Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary
May 11, 2023
Earnings Call Speaker Segments
Brian Shore
executiveThanks, John, and a warm welcome to each of you joining the Park’s of fiscal ‘23 Q4 Investor Conference Call. Joining me, naturally, is Matt Farabaugh, who serves as our CFO, just like always. Our fourth quarter results came out this morning, so if you haven’t had a chance yet, you may want to take a look; inside the earnings release you’ll find directions explaining how to reach the presentation we are about to walk through. There’s a webcast you can join. It’s available on our website as well. Perhaps you’re unaware, but by our own standards, this presentation runs somewhat shorter than what we’ve offered lately. I believe it comes to roughly 40 slides, or 39, versus more than 50 — perhaps 55 — yet plenty of material remains, so it could still consume the same stretch of time; we’re attempting a somewhat different method this occasion; we’ll spend less effort on program and project updates along with industry trends. Should you want those details, my suggestion is to look back at the presentation from our Q3 investor call, or the company presentation, both of which contain considerable depth on the material we typically revisit each quarter. But as I mentioned, we’re giving a slightly different method a try right now. We’ll go over the figures, though after that we’ll be more — this presentation will lean more toward our outlook, something fresh we haven’t provided previously. After that we’ll discuss capital, dividends, and we’ll discuss recent announcements. Then Matt and I will respond, once we’ve finished the presentation. As we move through it, Matt and I will gladly, naturally, field whatever questions any of you may have. So let’s begin. Here we go. Slide — let’s move to Slide 2, our forward-looking disclaimer. Just reach out if anything about our forward-looking disclaimer is unclear. On to Slide 3, where we keep our small table of contents, with supplementary financial information located in Appendix 1, which, as you’re aware, we typically don’t cover or walk through, but let us know if you have questions regarding it. We’ve got a small teaser right here. There’s a photo showing our new film line in production. We’ll get into that a bit later, but as you may have noticed from the news release, our new plant has received approval for production, and in fact it is producing. So let’s proceed to Slide 4. I’ll ease up slightly here. Here you have the Q4 figures. Looking at the column on the right, sales came in at $13,530,000, with gross margin at 28.5%. As we routinely put it, we’re not exactly thrilled whenever gross margin drops beneath 30%; so that leaves us less than pleased. EBITDA — adjusted EBITDA, $2,625,000; so what should we say regarding our Q4, back during our Q3 investor call, we provided certain estimates. As you know, when we provide guidance, our approach is to tell you our honest expectation of what will occur. We don't inflate it, and we don't hand you a conservative figure just so we can surpass it and look like champions. I realize that's the practice at most other companies, but for Park, we simply don't view that as the right way to operate. Turning to our sales projection, the range was $13.5 million to $14 million. We just barely made it in at the low end of that sales figure. The EBITDA guidance, though, was $3 million to $3.5 million, and we landed significantly beneath that — let me calculate — $375,000 under the floor of the range, at $2,625,000. So what caused this? Let's talk it through. The clear question is: we hit our sales target, so why did we miss on EBITDA? We need to dig into that, and we will, so let's turn to Slide 5 to start that conversation. First, I want to recognize our team for achieving the top line figure, the sales target, in extremely tough conditions, particularly given major difficulties involving supply chain interruptions and unpredictability. I'm aware that you may feel — and we address this topic each quarter, so it might seem dull to you, but for us it's actual reality; it's a daily, real-world battle and obstacle that we face with these issues. We continue to hear that supply chain conditions will improve, and are improving. We have yet to observe any significant progress. And once we reach the Airbus A320 ramp later in this presentation, perhaps we can consider the supply chain and how it's performing. That could at least serve as a decent indicator for the supply chain. Let's return to — pardon me, let's move to the following bullet point. We're getting — this is fine, it matters; this part is somewhat new. We are improving our ability to handle these difficulties by accumulating inventory when feasible and suitable and giving suppliers extended lead times when suitable, yet the situation remains highly challenging and hard. Regarding freight interruptions and unreliability, we'll provide you with an illustration of that. Next, persistent staffing shortfalls. This has not improved for us. It remains a very tough obstacle for us. They claim there's full employment in this country, but that's due to so many individuals having exited the labor force, which strikes us as a genuine tragedy — not just for us, but for those whose lives have been lost and adrift, who simply departed the workforce and likely aren't very able to return to it. It's truly sad. What would make this problem better? I'm uncertain, given the full employment circumstances, but many suggest what's required is a fairly severe recession; hopefully it won't reach that point, and we'll see how things unfold. I suppose I'll hold off on saying anything further about that for the moment. Moving along to Slide 6. All right, here we are. In Q4, total missed shipments came to roughly $1.4 million. That is an enormous, enormous figure. Lately, over the past several quarters, it's consistently been a large figure, though typically it's around $600,000, $700,000, $800,000 — $1.4 million. That's a whopper of a figure. But here's the catch: approximately $1.2 million of that amount consisted of missed shipments of higher-margin ablative materials destined for customers overseas — essentially two shipments, one in Japan and one in Italy, two extremely large shipments. What went wrong? Raw materials arrived late, you see? That's what happened. International freight — this poses a genuine challenge. Every one of our freights is refrigerated. We can't simply load it onto any truck, which significantly restricts our freight choices. Then when it comes to international freight, it gets even tougher; and it's hard for us to scale up our workforce when we're already stretched to the limit; so the raw materials show up in the final couple of weeks; we're constantly scrambling. It was forever a matter of tweaking our schedule. Beyond that, we're frequently reworking our manufacturing schedule owing to supply chain problems.
