Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary

January 5, 2023

New York Stock Exchange US Industrials Aerospace and Defense earnings 86 min

Earnings Call Speaker Segments

Brian Shore

executive
#1

Thanks, operator. Brian here. Glad to have everyone join us for the conference call on our third quarter. Happy New Year. Joining me, like he normally does, always does, is Matt Farabaugh, our CFO; we put out our earnings this morning. Inside that earnings announcement you'll also find directions on how to get the presentation, whether you watch our webcast or go through our website, and you'll want that open in front of you to make this call more meaningful, naturally. One quick thing, please don't get too alarmed by how long the presentation is. I believe it's around 55 slides. In this deck, we've brought back a number of slides from prior quarters—Q2 as well as Q1—to give everyone background and a broader view. That means the Q3 materials can be used independently. To see everything, you would have to return to the Q2 or Q1 deck, since the items we simply reused are essentially unchanged. We'll likely move past them quickly, or at least touch on them briefly. There are quite a few slides, yet I believe we can get through them fairly fast. Realistically, that's around 45 minutes, though we won't walk through each slide to fill that time. After we're done presenting, Matt and I will gladly answer any questions you have — and I believe that covers everything. So let's begin. Here we go. Moving along to Slide 2, which contains our forward-looking disclaimer language — should anything about that wording be unclear, just reach out. Slide 3 lays out our table of contents. The deck we're going to walk through, plus the supplemental financials, which sit in Appendix 1 — we won't be covering those in the presentation itself. That said, if anything there raises a question, certainly let us know. Moving on to Slide 4, we'll take it a bit slower here; what follows is a summary of our earnings at a high level. The column on the right side shows results by quarter, naturally. Q3 sales are marked in yellow at $13.867 million. Gross profit came in at $4.444 million, a figure that's simple to recall. Our gross margin stood at 32%, a level we'd prefer to see improved. That said, as we've consistently noted, dropping under 30% is when we truly get concerned. Looking at Q2, it did in fact fall under 30%. There have been a few quarters when it dipped below that 30% mark. And if you turn back to fiscal year '21, that period marked the start of the pandemic. We can point to several quarters in which margins came in below where they are now. Adjusted EBITDA reached $3.321 million, which works out to an EBITDA percentage of 29.3%. Regarding Q2 — excuse me — regarding Q3, the quarter we're currently in, what did we tell everyone on our Q2 investor call? We guided to sales between $13.25 million and $13.75 million, and actual results landed a bit above the top of that range. On adjusted EBITDA, we had projected $3 million to $3.5 million. As I noted, adjusted EBITDA was $3.321 million — putting us near the middle of the EBITDA range. Let me walk through how we build our forecasts. Almost every quarter we remind you of how we think about forecasts: when we provide guidance, we're telling you what we believe will occur. We don't engage in what we see as a game where we hand you a low figure we can surpass and then look like heroes. That's simply not our approach. Our employees share those same targets. So these represent genuine objectives for us. And they aren't simple objectives. Once again, we're telling you what we believe will occur, assuming we do what we always do — put in a lot of effort to hit the numbers. So I wanted to bring that up. If our results land where we said they would, and the number we put in front of you last quarter turned out to be conservative, so the Street calls it a beat — spending time on that kind of gamesmanship isn't something we see as a good use of your time or ours. Here's another thing: whenever companies do that — and I realize nearly all of them do — in our view, they aren't leveling with you. They present a figure as their genuine expectation, yet they don't actually expect it. That's just not the way we run things, and we're not criticizing anyone else. All we're doing is stating, and restating, what our approach is. Now let's turn to Slide 5. Park and the team performed exceptionally well, coming in just above our Q3 sales target and meeting our Q3 EBITDA target, especially considering significant obstacles involving supply chain interruptions, freight problems, unreliability, and insufficient staffing. Reaching those figures was no simple task. We lost approximately $650,000 in shipments during Q3; those problems persist for us; the three items marked account for what we failed to ship in Q3, which we hope will shift into Q4. Regarding the elements affecting our margins in Q3 — let's move to the following page — there are many elements, several elements we intend to go through. Up to this point we've addressed the top line in terms of the amount — the $650,000 we fell short on top line. Turning to the profit picture, please turn to Slide 6. We're still dealing with substantial inflation — it hasn't cooled off or let up, at least not in our case. Whether it's raw materials, shipping supplies, other supplies, utilities, inbound freight, outbound freight, or labor costs, chances are you're paying more. During Q3, we passed some of those elevated costs on to customers through higher prices, but not all of them. Why is that? The main reason is the lag effect. We honor the terms we committed to on our purchase orders. Some companies don't do business that way. A number of our vendors, surprisingly, haven't operated that way either; we'll verify a PO and afterward proceed to verify that same PO with the buyer, basing it on what we expect raw materials to cost. Then midway through, we're informed our cost is rising, despite the fact that we hold a PO from our vendor. That leaves us stuck. Yet that's not how we operate; we honor what we promised — there's nothing to debate, it isn't some gray zone. Once we commit, we follow through. That creates a delay effect. Consequently, we must hold off until we next provide a quote to this buyer so the higher costs can be factored in; beyond that, setting our vendors aside momentarily, other expenses alone are climbing. Their rise hasn't happened particularly fast. Folks discuss inflation easing. That isn't what we observe. At times it's tough to match the pace. We build a bit of inflation into our quotes, yet occasionally it outruns us.

Brian Shore

executive
#2

So we fall behind the power curve, but we just—we honor what we promised. That creates a lag effect; we'll hold off until we next provide a quote so we can factor in inflation. Then there's the matter of LTA pricing with specific customers, such as that large one, MRAS, which comes up frequently in these presentations. Our pricing is long-term and fixed. Fixed adjustments might apply, yet it's seldom tied to inflation factors. So that's another problem. And inflation truly weighs on us; it's genuinely turning into a burden for us. And our folks, I believe, are doing quite a remarkable job of discovering ways to get past that burden, since it is a genuine burden. It isn't merely some sort of rounding error type of burden; it's a genuine burden, and it's something we deal with daily; and we keep dealing with it. We don't know when it will disappear. As I mentioned, folks claim it's moderating; within our small world, we don't observe that. Let's move to Slide 7. We're still discussing margins, what occurred—not what occurred with our margins, but rather factors that affected our margins, let's phrase it that way. Product mix in Q3 carried somewhat lower margins than anticipated. So why didn't we completely foresee this while planning? When we provided a Q3 forecast back at the time of our Q2 announcement, why don't we foresee the product mix? And my remark is, I believe it's the same remark we offered previously, planning is intriguing amid supply chain chaos. So we have a good plan. It's excellent. But then we place the plan in the drawer, and then chaos strikes due to supply chain disruptions and freight disruptions. Whatever we plan is good, but it isn't what we can accomplish. We must shuffle. We must relocate items. We must scramble; we must get things done. That's the Herculean effort required to hit our numbers, to hit our quarters, because if we simply proceeded as planned, they wouldn't turn out very well; and then Mike Tyson, everyone who has—everyone has a plan until they get punched out. I think it applies to us, because we have a plan, but nearly right after the plan goes into the drawer, the world shifts on us, and by a lot. This isn't normal. I mean, things always shift somewhat, but shifted on us by a lot; so it's extremely hard to predict precisely what we'll sell in any quarter, and that's why it's hard to predict the product mix precisely when it comes to margins. What we plan is good, but what we actually sell during the quarter might not match what we planned. And as a matter of fact, it has exceeded what we planned. Ongoing interruptions in the supply chain keep creating major inefficiencies in how we manufacture. If you're acquainted with folks who operate manufacturing facilities, one thing they enjoy most is having the ability to build according to plan with a degree of predictability. When you're forced to scramble, make adjustments, and shift items around, that turns the manufacturing process extremely inefficient. Once again, this is something our team managed to conquer. In my view, they did a remarkable job getting past it. Yet ultimately, despite every hurdle, challenge, and problem, our wonderful Park employees banded together to complete the work and deliver our Q3 results. Every individual, every Park employee got a quarterly bonus, our Q3 quarterly bonus of $200, not in thousands. They were not given $200,000 — they received $200 for the excellent work each of them performed in very tough conditions. Let's move forward to Slide 8. Slide 8, we won't spend much time on it, but we include this slide in our presentations to offer historical background and reference. Should you have any questions regarding the annual — historical annual results, just let us know. Let's proceed to Slide 9, simply to conserve a bit of time here. Park's balance sheet, cash, cash dividend history and recent share buyback authorization. We'll breeze past portions of this material. A key investor of ours suggested to me that we cover it; we cover this each quarter. I figured it was a smart idea. So that's what we're doing. Certain parts aren't particularly newsworthy. It's somewhat revisiting topics we've addressed previously. Let's look — our reported cash stood at $103.3 million in Q3. What's our investment philosophy? We put money into highly secure liquid securities, like treasuries, governments, high-grade commercial paper. We assume no credit risk. We do assume interest rate risk since, look, our average maturity is 21 months. So when interest rates jump up, you don't have, because that means the worth of the investment, at least temporarily, winds up declining. Our approach, incidentally, is to keep our investment until maturity, but the value of them on an accrued basis is going to be pushed down if interest rates are rising, which they did, naturally; we report this the way reporting is done — mark-to-market. So it isn't the investment value, it's the market value of our securities and investments that gets reported to you with that $103.3 million. Just so you're aware, in case I phrase it that way, the amortized cost basis of our cash and marketable securities as of the close of Q3 was $109.2 million. I simply want you to possess that information and you work out, you determine what you believe is a more relevant number. If we hold these securities until maturity, which has been our approach, we'd likely get closer to roughly $109 million. When these securities mature, you've got a 21-month average maturity, but the present value of $103.3 million. Another thing I'd like you to understand, in case you're asking yourself where our cash went — it's not as if we've been burning through it carelessly. How much our cash is worth for reporting purposes depends on interest rates. To repeat, credit risk isn't something we take on. Interest rate risk is the only risk we take. So the average sits at 21 months, which means rate swings affect us. Moving along to Slide 10. If you have further questions on this topic, give Matt a call afterward and ask him, since that's the extent of what I'm able to say about our cash reporting. Slide 10. We have roughly $13 million in spending, particularly on installment tax payments; we want to pass that along to you as well, because it matters if you're trying to figure out how much cash Park actually holds. This is an obligation on our books, yet we're still required to pay the IRS across the coming three years or so — that $12.6 million. On cash dividends, we go over this each quarter. Now for the final check item. Since the start of 2005, Park has distributed $558 million in cash dividends.

