Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary

May 12, 2022

New York Stock Exchange US Industrials Aerospace and Defense earnings 56 min

Earnings Call Speaker Segments

Brian Shore

executive
#1

Much appreciated, operator. Hello, everyone. This is Brian speaking. Good morning to all of you. We're pleased you've tuned in for our Q4 investor conference call. Delighted to have your participation. As all of you know, we issued our earnings results today — a release went out — and you'll probably want to pick that up. Within that earnings release, you'll discover directions for reaching the presentation we're going to go through, both through the webcast and on our site. And here's the little disclaimer we always provide: covering absolutely everything just isn't possible. We have a great deal of material, but our goal is to concentrate on — we aren't going to get into really dry analysis of the numbers — we can handle that for you later on, if you want, but our goal is to highlight a few areas that we believe might be of interest to you and could provide an interesting perspective. We'll go quickly through certain parts of the presentation — it's very long. Portions of it exist purely to give context; we won't go through each item in the presentation. There's no time for that; and getting through this could still take 45 minutes, and I just want to give you that heads-up. Matt and I will, of course, take any questions you have at the — after we've finished walking through the presentation. All right, let's proceed the way they say to. We move on to Slide 2, the forward-looking disclaimer. Should you have any inquiries regarding that disclaimer, simply reach out to us by phone. Slide 3 contains the table of contents. The presentation to walk through is Slide 1. In Appendix 1, we've included our usual supplemental financial information as an appendix. I'd like to move forward to Slide 4, and I'll likely spend a bit more time there than on the first three slides. So, on Slide 4, we have our Q4 results, which you're probably already familiar with since they're also available; therefore, I won't devote much time to the figures. Looking at the figures, you'll notice the revenue line has declined compared to earlier quarters. Still, one positive development is that gross margin has climbed back above 30%; we weren't satisfied last quarter, Q3, when it sat below 30%. That left us less than pleased, and the adjusted EBITDA margin is likewise now within the range we want — ideally we'd prefer something stronger, though at minimum it isn't sitting under 20%, which is where it stood in Q3 too. On the EBITDA side, adjusted EBITDA came in at $3 million. That's something we feel good about. All right. During the Q3 conference call, what did we tell you to expect for Q4? We projected revenue would land between $12.75 million and $13.25 million. As it turned out, we missed that target — we fell short of it by $12.5 million. On adjusted EBITDA, we had put forward $3 million to $3.5 million, and our actual result landed inside those bounds. I feel compelled to repeat something I always bring up: when we share a forecast, the words "guidance" or "estimates" aren't ones we use. What we're doing is telling you our genuine expectations. There's a practice we refuse to take part in — one you could fairly call a cheap tactic, and one that probably 90% of other companies rely on — where a modest number gets handed to you purely so it can be beaten later, making them look like heroes. To us, that seems rather foolish and demeaning. So we share with you what's going to — what you expect will take place. Sometimes we get it wrong, but we claim we're telling you what we genuinely think will take place. In any case, despite the fact that we fell short on the top line. The bottom line landed where we wanted it. And I'd say Park's team did an exceptional job achieving that EBITDA figure given that we missed the top line and given all the other matters we're about to discuss regarding the everyday reality at Park. Let's move to Slide 5. Here we go, experiencing the Park Life throughout Q4, Q1 and beyond. If you've been listening to other earnings calls or keeping up with business headlines, none of this will come as a surprise: supply chain, supply chain, supply chain — honestly, it's amazing. I should note that people predicted this would be over — the problem would be resolved — by the end of last year. That was the claim. Of course, it wasn't resolved; and as far as we're concerned, it was never — we never thought it was awful. Our freight situation, freight, yeah, a daily challenge, and major staffing shortages; we'll come back to that later. In Q4, we lost out on close to $1 million in shipments, mostly due to issues in the supply chain — roughly a million dollars in product we'd have sent out, if only we'd had the necessary raw materials on hand. Moving on to Slide 6. Alright. We're continuing with the situation Park is dealing with: inflation everywhere, over and over, raw material expenses. There's freight, utilities, supplies — basically all of it. So again, we don't need to tell you about this. It's something everybody knows, whether you're at the supermarket, the gas station, you're hearing about it, seeing it, and experiencing it firsthand. But transitory. We've got a double how that, remember, transitory. The people still saying that. Let me be clear—this isn't some ultimate roster of alibis. At Park, "excuses" is a dirty word; we simply don't do that. Still, we figure you as investors would like to understand the daily grind we're facing here at Park, which is why we're laying all this out for you. Moving to Slide 7. On the supply chain front, let me add more—nothing remotely like what we're seeing now has ever crossed our path before. What began as an open scramble has ended with procurement networks falling apart entirely. Disorder rules the day, and in some cases even legitimate purchase orders go unfulfilled; that's exactly the kind of breakdown I'm describing. Under ordinary circumstances, commerce depends on a basic level of confidence and mutual good faith—without that, it can't operate. We receive a pricing quote from a supplier. We have a purchase order, a confirmed purchase order, and then we go back and give our customer a price. Naturally, that price is tied to what our costs are, tied to what raw materials run us, tied to what our supplier tells us on the call. After that it moves up and down through the supply chain in that manner; this happens all the time; it's simply handled in good faith. We don't bring in a law firm on each occasion. We don't reach out to the law firm whenever a PO or a PO confirmation comes up. That's just how business gets done. Yet at this moment, none of that is really functioning anymore. It isn't only that suppliers can't fulfill the delivery commitments they've made, which we understand, since perhaps they aren't receiving their raw materials on schedule, so we get that, or perhaps they're short on staff. But there's another thing going on that we find disappointing, though it isn't a shock: sometimes people, sometimes companies, won't even stand behind the pricing that's in appeal. I confirm the PO, and they say they won't honor that pricing; so the spot that leaves us in is this: fine, we took that price as a given — can we pass a price along to our customer?

