The idea was for this plant to serve as our Asian aerospace composite materials facility, yet it belonged to our Singapore company, our Singapore entity, our Singapore operation. Within electronics, our Singapore facility was the biggest one we had, so it was part of that. It wasn't a standalone entity, and crucially, it was supposed to be run and managed by our Singapore team, which at the time was the Electronics Group. I wouldn't call it particularly successful when it came to marketing; we never achieved much—we didn't generate much in sales, but regardless, for whatever reason—I wouldn't say it was a great success, right—but then, as you're aware, we sold off our electronics business entirely, AGC, in December of 2018, and that naturally included the Singapore operation, the Singapore entity. Now, this pioneer plant, as I mentioned, wasn't a standalone entity; it was part of the Singapore entity, but we carved it out and placed it into another entity owned by Park. Why did we do that? Because AGC didn't want to purchase the Pioneer plant—they had no interest in it. So we decided, fine, we'll retain it, and we have retained it; we had it mothballed nearly immediately, I believe almost right away when we completed the sale in 2018, since we lacked—without AGC, we didn't have our Singapore personnel, we no longer had the capability to run this plant, so we mothballed it; we didn't write it off immediately because we held some hope that we could—we might be able to utilize it at some point, and why is that? Keep in mind we've been discussing working on an Asian JV for some time. I don't think we brought it up every quarter. We've been talking about it for quite a while, and in fact we're still in talks with a large Asian aerospace company regarding forming a JV in Asia, and our thinking is that perhaps this plant could be utilized in that JV. These discussions are high level, at the executive level of this company. I would describe them as serious, but they're also still preliminary, and COVID hasn't helped us because we truly need to meet in person. We've done a ton of calls, sent messages back and forth, gone through questions and answers, but from my perspective, for this conversation to advance to the next stage, we have to meet in person — specifically, their team needs to visit Kansas and spend a couple of days alongside us, and given COVID travel restrictions, that simply hasn't been feasible and we haven't been able to make it happen. So this really threw the whole effort off track; discussions are still ongoing. I don't want to — I won't sit here and claim — I'm not saying it's dead in the water by any means. Talks remain active, probably on a weekly cadence with emails or calls, that sort of thing, but my sense is that without the ability to meet face to face, it won't reach that next stage. So why did we choose to write off at this point? Because this has been dragging on for quite a while, and even if a JV happens, it's uncertain whether we'd utilize this facility within it. Therefore, we made the call to writedown the assets now, and I believe that's the correct call. I think it was prudent, thoughtful, and the right thing to do. In case you're curious, the impact isn't huge — if you're wondering why, the pre-tax benefit from writing off the facilities now comes to $200,000 per year on the positive side, and the EBITDA benefit is roughly $80,000 since a portion of those costs is depreciation; so I just wanted you to be aware of that, because I believe the news release makes some mention of this write-down, but I wanted to give you the context. It simply wasn't — I mean, once we sold Electronics to AGC, we lacked any ability to keep running this plant, we just didn't have — there was simply no path for us to operate it. So perhaps the outcome was unavoidable, but we made the decision, and I think it was correct, with the right timing. Let's turn to Slide 4. A bit more background here regarding our 2021 results. You can observe the top-line showing nice growth across 2017, 2018, 2019, 2020 and whoops, 2021. Naturally, this is no surprise to anyone — it reflects the commercial aircraft industry downturn along with that destocking we occasionally mention. Alright, let's proceed to Slide 5, covering our Top 5 customers — this is something we include, I believe, in every presentation, actually. It's almost enjoyable at times, and we've got a small image for each customer. AAE Aerospace — that's the MK125 image in the lower left — and we provide material for this program, or rather structural components. This isn't the rocket; it's the structural components of the warhead. Now, let's take a look at CPI Radant — that's MK1 up in the upper right — along with the Navy Multiband Terminal, and we provide radome materials for that program. Then there's Kratos, which comes up fairly often in our discussions; that's the Valkyrie you see in the lower center. As I believe we've mentioned, we consider ourselves the primary supplier of materials — composite materials — to Kratos across every one of their drone initiatives, and what you're looking at here is a photo of Kratos launching what they refer to as a Baby Drone. It's a bit fascinating — a drone that launches another drone. So, there you go. As I recall, Kratos indicated they anticipate the initial production delivery of the Valkyrie within a couple of months. That was, I believe, how they put it. Then there's Middle River aircraft — the business formerly owned by GE Aviation, which is now part of ST Engineering Aerospace; you're familiar with them — and we've got a picture showing a 747 to 8 in the upper left, plus Turkish Aerospace, which doesn't appear in our Top 5 very often, so it'll be good to include them; they serve as a contractor for Sirkosky Aerospace. That's why you see a Sikorsky helicopter pictured in the lower right, and we supply materials for the structures used in those Sikorsky helicopters. All right, let's move ahead to Slide 6; I find these pie charts quite interesting. If we examine military in 2021, just run the numbers: $60 million in total revenue, and 35% works out to roughly $21 million.

