Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary
January 6, 2022
Earnings Call Speaker Segments
Brian Shore
executiveThanks, operator. Brian here. Hello, everyone. Happy New Year. Glad to have you on our Q3 investor conference call. Joining me, like he always does, is Matt Farabaugh, who serves as our CFO. We put out our earnings earlier today. A news release went out. Inside that earnings release, you'll find directions for accessing the presentation we're about to walk through, if you'd like to pull it up. It's also available on our website — that's one more way to get the presentation in front of you. But honestly, if you aren't actually looking at the presentation, I think this call won't mean as much. Like we normally do, our aim with these calls is to vary things a bit, to give you information that's useful and interesting, and an interesting perspective when we can. Going through a dry analysis of numbers and data isn't what we're about. We can do that anytime for you afterward if you give us a call back. So there's this dilemma that keeps getting bigger each quarter — the material we cover every quarter that we simply run through yet again, and the trouble is the presentations keep getting longer and longer. We also want to talk about new things; so at least a couple of sections — on topics we've addressed many times in earlier presentations and calls — we're going to skip over, or at minimum skim. So I suppose that covers it. I just want to give you a heads-up, I guess, that as we go through the presentation, it's a long one. We'll move through it as fast as we can, but it may run as long as 50 minutes, perhaps a bit more. That's 5 to 0, not 1 to 5. And once the presentation is finished, to whatever extent you have questions, Matt and I will be glad to answer them; so let's get started. Slide #2 is our forward-looking disclaimer information statement. If anything about that is unclear, let us know. Slide 3 is our table of contents. And Slide 4 — we can't move through Slide 4 quite so fast; it's a somewhat busier slide. So let's discuss our Q3 results. Sales $13.864 million, gross profit $3.863 million and EBITDA, adjusted EBITDA $2.670 million, and it's kind of interesting to examine the progressions from quarter-to-quarter. You can see that, at least in terms of bottom line, this quarter is down from Q1 to Q2. Let's discuss what we said, what we predicted, if you will — not really predicted, what we — our forecast estimates that we gave you during our Q2 call about Q3. We set our estimate for sales as $13 million to $13.5 million and adjusted EBITDA of $3 million to $3.4 million. So it's kind of a strange thing, we actually came in above our sales estimate, but didn't reach our EBITDA estimate. So that's the reason — and the reason needs some explaining, which I'm going to get into shortly. But first, let me remind everyone of our approach, the way we always handle forecasts: we tell you when we expect something to happen, and we give you our honest best assessment of what will occur. Sure, sometimes we get it wrong, but in the moment we're stating what we believe will happen. We don't engage in that game where we hand you a conservative figure we can easily exceed and then act like heroes. That's simply not our style — to us it feels a bit insulting. If others prefer to operate that way, no problem, it's just not what we do. I believe you're aware of that by now. Now, look at the bottom of this slide — there's a caveat, and it's a significant one. This matters. It'll probably come up once or twice more during this presentation. We had $2.4 million in missile programs essential component sales that we had anticipated landing in Q4, but they actually landed in Q3. When we held our Q2 call, we explained this to you. We indicated it would fall in Q4. That was our expectation. We can now refer to this product as C2B. Up to this point it's been somewhat of an unnamed product, but just yesterday we announced a deal with Ariane, and we'll get into that later. So from now on we call it C2B. It's a highly specialized proprietary fabric that we use to make a blade of products for missile and rocket programs, so we'll discuss the product in more detail later. For now, let's just use C2B as shorthand, because saying essential component sale, missile program essential component sales is quite a mouthful. Anyway, this sale happened in Q3, not Q4. That wasn't really something we controlled — the OEMs drive this. Keep in mind how it works. This component is critical for the missile program, a sole source on these programs; as we've been saying, it comes from a country that's an ally of the U.S. It's a French company. Ariane is a massive company, massive; but I suppose some of the OEMs <<inaudible>>. These are businesses that perhaps handle missiles and rocket programs and want to ensure they have a secure supply of the C2B. So they request that we purchase the product from them, from — pardon me, from Ariane. We have a relationship with Ariane; we do that, then we sell this C2B product to our customer, and we hold it on their behalf; it sits in our factory even though they own it. And there's simply a markup involved when we do that. So it's also a very low margin sale. The positive aspect, and there's plenty of it, is that in the end, we intend to utilize that product, manufacture our ablative materials, and when we sell those materials, they'll carry extremely high margins. So on balance, that's quite favorable. However, the initial portion of the deal might be restorative, since it involves substantial revenue at extremely thin margins. It was meant to land in Q4 but wound up — pardon me, it was meant to be — correct, Q4 wound up landing in Q3. So that somewhat disrupts everything here; therefore, let's simply consider that $13.9 million of sales in Q3, but for the sake of gaining some perspective, let's deduct that $2.4 million. It was meant to be Q3 regardless. That would indicate it's closer to $11.5 million excluding that C2B sale, $11.5 million; and $11.5 million versus our projection of $13 million to $13.5 million, well, that's $1.5 million beneath the low end of the range. So now you begin to see what's happening here. In fact, recognizing that, you say, wow, that EBITDA is rather strong and it is rather strong given these conditions relative to the top line. So, let me check what else I have here.