Brian Shore
executiveBut we can't simply ramp up, since we've been stretched to the limit these past couple of weeks getting product through the factory and past testing so it can go out the door. Now, the things that hit our margins — let's discuss margins. We covered the top line. Let's move to margins for Q4. Here's something curious. It's purely a coincidence, but that figure of $1.2 million — again, in fiscal '23 Q4, roughly $1.2 million in sales of Raycarb fabric, which Park sold under the business partner agreement we have with ArianeGroup, for ablative uses. Do you recall the mechanics? It's simply a markup. Many of our large customers want to keep this material stocked. Through our exclusive arrangement with ArianeGroup in France, we purchase it, resell it, and move the product to the customer. Frequently we store it on their behalf. Later, once they're ready for us to make the material, we'll manufacture it using that fabric they've already purchased and now own. The markup is small, the margins very thin — that's the design. When we do — in the end, it's beneficial; eventually — we actually produce the prepreg, and those margins are pretty strong. So do you see what occurred? We gave up $1.2 million on this high-margin product, and in its place we put $1.2 million of low-margin product. That by itself — that single factor by itself completely accounts for the EBITDA shortfall, and it would bring us to the bottom end of the range, which makes sense given sales landed at the bottom end of the range, all right? So it comes down to that $1.2 million figure — pure coincidence that both numbers match exactly — yet it's quite fascinating how those two figures interact. And as I said, I'll repeat it, that factor by itself — though it isn't the only factor — that factor by itself would account for the EBITDA shortfall; put differently, had that factor gone the other way, we would not have seen an EBITDA shortfall. So let's turn to Slide 7, since the story continues, even though that factor by itself would account for the EBITDA situation. What else are we discussing regarding what impacts our margins? Considerable inflation has not disappeared or eased — not yet — not in our case yet. And I won't walk through every one of these items, because this merely repeats what we've covered over the past couple of quarters, essentially all of it. We've been over this previously, but allow me to remind you: a portion of these higher costs reached our customers through increases in selling price. A couple of points here. To start, certain companies are simply — to us — I don't know. I mean, imposing absurd price increases, such as doubling your prices, and that's just something we won't do. We play the long game; we don't know whether these are — what we regard as mistreatment of our customers when handled improperly, indecently. We do implement price increases, though certainly not in any exploitative manner. So why hasn't that fully offset the rising costs, that timing gap we discussed earlier? When we take in a PO or revise one, we stick to it — we don't, midway through the delivery window, announce to customers that prices are going up, which is what some other companies do. That's not something we'll do. Plus we have long-term LTA pricing arrangements with certain customers, especially MRS; we simply can't pass along our inflation-driven cost hikes. Moving to Slide 8. Supply chain interruptions are creating major inefficiencies in how we manufacture. If you know anything about manufacturing, you're aware that what manufacturing folks typically desire is solid planning — mapping out three or four months or five months regarding what gets produced and when. That's the way manufacturing achieves peak efficiency. Our calling card, though, differs from others. Ours is responsiveness, flexibility, urgency. So we enjoy being able to — we enjoy having the capability to shift things around and adapt for customers. But this sort of situation goes far beyond anything we've dealt with. We anticipate supply chain shifts; we've got something scheduled and then it falls through — the raw material fails to arrive, something different shows up, we must pivot. Each time we perform a changeover involving these treating operations, substantial downtime occurs, substantial expense, substantial added expense. It's tough to grasp unless you've witnessed the operation firsthand, but it's a major issue, heavily affecting our margins. Staffing shortages and limitations. So we're shelling out for tons and tons of overtime plus other labor-related inefficiencies simply because our staffing is simply because it's so constrained, along with expenses tied to the recently commissioned Kansas plant. So that's a positive, a wonderful thing, but we've only just begun operating it. Naturally, it isn't fully utilized at this point; so for at least some stretch of time, there's a detrimental effect from the cost of that new facility, the new facility, where we only recently began producing goods for sale. Moving to Slide 9. This covers the fiscal year comparisons. And clearly, when you examine '22 versus '23, you'd say, wow, the top line came in roughly flat, '23 against '22, perhaps marginally stronger. What occurred with the bottom line? What occurred with adjusted EBITDA? What occurred with gross margins? Well, it comes down to those elements we already covered — inflation, supply chain, staffing; and we'll actually address that once we move a bit deeper into the presentation regarding putting numbers to what we believe that impact amounted to when we reach Slide 27. So with any luck, I'll keep in mind to raise it once more when we arrive at Slide 27; it's more toward the end of the presentation. Moving on to Slide 10. We'll go through this fairly fast. Each quarter we include this, our five biggest Aerojet Rocketdyne. That's the Army tactical missile system, Aeromatrix, something — there's a photo of them. Kratos, we clearly have the Kratos Valkyrie. Middle River, there's the Boeing 777X; and then Nordam, there's the 737 to 800, which is for the weather master radome. Moving along to Slide 11, our pie charts. The one thing I'd say is, you'll notice '23 looks a lot like '22; so it feels like we're sort of settling into this sort of market segment breakdown. If you look at '21, it was quite different, but clearly, that was a pandemic year. So let's continue. Slide 12. Park loves niche military aerospace programs. This is a slide we do each quarter for you; we enjoy showing you photos of some interesting military programs that we're involved in. And then there's our pie chart, which, not too different from prior quarters, but rocket nozzles, drones and radomes, we'd consider those niche markets. Space is small, but that's niche. Aircraft structures, even for us, it's niche. For other people, it might not be niche.
Brian Shore
executiveFor us, that translates into higher margins—improved margins. Moving on to Slide 13. All right, so I suppose we go over this each quarter, and we've done so for several quarters now. The patterns and factors in—regarding the military markets. We discussed the war extensively and the way it impacts military budgets along with spending. Let's move ahead to Slide 14. Should you have questions on any of these matters at the end, tell me, tell us, but we're simply going to sort of skim through it since we've gone over these points previously. Slide 14. I suppose the top—the initial items matter since there's this wish to build up military infrastructure, yet what's restraining it is supply chain constraints. There's also a sort of problem concerning the debt ceiling negotiations, which appears to be an element too. But I believe the big picture is really supply chain that's keeping things held back. Let's see. Following item, Missile Defense Systems. We discussed this. We discussed the PAC-3 Patriot missile. We're sole sourcing that program for ablative materials. Plenty of nations want the PAC-3 system for evident reasons. Moving to Slide 15. The check item on Slide 15 are sales of ablative materials, and C2B fabric were $7.75 million. We're giving that to you since we said we would, that we said we'd provide an update at the conclusion of the fiscal year. So there you have it. Slide 16, we've got some patterns and factors for commercial aerospace, not much new here. The commercial aviation industry keeps up a robust recovery and rebound. Domestic aviation, nearly back to where it was pre-pandemic. International, getting there too, 75% to 80% pre-pandemic. Customer demand appears to be present. But there are some watching question items, which we discuss periodically. Let's head to Slide 17, the economy. Well, folks keep flying at the same rates if the economy falters. Actually, there are early signs that perhaps the economy is having some effect upon travel patterns. I heard that Airbnb announced recently that they're seeing a slight slowdown in travel, so just something to be—to pay attention to inflation. So you know if you fly, the airlines, the ticket prices are quite higher. These airlines have to cover the additional costs for the people and everything else, but especially jet fuel; so is that going to be okay? Are people going to continue to pay these prices? I don't know. Then the last check item on Slide 17. Yes, these labor shortages, pilots, mechanics, flight attendants, you know, sorry, you name it, and you got it. So—and then the other thing that we'll throw in, which we haven't mentioned before, about those ATC delays that we're expecting this summer. I mean, big ones. So I suppose a number of the carriers are going to have to scrub some routes, since the ATC simply won't have the capacity to cope, especially in the Northeast corridor. That's one thing that might play in. The big unknown — the $64,000 question — is this: should commercial aviation hit a rough patch, how will the airlines react? What would Boeing's move be? What about Airbus? This came up earlier. My read is that both of them would like to press ahead with output levels, keep pushing them higher. Speaking just for myself — and I'm no authority — Airbus strikes me as the one better positioned to pull that off. Boeing might have the appetite, yet might lack the ability, for