Thanks, Alicia, and hello everyone. Brian here, obviously. Glad you could join us for the investor conference call covering the second quarter of fiscal 2024. Joining me, like always, is Matt Farabaugh, our CFO. Please be sure you can pull up the presentation — we released our earnings a short time ago, and there are directions on how to view the deck we're about to walk through. It's also available on our website, if that's easier for you. What we'll do with this presentation — perhaps a somewhat different format — is concentrate on what happened in the second quarter, then on the longer-term outlook and dynamics shaping our future, and we'll pass over items such as trend information on industry trends. After that, we'll move straight to questions. That said, it will likely still take us 45, 50 minutes to finish our presentation. And naturally, before we get started, I'd like to remind you — to point out — that this marks our 70th year in business. So let's get going. Slide 2 contains our forward-looking disclaimer information. Let us know if anything is unclear. Slide 3 is our table of contents. Our Slide 1 is our Q2 presentation, and supplementary financial information sits in Appendix 1, which we don't plan to cover or talk about. Should you have questions on it, please let us know. A picture of the — excuse me, A321XLR, which is a significant potential program, a future program for Park. Let's move to Slide 4; we'll need to slow down a bit here. Our quarterly results — let's begin right at the right-hand column for Q2. As you can see, revenues have fallen sharply versus Q1, roughly $3.1 million, and we'll get into the details on that, naturally; but I also want to call your attention to — and it's actually highlighted in yellow to make it simpler — the gross margin of 32.7%, which strikes me as quite outstanding when you consider the comparison in Q1, with a $3 million topline loss alongside a 32.7% gross margin. That doesn't happen by accident, in my view. We always say we don't like our gross margin dropping under 30%, and occasionally it does, and we tell you so. I was actually a bit surprised myself, with a topline loss of $3 million. I figured, wow, our gross margin will look really strong; so I was very pleased with that number. And we have an EBITDA margin of 21.4% too, which is pretty good. Let's continue to the text and the bottom of Slide 4; so what did we say about Q2 during our Q1 investor call — you recall, we said, well, we didn't give any sales or EBITDA estimates for Q2 because we knew a burn down was coming. We had shared that with you earlier, though for us it was somewhat fresh, and we lacked any way to measure it. So if we'd tried to provide a Q2 projection on our Q1 call, it would've amounted to pure speculation, which is roughly what happens when you're just providing service. In a way, we gave you a heads-up, saying, look, something is on the way, but we didn't have clarity yet. We needed time with MRAS, our customer, to grasp how far the burn down would go. Now that we've got that understanding, we're able to talk it through with you thoroughly, and we're going to. On the second point, regarding why their sales fell $3.1 million between Q1 and Q2, although that's merely coincidental, the decline in sales is fully accounted for, 100%, by a $3.1 million decrease in GE Aviation Jet Engine Program sales. It just so happens the figure matches exactly; and if you run the numbers, this doesn't require genius, the non-GE Aviation Jet Entry Program sales were basically the same in Q1 and Q2, which naturally stands to reason. So let's move along. Let's turn to Slide 5. Given that every GE Aviation Jet Engine Program that Park supplies into is growing and performing well, which they certainly are, why did GE Engine Program sales fall so sharply in Q2? What's happening? Well, you've already worked it out, it relates to the MRAS inventory burn-down, which we'll cover thoroughly later in the presentation. So we'll reach that; we'll get into specifics on the burn down. But first let's return to our Q2 and mention a few things. What other factors should we consider regarding Q2? How are things with supply chain, freight disruption and staffing challenges? We bring up those three items each quarter for — I'm not sure, you can tell me, at least a couple of years. These have been genuinely significant elements for Park and for operating our business. The difficulties persist, though conditions appear to be getting better. So what's the takeaway? It's not the same as before the pandemic, lead times have grown longer, but it's something we can rely on more. Through the toughest stretch of this situation, it didn't matter what the lead times were, or we wouldn't begin lead times. We'd say, listen, we'll deliver it to you whenever we deliver it. We don't even know, or we'd be given the lead time and we've blown it, and that made running our business very challenging from a production management standpoint, from a supply chain standpoint, from a staffing standpoint; so much improved. We still face longer lead times, but provided we sort of factor those in, we can manage our business far better than during the last couple of years. Total missed shipments in Q2, approximately 220,000. That figure is down. We still would like to be zero. The team feels we knocked it out of the park when it comes to reducing that figure. And what's the core issue here? My hunch is — and you've likely figured this out too — it's international freight, which has proven to be the hardest piece for us. I believe we're improving on that front too, yet international freight kept catching us off guard. Inflation and costs tied to our newly commissioned Kansas plant keep weighing on our margins. We'll get into the specifics on those items, which we addressed across the past two or three presentations. If you'd like to review them, along with the questions, unless nobody wants to — I just want to point out that these things persist. Let's move ahead to Slide 6. One key thing before we continue: I feel you have to give a special shout out to Park's people for the outstanding job they did, in my view, and for the margins they delivered in Q2, given a $3.1 million decline in revenues versus Q1. So there's always going to be some quarter-to-quarter variability depending on product. It favored us. So let's say it favored us in Q2. But even with all that, our Park people did an outstanding job in Q2, in my opinion. So Park, you probably got burned out pretty well.