Brian Shore

executive
#2

It's a pretty fascinating situation, and that's exactly why I describe the supply chain as being somewhat chaotic. All those things you'd normally depend on for regular operations — those are assumptions we simply couldn't rely on; we used to take them for granted, and now we can't anymore. But here at Park, we don't panic, even when the panic is being generated around us, and we simply coexist with the chaos. Should chaos head our direction, we'll handle whatever heads our direction. It's really unfortunate that this is the reality we're living in, because a great deal of time and energy goes into coping with this stuff that would be better spent on other matters, but we'll handle whatever we're forced to handle. That's the way we operate at Park. At Park, we honor the integrity of what matters most. At Park, our principles — we won't dwell on this again later, but you can probably see where this is heading. We honor the commitments we make. We honor the commitments we make regarding any pricing on a confirmed PO; we don't circle back and say, sorry, our costs went up. Suppose we have a confirmed delivery set for 3 months out; we don't return to the customer and say, "Sorry, our costs went up, so we won't be honoring that pricing." We don't operate that way. That isn't the Park way regardless. All right. Let's continue. We'll return to that afterward. Slide 8. Slide 8 is fascinating — lease — that's the yearly review, the annual fiscal year review of Park's history. And as you can see, we highlighted fiscal year '20 and fiscal year '22. We figured maybe we could zero in on those 2 years briefly, since we find the comparison rather fascinating. Notice, naturally, that during fiscal year '22, the top line fell short of fiscal year '20, partly for some of the reasons we've been discussing. Still, it fell short. But here's a rather pleasant caveat — examine the gross margins. Gross margins came in stronger in '22 than in '20, despite the fact that in '20, the top line was considerably larger. '20 was a strong year. Consider that for a moment. Our fiscal year wraps up at the close of February; therefore '20 was a pre-COVID year, right before COVID hit. '22 wasn't a pre-COVID year. Certainly not — not a pre-COVID, pre-economic crisis year at all. So even during the old second COVID year, our fiscal '22, that second year of economic crisis, our gross margins were in fact stronger. And check the adjusted EBITDA — not merely the percentage, the actual figure is stronger, $13 million in fiscal '20 rising to approximately $13.1 million, marginally stronger, but we'll accept it in '22. During 2022, we faced COVID-related interruptions, issues in the supply chain, payoffs, rising inflation, and not enough staff. Those were the realities we dealt with throughout 2022. Even so, just look at what the team managed to accomplish, especially with the adjusted EBITDA margin looking quite good too. So I'd call it excellent — truly outstanding work from the folks at Park under incredibly tough conditions to produce results like that. If you ever feel like writing a thank-you note, send it to Park's employees, not to me. I didn't contribute anything; it's our staff who did everything. Moving on to Slide 9, we'll breeze through this part. This is a routine we now follow each quarter — it came from one of our strong investors with a good suggestion, and we ought to include it every quarter, so we do. The sole point I'll address is at the bottom of Slide 9, that final arrow: with interest rates climbing quickly and the era of inexpensive, readily available capital possibly ending, hopefully Park's position of having harder-to-get money will at last carry value. It's been irritating — having funds while everyone else gets free money, and we're competing, say, on M&A, and prices skyrocket because another party is spending other people's money, whereas we spend our own. And that other money is low-cost. So with luck, there'll be some shift in that dynamic. Slide 10: the only item we'll touch on is the final one, just a quick update. We've paid $554 million, or $27.05 per share, in cash dividends since fiscal year 2005. By comment, I think you understand what that means. For a small business like Park, that's a substantial amount. Slide 11, all right. A bit more of the fun content we like here — the top 5 customers in Q4. There's an image of a Boeing 740 — pardon me, 787 — tied to GKN, which is tied to the GEN-1 engine, for which we provide materials. Boeing next to a subs — that's something like Nordea, the Wiregroup. And in fact that — since this subcharter employs the weather master radon, we made the materials for that, which produces and Patriot, the advanced capability packers system. This is the major one. We'll mention this a few times during the presentation: it involves a company named AAE; we supply the third-party materials for the Rockies for the PAC-3. And Grambling, you've likely figured it out already; that's a Kratos design and built reman drone; we lack a picture for Middle River, but we'll get to them afterward. Okay, let's continue. Slide 12. An intriguing comparison of fiscal '20 to '22 — you can see the pie is sort of returning more or less to how fiscal '22 is coming back to more or less what it would resemble in '20, except military is somewhat lower compared to '21. Moving on to '21, our sentiment there is that the military sector is an area we feel genuinely positive about, particularly looking ahead, and we'll touch on that shortly. When it comes to fiscal '22, though, our view is that military was somewhat constrained, since approval of the budget involved very significant delays. That budget has now been approved. So we'll watch how that plays out. Let's move to Slide 13. Park has a real fondness for niche military aerospace programs; we do this each time just for enjoyment; this is a project Dana and Elena put together every quarter, dreaming up some entertaining things that parts are tied to. At times it involves purely niche items, at times volumes aren't large, and at times they are. So Boeing, RC-135 materials for structures, the MK-125 warhead for the SM6 missile, which is materials for structures. In that instance, it's actually on ablative, in that case, that structures. Collins-class submarine, which is for the Australian Navy, materials, and materials for the Harrier. Let's continue. We'll keep an eye on the clock here. I need to get through Slide 14. Alright; so we're taking a slightly different approach here. We're going to discuss trends in the military markets and discuss trends in the commercial markets. We haven't taken that approach in earlier quarters; so we're attempting to offer a somewhat different perspective for you, one we believe is timely.