reasons of its own; so let's move ahead to Slide 18. And naturally, should aviation stay robust, the commercial aircraft side still confronts problems of its own. Which ones? Staffing, the supply chain, price pressures — sounds repetitive, I know, yet none of these problems belong to just one slice of the industry. They aren't truly tied to a single industry or a single region; they appear to be worldwide in nature. The bright spot, as we've noted previously, is that with fuel costs climbing, certain carriers are seeking to replace their older, thirsty planes with newer models that burn less fuel. Let's continue to Slide 19. We need to ease off the pace a bit here. This slide gets shown each quarter, though the content matters a great deal. GE Aviation jet engine programs. So we have firm pricing LTA requirements contract through 2029 with Middle River Aerostructure Systems, which we refer to as MRAS. That company is a subsidiary of ST Engineering Aerospace. I should remind everyone, we normally do that — what's the situation here, why so many GE Aviation programs, what's ST Engineering's connection to all this? All right. I believe you're aware, but let me jog your memory in case you've forgotten that Middle River spent a great many years as a sub at GE Aviation, and across all these GE — on all these GE Aviation programs, Middle River served as a sub of — MRAS was a sub of GE Aviation. Later on it was divested to ST Engineering Aerospace, a sizable aerospace firm headquartered in Singapore, roughly four or five years back. Even so, those programs carry on, since we're in the process of qualifying them. For your information, MRAS and STE are seeking life of program; thus our existing agreement runs through 2029, and what they want is life program. What's the meaning of that? It means we'd arrive at an arrangement whereby we supply into that program right up until the program concludes. Take, for instance, the A320neo — when would you say it wraps up? 2045? I have no idea. I mean, programs like these run for a very, very long stretch; that's the way life of program functions; the factory is done, yes. We wrapped that up. It's now in production. Sole source for composite materials, for engine nacelles and thrust reversers for these programs. Those initial five, which we refer to as the A320neo family, are all equipped with LEAP-1A engines, along with the 747 to 8. That program has concluded, though spares remain available for it. We're fond of that program. Turning to the Comac 919 — Comac is a Chinese firm, and the 919 — I want to go over this a bit more thoroughly, sticking to the slide, since our presentation doesn't include any discussion of these programs. As I mentioned, you can refer back to the Q3 presentation or the company presentation available on our website if you'd like additional detail on them. Comac is a Chinese company, and the 919 was designed as the rival single-aisle aircraft, the Chinese challenger to the A320 and the 737 MAX; it holds certification. Production is beginning. My understanding is that deliveries are just getting underway, so we'll observe how that program develops. The ARJ21 is a separate Comac program — a regional jet — and it's already being produced. It has been for some time now. Next, we had the Bombardier Global 7500/8000, powered by Passport 20 engines, which are GE engines. That's a business jet, a large one. Upper right. Park composite materials. We're also sole-source qualified as a primary structure component for the Passport 20 engines. That isn't actually part of the MRAS LTA, but it does form part of it.
Brian Shore
executiveThat is really a GE initiative. Then in the lower right corner, you see the fan case containment wrap designed for the GE9X engine that powers the 777X; it gets made using Park's AFP materials. This item is not part of the MRAS LTA, yet the folks at MRAS have informed us they'd like it included in the LTA. However, keep in mind — this matters — this program carries a design risk. The manufacturer responsible for the fan case is currently attempting something. They've succeeded with us on a handful of occasions, so one could feel somewhat doubtful regarding whether they'll manage to pull it off. Their effort involves re-engineering the fan case so the case wrap becomes unnecessary. Passing a test known as FBO, fan blade out, demands that case wrap, and that test is mandatory. The engine must prove that should a fan blade break free, it stays contained. It must not break out of the engine compartment, since if that happened, the consequences for the aircraft would be extraordinarily hazardous. So essentially, that's a deal breaker. That situation cannot be allowed. The core problem is that the FBO test must be cleared. Therefore I wanted to note that while this program genuinely excites us, a certain amount of design risk surrounds it. Moving along to Slide 20. A quick status report regarding GE Aviation jet engine programs. Really, we'll only discuss the A320neo and bring you current on that one. On the remaining programs, no updates will be provided. Regarding the A320neo, as previously stated, the aircraft family using CFM LEAP-1A engines covers the 319, 320, 321, 321LR, and 321XLR variants. So not long ago Airbus — roughly seven days back, I believe — restated its intention to reach a production and delivery pace of 75 A320neo family aircraft each month before 2026 finishes. I believe they mentioned wanting to hit 65 by the close of '24, in fact. So will that target be reached? Whether we arrive there by '26 is genuinely tough to predict. Still, I'd say I hold strong confidence we will reach 75. What makes me say that? Because there are 6,000 orders for these planes. 6,000 orders. So allow me to jump further down and discuss their delivery track record, just to give some context. 19 there's — these figures are monthly deliveries, 47 during 2036. Continuing downward, 2021 saw 40; '22, perhaps 42; '23 through April, 37. So their goal is reaching 75, then 65. They likewise claimed they'd hit 50 before last year ended, and for a month or two in November and December they did, yet they're falling behind; at present they sit at 37 across the opening four months of this calendar year. With more than 6,000 orders on the books, this constitutes a genuine issue; so you can judge for yourself how the supply chain is performing. If they could snap their fingers and ship 75 every month starting now, they'd do so immediately, because demand exists. They hold 6,000 orders. So, you're telling me this is aviation's largest-ever program, yet they can't reach the rates they're aiming for. They're really having a hard time. So you tell me how the global supply chain is performing. People claim it's improving, and it's truly great. I'm not sure. These are facts. These are numbers; and Airbus is desperate to get their numbers up; so I think it's a good proxy for how the supply chain is really struggling. Just do the math here for a second. If they were able to get to 50 a month, that 600 a year. That's 10 years to got 6,000 in backlog; so in other words, if they're at 50 a month, not 75, not 40, not 37, then they need to give somebody a 10-year lead time. You want to order an A320neo, good, 10 years. That's terrible. They can't get — it's hard to get more business, hard to get more orders. So they're desperate to get the rates up to 75 — to 65, 75. And they're struggling, they're struggling. Do I think they'll get there? Absolutely, I think they'll get there. In '26, I don't know. Maybe '26, maybe '27. I don't know when they'll get there, but my feeling is with lots of confidence that we'll get there. Why? Because they desperately want to get there, number one. Number two, the market is there. They have the orders. The orders are there. So let's keep going. Did I miss anything on this? Oh, yes. So this is important. Let's keep going on this slide because there's a point to this. So the A320 aircraft family offers two approved engines. One is the LEAP-1A engine and the other was a Pratt engine. We supply into the program using the LEAP-1A engine, so important to remember that. Now what's the market share between the LEAP engine, the CFM engine, the Pratt engine? 60% for the LEAP engine. And I believe, if I recall, there's over 11,000 orders, confirmed orders, for these engines. So there's a lot of ballast, a lot of inertia in that market share. So let's say, Pratt has good month, CFM has a bad month, it's not going to change that 60% market share very much because there's so much ballast in that — in the order backlog already. So much inertia, the order backlog already that leads to that 60% market share. So assuming you're 60% LEAP market share, 75 — this is the bottom check item, 75 A320neo aircraft family deliveries per month. Ultimately, if you look at the stuff in blue, the language in blue at the bottom, that would translate to 1,080 lead benches per year. Remember that number, we'll get back to it. 1,080 LEAP engines per year. This is just math. Suppose they reach 75, and that 60% share of the market holds — and moving that share much at all is going to be tough given that enormous backlog, the engine backlog. Here’s the figure. This 10,000 — pardon me, 1,080, one-zero-eight-zero, LEAP engines annually. That’s all there is to it. Nothing but arithmetic. Not what I think, simply arithmetic. 1,080 LEAP engines each year — hold onto that figure. Now let’s move ahead to Slide 21. Farewell to the 747, the magnificent queen of the skies. You’re saying goodbye to the magnificent 747 aircraft, unmatched by any other. I enjoy this picture; it was taken a few years back; the location is Anchorage. Snow is visible on the ground, yet it works as a rather apt metaphor. Perhaps I don’t need to spell that out for you. The plane is disappearing. We’re positioned behind the plane — through the windshield, that’s a 747 right there — and it’s symbolic that, well, it’s disappearing; so if something like that requires explanation, it’s likely not worth it. 22 — Slide 22. Let’s discuss Q4 revenues from the GE Aviation programs, which came to $4.7 million. I believe we mentioned during our Q3 earnings call, roughly 4.25 to 4.75; so we landed more or less within that band, totaling $22.3 million for 2023.
