Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary

July 7, 2022

New York Stock Exchange US Industrials Aerospace and Defense earnings 62 min

Earnings Call Speaker Segments

Brian Shore

executive
#1

Appreciate that, Paul. Brian here. Greetings, everyone, and welcome to the conference call for our first quarter. Joining me, like he always does, in his customary role, is Matt Farabaugh, who serves as our CFO. Earlier today, we issued our earnings release — the one covering Q1. Inside that earnings release, you'll find directions for trying to join the webcast, for getting the presentation we're about to walk through, and that presentation is also available on our website; so the deck, as you've likely already seen, runs pretty long, but no need to worry. This is the <<inaudible>> we had. It's been under 2 months since the conference call for Q4 — under 2 months. So very little time has gone by. And much of the material in that Q4 deck was fresh information, fresh content, and it remains highly relevant; so we didn't want to simply kind of strip that out. So here's what we chose to do: we chose to move a large portion of what appeared in the Q4 deck into the Q1 deck, though with certain refreshes and supplements — in other words, new items. And our plan is to concentrate during this call, concentrate on the refreshes and the new items, while we'll skip past, or at least glide past, a good deal of everything else; so — and the Q4 call remains posted on our website, should you wish to go back and hear it, please do so, obviously. Should there be items we glide past that you'd like to pose questions about, go ahead and ask. It isn't that we're unwilling to cover such things, but we're attempting to stay practical here. Since we're going to be hopping around somewhat, with luck, we'll attempt to keep it as cohesive as we can. If that comes across as a little <<inaudible>> — that's a phrase, so we apologize in advance. We always spend a lot of time in these decks on what we consider to be dry financial analysis. If you want financial analysis, just let us know, and we'll happily cover anything you'd like. But our goal is to make these decks more interesting and educational. I also want to give a quick shout out to Donna DAmico-Annitto, because she's basically my partner on these decks. I have no clue how to use PowerPoint — I'm an old guy. So the PowerPoint is all her work. Also, we end up putting in time on the Fourth of July and on Christmas, and I think you talked with her while she was on vacation, but even so she basically kept working right through the July 4th break. So, Donna, thank you. Once Matt and I are done — once we've gone through the deck — we'll obviously answer your questions. And even though we're trying to skip roll — trying to move quickly past some items and keep this as tight as possible, I'd guess it'll still take about 45 minutes. So I just wanted to flag that for you; now let's get started. Turning to Slide 2, that's the forward-looking disclaimer, just in case anything comes up. Slide 3 contains the agenda, and we'll begin with the investor presentation. Appendix 1 holds supplemental financial information, which we now attach to every presentation we deliver. Should you have any questions regarding it, simply get in touch. Moving to Slide 4 — regrettably, we must proceed somewhat more slowly here — this covers our quarterly results. Look at the column on the right side, the one highlighted in yellow. That represents Q1. There you can observe our sales, gross profit, and gross profit margin, which stands at 32%. We wish it were greater, yet whenever it's approximately 30% or above, we're satisfied; and you'll likewise see adjusted EBITDA together with the EBITDA margin. Regarding how we approach guidance, we attempt to mention this on every earnings call. Our forecasting approach is that anytime we give you our expectations, we put a forecast in the presentation. Essentially, we're sharing our honest view of what lies ahead. It's possible we'll end up being incorrect about that view; we don't play the game of sandbagging with a low figure just so we can exceed it and come off looking great. I realize many other businesses take that approach, but it's just not something we do. Here's what I'd like you to take away: a forecast from us represents our honest expectation of what's going to happen. With that in mind, let's revisit the guidance we gave for Q1. On the Q4 investor call, what numbers did we put out? For sales, naturally, we gave a range of $12.75 million to $13.25 million. We came in at roughly $12,783 million — inside the range, yes, but closer to the low end, in my view. On adjusted EBITDA, our estimate spanned $2.75 million to $3.25 million, and at $2.8 million EBITDA, we finished within it. The lower end is what I'm talking about. Still, we got into the range. I'd say the Parks team did a fantastic job reaching the first-quarter revenue and adjusted EBITDA numbers. That said, I'd note you've basically come in right at the bottom of the range. It's hard to really grasp the everyday struggles and the enormous amount of work that goes into it. Keep in mind, when we gave that forecast last quarter — during the fourth quarter conference call — we noted at that moment, which is interesting, that only about 2.5 weeks remained until the quarter's end, until Q1's end, when we provided the Q1 forecast, because in Q4 we had to handle our boarding and everything; so we announced later, after the — maybe roughly over 2 months past the quarter's close; so — and we said that even under those conditions, there's a great deal, a great deal of risk attached to the forecast we're giving you, as though everything we plan to sell had already been booked. That wasn't the case. Did the problems in the supply chain cause this? We were completely in the dark about what was coming; we had zero clarity on what would arrive. And what arrived was certainly not what we had hoped for. Here's what ended up happening: a big chunk of — how should I phrase this — a big chunk, not most of it, I take that back, a big chunk of the items that were supposed to be made and sent out during Q1 actually got made and sent out during the final two weeks of Q1. So every single day we're fighting the supply chain. Some raw materials showed up, and that was a relief. No matter what it took, we had to get them to move forward with building it, then run tests on it, then get it certified, and finally get it out the door — all so we could push the quarter across the finish line. That's exactly what our team pulled off. Folks put in extremely long hours, particularly over those final two weeks, doing whatever was needed to close out the quarter; and I can tell you, our quarters wrap up on a — many quarters wrap up on a Sunday, or the close of a financial period lands on a Sunday, and I can point to people who were working that weekend, sending shipments out that weekend, the very last weekend of the quarter.