Brian Shore

executive
#3

Let's talk about military markets, the trends, and the things you have to weigh — the new world order. What does that phrase even mean? It points to a fundamental shift in how people view the defense sector and defense spending, driven by what's happening in Europe. It happened practically in the blink of an eye — such a rapid change — and it's amazing what a war can do. War is terrible, obviously, yet it definitely leaves a mark — it has left a mark on the defense business worldwide. At least that's how it looks. I mentioned a moment ago that the U.S. defense appropriations bill got signed into law, so the defense industry isn't stuck in uncertainty anymore, and the 2023 defense budget carries extra spending increases, among them for missile defense systems — and we'll cover plenty of your missile defense systems, like the PAC-3, which we discussed, plus hypersonic missile systems such as the SM3 missile; we're involved in that program too. Moving along to Slide 15, picking up on military market trends. But Europe could be the truly enormous source of defense spending. We covered DOS and all of that — but what about Europe? Because while these products might be manufactured in the U.S., where are they actually deployed and bought? Countries such as Germany have already raised their defense budgets substantially, and plenty of others are looking at it — they're in the middle of weighing budget increases. And it comes as no surprise — given the situation, not surprising in the least — that the focus lands on missile systems. Well, I suppose we all understand the reason: nobody wants missiles fired at them. So that's a major factor, and I think that's perhaps part of what we'd call a sea change — we don't use the phrase paradigm shift to Park. So we use — we're not fond of that; and don't overlook Asia. That region isn't a cheerful spot right now either, with all the tension surrounding China and Taiwan; so Taiwan recently signed a contract for upgrades to its factory missile system. Japan relies on that packaging missile system, that defense system, as a vital piece of its submission defense strategy, South Korea, and as you'd expect, recognizes the Park missile defense system as a way to counter North Korea's ballistic missile capabilities. On to Slide 16, still on military markets, with some trends regarding the New World Order. So Lockheed said recently — pardon me, I'm pausing a little — Lockheed remarked that Russia's assault on Ukraine has driven up demand for their missile defense systems. During the earnings call, Lockheed's chief executive stated that requests for SAD and PAC-3 systems are coming in from all over the globe and are expected to keep coming. He noted that when people witness missiles striking hospitals and train stations in Ukraine, governments start to feel that possessing a capable missile defense capability could be a smart investment. He then moved on, saying that Aerojet, another key PAC-3 supplier, had just recorded significant growth in activity related to the PAC-3 missile system, and that Park's, as previously mentioned, provides specialty ablative composite materials in support of the factory missile fence system. So that brings us to this point. What conclusion should we draw from all of this? There's definitely a strong movement toward more — sorry, toward higher defense budgets across North America, Europe, and Asia, as far as I'm concerned, no question about it. However — and yes, there is a however — problems within the supply chain could, at minimum on a temporary basis, put a cap on how fast that spending can ramp up. That matters quite a bit, since the supply chain might not be in a position to react as swiftly as certain of these nations would like when it comes to modernizing their defense systems, and it takes some time before the supply chain can catch up. That's how it always works; so why don't we move on to Slide 17? Alright, we've covered what's happening in defense. Now let's turn to commercial, the base markets, and the trends we're watching. This part has more moving pieces, so going through it will take a little longer. Let's start with the fact that commercial aviation is still bouncing back, and the main driver is continued strength in U.S. domestic and transatlantic travel. Narrow-body jets — something we've talked about a lot — remain the engine of that recovery, and these are wide-body single-aisle planes designed for domestic routes as well as shorter international ones like TransAtlantic. U.S. domestic commercial aircraft are now at roughly 90% of where they stood before Covid. That's something we've seen reported in various ways. Business travel is another area that had been slower to bounce back than leisure flying, but it now looks like it's starting to come back in a solid way. We're not talking about large aircraft here. What we mean is business travelers flying on commercial airlines. According to analysts, the worldwide fleet count from 2019 should be reached sometime in 2023 and exceeded during 2024. Let's dig into that; beyond that, a number of U.S. airlines have lately shared figures showing robust passenger demand and have raised their revenue outlook. One of them said not long ago that they intend to hand jet fuel expenses over to their customers, and they anticipate those customers will absorb the higher fares. We'll get into that topic a bit further on. This morning, I caught a segment on a financial news broadcast saying that just last month, ticket prices climbed 18%. Now, don't hold me to a news program — sometimes they get this stuff on, but not surprising. So Slide 18, continuing with commercial aircraft — sorry, aerospace trends. So all the signals seem to be quite positive. Happy days are here again. We're going to celebrate; and generally, higher jet fuel prices provide airlines with extra motivation to more quickly replace less fuel-efficient legacy aircraft and more the fuel vision monitor aircraft such as the A320neo. As a general rule, higher jet fuel prices is a greater motivation. Broadly, carriers are reluctant to retire older aircraft ahead of schedule, since the financial case tends to argue against doing so. However, when prices for jet fuel climb high enough, the economics change, and that creates an incentive to swap out those older planes for a more modern model sooner. Compared with the older A320, the Neo delivers substantially better efficiency — fuel efficiency, to be precise. Then you arrive at a major caveat, and it is a large one. Is there some ceiling on how much extra expense the market can bear? Few voices are raising this point. Even so, it falls to us to think it through carefully instead of just accepting whatever others tell us. For an airline, jet fuel is regarded as the biggest slice of the operating cost pie. That held true even before jet fuel prices jumped so sharply. Jet fuel now runs at roughly double its price from 12 months earlier, which has driven a very significant — very significant — rise in what airlines spend to operate. It could be beyond double at this point, since it appears to climb higher week after week. To protect their margins, airlines have raised ticket prices by a substantial amount. We'll probably push them up further so they track those climbing jet fuel prices. Now, if you look at Slide 19, lots of folks keep bringing this up, and there's a ton of accumulated appetite for flying as the globe emerges from the pandemic. Beyond that, a lot of individuals are sitting on cash they're eager to spend, so they're ready to head out, watch restrictions lift, and take trips. That part is undeniable.