Brian Shore
executiveThe figure is odd, honestly. If you check that left-hand column at the top, 2020 came in at $28.9 million, and then 2021 was $13.2 million. That was clearly the pandemic year. In 2022 it was $26.5 million, which fell to $22.3 million. So what's happening? Are these programs declining? Definitely not. The programs are — well, everyone's trying to increase their programs regardless; short term, it's chaotic and highly erratic. Supplying into these programs becomes really tough; so you'd say they just — you can't predict it. The requirements on our end, at least, keep shifting, rising and falling with — saying visibility isn't very good might be putting it mildly. What figure are we projecting for GE programs, GE Aviation programs, in Q1? Between $6 million and $6.5 million. Even with roughly only 2.5 weeks remaining in our quarter, we're still adding this small footnote about the risk tied to that Q1 forecast. Let's move ahead to Slide 23. Here, then, is Park's situation, and not only GE Aviation. So we've already covered the Q4 figure and the total for fiscal 2023, the overall numbers; and we're providing a forecast of $14.75 million to $15.25 million in sales for Q1, plus Q1 adjusted EBITDA of $3 million to $3.5 million; and once more, check the footnote, since these risk factors exist. But here's another question you could raise: if our sales land at, say, roughly $15 million, shouldn't our EBITDA come in higher? Yes, the answer is higher than $3 million to $3.5 million. However, margins face temporary pressure from the very things we keep mentioning — inflation, supply chain, staffing, and a new plant. That explains why I believe we're seeing EBITDA figures somewhat below what you'd anticipate given those sales numbers. Let me continue to Slide 24. Alright, this is where the substantive portion of the presentation truly starts, meaning it took us a full half hour to reach this point. This is our financial outlook covering Park and GE programs. Let's turn to the baseline outlook. Given continuing major difficulties tied to severe supply chain disruption — I realize I sound like a broken record, repeating the same points, yet these are quite tangible issues for us — along with inflation worries and acute staffing shortages, which appear to affect the entire globe; plus substantial uncertainty about when such difficulties will ease and subside, meaning that offering a year-over-year financial forecast would require a great deal of speculation and thus wouldn't be useful or meaningful, as I mentioned concerning the A320neo, for instance. Yes, I believe it will reach 75 per month, and I'm fairly confident of that. But the timing? Honestly, nobody can say; we can hear what Airbus states, yet that's essentially their own target, and they've pushed it back since they're battling supply chain problems. They're already battling them. The target was 50, yet the actual figure sits at 37 — I believe I mentioned 37 for the opening 4 months of 2024. These are genuine problems. They aren't merely items that folks are grumbling about. So even though we can discuss our direction in terms of outlook, pinning it down on a year-over-year basis is tough; doing so, I'd say, amounts to guesswork, and what benefit would that deliver to you? It isn't truly meaningful or useful. Yet even if predicting with real confidence when these challenges will ease isn't feasible, we hold hope that should the world make it through the crisis it currently — the crises it currently confronts, pardon my sarcasm, I mean things such as nuclear war or similar. At some point, within the not-too-distant future, supply chains will restore some degree of order or inflation will ease and staffing dynamics will return to some degree of normal. Consequently, we're offering, on the slides that follow, a revenue outlook for our GE Aviation jet engine programs, and let's move to the baseline financial outlook for Park overall. Let's proceed to Slide 25. What assumptions underlie producing these items and offering these outlooks? And in offering the GE Aviation programs revenue outlook plus the financial outlook for Park, here are the assumptions that follow. No severe prolonged economic downturn occurs within the outlook time frame. That isn't to say there — we aren't — should a recession arrive, say, this year or next year, that's something we're addressing. We're addressing the outlook time frame. You may pick which year that is, '26, '27, I don't know, that period. The global supply chain goes back to some level of order in normalcy, inflation eases, goes back to historically more normal levels. Staffing dynamics go back to historically more normal levels. We're assuming at some point, the world will improve. Let's proceed to slide — we'll skip one, Slide 26. All right, here's where it gets interesting, GE Aviation jet engine programs revenue outlook; we provided the building blocks for this analysis, I think, last quarter when we provided the revenue per engine unit estimates. This — should you examine these figures, these figures originate from our Q3 presentation. So the actual question concerns engine unit assumptions, and here are the assumptions we're applying. You can insert your own figures, should you wish. So regrettably, we'll need to work through a number of the footnotes too, since they matter. Engine unit assumptions per year assumptions at footnote number one. Well, we already covered this. A320neo, aircraft assumption, there's that 1,080. Recall, I told you to keep in your head; that 1,080 rests upon information we possess from Airbus. When it comes to the per-year assumptions for the engine unit, those are our own, and we'll walk through what they're based on — the assumptions we put together, which I'd say are fairly middle-of-the-road, perhaps even on the conservative side. Let's turn to footnote 2: the engine estimates there draw on information provided by the customers. So those figures — revenue per engine unit, to be precise — they originate with our customer; we didn't simply invent them ourselves. Now let's look at footnote 3, which we've already covered. Then, regarding footnote 3, I won't walk through it — 3, 5, 6 and 7 — these are assumptions about whether film adhesive and lightning strike get used on these programs. Those assumptions might lean a bit conservative, but our intent is to be conservative. If we state that we're assuming, say, film adhesive won't be on a given program or lightning strike won't be in a program, that doesn't mean it won't occur. That doesn't mean we aren't pursuing it occurring, since those products must receive approval from the OEMs. They must be certified by the OEMs. Still, we're aiming to be conservative in this outlook. So let's walk through the individual programs, Passport 20.