Brian Shore

executive
#2

We're not the flashiest outfit around, and we don't employ many folks who came out of the prestigious aviation academies. However, our team is old-fashioned, and they understand the right moments to generate profits for owners — and from my perspective, that's likely quite significant for our owners. I mean, feel free to tell me if you see it differently, but were I an owner, I'd imagine, I want folks who are committed to earning money on my behalf. From where I sit, our Q2 ranked among our strongest Park quarters. Why would I say that? Because when everything's going well and your sales are climbing and everyone's a hero, yet when you receive the employee of the year — pardon me, the company year award, in my view, that amounts to nothing. When circumstances get tough, you still come through and execute, that for me signals a truly strong, dependable company. So that's simply my view, and you're welcome to see it differently. Moving along to Slide 7. I won't spend much time on Slide 7. It appears in each presentation. Sort of a viewpoint and a reference point. Moving along to Slide 8. All right. Each quarter we always feature our five biggest customers. So we're keeping up that practice, Aerospheres, very rapid. Israel, they wrap Israeli aircraft for us, Israeli aircraft builds the Gulfstream G280, in case you know that it's actually produced under contract with Gulfstream. So they landed in the top five, Kratos is among our top five. I believe nearly every quarter, a wonderful, wonderful customer. We adore them. And we had an excellent photo here of the Valkyrie, and it's performing a loyal wingman demo flight; alongside guess what? The F-35 and F-22; so among those three different airplanes, I'd guess the Valkyrie is likely the cheapest of the three. So I'm being somewhat sarcastic, I suppose. Middle River, we could use plenty of programs here, but with the Comac 919. LifePort, they sort of used some roundabout routes, took over part of the AAR structures business that we previously supplied into. Nordam, we picked the 737 to 800, that's where the WeatherMASTER Radome, which is on the 737 one. Moving along to Slide 9. Our pie charts, I always enjoy using, I don't know whether you hold any view on it, tell me now, but let me know, I find them helpful. Notice the contrast between 2021, the pandemic year, 2022 and 2023, quite similar. First six months of 2024, commercial down slightly. What's the reason? That's due to the burn down, burn down was entirely commercial in Q2; so fine, let's move along to Slide 10. Yet another of our customary slides, we adore niche military aerospace programs, which we definitely do. This is the newest project each quarter. She's our Head of Customer Service, MK125 Warhead; that's on the SM2, SM3 that stands for standard missile, you likely know that. Here you're looking at the standard missile 60s — those are some impressive missiles. The SM2, as I recall, was a hypersonic missile. Then there's the Alenia C-27J Spartan, radome materials. So naturally, we simply have a great deal of items, a great deal of materials within Sikorsky. The MK-41 Vertical Launching System — this one's a bit different. The components that use our material — it's actually not <<inaudible>>, we've got a pie chart. Rocket nozzles, drones, radomes — those we regard as niche markets for Park. Yet even in our case, aircraft structures is a niche market. We don't pursue the big programs