Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary

October 6, 2022

New York Stock Exchange US Industrials Aerospace and Defense earnings 71 min

Earnings Call Speaker Segments

Brian Shore

executive
#1

Thanks, operator. Hello, everyone, and welcome to our Q2 conference call; Brian here. Joining me, like always, is Matt Farabaugh, our CFO. As you've surely seen, we're attempting something somewhat new this time. For about as long as I can recall — feels like forever — our investor calls have taken place at 11:00 a.m. New York time. We're giving something a shot — an experiment, you might say, holding the call after the market closes, which from what I understand is actually the more typical approach; so we're giving it a try. Please tell us your thoughts; we'll be watching how many people are actually able to join, whether that number goes up or down; so share your feedback with us. The earnings release went out, I believe, at roughly 4:00 or 5:00 this afternoon. A presentation has been put up on our website. The earnings release also contains webcast instructions explaining how you can follow along with the presentation while we walk through it, which is exactly what we'll be doing today, as you know. Let me just check whether there are any other opening remarks I'd like to share with you. There's one thing I should mention, which is that I've been feeling a bit under the weather, and you might hear it in my voice. I feel perfectly fine at this point, but the issue is I've got a cough that's hanging around, which doesn't bother me, though it could become somewhat irritating for you; so if a cough comes on, please be patient with me. Sadly, the thing most likely to set off the cough is attempting to speak for an hour straight. I might pass things to Matt if it becomes an issue. So I just wanted you to know that. I'm sorry ahead of time for any distracting noises; so this presentation, roughly typical for us, will probably run about 45 minutes. Naturally, once the presentation wraps up, Matt and I will gladly take your questions. And I believe that's everything for the opening comments; so shall we begin? Here we go. Turning to Slide 2, you'll find disclaimer language there; we won't review it, I know, but please reach out if you have any questions regarding it. Slide 3, our table of contents, the investor presentation, supplementary financial information, which appears in Appendix 1. We won't be walking through that, but please contact us if anything about the supplementary financial information is unclear. Let's move to Slide 4. We'll likely slow down a bit now, unfortunately. Slide 4 covers the second quarter results along with the history here as well. Sales for the second quarter, $13.875 million. Gross margin, 29.4%. Like you're probably aware, a figure dropping to 30% is something we genuinely dislike. So a gross margin sitting below 30% doesn't sit well with us at all, to be clear about what I mean. Turning to EBITDA, that came to $2.709 million. As for the adjusted EBITDA margin percentage, it landed at 19.5%. Being beneath 20% is likewise something we aren't happy about. So those percentage figures aren't exactly cause for excitement on our end. What did we tell you regarding Q2 on that Q1 investor call? We had a — pardon me, that's cough number one. A sales estimate ranging from $13.5 million to $14 million. We wound up landing pretty much squarely in the middle of that range, at $13.875 million, though the adjusted EBITDA estimate was $3 million to $3.5 million; and we finished well beneath that figure, at $2.709 million. So let's dig into that. Why don't we move ahead to Slide 5; let's begin by recognizing the outstanding job our parts people did hitting the Q2 sales number despite major challenges involving supply chain disruptions, freight disruptions, and severe staffing shortages. I realize it sounds like a broken record, but these issues aren't disappearing. A broken record in the sense that we've discussed these matters often lately. These issues aren't disappearing. You'd have to essentially live it and nearly grasp how hard, almost oppressive, these things are and how — I want to credit our people for achieving the top sales number, in spite of all of this. Those 3 things combined probably amounted to roughly $750,000 in missed shipments when you add all 3 together. Even so, we still hit our top line figure. So what became of our EBITDA number given that we hit the top line figure, you'd assume we'd hit the EBITDA number; so let's dig into that. First off, there were 2 customer items, which together had a negative EBITDA impact of roughly $0.25 million, $250,000 from bankruptcy plus another customer related item, combining for $250,000 during the quarter. Let's move ahead to Slide 6. Significant inflation. Inflation isn't a fresh story, naturally, but portions of it we didn't entirely anticipate or entirely factor into our numbers when we provided our forecast. Material supply costs, not fresh, just perhaps somewhat higher than we anticipated. Freight in, freight out, both directions, freight costs, people costs, certainly, and whatever you can think of, likely pricier, insurance, though we could hand you a list of 20 items if you'd like. Now why didn't we fully pass these increased costs along to our customers in Q2? That's a really good question; and because like many others, we honor our commitments in confirmed POs. At Park, honor and integrity aren't relative principles and aren't negotiable. At Park, honor and integrity are what matter most. As I believe I mentioned during the previous quarter, one of our vendors was giving us a hard time about sticking to the purchase orders we'd committed to with our customers. What was his argument? Basically, he said everyone else is doing it—meaning they aren't fulfilling their POs. It reminds me of being told as a child that just because others do something, that doesn't make it acceptable. Hearing grown-ups reason that way is rather disappointing. Beyond that, we operate a company. We haven't shut down yet, and my guess is we're performing far better than the majority. So those points, in my view, serve as solid justifications or solid alibis. Now, about the lag effect—what it means is that we stick to the POs we've confirmed. When the moment arrives for us to actually provide a quote, that's when we're able to factor in these added expenses and pass them along if we decide to; at that point we can. However, that could be 3, 4 months away. What's the distinction? A great many others aren't holding off. They simply declare, fine, we can't maintain the pricing we've got in a confirmed PO. We don't operate that way. Consequently, we must be patient, and that's the lag effect. That's the reason we consistently lag somewhat when it comes to transferring these costs onward. Now, let's move to the following slide. Inflation at historically elevated levels. Indeed, we've discussed this before—trying to get that genie back into the bottle. The outlook isn't very encouraging.