Brian Shore

executive
#3

Alright, so in fiscal 2021, total revenue came in much lower — just $46.3 million. That breaks down to roughly 59% military. The military share has clearly climbed a good deal, but the actual dollar figure is around $27.25 million. So from 2020 to 2021, it did increase, which is encouraging. Keep in mind, roughly a year back we made the decision to concentrate on military, and I won't pretend we're fully satisfied with how things turned out — we have room to improve — but at least some progress has been made. Also worth noting, that $27.25 million figure contains a meaningful chunk from the sale of what we referred to as that essential component for ablatives used in rocket programs, so bear that in mind. Turning to commercial aerospace's slice of the pie, it was apparently $28 million. That appears to be fiscal 2020, and $16 million in 2021 — simple arithmetic, that's it. So clearly there's been a significant decline in commercial aerospace. Let's move ahead to Slide 7. This one's our fun slide — Don and Elaina put it together each quarter, and we try to pick out things that are enjoyable and intriguing. These aren't necessarily our largest programs, but we figured we'd make this a bit more entertaining for you, so we aim to highlight some neat programs, military ones. Upper left, there's a B-1B, though it's not tied to the B-1B program itself — it's the LRASM, the long-range anti-ship missile, launched from a B-1B. We make parts for that program using Park materials. Then there's the Avio Aster 30 air defense missile — rocket nozzle material, ablative materials, those go into that program. The F-15 Eagle, 104 to zero — do you know what that refers to? The 104, that's in combat. 104 wins, zero losses — honestly it's not even a fair fight. We supply materials for radomes on the F-15, and we've got the JSTARS parts where we cover some components and materials, plus there's the pie chart. Pretty interesting to see Rocket Nozzles are large, structures are large, drones are large. Radomes aren't as large, but still a really important segment for us. Okay, let's continue. Plenty to get through here. Slide 8, alright — so we've discussed how we love our military programs. In fairness, though, we should also mention we love our commercial aircraft programs. Equal time for commercial, then. We've gone over this already. It's sort of a review slide, so you're familiar with the story if you've been following our call. Single-aisle versus wide-body — there's a clear trend favoring single-aisle. Actually, even before the pandemic, people preferred flying direct instead of dealing with the hub-and-spoke system, and now that's even more true since domestic aviation has recovered — is recovering, has bounced back to some degree. International travel is probably still a ways off. For domestic, think single-aisle; for international, think wide-body. So, our take is that if you're going to play in commercial aircraft right now, you really need to be in single-aisle. Three big single-aisle programs exist. Two of those three include us, and we believe those are the right two to be involved with. No disrespect to the MAX; we're pulling for it. Fingers crossed it performs very well going forward, but we're pleased, extremely pleased, to be part of the A320neo program as well as the Comac 919 program. So, we feel we've ticked two boxes out of three, and we're saying that if single-aisle is where you want to be, which is where we want to be, those are the two boxes we're after. That's just our perspective, and we believe our position in commercial aircraft is ideal, partly through luck. Actually, saying partly through luck might be us flattering ourselves. I'd say it's mostly through luck that we find ourselves so well positioned. Now, Slide 9, commercial aviation climbing out of the abyss, and it truly was an abyss. Elevated jet fuel prices along with environmental worries give airlines added reason to swap out older, less fuel efficient planes for newer, more fuel efficient ones like the A320 family, and to do so faster. Twelve months back, fuel prices had dropped, as we were saying, and that acts as a bit of a hurdle for new aircraft, the newer, more fuel-efficient ones; at present, fuel prices aren't so favorable, they're extremely high. That's a bit worrying. Environmental worries remain regardless of whether fuel prices are high or low, but when fuel prices climb, that gives airlines added financial motivation to acquire more efficient, fuel-efficient aircraft, naturally. In China, domestic aviation has bounced back to pre-COVID levels, or even beyond, depending on who you ask. That bodes very well for single-aisle. U.S. domestic aviation has recovered substantially, roughly 75% of pre-COVID levels. A full recovery is expected in 2022. Very encouraging for single-aisle. Here's a fun little story, not sure if you caught it. Two new U.S. domestic carriers recently said they're starting up and, based on what they've stated, have no plans to purchase airplanes, but from programs, Park is on it, yet it's still a strong indicator of optimism in the U.S. domestic aviation market. Great news for single-aisle, I think twelve months ago folks were saying that's simply impossible. Nobody will launch an airline in the U.S., maybe ever, but that was the gloomy mood back then. Moving to Slide 10. This is another review slide. We include this slide just about every quarter. On the first item, we've got the LTA's, running from 2019 through 2029, it's a requirements contract, Middle River Aerostructure Systems, or MRAS, which is a subsidiary of ST Engineering Aerospace. So, where does GE fit in? Why are we discussing GE Aviation? Why are all of these programs GE Aviation programs? The reason for the Middle River connection is that MRAS operated as a GE Aviation subsidiary roughly 2 years back, before ST Engineering Aerospace acquired it. Those programs, then, are GE Aviation legacy ones — GE Aviation programs that relied on MRAS, at the time part of GE Aviation, for every nacelle structure and thrust reverser structure. That explains the link. As for the redundant factory, we'll get into that shortly. It's nearly finished, but at the time we entered into that LTA with MRAS, we agreed we would move forward and construct that redundant factory. What's the rationale? The following item: sole source for composite materials for engine nacelles and thrust reversers across multiple MRAS programs — the entire A320neo family of airplanes powered by those LEAP-1A engines, which covers the first 5 items, plus the Boeing 747-8, the Comac 919, the Comac ARJ-21, a regional jet for China, and the Bombardier Global 7500. Qualifying a supplier of composite material takes an extremely, extremely, extremely, extremely, extremely long time. So the issue you can see is that should anything befall our single plant, it becomes a major crisis for all of these aircraft programs almost right away. So it was entirely fitting and reasonable that they requested we construct a redundant factory as a condition of our signing the LTA, and that's what we did.