for structures where there's substantial margin pressure; that's simply not our focus. All right. Let's move ahead to Slide 11. And here's what we're skipping: this Slide 11 through — what was it, figured out — yes, through 15, basically with very few modifications compared to Q1. So if you'd like to ask about it, that's fine, but let's simply skip past it. I include it — we include it purely for perspective and context. Let's jump to Slide 16. Okay. So this is a slide we include each quarter just to sort of show you the lay of the land; GE Aviation Jet Engine Programs is clearly extremely important to Park. So we have — for those unfamiliar, Firm Pricing LTA, that's a requirements contract spanning 2019 to 2029 with MRAS, Middle River Aerostructure Systems, which is a sub of ST Engineering Aerospace, a large Singaporean aerospace company; we constructed a redundant factory when they — we said, we'll build you a factory, if you — we signed the LTA; so naturally, we honor our word and the factory is done, it's producing, all of you know that. So let's move to the next item: sole source for composite materials, for engine nacelles and thrust reversers, all these programs. So you're probably wondering, if you don't know us that well, what's happening here. These are all the GE Aviation programs. What's the link? Well, that would be a great question, since they are all GE Aviation programs; so the link is this: when we initially got involved and did the LTA and everything, MRAS was a sub of GE Aviation, after the point when we were getting on these programs. GE Aviation sold MRAS to ST Engineering. That's the small secret there. Boeing 747 — those are spares, and they cancel the program, we're still producing spares. Let's move to Slide 17. So allow me to explain something. Park Composite Materials are sole source on a primary structure component for the Passport 20 Engine, for the Global 7500, 8000 — not included in the MRAS LTA. This is a bit confusing, because for the nacelles and thrust reversers, that is included in the MRAS LTA. This is a separate structure. This is a primary structure within the engine, and that actually is not part of — that's not an MRAS program. That belongs to a GE Aviation program, which explains why that component isn't part of the MRAS LTA. Even so, you shouldn't think the Passport 20 Engine Program falls outside the MRAS LTA when it comes to all the nacelles and TR materials. It's covered under the LTA. Also, a fan case containment wrap made for the GE9X engine on the 777X aircraft, which uses our AFP composite materials, isn't part of the MRAS LTA — not as of now, at least. The reason I mention that is this program looks like it's on the verge of moving, and MRAS has already stated they'd like to bring it into the LTA. So we'll watch how that develops, though right now it isn't there. I mean, it does belong to MRAS, it just hasn't entered the LTA yet. MRAS qualification of two proprietary Film Adhesive formulations is underway. That's fantastic news that the qualification is underway. Park, MRAS — I always list them first. MRSA/Park LTA runs through 2029; it was recently amended so that three Park Film Adhesive product forms are included for composite bond and metal bond. Once again, really fantastic news. And then there's the Life of Program agreement we discussed last time, which they requested. What does it mean for Park in dollar terms? I have no idea. I mean, what is Life of Program?