Brian Shore

executive
#3

Here's the comment I always share with you: for a small outfit like Park, that's an awful lot of money — $558 million in cash dividends. Moving on to Slide 11. Our share repurchase authorization — this has been somewhat of a hot topic recently — we announced on May 23, 2022, that the Board had authorized buying 1.5 million shares of the company's — of Park's stock, common stock. So did we buy anything during Q3? No, nothing was purchased, though it wasn't for lack of effort. Perhaps the market was handing us an offer we couldn't turn down. Okay, so we were in a blackout starting mid-November. But back in Q3, before the blackout kicked in, the share price fell to roughly $10.11, if I recall correctly. It spent some time trading in the teens, then it stopped. At that moment, our view was that the market might be presenting an opportunity too good to pass up. As I mentioned during the last call, our position is that repurchasing shares isn't what we're here to do. We think that's something you do — you're the one who decides whether or not you want to purchase stock. We don't see that as really our main role. So what is our main role? Our focus every single day is doing whatever we can to grow the company's intrinsic worth. Trading the market isn't our business. So snapping up 5,000 or 10,000 shares daily really doesn't get us going. It sort of feels like you'd suddenly be burning your time on trivial matters; however, once the stock had dropped to that point, our sense was that perhaps an offer too good to pass up was being made by the market. We completed an <<inaudible>> quantity of buyback. They're performing excellently. Should you ever come across someone interested in running a buyback program, I'd endorse them with no hesitation. Plus we were hunting for blocks, sizable ones, yet nothing turned up. We were also informed that the institutions were essentially all purchasers rather than sellers, which is why we came up empty. Then, as you may recall, the share price began climbing away from us, reaching $11, $12, $13, and $14. Once it got there, we stepped aside, since competing with genuine outside buyers of the stock isn't something we want to do. Let me just make clear that I'm not commenting on the price at this point. We aren't declaring that if it drops to $10.5 we'll re-enter the market; that's information for us to hold and for you not to have. That's — what we'll do going forward is something we'll talk about. I want to lay out what actually took place previously, okay? That way you have the right frame of reference. One last point: with interest rates climbing, the days of inexpensive, readily available capital are winding down, and our hope is that money Park worked so hard to earn will at last carry some value — perhaps that's wishful thinking. Let's move to the next item, which is actually Slide 12. We go through this every quarter, so let's do it once more. AAE Aerospace — this covers the MK125 warhead together with a standard missile 2, SM 2. It's a wonderful program to be a part of; I take pleasure in it. Next up is Kratos Defense, and there you can see the Kratos Valkyrie. Participating in that initiative brings us a great deal of satisfaction. It's an exciting one, and we really like collaborating with Kratos too. You may or may not have seen it, but not long ago they announced a fresh agreement with Kratos and the navy covering a couple of Valkyrie aircraft, which is exciting for us regardless. Then Lockheed Martin — that's a classified effort, so we're not permitted to discuss it. No images or anything like that can be shared, but it sits in the top 5. We can say it ranked top 5 in Q3, and that's the extent of what we can share there. And Middle River, yes, we know them — MRAS is what we call them. That's the Comac 919, powered by LEAP-1C engines. Moving to the bottom right, Nordam — that's the Bombardier Global 8000, which uses Passport 20 engines. MRAS is involved in that program too, working alongside Nordam, though for this one we chose to put the spotlight on Nordam for the Global 8000. Moving on to slide 13 and those pie charts. At a big-picture level, the thing that stands out to me is how close fiscal '22 and the first nine months of fiscal '23 appear — hardly any change at all. The commercial slice is exactly the same percentage. So it looks like the segment mix in the pie chart has more or less stabilized at these levels, at least for the moment. Now shift your attention to fiscal '21, the pandemic year, as we could call it, when commercial was dramatically, dramatically smaller. You may remember those flights where the planes had nobody on board — does that ring a bell? Fine. Let's move to Slide 14. Niche military aerospace programs are something Park really likes. This slide gets included every single time; Donna is the one who puts the presentation together, she does a fantastic job, and she even keeps working right through the holidays and everything. Donna's work is genuinely excellent. The individual who pinpoints which programs belong on the Park niche military aerospace slide is Elena, so she deserves recognition as well. Here's what you're looking at: the ASTER 30 missile, those are blades, the Predator Radome materials, the Growler Radome, structures materials, and the Poseidon structured materials. If you take a look at that pie chart — rocket nozzles, drones, Radomes — every one of those, in my view, counts as a niche market for us. Our focus is squarely on niche areas instead of commoditized ones, whether in commercial or military work, and especially military. All right, on to Slide 15. Military markets — not every slide brings good news, though that's not what we're after here; we're just laying out our perspective. The worldwide situation has changed enormously, a genuine sea change, and the war in Europe continues to grind on. Many governments seem prepared — maybe even eager — to keep funding and supporting that conflict by providing military hardware, equipment, and assorted other goods. At the same time, Asia isn't exactly a bright spot right now. People are now openly discussing whether nuclear war could happen. I mean a nuclear war that wipes out civilization on this planet. Is that the sort of nuclear conflict being referenced? Elon Musk aims to build settlements on Mars so humanity survives should we fail to endure here on Earth. You'd best move fast. That's a joke, and it isn't meant for us regardless. What matters most to us is that we truly hope the fighting countries figure out how to halt their conflict and put an end to the bloodshed quickly. Such a senseless loss of life. Yet even if that happens, our view is that these intense military expansions will probably keep going for some time, given how much animosity, dread, and suspicion exist across the globe right now. Turning to Slide 16. As I mentioned, not every slide brings good news, yet that isn't what we're here to do.