Brian Shore
executiveOne quick thing I wanted to mention — and maybe it's only interesting to you — right now we've got more than $5 million of their C2B product sitting in our factory. We don't own it. Our customer does. That's actually a positive, though, since it signals a substantial amount of ablative sales heading our way. It won't land next quarter; that isn't how this works. They're looking for a dependable supply over the long haul. That's a good thing, because it's like money in the bank for Park, since the eventual plan is that whenever our customers give us the word, we'll take that C2B product and, using our proprietary resin systems, manufacture this ablative material. That's where the sales — and the margins on those sales — turn out to be quite strong. So I believe that wraps that up. Let's go to Slide 5. There are also additional factors that hit Q3 sales and margins, not only those two items. So let's get into it. Supply chain challenges are a fight every single day. We discussed this back at Q2, and we didn't precisely anticipate it, but from where we sit, things are actually worse in Q3, and worse right now, than they were when we reported Q2. So when folks claim it's improving — your reports on the topic, newspaper pieces, the Wall Street Journal — I don't know what planet they're living on. It certainly isn't ours. Our situation isn't improving. And beneath supply chain challenges: trouble sourcing raw materials, international shipments, domestic shipments, freight problems, extra costs for expedited freight shipments. Taking those first three bullet items collectively, that's $600,000 in sales we didn't get in Q3 because of these issues. Either we couldn't find anyone to ship the product domestically or internationally, or we had trouble sourcing raw materials. We couldn't obtain the raw materials to make the product and get it shipped before the quarter closed. So my sense is our team is performing really well under extremely tough conditions, but we couldn't secure all the raw materials required for the quarter. Add those three things together and you get $600,000. We actually know the precise figure — it's around $593,000, something in that vicinity. But we won't provide the breakdown; we figure that's a bit more detail than is helpful. Still, we can calculate that number. It's a firm number. So recall I mentioned a $1.5 million shortfall on the top line. $600,000 of it is accounted for, but plenty remains. What about the rest? Where did the other $900,000 go? Let's discuss that now. Supply chain problems are affecting the aerospace industry broadly. What does that mean? This isn't about our supply chain. It means we aren't the only ones. From what we can tell, this is a problem everyone's dealing with. It's really slowing things down and holding back the entire sector — the entire aerospace sector — since if we're unable to obtain materials, chances are others can't obtain them either. And if you're an OEM, Park, and they're solid, they deliver on schedule, they can supply whatever you need — well, that's great. But I've got 25 other suppliers providing me the parts I require from them. So what's the sense in building those additional planes or missiles, whatever it is, if I can't obtain every bit of the raw materials? So it sort of holds back the entire sector; and now we're discussing our top line, not merely the $600,000, which we could calculate. That particular item can't truly be calculated, it's difficult to determine, but it exists. From our standpoint, it's quite tangible. So, another item: costs and efforts tied to getting the new plant up and running plus equipment trials. When it comes to directly affecting the P&L, these costs are minimal. When it comes to the effort involved, major, major effort, I'd say. So the next one is another significant item. Supply chain problems hitting the aerospace sector and delays in boosting the defense budget. Those two items, to me, genuinely account for why our market is soft at present and likely will remain soft through Q4. None of this relates to GE, incidentally; that's the sole exception. GE is simply proceeding per the plan for GE programs. This is everything apart from GE. So for us, everything apart from GE is going to be mostly — a great deal of it is going to be military. So you'll hear plenty, plenty, plenty regarding how the holdup in passing defense budgets has impacted the defense and military sector. I just read a report this morning from a big company announcing earnings that, yes, they truly — they fell short of their numbers due to the absence of approval for defense budgets. So the budget was approved not long ago; and this is Washington matters. I don't grasp these matters particularly well, but that was the Defense Authorization Bill. It was, I believe, signed into law on December 27; but then there's another thing called the Defensive Appropriations Bill. That hasn't been signed yet. I suppose that one's significant since it means authorizing the actual expenditure of funds. So this has kept the defense sector in limbo, and I've come across lots and lots of reporting on this. So it's definitely not only our viewpoint. So let me just check what else. I'm reviewing my notes here, apologies for that; so, the reality that the defense sector — sorry, the Authorization Bill has been signed, I hope that's a positive. I suppose now folks are saying, well, I need the appropriations bill signed too. But with luck, that will get done and afterward the defense sector will return to business. At this moment, in my view, certain programs remain somewhat paused, and perhaps a number of the OEMs are holding off until they find out how things develop. So, we'll address that down the road. In fact there's one item, a bit of positive news regarding the Authorization Bill. We'll get into that afterward in the presentation. Let's move to Slide 6, inflation. Alright, these days we're hearing plenty about inflation. Absolutely everything, raw materials, freight, supplies utilities, just about all of it. When we requote businesses — pardon me, when we quote business to our customers, that is what I mean — we do hand along quite a few costs. But the huge question, at least in my own head, is: for what length of time could those higher costs be handed over to customers? Whether the subject is consumers, or the subject is their businesses, for how long? Since it's nearly just physics. A ceiling has to exist. And it's invariably the same story. You have no idea where that ceiling sits, how far is it possible to push it, how far is it possible to push it? And the trouble is that with these situations, at times nobody has the answer, they continue pushing, and pushing and pushing; and then it's like suddenly, everything halts; we've had enough. We're not paying these prices anymore, and typically that's — in the past, at least, we would often find it's been a sort of a severe event.
Brian Shore
executiveMany folks who are brighter than I am claim this time it won't occur, so perhaps they're correct, I can't say. Now, these aren't our set of alibis. These are elements that we believe you'd like to hear about. We believe we ought to — we believe you'd like to hear about these sorts of matters we're battling with, these troubles, though not alibis, not alibis; we're not — I hope it's obvious, we aren't saying sorry for the quarter. Honestly, I believe our folks performed a quite darn fine job given these conditions and how hard matters were. I believe you're aware of this, yet perhaps just — it merits a moment to clarify. For us, regarding quarter-to-quarter top line, there's just a restricted effect we can have on that quarter-to-quarter top line in the near term; it doesn't truly function that way. So since we can't instruct Airbus on how many A320s to build, I can't phone the CEO of Airbus and say, look, we're a bit short on our top line this quarter. Might you order a few additional A320 — I mean, build a few additional A320s or phone some airline, might you order additional A320s or some missile program? Might you build a few missiles this quarter since we want to raise our top line, clearly, I'm being somewhat facetious, that's absurd, though that's somewhat illustrative of the circumstance; so for us, we must operate our business extremely hard each quarter, extremely tight, extremely hard and afterward ensure we're engaged in creating fresh chances and won't enter that bunker mode. Everything is difficult. We're going to go conceal ourselves somewhere, which we observe frequently — I suppose, globally, perhaps within our sector, though it's truly crucial. We don't do that. We continue pressing and we continue seeking chances since that's the key. We had minimal command over the top line quarter-to-quarter since we can't instruct the OEMs when to purchase items, when not to purchase items; we can't command the reality that the defense sector is somewhat in the dumps since Washington hasn't passed the defense budget; we can't truly command the supply chain chaos that's truly appeared to impact the entire sector. We truly can't do that; and there are other program problems. There might be a cause why a certain — the OEM will hold off until next quarter to build additional missiles. I mean, that's their prerogative, naturally. And afterward they possess their own causes; those are matters we truly can't command. What we can command once more is operating our business extremely tight, extremely hard and striving hard to create fresh chances and not permitting ourselves to enter the bunker mode, everything is terrible. So we'll come out from a bunker, whatever. The issue is in truth individuals never reverse from the bunker. We'll discuss that afterward. Okay. Let's continue, since there's still plenty of ground to cover and much left to get through. Page — my mistake, Slide 7. This is simply yearly information. To give you some context, and you'll also find this on Slide 25, our guidance for fiscal 2022 is sales between $53.8 million and $54.3 million, with EBITDA between $13 million and $13.5 million. So that's noteworthy. On the top line, we'd essentially be returning to where we were in fiscal 2020. Yet it looks like we'd land near that same fiscal 2020 EBITDA figure. Another interesting point: if you compare the first nine months against fiscal 2019, EBITDA comes out roughly equal for those first nine months versus 2019, while