Brian Shore

executive
#2

Okay, so as I was saying, a big chunk of Q1’s sales and production happened in the last 2 weeks, so that’s just <<inaudible>> my notes here already address that, and we discussed the weekend; so Park’s team basically forced the quarter across the finish line. We’ll return to this and what it means, what sort of people we have, but I just want to make that point. That’s why I’m calling it an outstanding job, even though we only reached the bottom of the range, on both the top and bottom line. Let’s move to Slide 5. This is pretty much all a repeat of what we had in Q4; so freight, freight, freight, the information <<inaudible>> had a recent report that the Mike a little likely in the tunnel regarding international freight shipping overall. But why? Why? Is that good news? Well, no, the report said, it’s user demand destruction; so you tell me whether it’s good news. But maybe at least there’ll be some easing of access to international freight, which has been a real problem for us each quarter. Severe staffing shortages. Yes, they’re definitely like disappearing. But what we’re saying is, we are handling this the right way, the Park way, which means we’re focusing on a Park family culture, not taking shortcuts like throwing money at people. Total missed shipments, $1.25 million. Now we announced Q4, I think we’re thinking about being a $1 million, $1.25 million in missed shipments because of all these reasons create mostly supply chain. Supply chain was a big kahuna. So anyway, that gives you a — I think I’ll give a little bit idea, a little perspective on the battles we’re fighting daily battle, what we’re saying, and that’s — I don’t think we’re being a little overly dramatic when we — when you describe our experience as a daily battle. Let’s go to Slide 6. Yes, inflation, it’s still there. The second checkmark, historically high, maybe was with us for a while. Maybe it’s not so easy to break the pattern. Maybe we screwed the pooch as the astronauts used to say. Pretty good here. Maybe now it’s not going to be so easy to get out of it. So not a list of excuses. We don’t like excuses at Park. We don’t go for that stuff; but we do think you want to know what kind of stuff we’re dealing with on a day-to-day basis since you’re investors in our companies. You want to know what we’re doing every day. Slide 7. Yes, supply chain has become a free fall. This continues having gone better, not as far as we know in any way, chaos and panic; and in many cases, even <<inaudible>> are not being honored. We talked about that a lot last time, so I won’t go into it, but I just wanted to know that continues. Putting our integrity first is what counts the most. Our principles aren't being discounted. I'll come back to that, Slide 8. So, during our last — this slide comes directly from the prior quarter's presentation — the Q4 presentation. We call out fiscal '20 and fiscal '22 since the key point is: compare the fiscal '22 top line with the fiscal '20 top line, and it's significantly lower. Even so, the gross profit margin came in higher, and the EBITDA figure was higher too — not by much, only a slight amount — sorry, in fiscal '22 versus fiscal '20, despite the top line being significantly lower. I felt that was a superb effort from Park's team. And on circumstances. Slide 9. Let's keep going here; so much of what's on this slide repeats last quarter, though there are a few new items I want to flag for you. So Park is long-term debt. Yes, we're on Slide 9, as I mentioned, I already told you that. Cash reported, $107.3 million. That has dropped considerably. So what's happening there. We're using money. Well, let's discuss Park's investment philosophy. Our cash sits in extremely safe liquid securities, including treasuries, governments, high-grade commercial paper, and the average maturity is 23 months. I'd say that isn't very long. However, with interest rates rising so much, it has a major effect. So it isn't the — not a credit risk on the investments, but the interest rate risk is what we're facing. Now our practice is to keep our investments until maturity, not to trade. We don't do that. But we could — I'm not saying we won't in the future, but our practice has been hold to maturity; so we have mark-to-market reporting of cash. Now if you want to discuss this for — you guys talk to Matt about it, I'm just trying to give you a kind of high-level understanding. Yes, it's important; so now when we report our cash, it isn't based upon the investment, the cost. It's based upon the market value of the investment at that moment. So all these securities are highly liquid and quoted like treasuries every second of every day. So it's easy to obtain that market value. But the market value has declined, even though they're really short-term, 23 months, because interest rates have moved up considerably; so that's why we're reporting a lower number than $107.3 million. Now the amortized cost basis of our cash at the end of the quarter was $111.3 million. You could — we report the number we're required to report based upon GAAP requirements. But once you have this information, you decide which number you think is more significant; now if we hold these securities to maturity, then it's likely we'll get closer to that $111.3 million number rather than a lower number. So why isn't it precisely that figure? The reason comes down to how amortized cost basis operates—we start with the investment at its cost, then either amortize it or write down the premium on a discounted basis across the security's remaining term until maturity, and that process continues over time. That's the reason it doesn't match what we paid at the outset. As I mentioned, for additional details on this, reach out to Matt—I'm aware many of you are finance professionals and likely understand this material far better than I do. Still, I simply want that number to be clear to you. And I should also flag that once we reach Q2, this gap—or delta, if you will—will likely widen, since interest rates are shifting and trending upward. They dipped somewhat, yet from our perspective the direction has been higher. So I just want that on your radar, because I believe it matters when you're reviewing our cash figures. Turning to Slide 10. There's no need to cover the upper section again. We already addressed it earlier. Nothing has changed there.