Brian Shore
executiveWe're working with an assumption of 90 units annually. Our customer actually provided that figure to us. Still, I'd call it fairly moderate. They've been producing roughly 40 airplanes each year, and with two engines on every airplane, 90 seems like a sensible estimate. For the C919, 200 — that works out to 100 airplanes. Now, where does that figure come from? Consider the A320 from Airbus — keep in mind the 919 is a single-aisle rival. Airbus is aiming for 75 airplanes monthly, which equals 900. Boeing's target is 50 airplanes monthly, totaling 600. So with the 737 MAX, Boeing targets 600 while Airbus targets 900. For the A320neo, the goal is 100 — 100 airplanes, meaning 200 engines. In our view, that's a fairly cautious estimate, and it's likely shaped mainly by supply chain factors, since the Chinese hold sway over that market. And clearly, the Chinese are eager for this aircraft to succeed, controlling who purchases the planes and who doesn't within China particularly. As for the ARJ21, that one isn't overly complex. There were 26 delivered last year — airplanes delivered, with two engines on each, so we're assuming 50. On the GE9X, we aren't sharing specifics at this point. We possess them, but we're attempting to keep that program somewhat more under wraps. So clearly, if we reveal either of those blanks, you could run the numbers and work it out, and we're trying to avoid that. That said, I'd note the revenue per engine unit is something we know from our customer. As for the engine unit per year assumptions, we're being quite cautious there. And keep in mind there's a design risk involved, so that entire $6,500,000 figure could vanish; we had everything totaled up and we arrive at this $50,625,000 figure. Just as a reminder — I want to remind you — for fiscal '23, the figure stands at $22.3 million. So a considerable amount of incremental growth is anticipated from the GE Aviation jet engine programs. Again, we label it an outlook since we can't tell you precisely which year it is. But with the A320, as I mentioned, there's strong confidence we'll reach 75. For the other programs, we don't — we believe we're being moderate and perhaps even cautious. It's simply arithmetic once we determine which engine unit per year assumptions go into the table, just arithmetic, 15,000,562. So as I said, considerable incremental growth is anticipated from the GE Aviation program. Now let's move to Slide 27. This is where things get even more fascinating. We'll need to slow down further to address this adequately. So, Park Aerospace core baseline financial outlook. This concerns the company, and it's mainly founded on growth projections for programs where Park holds sole source qualified status. So we aren't discussing new programs we're pursuing — these are programs where we're already sole sourced and qualified. Alright, we need to walk through the footnotes. Starting with the first line, base year: $54.1 million and $11.5 million. Those figures are simply for fiscal '23, which you already have. For estimated GE program incremental sales, look at footnote 1 — $28.3 million — that's just the arithmetic. We had taken that outlook from the earlier slide, used the fiscal '23 number, and here's the incremental figure: $20.3 million. Next item: estimated incremental sales for ADL, ADRS program, PAC-3 missile system, Kratos Valkyrie unmanned aircraft — $20 million. So we aren't providing a breakdown, mainly because we want to safeguard the confidentiality of these programs. We possess the information, but we aren't at ease sharing it with you. So I'll just leave it with you at this point, making those assumptions public; but we believe those assumptions are sort of middle of the road and perhaps a bit conservative. Non-GE program incremental sales: $8 million. If you check the footnote, what we're essentially saying is that in the last fiscal year, '23, there were roughly $32 million of sales for non-GE Aviation programs; and we're saying that by the time we reach the outlook here, that will be 25% growth; so $32 million times 25% gives $8 million of incremental sales for the non-GE Aviation business; we consider that a reasonably conservative estimate. And we arrive at the estimated revenue outlook of $110.4 million, approximately $110 million, when we get to the outlook here. Now let's discuss EBITDA. We began with $11.5 million. Then estimated EBITDA contribution from incremental revenues. If you look at the footnote, we're simply saying, okay, we take 110 minus 54, those are the incremental revenues; we multiply that by 37%, which we believe is an appropriate contribution number based on our historical financial data and performance. So we think that's a fairly reasonable middle of the road figure: $20.8 million. Adjustment to base year EBITDA. You can look at the footnote: $2.5 million — I mentioned it earlier in the presentation — we're saying that we have roughly a $2.5 million impact in our current fiscal year — sorry, let's say fiscal '23 — from all these things we keep talking about like a broken record: inflation, supply chain issues, staffing issues, and now, of course, the cost of new plant. So we're saying these things will go away long-term. Inflation, we hope, will moderate. Our pricing will catch up on inflation. Staffing shortage, we hope, will moderate. Supply chain issues, we hope, will moderate; so we're making an adjustment because we think our P&L in fiscal '23, the baseline EBITDA of $1.5 million, was burdened by these factors, which we think will improve significantly. We get to an estimated EBITDA outlook of $34.8 million, okay? So that's just doing the math here. And remember, this is only an outlook. This isn't a projection; no new programs we're developing are factored in. We're only including what we're already sole-source qualified for, and we're taking that $32 million baseline and raising it by 25%. So let's move to Slide 28. I believe we don't need to walk through each footnote individually, since I think we've essentially covered them already. Yes, we have covered them. Should you have questions regarding the footnotes on Slide 28, please reach out. Now Slide 29, this one matters. This is footnote 6. The outlook analysis above does not constitute a forecast. It accounts solely for anticipated expansion of programs where Park already holds sole-source qualification, along with 25% growth in non-GE program sales by the outlook year, as we mentioned. No other revenue opportunities are factored into the analysis, including — and these are merely illustrations. This isn't a complete list, just illustrations. Revenue opportunities tied to the AFP manufacturing project we've been discussing over the past couple of quarters. The company's new film adhesive product line, which we recently launched. Zero sales for that, 0. The Asian JV, which the company is currently negotiating with two separate large aerospace companies.