the top line was $51 million back then against $41 million. That tells you something — likely that our margins have improved, perhaps our product mix has gotten better, perhaps we're creating and launching products with higher margins, possibly. Moving along to Slide 8, let's keep things rolling. We'll go through this fairly fast. Each quarter we go over this — balance sheet cash, and the history of cash dividends. The second arrow item shows $110 million, which is somewhat interesting, since that C2B sale also skewed our cash, because the sale of the cash — sorry, I'm going too fast — the C2B sale took place in Q3. However, we weren't paid until last month, in Q4. So the invoicing and the payment at the close of Q3 fell across those two periods. In a sense then, that $110 million actually falls a couple of million dollars short, given that the sale happened in Q3. Payment for that large special item didn't come through until Q4. Regardless, you may want to run some quick numbers: take that figure and deduct what we must pay for the expansion plus the installment payments on the transition tax. You'd conclude, yes, in a conceptual sense at least, that we perhaps have roughly $96 million. That's a conceptual sort of analysis. Down at the bottom of the page is our cash dividend history; we just move to the last checked item — $550 million in cash dividends paid since the start of 2005. As I usually note, that's a substantial amount for a small business like Park. Let me also address the first checked item — I ought to do that. While others were canceling or reducing their dividends amid the crisis, the economic crisis brought on by the pandemic, we chose not to, and kept paying a regular dividend the whole way through. Let's move to the following item. Slide 9 covers our top five customers, something we do each quarter. Let's not dwell too much on this. You're probably familiar with most of these names, since they appear quarter after quarter: AAE Aerospace, which relates to the Raytheon SM-2 Missile. Aeromatrix, with whom we handle multiple programs. GKN, which involves the Sikorsky Helicopter program. Kratos is clearly the Valkyrie shown in the lower left, while Middle River, MRAS, corresponds to the 747 to 8 Engine Nacelles program. So let's continue. I believe we're on Slide 10. Yes — something I find interesting here, just to provide a bit of context, is the pie chart in the bottom right. You might say, well, this covers only one quarter, not year-to-date. So for Q3 alone, revenue came to $13.9 million, and if you look at military, at 41%, that comes to roughly $5.7 million of military; that's not too bad, except $2.4 million goes back to the C2B. That's the military portion of the pie chart. So we didn't anticipate that in Q3, but in Q4, it will come back out to $2.4 million, which leaves only $3.3 million. That's quite a low figure. If you look at the history, it's quite a low figure, not only in percentage terms but in absolute terms. So again, this returns to the discussion of what's happening with the market; we're quite certain, quite certain, we haven't lost any business, any market share; that isn't the story at all. We believe we're getting opportunities, new programs. That isn't the story at all. It's the end market itself that we believe is the driver here.
Brian Shore
executiveMoving on to Slide 11, which covers our niche military aerospace programs. Once again, we include this almost purely for enjoyment — these are, in a sense, the entertaining programs we like to show you. Take the JSTARS: those are components produced using our material. Then there's the ESSM, blade materials for rocketry; and the Standard Missile 3, which also uses blade materials. As a bit of a fun fact, that's a MAC 16 to MAC 18 missile. You'd call that fast. Whether that's an official term, I'm not sure — let's just say fast. So the military side gets hit by supply chain issues, budget delays, and the uneven rhythm of military work that we mentioned earlier. Certain programs are running this month, then not the next. During one quarter they're active, and the following quarter they aren't. That reflects whether a program is ramping up or winding down. That's simply how the military business works — at least for us. There's a key footnote at the bottom; we still genuinely appreciate our military aerospace programs. Now Slide 12, all right; here's what we'll do — this is something we've gone over each quarter for quite a few quarters now. From Slide 12 through Slide 16, we're going to skip ahead. We won't walk through every single item. I'll just note that this section explains how the aerospace industry, particularly commercial aerospace, ended up in the situation it faces today. The whipsaw effect — we've discussed it repeatedly. I believe we've laid it out fairly clearly within the slides themselves. So let's skip past it, and if anything comes up, just reach out. When we finish this set of slides, we do highlight that this is what everyone else did. They fell into end of days thinking, an Armageddon mindset. Now, I realize those are two separate terms, but I don't believe I'm overstating it. The industry basically collapsed — but not Park, not Park. We never purchased engineering assets; we never let a single person go. We didn't release our employees. We didn't halt spending from our expansion budget. We didn't reduce our dividend. None of those things did we do. And naturally, at the time we couldn't be sure we were correct. When you're running a company, decisions have to be made. But I believe history will show we were right, while most of the rest of the world probably was not. At minimum, the rest of the world — most of the aerospace industry — adopted that Armageddon-style outlook. All right. So you're welcome to pat me on the back for that later, but I simply wanted to point out that we didn't take that path. Let's move to Slide 17. Here's one more item that comes up on every call, so we'll move right through it as well. The takeaway here is that domestic air travel is recovering more quickly than international routes. When you combine commercial—and I do mean commercial—with domestic, you get single-aisle. International travel corresponds to wide-body. So in our estimation, single-aisle is where the opportunity is concentrated at present—at present only, not permanently, but at present, understood. Now let's look at Slide 18. The GE Aviation jet engine programs slide—we bring this out each quarter because it's somewhat—I know it's not new information, but it provides useful background and framing. There may be some people joining the call for the first time. Starting with the first point in the upper-left: we've got a firm-priced long-term agreement with Middle River Aerostructure Systems — MRAS — that extends through 2029. MRAS is an ST Engineering subsidiary. For those unfamiliar, I should explain: for many years, MRAS operated under GE Aviation, before GE Aviation divested that sub to Singapore-based ST Engineering roughly two years back. That background is why all the programs listed here trace back to GE. On the redundant factory: we committed that as soon as this LTA was inked, we'd construct one for them — and we followed through. Moving to the second point: we're the sole source for composite materials used in engine nacelles, thrust reversers, and several programs. I won't go through each one individually. The leading five, which we refer to as the A320neo family aircraft programs. Then we have the 747 Comac programs. We'll get into that later. Both the 919 and the regional jet, plus the Global 7500. Upper right — what the upper right is telling us is that this represents a different type of structure. For this Passport 20 Engine it's a primary structure; and this comes through GE. It does not come through MRAS. Item — pardon me, Slide 19. Let's walk through a few updates regarding what's happening at GE Aviation, the key programs. So on Slide 19, this is in fact something that appeared in the earlier presentation, the Q3 presentation. Possibly during the first quarter — pardon me — there's a remark of real significance that the chief executive of Airbus made, essentially setting out his strategy and making his position clear. He stated what they intend and what they anticipate from the supplier network. So Airbus held firm on keeping A320neo output at no fewer than 40 each month for the duration of the pandemic. Meanwhile, skeptics and industry analysts kept claiming problems would arise, that production would fall, and that the company couldn't sustain that rate. That situation was quite harmful, since when those analyst notes circulated, people stopped trusting Airbus. They put their trust in what the analysts told them and figured they'd expand their operations; from that angle, the result was that the situation got even worse. Regardless, the figure never dropped under 40; at this point they claim it'll hit 45 once last year wraps up. After that, the number climbs to 64 during 2023, reaches 70 in 2024, and hits 75 by fiscal — my mistake, I keep using that word — these refer to calendar years. Apologies, calendar 2025. Since I'm speaking quickly, I'm not expressing myself clearly. Moving on to Slide 20. The A320 topic continues to be our main priority. Therefore, by the close of October 2021, CFM — the company that builds the LEAP-1A engine — held a 60% portion of confirmed orders for the A320 family of planes; this comes from Aero Engine News, essentially the authoritative source, containing plenty of fascinating and thorough details. That is quite solid data. And as you're aware, considerable equilibrium exists within that figure. This initiative is jointly held with Pratt — CFM alongside Pratt. What's the reason? It's simply above 10,000 confirmed orders, more than 10,000. To put it differently, should someone secure an order for 50 units at present, it won't shift that proportion significantly. There's substantial weight. The extensive remaining orders for these engines as well as these aircraft. Thus, taking the bullet point here, a 60% CFM market portion, 75 A320 family planes each month, that pace equates to roughly $30 million annually in revenue for Park beginning in 2025, when they indicate their target is the 75 per month pace. We haven't previously shared this detail with you. We sort of avoided stating it directly, so it's larger than a bread box, that sort of thing.