Brian Shore

executive
#3

On the dividend side, just a quick note: in fiscal 2005, our cash dividend payouts totaled $554 million, or $27.05 a share. Now let's turn to Slide 11. There's something new to report on our share repurchase program. The Board signed off on May 23 — we put out word that they'd cleared us to repurchase as many as 1.5 million shares of company stock. Since getting that green light, we've been unable to trade because of a blackout window, and as far as I know, that window closes tomorrow. So what's the situation at this point? It's interesting, because even prior to our making this announcement, we received a great deal of feedback from investors, from shareholders, some of you, regarding this capital allocation question, and the opinions we got were quite varied. There were perhaps 3 distinct categories. A few opinions were, don't pursue a buyback, don't even make an announcement about one. And at that point, as I remember, a few shareholders — and every one of them holds a meaningful stake — told us: declare a repurchase program, but keep it purely as a defensive tool. Don't buy at today's valuations. Instead, wait for a big drop, some market shock, real turmoil, with the shares falling to 7% or 8% — that's when you'd want it ready to fire. That formed the second bucket of input. The third bucket went like this: just go ahead and declare a repurchase — a few even proposed declaring yet another repurchase once the first one was out — and buy near current price levels. So altogether, we got feedback falling into those 3 distinct groups. There's a point I want to speak to. Someone — I'm not certain who, possibly an analyst — said our buyback announcement amounted to appeasement. I'd like to answer that. What does appeasement mean? It means you didn't think the move was correct, yet you made it anyway since you lack courage — you're a coward — and because pressure was weighing on you, you'd go ahead and do something you didn't consider right for Park. That's what appeasement means to me; and I have to say I was taken aback by that comment, because if you know Park, that's not what we do, that's not what we do. We act on what we believe is best for the company. Now, we value the feedback we receive from shareholders, and we assess your statement. Many of you are aware that certain things we've put in place came from shareholder input — genuinely good ideas. When we get an idea and it's a good one, we'll put it into practice. We don't have any of that <<inaudible>> stuff. But ultimately, we'll do what we believe is right for Park. I just want to make sure that's clear to you. We don't do things for the sake of appeasement. We witness that frequently in corporate America nowadays, and we find it quite sad and quite disappointing when CEOs lack backbone. They simply act in whatever way they figure is necessary to protect their positions, or something along those lines. But here's what I'll say to you. Staying in this job isn't my motivation. My aim is to act in the way I judge best for the company. So what will we do? We'll find out. I merely wanted to offer a few points for you to consider regarding that item at the bottom of the page. So perhaps our money will at last be worth something, and perhaps it now counts as a significant strategic asset. Another thing is that, in our view at least, the economy in this country sits in a deeply troubling, dark spot at present — extremely worrisome. Will things improve? People believe they will improve. Then I ask: why? What reason is there to expect improvement? What will cause that improvement? I'm not convinced there's a very clear answer to that. I don't wish to launch into a debate over why it happened, or our opinion on that. So I just want you to know we're weighing those 2 factors — but we'll find out; we're not — we know the announcement to make about whether we'll begin purchasing stock at this low or not. We'll give that some thought for a bit. We'll observe what takes place, watch what takes place around the world; and ensure we act in the way we judge best for the company. Any thoughts you have, we appreciate and welcome them at any time. But we'll act in the way we judge best for the company. And who does the company include? It includes the owners. When we say best for the company, we mean including the owners, naturally. Moving along to Slide 12 now. This won't take long — I just want to flag a couple of items. As all of you know, we do this every quarter. Whether you'd remember it off the top of your head, I can't say, but the top five look exactly the way they did three months ago. So there isn't a whole lot of shuffling going on. Every quarter, we put together a fresh graphic showing which programs those leading five customers appear in. There's the Global from Bombardier paired with Nordam alongside the Passport 20 Engine powering the Global 7500. On the XLR side, that ties to MRAS, while Sikorsky connects to GKN. I think there was an announcement that Sikorsky landed a $2.3 billion contract covering Black Hawks. Regarding the Patriot Missile, as you're likely aware at this point, that program probably involves both AAE and Aerojet. On the AAE side — so that covers Aerojet along with Kratos. Obviously, I understand how Kratos fits in there with the Valkyrie. There may also be a T-38 involved. I can't confirm that — it's purely my own guesswork — but my hunch is this could be showcasing the loyal wingman idea, pairing a crewed jet alongside the Valkyrie. Again, I'm not certain; that's just speculation. Moving on to Slide 13. Turning to the metrics, it's worth pointing out that the revenue composition for Q1 looks a lot like the mix from the previous fiscal year. That said, the military share could begin climbing, depending on a few items we plan to cover during this presentation — we'll have to wait and see. Moving to Slide 14: every quarter, this is what Elena does — she puts together some great visuals covering military programs. These aren't necessarily our largest programs, but they're intriguing ones for us, since we're putting money behind efforts we want to tell you about. At the same time, we may not get into the specifics of each of these programs, other than to note that all of them are active, and there are certain new developments — recent ones — tied to them that made us want to put them in the spotlight, all right? You'll also notice a small 22% slice for space, which would be private space. Honestly, I believe that's what space amounts to nowadays — private space. Let's continue, 15. These next slides matter — they cover trends and considerations for both military and commercial — yet everything on them comes straight out of the Q4 presentation, with almost nothing fresh for the new year starting — pardon me, 15, rather, new orders. We've already discussed that topic at length.