Brian Shore

executive
#2

Plus, there’s a mix that carries a thinner margin. You’re probably going to say, so why wasn’t that factored in when the guidance was provided? The reality is that trying to plan in this environment of broken supply chains is very “entertaining.” We do make plans, but honestly it’s almost like — whatever. A plan exists, yet it never materializes, since we are constantly shifting things, constantly relocating items, pulling something and pushing things out, because we’re set up to build for this week — and the needed input won’t arrive. So we have to swap in something else for which we do have the materials. It’s basically like using sheer force, a bit disordered, and at times perhaps even more disordered. I mean, we’re skilled at handling it, but it takes a massive amount of work. Yet the essential point is that we have no idea what we’ll be making during a quarter. When a forecast is handed to you, we believe this is what we are making and delivering. We can’t be sure, because there are just so many unknowns driven especially by supply chain interruptions, plus workforce problems, <<inaudible>> would add. That explains why it wasn’t really possible to fully foresee — we did not fully foresee the mix of products; so it’s a mix of products with a somewhat thinner margin. Some items we had hoped to ship at the close of the quarter carried a fatter margin; we simply couldn’t get there. The inputs didn’t show up on schedule, and we just couldn’t — just — there was no way to finish it. Those supply chain interruptions are going to create major inefficiencies in how we manufacture. Most folks in manufacturing prefer to have a tidy plan, with everything easy and uneventful and steady. Tomorrow we’ll do this, or next week, and in 3 weeks from Tuesday we’ll do that. All of that sounds great. So you might as well throw everything away and start over. We're constantly moving things around, which means all those efficiencies—the manufacturing efficiencies that the manufacturing folks care about—just disappear. They're gone. That's what we're up against. So when it comes to our list of excuses at Park—excuses aren't something we do. The bottom line is we came in below our EBITDA number. Plain and simple. There are no quarterly bonuses for our team. You could say that's pretty harsh, with a lot of people not falling. But that doesn't matter. We're all in this together, and harsh as it may be, at Park we earn whatever we get. If we don’t earn the money, we don’t receive the bonus, full stop, that’s the end of it, whether people approve or not. That’s the sort of approach we take at Park; but we still figured you’d want to hear about a few of the critical matters we’re dealing with and that shaped our Q2. Now we’re <<inaudible>> but I believe you want to know. Let’s move along to Slide 8. This covers the historical fiscal year results; we’ve presented this over the past few quarters. Things are quite interesting. The reason we're calling out '20 and '22 is that, well, clearly, when you take a look at '22, our sales were significantly lower, yet gross margin came in considerably higher; and even the EBITDA figure — not the percentage, but the dollar amount itself — is somewhat greater; so I wanted to make sure you noticed that. Moving along to Slide 9. We've been showing this now for several quarters. As a matter of fact, a suggestion came from one of our really strong investors. We welcome input from our investors, and while not every suggestion gets put into practice—we're not just doing favors to please folks—if a proposal has real merit, then sure, why wouldn't we. One thing you definitely won't find bolted onto the Park is anything of that <<inaudible>> variety, you can count on that. Anyway, to answer directly: we carry no long-term debt whatsoever. Cash plus marketable securities came to $102.5 million when the quarter closed. Regarding how we manage money—our investing approach favors instruments that are extremely safe and easy to convert to cash: treasuries, government issues, top-rated commercial paper, to give one illustration—with an average maturity right now sitting at 22 months; and we've made it our habit to keep holdings until they mature. That point matters somewhat; we'll circle back to it shortly. We've talked before about how we mark our cash to market. The reason I raised that topic earlier is that I saw this situation developing. Rates have continued their steady, relentless climb — there's no question about that. Consequently, the way we present our cash position under GAAP gets impacted. Turning to our cash position, the amortized cost basis is in fact significantly greater, coming in at $107.2 million. The thinking here is that provided we retain these holdings — the cash-like investments we put money into, the ones we discussed — all the way through to maturity, which is what we've always done, the outcome is more likely to land at that larger figure of roughly $107 million instead of $102.5 million. As a quick note, let's move ahead to Slide 10. Now we'll discuss a few areas where funds are going out. On the major expansion, roughly $500,000 was used during Q2, with approximately $0.5 million remaining; and regarding the total transition tax installment payment, that's something we've addressed throughout the year. The situation has some complexity to it, but there's still $12.6 million remaining, with $8.4 million already paid. Repatriation is what this relates to. It's not simple. Matt can give you a fuller explanation if you reach out to him — we'd rather not spend your time walking through it all over again. During Q2, though, a payment of $1.7 million was made. As you can see, the total is beginning to grow. Also, in case you didn't catch it, our balance sheet shows inventory up by $3.2 million relative to where the fiscal year started. That was a deliberate choice on our part. Like I said, the supply chain is giving us a lot of trouble — it's frustrating enough to drive you crazy. That said, we have a chance to strategically build up some inventory. We're pursuing this based on the belief that it will hopefully improve the supply chain situation, giving us greater predictability, a better capacity to plan, and a stronger ability to fulfill our commitments to customers too. And naturally, there's one more item you're likely already aware of. Each quarter, we make a roughly $2 million cash payment — a regular cash dividend. So those are a few of the things we're allocating money toward, just so you know, in case it's of interest. When it comes to cash dividends, while others reduced or eliminated theirs, we kept paying a regular dividend all the way through the pandemic. We have now provided regular cash dividends without any interruption for 37 years straight. Let's turn to Slide 11. Here's the number — $556 million. That figure has always been something I appreciate. For a company like Park, $556 million is a huge sum; I have to say, that really is a great deal of money. Since 2005, that works out to $27.15 per share. So remember, we have no long-term debt on our books and we continue to hold a sizable cash position. There's a share repurchase authorization — we talked about this before — that was announced on May 23, covering 1.5 million shares we are permitted to purchase. As of yet, we have not purchased any shares under that authorization.