Brian Shore

executive
#3

Two decades, maybe a quarter century? Honestly, I couldn't tell you. And when you check — I believe it's on Slide 34 of our outlook — we put the figure at roughly $55 million annually. So you can run your own calculation and work that out. Then, beginning after 2029, assuming we keep going, which as most people placing bets would tell you, yeah, we will keep going. That number typically comes in larger since pricing would rise by then, naturally. But go ahead and crunch the numbers yourself, on your iPhone if you'd like. Moving to Slide 18, an update on GE Aviation Jet Engine Programs, the A320neo Aircraft family, the CFM LEAP-1A engine — that covers the 319neo, 320, 321, plus the A321LR and XLR. This one is the big dog, the big kahuna within GE Aviation as far as our GE Aviation work goes. Airbus holds an enormous backlog, and I'd put that at a massive 6,720 airplanes for the A320neo family. That represents a great many of our airplanes — I mean, pardon me. On Airbus' first half earnings call during July 2023, they simply reaffirmed their intention to reach a rate of 75 A320neo. Airbus family deliveries each month in 2006. Did you catch a slight nuance there? Previously they'd say by the end of 2026; that phrasing is gone now, they just say 2026. Maybe I'm overanalyzing it, but the "end of 2026" wording has disappeared. So I'm unsure. I can't say what's happening there. Possibly nothing at all. Will Airbus hit that rate in 2026? Tough to predict, yet given their enormous backlog — enormous backlog — there's strong cause to think they'll reach it during 2026, or at some point not too far off afterward. Here's a lovely image of the A321neo, currently their top seller within that family. How is Airbus progressing with the ramp-up you've planned? Let's move to the slide, which one is it, 19? Pretty decent based on reports, 2023 year-to-date through August — I don't have September included yet. I've spent a couple of weeks preparing this presentation. September's data wasn't, in my view, dependable yet, so I skipped it. Airbus averaged 43.5 Neo aircraft delivered monthly. So progress is happening. Yet here's an intriguing detail: they averaged 15 delivered across the last four months through August; so you'd call that heading the right way, I think you would. Obviously, though, with such an enormous backlog, they'd already be at a rate of 75 per month were it not for supply chain restrictions, limitations that are likely clear to you. What about the engines, though, for the A320neo Aircraft family? What about those engines? As we review, the A320neo aircraft family provides 2 approved engine options, specifically the CFM LEAP-1A engine and the Pratt 1100G GTF engine; now we supply — Park supplies into the A320neo Aircraft family using the CFM LEAP-1A engine. There's nothing in our portfolio for the A320neo family that runs on that Pratt powerplant. And now, here's a genuinely fascinating development. When it comes to firm engine orders for the A320neo aircraft family, CFM's LEAP-1A share had been sitting at roughly 60% for about the past 2 years. You're aware of this since we bring it up each quarter — so those of you who attend Park regularly have kept hearing that 60% figure, somewhere in the 59%, 60%, 61% band for quite some time. But then — let's move ahead to Slide 20 — everything shifted. Over the past few months, the LEAP-1A has clearly emerged