Brian Shore

executive
#4

Wrapping up the check items — Finland and Sweden formally submitted their applications on June 29, and NATO gave the nod, I believe, for them to join; so that's a small update on that front. Moving to Slide 16. Europe, a fairly major story, the second arrow item, though there's nothing fresh in the presentation here. On 17, Asia. Let's not overlook Asia, and we went through all of this last quarter, aside from that small bullet point about South Korea; they just announced plans to buy extra PAC-3 defense systems — is that really a shock given what's happening around the globe, a troubled world, troubled nations, a troubled global economy. So to me, not a shock at all that these folks are thinking they'd better be cautious with their defense systems — cautious meaning ensuring they're in good shape and perhaps upgraded. The final point on 17 carries over from last quarter, but it's still worth examining: Lockheed's CEO mentioned they're seeing demand signals for the PAC-3 from across the globe; particularly when you witness missiles hitting hospitals, and so on. Again, I don't find it shocking, but I wanted to call that out since, as you're aware, PAC-3 is a major program for us. Slide 18. We addressed the first arrow item last quarter. Moving on, the second arrow item relates to the PAC-3 system. The third arrow item is brand new to this presentation and is already in progress. We had been detecting some of these market signals, but at this point we are getting direct signals from customers and OEMs regarding significant growth in ablative materials for the RAYCARB product — a C2B item that Park sells under our partner agreement with ArianeGroup. As you may remember, we covered this, I think, last quarter, or the quarter before that. That is a pretty exciting development. It backs PAC-3 missiles along with other systems. One thing I should note is that we are talking about ArianeGroup. In fact, let's go over the checkout and Park's forecast. We've got 23 deals for ablative materials and RAYCARB products that came in well over $10 million. Honestly, I don't remember exactly what the figure was — it's actually north of $13 million. But here's the key thing about the RAYCARB product: we're not just selling it to outside customers. We're selling it to our own customers, and the plan is that down the road we'll turn that into pre-preg, so it works out as a double benefit. We make money selling the customer this RAYCARB C2B product, and then we make money again when we eventually convert it into pre-preg. So it's a double benefit. Taking those two together, the figure likely exceeds $13 million. To give you some perspective — I happened to look back at this just yesterday — in recent years the norm has fallen between $5 million and $6 million, aside from one year that ran higher. So that's a meaningful increase, and given everything going on, it's not surprising. Last thing on this: remember, supply chain challenges are hitting everywhere, the military included. Moving to Slide 19 — commercial trends and considerations. Again, most of this came up on the Q4 call, including the item about IATA's forecast that global air traffic would get back to pre-pandemic levels in 2023. I don't think that was included in the Q4 presentation, as far as I can tell. It seems like it might be a relatively recent addition, but it doesn't really conflict with anything else we've been hearing. We devoted a great deal of time on those pages to talking about the significant increase in jet fuel costs and the way airlines are passing those costs on to passengers, and everybody is just delighted with how things are going; and then we get to Slide 20, where we pose the question: but is there a limit to how long this can keep up, how long customers will continue to swallow these higher ticket prices for air travel, which the airlines have no choice but to charge not just because jet fuel costs are rising steeply — plenty of costs are rising. Still, jet fuel is obviously the giant expense on their purchasing side, and it's gone up a lot. Sure, there's demand that had been held back—we get that—and consumers do have cash on hand. Anyway, I meant to go to Slide 21, my mistake. Will this keep going forever? Is that logical? Or does it just occur naturally? Then there's your guidance, which is shifting more and more away from being just something that might happen or probably will. So how near is it, how probable—this chance of a downturn? Yet at this point we're already thinking like we're in one. And right now the number one worry is inflation—everyone's paying far more for gasoline, far more for groceries. But then all of a sudden a downturn hits. So maybe you start hearing that your <<inaudible>> their position is at risk. Are you still going to book that Cancun trip for the whole family right now? I'm not sure. Either way, I'll give it some thought. So let's turn to Slide 22. The key piece, I think, is at the very end. Should the airlines pull back, they might delay certain aircraft orders. How would the OEMs react? What moves would Boeing and Airbus make? Would they cut production, or would they take a different approach? I believe a split may be developing here, and we'll cover that shortly during the presentation. Slide 23. Additional elements that impact commercial: pricier jet fuel gives airlines a reason to switch away from older planes toward newer, more modern, more fuel-efficient models sooner than they'd intended. Also, keep in mind at the end — the bottom of Slide 23 — keep in mind those supply chain issues, because they're substantial and looming over us, and truly something that those in the industry and the supply chain must deal with every day. Turning to Slide 24, we're running short on time. I don't think we need to spend any time on this slide since it shows up in every deck. If you've got any questions about what's going on there, feel free to reach out. The key thing to understand is that every one of these falls under GE Aviation programs, and the reason is that MRAS originally served as a sub to GE Aviation. These days, MRAS is a sub under STE Engineering. But in the beginning, MRAS was a sub of GE Aviation, which is why all of these count as GE Aviation type programs. Let's move to Slide 25. This one is another carryover from last quarter — film adhesive. We've got new updates here related to GE Aviation programs, film adhesive. Fantastic news for Park. Lightning Strike — that one is also going onto Slide 26. Fantastic news for Park. Last time we discussed the Fan Case Containment Wrap, which has us excited, and the program looked like it was being restarted after sitting dormant for a while. Then we'll move to Slide 27, but then Boeing said they are delaying the 777 entry into service — the 777X entry into service — until 2025. I believe that was a 2-year delay, clearly a disappointment.