Brian Shore

executive
#4

Yet, then we return to that same caveat once more: will the individual traveler and the vision traveler really keep agreeing to shell out those hugely inflated fares indefinitely, with no conclusion anywhere in view? Does that truly add up? Is that the logic? I'm not sure. That's a device history — oh right, it's a price history. Things haven't played out that way before. Does it defy gravity? Honestly, I don't know, perhaps it does. And what about that unpleasant other word? What happens if there's a recession? Would people still fly and still hand over rising ticket prices should the economy stall out or move in reverse? So, thinking about it — let's continue to Slide 20, still covering commercial aerospace trends; so that's a point worth pondering while we're cheering with exuberance about how wonderful commercial aviation looks. Naturally, we must ask whether that's irrational. Should people fly less, would airlines order fewer airplanes? Well, perhaps that's something to consider regardless. If that comes to pass, would commercial aircraft manufacturers dial back their production rates? Here's a fascinating bit. Some might, some might not — something we ponder. Now this could be where we arrive at that diverging duopoly idea. Boeing, based on what we call their reports, is concentrating on cash flow. Airbus, according to their reports now, is concentrating on dominating the single-aisle world. The reaction might not be the same, or Boeing could come back and say they do need to bring things forward. It makes sense that while I'm pointing out issues with Boeing, Airbus may move in the other direction. We'll come back to that later, but it's something truly fascinating to monitor, especially if the economy loses steam and starts contracting. Moving on to Slide 21. Slide 21; this particular slide shows up in all of our decks, so we're just going over it again. We have a solid long-term LTA requirements agreement running through 2029 with Middle River Aerostructure System, MRAS, which operates as a subsidiary of ST Engineering. I always have to point out that MRAS was previously divested from GE Aviation; that makes clear who's involved across all those GE Aviation programs. There are certain programs that existed back when MRAS was still part of GE Aviation. For those, we set up a second plant, serving as the only supplier of composite materials or engines — pardon me, and thrust reversers for the initial five. I went through the list, and we'll refer to them as the A320neo family of aircraft using LEAP-1A engines, the 747, the two Comac planes, and the Global 7500 aircraft. Let's continue. This image is one I always enjoy highlighting. Those are Boeing 747s and — just compare their scale to the guide in the background of that photo. Alright. Moving to Slide 22. Now, a few fresh updates from GE Aviation. So, we've got something exciting here — Park has created a brand-new film heater product, and it came out of a joint development MOU, an agreement between MRAS and Park. Developing this film heater product took a really long time, but now it's finished. Qualification testing with MRAS is currently underway for our new film product. That's great news, and we're very happy about it. It's a long process. In addition, Park's live strike protection LSV material — the LSB parts material — was also developed together with MRAS. MRAS is already using it on the A320neo aircraft family and the Comac 919 program, and we're still supplying both of those programs. That's a positive, though it isn't new information. To begin with the latest developments: LSV materials for slip parts have received approval for use on the Global 7500 program, and that program has now passed 20 engines. This is also very good news for Park. If I had firm timing on these items, I would pass it along, but that certainty isn't available to me. So that's the first point. There's also the case containment wrap for GEnx engines used on the 777X aircraft. This is truly encouraging — the fan case containment wrap program had been inactive for close to two years, and about a week ago it became active once more. Design risk is still present. As you know, we told you before that it was possible the fan case might be redesigned, which would eliminate the need for the containment wrap. But even if that happened, we'd still need to make quite a few containment reps. So at least for the time being, we're very pleased to be involved in that program again. In fact, we expected purchase orders for this program at any moment, with the kickoff imminent, and then Boeing pulled the rug out from under us. They caught a lot of people off guard when they announced the 777X would enter service in 2025 instead — a delay of two years. Obviously, that's a letdown. At this point, we don't have much clarity on what the impact will be on the containment wrap program, but there's no question it could push things back. So that's somewhat unwelcome, and it might temper expectations a bit as well. Turning to Slide 24. We've spent considerable time on the A320neo family and its LEAP-1A engines, given how significant that is for Park. I think we've put this slide into 2 or 3 decks at this point; it captures the moment Airbus essentially set a firm boundary, declaring what they intended to do. That was in May of last year, a year back. They were saying, here's our plan, all right? As soon as that happened, the supply chain essentially goes into a state of panic, and you get considerable resistance, with many saying this is excessive, how is the supply chain supposed to handle that; so right away tension emerges between our Airbus and the supply chain. Turning to Slide 25. A bit of background: Airbus averaged 40 Neo family aircraft deliveries each month during 2021. They insisted they would never fall below 40, and they maintained that position even when the pandemic struck, asserting 40 was attainable, so many doubted it, many doubted it, and still they delivered. Moving to the next point, they're currently handing over A320neo family planes at a pace of 49 each month, which as far as I can tell matches their intentions; so the ramp-up is already underway; and Airbus put out a plan not long ago — and this one matters a lot — to hit a delivery rate of 65 A320neo family aircraft per month by the middle of next year, only 14 months away from today. To hit that pace, obviously the supply chain needs to ramp up much faster than that deadline—arguably starting immediately. And in a speech given recently at the Aviation Week raw material supply manufacturer supply conference—that's an event where Airbus people talk to their suppliers—what did he say? He made an interesting point. He told them: we need you—the suppliers in that room—to follow the rate increase signals coming from Airbus and phase in those hikes according to what Airbus signals. He also told the audience that we would sort of rather you didn't second guess; so Airbus is displaying a bit of impatience, growing somewhat restless about the supply chain. That's how I read it, at least.