as the market share leader for the A320neo Aircraft family; shown in red now, CFM's LEAP-1A share of firm orders for the A320neo Aircraft family climbed to 66% as of just July 31, 2023. That's an enormous increase. What explains it? Such a big gain in market share is really striking given that firm engine orders for the A320neo Aircraft family total 12,348 — pardon me, firm engine orders for the A320neo Aircraft family. I mean, with the market share that evenly split, a meaningful shift of that kind, say a 60% share, would be viewed as extremely improbable. Put differently, if 20 engines get ordered, someone picks up five. Fine, that does move the needle. Yet with more than 12,000 engine orders, moving that needle requires a great deal. 6% is simply astonishing, an enormous figure. So what's behind this? Astonishing to me, at least — that's just my view. Perhaps others would disagree, but regardless, what's driving it, and why? Slide 21. As a brief side note, at a delivery rate of 75 A320neo family aircraft per month, a 66% LEAP-1A market share works out to 1,188 LEAP-1A engines per year. I'm merely running the numbers, sorry — if you've got a small calculator on your iPhone, you can work that out on your own. What does that mean for Park? For your outlook, it would come to $36 million per year. Just run the numbers once more, do the arithmetic, since we know what our content per engine is: $36 million per year. That's only for the A320neo family. At present, we hold 8,144 firm LEAP-1A engine orders. What are those firm orders worth to Park? That's somewhat harder to pin down, because a number of those airplanes will be delivered beyond 2029. And as I mentioned, if you're betting early and you're going to wager it continues past 2029, our prices will rise in 2029. The price is also climbing in 2025, or perhaps that offsets. So this year and next year, price sits lower, then it increases in 2025. So you attempt to <<inaudible>> each other. Still, you could do your own arithmetic — multiply 8,144 by — you'd want 30,500. So that's the amount per — that's 30,500 per unit, not million. That comes to roughly $0.25 billion. Alright, so that's really just a rough — sort of an estimate, not the actual program. More orders should keep coming under the program, I'd anticipate. Anyway, what took place? Let's return to the core issue. Why have firm engine orders for the market share shifted toward the A320 aircraft family? What explains the chip swinging so suddenly and sharply in favor of the CFM LEAP-1A engine? There are extremely grave problems with the Pratt 1100G; last time we touched on durability, but the category of problems here is different. These problems have now been widely documented. Consequently, covering them thoroughly isn't something we'll try to do here. Even so, through 2026, issues with the Pratt 1100Gengine are anticipated to ground 350 A320neo family airplanes each year, and in the first half of 2024, groundings reached as many as 650 — that's not an analyst or commentator saying it, that's the company. That's their own statement. If you operate an airline, your profits aren't that large to start with. Grounded airplanes are the last thing you want; for an airplane, that's fatal — an airplane can never sit grounded. That's the reason this issue is so severe; now let's move ahead to Slide 22. And this, too, originates from the company. It isn't anyone's opinion.