Brian Shore

executive
#4

What we're supposed to do, I believe, is share our perspective with you. On Slide 16, as you'd expect, there's a lot of focus right now in numerous regions globally on rapidly growing military budgets and spending within the U.S.; plus other nations, and also predictably, missile defense systems, among them the PAC-3 Patriot missile. This ranks among the main priorities when it comes to higher defense spending. That's likely no surprise given the situation, with missile defense systems being extremely important. And this one stands out as the leading missile defense system, I'd say, for — at least for numerous early systems, I mean the PAC-3. Keep in mind, the Patriot missile used during the first Gulf War in the early '90s. This, of course, is clearly a newer generation. Several generations have followed it, yet it's actually existed for quite some time. Moving to Slide 17, Park backs the PAC-3 missile defense system using specially made ablative composite materials. And our ablative composite materials hold sole-source qualification status within that program. Japan, South Korea, Taiwan, Germany, Switzerland, Poland, Netherlands, Romania are purchasing PAC-3 missile systems or upgrading their systems. I believe next quarter, we'd probably like to simply provide a roster of nations that aren't purchasing the — or aren't employing the PAC-3 missile system. And when President Zelensky visited Washington, the U.S. pledged to supply PAC-3 missile systems to Ukraine; that's significant since they'd been requesting it for quite a while. So that's essentially the huge gohona <<inaudible>> at last. Ukraine is getting the PAC-3 missile system. Now the final point on 17, Slide 17, as we mentioned earlier we're receiving plenty of signals regarding rising demand for ablative materials, along with this RAYCARB C2B product, to support the PAC-3 missile system and other missile systems. Let's move ahead to Slide 18. So just the initial point, the check item, sort of — we're merely bringing you up to date, we provided earlier signals on this figure. As a refresh, Park presently projects total fiscal '23 sales of ablative materials and the RAYCARB C2B product at roughly $7.5 million. So once more, we're doing this simply because we offered signals in Q1 and Q2 when we wish to refresh that signal. Major supply chain and inventory management difficulties remain a possible notable boost to how quickly the worldwide military buildups proceed. So shall we keep going? Let's proceed to Slide 19; so here's what I figure we'll do, simply to conserve time, this is among the illustrations of — this is an illustration of what I covered in my opening remarks prior to beginning the presentation; this portion of the presentation appeared in our Q2 presentation. So we'll merely glance through it. We won't spend time covering it thoroughly, but I want you to have it; so that, as I mentioned, you get one stop shopping. The Q3 presentation is comprehensive. There's no need to dig up old presentations to understand what we're referring to. Right there on Slide 19, the commercial aviation sector keeps bouncing back strongly. Let's move to Slide 20 in short order. Up at the top, you'll see the items to keep an eye on. We've covered these previously. They're still with us. So these are significant things to monitor. And the major question posed at the bottom of that slide is this: should the commercial aviation sector stumble, what's going to happen with the commercial aircraft sector, and how will it react? The way we see it, whether the discussion involves Boeing or Airbus, the response could be pretty different. Let's proceed to Slide 21. And the commercial aircraft sector confronts the same sorts of difficulties that everyone faces, listed at the top of the page. One fascinating twist is that international travel is bouncing back faster than anticipated. That's welcome news for wide bodies. Moving to the top of Slide 22, this encompasses the Boeing 777X aircraft, which we'll get into more thoroughly later in this presentation. And a positive note, just to cover this briefly, once more, as jet fuel costs rise, airlines get a stronger incentive to retire their older legacy gas-guzzling aircraft in favor of more modern fuel-efficient planes; they'll make that switch sooner than they initially intended since they have math, they have their own formulas and such, every airline does. It isn't all that complex. It's purely numbers. But when the fuel price climbs, that's a major variable. It shifts the calculation, and that means, okay, we're now going to replace our older airplanes sooner; so that's welcome news if you're a supplier into the new airplanes. Slide 23, GE Aviation, jet engine programs. We won't cover this in extensive detail; this slide, we put it in every presentation with a few small tweaks. Firm pricing LTA with a requirement contract from '19 to '29 with Middle River Aerostructure Systems; we refer to them as MRAS, a subsidiary of ST Engineering Aerospace, which is a Singapore company. So every one of these programs here is a GE Aviation program. You might be asking, well, what's the link to Middle River, ST Engineering. Well, GE Aviation sold Middle River, MRAS, to ST Engineering several years back. All these programs trace their origins to when MRAS was owned by GE Aviation. That's the tie to GE Aviation, and even though GE Aviation no longer owns MRAS, all these programs are GE Aviation programs, as you'll observe. We've completed — actually we've discussed that on numerous occasions. We've built, we've done the PAC-3 for GE Aviation and for MRAS to back these programs. Sole source for composite materials for engine nacelles and thrust reversers for multiple programs, A320, Neo family, 747, 2 Comac airplanes and Bombardier Global. And then when you look at the bottom right corner of the page, we now begin discussing the 777X manufactured with our AFP composite materials. And I often mention, there's a great photo showing the 747 with its 8 engine nacelles, and the reason I'm fond of it is that the individual standing back there really conveys how large and how big these structures are. Moving along to Slide 24. So we've got quite a few slides giving updates on GE Aviation programs, and we'll attempt to get through them fast, but Park considers them significant. So we'd like to spend a bit of time on them. I'll begin with the A320neo family of aircraft, and after that the LEAP-1A engines. That covers 19, 20, 320, 321, 321LR, 321XLR. The reason we refer to LEAP-1A engines is that the A320neo program aircraft has two approved engines. One of them is the LEAP-1A engine made by CFM, which is a JV between GE Aviation and Safran. That particular one is a CRDI engine. We're only involved with the CFM engine. So if an airline purchases an A320neo and they ask for the CRDI engine, then that's not — we get nothing from it. If they ask for the CFM engine, then we get a lot from it. So I just want you to understand, perhaps I should have clarified this better in a few of these presentations.