Brian Shore

executive
#5

Basically, quit doubting what we're doing and fall in line — that's why this is getting noticed. Moving on to Slide 26, GE Aviation. In my view this is significant, and not long ago it was said openly: we're witnessing an increase in lead production the likes of which we've never seen; and they continued by saying that we're in alignment with the. That means Airbus, about what has to get built through 2023. So this might be a major development, because GE was GE Aviation, among those businesses and that supply chain that was likely doubting how aggressive Airbus has indicated the rate increases would be. Okay, let's go on to the next one; and it's been reported. One subject that keeps coming up again and again is how expensive oil and jet fuel currently are. Because of those costs, a lot of operators still flying older A320s are feeling encouraged to move up to A320NEO planes sooner than they otherwise would. Once more, these jets burn far less fuel compared with the earlier A320 models. Then there's the final point, which is fairly significant and somewhat fresh, having only just come out — it arrived exactly one year after that first signal, which as you'll recall came in May of last year, and I believe it formed part of what Airbus shared in its Q1 earnings report. As we look past 2022, demand for commercial aircraft keeps expanding strongly, and the A320 family is what's fueling that trend. So because of that, we're teaming up with our industry partners right now to raise A320 family output to 75 planes per month by 2025. You can see they aren't stepping back — if anything, we're pushing even harder. In that news release, they also said Comac's A320 family manufacturing is moving toward 65 aircraft a month by the summer of 2030. That's the same point I keep making: 65 a month next year, 75 by 2025, according to the filing analysis. This matters for worldwide customer demand, and it also reflects how ready the industrial ecosystem is — really, the supply chain. The company is currently collaborating with suppliers and partners to make monthly production of 75 possible in 2025. Also on that call, Airbus mentioned they'd gone through a big group of suppliers and were getting responses like, "Alright, we've already fielded every question on this front. We're collaborating with our suppliers, and we're handling it." That's how I read it, anyway. Moving on to Slide 27. As of the close of March 2022, the LEAP-1A, CFM, held a 57.4% portion of orders for the A320 family. That's the biller in. Two engines are approved for the A321neo. The first is a LEAP variant — the one we're involved with via CFM — while the second is a Pratt powerplant, which we aren't part of. That figure matters a great deal, since our involvement covers just the LEAP side, that 57.4%. Let's go with that 57.4% figure, even though it clearly fluctuates month to month. We'll just take it as the present value. Those 75 A320neo family jets each month work out to roughly $28.75 million in annual revenue for Park, beginning in 2025. One more point — something we bring up each quarter and it's fairly major. Time isn't on our side here, which isn't ideal. The first slide was expected sometime this year, with certification and service entry set for early 2024 — a truly unique jet within the single-aisle segment in terms of how many seats it holds and how far it flies. As of February 2022, there were 515 firm orders. And here's the notable part: Boeing still has contributed nothing. There's no response from Boeing regarding this plane, and we're not hearing a thing. I'm not sure what to make of it, but it looks like Airbus plans to dominate this segment—unless Boeing acts fast. Let's go to Slide 28. Continuing with the update on the GE Aviation jet engine program, the COMAC919. That's a significant program for Pratt, with entry into service expected at the end of this year—we'll see. Then there's the Global 7500: 39 units built last year, and they recently reached their 100th aircraft. Let's move to Slide 29. The 747, which we discuss each quarter. Production of the 747 has ended in terms of volumes. I believe the final one was delivered in October. Honestly, this situation is genuinely upsetting for us, since that aircraft means a great deal to us and plays a significant role. On top of that, it was the very first plane tied to our initial GE Aviation engine initiative, which we took on back in 2014. That gives it an emotional connection for us too. Moving to Slide 30. We'll skip the background — you can look at the bottom of the page and derive that yourself — covering our projection, which is a GE Aviation initiative, along with the sales record — the sales record, the record — and the Q1 outlook of $6 million, or $6.5 million for Q1, which spans just over 2.5 weeks, though Q1 still carries substantial uncertainty. As you can see, that figure is lower. Q4 came in at $6.7 million. The decline there is entirely attributable to constraints in the supply chain, as far as we can tell. Now, moving along to the following section — this covers Park's historical financial results along with projected figures. Once more, the upper portion shows the past, while our Q1 revenue projection falls between $12.75 million and $13.25 million. As for EBITDA, that range is $2.75 million to $3.25 million. So these aren't particularly strong figures. Yet earlier in this presentation, when discussing Q4, we noted roughly $1 million in sales were lost, largely due to supply chain problems. These projections, though, factor in that we'll likely lose an additional $1 million in sales during Q1. To put it another way, sales would be significantly greater if everything were ideal, the supply chain were in place, and we had all we required. So let's continue. Now let's discuss a few remarks regarding our forecast and outlook. To begin with, forecasting is extremely challenging and likely not very useful given the current situation of supply chain turmoil and this sequence. Under such circumstances, projecting ahead is more of a guessing game than anything else, and even for Q1, it's challenging to forecast for Park and GE Aviation programs. With only 2.5 weeks left in Q1, the problem for us is that acquiring raw materials is difficult, which means production is heavily concentrated in the back half. So the situation is that significant risk exists even in the guidance we provided—the guidance we provided—which factors in many things we won't manage to ship during Q1 due to supply chain problems. Yet additional risk remains, because reaching the figures we projected requires everything to go smoothly. If a snag occurs, and we face further supply chain letdowns, even those figures are in jeopardy. So I realize it seems odd—with 2.5 weeks remaining, how could there be this much risk? Well, these are highly unusual times we're in. Supply chain chaos and disorder. So predicting anything in such conditions is extremely difficult. It's genuinely hard to predict even 1 week ahead. So when we discuss long-term guidance, well, that's somewhat foolish. And the guidance we provided—treating it as long-term guidance—holds very little value; we understand your time is something of limited value. However—and this is a significant however—we think we can offer something meaningful, just checking the time, it fits within our company outlook. So let's split it between military and commercial.