Brian Shore

executive
#4

Inspecting and fixing each engine will likely require as many as 300 days. That means aircraft will be grounded for an extended stretch, which is a really hard set of circumstances. It's hard to grasp completely what this crisis will ultimately mean and where it ends up, though the saga might continue, possibly nowhere near finished. How I see it: any time a crisis appears incapable of growing worse, it grows worse — that's simply how I view it. Could this crisis produce substantial extra market share gains within the A320neo Aircraft family for the LEAP-1A engine? A great many people think so — what's your view? The tricky part, of course, is that customers keep placing orders for these planes, and plenty of them. They must decide which engine to select — so give that a little thought. Moving along to Slide 23. The leading item still within the A320neo family is the A321XLR; I simply want to call attention to it. That's all — it's supposed to be, what, entering service during the second quarter of next year, and Boeing offers nothing comparable; plus this is a genuinely significant program for Park. There's a great deal — we're seeing a great deal written about it these days. I believe folks across the industry are growing quite enthusiastic about this aircraft. We went through it more thoroughly before, and I won't repeat that now. Still, it's certainly what we'd call a positive. Comac 919, powered by those LEAP-1C engines. Within five years, Comac intends to reach an annual production rate of 150 C919 aircraft, according to what they claim. That isn't coming from some analysts. It's their own claim. Now, when we reach our outlook, I believe on Slide 34, we're only assuming 100, so bear that in mind. At present they lack more than 1,000 orders, and 2 919 aircraft are presently flying with China Eastern. Let's continue with a nice picture of it here. On to Slide 24, still concerning the 919. China Eastern lately disclosed an order for 100 more 919 aircraft, slated for delivery from 2024 through 2031. That's the biggest 919 order so far. Then GallopAir of Brunei recently declared an order of 15 — why would I bother mentioning that? 15 orders doesn't sound like much. The reason: up to this point, Comac airplanes have been viewed as China-market-only airplanes, meaning they sell plenty of them, yet solely within the China market. Well, clearly Brunei, if your geography is up to scratch, isn't part of China. That's why I figured I'd point out that very intriguing fact; and next let's discuss the Comac ARJ21, the regional jet featuring those GE CF34 to 10A engines. For Comac, 112 aircraft have been delivered and put into service, with 775 open orders; and here you go, GallopAir of Brunei announced an order for 15 of these airplanes. Okay, so once more, something we used to think of as a market only in China — yet Brunei isn't part of China. Here's a good image of the ARJ21, which is a regional jet. Moving along to Slide 25. All right; so that's the 777X, with 9x engines. Over the past several quarters we've discussed at length the problem involving the fan case redesign — should that redesign work out, then the case wrap would no longer be necessary. I'll share my own view, based on what I know, and I suppose that's fairly substantial. My sense is that the odds of that occurring are gradually diminishing. So I think — in my judgment, for a long time ahead this will be a truly important, exciting program for Park. Entry into service is planned for 2025, and right now it's an active program for Park — if you're aware, this is presently an active program for Park. I'd rather not say much more on it, but I'm feeling pretty encouraged that it isn't disappearing, and it will be advancing into what could become a significant program for Park. So that makes us happy. We have to give honorable mention to the 747 — we're still producing spares for the 747. Slide 26. This slide is one you know, though there are a couple of modifications to it. GE Aviation Jet Engine Program sales history — I won't dive into the history, just look at the slide — but in the column, look from Q1 to Q2, $6.2 million down to $3.1 million, that's a $3.1 million difference, and I believe that's roughly half, right? Yes. For Q3, we had $4 million booked, but we're not — it isn't a forecast, since there's so much uncertainty, which we'll discuss a bit more. We understand it's a burn down, we got it in Q3 and Q4; so I mean, look, we wouldn't anticipate anything below that, but we aren't providing that to you as a forecast. We're simply stating this is what we know, and we aren't giving a forecast. We just aren't comfortable. Now, one more thing I want to mention is on the right hand — in this little box here, see, $9.4 million. Recall what we said earlier: the same amount of non-GE Aviation Programs in Q1 and Q2. Annualized, that comes to $37.5 million. And I just want to — just keep that number in mind, $37.5 million, in case I forget when we reach our outlook; so we'll revisit that when we get to that outlook. I think on Slide — I don't know, 35 or something like that. Okay. Let's move to Slide 27. All right; now this is the painful portion of the presentation. GE Aviation sales are entirely about the MRAS inventory burn down — still on schedule, the steep drop-off in Q2 GE Aviation program sales is entirely about MRAS's burn down of Park inventory held by them and its subcontractors. Now this is a really key point. Regarding the MRAS build plan for calendar year 2022 — that one belongs to them, not to us. It's their plan. What they intend to construct during 2023 is what this covers; our own build plan, as I recall, is for somewhere around 2028 or 2029. This information originates with them rather than from us. It works out to roughly $20 million — pardon me, $23 million in sales for the Park Aviation GE Program in calendar year 2023. Doing that calculation is quite straightforward. When we understand the quantity of units they intend to produce, along with how much material each unit consumes and the price at which we sell that material, arriving at $23 million becomes simple arithmetic. Assuming the build plan holds up — and typically it does — that figure is fairly exact, amounting to about $5.75 million each quarter. Now, the MRAS calendar 2023 build plan has been trimmed somewhat; this is merely an aside. The reason is that MRAS is also sitting on surplus finished structures inventory. I hesitated to include this point, since it might create confusion. All it means is that their build plan would be larger, were it not for their own inventory. That has nothing to do with Park's inventory. From Park's perspective, their build plan is the thing that counts, all right? That's the important part.