Brian Shore
executiveDiscussions are underway with a major aerospace firm about a possible joint venture covering a brand-new product family. There's also a significant aerospace program in which this company's composite materials have made it to the finalist stage. Then there's a project involving structures, assemblies, and integrations, and serious talks are happening with a customer the company already has about that one. A technology license deal is also being discussed with a large OEM. Beyond that, several rocket and missile programs are in progress, with the company's products currently going through qualification. As I mentioned, these are just examples rather than an exhaustive list. What I want you to take away is this: we aren't calling it a forecast. Were we putting together a forecast, we'd bake in those fresh opportunities and attempt to work out how many we'd end up winning versus losing. That isn't what this exercise was meant to do. Our goal was handing you a baseline outlook. In a bit, I'll walk through the reasoning behind that, since this originally tied back to the dividend calls we reached a couple of months back. Moving to Slide 30. Time to change direction somewhat. We need to move quickly now. We've almost hit our 45-minute mark. There was a press release about this, so it's likely you've seen it already. The big build-out we've been doing in Newton, Kansas, is now finished. On April 5, MRAS gave the go-ahead and qualified a brand-new plant for manufacturing. In the picture shown here, you can see a pleasant small group shot featuring folks from MRS, STE and Park. That was taken when they came by on April 5 to check out the approval of the new plant. Approval actually came through right there while the visit was happening, so it turned out to be quite a joyful little visit for us. The very first manufacturing run happened not long afterward, on April 19. This build-out ran us $20 million, something I believe you're already aware of. The journey that started when we put shovels in the ground for the new facility on August 15, 2019, has been lengthy and full of twists. Still, we got there in the end. The work is complete. Nice job, everyone at Park. Naturally, back when we started construction, none of us realized the pandemic was about to hit, which made things far harder. Our team never gave up. Even so, completing the project proved significantly tougher. Think back to those early pandemic days with the construction crew. If a single worker tested positive, the entire crew was sent home for two weeks — just one person with COVID, and the whole crew was out. Now, please turn to Slide 31. One more development to share. We've just introduced a product called Aeroadhere — let me make sure I say that correctly — FAE-350 to 1, a structural film adhesive. It's a brand-new offering from Park, and we only announced it on May 9. Aerospace primary and secondary structures can be bonded using it. So film adhesives play a role in manufacturing composite structures. The main component in this context is composite materials — the prepregs that we produce — although film adhesives, which are consumed in smaller quantities yet still matter, are also part of constructing those composite structures. The crucial point is the customers; really every one of them, in my view, also relies on film adhesives when constructing the composite structures they turn out. So Aeroadhere, FAE-350 to 1, that's a 350 epoxy-based formulation, and it works for all of these uses; and why don't we move to the final item. Bringing out our new Aeroadhere product marks a significant milestone for Park, since it's a first offering toward a major new adhesive line, with more items in development and on the way. So this matters a lot; it's essentially an entirely new space for Park, even if it ties into the construction and composite structures. We're a business that has been producing — excuse me — prepreg materials, composites, or composite structures, and we're involved with colliding materials as well. And at this point we're expanding into film adhesives, which represents a significant move for Park and, I would think, a significant top line opportunity for us as well. Let's go ahead to Slide 32. All right. Going back to the financials, changing direction again. There's a reason for doing that, and we'll get to it soon. A look at Park, cash and cash application. So let's go through this math a little bit, $105 million — $105.5 million, which is the cash just reported at the close of the fiscal year. The transition tax installment payments that are still owed, $12.5 million. We've been over this many times already, and that amount is payable. Let's look at what the footnotes show: the per-share dividend we declared and paid, totaling $20.5 million through 2025. Then there's the solution treater for the ADL project — if we move forward, that's $6 million. And the AFP project, if we move forward, would be $10 million. We haven't made a final call on either of those. My sense, though, is that we probably won't. Adding everything together gives us $49 million. Subtract that from $105.5 million, and what remains is $56.5 million. This is just a rough calculation, but the point is that after accounting for all of those items, around $56.5 million in cash is left over. That figure is an estimate. There's a purpose behind doing this, and I'll explain it in a few slides. Now let's turn to Slide 33, which covers Park's balance sheet, the history of our cash dividend, and some thinking on capital allocation. I should point out that we carry 0 long-term debt, which makes us very happy. As for our cash dividend, while other companies reduced or eliminated theirs, we kept paying our regular dividend of $0.10 per share the whole time the pandemic lasted. For 38 straight years now, Park has distributed regular cash dividends without a single interruption, never skipping one and never cutting the amount. Our Board gave the go-ahead on February 9, 2023, for a 25% bump in the regular quarterly cash dividend, moving it from $0.10 each quarter up to $0.125 each quarter, which works out to $0.40 annually — $0.50 annually. In terms of total dollars, we're talking $8 million to $10 million annually. So why take this step? Let's turn back to Slide 27, since that's essentially the reason we carried out the analysis shown there. This was initially put together through something we walked the Board through, with somewhat more granularity offered, naturally. Here's what we saw: our EBITDA guidance — and to be clear, that's not a projection — was about $35 million, and we were pretty comfortable bumping up the regular dividend to roughly $10 million — an increase from $8 million to $10 million each year. One could have taken the position, or argued, that we could have done something bigger. But since Park tends to be a cautious organization, we just said, all right, we'll stick with that $10 million, which works out to $0.125 per quarter for the regular dividend; if we ever want to, we can always increase it later on.
Brian Shore
executiveHowever, the real reason we conducted that analysis on Slide 27 in the first place was so the Board could determine if our dividend policy needed to be changed. At that time, the material we went over with the Board was more comprehensive than what you see here, but fundamentally this is the type of analysis the Board relied upon when making its decision; we have enjoyed an extended streak of paying a regular dividend, going back to Slide 33, and we have no plans to interrupt that streak. Put differently, the key takeaway is that we are quite confident about raising the dividend and will not have to undo that move later on. Let's move to Slide 34. Once again, just picking up with Park's balance sheet and so forth. Then on February 9, the same date, Park's Board likewise declared special dividends of $1 per share, amounting to roughly $20 million in total, which was paid — already disbursed on April 6, so those funds are no longer there. What prompted us to take that step? Let's now turn to Slide 32, since there is a rationale behind Slide 32 too. This represents the analysis we examined at the time the decision was reached — the Board decided to distribute the special dividend. And we believed — in fact, we invested considerable time into this, received guidance from external parties, investment bankers, performed a very thorough assessment. Yet we believed that this figure, this conceptual figure of $56 million, so to speak, is an appropriate figure for Park. We were at ease with the $20 million or $20.5 million, $1 per share dividend. And that rested on a rather rigorous, deliberate analysis, I should say. What about M&A? Fair question. We are not abandoning M&A. We continue to evaluate M&A, though I believe we have reached the conclusion that M&A is likely a less probable use for our cash than perhaps we initially assumed. What's the reason? Since there are 2 categories of things we are examining. First is something that comes to us, typically an auction being run by some banker. When you examine a number of these situations, and the prices at which they are sold, the amounts these companies fetch are considerably higher than what we would be prepared to put forward as a bid. And we hold no regrets regarding that. We believe the market is indicating and we are indicating that we feel okay. We hold no regrets, we feel okay about the valuations we arrived at; however, the outside world holds a different view, and we will not pursue those sorts of values. So that presents somewhat of a problem with the companies being auctioned. Naturally, when companies go to auction, they are not precisely what we are seeking in any case. There is — the company being offered for sale gets brought to our notice by an investment banker. The second category we have been examining is companies we target, we pursue, that are not necessarily up for sale. It’s somewhat of a distinct type of issue — namely, if the owner has no interest in selling, or won’t sell at a price we consider reasonable, then it simply may not come together. So at M&A, we aren’t throwing in the towel. We’re simply examining a different possibility right now that we only began reviewing within the past couple of weeks; though I’d say I’m somewhat less hopeful that M&A will provide a place to put our cash. Should we locate something, would we be open to providing financing? Absolutely, we would provide financing if it’s sensible for Park. The positive side, however — and I believe this is the key thing to convey — is that although we might not be putting money into businesses through acquisitions, and perhaps we will, perhaps we won’t, there are numerous opportunities, extremely appealing opportunities, arriving for us to invest in. A number of those appeared on that slide, that footnote 6, the slide about our outlook; those opportunities, and we’re stating we aren’t factoring them into the outlook calculation, plus many others; these things are actually arriving for us; and why? Is it merely luck? I’m not sure. Perhaps we paid plenty of dues, we gave up a great deal and got past much, so that we now find ourselves in this position. We’ve earned the right for these opportunities to be brought to us. And what I’d say is the ROI on these opportunities for, let’s call it, internal investment in programs or projects, tends to be far, far, far more appealing than the possible ROIs from acquisitions, by orders of magnitude at times. So the positive side is that we aren’t lacking opportunities for — quite the reverse, in fact; but I think our emphasis will be on a different sort of opportunity at this stage. The $56.5 million figure, we’re at ease with that figure. We believe it’s fine; and we believe we’ll be able to capitalize on some of these other opportunities. And as I mentioned, if we sense we must finance an opportunity, we’ll be open to weighing that too. So just carrying on back on Slide 34. Park has by now paid $583 million, or more than $28 per share, in cash dividends since the start of 2005. Our views on cash and capital allocation, no Bucks, no Buck Rogers. That’s a Tom Wolfe reference from The Right Stuff, yes, Right Stuff. So our take on it is no capital, no capital allocation. Somewhere along the way, somebody must produce the capital, or there will be nothing to allocate. So there’s plenty of discussion about capital allocation, and that’s all well and good. It’s fine. I’m not knocking it. But what seems absent at times is, well, you must produce the capital. Someone needs to do that. And that isn’t something readily accomplished through a conversation at a business school. To us, that demands effort and giving things up. Moving to Slide 35 now. What about Park? In what way has Park performed when it comes to producing capital? So, what's our record? Two men launched this business out of a garage in Woodside, Queens back in 1954, using a small amount of cash remaining from their War Duty. Essentially, they began with zero funds. We were never handed anything by anyone, at least nothing I can recall. Right, nothing out of the ordinary, yet we've distributed $583 million in cash dividends starting in 2005, so clearly someone at Park must have worked out how to produce capital across the years. Without capital, there's no capital allocation. Therefore, the reality that we produced capital is what gives the capital allocation discussion meaning and relevance. Had we not produced capital, there'd be nothing to discuss. So that piece of the equation shouldn't be overlooked. Slide 36 — the Park family culture eats strategy for breakfast. That's something Peter Drucker said. So at Park, we do have a strategy as well, we're not minimizing strategy, but our Park family culture is what keeps us strong and lets us endure. In what manner do we produce capital at Park?