Brian Shore

executive
#3

You might not see it this way, but in our view, purchasing our shares is your responsibility, not ours. Ours is to do all we can, and then some, to grow the company's underlying worth as much as possible. That's our perspective. I realize plenty of folks aren't fans of that and don't share it, but that's where things stand. So once in a while, the market presents an offer too good to turn down; that's what we have right now. Will it actually come to pass? We'll find out. Still, the share price is becoming appealing, to phrase it that way, judged by just about any measure that sensible folks would apply. As I said, you're free to disagree, this isn't our view, buying our own stock isn't ours to do, it's yours if you choose to. So it all comes down to whether you want to; ours is to do all within our capability to grow the company's underlying worth as much as possible. That's what occupies us 24/7, I believe; so we keep at it, the final point being that with interest rates climbing and the period of cheap and easy money drawing to a close, will our hard-earned honest money at last be worth something? Moving along to Slide 12. Top Five, well, dull since it's an identical count of companies, identical names to the prior quarter. So we have to keep cranking out new images and new applications at a rapid pace. When it comes to the SM-3 missile, that's the newest program we've got. It's a fast one — an incredibly quick missile; in certain variants, I think it moves at about Mark 13 speed. Next, the A320neo — you'd probably guess that's an MRAS reference, but it's actually GKN, because GKN also provides components for the LEAP-1A Program and — drawing on our materials — the 737 to 800. That one's Nordam, which ties into the Nordam, Nordam <<inaudible>> WeatherMASTER Radome, and from what I understand, it used to involve a lot of legacy 737s as well as the MAX. Then there's Kratos — they're kind of a regular presence these days, and this is one of their drones. This here is the target drone. Alright, let's go to Slide 13. There isn't a lot to cover here other than the first half of the year, and this is pie chart stuff, which I kind of like, though I'd say there isn't anything too shocking in it. That said, when you look at those initial six months, it seems to be following what happened in the previous fiscal year, roughly speaking, with a percentage point or two shifting around. The difference isn't very big. So make of that what you will. Now on to Slide 14. Park is very fond of Niche military aerospace programs. Figuring out some sort of exciting new programs to discuss with all of you has always been Elena's undertaking. These tend to be the biggest ones, with great and interesting material. The GBSD program, including its components and materials—really, it's mostly structures and ablatives. Then there's the Raytheon MK 56 guided missile, ablative materials, and the E2-D Hawkeye, for which we make certain parts. The standout item this quarter is likely the helmets and space suit work done by David Clark, which is tied to the Orion Space Program. If we're handing out an award for coolest project, that one probably takes it for this quarter. Looking at the pie chart, there's nothing wildly different. As we've mentioned before, Radomes, Rocket Nozzles, and drones typically fall into the niche category. We also have a substantial amount of aircraft structure for military use, which we'd also classify as niche. Niche is a good thing, of course. Now on Slide 15 — we discussed this before, though from a somewhat different angle, so let's give it another shot. The new world order — we certainly went through that — the profound shift in the defense industry brought about by the war. Two big consequences: a substantial increase in defense budgets and spending throughout Europe, Asia, and North America. We've been through that. Deglobalization — that's something we didn't really dig into previously. Countries in Europe and Asia, individually, are shouldering greater responsibility for their own defense requirements and expenditures; they're less inclined to lean on and depend mainly on the U.S., NATO, and other alliances when it comes to their defense needs. Poland stands out as the clearest illustration — they've really raised the bar, boosting defense budgets by a large margin to grow and upgrade their armed forces. Turning to Slide 16 now. And as you'd expect — no shock here — systems for defending against missiles, such as the PAC-3 Patriot. That's one of the main priorities: when rockets and missiles are being fired at you, your mind naturally goes to missile defense. As we've mentioned before, Lockheed and Aerojet have both lately experienced a big jump in demand for orders tied to the PAC-3 missile system. Park provides support for the PAC-3 Missile Defense System, using particularly ablative composite materials, and our view is that we hold sole-source status on that program — that program. In Asia, the PAC-3 Missile Defense System plays a central role in the defensive architectures of Japan, South Korea, and Taiwan, and it should come as no surprise that all three nations are now either modernizing those systems or expanding them. Unfortunately, the world is fairly turbulent at the moment. That situation does not please me. Our role is simply to back these programs. Were the decision ours to make, the world would look quite different. Turning to the Netherlands and Romania — both are in the market for PAC-3 Missile Defense Systems. As for Poland — our thanks go out to Poland. They already possess PAC-3, yet they are placing orders for additional units, Poland. Moving to Slide 17. We'll keep going with military markets and the trends within them. Like we mentioned before, Park — we need to revisit this since we provided that guidance previously, and it needs correcting. Park got signals from customer OEMs about major upticks in demand for ablative materials and the RAYCARB C2B product, which supports PAC-3 and other missile defense programs. So during the prior quarter, we indicated our sales of ablative and RAYCARB C2B products would exceed $10 million this fiscal year by a comfortable margin. However, factoring in recent input from our key customers, we now believe that roughly $6 million in RAYCARB product sales — originally slated for Q4 — may shift either partially or fully into the next fiscal year. So, to put it in context, we aren't claiming this is going to occur. Should every one of those C2B Q4 sales shift into the last fiscal year, then our fiscal '23 sales for ablatives and the C2B product would likely land at $6 million. Now, as I mentioned, we aren't saying that; we want to hand you the baseline. Should you care to make a guess — and please, for my sake, underline the word guess — our own guess would be that roughly 1/3 of that $6 million remains in the current fiscal year, with perhaps $2 million of it shifting into the next fiscal year. So possibly $2 million out of the $6 million stays in this fiscal year, while the remaining $4 million might get pushed. So go ahead and do the math any way you prefer. Slide 18. A major caveat — let's handle the caveat material here. This new world order appears anything but protected from the significant supply chain and inventory management difficulties that the Defense industry confronts, since we've reported that the U.S. defense industry supply chain is having trouble, possibly severely, keeping up with the substantially greater industry demands. All right. So now let's move on to commercial, Slide 19. I appreciate your patience with me here. So commercial market trends and considerations.