Brian Shore
executiveWe chose to share this data since it has secured such a major program for Park that we felt it was appropriate to pass that along to all of you. Moving on, there is friction among Airbus suppliers, and some of that friction has arisen regarding the ambitious planned increase for the Airbus A320 aircraft family, which is fairly public knowledge, something I find somewhat odd. You would assume those conversations happen privately somewhere. Yet Airbus keeps saying it won't pull back. Instead, it's pressing harder. Their stance on the A320 is quite resolute. My view is that they hold the strongest position here. I believe that's true given that they have 2 engines involved in the program. That lets them play one against the other, and plenty of proof suggests they've done exactly that to determine what the supply chain can deliver to reach that goal of 75. Slide 21; we remain focused on the A320 family, though the A321XLR is really the headline item; Airbus finished the initial build of the first test aircraft — final assembly, I should say. Maiden flight is anticipated within this year, with certification and entry into service the following year. That's quite quick. The A321XLR genuinely stands as the sole single-aisle plane offering 5,000-plus mile statute range — statute mile range — along with 225-plus seating capacity. That's huge. It's a transformative aircraft. I'm not sure many people realize that. Why? Since this plane can substitute for wide-bodies on specific routes. That amount of range, that amount of seating capacity swapped for wide-bodies, which cost far more on particular routes; and that matters greatly. Right now, Boeing has yet to answer this plane. Whether they're developing one remains uncertain. Some claim they are, but the issue is that this plane, the XLR, arrives in 2023. Developing a new plane requires considerable time. So I'm hopeful Boeing will join the effort, but even if they do, it will take many, many years before they have an aircraft in production and for sale that might rival the XLR. The A320neo aircraft family performed strongly in Dubai. Airbus lately secured sizable A320neo aircraft family orders from KLM and Qantas, both historically steadfast Boeing clients; so that's rather significant. Airbus is winning over Boeing's customers. Now we all know, everyone knows Boeing struggled with the MAX, and we wish them the best. We'd love to join the MAX program; we aren't in it, so we have no issue with the MAX; but my impression is that Airbus and its CEO are attempting to seize the chance during this window to expand market share and are acting quite aggressively. That's my impression. So I suppose it might be typical for us to hold that view; going after Boeing's customers, then, isn't exactly untouchable, I guess. The A320neo just overtook the A320 as the variant within the A320 and neo family holding the most firm orders; that's genuinely fascinating since Airbus is placing its emphasis squarely on the A321, not on the A320, but truly on the A321neo. I believe they're establishing a new facility in Toulouse, possibly solely for the A321. So it's intriguing that this plane is actually more sought-after than the A320 right now. Then the final point here is somewhat troubling. Pratt lately unveiled an upgraded iteration of its GTF engine paired with the A320neo family. Deliveries are set to start in 2024. Now this is the engine that — the alternative engine choice for the A320neo. So CFM splits a program with Pratt; up to now, CFM holds 60%, yet Pratt is bringing out an upgraded engine. Ought CFM to worry? I wish they would, because I'd regard Pratt seriously if I were — they aren't consulting me, but that's my view regardless. Slide 22, so let's shift to a few other GE program updates here. Comac 919. So Comac, that's the Chinese planemaker, the 919 was intended as a rival to the A320neo and the 737 MAX. Until quite lately, until the start of December, Comac kept insisting they would secure certification for their plane in China regardless and start deliveries in China prior to the close of last year; and then extremely late in the year, in December, the China FAA, let's refer to it that way, declared that the Comac 919 isn't anticipated to finish certification until 2022. That's this year. The statement noted that as of early December 2021, the 919 prototypes had logged merely 34 of 276 mandated certification flights. So that's fairly useful information since it isn't just slightly postponed and they have a considerable distance to cover regarding certification. I just read a report this morning, not from Comac, not from the Chinese FAA that indeed, the program is postponed; they aren't discussing when they intend to get it certified even though the Chinese FAA is mentioning this year. And Comac, I think, mentioned COVID delays. There are numerous severe lockdowns in China as a cause — one of the causes anyway for this certification's delay. Skipping past in this presentation discussion is the Global 7500 and the ARJ21. It isn't that they're unimportant. There simply aren't really many changes in those programs, and we're attempting to move through the presentation here. Slide 23. Okay. The 747, we're going to include this until the end discussion about the 747. Boeing has declared it will end production of the Queen of the Skies in 2022. The final 747 is anticipated to be delivered in October 2022. That's just around the corner. A melancholy moment for what many consider — myself included, I'd say it ranks right at the top — the greatest commercial aircraft ever made. May the Queen endure forever. For us, this one carries genuine sentimental weight; it was the very first initiative we became involved with, the GE Aviation initiative we joined back in 2014, and it remains my personal favorite plane. Yet I'd constantly want to point out that despite this emotional attachment, it brings in slightly under $2 million of revenue for our company. Two fresh images appear on the left and right. These, then, are our latest pictures of the 747 taken in Anchorage, Alaska. In Anchorage, plenty of 747s can be spotted. Moving to slide 24. Alright. Here we need to take things a bit more slowly. There's quite a bit of detail on this one; let's begin with the upper section of the slide to get some perspective and understand what occurred with — let's treat this almost as a stand-in for the commercial aerospace sector. During fiscal 2020, our sales came to roughly $29 million. Actually, it's closer to, shall we say, $28 million, since $1 million of that came from sales on the 9x program, which currently isn't an active program for us and sits dormant. So let's call it $28 million. What I like about taking $28 million and dividing it by 4 — that gives $7 million — is that it works out quite neatly.