Brian Shore
executiveAt Park, the way we create capital — how we create value that lasts — comes down to commitment, to giving things up, to not quitting. I doubt business schools actually teach these lessons. They may teach the capital allocation side, but how do you create capital? Regardless, this is how we create capital; and you must decide for yourselves whether we've done well. My own view is that we have, though that's just my view. Given the staffing shortages we continue to face, the people on our film line and tape line have put in 60 or more hours each week, week after week, for more than a year now. It isn't just film and tape, but right now our attention is on film and tape. That's how we create capital at Park. Let's move ahead to Slide 37. So why would our people do this? Why would they choose to work 60-plus hours each week, week after week? How does that function? A 12-hour — 5 days, 12 hours. That gives us two shifts, two crews, day and night; so we essentially have 24/5 coverage on those two machines, the critical machines, the hot mill machines, film and tape. So perhaps why do people do this? What for? Because we're kind folks or something? Because we say kind things? Perhaps because actions speak loud in the words. You know, that came from Abraham Lincoln. I wasn't aware of that. I checked, and apparently he was the first to coin that phrase. It's a good one. So when we — right when everyone was laying off their employees at the start of the pandemic, you remember that, sometimes by the thousands, we at Park laid off nobody. We retained every one of our precious Park family people, even when we were told doing so was crazy. So we're in aerospace. Remember, the planes were flying, which you saw proud pictures of, one or two, three people. Most of them were simply parked and not flying at all; so the industry was in awful shape. I mean it just was — the aircraft industry nearly collapsed. But beyond that was the fact that there was enormous uncertainty about what would happen. We all remember that. People spoke of Armageddon, the end of the days; so yes, things were really bad, but what would happen going forward. And many people surrendered to fear, and I don't blame them, and they cut costs dramatically, laid off lots, lots of people. There's this thing George Patton said, don't take counsel of your fears. I believe that's the correct quote. But we didn't take counsel of our fears, and we laid nobody off. Somehow we decided we would stay with our people, and that's the last thing that would go. And remember the vaccine mandates where we were being pressured, pretty heavily pressured to fire people who dared defy the mandates. So what was the message we gave our team? We told them: no, you won't be let go. The choice about getting the shot is yours alone. We never instructed anyone that they had to take it, nor did we say they shouldn't, honestly. Vaccines weren't something we opposed. Still, we made it clear: no, this isn't something we're doing. In fact, we promised no one would lose their job. In fact, we put it down in writing — over our dead body — just so it was crystal clear we weren't joking around; and I was sincere. I wasn't — I meant that in the most literal sense, over our dead body. If you're going to have a culture that carries any genuine weight, you'd better be prepared to live and die by it. Companies have cultures. They've got fancy PowerPoints made by some PR agency to showcase a culture; but that's empty unless you're truly ready to give everything you've got to it, in my view. If not, it's pointless and it's foolish. Our folks recall those moments. I believe they do, and what you do matters more than what you say. So perhaps that explains why our team is so committed — one example of why are our people so committed, because we've shown through deeds, not talk, how much they mean to us and how committed we are to them. Let's move to the slide — our final slide. We'll be wrapping up in under an hour, Slide 38. If you want your employees to feel love for your company, you'd better love them back and it had better be genuine love too. Love can't be faked. Our team is family and family isn't something we abandon. Peter had it right. So here's a photo of our hardworking film line and tape line teams. These are truly, truly great people. I felt really happy when — I had asked Cory to snap a picture of these folks, the men and women, during shift change since that's the only moment we can gather most of them together for one shot. It's genuinely an honor for me to get to work alongside these individuals. And honestly, I got a bit emotional. I became a little emotional looking at this photo because they seemed so joyful; and they're putting in so much effort and there are so many lovely smiles on their faces; so that meant a great deal to me. I'm not sure if it matters to anyone else, but I just wanted you to know it mattered a great deal to me. So alright, thank you so much; we have one hour and one minute. That concludes our presentation. So operator, if anyone has questions now, we'd be glad to take them.
Analyst
analystMorning, Brian, and everyone there. Is my audio coming through clearly?
Brian Shore
executiveYes, Nick, that’s perfectly fine. Yes. Thanks.
Analyst
analystOh, wonderful, wonderful, wonderful. Only a few questions. Could you provide a brief update along with your perspective regarding the situation in China and the Comac program? Lately, there really hasn't been much coverage of that in the media. Second, you've once more described how Park is truly a growth-oriented manufacturing business based in the U.S. That's how I see it. Given the outlook, I view you as a growth stock. So if we were to encounter some hiccups here, would you still be interested in repurchasing shares if Mr. Market got foolish at some point and the stock price dropped? And last, this might be a dumb question, if there is one. What are your thoughts regarding the removal from the S&P Index? I realize that's beyond your control. Any perspective you could share on that would be appreciated? Thank you very much.