Brian Shore

executive
#4

We've been through this over many quarters now — how the industry fell apart when the pandemic hit and then came back, plus a lot of specifics. We won't rehash all of that. Still, it's fair to say that the commercial aviation sector kept up its vigorous rebound and recovery from the pandemic and the economic crisis. Domestic Commercial Aviation keeps setting the pace in that recovery. Domestic Commercial Aviation is typically served by single-aisle planes such as the A320neo family. It appears that customer demand exists to underpin Commercial Aviation's ongoing strong recovery. Moving to Slide 20; however — and that's a major however, things to watch, watch and caution items. These create worries regarding whether the recovery can be sustained. What are those items? The evident ones, so pardon the repetition, the economy — will people keep flying if the economy takes a serious downturn? I lose — my neighbor loses his job, perhaps I'll take a — won't take that really extravagant vacation. I lose my job, I'm staying put, you understand. Inflation, oh my goodness. Will the flying public stay willing to swallow these rising ticket prices while the airlines pass along their substantially higher costs for jet fuel and other things such as people. Labor shortage of pilots, mechanics, flight attendants, ticket handlers, whatever you can think of. I have a close friend who runs an airline operation. And we hear retention, since that is the very first thing he brings up, I can't find people. Will the airlines manage to deliver suitable services to the flying public, or would they be forced to sharply reduce their schedules and operations? And the $64,000 question, if the Commercial Aviation industry does weaken and airlines look to defer, push out, cancel new aircraft orders, what will the commercial aircraft industry do; that's what we're tied to the aircraft industry. Perhaps the answer will hinge on which OEM we are talking about. If it's Boeing, I would anticipate a different response than Airbus. Airbus may attempt to press their advantage even more aggressively. I'm speculating, I don't know. I'm merely going to put it out there. Slide 21. And of course, even if commercial — if the commercial aviation industry stays strong, the aircraft industry still has to contend with its own enormous challenges involving what? I don't know, pardon the repetition, supply chain, labor staffing, inflation. Yes, big things that won't disappear, maybe getting worse. I don't know. You likely know more about it than I do. An interesting new wrinkle that complicates things for all of us is, of course, you like simplicity in our presentations. Demand for international travel is now bouncing back quite nicely. That wasn't supposed to occur according to all these <<inaudible>> and all these commentators and industry experts. Not supposed to occur for a couple of years or perhaps ever. Perhaps international travel will never come back; yet because of that, plenty of these analysts and commentators are forecasting a comeback for wide-body planes. Longer-range international aviation operations tend to be served by wide-body aircraft. There is a link between those two things. So the timing is interesting for this anticipated wide-body comeback, since Boeing is set to hand over its final 747 soon. Airbus has scrapped the A-380. Moving to Slide 22. So could this be a chance for the 777X, which, to my knowledge, is the sole aircraft out there with something close to the range and passenger capacity profile of the 747 to 8, the A-380, possibly? And I also have to pose this question: how much share is the A321XLR going to capture from smaller widebodies such as the B787, A330? And will the XLR hold back the widebody comeback? I don't know, but it's worth pondering; and the final silver lining, which we've talked about previously. Usually, expensive jet fuel gives airlines added incentive to swap out the gas guzzler planes faster for more fuel-efficient modern planes, like the A320neo or the — perhaps the 737 MAX; and there are reports this is occurring, that airlines are replacing their legacy planes sooner than they had initially intended because jet fuel prices are so high. Moving to 23. So this is a slide we show you each quarter, just to sort of summarize; we have a firm pricing deal requirements contract through 2029 with Middle River Aerostructure Systems, a sub of ST Engineering. What does this involve? These all appear to be sort of Engines programs. So what is the link? I believe most of you are aware, Middle River — MRAS was a sub of GE Aviation. And when we signed this deal, they were a sub of GE Aviation. So we have all this GE Aviation legacy work through MRAS; we constructed a redundant factory for them and GE Aviation, sole source for composite materials for Engine Nacelles, Thrust Reversers on these programs, which we won't list off. They're mostly — what? The A321 family, Comac and Bombardier, that pretty much covers it. 747 Is disappearing as we know. Let's head to the bottom right here. This is something we added this quarter. Hopefully, it's not too soon. Hopefully, we don't jinx ourselves as fan case containment wrap for the 9X, GE9X engines for the 777X aircraft. We've discussed this previously, but the airplane kept getting delayed and pushed out and delayed and pushed out; so we sort of eased off talking about it. But now it looks like maybe a comeback. We produce the AFP composed materials for this containment wrap, as we're making a return, we don't know we just have to remind you as well that it's possible the containment wrap will be designed out of Safran, it is trying to redesign the <<inaudible>> to remove the need for the containment wrap. All right, that danger has existed for quite a while — we simply need to bring it back to your attention. Okay, moving along to Slide 24; this deck can feel boring, but we are putting in our best effort. My aim is to avoid repeating all the material we have covered numerous times already. Now, an update regarding the GE Aviation <<inaudible>>program: clearly, we began with the large <<inaudible>>A320 aircraft family featuring LEAP-1A engines; and the various aircraft variants contained in that family are there for you to see. As we have covered extensively across the past several quarters, Airbus has made public statements regarding its ambitious production ramp for these programs. After that came supply chain players publicly voicing doubt and pushing back on Airbus regarding those projections, followed by some supply chain participants failing to hit those projections, plus the visible friction between Airbus and certain supply chain participants stemming from all of it; so rather than rehashing those specifics, this is just a reminder of that dynamic, giving you the complete picture. Slide 25. Still, it is fair to state that Airbus has communicated its plan to reach production rates for the A320neo aircraft family of 65 aircraft a month by early '24 and 75 aircraft a month by mid-'25.

Brian Shore

executive
#5

Even if you grant that those targets are quite ambitious, Airbus has repeatedly reinforced its dedication to achieving them—doubling, tripling, and quadrupling down. And here’s something major: remarkably, within roughly the last two weeks or so, Airbus indicated it plans to get to a build rate of 50 A320neo aircraft each month by the close of this year. That is essentially right now. Fifty monthly. So, wow, that’s fairly significant. And the close of this year—what does that even mean? Next week? First off — actually, let me correct myself — one point that came across very clearly from Airbus is that demand is real, and the A320neo aircraft family's order book supports these ambitious production rates. There's basically no doubt about that. It isn't a question of whether buyers exist for these jets; what matters is whether Airbus can actually manufacture and hand over the planes, and the company is really leaning on its suppliers to support those rates. As it stands, the A320neo aircraft family's outstanding orders total 6,150 airplanes. I'm certainly no authority on this subject, but that sure sounds like an enormous number of planes waiting in the backlog. Now let's turn to Slide 26 — we're still working through the updates. Will Airbus actually hit those goals? Sixty-five by early '24, seventy-five by mid-'25? Our view is that they'll make it, or come very near. What makes us say that? They are absolutely determined to get there, and there are plenty of solid reasons behind that determination. As far as our own opinion goes — and it may not be worth a great deal — the supply chain ought to put its effort into backing Airbus's ambitious A320neo output plans instead of taking them on in public. And honestly, it strikes us as somewhat odd if that kind of public pushback is happening. At Park, naturally, we have only minor worries. Regarding this dispute, we made our position clear back on June 17, 2022, in a news release. We stated that we back Airbus's planned rate cuts for the A320neo family completely and without reservation. Being able to assist with this A320neo program feels like an honor and a privilege for us — it's expected to become the largest commercial aircraft program in history, and we're fully committed. Turning to Slide 27 now. This is something we review each quarter, so at July's close, the CFM LEAP-1A held 59.75% of firm orders within the A320neo aircraft family. That figure comes from Aero Engine News, which is essentially the authoritative source. Each month it runs around 100 pages, packed with an enormous volume of data. So it's not as though someone just threw out a figure off the cuff, or that these were merely opinions. And by the way, that 59.75% is actually a rounded figure. My guess is the real number is something closer to 59.723%, or thereabouts — the key point being that this is extremely granular data. More recently, Park got updated figures concerning the usage of composite material in A320neo engine units for MRAS. Why did that happen? Because we scrutinize everything with tremendous care — every last piece of data. Whatever input Airbus provides us, every scrap of information we're able to load into our small computer, we challenge it and we probe it. Does this make sense? Does this make sense? So we went back to MRAS and let them know that certain of these details struck us as not being right. The reason usage data matters so much is this: keep in mind, whenever we provide material to MRAS or via their subcontractors, every bit of it goes out under one identical specification. That means we have no idea where it ends up. We have no idea whether it's for the A320neo, the Passport 20, the 919, or the 747 — which is exactly why having this usage data is so essential for us. That way we can say, fine, if Airbus is building this quantity of planes, and this represents the LEAP market share, we understand what that converts into regarding revenue for Park. So in any case, we went back to them, we pushed back, and they replied, "Yes, you're correct." They returned with completely revised usage data for us. Now, whether that data is more accurate — or likely more accurate — but whether it's entirely accurate, we can't say. We simply continue reviewing and verifying, reviewing and verifying. So, here we go. Taking a 59.75% CFM market share alongside the refreshed usage figures, the rate of 75 A320neo family aircraft per month equals roughly $32.5 million annually in revenue for Park prior to rebates, beginning in 2025. Why do we concentrate on 2025? That's when we anticipate the <<inaudible>> program, and additionally a price escalation is baked into 2025. That's why our focus is on 2025, in line with our LTA. Whether we'll update this every quarter is still up in the air, and here's the problem: the market share figures come out monthly and they move, even if nothing has changed in the engine usage data. So every time we hold a quarterly conference call, we could wind up annoying you by saying it's up or down by a couple of — by a few hundred thousand dollars. So we'll sort that out. But I just wanted to give you that data so you have it. Slide 28. Providing another update on GE Aviation. So if you look at a brief window, the revenue Park reports from the A320neo won't line up with Airbus's figures, and that's just not something that will happen. You can point to plenty of reasons for that. But the key thing is this. In the end, when it comes to the A320neo program, the only number that counts for Park is how many A320neo deal aircraft Airbus builds and delivers with CFM LEAP-1A engines installed. That's it. If our usage data holds up, then everything else comes down to timing. Which quarter it falls into — yet in the end, what Park cares about is the count of those planes that get built and delivered with LEAP-1A engines. Some news regarding the XLR. We've talked — we cover this, I believe, each quarter. A lot of what I'm about to say isn't really new. The first test flight happened on June 15, with certification anticipated in the following year and entry into service in 2024. So beyond that, it brings plenty of distinctive capabilities — among them, as Airbus asserts, a 30% reduction in fuel burn per seat relative to legacy airplanes, plus more than 500 firm orders, and Boeing isn't preparing any countermove. Does that make it a game changer? Well, my sense is — and plenty of others share this view — yes, since this aircraft can take over missions flown by particular wide-body planes while running far cheaper on shorter wide-body routes; so let's move to Slide 29. All right. Leaving the A320 behind, turning to the Comac 919, there's significant news here. At a recent ceremony held at Beijing Central Airport, with President Xi of China in attendance, the Comac 919 was granted its type certificate by the China FAA, the CAAC, essentially China's FAA. A production certificate is still something Comac has to obtain. I'm not sure whether you know this, but typically the OEM receives a type certificate first, yet a production certificate is also required, and what that means is that each one you build will come out identical; that's a rather loose way of putting it; still, that captures the idea behind a production certificate.