Brian Shore

executive
#4

It was honestly, I believe, a handshake — yet we're folks who honor our commitments, whether that's the correct approach or not. Up in the top right, just briefly, we also make a component for those Passport 20 engines. That isn't included in the MRAS LTA; it actually goes through GE Aviation still, and we provide it to one of their contractors. There's a photo of the iconic Boeing 747 with its 8 nacelles — I really like this image since it shows you how enormous these nacelles are. I mean, check out the background there, and every one of these nacelles uses Park materials — and not just the nacelles, but the thrust reverser structures too, plus some internal fixed structures for Boeing on the 747, I should mention. Let's move along to Slide 11. We'll keep things moving quickly here. All right, so let's give an update on these particular GE Aviation programs. Starting with the A320neo family. By the way, we brought in the A319 deal. That belongs to the family, isn't discussed much, though there are some sales. So it's within the family, and it runs on LEAP-1A engines, meaning when those LEAP-1A engines are used, that's our program. I'd certainly describe us as being in ramp mode here. Just a bit of data: Airbus delivered 57 neo family aircraft during March. That comes from Airbus itself; it isn't industry rumor or analyst speculation or anything like that. Airbus intends to raise the A320 family production rate from 40, where it currently stands each month, to 43 per month in Q3, 45 per month in Q4, and if you'd like to run some numbers — I don't know about you, but I enjoy this — keep in mind that the A320neo family aircraft have two engines. One is the LEAP-1A engine. That's the program we're on; they also use a Pratt engine; now, every airplane has two engines. You need to remember that while calculating. Just for your information, I'm not predicting what will occur later, since I don't know, but if you check the May edition of aero engine news, it reports that the LEAP-1A, which is CFM — CFM being a joint venture of GE and Safran — LEAP-1A engines hold roughly 61% market share of all firm engine orders for the A320neo family of aircraft, all right. So, if you enjoy running numbers. That's how things stand right now. I'm not claiming it'll be that way later, at least we don't know, around 61% market share; so two engines, yet 61%. Look at it that way. Let's continue; now this matters quite a bit, on Airbus's Q1 investor call held April 29, 2021, the Airbus CEO — I won't attempt his first name, you can give it a try, but I believe it's Mr. Faury and I'm likely getting that wrong. Apologies for that, to all my French friends — and stated there will be a steep ramp-up. Here's a quote: a sharp increase is coming during 2022 and 2023 for narrow-body planes. In other words, the A320neo line of jets. A steep production climb — that's what he said about those two years. During the same call, he noted that Airbus has handed scenarios to its suppliers so they can work out the quickest achievable production increase for narrow-body jets that those suppliers could realistically handle. Do you follow what's happening here? The way I see it, these folks are quite bullish. They're attempting to raise the A320neo build rate as high as they can, and right now they're working out what the supply chain is able to handle — that's a really crucial point to grasp. Fine, so that covers the A320neo situation. Moving to Slide 12, which is also about the A320neo family. News on the A320XLR — this belongs to that same family and runs on the LEAP-1A engine. The first test aircraft is approaching final assembly. The initial flight should happen during 2022. Certification and entry into service come in 2023. Honestly, that's practically right around the bend — in aircraft terms, back in the old days of electronics that would feel like ages, but 2 years in this industry feels like tomorrow, and plenty of people anticipate this plane will change the game. It offers very substantial range, carries a large number of passengers, and the thinking goes that it will take over wide-body duties on many routes, or at least on certain routes — and the crucial part is that Boeing lacks any counter to this plane. Word is Boeing is weighing the 5X, which would serve as their response to the XLR. From where I stand, they truly need to build it, since they've got nothing to compete with it — though the difficulty for Boeing, I suppose, is somewhat that the XLR will already be in production and on sale within 2 years, while Boeing hasn't even revealed the 5X at this point. So I have zero clue what schedule they'd be discussing, but it will be somewhere down the road. With a brand-new aircraft category like this, I figure the usual wisdom is that it's generally advantageous to get there first — perhaps not in every case, but typically it pays to be first. Let's move along to — in any case, just regarding — looking at 12, well, my view is this could be a truly major program for Park, the XLR, which is part of the A320 family, yet a genuinely major program for Park. Now let's turn to Slide 13, the Global 7500. I believe they just sold their 50th unit; this jet is in production, performing nicely, and in ramp mode — ramping up — which is excellent news on our end. Comac ARJ-21. This is a Chinese jet built by Comac. It's a regional aircraft. It's in production, with most of it going to the China market at present. They're ramping up. It's in production and ramping up. Slide 14, the Comac 919, powered by LEAP-1C engines. So Comac has stated its intention to certify and start deliveries of this plane prior to the close of 2021. That's this year, so I suppose we'll find out what occurs. Whether that's accurate, I can't say. I haven't gotten any fresh information regarding that, yet regardless of whether it happens in 2021 or at another point later on, my sense is this could be an extremely significant initiative for Park. Here you're seeing Airbus's effort to become a genuine force in commercial aerospace; it serves as their response to the 737 MAX and A320; it's their narrow-body jet, and a photo of it appears right here. So my guess is it will be substantial. My guess is that at first they'll market it within China. Keep in mind, home-market aviation narrow-body, though in time I think they would want to offer it beyond China. Boeing 747 to 8, Boeing stated it would end manufacturing of the Queen of the Skies during 2022, with 12 orders still remaining to be fulfilled. Long live the Queen, as a number of you are aware I hold genuine affection for the 747 to 8. Among the factors that render it truly sentimental for us is that the very first program we engaged in alongside GE Aviation was the 747 to 8. Our initial delivery under these programs came on February 28 <<inaudible>>, 2014 at roughly 11 o'clock at night, which was somewhat of an exciting occasion for Park, honestly; thus we carry a particular affection for the 747. I knew about this on a personal level.