Brian Shore

executive
#5

In any case, let's turn our attention to the A320neo, specifically the aircraft side of things. We've talked across numerous quarters about how Airbus is pushing hard to raise the rates, and how the supply chain has largely been a drag on Airbus. There has been friction between Airbus and its suppliers. Let's not dwell on it, since we've covered that friction and that dynamic repeatedly in prior calls. Slide 25. This matters. Airbus had stated its goal of reaching production rates for the A320neo family of 65 per month by early 2024. That had slipped from mid-2023, the initial target, owing to constraints or limits in the supply chain, and 75 airplanes per month by mid-2025. Just so you understand, we're talking about an enormous quantity, an enormous quantity of aircraft; never before has any commercial program achieved such rates. From what I remember, the A320neo — before the pandemic showed up, Airbus was producing 63 each month. So even getting back up to that number is still a struggle for them. I believe there's no argument that this plane will become the highest-selling commercial aircraft in history. Not long ago, Airbus also announced an objective of hitting a production and delivery pace of 50 neos each month by the close of 2022. Well, it looks like they pulled it off: in November, they got to 53; according to a preliminary report I saw yesterday, December came in at 58. So keep in mind, that's preliminary. Ideally that number stays where it is, though that's just what came back to me in the report. Can that pace keep going? I have no idea. What I can say is Airbus is absolutely committed to keeping it going and pushing it even higher. According to Airbus, one thing is very apparent: the demand reflected in the A320 family order book is enough to justify these ambitious production speeds. Right now, orders total 6,349 planes — an enormous figure, an enormous quantity of aircraft, an enormous quantity of aircraft. To put that in perspective, if you build 50 each month, what's the total? 50 multiplied by 12 equals 600, correct. Divide 6,349 by 600; that's more than 10 years; so you see the difficulty Airbus faces: you want to order a new A320neo now? Well, I suppose they'd have to give you a delivery around 2034 or something like that; that's awful; they don't want that. This is among the reasons they're trying to push the radomes so the lead times aren't so long; they obviously want to grow the backlog, but they don't want to keep extending the lead times for these airplanes. Let's continue. Slide 26. Okay, some recent disappointing news from Airbus. First, they said they intended to ship 700 total commercial aircraft in 2022. Not going to make that — didn't make it. I came across a few write-ups yesterday — perhaps 640, 672 — though they suggested, I'm not sure, roughly four weeks back that hitting 700 wasn't going to happen, so that didn't catch me off guard. There's also something else that came out not long ago, and that one likely matters more for Park. I'm going to read a quote here: "Considering that this is Airbus, and given that this complicated set of conditions is going to last longer than people had thought, Airbus is going to change how quickly it ramps the A320 family up to rate 65 for '23 and '24; right now it isn't fully clear when Airbus anticipates hitting 65 deliveries each month." So what they're telling us is — keep in mind, previously they'd said, what was the timing, early 2024. Right, early 2024 — and now the message is, well, perhaps that won't pan out. Yet they haven't — no new target has been given for when the 65 rate gets reached, even though they still insist they want to hit 75 by the middle of the decade, 2025; so as things stand, that isn't being pushed back, but they did cast doubt over the 65 and the timing for getting there. What's interesting is that lately there's been news suggesting the engine makers have more or less closed the gap, because if you turn to Slide 27, the engine manufacturers were the biggest reason Airbus couldn't ramp those rates as fast; and Airbus' CEO said not long ago that the engine makers have essentially caught up. Still, plenty of other supply chain bottlenecks exist beyond engines — forging, casting, whatever you can think of — the supply chain is a genuine problem, a genuine problem. You're familiar with this. With the pandemic, many businesses pulled back, let go of a lot of workers, and now there's a fierce effort to scale back up and everyone is caught off guard, as people just said. So I found myself asking, why aren't people returning to their jobs. There are tons and tons of positions open, tons of folks who aren't employed. So we won't dig into that in any depth. I think you're aware of this. So, back on June 17, 2022, we put out a press release where we basically made our position clear. Our message was: we're going to support Airbus no matter what the ramp rate ends up being. Then, by the close of October 2022, here's where things stood in terms of key figures. CFM's share came to 60.7%. Remember, that's CFM's portion on the A320neo program competing with Pratt — 60.7%, which is comfortably above half, and these are confirmed orders we're talking about. This isn't just speculation regarding confirmed orders. And let me check — what was that total? Here we go, right here: 6,816 confirmed orders for LEAP-1A engines. That puts us past 10,000 confirmed engine orders. So there's quite a bit of fluctuation baked into that number. I mean it could shift somewhat from one month to the next, but given how many firm orders already exist, that share likely won't move so fast. So the share clearly leans toward CFM, which benefits Park, as I laid out. On Slide 37, we provide our estimate of roughly how much revenue comes in per LEAP-1A unit, so you could run the numbers yourself and work out what that LEAP-1A backlog could be worth to Park. And as I mentioned, Airbus is looking to book additional orders. That basically covers the entire A320neo landscape, and I'm certain it includes LEAP-1A and Pratt engines too. Turning to Slide 28, the A321XLR — we've gone over this for perhaps several quarters now — a really thrilling program for Park, once again featuring the LEAP-1A engines. The initial test flight happened in June powered by a Leap-1A engine, not a CRDI engine. When you consider their single-aisle aircraft, it's the sole single-aisle aircraft with a range exceeding 5,000 statute miles, and we'll return to that shortly; it's rather intriguing. Another point called out here: Airbus recently performed an A321XLR long-duration test flight lasting over 13 hours. That's an extremely lengthy stretch for a single-aisle airplane. It's practically unheard of, honestly. On a 380 or 747, you might stay airborne for 12, 13 hours, but with a single-aisle, I doubt it. And as you're aware, Boeing has stated they won't respond. They won't build a new commercial aircraft during this decade.

Brian Shore

executive
#6

Boeing won't be bringing a brand-new commercial plane to market within the next ten years. That means Boeing has handed over this entire niche — this market — to Airbus, which benefits Park, naturally, because we're involved in that program. Moving to Slide 29, let's turn to a few more GE Aviation programs. Regarding the Comac 919, we covered the major headline during the previous quarter. What's even bigger is that Comac secured its production certificate for the C919. That production certificate matters enormously, since it enables Comac to move into volume production of this aircraft. Obtaining production certificates tends to be harder than getting Type certificates. Type certificates draw far more attention; however, plenty of airplanes received Type certificates, never obtained production certificates, and nobody ever heard about them, since they never entered production. So production certificates, I suppose, don't attract as much attention frequently, yet they're arguably more important. Getting that production certificate is a major development; furthermore, there are 686 firm orders for the 919 right now, all destined for the Chinese market, I believe. Those planes use LEAP-1C engines, again from CFM. Now on Slide 30, we haven't spent much time discussing the COMAC ARJ21 over the recent quarters; however, we came across a report just lately indicating 26 ARJ21 aircraft were delivered during '22; that exceeds what we anticipated. So we thought we should highlight it for you. I mean, we're glad to be part of the program. We'll say once more, this serves the Chinese market. On Slide 31, we covered the Bombardier Global 7500 and 8000 during the earlier quarter. So we likely won't devote much time to this slide. Mach 0.94 maximum cruise speed — that's quite fast. From what I understand, they actually exceeded the sound barrier during some testing, which is fascinating. Slide 32, remaining in the GE Aviation section, we chose to dedicate an entire slide — actually 2 slides — to the fan case; we hadn't done so previously, because the 777X program had been somewhat dormant and perhaps stuck in limbo. We weren't certain — nobody was certain what was happening. But it appears to be moving forward. The fan case containment wrap for the GE9X engine used on Boeing 777 aircraft — that's our portion of the work, the fan case containment wrap. Let's discuss the aircraft itself, the 777 to 8 variant, over 10,000 statute miles. Recall that I mentioned a 5,000 statute mile range for the XLR being a major deal. For wide bodies, 10,000 statute miles isn't the big league — it's beyond that. That's an extremely long distance. 425 seats, depending on how the seating gets configured; and given that the 747 and A320 programs were canceled, no other commercial aircraft comes anywhere near those range and passenger capacity capabilities. So this will be a significant niche, potentially a significant aircraft for Boeing. I hope it succeeds for them. I'm not aware. I doubt anyone realizes that Airbus has also been working on an aircraft meant to go head-to-head with this one, the 777X. Certification for both the passenger and freighter variants is anticipated during 2025. A buddy of mine who works at a company in Fairbanks called Alaska Air Fuel sent me this photo. The plane is parked on the ramp there at Alaska Air Fuel's ramp in Fairbanks. It had gone up there as a single test aircraft performing cold weather testing in Fairbanks during winter. If you're going to run cold weather tests on a plane, Fairbanks is the spot, since it's easy to encounter temperatures of minus 40, minus 50 degrees. So I'm quite fond of that photo and wanted to share it with you. Slide 33 — I'm attempting to speed up a bit, I suppose. Moving along with the 777X program, the test effort saw a minor disruption and has now restarted, with 353 firm orders. And what's our role? We make composite — AFP composite materials for the GE9X fan case; our content per engine on this program is significant. And not long ago we quoted materials for this program totaling more than $1.2 million. Why bring that up with you? It isn't really about the figure, it's simply to say that, yes, things appear to be becoming real now for Park. We haven't received the POs yet. Let me be clear on that, but a quote request did come in for — and we quoted roughly $1.2 million for delivery during 2023. And keep in mind, that design risk is still there. We've discussed it before. The company building their fan case is attempting to read us into their fan case, meaning our case wrap isn't needed. That way the fan case can pass the fan blade out test without any case wrap. Slide 34, 747 queen of the skies. The final 747 came off the line at Boeing's Everett, Washington factory on December 6, 2022; it was unit 1,574. Early in 2023 it will go to Atlas Air. The first 747, we handed over to Pan Am on January 22, 1970. This is the aircraft that transformed the world. Watching this program finish is heartbreaking, at least to me. This photo was shot October 10, 2022, in Anchorage, and obviously that's Atlas Air, a 747-8, and they're getting the last one. Anyway, alright, I took that photo. Let's continue to Slide 35. Yes. So here's where things get somewhat complicated. You might wonder what on earth is happening here. Looking at the history on the left side of the left column with the figures, in fiscal '22 and fiscal '23, that's over $6 million each quarter for GE Aviation program sales history and forecast estimates, so $6 million to $7 million a quarter. The year before that was the pandemic year. The figure is significantly smaller. Yet during 2022 and the opening half of 2023, it exceeded $6 million each quarter. Then Q3 came in at only $5 million, and the latest quarter was also $5 million. When we presented Q2, we projected roughly <<inaudible>> quarters across three quarters. So we're coming in slightly above that, though still far beneath the historical level. Here's my read on the situation: the programs aren't declining—they're rising. Now let's move to the right-hand side, the GE Aviation program sales forecast estimate for Q4. Once again, we're putting the range at $4.25 million to $4.75 million. Adding year-to-date through Q3 together with the Q4 estimate gives you the total—that's simply arithmetic. But I should point out that $5.8 million is already booked for fiscal '24 Q1, and we'd anticipate booking additional amounts in 4Q and shipping beyond that figure. So what on earth is happening? This might be something to watch, perhaps even a warning. Let's proceed to the following slide. What on earth is happening, Part 2? Downstream inventory, production management difficulties, dislocations—these are creating severe misalignments pitting aircraft program rates against the Park's material production rates.