Brian Shore

executive
#5

What that means is the quantity of units they intend to produce, and that determines the amount of material — Park material being consumed; however given that MRAS' 2023 build plan equates to $5.75 million in Park GE Program sales each quarter. So why did Park GE Programs sales come in at just $3.1 million in Q2? I suppose we've sort of already let the cat out of the bag, but what accounts for $2.65 million, that's simply arithmetic. That's $5.75 million minus $3.1 million. Which works out to a $2.65 million shortfall versus Park's anticipated Q2 GE Program sales derived from the build plan and the parts' actual Q2 GE Program sales. Well, once more, it all comes down to the burn down — the MRS burn down of Park's inventory held by MRAS as subcontractors. The inventory burn down accounts for 100% of the gap or short flow, which stands to reason since — as we said the programs are ramping up, the programs are going strong; so why would the figure be lower? Well, that's the reason. That's 100% of the reason. Let's move to Slide 28. Why the inventory burn down? Why the shock regarding the excess Park inventory held by MRAS? I want to say something, and I mean it very sincerely, MRAS is a fantastic customer. MRAS and Park share a connection that's truly one of a kind, and Park really couldn't ask for a better customer than MRAS — it's an exceptionally rare relationship. And I'm not just saying that to blow smoke. Absolutely not — that wouldn't be honest. I've been in this role for many years now. Plenty of customers have come through over that time; a number of them were excellent, others left something to be desired. Still, this particular customer stands apart — extremely so, I'd argue — and what we have with them is genuinely distinctive, an authentic partnership in every sense. For those of you who have been following this company for some time, whenever a customer starts using the word "partners," it tends to make you uneasy. The reason is that when that customer needs something from you, suddenly you're partners — but the moment you need something from them, that partnership disappears. With MRS, though, I was able to rattle off twelve examples off the top of my head. It genuinely has been a partnership where both sides win — that's the honest truth. The folks in their sourcing department are extremely forward-thinking, I'd describe them as very enlightened individuals. That said, to phrase it delicately, inventory management may not be the aerospace sector's greatest strength. So what's really happening? Let me share my perspective. I don't have any additional involvement in aerospace — it's an unusual field, there's no question about that. The industry is highly risk-averse and resistant to change, though the reasons for that are clear enough when you consider safety. In my view, regulators like the FDA are unwilling to let an equipment manufacturer or an outside supplier casually alter aircraft, airframes, or onboard systems—such a situation would invite peril and disorder. That said, I believe there are secondary consequences tied to an overly cautious stance and an unwillingness to embrace change. Consequently, as I see it, companies in this sector frequently remain on cruise control far past the right moment and end up going too far. They settle into a fixed approach and quit paying close attention to the warning signs. You could say there's not a lot of nimbleness in that area. Part of it may come from a tendency to avoid risk and push back against change, and honestly that's a positive — it's the right posture when safety is the priority. But what happens is, that tendency can produce escalating swings, these overshoots. You keep putting things off, keep putting things off, and you're not responding. Then when you finally catch on, you're half a year late, and you act — and by then the fix that's needed could be really drastic. So when it comes to Park, look, we're not about to reinvent the aerospace sector. We decided we wanted to operate within aerospace. So what does that mean for us? We need to operate with real agility, adaptability, and a strong sense of urgency in the way we manage the company. To be clear, we aren't singling out MRAS—they're probably better than a lot of other businesses in aerospace. Still, I'm trying to phrase this cautiously: here's what's taking place, and here's why we ran into this unexpected situation and had to draw down inventory. Could this kind of inventory shock happen again? It likely will happen with <<inaudible>>. How tightly do we work alongside MRAS? We work with them very closely. There's nothing hidden or anything like that. It's very transparent. This has happened in the past, and chances are it'll happen again somewhere further along the line. So it's possible that, well, you'll see a certain amount of fluctuation from one quarter to the next when it comes to our GE Program sales, because managing inventory isn't easy — maybe a few ups and downs here and there. The way I look at it, that's just the reality. Moving to Slide 29. Still, once you factor in everything fantastic that's resulted from working with MRAS, along with all the fantastic things we still expect that relationship to deliver, all things considered, we have absolutely no doubt that having MRAS as a customer is an enormous stroke of luck, all things considered — it isn't even a close call when you stack up the good against the bad. It isn't even a close call. No. There's nothing to talk about there — it isn't even a close call. Sure, GE Program sales could swing around from one quarter to the next, and we're happy to take that on and deal with the ups and downs and difficulties that come with it, since what matters far more to us looking out over the long haul is the longer-range picture for GE program sales, the one we went over on Slide 34. Right, it does create — we have to — of course, it puts pressure on how we run production, along with managing our supply chain and managing our staffing. We're happy to take that on. On balance, we're happy to take it on, and it isn't even close. So where does the burn down take us? Based on what we know, we've got a lot. We think the burn-down will probably wrap up during our Q3, and the Park inventory that MRAS holds will be "normalized" by the time Q3 ends — we placed normalized in quotes deliberately, since that term is fairly complicated. Moving along to Slide 30. Another point about managing inventory. Broadly speaking, we've already somewhat addressed this: it's crucial not to overcorrect, since doing that — essentially overshooting — can generate extra volatility, with growing sine wave amplitudes and inventory swings resembling oscillations. So you likely understand what that means. Sine waves that rise and fall, you've witnessed that. This worries us and worries others; we aren't the only ones, and I won't say who, but we aren't alone in being worried. Should our worries prove justified, it might cause a major demand spike in our Q4 and continuing into 2025. So that shouldn't come as much of a shock. Time will tell; but for now, we're keeping our antenna up and our ear to the ground. Moving along to Slide 31; I think this sort of sums it up for us — for me at least; regardless, what's our view on all this? What's our view on all of this? Our view is that most of it is short-term noise, just static.