Brian Shore

executive
#5

This photo, I actually snapped it over at the Anchorage airport; the plane in it, you can see its landing gear is down and it's on its way in to touch down. Moving to Slide 15; so a look back at the commercial aerospace year, armageddon once more; so you're aware of all those aircraft sitting parked in the thousands. Donna did a really great job on these images. Airline terminals had become ghost towns. In case you weren't around for it, you've probably heard the stories, planes up there flying with hardly anyone aboard. We're seeing plenty of shots with just a pair of passengers on a jet. Thousands of flights got scrapped. Tens of thousands of people working in commercial aviation and commercial aircraft lost their jobs. If you want to know what armageddon looks like, that's it. Almost all the news involving the commercial aircraft business was negative — severely negative — and as had happened previously, the analysts along with, well, the pundits and the people who like going on television to be interviewed, the ones I assume a great many viewers watch, and perhaps that was a bad thing, because it becomes a self-fulfilling prophecy. People who analyze and comment on aviation predicted that a complete recovery was many years away, or perhaps would never come at all, maybe it's over, maybe commercial aerospace as an industry is a thing of the past. There'll hardly even be an industry left, the end of days, that's what they're saying. Slide 16, yet here at Park, we didn't entirely swallow all of that doom and gloom. We didn't accept that the end of days had arrived, though honestly it doesn't matter much one way or the other, we reached an agreement with MRAS to hold minimum monthly baseline, critical mass production levels so we'd preserve Park's capacity to ramp-up production whenever it became necessary. I believe we went over this on the last couple of calls at least. So if you've been listening to our earlier calls, you're familiar with this, but it mattered a great deal to MRAS and Park that we did it; we didn't want our production levels for the kind of product we build for MRAS dropping beneath the critical mass because we knew — well, we didn't know. I suppose none of us knew anything, nobody did, but we had plenty of — we believe we're going to have to ramp back up at some point. The figure came out to somewhere between $700,000 and $900,000 on a monthly basis. Because this concerned production rather than sales, those minimums got expressed in units. Around July, though, it became clear we were seeing about $700,000 to $900,000 every month. Commercial aircraft manufacturers everywhere were cutting staff, and the cuts were deep and widespread, yet we let go of no one — zero of our employees — right through the bleakest stretch, when the commercial aerospace sector looked beyond saving. You'd hear these people on television declaring it was finished, the end of days, you know. Everyone we knew was cutting staff, yet we chose not to, and it turns out that choice not to reduce our workforce matters enormously to Park since, if we are increasing production again, we would need to go attempt to bring those employees back and call them back, which I know many other businesses are doing — we never released them in the first place. One reason for keeping them wasn’t just that; it’s that we dislike doing that sort of thing, as we’ve talked about many times before. Slide 17, carrying on with that same subject. On our investor calls for the first, second, and third quarters of last year, we went over at length how far apart the minimum monthly baseline critical mass production amounts we had agreed on with MRAS were from what the end market actually required at that time for the GE programs Park is involved in — a major divergence and mismatch. That's referring to back then, not the present. Airbus consistently said they would hold at 40 and would not drop below that figure. Every analyst — well, not every single one; saying all would be unfair. Many of the analysts and commentators kept saying, oh, they're going to have to—you know, something else bad is bound to happen. All right, fine, it never happened. But at that time we were manufacturing at our lowest output, roughly 50% of what the market back then required—the market as it stood then, not as it stands now. Inventory destocking—here's what took place: everyone was so intimidated, so frightened, so scared, and as I mentioned, the analysts and commentators weren't much help. Nobody wanted to purchase anything, nobody was going to construct anything, they simply sold off inventory because essentially it felt like the end of the world. What did we say? We told you before that you can't take inventory below zero. A negative figure isn't possible, unless somebody gets really inventive with the books, I suppose. That gap couldn't hold up mathematically. How long can a mismatch like that last, really? We have no idea, but it wasn't going to keep going, unless the aircraft end market dropped sharply once more. A reckoning was inevitable. That's what we said. That was our view. And then it happened. The destocking is over. Every GE Aviation program Park is involved in is now ramping, with the exception of the 747, where rates haven't moved. Turning to Slide 18, that ramp looks steep. Here's an update on what we showed you on the slide last quarter. To give you some context, our GE Aviation program sales — and I should note these are calendar-year figures, since we usually discuss fiscal years — came to $29.3 million for calendar year 2019. For calendar year 2020 — sorry, let me correct that — the figure was $15.8 million, although the last 6 months of that year totaled $5 million, which annualizes to a $10 million run rate. But then, think about it this way: the floor ranged from $700,000 to $900,000, so let's say roughly $800,000 — the midpoint of that range — and $800,000 times 12 gets you to about $10 million. So those numbers are roughly consistent. That means through the back half of calendar 2020 we were operating at a $10 million pace. All right, calendar year 2021. The calendar year remains calendar; our projection for GE Aviation program sales, based on the fresh forecast the customer just sent us, sits at $25.5 million. What changed? When we last spoke with you, the figure stood at $24 million. It went up. Has it finished going up? Unknown. We'll need to find out. What's the takeaway? This isn't a forecast we're giving you; we're merely sharing the forecast that came to us. Our own forecast to you will come on a fiscal year basis. Ordinarily, ranges accompany any forecast we provide, yet here the point is simply to show you how steep the ramp is. From a $10 million pace to a $25.5 million pace across a stretch of, what, about a month. So that's the perspective. On Slide 19, we keep going in ramp mode and are entering hit mode. Beyond that, we've written — and this matters a great deal — beyond that, we just obtained a revised long-term forecast for GE Aviation; this covers far more than 2021 alone. It spans 2021 through 2029. The remainder of the firm pricing LTA, as you'll recall, ran 2019 to 2029. Naturally, in 2021 or 2029 we won't be there now when it comes to the revised forecast. What's done is done. So here's a crucial point.