Brian Shore

executive
#6

The production certificate is truly essential, honestly. To reach volume manufacturing, they must obtain it; many key parts come from Western suppliers. Congrats to Comac on hitting this significant milestone. For Park, this could be a really major initiative. With the A320, we share parts with another company, but the 919 currently relies solely on a LEAP engine. So from a components standpoint, we aren't splitting this program with anyone else. Now, moving to Slide 30. The Bombardier Global 7500—nothing much fresh to report. It's a strong program for Park. Regarding Bombardier, as I believe we mentioned previously, they just unveiled a Global 8,000 variant, with service entry slated for 2025. Slide 31. Here we have the Boeing 747-8. Boeing has declared it will stop making the Queen of the Skies, as you're aware. The final 747 still outstanding should go to Atlas Air this month. Actually, I understand one was just handed over, and another is in assembly. They're receiving the last handful, so it seems that one will reach Atlas Air later this month. It's a sorrowful moment for one of the finest commercial jets ever made. I believe Atlas Air holds more 747-8s than any other operator; and we're bidding farewell to the magnificent 747 in Anchorage, Alaska, where it dominated. And let me tell you, you spot plenty of Atlas planes, plenty of Atlas 747 aircraft. There were all — I shouldn't even say nearly, all for freight, for cargo, departing from Anchorage. Tons and tons of 747 activity in Anchorage. May the Queen endure forever. Now on to Slide 32, where matters become somewhat intricate. The left section — the left-hand column — is merely historical. Nothing surprising there. Q2 shows $6.1 million. So it's remained within that $6 million to $7 million per quarter band for some time. Alright. Understood; next, check the right side of the page — what's this all about? GE Aviation programs sales forecast estimate for Q3, $4 million per quarter to $4.43 million per quarter. What on earth does that signify? And it's a solid figure since it's essentially what's been booked; we don't anticipate any new orders for shipment in Q3. So that will be the figure; so what on earth is happening here? Fair question. Let's proceed to Slide 33. This becomes somewhat, I don't know, sensitive, shall we say. Let's discuss what's happening here. To start, let's address the programs we just reviewed. A320, 50 per month this year, 65 per month by early '24, 75 per month by '25. When did we need to be at 50 per month to support 50 per month this year, like 6, 8, 9 months back. What about 65 per month early '24? We ought to already be at that level by now. 75 — that will come along not long after. So what on earth is happening? And 919 just received certification — that would be welcome news. 7,500 is performing pretty nicely. So what on earth is happening. We brought up downstream inventory together with productive management challenges and dislocations. So we want to speak off-script here; yet many loyal investors care deeply about this stuff, and we figure we owe you some sort of explanation regarding what on earth is happening. It's amusing — with those inventory management matters, we come from the electronics industry and all of that, electronics industries, you've got zero visibility. You're fortunate — you have no lead times. There is no visibility. There is no forecast. I mean, you're fortunate to — in some — a lot of instances with these airplanes, it's 6-, 7-, 10-year forecast. Electronics would be delighted and thrilled to have a 6-week forecast; yet electronics, that industry is extremely effective at managing inventory and production. We didn't get these sort of insane wild swings. That's the concept behind it. In Aerospace, evidently this is sort of a routine matter. It isn't merely tied to our customers. And — I don't know, evidently it isn't improving, a really weak track record when it comes to managing inventory and production; so it's constantly overshooting, overshooting, overshooting, despite the fact that there's the long-term end-market forecast that ought to make it far simpler to correctly plan inventory and production. So the explanation — well, there's finished goods inventory. The question is, okay, how much and where? Haven't received a meaningful answer. So you can picture how maddening and frustrating this is for us; and that's what we're contending with. Ultimately, the only thing which matters to Park when it comes to the GE Aviation Program we support, the only thing that matters ultimately, is how many LEAP-1A equipped 320 — A320 family aircraft Airbus delivers? How many 919 and ARJ21 aircraft Comac delivers? How many global 7,500/8,000 aircraft Bombardier delivers? Period. That's the whole story. But, there is a big but though, the downstream inventory and production management dislocations create major challenges for Park in managing our production and supply chain. So here's the thing, it's nearly as if we're our own worst enemy. There's no <<inaudible>> be very flexible, very agile and responsive. I think people perhaps sort of take advantage of that. At Park, they'll just turn on a dime, and we will. But our suppliers, nor sir, no ma'am. That is not true. So that — it makes it much harder for us because perhaps we can turn on a dime. Good luck with our suppliers. If we go to suppliers that's kind of crap, what they're going to do, in 2 seconds, okay, thank you, we're going to give your allocation to somebody else. And then the moment arrives when you need to increase output—sorry, that's impossible, since your supplier handed your allocation to someone else. And you're aware of what's taking place. You're aware of—sorry, you're aware of what lies ahead. I mean, it's purely arithmetic; purely arithmetic. It's merely a question of when. I don't know the timing of that call, oh boy, we went too far, we must increase output quickly. And this is what we face every day, every week—every day and I'm not improving. So as I said, I don't want to speak out of turn, but we had many loyal shareholders who'd stuck with us for quite a while; and I believe your own solid grasp, a reason why on earth would we be considering that sort of figure for Q3? So that's the reason we're giving, we're not changing it. Slide 34. Let's move ahead to the Park projection; so you see—first of all, you've got Q3. Q2 actual, we said our Q3 projection, nothing shocking here, $3.25 million — beginning at $13.25 million to $13.75 million in sales. $3 million to $3.5 million adjusted EBITDA; now we truly wanted to provide a Q4 projection right now.