Brian Shore
executiveSo roughly $7 million each quarter. And you can look at 2021 — once the pandemic began hitting us — one, two, the figures decline significantly. Take $7 million as your baseline. By fiscal — by Q3 of fiscal 2021, Q3, $1.8 million, which equals 25% of $7 million, meaning a 75% decline. I'd call that a fairly steep decline. But then see what followed. We move from Q3 of 2021 to Q1 of 2022, Q1 of this year — that's only two quarters. It rises from $1.8 million up to $7 million. Climbing back up is much harder than falling. That's 4x across two quarters; that's an enormous, enormous ramp-up. And obviously we managed it — those represent our sales; and currently we're sitting around that $6 million to $7 million per quarter. Good context. But the interesting thing here is that it's somewhat of a different story, since Airbus never dropped below 40 A320 units per month, and the 747 stayed flat throughout this period. Other programs are increasing. So it wasn't truly an end market program problem. What caused it? Destocking. It was that sort of end of days, Armageddon mindset in which the supply chain halted everything. Beyond that, they wanted to clear out all their inventory. They're liquidating their inventory. And not only are they not producing, they're not — they're selling inventory, whatever they could sell; so I believe that really is the sort of message underlying our numbers. It wasn't so much the end market, the end program markets; it was the destocking that was simply widespread and rampant across the industry. And naturally, that leaves the industry in a difficult position, because we return to that part we skipped over — they're back on their heels. They let go of lots and lots and lots of people, and hiring back isn't so easy. And guess what, they have no inventory remaining to cushion the ramp-up; so the supply chain landed itself in a real predicament here. To Q2, let's go to the bottom list, the top portion of the group of numbers. Fiscal 2022, Q3, the quarter just ended, $6.2 million. Our forecast when we did our Q2 presentation for Q3 was $6.25 million to $7.25 million; so we're kind of at the bottom of the range. I wouldn't read anything into that. These numbers move up and down a little bit depending on something shifting at the beginning of the quarter to end of the quarter, but I wouldn't read anything into that. Going down to the lower part of the page, our Q2 fiscal 2022 Q4 forecast, the current forecast is $6.6 million to $7.1 million. In Q2, that was $6.25 million to $7.25 million; so we're kind of tightening the range; we're not really changing very much. Tightening up because it's this quarter; we'll give more information about it. So that brings the overall projection for this fiscal year to somewhere between $26.3 million and $26.8 million. If we look back at fiscal 2020, it was $28.9 million, though perhaps $28 million on an adjusted basis. We are approaching that level. Not completely there yet, but getting near. There are some things that could influence this projection. What about the supply chain? What about COVID-related interruptions? Those are two. Every element we brought up and went over during the earlier part of the presentation, Slides 5 and 6, those are relevant; however, in my view, the supply chain and possibly COVID interruptions are what might have the greatest effect on the projection. As for Q4 orders, those orders have been booked. So if they don't get shipped — meaning something occurred that stopped them from being shipped — so let's discuss what it means when orders are booked. I'm referring to GE specifically, not everything with Q4 for Park. Let's move to Slide 25, there's a bit more to cover here; we need to return to that $2.4 million in C2 sales; so for — let's go straight down to Q4 and at the very bottom, fiscal year 2022 Q4. Our projection is $12.25 <<inaudible>> million to $13.25 million on the top line. So what's happening here? Back in Q2, we forecast $15.75 million to $16.75 million. Now if you take away that $2.4 million, what should it be? And that — that was meant to be in Q4, and it won't be in Q4. That still doesn't bring us to where we need to be. That would take us to $13.35 million to $14.35 million; so essentially, take what we provided in terms of the Q4 and Q2 forecast, subtract $2.4 million. It still leaves us with $13.3 million, let's say, to $14.3 million, which exceeds the $12.75 million to $13.25 million. Why is that? Because the issues that impacted Q3, we believe are carrying over into Q4; now you can see it isn't GE, it's everything else, particularly military; and then we come to the bottom line. $3 million to $3.5 million once again for Q4, for the current fiscal year Q4. In Q2, what we predicted was $3.5 million to $4.5 million. So, we are lowering that figure, clearly because of the top line; that's truly the story. Nothing regarding the bottom of the top line. One bit of positive news I'd like to share regarding Q4. We mentioned this in Q2 when we gave the Q2 presentation; we still anticipate roughly $1 million in blade of material sales during Q4. That isn't the C2B, that's our materials, where margins are pretty strong. So, alright. Long-term projection. Sorry, let me not overlook certain factors and risks that could impact the projection. These are comparable to the factors that impacted Q3, listed on Slide 5 and 6; so once again, refer back to those risk factors. Supply chain end market for defense, non-GE, COVID disruptions, those are what I would likely point to as the major risk items. Regarding the long-range outlook, folks have inquired about the timing for when we might provide it. That's something we'd like to do; however, right now, we believe there's simply too much unpredictability in the marketplace for us to proceed. Plus, we aren't interested in handing over mere speculation; we need a certain degree of assurance that the projection is sound. So it could happen—I'm not making a commitment—but it could happen in Q4, which falls in May, and perhaps by then, things will have settled somewhat and we can offer a longer-term projection of some sort. Let's move along here. We're behind schedule. Slide 26, our Kansas expansion. We could breeze past these details. The figures tell the story on their own. The film line trials have finished; that's positive; it's a significant milestone. Tape line trials are underway, with qualification set to start in January; and I'll simply note this. Even as lots of others were cutting their capital expenditures or scrapping their capital plans entirely, we continued and finished our big expansion.