Brian Shore

executive
#6

If you look at it on a like-for-like comparison, the overall revised projection — GE Aviation program sales across the calendar years 2021 through 2029 — comes out quite close to the overall projected GE Aviation program sales contained in the forecast from before COVID for those very same years. Essentially, we've returned to the pre-COVID position. That's the projection we were handed. So how does this updated projection get put together? Fine, I believe we've explained this to you previously. Units get provided by us; we understand which materials — the quantity of material consumed, the kind of material consumed per unit. The selling price for those materials is known to us; from that point we simply assemble it. A highly detailed long-range projection gets built by us, enormous spreadsheets, an abundance of detail, yet that's the way we assemble it. What's our view? The revised long-range projection we're discussing right now might not completely reflect the sharp ramp-up in A320neo aircraft family output during 2023 that the Airbus CEO predicted only a couple of weeks back. The reason we say this is we believe those remarks were made after the projection reached us, and beyond that, my own view, I suppose, is that the projection might not reflect the XLR sales opportunities, and the basis for my saying so is that plenty of folks believe the XLR will amount to something significant, yet in the long-range projection, we don't truly observe any bump that would be connected to the XLR's introduction. That isn't to say it's absent from there. I'm merely saying we're sort of questioning it, but that's a crucial matter, so there's a bit of upside that we believe the projection perhaps failed to completely reflect in these 2 areas. Yet on the opposite side of the ledger, how will the commercial aerospace manufacturing supply chain react to that sharp ramp; that's a major question. Keep in mind the Airbus CEO stated they approached the supply chain to determine what the supply chain is able to support. Thus there are 2 separate factors that are sort of tugging in opposing directions, I suppose. Slide 20, how are we reacting to the ramp-up, it comes down entirely to our people. Well, Park's headcount right now stands at 106. So what on earth occurred here? Recall, during the prior quarter it was 107, and we informed you we intend to bring on 15, 20 people. So where have those people gone? Our headcount hasn't gone up. So why? Well, perhaps people are being paid to remain at home. So whom does that benefit? We are — regarding financial news, reports about all those businesses that can't genuinely reopen, can't ramp up, can't bring people on; it's truly awful. The government is paying them to remain at home, yet you don't hear much regarding the people. It solely benefits those people; so perhaps you'd want to consider that for a moment. These are human beings. A number of them by now haven't worked for a year; they're at home growing fat, you know. Their intellect is possibly turning to mush, they're losing their sharpness. Some of these individuals are now wasted people. They might lack the capacity to return to their jobs, possibly permanently. Listen, if you're absent for several weeks, that's okay. What about a whole year? So perhaps certain of these individuals have shattered spirits. What happens to them? They're human beings as well, after all. Their existence is getting ruined, at minimum a portion of them, yet amusingly, that never enters the conversation—it's constantly focused on the companies, which are able to reopen and I value that. I believe that's a really valid observation, but why isn't anyone considering those individuals. Are they receiving assistance from this? I hold a view regarding who benefits and it isn't them, but don't fret about our situation, we'll handle it. As always, Park's employees rising to the occasion, completing the task. Corey has performed brilliantly in sort of arranging a labor force so that we can fulfill the production increase. We never mention letting customers down. That phrase doesn't exist for us. By some means or another, we'll finish the work. Slide 21. So what's our approach. Thank heavens for our customer flexibility program. We've discussed it frequently, here's a bit more specifics. Overall present enrollment 80%. Among that 80%, two job categories 47%; three, 30%; four, 18%; five job categories, 5%. Absent this customer flexibility program, it would simply be extremely, extremely hard to complete the work; this customer flexibility program is truly a blessing. It assisted us enormously through the slump to keep operations running, not releasing workers and it's aiding us tremendously right now with amazing adaptability to react however required. Thank heavens we didn't release anyone during the bleakest periods in the commercial aircraft sector, since we didn't need to bring anyone back; every one of them remains. Our crew remains. That isn't the cause, the sole cause and the additional cause is we simply don't support letting individuals go; that's just not our way of viewing matters. Those individuals are invaluable and thank heavens for Park's wonderful staff. Without them, we couldn't complete the work. Park is extremely lucky and blessed to possess the wonderful staff it does. Let's proceed to Slide 22, GE Aviation program, how are we doing on schedule? Perhaps over 45 minutes. GE Aviation program sales history and forecast estimates. So the upper section is the history, which you know well. Q4 was $4.4 million. I believe that's roughly what we projected on our Q3 call. Overall $13.2 million and look that's lower for 2021. Pardon me, fiscal 2021. I'd say it's under 50% of fiscal year 2020, which isn't a major surprise I don't think to anyone. Our projection, Q1 $6.5 million to $7 million and that's essentially secured. Q2 $6.5 million to $7 million; for the fiscal year $26 million to $28 million, is that correct? Well, I’m not sure — it could happen, and I suppose part of it hinges on what goes on with the A320 and on what Mr. Faury, the Airbus CEO we were just discussing, had to say. Then there’s the other side of things: can the supply chain actually keep pace with the ramp up? I’m not referring to us, but should any portion of the supply chain fail to sustain the ramp up, that would mean the ramp up itself might get slowed down somewhat. So once again, here’s a shot of the 747 to 8 leaving Anchorage. You come across plenty of images of the 747 to 8. Being the CEO, I have picture authority, and I adore the 747 to 8. So even if it isn’t our largest program, I simply adore that airplane. I adore including images of that airplane in the presentation, but as someone inquired about this, it’s actually under $2 million in revenue for us annually. So although it holds a great deal of sentimental value for us, it isn’t among the larger programs for GE Aviation; so I just want you to know that, but what you’re seeing is programs being ended. Slide 23, we’ve got a small forecast for you here. To start, the top box is history.