Brian Shore

executive
#7

Eventually—perhaps before long—these mismatches can't keep going, and they'll hit a tipping point, and when that reckoning arrives, the corrections and realignments may come suddenly and painfully. That's simply arithmetic. If what we produce doesn't line up with what Airbus and the other firms flying these GE engines are building, then at some stage something has to break. Keep in mind that on these programs, we are the sole source. Day in and day out, dislocations further downstream make things very difficult for Park when it comes to running our manufacturing and supply chain operations. We're attempting to gain a bit of insight, and instead we keep receiving odd signals, like what showed up in Q2—pardon me, Q3, and then Q4. Still, for us this one is substantial regardless. Looking out over the longer horizon, just a pair of factors matter to Park regarding the GE Aviation programs we support. First, how many aircraft get delivered carrying these engines? The LEAP-1A, A320neo with LEAP-1A, 919, the ARJ21, the Global 7500/8000 on the 777X. The second factor, if you want the full picture, sits at the top of Slide 37—the anticipated Park revenue per engine unit for those programs. That's derived from Park material usage for engine units on those programs, and that usage figure comes to us from our customer. So beginning in 2025, we're receiving this data because we grew frustrated enough trying to forecast what lies ahead. We'll state it plainly—right now we're giving you our projected revenue per engine, and you're free to choose whatever unit counts you want to plug into your calculations. Beginning in 2025, using the program engine material usage data our customer supplies, estimated Park revenues per program end unit break down roughly like this: for the A320neo family, $30,500; for the ARJ21, $29,500; the 919, $26,500; the Global 7500/8000, $49,000. Now, each of these figures rests on assumptions you need to examine. We aren't forecasting that these outcomes will occur. We're merely making our best effort to estimate what might occur, drawing on signals from our customer—and this applies especially to LSP and film adhesives, specifically which programs will adopt our LSP products that currently don't use them, and film adhesives that currently don't use them. So we must make a few assumptions there; we chose ones we consider reasonable, though they could prove right or wrong. I simply want you to be clear on that. The final item, the GE9X fan case, is a large one; we won't provide a figure just yet. It remains a relatively new program. In my view it's somewhat premature for that. And naturally, there's a chance the program—that the fan cases we designed for it—might not carry on. Alright, Slide 39. Now let's discuss Park's financial performance, along with historical results and forecast estimates. I don't believe there's anything to overshadow here, but I do want to point out that we basically just went over this. If you look at what they sold in fiscal '20 — and the quarters for fiscal '22 and '23, keep in mind that through Q2, GE Aviation program sales came in above $6 million in each of those quarters, correct? And then in fiscal — in Q3, the quarter we're in right now, just $5 million, yet overall sales still hit $13.9 million. Someone fairly clever worked out what's really happening. Well, clearly, we arrive at those figures by compensating for the shortfall in GE Aviation sales with sales that aren't GE Aviation. They look at the Q4 forecast, we're projecting $13.5 million to $14 million, but our estimate for GE Aviation sales is only $4.5 million. So once more, I think that's something you ought to be considering. Well, it likely indicates that non-GE Aviation sales are heading in the right direction. EBITDA estimate of $3 million to $3.5 million. And for fiscal '23, again, we're simply attempting to do the math. We take year-to-date and add the Q4 estimate, and those are the figures we arrive at. Let's move ahead to Slide 40. And this one we'll skip, since we addressed these remarks and thoughts regarding our forecast and outlook over the past couple of quarters, and there isn't really much change to them; we feel — just to restate that offering a long-term forecast given the situation, with the tremendous uncertainty we're facing, wouldn't be all that meaningful; and if you'd like to skip, we can jump to Slide 43, the close of this section, where we're saying that given all these considerations, even though there are significant worries about the economy, inflation, workforce shortages, supply chain challenges, we believe Park's outlook is very positive. So we don't think we're in a position to give a meaningful long-term forecast with numbers; but we can say, based on this discussion, that we think Park's outlook is very positive. So let's continue to Slide 44. Just a few quick updates here. The expansion is essentially finished. The qualifications ought to be wrapped up within a few months. And the middle picture, we haven't — and there's the top and bottom picture, we showed those earlier. The middle picture, though, is a passage way connecting the new plant and the old plant; we're viewing it from the new plant, looking into the old plant. And if you look at the top picture in the back, you'll see that the passage right at the top of the picture, I don't know whether you can see it. There's a sign in this picture, the best way picture on the right. And it essentially says it's a fire door. And should a fire occur, that door will close automatically. Why is that? Because it's a redundant factory, so anything that goes — happens to one factory. The key thing is ensuring it stays separate, preventing any transfer over to the second plant. Let's move ahead to Slide 45, James Webb. Each quarter, this comes up in our discussion. Park won't be generating additional revenue. My expectation is that no further product will be delivered for the James Webb Space Telescope; at this moment, it sits 1 million miles away from earth. Even so, our '21 SigmaStruts are built into its structure. Those struts play an essential role. Without them, the telescope structure simply wouldn't function — it would just fall apart. A few noteworthy points: the James Webb identified concentric angular rings encircling a giant star, offering the first credible sign of light displacing dust around it, and here's a picture of that. I haven't a clue what that signifies, yet personally, it strikes me as deeply awe-inspiring; also, James Webb reveals a dense cosmic knot in the early universe — once again, that's far beyond my level of expertise. Still, for me, it feels so moving to learn about those sorts of findings regarding our understanding — fresh comprehensive, new vantage points, to phrase it that way — into the universe. Slide 46, all right.