Brian Shore
executiveFortunately, we made that decision, since without it we would currently be facing severe consequences—particularly considering projections such as Airbus's forecast of 75 units per month. We would lag considerably, both regarding spare capacity and overall capability. Regarding Park's workforce, please refer to Slide 27; our headcount currently stands at 112. During our Q2 presentation, that figure was 114. Thus it declined rather than grew, though we are striving to increase it. Hiring the individuals we need remains extremely challenging; this is no small matter. It is a significant problem. While others face the same struggle, our focus is Park. We will keep you informed; we recognize that we aren't alone in struggling to bring people aboard. Park's team confronts numerous difficulties and operates while understaffed. On the major supply chain front, we are examining topics previously covered, yet I want to frame these as everyday realities for our staff. Significant supply chain and freight difficulties represent a constant struggle involving substantial effort; what results from this? It results in sudden revisions and shifts to production planning and scheduling as we attempt to address supply chain problems. Those who manage a factory prefer a degree of predictability for planning purposes, perhaps looking ahead a couple of months or so. That would be optimal. For us, it isn't, because suppose we intend to manufacture a certain product next week but lack the raw materials; then we must reorganize everything. We reassign workers; we manufacture an alternative item for which materials exist. So it's somewhat challenging, requiring considerable additional labor and energy to run our operations under such conditions. COVID-related difficulties persist. This quarter proved tough owing to COVID. Additionally, we began the New Year poorly regarding COVID—presumably the Omicron variant, which spreads easily; thus we hold two worries. First, clearly the priority is our staff. The majority have fared well. That is, they are all right. They have recuperated. Yet it likewise generates considerable upheaval for manufacturing; we contend with supply chain complications. We relocate production. Then employees—someone in their household tests positive, or they themselves do. They might be all right. They might be fine, yet they are absent. Quarantine is required. Unlike a holiday where advance notice is given, instead someone phones in saying they just tested positive for COVID or feel unwell and are awaiting test results; hence this absolutely qualifies as a challenge. The anxiety and stress brought on by vaccine mandates—you hear constantly about how great all this is, but for those of us who actually have to work to earn a paycheck, it has created tremendous worry, since they wonder: what happens if I get fired right now? Then we'll go get the shot, and maybe we'll get the shot even before having had COVID. I won't debate whether the vaccine is good or bad; that isn't my field. What I will discuss, though, is our workforce. We assured our employees that nobody loses their job over refusing the vaccine, and many came forward saying what a relief that was, because they had feared termination, they had feared losing employment. Now, with this OSHA rule—you're probably aware—unless the Supreme Court overturns it, a testing alternative is supposed to exist, which is a positive thing. To put it another way, the way to grasp it is that those who aren't vaccinated may take a test instead, and we'll arrange that for them. The test will be purchased by us; they won't bear the cost. We'll have them come in, probably administer it whatever once a week, perhaps on Monday, we still need to work that out. Whether we can obtain the tests—that's an if at this moment. So we'll watch how that unfolds. Getting the new plant up and running, trials of new equipment. This is an enormous, enormous, enormous matter, the major consuming project that our employees are tackling short-staffed with no added help. Let's move to slide, which one is it, 28 here, still on our workforce, on managing Park's new projects and initiatives. We'll discuss a few of them; that requires tremendous work, tremendous effort. That's what I mentioned earlier. Frequently, companies feel pressured. They're stressed. They face many challenges. They retreat into a bunker. A bunker is not where we're headed. We don't halt. We don't remain idle. We continue onward. We seek opportunities, we chase opportunities; but it means a great deal of additional work. Our employees are managing that. Major consuming projects, our employees are managing with no added help, again short-staffed. Yet regardless, in fiscal 2022 Q3, Park's team once more rose to the occasion. That's the nature of Park's team. Anything that could be made and delivered was made and delivered despite the numerous obstacles and roadblocks that our Park employees had surmounted; and once again, thank goodness for Park's customer flexibility program, which I mention just about each quarter. So I won't go into specifics, but it truly is heaven-sent. Heaven-sent when business was declining, heaven-sent when it's climbing back. Slide 29. And above all, thank goodness for Park's wonderful employees. Park is extremely fortunate and blessed to have such wonderful employees. During the pandemic and the economic crisis, while other companies let thousands upon thousands of workers go, Park kept every single one of our employees on board. We never requested or accepted a single dollar of government funding to retain our team; government money or government incentives aren't something we require to hold on to our people. Holding on to our people is simply what we choose to do. The people at Park matter deeply. They're the very reason Park is Park. What you're seeing here comes from our holiday celebration. Each year, there's a paper airplane competition. Here are this year's champions, from both day shift and night shift. People truly take it seriously; these folks are practically aeronautical engineers in the way they craft their paper airplanes, and whoever tosses theirs the farthest wins. So there you have the victors of our holiday paper airplane competition. Moving to slide 30. Now let's discuss what's new with us, rather than sitting in a bunker. Take James Webb. It's genuinely thrilling — the launch happened from French Guiana on Christmas Day, riding atop that Ariane 5 Rocket, which, incidentally, belongs to the very company we hold a distribution agreement with. Right now it's traveling toward its Lagrange 2 orbit point, roughly one million miles away from Earth — the James Webb Space Telescope.
Brian Shore
executiveTo put things in perspective, the distance between the moon and Earth is roughly 239,000 miles, while the sun sits at approximately 93 million miles away. I can't speak for anyone else, but until maybe two or three weeks back, the term Lagrange point meant nothing to me, and these days I come across it around 20 times daily, since the James Webb generates so much coverage. In fact, there's a — over on Facebook, you can visit or perhaps become a member of a page where, each day, you'll find plenty of genuinely fascinating updates regarding the James Webb. There's also a site where its journey toward the Lagrange two point can be followed, which is, at least in our view, enjoyable and thrilling. So the James Webb Space Telescope's mission has peered back to the origin of time, the universe, existence; that makes this quite a significant matter. Numerous theoretical beliefs and scientific theories exist concerning how the universe came to be. Yet we've never truly managed to witness how the universe started, how existence started; take, for instance, what existed prior to existence's beginning — those are fascinating questions, and perhaps this isn't the right subject for an investor call, where you discuss plenty of figures and such. All the same, in our view, the James Webb Space Telescope — which we are involved with and whose framework our teams assisted in constructing — represents something tremendously significant. Now, onto Slide, um, 31 — sorry, I can't make out the slide numbers down at the bottom of my display. If the James Webb Space Telescope fulfills its objective, once more, in a comparable vein, where would it sit among the things humankind has accomplished? Honestly, I'd describe it as a fairly monumental one, stretching back to the earliest moments of time, at least as far as our species goes. A real feat, assuming it succeeds, to truly witness how life emerged, how the cosmos emerged, how everything emerged; that's massive. So, go ahead and insert whatever fits there. Even so, I'd argue it deserves a spot there. And also down at the bottom of the page. Our Sigma Struts, which are proprietary, are incorporated into the James Webb Space Telescope's structure. Park is with us on this journey of journeys to share that saying Park considers it an honor to play a part in this incredible James Webb mission would be the understatement of our lifetime. Honestly, it's very — no words can really convey what this means for us. The image you see here is a bit fascinating. It's a small diagram illustrating the Lagrange points. The James Webb is going to orbit that L2 point, which sits on the right-hand side of that little diagram. Let's turn to Slide 32. A press release went out yesterday regarding this, so it