Brian Shore

executive
#7

Okay, to give you some background, we went over the history on a slide earlier. Just as a reminder — and yes, I know I sound like a broken record — that's the key component for missile programs. In last year's 2021 Q3, it was roughly $2 million, and in Q4, around $3.5 million, so keep that in mind. Now, let's turn to our forecast. It's been a while since we provided one. We gave something like a rough forecast, maybe three or four times. Now we're trying again to give you a forecast. There's still plenty of uncertainty in our view, but we feel somewhat better, so we're giving you a forecast. Q1 sales of $13.3 million to $13.8 million. As you can see, that's below Q4, but again, we don't have those sales of that key component, and EBITDA of $3.6 million to $4.1 million. So we're climbing back up. Just so you know, in Q1, this is something we're unsure about. We have forecasts, we do P&Ls weekly and we test our forecast, but gross margins in Q1 should be — we're predicting well above 35%. I'm not claiming that's sustainable. If you look at Q2, it's interesting, because revenues are rising but adjusted EBITDA is dipping a bit. First, it's the — same broken record — but there's $1 million of the key component sales in Q2, remember very low margins, but the mix shifts from quarter to quarter. Since we're doing much more military, we'll have mix changes quarter to quarter, and that will impact our bottom line. With the GE Aviation business, there's really no mix shift, it is what it is. Military, many programs, and you know one quarter it'll be more of this and another quarter more of that, and that will move our EBITDA up and down from quarter to quarter. For the year, looking at $55 million to $62 million revenue, $13.5 million to $16.5 million EBITDA. I think fiscal 2020 is in the earlier part of the presentation with $60 million of revenue and $13 million EBITDA, so we're saying for the year, we're kind of back there, maybe a bit better than that; so just a few things I want to mention, these are factored in when we do our forecast and we could be wrong, but as I told you earlier and we've covered this many times. We'll give you a forecast, we're saying, this is what we think will happen based upon, of course, working hard. This isn't a walk in the park or anything like that, but we're working very hard, doing our jobs, but we're still looking to hire people, we haven't given up. So right now you're looking to bring on maybe 8 or 9 individuals, and possibly more down the road, so people represent a genuine expense — folks just starting out aren't terribly costly, north of $50,000 <<inaudible>> apiece. With a new plant getting underway, you're going to incur some expenses for that start-up. The cost of raw materials keeps climbing. I mean, inflation is a significant worry. So thanks to the LTA with GE Aviation, those raw materials are secured; we couldn't have gotten an LTA done with GE Aviation unless we had an LTA in place from our suppliers, but for most of the other customers there are no LTAs, so we quote frequently and what we wind up doing, unfortunately, is push our prices higher to account for rising raw material costs. That's our approach. It isn't good and we understand how that plays out when prices continue climbing and climbing, it isn't a good situation. Items such as utilities are rising, supply is rising, shipping is rising. Usually we've got that covered either within our selling price or through our raw material purchase price, and there's also, I'd say, well, I'll speak just for myself, significant worries about the economy, what's happening, how it's being handled, inflation, interest rates and that sort of thing, and we don't actually devote much time to pondering it, but we can't ignore it. We're still out here living in the world. We do what's necessary each day, but I don't believe it would be right for us to claim we're shielded from what happens in the outside world. All right, let's turn to Slide 24, our expansion update. Our budget now stands at $19 million; it was $18 million the last time we talked. So what took place? We began at $20.5 million I believe; we reduced it to $18 million based on the idea that business is quite slow. So let's sort of hold back a few items, see how things go so we can decide afterward, but given the ramp up and all of that it's grown to $19 million. Spending so far is roughly $15 million. I suppose you can do the math, approximately $4 million remaining. Completion is essentially next month. Smaller items will get attention for some time but completion is essentially next month. We kick off the manufacturing trials for the major equipment shown below the top, bottom left and right corners, July of 2021. Qualification runs for MRAS is September of 2021 as planned. These 2 pieces of equipment; we're not really, they're enormous and it's tough to give you a sense of their size because there's some stuff we don't want our competitors seeing and they can view our presentations too; so we sort of used an odd angle on this equipment to take one and film one top right picture of our new offices and the office is open. You can find my office in the upper right portion of this image, and then there's the bottom center. It's a great shot since on the left side you're able to see a brand-new building, while on the right is the older one, though it now includes the added offices, and then roughly toward the rear, sitting between two rooms, you'll find the corridor. To the right side of the pre-existing building, the warehouse is located as well, though it didn't make it into this photo. So that sums up the tale of how we grew. Let me attempt to bring this to a close. On slide 25, we have Park's thoughts regarding its 2021 fiscal year being our brightest moment. All right, let's get into that. Throughout that year, Park experienced its portion of sorrow and grief, the sort of grief that never fades. Yet here at Park, we never stop, we never surrender. We never retreat. That simply isn't our way, it isn't in our character, and we continue onward. We drove ahead with our significant build-out while certain others cut their capital expenditures. We remained committed to our beliefs while perhaps certain others did not; we refuse to compromise when perhaps certain others did. We let nobody go when so many others did so by the thousands and thousands. The people at Park matter deeply. The Park family remained united and endured the hardest times as one. Here at Park, we operate as a family, and we look out for one another.