Brian Shore

executive
#6

When we look at military spending first, shaped by the new global order and driven by war, we think the prospects for Park look very strong—especially in missile defense systems, for the reasons we’ve already covered. In our view, this new-order dynamic isn’t just a passing phase. We see it as something emerging that will last over the longer term and be sustainable. It’s as if the world received a wake-up call, and it won’t drift back into slumber. I mean, war is—you talk about it when a war is happening. You watch it on television daily, you see the consequences, and it grabs people’s attention. Of course, if it’s in Europe, it draws even more of your attention since it’s right in your backyard. People recall—well, I’m not sure, they probably aren’t alive for it, but that or 2, but they likely heard about it. About what might unfold in Europe, in other words, if a war occurred. All right. Slide 33: how our session affects the outlook for our military business. We don’t think it changes much, because too much is at stake for countries looking to raise their defense budgets. There is, again, that small drag—the supply chain. But if you’re worried about missiles heading toward you, you’d likely put your missile system ahead of other things, maybe fixing your roads or whatever else—what our country spends its money on. Commercial Aircraft business outcome. This one’s a bit more complicated, so let’s get into it. Why don’t we go program by program, since I think examining the key programs helps us understand. A320neo, clearly, we’ll start there. Airbus has been aggressively trying to aggressively raise the rates for this crucial program. How would a recession affect this program? We think Airbus is being really aggressive right now. They look at Boeing and see weakness, and they want to grab as much of the single-aisle market as they can and make their lead there permanent. So if a recession hits, our sense is they'd probably press that advantage even harder. For commercial aircraft, this is a really pivotal point. If you're American, that might be frustrating to hear, but in their view, Airbus has a window here to break the duopoly for good and become the dominant player in single aisle. Single aisle is the whole game. Based on what I can see, Boeing and Airbus approach things quite differently. Airbus comes across as highly aggressive. Should a recession hit, my guess is their approach would get even more aggressive—that's just my read. Whether that's accurate, I can't say; I'm essentially just reasoning aloud with all of you. Nobody feeds me information. I'm only going by what's publicly available for anyone to see. Turning to Slide 34, let's talk about our Comac program. The RJ is a small oil proband that's consuming a great deal of our attention. As for the 919, there's considerable growth potential for Park once those aircraft receive certification. How would a downturn affect those efforts? Hard to predict, yet one important factor is that these aircraft are meant for sale in China, where a centralized government calls the shots. That makes 909 a significant prestige effort for Beijing; they could keep pushing it ahead despite a recession. Worth pondering. On slide 35. Let's discuss the Global 7500 initiative. It isn't there yet, and we're putting it under commercial, I suppose, purely for ease in this deck — obviously a crucial initiative for Bombardier; in fact, we see it as a must-succeed initiative for Bombardier, yet the encouraging part is they've done well up to now, plainly putting major focus on it. What does a downturn do to that initiative? Fascinating to consider, not entirely evident, yet it's plausible the forces behind its success will remain even through a recession. During a recession, an ordinary purchaser of $40,000 might hold back, but would a recession deter the ordinary purchaser of the $73 million plane? I can't say, though such buyers would approach it with a different mentality. Obviously, the fellow is eager to get that lovely Chevy. Though in reality, there are no cars sitting on lots at the moment owing to the — I suppose, the chip shortages and other supply chain problems. Yet theoretically, if a lot had cars, the fellow able to spend 1 400,000 might hold back. Given all that, here's the key takeaway. Despite significant concerns about the economy, inflation, labor shortages, and supply chain disruptions, we believe Park's outlook is actually quite favorable based on everything we've discussed. Okay, we'll try to move quickly now. Shifting gears rapidly—this represents a substantial expansion. We won't go through the numbers, except for the penultimate item within qualifications currently underway, but they haven't slipped because of supply chain issues or staffing limitations. And as you're aware, those lines are being run for qualification purposes by R&D and engineering personnel. We do what's required, not what we'd prefer, but we do what's needed. Every person at Park does what's needed. I'll keep this short and won't take up much of your time. If you look at the picture at the top, you'll see one of our newer structures — actually, it's the facade of the building we're in now, the part where we added more office space. That middle section on the second floor is the standout piece of what we built out. It serves as a conference room. Roughly a year and a half back, we made the decision to name it in honor of a truly remarkable member of our team, someone who worked as a broker and is no longer with us. So we decided to call this route the Linda observation deck overseas; the airport property and the runway make up a genuinely stunning room. We also held a small dedication, or family gathering, so I just wanted you to know about that. Let's go on to Slide 37, where there's a bit of a shift with the James Webb Space Telescope, which is now about 1 million miles away from earth. And really, when you think about it, this baseball scope holds a great deal of our Sigma stretch and corporate infrastructure — what I believe is referred to as a bus. Those small—well, not small—those stretch items were produced at a modest facility, and placing a small, quote-unquote, compared to 1 million miles in Kansas, plus another $1 million floating in space, or wagering one million miles from the year to Munis, only 0.25 mile on year for perspective. And this, I suppose, requires it to be extremely cold in order for it to function correctly. So they keep it at a genuinely cold temperature; I just does sort of a final factor. Let's continue, site short of time, naturally. Let's—okay? And we are serving time. Park's people—I always discuss parts people. So indeed, this is our staffing crisis here, or challenge.