Brian Shore

executive
#7

And we actually do have the first draft — we did have it. But it truly wouldn't have told you much. The main reason is that 2 major variables affect Q4. The first is that C2B product, which we talked about at some length on Slide 17. We simply don't know how much of it will slip into the next fiscal year. That makes Q4 really back-end loaded. On top of that, the forecasts we're getting for the GE Aviation Program are pretty questionable. So giving you a meaningful Q4 forecast right now just isn't possible. We apologize for that. As I said, we genuinely wanted to, but it wouldn't have told you anything useful. Let's move to Slide 35. On the clock side, things haven't gone well — my apologies for that. I mentioned 45 minutes, and we've already hit 45 minutes, so that part's done. These slides are essentially identical to what we showed in the earlier presentation, so we'll just go through them quickly. Let me start off by noting that making forecasts right now is really difficult, and it may not even carry much value, because we're dealing with supply-chain disruption, substantial inflation, worries about a serious recession, and staffing problems. That makes short-term projections tough — and long-term ones would be even less useful. Still, we'll go over what we believe our outlook looks like, since we don't think we're in a position to offer you anything truly meaningful regarding where the company is headed. Should a downturn hit — and plenty of folks argue we're in one already — that still won't be something we have to endure. Go ahead and look it over, and reach out with any questions you might have. Now, let's jump ahead to Slide 38, which gives us the final takeaway, drawing on everything discussed so far: sure, there's plenty to worry about when it comes to the economy, rising prices, a lack of workers and tangled supply chains, but our view of Park's future remains strongly favorable. And like I mentioned across the last 3 — the preceding 3 — slides, we laid out the reasoning behind that belief. Moving to Slide 39, we have the big Newton, Kansas expansion. We can go through this fairly fast since I won't bother reading the figures aloud — there honestly isn't a lot of new information to share. Previously, when a lot of other companies were cutting their capital budgets or scrapping them entirely, we kept going and finished our expansion. Alright. Now on to Slide 40, the James Webb Space Telescope — this is our fun, cool slide. I believe this makes the second one of those; as a reminder, the James Webb includes 21 of our proprietary SigmaStruts. During the earnings call, James Webb, together with those struts, is positioned at the Lagrange 2 Orbit Point, roughly 1 million miles away from Earth. That honestly astonishes me. My understanding is that those struts will cut back their Kansas factory; they're 1 million miles from Earth; so Donna and Elena were the ones overseeing this. We have an enormous number of truly remarkable photographs and images from James Webb. I instructed them, fine, you two need to select 3. That proved difficult — truthfully, you ought to have to choose 100. In my view these images are simply unbelievable, just extraordinary. I'm not sure what — there's no possible way for me to put into words what they depict. Elena here is our in-house James Webb nerd, so she'd likely give you a fantastic rundown of what those images are depicting. But something caught my eye — an article saying that James Webb is observing things that aren't supposed to be there. I found that quite interesting. Let me go off on a tangent briefly. Isn't that exactly the point — observing what exists instead of what ought to exist? That's what science is fundamentally about. It's irrelevant what you hold to be true; science deals with truth, with reality, not with your beliefs or what ought to exist. That's the way science advances. That's the way humanity advances, in my view. Don't fixate on what people assume should be there. Consider Einstein — folks figured space and time had to be fixed. They were believed to be unchanging. Yet no matter what they're expected to be, they simply aren't. That said, I'm drifting away from my point, like I said, but I found that pretty fascinating, and I'd rather not spend any additional time on James Webb and that piece regarding spotting objects that shouldn't be present. Okay. Moving on. Slide 41. Sorry about that, and a lot of you are wanting a genuinely strong update regarding the ADL. Just to note, our materials right now are the only qualified sole source on the ADRS program at ADL for the 737 legacy aircraft. Worldwide, there are a great many 737 legacy planes still flying — many thousands, in fact. Go ahead and look it up yourself. My understanding is the count exceeds 5,000. That being said, ADL came to us not long ago asking that we refrain from discussing the ADRS program publicly. Given that, no new details on the program will be shared at this moment; the only thing we can say is that our work on this program opportunity will continue in an active way. On top of that, we feel quite good about being included in what could become an exciting new program. So once more, I apologize, but at this stage we intend to honor what ADL has asked of us. 42 is a fairly significant one. On slide 42, we've talked about the room we're reserving in the new plant for project initiatives, so here's an update on the big potential projects planned for that facility. This is something we've brought up across several quarters without saying what we had in mind. Now, as the big reveal, we'll describe one of the primary projects we're considering. This one involves Automated Fiber Replacement, or AFP, manufacturing of aerospace composite structures. Nothing has been decided on this project yet, although Park has already done considerable due diligence on it. Around $10 million is the estimated capital outlay for the equipment, which covers every piece of support equipment needed to deliver full AFP manufacturing capability to customers who want it. While we are still reviewing where the equipment would go, it is our belief that every piece of equipment involved — and there will be quite a lot of it — could be accommodated within the major expansion we recently finished in Newton, Kansas. Turning to Slide 43. Picking up again with this AFP update. So, what does AFP mean? Robotic technology is employed in AFP manufacturing, which counts as a type of additive manufacturing technology, in contrast to the subtractive manufacturing technology that conventional hand layup of composite structures relies on. That matters a great deal. Should Park move forward with putting money into AFP manufacturing, that ought to be viewed as a strategic investment for the long term. It would not deliver a fast payback — it would be long term, it would be strategic. Currently, AFP manufacturing tends to be carried out in-house by big aerospace OEMs rather than by companies like Park; even so, we think a niche may exist for us when it comes to AFP manufacturing of assorted space composite structures.