Brian Shore

executive
#5

Also, perhaps you’ve got an endowment program of your own. Even so, there’s some positive news—certain carriers, certain airlines, are placing orders for the 777X. That’s a favorable development. And it’s possible the program will be fine, merely slipping by a short amount. Let’s move ahead to Slide 28. All right. This one concerns the A320neo family of aircraft; it’s quite involved. It isn’t simple to squeeze everything into a tidy little bundle for you; we attempt to provide a bit of flavor, a bit of perspective, since clearly this is a genuinely significant program for Park. So we begin at Slide 28. The majority of the material was carried over, yet there are a few fresh items in the—tied to the A320neo family within the presentation. So on Slide 28, that’s where Airbus is placing down the markers, saying, look, we’ve got large ambitions for this program. These are the ramp—this is the ramp rate. These represent the target levels. We aim to reach those rates by 2023, 2025. And proceed to Slide 29. Significant recent developments; so this is now jumping forward. This appeared in the Q4 presentation; this is jumping forward by a year. It’s now May of 2022, when they truly are sort of doubling down and stating, yes, we’re dedicated to carrying out these things. We’re dedicated to these rates, 65, 75, we’re dedicated to these things. The previous year, they were sort of releasing what would you call it, a trial <<inaudible>> nearly to gauge what sort of response we received; now it’s somewhat more forceful and you’re saying, no, we’re doing this. And let’s proceed to Slide 30. At the top of Slide 30, yes, this isn’t new, but it’s intriguing and it’s somewhat pertinent to what’s happening here at this suppliers conference—one of the Airbus executives was sort of scolding the supply chain, saying, "We need you to adhere to the rate indications we’re providing you and have faith and we need to challenge you not to second guess." That was sort of odd, but all the same, perhaps pertinent given what’s happening. Now in March of last year, GE Aviation stated, "Don’t worry, we’re going to maintain the LEAP rates." We’re fine. And then—that mattered because before that, GE Aviation was openly saying they’re doubtful about Airbus’ indicated ramp rates on the A320neo program, naturally; but look at the bottom here, this is a major one. As per a May 24 Reuters report, CFM is confronting industrial delays of 6 to 8 weeks, oops, hold on, now it’s falling apart, coming undone. And 6 to 8 weeks, well, let’s continue. Let’s see whether that adds up, merely 6 to 8 weeks. Let’s proceed to Slide 31. Turning to June 24, a recent address by Airbus CEO Faury verified that engine suppliers are trailing A320neo jet manufacturing. Yet he said he has confidence Airbus will hit, as we'd ramp toward, its record single aisle build rate. CEO Faury further suggested Airbus would keep making A320 planes and fitting the powerplants, handing them over once those powerplants become ready. He also voiced a bit of frustration — pretty clear to me regardless — about doubt existing in the supply chain, since people keep challenging whether Airbus can reach the rates it aims for; so let's carry on. At this point Airbus handed over just 36 A320neo family jets each month during 2022 up through May, yet Airbus built 44 each month across the second quarter; so what explains that? What causes the gap? And Airbus aims to deliver 600 during this year. That works out to an average 50 each month, correct? Indeed, 600 split by 12. Then something surfaced yesterday, and I try to keep up with news items, I lacked time to work it into the presentation, but I'll read from it; this is CEO Faury's interview with Aviation Week dated July 5, and I'll read from it. So stay with me here, it's somewhat interesting and possibly significant. Faury acknowledged your difficulties. So your difficulties and the Airbus supply chain are rendering the planned ramp-up to 75 jets each month in 2025 plus a goal of delivering 720 commercial jets in '22 into tough challenges. This is a quote from <<inaudible>> the first half of 2021 that the industry ought to brace for the ramp-up. Lots of people were saying, we were stupid, as we said, is we're stupid. Money weighted, perhaps the engine makers too, but by then it was too late, you're behind the curve when the curve is steep and it's hard to catch up — that's precisely where we sit now. So you can see my feeling is, you get somewhat unhappy and possibly exasperated. We're saying, look, we warned you folks, perhaps during the last year, you didn't pay attention to us, you don't listen to us, and now look at the predicament we're in. So Airbus at present is back to — I'm really pulling from the article again — back to building gliders. Otherwise complete the jet minus engines still to be delivered. And this matters, so probably explaining the discrepancy between production and deliveries. So let's see what else he said here. "On the single aisle, it is a supply-constrained market, at least for the short-term." He said <<inaudible>> assembly lines, as Airbus has committed to doing this. I never — all the same stressed that he isn't prepared to drop their production targets. Is it time to give up "Of course, not" he says. Teams are working like crazy. The supply chain is increasing output, and we are pressing the engine makers, pressing the engine makers, to get them back on track. They assure us they will recover; that also brings to mind the 2018 crisis, when Airbus faced a different situation. They managed to hit their delivery goal, yet they had to assemble the gliders separately from the engines so those could be attached later; so clearly Airbus feels frustration. He mentioned <<inaudible>> earlier. They gave the industry a warning, they gave the engine manufacturers a warning, watch what we are doing. At the supplier conference, this Airbus executive is telling the supply chain off, watch what we are doing, and they did not. And so at present we are simply in a bind, but they are assembling gliders. So what is the takeaway? That remark matters greatly. And it largely validates what we have been guessing at on Slide 31 here, namely that Airbus will not halt, it will require a great deal of money, they are going to produce many aircraft lacking engines. Many aircraft. They will continue producing the A320neo since they wish to keep progressing. That is how I read it. They intend to keep pushing, then we become stuck. And afterward, once the engines become obtainable, this involves not only CFM, so for Pratt, to be fair, in both GE CFM and Pratt, which have formed high.

Brian Shore

executive
#6

Once the engines become available, they’ll be attached to the planes, and then those planes get handed over. That’s the way it was done previously. That’s exactly what’s happening at present with this glider idea. Maybe that clears up the mismatch we noticed—why more aircraft are being built than are being shipped. Well, we now have the answer, since Faury himself stated what they’re up to. All right. So I realize this took quite a while and we’re behind schedule. Slide 32. There’s a press release we issued—why did we do that—saying we’re dedicated to backing Airbus’ ramp rate? And we want to make a firm commitment because many suppliers were sort of hesitating and that sort of thing, we want to extend; and we’re happy we did; so at the bottom of Slide 32, essentially no change there. Let’s move on. Slide 33. The XLR update: the initial test flight of an XLR fitted with LEAP-1A engines happened in June. That’s really great. In addition, Boeing and the Boeing CEO has stated they won’t bring out, announce any new aircraft for at least a few years. What does that mean? It means that likely never—likely never create an answer to the XLR; and even if they did, it won’t be until 2030, and at that point, I’m not sure whether it’s relevant or not. So I think what Boeing is doing is essentially observing this space, this entire space that Airbus is a very important space. So a question came from our—one of the investors looks at our interval, why don’t Parks A320 drive revenues reconcile to A320 aircraft family deliveries. We discuss what’s happening in the A320 big picture often, why don’t our revenues reconcile? And the answer is that it’s a good question. There are many timing differences in the downstream supply chain, not our supply, the downstream supply chain and the inventory is a big deal; and to me, it seems like inventory sometimes isn’t managed too well, a lot of overcorrections, overshooting, too much to little, too much to little, too much to a little. So it’s very hard to sort of align and reconcile on a short-term basis, what we’re doing and what Airbus is doing, it doesn’t work. However, this might be the most important thing in the presentation that’s last thing at the bottom of 33. At the end of the day, it doesn’t really matter. The only thing which matters the Park in connection with the A320 programs how many A320neo aircraft equipped with those CFM LEAP-1A engines Airbus deliveries? That’s it. So the timing differences are going to be hard to figure out. But at the end of the day, that’s all at better support. And it’s an important thing to remember when you’re thinking long-term, at least for me, it is. On slide 34, the first COMAC919 production plane has been flown. Bombardier's Global 7500 — there's a new announcement there. Honestly, I'd call it exciting. Bombardier rolled out what you could describe as a fresh derivative of the 7500, named the 8,000. It has an 8,000 nautical mile range, it's a very fast aircraft, it runs the Passport 20 engine, service entry is 2025, and Park works on that program. That's good. On slide 35, the Boeing 747 — we go over this each quarter. Boeing has said the program is being canceled, and just 3 remain to be delivered. Slide 36. GE Aviation forecast — the GE Aviation programs forecast; so to start, Q1 landed at $6.4 million. I believe during our Q4 call we told you it would fall somewhere between $6 million and $6.5 million, so it arrived inside that range; and for Q2, we're pointing to $6 million to $6.5 million. There are notable supply chain risks inside that forecast. Moving to slide 37; if you look at Q1, we already provided the Q1 numbers. For Q2, our forecast is sales of $13.5 million to $14 million; adjusted EBITDA of $3 million to $3.5 million. Once again, notable supply chain risk accompanies any forecasting right now. Let's move to 38. These slides matter a lot, I think, for us, but they originate from Q4. So we won't walk through them in detail; but I think there are genuinely important points being raised here, for me at least. I want to call out just one item. The first arrow item, second check — to see what we're discussing. Forecasting is problematic even for the upcoming quarter, let alone long-term forecasting. So under this highly stressed environment, this chaotic environment, especially with supply chain, that isn't really possible for us; but we believe we cannot offer meaningful insights into our company outlook. We split it out by business — sorry, by military aircraft first, then commercial aircraft in terms of outlook. I won't walk through these items. Please reach out if you have any questions. Everything here is still part of the Q4 presentation and still applies — well, let me add just one item on slide 39. There's something we did add at the bottom regarding Airbus and what they're doing. So we state that Airbus is attempting to establish an irreversibly dominant position in single aisle, to permanently end the duopoly. Take as much market share as possible, but permanently end the duopoly, and that appears to me to be what they're doing. And as — at the bottom, Boeing has no response. The XLR niche is being left to Airbus. Slide 40; so we cover some of these programs, how the recession affects these programs. I won't go back over that. Slide 41, same thing with the Global 7500, how a recession would affect that program. At the bottom of 41, this is the important part of it. Taking all of that into account — or if there are grave worries regarding the economy, inflation, labor shortages, and supply chain turmoil — we still see Park's prospects as fairly strong, for the reasons laid out over the last several slides. Moving along to Slide 42. Each quarter, we provide you with an update. I won't walk through these figures; I think they're self-explanatory. If you have any inquiries regarding our expansion, just reach out. Now on to Slide 43, James Webb. For Park, this is a relatively minor program. I mean, we supplied 21 Sigma Struts for the James Webb. But it's — maybe we shouldn't get emotional about business, yet this particular one stirs some emotion in us. It's somewhat of a significant matter. So we feature it in our quarterly presentations, and we might keep featuring it over the next couple of quarters too; so 21 of our Sigma Struts are built into the James Webb Space Telescope's structure. And they were produced right here. So that arrow you're seeing indicates a small workstation, or a small workstation, where those Sigma Struts were manufactured. Perhaps take a look at 2 hours pointing downward from that spot.