Brian Shore
executiveOkay. Thanks, Nick. Comac, it's amusing that the Chinese aren't as transparent. They're somewhat opaque. And we track news, you likely see the same items we do; and we haven't seen much regarding program updates. From our standpoint, the programs are advancing in terms of material needs. The ARJ21, at this point, is truly an aircraft in full-rate production. I'm not sure whether it will increase to higher rates. Like I mentioned, last year, I believe they built 26 airplanes; so it's a small program, yet still a significant one for us. And it's also slated for approval of our LSP product, which would make us very pleased. The 919, that's clearly the major one for the Chinese. It's a genuine prestige program. They're competing against the 737 and A320, as you know; we'll have to wait and see what occurs. I haven't heard any recent news though, Nick. That said, I'd simply return to what I've stated many times, which is that this is a huge, huge, huge prestige program for the Chinese. And my wager is that they'll do everything possible to ensure it succeeds. The — let's see. You made a remark about us being a growth stock. And I don't recall what the question was there, but you did a — you can remind me, but buyback, you asked about buybacks. Yes; so will the market make us another offer we can't refuse? Yes, we're very open to doing buybacks; and I suppose maybe you're connecting the growth outlook to buybacks, I think that was the question. Yes. So actually something we are considering, something on our radar screen, especially like I think what you're implying the outlook is our — which will be valued properly, probably not. And that actually connects to the removal from the S&P small-cap index. And we received no notice about it. You read about it probably when we read about it. That was quite a letdown. A person said something I didn’t much care for. His point was that our removal from the S&P Index, SmallCap Index, happened because our market capitalization hadn’t grown enough as required, or hadn’t grown much at all, or words along those lines; and my reaction was, all right, among the businesses listed in the S&P SmallCap Index, what number distribute cash dividends? All right. Next inquiry — though my suspicion is the count isn’t large, since firms of smaller size typically don’t distribute cash dividends. Next inquiry, among those businesses within the SmallCap, S&P Small Cap Index, that do distribute cash dividends, what number have distributed $28 of cash dividends per share from 2005 onward? Since clearly that carries a significant effect on a company’s worth. So quite a letdown. We had raised our dividend, the regular dividend. And that appeared to push the share price up substantially to, I believe, the equivalent of high 15s when you factor in the $1 special dividend. Perhaps 15, 80 or roughly that; and afterward we did the — and afterward the removal took place, with no warning given to us, and the share price dropped back to its prior level; so this is beyond our control. To us, it’s simply a letdown. What we’re going to say is that it isn’t fair — naturally not. We’ve reached out to S&P. Their manner has been quite courteous and quite friendly, and they aren’t very transparent regarding how they arrive at these choices; but clearly, it wasn’t what we hoped for, yet we simply must continue onward and we’ll observe what unfolds. And with luck, we have an opportunity to rejoin the index, though that isn’t truly our primary aim. Our primary aim is to achieve the objectives for Park. And Nick, was anything left out by me? Did I address every one of those questions or...
Analyst
analystYeah. Nope, that’s quite solid. Thanks a lot. I really appreciate it. And keep doing what you’re doing.
Brian Shore
executiveThanks a lot, Nick.
Brian Glenn
analystHi Brian, I appreciate the consistently detailed overview you always provide.
Brian Shore
executiveBrian, how are you doing?
Brian Glenn
analystAll right. There are two things I want to ask about. Let me start with MRAS, which I understand came in at 3.5 across 5 years. Can you walk us through — and I realize you likely can't share specifics — the way the reprice works? My understanding, and tell me if I have this wrong, is that it happens in 2025.
Brian Shore
executiveThat part is fixed in stone. Correct, we do have a price increase. Every bit of our pricing steps up at the start of calendar 2025. That was included in the 10-year LTA we signed. So it's essentially locked in. When we put that 10-year LTA together, the inflation figure we used was around 3%. On raw materials, we hold LTAs with our suppliers, with the exception of one component where there's a sort of shared-risk setup covering one raw material input, though the exposure we actually carry sits in a cost category that isn't really raw materials. Our assumption was roughly 3% inflation on a year-over-year basis. Clearly, that hasn't matched what happened over the past 12 months or so. That's precisely where our exposure lies. And the increase taking effect in January of 2025 relies on that same 3% assumption. One thing I want to make clear — it isn't an index. Put another way, it won't move around depending on what inflation does. What I mean is that at the time MRAS and Park worked out the deal, both sides settled on assuming 3% inflation year-over-year as the basis for setting the pricing.
Brian Glenn
analystOkay. Yes, I’m grateful for that. I appreciate it, and I understand. My next question has two parts. I suppose there’s been considerable discussion about the strong dividend history, and it truly is strong, substantial, worthy of respect, and valued. As far as you’re able to tell us, does the Board ever discuss total shareholder return? Or is it mostly focused on dividends? And tied to that — I realize many people have raised this during the past several quarters and years — what about dividends compared with buybacks? Are there other considerations that could shape that choice, such as your or the Board’s preference regarding the number of shares outstanding, trading liquidity, or anything similar, or ownership interest that might tilt you folks in one direction or another? Or does that simply not matter?
Brian Shore
executiveWell, Brian, every one of those matters, and perhaps my explanation wasn’t clear enough. When we carried out the analysis that led us to decide on the $1 dividend as well as the raise in our dividend, we talked about all of those items: total shareholder return, buybacks, M&A, investment — putting our cash toward internal investment. So I wouldn’t say — nothing has been ruled out. We are considering everything, and we are evaluating everything. During our discussions, all of these items come into play. So if I made it sound like there’s just one path, that it’s solely about dividends, that wasn’t my intention. The likely explanation for why we emphasize dividends in the presentation is that we have the recent bump in the regular dividend as well as the special dividend.
Brian Shore
executiveSure, Brian, I’d like to chime in on that. Let me reiterate something. In my view, the Board has a strong grasp of these matters. If anyone holds a different impression — well, that impression is simply mistaken. Beyond that, we routinely receive guidance from external specialists, bankers who rank among the very best at their institutions, folks at the chief executive and president tiers of those firms. So I believe we have solid counsel, and I believe we fully recognize every element you brought up regarding total shareholder return.
Brian Glenn
analystYeah, yeah, got it. So, my take—and this is only my view—but if you consider the guidance, and perhaps that gets achieved someday, perhaps not, I realize it isn't a projection and there are numerous variables at play; from where I sit, a meaningful return could be captured eventually through buying back stock, and that might exceed the historical return on assets or return on invested capital for the company. And I realize that's shifting because of the footprint and the new plant starting up plus certain internal projects. Still, that's simply my personal read and something I hold to be accurate. But I truly value you walking us through this. It's always valued, and I consider the amount of detail you all invest in this presentation incredibly useful and valued. All right. Well, many thanks for what you shared, Brian. Thanks, once more.
Brian Shore
executiveThank you.
Brian Shore
executiveAlright, Brian here once more. I really appreciate all of you for tuning in again. With these calls, I aim to keep them brief and move through the material quickly, yet somehow I wind up taking 400 hours, so thanks for staying with me. And don't hesitate — should you have any additional questions, please reach out by phone, whether to Matt or to me. If not, we'll be in touch before long, since our report for the first quarter comes out at, I believe, the start of July. Thank you, and enjoy the rest of your day. Goodbye.
Operator
operatorAppreciate it, everybody. That brings today’s call to a close. You’re free to hang up your phones now. Thanks for joining us, and enjoy the rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.