Brian Shore

executive
#8

Should Park move forward on this initiative, it could, to a certain extent, end up being the kind where you build it and they will come. So pulling the trigger would require both belief and nerve, yet those are qualities we typically have in good supply, I believe. When it comes to making aerospace composite structures, AFP production offers quite a few possible upsides versus the conventional hand layup method—the approach we currently use and the one most businesses use. Reductions in labor expense tied to removing particular manual steps simply aren't possible with AFP. There's no ply cutting, and no laying up by hand. Let me move ahead to Slide 44. What this is not: we have zero interest in automation that would swap out our current employees. Plenty of businesses bring that up; that isn't the situation here; however—and this is a major however—because properly staffing our operations is, and might remain forever, extremely challenging, AFP automation could prove to be a highly valuable strategic means of adding to our current workforce so we can enable greater manufacturing activity. It has been a strategic, I should say, manufacturing activity, with cost reductions stemming from extremely high material utilization rates that come with the AFP additive manufacturing method, set against far lower yielding material utilization rates tied to hand layup subtractive work. Just consider it: with subtractive manufacturing, you're removing material, you're pulling material out of the picture and discarding it; thus material yields under subtractive manufacturing layup might result in major yield loss—10%, 20%, 30%. That is enormous, honestly. And AFP manufacturing doesn't have that problem, since with AFP we aren't subtracting—we're purely adding. That's a major distinction. There's also considerably better quality, reliability, repeatability, and consistency that come with AFP automation, process automation, which tends to be characteristic of automation when set against manual operations. It could also be a good fit for volume manufacturing, particularly for larger composite structures. Turning to the drawbacks now, let's move to Slide 45. AFP manufacturing. AFP manufacturing, similar to most automated processes, might not be a great match for lower volume production, particularly for oddly designed, quirky composite structures. So for fast turns and greater volume, the economics might not always hold up. Additionally—and this matters a lot, it's a very large obstacle to entry—there's substantial upfront investment; we've given you the figures, but the learning curve expense is a really, really big matter. So many businesses say, good Lord, that's not for us. There's still due diligence left to finish, and no firm deadline exists for the final call on the AFP project. We're hoping to be able to reach that decision soon, and we'll keep you updated; so this is—we don't know whether we'll do it or not, we might not; we felt we ought to tell you what we're up to, something we've devoted a lot of time to, and we don't know whether we'll pursue it. Also, in my view, this might be a rather thrilling initiative for Park, even if, as I mentioned, it's more of a long-range idea instead of a fast return or recoupment. Moving to 46, Slide 46. Park's team, shifting topics entirely now. An update regarding our excellent Customer Flex program. You're able to view the figures, the percentages. Under today's extremely tough conditions, getting the job done would simply not be achievable without our Customer Flex program. That isn't mere exaggeration; it's the truth. I mean, daily, our Customer Flex program enters the picture and — it turns into something that matters for us, affects whether we can accomplish things. Park's present staff number, 99 people, which isn't a favorable figure. The optimal headcount, staff number, ought to be 125. The lowest staff number for a function to run correctly, 115. So what's happening here? What exactly is happening here? There are several causes, yet one key cause — this might not be politically correct, but my purpose isn't to be politically correct; my purpose is to share our thinking and our beliefs. A key cause is that specific other firms, mainly bigger firms, have been fiercely pursuing our staff for hiring. People on Linked In, finding them is so simple. They seek individuals from this function and that function. Slide 47. So perhaps this is merely capitalism, the free market functioning. Sure, isn't that wonderful? But is it really? A number of these firms that are pursuing our staff were handed enormous sums of government money. Where did that money originate? From us, from taxpayers such as us throughout the pandemic, enormous sums; this government money, paid for by us and other taxpayers, was meant to encourage the recipients, not to dismiss their staff. Yet in certain instances, recipients dismissed substantial numbers of staff regardless, thousands. In certain instances, the recipients of the government money paid for by us are still shedding very large sums. So you tell me, it's merely capitalism and the free market functioning for the government to take our hard and honestly earned money, tax money, and hand it to others who have done nothing to earn it or deserve it so those others can use that money to fiercely pursue and hire our staff. Is that capitalism? Slide 48, perhaps it's crony capitalism or phony capitalism or no capitalism whatsoever. What's your view? And one further point regarding these firms that are pursuing our staff. What will they do the moment the people they hire and bring in aren't required? Will they be there to retain them? Well, you can form your own view regarding that. In any case, whatever the reason or the politics surrounding it all, we're handling our workforce difficulties as we always do. We don't surrender. We persist; we don't sell out. We don't sell our souls. We continue generating fresh concepts and putting in the effort, yet selling out isn't our goal; our aim is to treat this difficulty as a chance to genuinely improve our team and guarantee the suitable individuals are employed at Park. The newest concept, appearing somewhat encouraging, involves adding a weekend shift. I might mention that Courtney, Nancy, and Corey too are involved in something we're dedicating — they're dedicating tremendous energy toward — constantly, constantly, constantly, laboring, laboring and laboring while producing fresh concepts, gathering with potential staff members, showcasing Park, showcasing the Park culture, a great deal of energy. And doing it properly instead of doing it poorly is worth the trouble. That's my view. Slide 49, returning to Park's personnel, yet another less pleasant narrative, inflation; at this point we aren't discussing Park's inflation, we're discussing the inflation folks contend with regarding daily existence. Despite the fact that we didn't trigger it and aren't able to halt it, hearing folks discuss deciding between purchasing gas and food is extremely difficult. Hearing that is extremely difficult. And this isn't complicated.