Brian Shore

executive
#7

At present, those are positioned 1 million miles away from Earth — that's L2 — just as the Sigma Struts currently are, 1 million miles distant from our planet. On July 12, the first full-color images from the James Webb Space Telescope are set to be released. You may have heard that certain individuals have already viewed them. When they beheld those images, they became quite emotional, I'd say. So seeing how those initial images turn out will be very fascinating. Being involved with this amazing James Webb Space Telescope machine makes us thrilled and honored. Moving along to Slide 44. Actually, our Q3 presentation addressed this. During our Q4 presentation, someone asked why we hadn't provided any information about that item. At the time, we didn't have much to share. That has changed. If you look at the highlighted line — the sole item we're covering — we are now working alongside a possible new joint venture partner on these programs. They're still a top priority for us, and we're in active talks about them, but we made the decision to team up with other partners. So, together with that extra prospective partner, we're moving forward on these projects, okay? Now let's turn to Slide 45. For Park, this is something new and exciting. We haven't brought this up before — it's a fairly recent development — the company called Aero Design Labs. There's a program they refer to as the Aero Design Labs Drag-Reduction System Program, or ADRS, and within it, Park's materials hold sole source qualification. The modification applies to legacy 737 aircraft — a thousand of these planes are out there, a thousand are actively flying and in service worldwide. We're not talking about the max here. These are older-generation airplanes. What the ADRS program aims to do is improve the aerodynamics of the 737. Greater fuel efficiency should follow, which translates into meaningful savings on fuel. Given how much jet fuel prices have climbed, the business case for putting these kits on aircraft has become even stronger. On the FAA side, ADL got its STC covering the 737-700, and by the end of this year the company expects to obtain the STC for the 800 through 900. Getting that STC matters a lot. Well, it's fine — you're in good shape. The FAA gave its approval and put their signature on it. That's Slide 46. As we mentioned, there are thousands of legacy Boeing 737 planes out there. For Park, this could be a really substantial program. Park would look at — in fact, it is looking at — putting in more money to back this program where needed. Now on to Slide 47. We picked up a nice small honor from Aerojet Rocketdyne, one of the OEM customers we like best. Specifically, Aerojet gave us a distinguished supplier award. They told us that fewer than 1% of their suppliers receive this recognition. We feel a great deal of pride about it; and indeed, it's among the key programs through which Park backs Aerojet. This one relates to the PAC-3 missile program; you can see a small image of the banner there. As it happens, it's hanging on a wall at our factory at this very moment. The customer service team — Dakota, Elena, and Sara — are the ones lifting it up. Thank you, ladies. Moving to Slide 48. Park's people. We covered this during the previous quarter, and most of these slides match exactly what we presented back then. So we won't spend much time on them, despite the fact that they're extremely important. Headcount — well, the number of people is actually 106. We're not exactly where we want to be yet, honestly. But let's jump forward a bit—we've talked about this a lot: at Park, we don't just hand out money to people, we do things differently. On Slide 49, the idea is that people earn what they receive. We've also gone over the fact that no one here lost their job during the pandemic and the economic crisis. Now let's go to Slide 50. There's Peter Drucker, who's helping us out with a cultural strategy for breakfast. So how did we still meet our Q1 sales and EBITDA figures while cutting the workforce so drastically? Is it magic? I don't think so. Our team has been working incredibly long hours. At times, that means 70-hour weeks, one after another. No one asked our employees to take this on—they just do it on their own. Meanwhile, a lot of other businesses out there have let go of large numbers of staff, maybe even thousands, and then they turn around and ask those same people to log extra hours. My reaction to that is: best of luck. You just cut 10 or 12, maybe even 100 of my friends. And now you want me to bust my back for you? What reason would I have to do that? It's obvious you have zero concern for me, so why should I have any concern for you? So all I can say is: best of luck with that. Can you see how lucky we truly are to have such incredible people, and do you get why we care so deeply about them? It turns out that caring deeply about our people is also smart for business. These are individuals who'll do anything necessary to make our company win—or at least every piece of it, since we're all in this together. It's not as if we're putting clothes on them. That's not something we do. Yet they want our sincerity. If it isn't genuine, it means nothing. Now let's turn to Slide 51. This idea resonates with me—about our approaches and accomplishing huge things: when you have a workforce that's committed, driven, and inspired, a company can accomplish huge things, which includes hitting our EBITDA and sales goals even after cutting staff very deeply. If you don't have that kind of team, nothing gets done. As I mentioned earlier, see how far you get asking your employees to put in extra time and so on. We had just gone through layoffs one after another, and clearly, when you send the message that they don't matter to you, why would they care about you? Let's continue. The Customer Flex Program — we're simply refreshing the figures. For Park, this program is essential. Without it, we could never have achieved what we did — for Park, it's an enormously important effort. And recently, we increased the hourly bonus our employees receive for participating in the Customer Flex Program. Slide 52, we're finishing up now. My apologies — we're running quite long; we've attempted to leave out whatever we could, yet leaving out all of it isn't easy. Our principles aren't inexpensive. We went through this in Q4, so here's just a brief recap. It might represent the expense <<inaudible>> privilege of POs and PO confirmations at a time when plenty of others aren't doing that. Yet at Park, we follow through on what we say. At Park, our word is a bond. Now, what's somewhat fascinating on the update front is the sort of thing — the sort of thing we've heard from folks regarding certain commitments we make: a supplier that isn't honoring its POs told us we shouldn't be honoring ours either. We ought to honor POs toward our customers. And they claim, well, if you go ahead with that, you'll be shutting down your business.