Brian Shore

executive
#8

So over the past few quarters, we've discussed this Aero Design Labs initiative, the ADRS program. On this program, Park's materials right now hold sole-source qualification. More than 6,000 Boeing 737 engine aircraft are in service. This initiative concerns the Boeing 737NG aircraft. Back in May 2022, ADL got an STC for the 737 to 700. Come November, ADL signed an MOU with Delta covering testing and certification of its kits for the 737 to 800 and 900 variants. So that's all positive. And according to the forecast the customer gave us, Park anticipates bringing in roughly $2 million of revenues during calendar year 2023 tied to this program. In fact, a solid chunk of that is already booked, I believe. But the reason we're sharing this is simply so you understand it appears genuine. It's taking place; we aren't the customer ADLs at the present low key; we won't be giving out further details regarding the program, the expectations, the forecast, we're not going there. But we at least wanted to touch on this. And regarding Delta, that's public. It was in the news release, so we aren't revealing anything you likely don't already know. And we'll look at further investment for this program should it be needed. This might be a major development for Park; so we're pleased about it. Let's see how it plays out. Slide 47. Okay, during the last quarter, we discussed AFP, gave Park an update on a potential automated Fiber Placement, AFP manufacturing project initiative. We first brought this up on our Q2 call, as I just mentioned, let's provide an update. Not a whole lot new — the project sits under serious consideration and review; no decision has been reached as of yet. It's a front burner project for us. We're seeing plenty of high-level attention and focus. However, I want to make you aware, this potential AFP manufacturing project is vying for high-level Park management attention and focus alongside a potential major multi-front JV project with a large aerospace company; this has only been developing over the last several months, but it's grown into a fun version project too. The potential JV project is under ongoing serious consideration and review, receiving a significant amount of attention. So there's something of a balancing act for little Park to juggle both of these important potential opportunities simultaneously. A good problem to have, just wanted you to know that; this should be a real word part of it. Let's move to 48. Now these slides match the ones that appeared in the earlier presentation regarding the potential AFP project. In our view, AFP is a very intriguing potential strategic opportunity for Park. And in the slide, the next few slides, we walk through why we believe AFP is intriguing, but we won't go back and review every slide, just to save some time. Naturally, if you have any questions, let us know. Slides 48 through 51 largely matched what the Q2 presentation already had, aside from a few small tweaks. Moving along to Slide 52 — we're nearly finished. The Park family, plus news on Park's excellent customer Flex program. This gets highlighted each quarter, and rightly so, since it matters a great deal. Getting the job done under today's extremely difficult conditions simply wouldn't be achievable without our customer Flex program — it just wouldn't. Park's headcount right now stands at 112. That's definite improvement. It's not yet where we'd like to be, but today's headcount of 112 rose from the 99 we reported in the Q2 investor presentation. The wonderful part is that every bit of that progress came about the proper way — the Park way. There's a small photo showing a handful of the fellows who took the prize in our 2022 holiday party paper airplanes throwing contest; that's a yearly tradition here at Park. So congratulations to those fellows, and we're <<inaudible>> at this point. Still, one thing deserves mention. During Q3, we were sort of hobbling along at 98, 99, 100, 101, 102. Only following Q3 did we truly accelerate to that 112 figure. So all that work got completed, all of it, the 13.9 million shipped during Q3, we shipped that with a heavily strained workforce, a severely shorthanded one, perhaps 100, 101, 102. I simply want that on your radar. Slide 53: we won't sell out or compromise our sacred principles just to bring aboard the extra staff we require. That point is crucial. And for your information, other firms, larger multi-firms, keep aggressively going after our personnel to recruit them. Now here's a question. Will they feel bad if, sooner or later, they realize — all of us know they will — what will those bigger firms do with the personnel they recruited so aggressively? So indeed, the answer to that question eludes us. The moment those personnel are no longer required, out they'll go like yesterday's trash onto the garbage sheet, which is precisely what has occurred on every past occasion. That's my reason for saying it. I don't consider that an outrageous remark; it's exactly what has occurred on every past occasion. And do you imagine that inside the boardrooms of those firms hiring 1,000 personnel at a time, flinging cash around, hiring bonuses, huge sums at those personnel, do you imagine you're agonizing and wringing your hands over, oh my god, what occurs when aircraft rates decline, what do we do with those personnel? It isn't even under consideration. Why? Since we know what they'll do; they'll fling them onto the garbage sheet as they always have, the personnel they hired; yet the good news is that we keep going — Park keeps progressing with recruiting and training personnel the proper way, the Park way, regardless of what those other firms may or may not do. Our mindset when bringing someone on board is that it's a lifelong commitment. We're not going to thoughtlessly add a bunch of staff — hey, let's bring in 25 people. They're here for the long haul. That said, it doesn't mean there aren't lots of folks for whom Park isn't the right fit, or the reverse. In that situation, if someone's attitude doesn't suit Park, they won't remain at Park. That's not what I'm referring to. I mean solid individuals with the proper mindset — when our mindset is that we bring somebody in, we consider it thoroughly and gravely. We've made a lifetime pledge to them. We won't discard them like trash the moment business declines. We didn't behave that way through the pandemic. During a period when our business had under — I believe we recorded $9 million in sales for the quarter. We didn't do it back then. So that isn't what we plan to do. Our mindset isn't — human beings aren't goods, aren't pork bellies to be traded, with prices bid up and bid down; that's a different thing. So that's what I mean when I say we follow the Park way. That's what — that's one illustration of the subject at hand. Let's move on to Slide 54.

Brian Shore

executive
#9

Everyone here has weathered quite a bit side by side during the past several years, facing numerous difficulties, adversities, and diversity that needed conquering. I'm not going to recite all of it for you — you can likely work it out on your own. The fantastic part is that after surviving and getting past those difficulties, adversities, and challenges as a group, our Park family has triumphed — we've drawn nearer and bonded more firmly than at any prior point. When a workforce is committed, driven, and inspired, a business can shift mountains. Lacking that kind of workforce, a business can shift nothing at all. And the folks here are shifting mountains. When 100 individuals generate $13.9 million during the quarter, mountains are definitely being shifted. I can assure you of that. Park feels incredibly lucky to have the amazing team that we do. On the final slide, this is the Christmas celebration, and you're able to spot a few of these individuals wearing their Christmas ugly sweaters. This was — this is likely the majority of the Park crew. It isn't the full 112 of them, but we hold a really lovely Christmas celebration where we capture a photo of the Park family for all of you. So apologies for that running so lengthy; we're roughly an hour into the presentation now. So operator, we're prepared to take questions should there be any. Thanks to all of you for tuning in this far.

Analyst

analyst
#10

Hello, and a happy new year to everyone. Once again, I want to express my gratitude for the extremely thorough presentation you gave. I tune into a great number of conference calls, and honestly, Park's presentation ranks among the most comprehensive of them all. That's fantastic. For the first time in my entire career, incidentally, I've heard Vito Corleone referenced during a presentation — I got a real kick out of that. So here's my question, and I realize it may put you in a tough spot: the wording on your slide regarding the China initiative, Comac, mentions significant upside potential. If you could possibly put a figure on it — even in your wildest dreams, or simply a range — what might that translate to for Park a couple of years from now? That's my first point. Second, given that it's China, there's a fair amount of, shall we say, tension. As a supplier on this program, do you perceive any political risk for Park? And last, this is more of a big picture question, Brian. How would you describe Park's competitive standing — your moat, for want of a better term? Thank you.

Brian Shore

executive
#11

Thanks, Nick, and happy new year to you as well. I appreciate the input. Let me just add, insofar as people are still tuned in, if there's anything you'd like us to address in future presentations, please tell us. This time belongs to you, not to us; it isn't a chance for us to hyper promote our company and boast about how smart we are. It's an effort to communicate what we believe could be meaningful when it comes to understanding Park, our business and our objectives. So Nick, regarding the 919 program, what's the upside potential? Well, at present, it's essentially almost zero; the real question becomes how many 919s Comac builds. The good news on Comac's side is that they possess a captive market — namely the Chinese market — and that market is controlled, and the Chinese government will, to some degree, dictate, in my view at least, which Chinese — which airplanes Chinese airlines purchase. So we've seen certain figures emerge from Comac, and we're hesitant to relay those; we aren't certain what they signify, whether in terms of forecast or the ramp rates and similar items. So we're hesitant to relay those. We aren't certain how much they can be relied upon; but look, beginning at zero, let's just say they reached 100 airplanes per year. I'm merely throwing that number out there in comparison to 75 airplanes per month, which is what the A320neo program is — its target is; that still represents a lot of revenue for Park. And what we chose to do this time is actually give you the revenue per program, so you can kind of run your own calculations. Obviously, I believe you're aware of this, there are two engines for C919, so that figure has to be multiplied by two. On the plus side for the 919 — that engine, the LEAP-1C engine, sorry — that aircraft program exclusively employs a LEAP powerplant, exclusively employs a CFM powerplant. It isn't a program shared with Pratt. Therefore every C919 that rolls out will be fitted with that LEAP engine, the LEAP-1C engine, featuring the Park materials. The risk — that's a fair point. I can't put a number on it. I would never rule anything out. I suppose the counterargument, or the consideration, could be this: the 919 represents an extremely significant prestige effort for the Chinese authorities. And switching carries substantial risk. Once an aircraft is up and running, there's considerable risk, considerable cost, considerable trouble, and altering direction midway; so for them to choose to swap engines or swap suppliers and their cell structures, anything could happen. Yet it takes enormous effort, enormous risk, and it's a risk to their program, which they're aware the whole world is watching — that's my view once more. And I don't believe they're after a hiccup; so I believe they're after a seamless entry of this plane into the marketplace; they want the globe to witness how that's — the globe to be impressed by how it's proceeding. So I believe they will be hesitant, and they are wise to introduce variables into the program that truly aren't needed by them that might trigger certain setbacks in the program that aren't needed by them. They consider the big picture. There's some chatter. I believe we talked about this perhaps a couple of quarters back — that Comac, or the Chinese authorities, I can't recall where it originated; it's sort of the same — desires a Chinese substitute — a Chinese engine substitute for the LEAP-1C from 919 by 2025. And I'd say I'm extremely doubtful regarding that goal. I don't consider that realistic. And I haven't heard that emerging from China for some time. So I think perhaps they — again my view, perhaps chose to sort of pull back on that goal. In the end, China desires to take any technology, airplane technology, electronics, and have as much Chinese content in this technology as they can. So we'll need to watch what unfolds. There's a risk — and I can't put a number on it, I suppose, perhaps the sole additional remark I'd offer regarding the risk is it's likely, in my view, a longer-term risk rather than one that would make an impact, say, through the close of this decade; and you're correct, there definitely are tensions. I think just one more remark — GE has a great deal happening in China, a great deal of inroads in China, as much as their attentions. They also have symbiotic relationships where both sides are sort of reliant on one another as much as they might not wish to collaborate. They basically have no alternative; plus they're being pragmatic and hoping their initiatives work out. Let's see. That final inquiry was about it — the ways in which we differ, the ways in which we stand apart from the other players. So that's a solid inquiry, perhaps an even better one to pose to our clients, direct it at our clients. The way I see it, it's likely a whole bunch of factors. Here at Park, our culture is quite intense. And to me, if you genuinely want a culture, you have to be ready to live and die by it and not merely discuss it somewhere in the board room. And in our case, we attempt to act in ways consistent with our culture, rather than merely discussing it. A sort of signature trait for Park is this: flexibility, responsiveness, urgency. The aerospace sector is somewhat odd. It's well, yes, it's 9 months, 12 months, whatever lead time. And okay, I suppose that's how it is; we — that isn't how we operate. We don't want to sort of get ourselves range into that sort of mindset. So I would perhaps just name that single item as possibly the distinguishing factor between Park and the other players.