may have come across your radar, concerning the business partner agreement we signed with ArianeGroup over in France. We've been procuring our C2B type product from that company for a very long time. In fact, I personally went to see them in Bordeaux, I believe, around 2005, so our working relationship with them goes way back. This company is one I love — a great company, a very special company — and they approached us about becoming the exclusive distributor for this product. Our plan is to keep buying that product for ourselves. However, they came to us and inquired if we'd act as their sole U.S. distributor. We said yes, and we feel genuinely privileged, clearly. That represents a massive opportunity. We couldn't be more pleased with it. Now let's turn to Slide 33, I believe that's the one. Here's another update on what's happening at Park — significant possible initiatives tied to a new plant. Unfortunately, we're unable to share additional specifics at this time. We simply aren't able to do so right now. Even so, these are substantial endeavors we're pursuing. At minimum, we wanted you to know about them. Someone raised a good point — suppose a person toured our facility, they'd wonder why we built such an enormous new plant. It was a sharp observation from an intelligent individual, since a portion of that building already has a purpose assigned. Our tape line and film line are in there, along with freezer capacity, slitting equipment, and a warehouse. Even so, plenty of room remains unused. You may recall us mentioning before that additional space exists for either a hot melt tape line or a solution line, which would expand what we can produce today — though that's tied to business we already handle. There's a different line I should mention — the hot melt line, or solution line — and adding that would expand what we have in our equipment inventory, boosting our capacity. But that's something already underway; we've discussed it previously. This page isn't focused on that. In the new plant, there's extra room reserved for new project initiatives, and that includes two potential projects we're actively pursuing right now. For both of these projects, we'd be purchasing and installing significant new equipment lines, which would deliver new capabilities and market offerings to Park. One of them is a joint development effort with a key customer, while the other is something we'd undertake independently. Right now, we've got equipment suppliers looking at both of those projects with us. To give you a sense of scale, moving ahead on them would mean spending somewhere in the range of $6 million to $9 million on buying and installing equipment. Let's move to the next slide — I think that's Slide 34. Staying on this subject, there isn't a firm cutoff date by which we have to make a final call on either project, though both are top priorities, and we'll share updates as things develop. These efforts do involve making composite structures, but they aren't a big leap into some completely new space; each one would bring new capabilities and new things to sell into the Park lineup. These are things we don't do today. Now on to Slide 35. We're continuing our look at what's new at Park. There's an informal partnership with a well-established aerospace manufacturing firm — partnership at Park since it isn't a formal partnership or a formal agreement. It's more of a collaborative type of arrangement. Again, apologies, but we can't share much regarding this one. Details aren't available. It's quite preliminary. However, I'd like to inform you about some significant matters we're pursuing, so we will discuss this. Park thinks this well-established aerospace manufacturing firm possesses significant capabilities that complement Park's own. So they handle tasks we don't. We handle tasks they don't. That's frequently the recipe for an excellent "partnership" or collaboration regardless. Park and this informal ally have been working together on specific defense programs; this concerns defense. Thanks to this collaboration, our partner and we have already landed a big new defense program contract. Right now, Park and we are jointly pursuing a request for proposals tied to another sizable defense effort. Hopefully we win it — time will tell — and we'll update you as things develop.
Brian Shore
executiveWe think this casual collaboration could unlock meaningful new possibilities for Park and for the informal partner we're working with. Let's move ahead to Slide 36. These are pretty much the final slides, I believe. Apologies that this is dragging on. You can probably tell I'm hurrying and likely tripping over parts of it because I'm going too fast. Let's begin with the top year. There are those who claim the economy is strong and everything is fine across the globe. We hear that constantly. I come across it frequently in the press, the financial press, and our only response is that isn't the world we know — perhaps it belongs to someone else. Maybe that's the world of Wall Street investors, but it isn't our world, the Mainstreet world; that isn't where we live. Park's world is packed with difficulties. I'll walk through a few of those difficulties just to give some perspective: serious supply chain and transport problems. Certain people say these are getting better; we aren't seeing that, at least not so far, an everyday struggle, then sudden shifts in production planning and scheduling, extremely hard to bring on the workers we require, still dealing with COVID and all its many complications, vaccine mandates, which we discussed, getting a new plant up and running, trials for new equipment, a huge undertaking, a huge undertaking, and our team is confronting all of this while short-staffed. We can't bring people in. Let's move to the following slide, number 37. But here's what matters most. Even with all these numerous difficulties that our people face and handle daily, our people keep pushing ahead on major initiatives. That's the crucial point. We have plenty underway, plenty of difficulties, plenty of hardship, that's simply how it is. We aren't grumbling about it. It's simply our reality. We want you to be aware of it. But that doesn't mean we retreat into a bunker and hide until conditions improve. We continue pushing ahead. That's our way. That's how our people operate. Our new business partner agreement, these are a few examples we just mentioned involving ArianeGroup, the two major initiatives in development projects we're pursuing under our new plan. Significant new possibilities we're chasing via collaborations with our informal aerospace manufacturing company "partners," along with many other initiatives. What matters here is that all these new efforts demand enormous effort, enormous commitment, enormous time. So we might say, sure, we're completely consumed by all these problems and all the difficulties before us, we'll handle this at some later point. But we don't accept that; that isn't who we are. For us, that later point never arrives. So we act now; we push ahead; we capture developing opportunities. That's our way. When difficulties and hardships arise, others might look for shelter in the bunker and hold out until conditions improve. But here at Park, we don't do bunkers, and we don't wait. As far as we're concerned, the bunker is the place you head to in order to die. I believe it's the final slide, number 38. Here at Park, even when the world is full of difficulties, we keep pushing, we go on the offensive, we never halt. That's everything we understand; that's what we're about. Here at Park, we're aiming for the big prize. We aren't the same as the rest. Here at Park, we're in it to win. Now, when each presentation wraps up, we display a small image of one of our departments, groups, or teams; that's not typical. This one is a mix of various departments. These folks are the ones accepting accountability for equipment trials and getting a new plant up and running. That's a huge, huge undertaking, and the individuals here come from R&D, engineering facilities, and production. Roughly 4 more couldn't be in the picture. I don't — perhaps they weren't working that shift, or something along those lines. But I'll go ahead and say the names aloud. Back row: Christian, Dexter, David. Front row: Philip, then Davakar, Kelly, Dave — that's Dave Way — Mell, Martin, Leo. As I mentioned, a number of folks aren't in the photo; but what's happening here? These aren't recent hires. They've been with us for quite a while; so 4 months back, there was no new plant needing to be started up. There were no trials. These folks had no more spare time than I can recall. So these are the very people carrying out this big initiative of the trials and getting a new plant going, despite having their regular jobs. And it isn't a single department. It isn't a case of, fine, we have — we attempted to bring people in, we couldn't bring people in. So the staff we already have are handling it, and handling it extremely well, extremely aggressively. Running the trial, as I said, the film line trials have wrapped up. Right now we're doing the tape line trials, the qualification, plenty of other elements of getting new plants started up; so that's merely one illustration of what we mean. All right. That brings our presentations to an end. Once more, I'm sorry it consumed a full 60 minutes; so operator, should anyone have questions, Matt and I would gladly respond to them right now.