Brian Shore

executive
#9

Every high school econ student could explain that when you flood an economy already coming back from the pandemic with trillions of dollars, and at the same time you try to close down oil and gas, the result is serious, lasting inflation rather than something temporary. The folks behind this inflation are clever; they understood exactly what they were doing and what would follow from it. As we see it, they simply did not care. Our people mean nothing to them, and they never stop to think about how much harm their choices inflict — and are inflicting — on our people. In their eyes, our people can be thrown away, they are irrelevant. For us, though, our people cannot be thrown away. Our people come first, our people are invaluable. Turning to Slide 50. Not long ago we put in place an inflation pay premium covering every one of our people earning roughly $60,000 a year or less. Like I said, this brutal inflation is not something we created. Nor can we possibly make up for every wrong, every bit of harm this brutality has caused, yet it troubles us deeply, it troubles us a great deal, watching our people struggle. That is why we put this inflation pay premium in place — to do whatever we felt we could to lend our people a hand. And you ought to be aware, because figures sometimes carry weight, that this newly introduced inflation pay premium will run us about $150,000 annually from here on out, with no set end date. Moving along to Slide 51, closing thoughts. Apologies for carrying on. We're already at an hour, but the closing thoughts are up now, so let's try to finish. At Park — through the whole pandemic, the subject here, the running theme, is that we earn whatever we get. At Park, all through the pandemic, not one of our people was let go; we had zero layoffs, even as plenty of others were setting their workers adrift by the thousands; we turned a profit every single quarter, even as plenty of others were bleeding money in enormous amounts; we held our quarterly cash dividend steady, even as plenty of others were cutting their cash dividends sharply or doing away with them entirely. We carried on with and finished our big plant expansion, even as plenty of others were hacking away at their capital budgets and spending or scrapping them entirely. We kept our superb balance sheet — substantial cash and no long-term debt — even as plenty of others were piling leverage onto their balance sheets just to keep the lights on. We handed over our taxes, and plenty of them, even as plenty of others paid nothing, perhaps creating NOLs so they won't owe tax later either. We accepted no government handout, no corporate welfare money, though we could easily have grabbed it, and a lot of it. Brian, a ton of people asked me, what's wrong with you? That's free cash—grab it, just go ahead and grab it, you might pocket millions of dollars, even while a great many others were collecting gigantic amounts of government giveaway money funded by taxpayers such as us, because it's taken right out of our wallets. Turning to Slide 52. Here at Park, we earn whatever we get—we've never asked for or accepted a single government handout or any form of corporate welfare. So what do we want the government to do for us? Not to—well, I was the one raising that question, but I'll give an answer anyway. There's one request we have: stop taking the cash we've rightfully and honestly made through hard work, and stop giving it away to other companies that never did anything to earn it and have no claim to it. When it comes to succeeding in both life and business, what really matters? At Park, the answer involves achieving significant goals through giving up things and putting in real effort. As for certain other companies, we can't say for sure. What's their approach? Hiring more effective lobbyists? Ensuring you're at the front of the queue when government giveaways and special treatment get handed out? How is that worth anything? Those aren't values at all. It's somewhat pitiful. But here at Park, we don't operate that way. Here at Park, we're in it to win. Every presentation wraps up with a spotlight on some of our Park folks — a department or a crew. Down in the lower right corner, you're seeing Park's solution, a mix team, a crew. There's William, looking really cool in his shades. Then we've got Johnny. Johnny is — how do I say this — the fellow who's been at it the longest. I'd rather not call him an old-timer, but Johnny's the veteran. And Daniel. Daniel's a recent arrival to the team, though from what I hear, Daniel's performing really well. A terrific new addition to our Solution Mix group. So, here's what I want to share with you. Back when we had electronics sites, I believe the count was roughly fourteen, and each one included a solution mix room somewhere in the world. Whenever I visited one of those sites, I made a point of stopping by the mix room. Why? Because without fail, it was the filthiest, most rundown space in the building — resin dripping all over, hardened layers stuck to the floor. Then, upon walking into the factories, local management would frequently attempt to lead me in another direction, away from that room. Naturally, that only made me want to see it more. Over the years, I'd estimate I've stepped into mix rooms hundreds of times — perhaps 300 or 400. That is no exaggeration. I'd guess I've been in that situation somewhere around 300 or 400 times. Out of everywhere I've ever set foot in my entire life, this solution mix room is hands down the tidiest one. Nobody ever told these folks to do any of it—it was entirely their own doing. That means a tremendous amount to us, and to me personally, when individuals step up on their own to build a space this great, a mix room this lovely. You've likely never visited 300 other mix rooms, I realize, but were you to have done so, you'd understand exactly what I mean. This place wasn't spruced up for the shoot; it always looks like this. Gorgeous. Like folks say, get off the floor. Yeah, perhaps we ought to grab a bite down on the ground in the mix room, picnic-style. To me, that's really meaningful and has a certain warmth to it; and I'd like to express real gratitude to William, Johnny and Daniel for the great job they do keeping that mix room in such lovely shape. Okay. Operator, that wraps up what we had to present; and Matt and I are happy to start taking questions at this point.

Analyst

analyst
#10

I wanted to circle back very quickly regarding the GE Aviation Q3 guidance. That's a fairly significant drop from Q2 to Q3. And perhaps I missed part of what you said. But could you give us a bit more color on that? I mean, is it purely the calendar moving things into Q4? Do you anticipate making up those lost sales during later quarters? I'm just looking for a bit more information about that decrease.

Brian Shore

executive
#11

So in case you didn't catch it, I made quite a few remarks on this topic; and you likely should go back and hear them. I really don't want to — I certainly don't want to repeat all those remarks, and I don't want to attempt to recap it in a way that isn't fair because there are many things at play here; and to some degree it's a bit sensitive, to put it that way; but I believe what I did was try to be as open as I could out of regard for you and other long-term shareholders who genuinely care about what's happening. What I'd recommend is go back, listen to that section of the call if you haven't, then call us and ask if you've got any further follow-up questions regarding that topic, if that works for you.

Analyst

analyst
#12

All right. Yeah. Yeah. That's absolutely fine. We can circle back with you about that. I did want to ask about that $32.5 million figure for 2025. I'm quite struck by the gains you folks have mentioned across the past several quarters, if I look back and — sort of work backward into the shipset value that suggests, it's fairly solid, I think, an 8% to 13% rise across the past several quarters. Is it purely pricing? Or could you give any color on what's behind the shipset increase that you folks are seeing?

Brian Shore

executive
#13

Yeah, that's only for the A320 as well; so the — I suppose a few things are happening here. A few. One is we have these new usage numbers. Keep in mind, we had a question about whether the earlier usage assumption was right. Keep in mind, we ship a product, we don't know which program it's headed to. There are all these programs, what we ship is the same spec. So the usage information really matters to us. So the usage information shift meant more square feet of material per shipset for the A320. The second thing is that in '25, there's an embedded increase under our LTA. So that's locked in; it's part of our LTA. And the third thing is, like I said, that by 2025, we also expect film adhesive to be on the A320 program. So those are 3 factors that would impact the A320 unit numbers, to put it that way.

Brian Shore

executive
#14

Thanks a lot, operator. And I appreciate everyone tuning in. Sorry for running over so much — I'm fairly certain this has been our longest one yet. I also want to say sorry about the coughing. I can just picture how annoying that must be to hear. Somehow I made it through, likely with some cough sounds that were distracting; so I'm grateful you stayed — for sticking with me and putting up with that small problem. So once more, thanks for joining, don't hesitate to ring Matt or me whenever you've got any follow-up questions. Enjoy the fall season, and we'll be in touch before long. Be well.

Operator

operator
#15

That brings us to the end of today's call. At this point, you're free to hang up your lines. We appreciate you taking part.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.