Brian Shore

executive
#12

All right, I appreciate it — that's really useful. Thanks, Nick.

Brandon Dietz

analyst
#13

Hi Brian, and Happy New Year. I appreciate you taking my question. Alright, I have a few things to ask. To begin with, regarding the AFP initiative, you mentioned a possible major multi-front JV project involving a big aerospace firm. I'm just wondering, what does multi-front refer to?

Brian Shore

executive
#14

What multi-front refers to is that there are actually 2 separate major initiatives tied to those JV talks. At this stage, though, it's too soon for us. It wouldn't be suitable for us to say what those are; however, both are significant initiatives, and they involve different kinds of things. This was brought up by that company; it originated from their end, initially, as 2 concepts. And I apologize, I wanted to share that because I want you to be aware, in the interest of transparency, that we're handling 2 major projects — the AFP project and also the multi-front JV project with this big aerospace company; and I'm sorry for doing that, perhaps we've stirred up too much curiosity, but we truly aren't able to give any further details about which company that is or what these JV opportunities involve, yet each of them is significant on its own. I mean, even if we pursued just 1 of them, which could happen — they don't rely on one another — it would still be significant.

Brandon Dietz

analyst
#15

All right, that's fine. It certainly got us interested, and it's really good to hear. For my follow-up, I've got something more about housekeeping and modeling tied to the rate card C2B sales. From what I recall, previously you mentioned anticipating a rather modest figure during Q2 and Q3. Given the expectations you've now updated, would it be reasonable to think that most of what you project for the fiscal year will land in Q4? Also, could you put a number on those amounts so we can model them?

Brian Shore

executive
#16

Give me a moment to see whether I can pull that up. Right, so roughly 50% of that figure should come in Q4. That's right. However, 50% of the $7.5 million figure should arrive in Q4. So your observation is accurate.

Brandon Dietz

analyst
#17

All right. It's good to see the headcount going up. I'm aware that the last 1 to 2 years have been a struggle. And you mentioned that it was somewhat of a sudden rise following Q3. Was there any shift in Park's approach to hiring, or was it simply the labor market being somewhat more willing to work with you?

Brian Shore

executive
#18

Our strategy stayed the same. As I mentioned, we held to our principles. There was one occurrence, however, that happened in our small town of Newton. I mean, it's roughly 30,000, which is, there's a different company that's been located in Newton for many years, not in aerospace, that stunned everyone by shutting down with perhaps one week of notice. What caught us off guard is that this is one of the businesses that was hiring people aggressively with sign-on bonuses and large compensation packages right up until the announcement. So that represented a solid chance for us, and we've brought on a number of individuals from that company, so people from the local area, which is truly great. Our preference, particularly for production staff, is to hire local people instead of those from Wichita; so that assisted us considerably. Our approach didn't change. Our standards didn't change, and we didn't do any of that. It was simply that we suddenly had some people who were available. And look, I mean, I can't predict what will happen with the economy, but it's possible we'll witness more of this going forward.

Brandon Dietz

analyst
#19

Yeah, absolutely. You mentioned that despite bringing those people on board, you're still not at the level you'd like to reach. I mean, how are we supposed to think about, like, what headcount would be ideal for Park that you still have to reach?

Brian Shore

executive
#20

Well, that's a solid question, and it's something we're talking about right now, and honestly, there isn't one simple answer. It hinges on how the shifts get organized. What's typical is going to vary somewhat. But my sense is roughly another 6 people, perhaps as many as about 120, and then we'd hit a spot where things feel pretty solid. You might want to make a few adjustments, but we're definitely much nearer to that figure than back when we sat at 99, since what's needed hasn't shifted. It isn't as though fewer staff were required at 99; so we're headed the right way regardless.

Brandon Dietz

analyst
#21

Yeah. No, absolutely. Perhaps one final question, and I'll keep it brief. I realize the ADRS program comes with restrictions regarding how much you're able to share, but it's genuinely encouraging to see that $2 million figure projected for calendar year 2023. Are you already manufacturing that? Or does it still depend somewhat on when production kicks off for — to make the kits for this program.

Brian Shore

executive
#22

A portion of that has been booked, a solid chunk has been booked. I'd say roughly 40% of it. And we've got orders to ship during our fourth quarter, our fourth quarter, which covers the next two months. So I believe it's genuine. That's why we put that number out there, because we just — $2 million is sort of a round figure, but we wanted to communicate, we want our investors to know this isn't merely something we're discussing as a possibility anymore; it appears it's truly going to happen. It appears it truly is happening.

Brandon Dietz

analyst
#23

Yeah, that appears as though it will be pretty substantial, so it's certainly encouraging that you folks are involved in this initiative. All right. Well, those are the only things I wanted to ask, Brian. Thanks for — again, I appreciate you answering them, and Happy New Year.

Brian Shore

executive
#24

Happy New Year to you as well. I appreciate your questions, and I appreciate your interest.

Daniel Baldini

analyst
#25

Hello, good morning. I appreciate you taking my question. This is kind of a wide-ranging one. What I'm attempting to figure out is how much of the demand for your products got wiped out by the pandemic and the economic turmoil that came with it, versus how much was simply pushed back? For me, perhaps the best way to approach this is to look back about 3 years, to just before the pandemic hit, when you attended the Needham conference. During your presentation there, you laid out a long-term figure, which you referred to as the long-term forecast estimate. You projected sales rising across that 4-year stretch to somewhere between $94 million and $100 million by fiscal year '24. Now, when I take your 9-month results, add in your fourth quarter guidance, and then apply the breakdowns from the 9-month period alone, it appears to me that both your commercial business and your military business have recovered to where they stood before the pandemic. Yet the overall business is down by — I'm not certain — perhaps 50% or slightly more than 50% of what it once was. So, if I were to make the case that demand has merely been delayed by, let's say, 3 years, do you believe you could reach $94 million to $100 million in revenue 3 years from now, in fiscal year '27? And if that's not achievable, what has shifted during this 3-year stretch regarding your view of the potential?

Brian Shore

executive
#26

Alright. Thank you, Daniel. That's a fine question. Like I've mentioned, we aren't — we don't feel at ease giving a fresh long-term forecast, given all the near-term uncertainty. As we've explained, we believe the outlook for Park is positive. Still, it's a very good question — how much has actually been postponed. You used the word destroy in asking it. I don't know of any programs that got destroyed, though plenty were delayed. And we haven't fully returned to where we once were. In the pre-pandemic year, I believe our sales came to $60 million; we're not yet at that figure. And...