Brian Shore

executive
#8

On slide 26, you'll see that Park is an odd and remarkable business, full of terrific and exceptional individuals. Regarding our workforce, we are extremely lucky. We differ from the rest. Here at Park, we compete to win. We aren't messing about; our goal is to create real change; therefore, fiscal 2021 might have been the greatest in Park's history. As you know, my time with this organization stretches back to 1988. I cannot comment on earlier periods, perhaps during the 50s, in the initial years over in Woodside, Queens, there might have been some outstanding years at the start, long before I arrived, yet I can state with certainty that, in my view, the 2021 fiscal year stood out as the finest — Park's top year from 1988, when I came aboard, and I would say so with no doubt, I cannot recall any other year that measures up. I believe it's our greatest year; at least that's how I see it. Indeed, our peak moment; thus we'll reserve the final one for an image of a crew, something we enjoy doing. In the upper row are Guadalupe and Juan. In the lower row is Jose, who serves as a lead. Joshua and Seraphin. What's fascinating is that this shows Park's second shift solution treater along with the film line crew. Hold on, those are two separate operations. So, what exactly is happening? This is the customer flexibility program. Every one of these five individuals has received approval to run both lines, which is significant. You don't assign someone to these lines by saying fine, here you are, we just brought you on. No, that's not how it operates. So you can see how customer flexibility functions. These folks can shift back and forth across those two key lines, and that mattered enormously to us throughout the downturn and matters just as much to us today as we work to ramp up. So that's the way it functions. I believe we've reached the conclusion of the presentation. Slide 27 is our thank you slide. Operator. We're now glad to answer questions, provided there are any.

Brad Hathaway

analyst
#9

Thanks a lot, and congratulations. Brian, making it through a year that difficult is truly quite impressive. Brian Shore, CEO: I appreciate that, Brad.

Brad Hathaway

analyst
#10

Thanks for being ready to share a 2022 outlook, plus everything you said regarding the acceleration you're observing. Since conditions appear to be improving, and you mentioned earlier that the old guidance had simply moved somewhat to the right, I wondered whether you have any views about those earlier projections, and also when you might feel ready to provide a long-term outlook once more?

Brian Shore

executive
#11

As we said a moment ago, our guidance covers the present fiscal year. It resembles fiscal 2020 prior to the disaster that struck the world and this industry. Ours is perhaps slightly stronger, especially on EBITDA — basically right around that level — for the top line. I'm not sure how to respond, other than perhaps one perspective is that this serves as our starting point again. Clearly, before releasing a fresh long-term outlook, we cannot simply launch it and then move it out or delay it by 2 years. That truly wouldn't be appropriate; we must factor in all that we currently know, every update and every new development, and there are important new developments, most of which I believe are actually favorable. When will we be prepared? I don't know, I don't really sense it will happen next quarter, but let me simply say I hope that before this year ends we'll manage to introduce guidance covering more than a single year. Even that 1-year outlook, as I mentioned, involves uncertainties we continue to face; the world isn't exactly steady at the moment, yet we felt sufficiently confident to give you something. I'm not sure how to address that second question. I'll just say I'm going to hope by year-end, because as you know, what's occurring is we sense we're receiving far more valuable information, and what we're doing is genuinely paying attention to what Airbus states, what Bombardier states, what Comac states, what Boeing states — regarding commercial, that is — and sort of ignoring all the analysts and such, along with the commentators. Those statements genuinely haven't been useful and have tended to be incorrect, but it's truly excellent, like the A320, to be involved in that program, because never mind what anyone else claims — how about the Airbus CEO? It's so valuable to connect our actions to what Airbus says, and we're capable of doing so. We can accomplish that with fairly strong accuracy once we understand what they're referring to. So, I don't know — apologies for not providing a superior response, but that's everything I can come up with at the moment.

Brad Hathaway

analyst
#12

No, that's fine. In any case, it's encouraging to watch all these programs after a hard year trending — they all appear to be heading in a fairly good direction. So that's excellent; regarding M&A, can you give us any sort of update on what you're seeing out there?