Brian Shore

executive
#7

Perhaps "crisis" isn't the right word—let's call it a serious challenge. Our headcount sits at just 105, though we brought on 7 more just last week, so for some time we'd been hovering around 98, 99, 100. For us, the ideal staffing level would be 125, or 128 at a minimum—these are genuinely hot-printed roles, 115 of them. Lots of other businesses are pulling in money from people—you hear about it constantly—offering cash to people just to get them hired. Big money. Naturally, that's an issue on our end; it makes recruiting people harder for us. They drive up what people cost in the near term, and those people are needed, and they get taken from you—for those of you investors out there. You know what that means: toss them onto a garbage sheet, and they aren't bought as commodities to be traded like work bellies, part—it's somewhat heartbreaking to witness. Our view is that flinging money at people and paying them for what they haven't earned can be cool and hurtful to them; it can wreck their sense of dignity, sulfur spec, humanity, and self-worth. It's plainly harder and more challenging for Park to bring people in when others are flinging money at people to recruit them, and Park isn't willing to do that. However, Park, we stick to our values regardless of how tough or awkward it gets to simply throw cash at individuals like they're merchandise. That's not something we do. The folks who work here aren't merchandise; they're valuable—they're like family to us. Slide 39: at Park, nothing comes to our employees without effort. We never give out handouts—we feel our team members receive fair pay, yet they have a stake in what they receive. That way they keep their self-respect. No handouts, nothing for free. We held a great many people in too high regard to push them aside, to preach at them, to make them seem more human by handing them things they didn't work for—doing that diminishes someone. Tim, the significance—what occurs if there's an economic slump or a recession. Okay, so look at those businesses — they bring in revenue by attracting talent, and they're determined to keep everyone they bring aboard, right? What's your take on that? Now, regarding Park — when we bring someone like Park on board, whether it's in a park setting or whatever the circumstances, our approach is that hiring people doesn't necessarily mean things will immediately fall into place. It won't always pan out. They might produce results — or perhaps if they aren't a good fit for our organization, they'll move on. Still, that's how we see it regardless. All the way through the worst stretch of the pandemic and the e-commerce period, we retained every single one of our valued employees, without exception. You recall that pandemic situation when sales — it wasn't exactly a gentle dip, more like everything just plummeted, I suppose you could say. Let's go to Slide 20. Think back to how unsure everything felt during the pandemic, when nobody could say if the world would make it through. That was two years ago, and honestly, we had no idea how things would turn out. Fear was everywhere, and uncertainty was everywhere. So what was our response? Even then, we refused to lay off a single one of our employees. Now, if a recession were to come, would we still be committed to holding on to all of our staff? I'd like to hear what you think. Let's turn to the next topic, which is pretty fascinating. On the subject of culture and strategy for practices, Peter Drucker — a name some of you might know, and I'm sure plenty of people in our audience recognize exactly who he is — offered this insight. So, how were we able to hit our Q4 EBITDA figure with a workforce cut back so drastically? Was it some kind of magic? I'd say yes. Our team puts in extremely long hours, sometimes 70-hour weeks, week after week. Twelve of our salaried employees, our VP and GM included, spent time on the line during Q4, and that covered the 3-day business weekend. That fell right before Q4 wrapped up, and a great deal of production had to ship so we could reach our targets. We asked our employees to step up. They simply did it. We know just how lucky and blessed we already are to have these incredible individuals, and we know exactly why they matter so much to us. That's what it comes down to. On to the next thing — my apologies, this is Slide 41, and we're moving fast. It's common for people to talk about strategies, and sometimes those are pretty intricate, put together, I think, by consulting firms. We've got nothing against high-end consulting firms, but that's usually where strategy gets created. Yet here's the key thing that a lot of folks miss, and yes, some IV Leger's are in that group: when you've got a workforce that's committed, driven and inspired, a company can accomplish incredible things. Take that kind of workforce away, and a company can't accomplish anything at all. It doesn't matter how sophisticated their strategy looks. Our strength in strategy isn't the whole story either—it's really our amazing team that gives us our power and makes us complete. Turning to the customer Flex program update, since we cover this each quarter, I'll skip reading the figures aloud; I'll just note that this initiative matters enormously to Park. Without it, achieving our goals would be extremely hard. We genuinely love that program. Moving ahead to Slide 42, which covers closing thoughts. We'll reach that point. Is a recession coming? The excess present in the economy and throughout our society strikes us as so severe, and it can't last. Will consumers keep agreeing to pay such inflated prices? That question applies to virtually everything we offer. As the money supply gets reined in and borrowing costs rise, the era of easy, inexpensive capital is ending. It would be nice if that trend persisted indefinitely. Is that clear? So, my thinking is that we aren't independent—obviously, we hold the view that a downturn is probable given these conditions. What's our stance on that? Sure, it may sound brutal, but we actually want a recession to occur, since in our view, that could be the sole means by which a measure of equilibrium, proper conduct, reason, structure, and Sandy can return to both the economy and our society. What would we change if a recession hits? Likely very little. Please turn to slide 43. Wrapping up, I want to say this: values aren't inexpensive—so let's return to that idea that principles carry a cost. What really matters is one thing: do you remain true to what you believe in when all eyes are on you? The real test of whether a person genuinely holds principles comes when they're under strain—when sticking with them isn't simple. It's inconvenient and costly to keep our commitments to Neo, especially in a world where many others would walk away. But at Park, we do what we said we'd do. No matter how hard things become or what we have to pay, Park's dedication doesn't waver. Our promise is sacred; we'd never break it—and I'm saying that about both pricing and appeal. I'm not referring to vendors who are running behind; that isn't on them, it's their supply chain failing to back them up. We're talking about agreed-upon pricing and a confirmed PO. And it's tempting for Park to avoid spending money on folks who understand how to bring people in, especially when so many others are doing exactly that. At Park, our people matter deeply. Our team members aren't products to be driven up in price or undervalued based on whatever direction things happen to be heading. Other companies must decide for themselves what's important to them and what isn't. And we must accept those decisions. That's on them.