Brad Hathaway
analystHi Brian, thanks for walking us through all that detail. I particularly valued your comments about how the MRAS programs would look alongside the A320 in 2025. That struck me as genuinely incremental and useful, so I appreciate it. I've got a short question for you, then a longer one. The short one: could you share any thinking around how material the Ariane space sales relationship announced yesterday might be?
Brian Shore
executiveWe aren't able to put a number on it. Let me try answering like this. To start with, we're already a substantial purchaser of this product, so as far as we're concerned, it's significant as it stands. When it comes to acting as a distributor and selling these items to other parties, we're only at the beginning. Time will tell. Honestly, it's quite difficult to forecast. The components involved are extremely critical — this fabric, the C2 fabric, which gets used across many missile programs; so if other companies wish to participate in those missile programs, this material becomes necessary for them; and at minimum in North America, they would need to obtain it via us; even so, I can't put a figure on it. It's just that, well, just yesterday — in the news release, I believe — I think we executed this agreement with them only about a month back. So possibly less than a month ago, somewhere around mid-December. I'll need to follow up on that. We'll keep you posted as things develop. That said, I wouldn't anticipate — given how aerospace operates, especially in defense — that come next quarter we'll be reporting $5 million in sales of this product. My sense is that building this business is more of a long-term undertaking.
Brad Hathaway
analystGot it, that makes sense. If you can share any additional information later about how significant this could be over the long run, that would be excellent, and we're grateful for it. Moving to my second question, which concerns capital, something we've gone over numerous times. In the presentation, though, you mentioned, if I understand correctly, a project that might require between $6 million and $9 million in capital. Even so, you still hold, even using a cautious estimate, essentially nearly $100 million in capital on the balance sheet. What's your thinking on, I suppose, the options for deploying that capital moving forward? And regarding what you're seeing, what has you excited, or what excites you most now versus where things stood six months back?
Brian Shore
executiveWe absolutely don't require that kind of money to operate our company day to day. Typically, we produce cash. Being conservative is something we prefer. Having some working capital on hand is what we want. So really, that's our opportunity money, and yes, I'm aware it's $6 million to $9 million. To certain companies, that figure would be substantial. For us, it's likely not all that significant. It matters as money since we had to work to earn it. No one handed it to us. That's roughly how we think about our money, and we recognize that we don't spend it carelessly. Yet as you mentioned, it doesn't leave much of a mark on the cash position at present. And this is perhaps somewhat of a good but frustrating conversation for you and certain other shareholders, since the only thing we can say is that we're working on things, several things, yet we truly can't name or put numbers on those things, acquisitions included. I realize we've discussed this for quite a while, so I wouldn't fault some shareholders for being somewhat doubtful about it, and we accept all of that. Our bar is somewhat different; simply buying something for the sake of buying it isn't what we're after. We've probably covered that a dozen times. But allow me to return to my earlier point. For us, this is our opportunity money for what lies ahead. And whether we pursue one thing or another — we've paid out a lot in dividends historically. A regular dividend is something we keep paying. That's something we obviously always take into account; but my hope is that we can still deploy a solid share of cash toward building opportunities for Park going forward.
Brad Hathaway
analystNo. Let me make it clear — my preference is always this: if you're able to locate a use of that capital that generates a high return, whether through buying a company, forming a joint venture, or putting money into another factory, it might deliver returns from the new nature since those are going to be unbelievable. That is what I would prefer. But let me press just a bit further — as you put it, aerospace was dead 12 months ago and today it's coming back. So then, if you were unable to get — if no deal that made sense for Park could be found over the last 18 months, when do you reach the point where you say, you know what, applying your valuation criteria down the road is actually going to get even tougher, and admit you won't be able to deploy that cash?
Brian Shore
executiveGood question; you're right; when the market collapsed, we believed lots of fantastic opportunities would appear — perhaps businesses with good talent but carrying excessive debt and things like that — and that valuations would become truly attractive. Yet that's not what took place. I'm no authority on that subject, Brad, but my understanding is that with so much free money, so much money from the Fed floating around, folks managed to hold on instead of selling at those distressed levels, those bargain basin levels — hold on and survive the tough period, which I believe is what many people chose to do. And you're absolutely right that valuations never dropped as far as we'd have hoped, yet they certainly sit very high at present. Everything is expensive — any asset: cars, houses, boats, planes and businesses. And clearly that isn't our friend. That isn't favorable to us. And perhaps as interest rates rise — maybe nobody wants rates to rise except us, since we're the ones holding the cash — maybe that will give us a bit of help. It appears the tenure has ticked up a little again. So that could in fact be welcome news for us. But the most straightforward response is that we must continue shifting our focus and examining alternative approaches and alternative things, which is what we've done and what we're doing, because you're right. I mean, what did Einstein say — repeating the same action while expecting a result, that's a definition of being insane. So simply continuing to add and saying, oh, we're still doing the same thing, there's no logic in it when your point is correct. I mean, that success has eluded us. So what we do is keep shifting our focus, refocusing and retuning, looking from other perspectives. And we're fairly actively engaged in that right now, actually. The frustration with M&A stuff is, obviously, there's only so much I can say. We can't really give any specifics. I'm sure you understand that. That isn't a thing we can do. So I'd rather not claim anything, other than to say I hope you'll notice some intriguing developments down the road when it comes to M&A. Still, we keep pushing on that front. And that's a really fair point — rather than just banging our heads on the same wall over and over, we're shifting where we aim our attention as we move along, which gives us a stronger shot at coming out ahead.
Brad Hathaway
analystGreat, excellent. Thank you very much for your efforts and efforts for the Park.
Brian Shore
executiveHappy New Year Brad.
Brian Shore
executiveBrian here once more, naturally. Wishing everyone a Happy New Year. We really appreciate you sitting through such an extended presentation. Each time I aim to trim it down, it winds up growing; still, Matt and I send you our best wishes for a Happy New Year. Should you have any follow-up questions, don't hesitate to give us a call. We're always glad to chat with you. Thanks, and goodbye.
Operator
operatorThis concludes the program. You may now disconnect. Everyone, have a great day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.