Brian Shore

executive
#8

That's really fascinating, because — here's what I'd say: selling your soul puts you out of business. Once your soul is gone, nothing remains, and it's simply a question of when; your days are numbered. That is the point at which you go out of business. So I can't really say I agree with that remark. I found it somewhat curious that people are pushing us to behave dishonorably too. And once again, it's inconvenient for Park — not only for money do people wish to recruit them, in a world where plenty of others are doing exactly that; but at Park, our people matter deeply, our people aren't merchandise to be bid up and sold short. Like I mentioned, taking care of our employees is smart for business. But some have told us the right approach is to outbid others for talent, bring those folks on board, and then, once they're no longer useful to us, simply let them go. Who cares — they can be replaced easily. That's not the way we do things. Now let's turn to Slide 53. You'll see the same concept reflected here, though it's framed a bit differently. Park chose not to ask for or take NAPP funds or government money — which is really taxpayer money, since the government doesn't have any money of its own; it all flows from us, the taxpayers — and that decision came at a cost. When the pandemic and the economic crisis hit, plenty of other companies—really, a huge number of them, some very big—accepted tens of millions of dollars in government funds. That's taxpayer money. That's our money. They took it as incentives, and by incentives I mean payments that weren't meant to retain every employee. Here at Park, we generate our own revenue. We don't take corporate welfare or handouts from the government. Throughout the pandemic, Park turned a profit and paid taxes each quarter. At Park, we held on to more than our share of staff. We have no need for government funds as an incentive to retain our employees or to keep people under pressure. So sure, other people told us we ought to take that money. They said, come on, it's millions of dollars, it's free cash. Is there really such a thing as something for nothing? Right now we're dealing with a bit of inflation. Was that cash truly without cost? Did the funds folks received at no charge actually come free? I'm not so sure about that. Perhaps <<inaudible>> has it right—there's no such thing as a free lunch. So the top concern is that some of these individuals who accepted substantial government funds, or those attempting to lure workers away. Let's move to Slide 54. This is our final slide. Other companies must figure out for themselves, making long-term decisions regarding what's important and what isn't, then accept the consequences. At Park, though, we respect the value of what matters most, and Park's principles don't come cheap. Here at Park, we do things differently than everyone else. Our focus is on teaching. We aren't dragging our feet. Our aim is to create real impact. Average results aren't what we're after. At Park, we pursue top marks. Okay, on this slide you can see a sample of the people who make up our ablative materials special operations team; it's sort of a — well, it's a particular type of operation; there's a lot we could mention about it. Kevin is with us here. He's — these folks truly welcome customer flex, Ula. A number of them have spent many years with the company. Salthy, on the other hand, joined us not long ago, and is doing well. Sarea looks after many customer flex categories, and Michelle is new as well. This team worked really hard, and a lot of that work, as you'd expect, got done across the quarter, but a big chunk of that effort tied to ablative materials for missile programs also happened within the quarter. So hats off to them for a job well done; and this is not something we had ever achieved before, Slide 55. That's our Board of Directors. We — this part really bothers me. But for 2 years, at each meeting we held, I didn't like it. Finally, though, we got together in person. On May 18, we held a Board meeting in person at Park at the company, and we took a nice little photo. And I want to mention, my apologies, we don't get dressed up for Board meetings. So aside from Brad, who's wearing a nice jacket, the rest of us simply dressed quite casually. Okay. Many thanks for your patience in listening. And operator, at this point if any questions exist, we'll gladly take them.

Analyst

analyst
#9

Brian, I was hoping you might share your thoughts on some possible new niche markets for Park. Specifically, I have SpaceX and Blue Origin electric aviation in mind — is there anything Park could build for those sectors? Also, would your approach to selling look any different when going after those kinds of efforts?