Daniel Baldini

analyst
#27

Once you factor in all the variations, that accounts, near as I can figure, for the sharp decline in business.

Brian Shore

executive
#28

Yeah, that's right. Take the A320neo program — before the pandemic hit, it was turning out 63 planes a month. For calendar '22, what I heard was just 41 a month; today they've reached 50, perhaps slightly above that. They're fighting to get back to where they were, yet it's still well below the pre-pandemic level. That likely serves as a decent benchmark for other programs, particularly on the commercial side. Military is somewhat different, since it brings in other sorts of drivers, other dynamics, you could say. So we'd simply say we'll move everything out three years. Given how much uncertainty there is, I don't think we're really ready to do that. Still, the idea doesn't hold up, since I can't think of any programs that simply vanished and died. Actually, I shouldn't put it that way — the 747. That one was likely a casualty of the pandemic. It was never a big program anyway, being fairly small already; they were building only around 6 planes a year, 24 engines. As I think I said, that came to slightly under $2 million a year for us. So that's correct. The 747 went away, and some might claim it would have faded out regardless, but who can say. Such cases are probably very rare, though. Mostly things got pushed back and haven't fully returned; and the A320 program, as I noted, is a strong illustration of that — nowhere near back to where it once was; that isn't Airbus' decision. They hold a huge number of orders; they'd prefer production rates above 60% by now, but there's just a lot of — they're finding it hard to get there; and supply chain, supply chain is the core problem. Well, we discussed what took place when the pandemic struck — it was truly Armageddon. I mean, those were terrifying days, since nobody knew what would come next. Not only was the industry's contraction itself terrible, but people were genuinely saying the world was ending; so what did businesses do? They cut and cut and cut, purely to stay alive; then demand began returning far faster than anyone anticipated, and they're completely past the power curve and still haven't caught up. The Airbus CEO, I believe, said the supply chain might be back in shape and caught up around the start of 2024. I don't mean any offense by this, but the date keeps getting moved later since he'd previously made other forecasts that the supply chain would return to something like its usual condition sooner than that; so I'm going on a bit here. Park, I think there's one more thing to mention, which is that perhaps our capacity to recover those figures can rest on these programs reaching the levels they're meant to reach; and then there are items such as the other possibilities, ADL for instance, the PAC-3 — honestly I have no idea where that one is headed, but it appears as though every single person and their sibling is firing PAC-3 missiles nowadays; so quantifying the potential gain there is even difficult. I simply read the material anyone could read concerning this nation, that nation, all of them are increasing their PAC-3 missile stocks. And AFP would serve as another instance of a long-term strategic case for extra revenue, this joint venture we're discussing. Yet another instance of meaningful potential revenue growth. Still, I believe when those projections were provided, Daniel, I think at that moment we stated that we aren't considering sort of — we are considering our existing business, and our existing business expands organically instead of through acquisitions and big joint ventures. So for this conversation, perhaps I ought to remove the possible joint venture from consideration.

Daniel Baldini

analyst
#29

Let me ask a follow-up, then. During the prior quarter, you showed a slide observing that with a 59.5% share of the leap market and 75 builds per month for the A320neo, that worked out to roughly $32.5 million in annual revenue for Park beginning in 2025. And I'm just wondering, if you can cast your mind back three years, when you were putting together your projection for the LEAP engine business, did you envision it reaching a figure bigger than $32.5 million? Or is $32.5 million roughly what you'd been anticipating the whole time?

Brian Shore

executive
#30

Regarding the LEAP engine. I can't recall precisely what our thinking was when that long-term forecast was made. What I'd say is this: if that longer-range projection had been built on a figure higher than 75 a month, I'd be taken aback. That would catch me by surprise. So the picture has changed. As I say, we've been over this in the past several quarters. Again, this is my own view — though not purely mine, because Airbus has been pretty candid about it. They've got a mission. In the single aisle, their mission is what? To turn Boeing into a second-tier supplier. They spot an opening, they're pushing ahead, and they're trying to be as aggressive as they can. In their eyes, Boeing has been weakened, and they intend to capitalize on that. They're aiming to come out of all this in a position where, as far as I can tell, they aren't contemplating a scenario in which Boeing's narrowbody product, the MAX, falls significantly short of the A320neo. We also discussed the XLR, which simply hadn't been part of the conversation before. When we put together that long-range projection three or four years back, Boeing had nothing to counter the XLR with. Their position was that a brand-new aircraft wouldn't be developed by them within this decade. So my sense is that we're looking at a fresh set of circumstances, brought about partly by what happened with the MAX and partly by the pandemic, and the result is that Airbus now operates with a more aggressive mentality than it had before. I know I'm going off on a tangent a bit, so bear with me, but even three or four years back, I doubt we would have been thinking about anything beyond 75 per month. And to finish up on the value side of this — the reason we handed you the revenue per engine figure was so that you could work it out yourself. We've given you the market share that LEAP holds versus Pratt. And we're telling you that the folks at Airbus are still discussing per month by 2025. But you're reading the same material I am — is 2025 a realistic time frame? Some would argue perhaps it isn't. Even though Airbus isn't quite there yet, let me just mention something else: from where I sit, they're going to make it. Some folks might say perhaps 2025 isn't the year. Still, I believe they'll reach that goal. Their determination to get there is powerful — remarkably so.

Daniel Baldini

analyst
#31

All right, and if I could squeeze in one final question on this topic. As I mentioned earlier, your business jet operation has dropped off pretty dramatically since the pandemic hit. What's your take on how likely that is to bounce back?

Brian Shore

executive
#32

The largest program we have within the business jet segment is the Global 7500/8000, and that's a solid program to be involved with. We also carry a great deal of content on that program on a per engine unit basis; it's arguably the premier, truly massive business jet out there. At this point, Gulfstream has essentially delivered a response when it comes to size and range capabilities. Here's where I stand on the business jet industry. And this is only an opinion, and I want to be clear about that, some folks will disagree, that's just how it goes. My view is that a recession is arriving this year. Then the real question becomes, what kind of effect does it have on the business jet industry. My view once more is that the impact will differ, hitting the industry in a distinct manner, for the truly large business jets versus a swan mid type business jet, and why would that be? The Global 7500/8000, I believe, runs $78 million per unit. So that's a significant amount of money we're discussing. This isn't your typical ordinary wealthy individual. These are major corporations, <<inaudible>> Elon Musk types. In a recession, would they hold back on purchasing a $78 million airplane? In my view, probably not. So I think the Gulfstreams and the Bombardier and the Falcons will likely fare better during a recession. Now when it comes to the smaller and midsized jet, that's an entirely different market. That's an entirely different buyer. Perhaps it's someone who owns four or five car dealerships and wants a jet, maybe now not a $75 million jet; it could be $5 million to $10 million. That person probably doesn't have $500 million or $600 million sitting in a bank and is more exposed to recession, and that person might be impacted more when it comes to his buying attitudes about jets than the person or the company purchasing the $75 million airplane. So my sense is that the larger aircraft, Gulfstream, Bombardier, Falcons will fare better. The smaller jets, perhaps will be hit harder by the recession. And I'd also ground that view in past history; previously, when receptions have occurred, economic downturns have occurred. The companies that built the smaller business jets suffered severely; and I'm not aware of any reason why that pattern or dynamic would be very different if there's another recession.

Daniel Baldini

analyst
#33

Alright, that's excellent. Thanks a lot for spending some time with us.

Brian Shore

executive
#34

Of course, I appreciate the questions you brought and the interest you've shown.

Brian Shore

executive
#35

Much appreciated, operator, and many thanks to each of you for tuning in; that means a great deal to us. Wishing you a joyful New Year. Best wishes to you along with your loved ones for 2023. Don't hesitate to reach out by phone whenever you like should you have additional questions. So, thanks again, and stay well. Farewell.

Operator

operator
#36

Everyone, that brings today's teleconference to a close. We appreciate you joining us. At this point you're welcome to disconnect your lines, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.