Brian Shore

executive
#8

Yet one thing about our character matters most of all, and at Park our principles aren't inexpensive. Slide 44 — that additional section really contains nothing fresh. Keep pushing ahead and keep taking the fight to them. We aren't timid. We pursue things with aggression. We keep generating profit for our owners. That's a point every one of our folks recognizes as significant. Profit for owners is what we deliver. We always have. That's our aim regardless. And we keep swinging big. We don't settle for a lesser outcome; we're forever going for the fences. And at Park, we differ from the rest; we're not coasting here. We aim to create an impact; we aim for greatness — at Park, we play for keeps. The final item we constantly discuss is our picture, though this one is somewhat unusual since it's a photo of people. Not everyone is in it. We attempted to include everyone, yet a storm hit and folks couldn't attend — they had gathered in Kansas. You've all heard of that Wizard of us. And it's just roughly half of our workforce. Even so, we still take a company picture, because truly, we want to acknowledge everyone — in Q4, everyone performed so well; and fascinatingly, that small object up there, just above the group — that's a real Transco structure on the day of a through. So coppers stop, looking operating, Neoitdwas handed to us as a. That copper material, that looking material — that's the genuine live strike material. So you can somewhat grasp the scale — the size, and the Transall engine, the cells. So I believe that wraps it up, how we did on time — not great, 50 minutes; so operator, should any questions arise, Matt and I are available to answer them.

Brian Glenn

analyst
#9

I recall there was — this takes us back to the quarter that closed in May 2020. A modest repurchase happened. Roughly 137,000 shares, and the share price is roughly where it sits now. From where I stand on the outside, the prospects look far stronger and far more solid, even with a huge amount of uncertainty out there. Back in May of 2020, no vaccine existed, no timeline existed. Global air travel had been halted; and today it appears you're gaining bigger exposure on certain existing programs, such as the film adhesive for the 7500, with the A320s ramping up; those statements are public. You made your remarks regarding China's Comac, and then the military spend. Still, the stock trades at about the same level today. So if buying back shares was attractive enough at that earlier point, what's changed when it comes to any buyback, whether small or large, right now?

Brian Shore

executive
#10

All right, yes. That's a genuinely good observation. Right now, we're basically in a blackout period. Still, it's worth thinking about. We haven't been particularly aggressive with repurchases, because as you probably know, our track record has been to lean more on returning capital in cash, and in fact to favor special dividends—quite special ones—over buying back stock. Even so, I appreciate the suggestion, and it's worth considering. I'd just like to say that I'm in agreement with you. When it comes to the near-term projection, we aren't in a position to provide even a single figure — the market is just too unpredictable at the moment. I share your view that the longer-range picture looks favorable, though pinpointing when that will materialize is tough given all the near-term disruptions — we could just call them transient elements. Still, I think your read is correct: the outlook is a good one. So I appreciate the suggestion; it's something worth considering. Naturally, I can't give you a definitive response right now, but we'll talk it over — we'll bring it up when the board meets next; that's all I'm able to share with you at this stage.

Brian Glenn

analyst
#11

All right. Could you refresh my memory about the A321, that SLR you brought up? Does it fall under the long-term agreement for MRAS, or does it sit outside that? I believe you referenced it earlier, but I simply can't remember.

Brian Shore

executive
#12

It falls under the LTA. So indeed, that engine is a LEAP-1A. So everything there sits under the LTA.

Brian Glenn

analyst
#13

Got it. And then, if I may squeeze in one final question. Do you have anything to say about when actual workflow will be carried out at the new facility, and could it perhaps already have taken place?

Brian Shore

executive
#14

When work will begin at the operating facility. Right. Right. So regarding the — right, please continue, my apologies.

Brian Glenn

analyst
#15

Yes, yes.

Brian Shore

executive
#16

The qualification process is still underway. And like I mentioned, it's running behind schedule. We actually had to make a call between getting qualified and making product, and we went with making product. Disappointing our customers isn't something we're willing to do. So the delay in qualification happened purely because of shortages in raw materials and not having enough staff. As I noted, the individuals operating the equipment right now come from R&D and engineering, which isn't the setup we're after. Our preference is to have operators stationed there. So right now, we're not pushing hard on presale until qualification wraps up, which is a positive. So it might stretch out a bit more; but the moment qualification is finished, we'll begin manufacturing in that facility for MRAS and additional customers too; but I can't give you a firm timeline on that. And it's one of those situations that keeps shifting depending on all the other supply chain problems we're facing.

Brian Shore

executive
#17

Much appreciated, operator. Thanks to all of you for tuning in and staying with us. I’m sorry that these calls continue to grow longer and longer. We try our hardest to move through them quickly; in any case, enjoy the rest of your day. And Matt and I are always reachable if any follow-up questions come up — we’re glad to take your questions anytime. Have a wonderful day. Thanks. Goodbye.

Operator

operator
#18

Thank you all for joining us on today's call. That brings the program to a close. You're welcome to disconnect at this point. Have a great day, everybody.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.