Brian Shore

executive
#10

Thank you, Nick, and thanks for bringing that up. Up to now, we haven't really done much on the sales side in these 2 markets, meaning eVTOL electric aircraft along with private space. There is a product we're aiming at these eVTOL type — aircraft, I suppose you'd say. And we've been putting effort toward those private space companies. During the pie analysis, I noted there's a portion coming from private space. Still, I'd have to say the success hasn't been what we'd hoped for up to this point. Even so, those 2 markets you brought up, Nick, remain ones we're genuinely keen to go after. And my feeling is we've got products that could perhaps prove quite fitting for them.

Analyst

analyst
#11

Correct.

Brian Shore

executive
#12

Does that answer your question, or would you like additional details?

Analyst

analyst
#13

Yeah. Thanks. I really appreciate it. Thanks.

Brian Glenn

analyst
#14

Only a couple of items. I suppose the initial one, this relates back to, I believe, Slide 17, possibly 18. You brought up fiscal year 2023 sales for the ablative and RAYCARB. All of you anticipated $10 million. Can you give us any sense of what that number would have been during fiscal year 2022, simply so we can get a handle on the trend?

Brian Shore

executive
#15

Yeah. $5 million, $5 million up to $5.5 million, roughly that. And I believe we stated that, correct, we truly ought to have said above $13 million. I think we were attempting to be overly cautious. That's a projection. Not everything is under contract. So in fact, the figure we're targeting for this year exceeds $13 million; yet indeed, the prior year was, I believe, $5.5 million. I can't recall with it in front of me, but around the $5-ish million.

Brian Glenn

analyst
#16

Got it. Alright, that's useful; now for my second question — I realize you said you've had conversations with shareholders, and I've raised this a few times too, about how capital gets allocated, and more specifically about buybacks. The one other item I'd like to raise: I realize you folks are thinking hard about the smartest approach for the company to weigh this, and many assumptions feed into it. But the one other item I'd like to raise is whether you hold the view that a stretch of multiple years of earnings growth lies ahead; obviously nothing is certain, but if that's how you see it. And clearly there's some calculation involved in judging whether the shares are inexpensive against that growth; still, I wanted to raise that you save a couple of bucks on the dividend for each share you repurchase. And another effect is that you may buy out short-term holders. So anyone holding ownership in the company — and I realize you value ownership — but anyone with a brief time horizon is more apt to be a seller. So you essentially clean up the capital structure somewhat as far as who owns it. And a sort of selection bias shows up any time a company does buybacks. Again, they must be judicious and deliberate, yet you do in a sense filter your investor base, and you hopefully finish with a superior group of fellow shareholders and partners who recognize the business is worth more — that's the reason they held on — and also possess a longer horizon, more of a long-term one. So that selection bias, in my view, deserves the Board's consideration and could be attractive.

Brian Shore

executive
#17

I'm in agreement, and I value the input. You provided input previously and it was valued; and as I said, we see — it was somewhat curious. I'm not sure why, but all at once we got input, roughly from possibly 6 to 8 separate investors, with opinions regarding capital allocation. And what was curious was that some arrived before the announcement was even made. So there may be some anticipation or something like that, but we value the input; and we weigh all legitimate input. Your input is legitimate. I can't say which way we're headed at this moment. At this stage, I believe we want to assess things a bit. As I noted, we're fairly worried about the circumstances in our nation and the economy and the country overall and its direction. That's one factor among others, not the sole factor. But the factors you reference are clear; we've even gotten some analysis, unsolicited though appreciated, from certain shareholders. I did a bit of number crunching myself about, well, if you purchase stock, just verify at this level, it looks like what would happen. And we've done that on our own. We do bring in external advisors and investment banks to handle this kind of work for us too. Still, we're always grateful for that kind of feedback. Nothing you've mentioned is something I'd push back on. In my view, it's all legitimate. Ultimately, a choice has to get made after weighing every factor, and as tends to happen, Brian, in the big boy and big grow world, not every signal points the same way. You've got to exercise judgment and do the best you can. Then afterward, you always adjust course, or at least I hope so. If you come to see that, hold on, that call wasn't the correct one. So that's really the most I can offer in reply to what you're saying, other than repeating once more that none of what you said is something I'd disagree with.

Brian Glenn

analyst
#18

Yeah. Thanks for that. And yeah, I completely get it. So I suppose the final item, which is, I suppose, more of a question. But it appears, once more, I'm just a passive investor, obviously. It appears that apart from any major M&A, and I realize you folks understand this far better than I do, but it appears that every growth avenue Park has looked into or weighed or some of those partnerships you're doing through the facility expansion; it seems like — and tell me if I've got this wrong, that those need fairly little capital. And I realize you can't discuss what hasn't occurred or what's being negotiated in private; but as I sort of scan across, like, a bunch of levers you've been pulling during the last 2 years, they're all quite modest when it comes to capital investment or the working capital tied to that partnership. But I suppose, tell me if I've got this wrong, I suppose that's my question. Is my read correct? Or do some you're examining perhaps carry a bigger capital commitment element?

Brian Shore

executive
#19

I'd say that's partly right. Now if we discuss this item on the slide and the presentation regarding these 2 projects, on capital price you're correct, I believe it's $7 million, $8 million, something along those lines; however, we have continuing talks with others about projects that would take up far more capital, not discussing M&A here, as you mentioned. But joint ventures, for example, which would take up far more capital; and we've been somewhat proactive on that front. We're attempting to leverage our balance sheet as an advantage. We've talked — spoken with OEMs and even customers saying, perhaps you'd like, perhaps we ought to talk, we sometimes start conversations about this project or that project, something we could undertake together. And those — a number of those are — would take up far more capital.

Brian Shore

executive
#20

Alright. Paul, thanks to you, and thanks to all of you for tuning in. I appreciate the questions. I appreciate the time you’ve given. Matt and I can always be reached. Don’t hesitate to ring us whenever you’d like; enjoy a wonderful summer, and we’ll be in touch before long. Take care.

Operator

operator
#21

That brings us to the end of today's call. At this point, you're welcome to hang up. We appreciate you joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.