Brian Shore

executive
#13

Sure, so I believe during the previous quarter we discussed this a bit, and our expectation had been that we could pick up some distressed sales during the prior year, which never happened. According to our advisors, the reason is that the Fed enabled folks to hold on. We remain quite busy in certain spaces — in fact, I think we're submitting a preliminary bid on a single company later this week. The search continues. Our focus is on finding niche targets. Our focus is on finding opportunities that aren't being chased by everyone and their brother along with all the financial buyers, since that simply pushes valuations up so much, but beyond that, we are — we've pinpointed a particular product area that ties in very closely with composite structures and composite materials, and I'd say we're conducting some fairly solid research there, and we've actually approached multiple companies that already have operations in that space. At this stage, I suppose we won't name it, but it's something that will be utilized by a company producing composite structures in addition to the composite materials. So we believe it's a truly strong tie-in, and a number of our customers have actually assisted us on that front too. So we're optimistic, we're discussing — not optimistic, that's probably not how one should put it nowadays. M&A has gotten more difficult, but our feeling about it is better than simply showing up at the auctions. Let me phrase it that way. These are companies, some privately held, some are divisions of large corporations. They likely aren't going to be for sale; so our aim is to get the conversations started and we'll see where those lead; and then the other area I want to bring up is, there are projects we've worked on and we're aware of the joint venture discussion in Asia, but there are additional projects we work on alongside some of the large customers that wouldn't really count as M&A, but would require a significant investment of capital; so I suppose I'd mention those three things, maybe. We certainly haven't given up or let down at all even though we have this worry about these companies being bid up right now with, I guess, M&A inflation. I don't know, perhaps it won't lessen, perhaps that will reverse, we'll see. So clearly, we'll let you know as soon as we have something to report and we don't have anything to report right now, but I guess the message I would send is that we're still working on it; we haven't given up or just decided to take a year off or anything like that or wait till valuations come back down.

Brad Hathaway

analyst
#14

Got it. And from your perspective — clearly, if the situation keeps getting better, then for one thing, the M&A landscape could get tougher down the road, unless you're able to land one of those deals that gets pushed your way, or something truly niche. Is there a threshold where you'd conclude that the cash sitting on the balance sheet won't be deployable for any sort of investment, and you'd start looking at other options?

Brian Shore

executive
#15

Absolutely. A threshold does exist — I can't tell you where it is, but absolutely, one exists. So in a sense, that remains an unresolved matter for us. I completely grasp what you're driving at — or at least, I believe I do. I'm not able to — I can't hand you a specific date, but it's definitely something lurking in the back of our minds.

Brad Hathaway

analyst
#16

Well, clearly, what I'd like best is for you guys to locate a really strong bolt-on acquisition. So, if that's something you're able to pull off, that would be wonderful.

Brian Shore

executive
#17

Thanks; and, you know, our view on this matches yours, but we appreciate the remark. Please continue, my apologies.

Brad Hathaway

analyst
#18

Actually, I only wanted to express my gratitude. I truly value everything you did to produce the outcomes you achieved during a year similar to — a year of pandemic such as the one before this. That is quite remarkable. So many thanks for your work.

Brian Shore

executive
#19

I appreciate what you said.

Analyst

analyst
#20

Hey there, Brian. You all sound like you've got a lot going on.

Brian Shore

executive
#21

Yeah, hi, Leonard. How's it going? It's been some time since we last heard from you.

Analyst

analyst
#22

Things are fine on our end. We’re getting by. I happened to see a report mentioning that the U.S. will soon have a wind turbine farm. From what I gather, it would be the first one the government has approved. Do we have any part in that, or could we get a part in that?

Brian Shore

executive
#23

No, we aren’t, and we have no desire to be. Our market isn’t wind turbines. In fact, if you examine the companies that do take part, the story isn’t a particularly happy one. Those programs carry low margins. Aerospace is what we do, and that’s all. When we chose to enter aerospace, we understood from the very beginning that we had no idea what we were doing — you simply don’t know, you don’t know. Aerospace is such an enormous, complicated field that our feeling was: as a small company, we lack any means to move into other areas — boats, wind turbines, skateboards, whatever it might be. Obviously composites go into a great many products. We are an aerospace company, period — no wind turbines for us.

Analyst

analyst
#24

Alright; it's simply that those blades involve a great deal of aerodynamics.

Brian Shore

executive
#25

Yeah, that's true, and I believe they're becoming more advanced. I don't have expertise in that area, yet I think from an aerodynamic standpoint they're also becoming more advanced.

Analyst

analyst
#26

Alright, I appreciate it a lot. That was quite an engaging discussion. Wishing you the best of luck.

Brian Shore

executive
#27

Alright, thanks for reaching out, Len — good to hear your voice. So with any luck, we'll be seeing you before long.

Brian Shore

executive
#28

Alright, thank you, operator. And thank you to everyone for tuning in. My apologies — I mentioned 45 minutes. It seems we've gone beyond that 45-minute mark. I attempted to move quickly, though there's always plenty you want to include to give better perspective. So once again, I appreciate you joining. Have a wonderful day, and don't hesitate to reach out. Matt and I can talk whenever it suits you. We'll be speaking with you pretty soon, since our first quarter is really only a couple of weeks away. So likely in early July, we'll hold our first quarter announcement. Alright. Take care. Have a great day. Good-bye now.

Operator

operator
#29

This concludes today’s conference call. Thank you for participating. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.