Brian Shore

executive
#6

So, as I mentioned, management has to contend with the swings, the rises and falls. But when it comes to what truly matters for Park over the long haul, most of the short-term noise is just static, in our view. We believe the freight train — the "Juggernaut" — is barreling down the tracks toward us at 100 miles per hour, and nothing can halt it. You need to check Slide 34; we are not playing games here. We think we had better be prepared, or we too will be steamrolled. That is our take on it. So let's move to Slide 32. All right. Financial outlook. How are we doing on time? Yes. Regarding Park and the GE Program's financial outlook, this is more of a refresh. Alright. Given the ambiguity around Q3 stemming from the burn down, and around Q4 since those figures have only just surged, producing a meaningful forecast for Q3 and Q4 is extremely difficult for us. We won't — what would be gained by speculating? We won't — doing that would only let you down. As for when we can go back to offering quarterly long-term forecast estimates, I can't say for sure; we will definitely keep you informed. That said, here is what we can share: an updated revenue outlook for GE Aviation Programs, plus a financial outlook for Park as a whole. Our view is that the long-range picture for GE Aviation Programs and Park carries much greater weight and relevance than any estimate tied to a single quarter, since those three-month periods swing around for reasons nobody can really pin down. What truly matters on our end is the bigger question: where does this go over the long haul? What do the longer-term prospects look like? Those carry more significance for us, and they are also something we can grasp with greater confidence. As for when that outlook lands, what is the timing? We have the outlook plus one year to — as folks put it, which year are we talking about? It gets to the point where nobody can say for certain which year it is. Take the case where the head of Airbus states that you will reach 75 A320neos by 2026. How should I respond to that? Say he's mistaken? I have no idea. But here's the thing — since we're in the dark, what's the point of speculating? I can't say for certain; however, like I mentioned, and this matters greatly for Park: that freight train is on its way, nothing will halt it, and we need to be prepared. Now onto Slide 33. Here you'll see the assumptions behind our figures. I won't walk through each one; they're identical to the ones we provided a quarter ago. Moving to Slide 34. I'll pause here since I'm aware we're behind schedule. Still, this particular slide deserves some extra attention. Notice that figure of $55 million? Would you call that an aggressive number? Okay, let's walk through this and work out the numbers. For the A320neo, the figure is 1,188 — as you'll recall, we've mentioned that before; this is purely the calculation. At 75 units a month with a 66% share of the market. We aren't building in any increase in that share. It could rise. That's not something we're assuming. And we do know the revenue for each unit. Each year, the A320neo brings in $36 million. That number is based on pricing for 2025 through 2029 — 2025, 2029 pricing. It accounts for 20; it accounts for the Global 7500 and 8000 aircraft. 90 airplanes? That's the lowest point of the build plan. MRAS provides us with both low and high build plan figures. This is the low end. So, would you say we're being aggressive? Regarding the C919, here's my take — apologies, but yes, Comac has said they'll hit 150 within five years, and that works out to 300; keep in mind each plane needs two engines, correct? So we're just talking 100 equivalent — 200 engines, that is 100. Let's dig into that now. On the A320 side, the forecast is 900 aircraft per year, while for the 737 they're only just now mentioning it, but if they get to 57 a month, that comes to 684 aircraft per year. We're only talking about 100, so that's 50 less than what Comac is putting out there? Is that aggressive? I'm not sure. Once more, on a per-unit revenue basis, we do have those numbers. As for the ARJ21, the regional jet, 55 is on the low side — right at the bottom of the build plan range. Two figures exist—one high, one low—and this falls under the build plan's range. Is that too aggressive on our part? On GE9X, unit counts won't be shared, though I can tell you it's a conservative approach. Turning to the number—the overall totals went up. What's the reason? Revenue per unit rose thanks to new pricing, and that price—we're incorporating the new pricing, which produces the $77.5 million annually, with what I'd call a fairly cautious unit count. Let's spend a bit of time on a few footnotes here. Alright. Moving to Item three, footnote three, A320neo aircraft. Park is utilizing Film Adhesive materials—qualified and using this program? Does that seem aggressive? Okay, so you're telling me we're getting qualified, and for MRAS that's a significant sum too, getting their Film Adhesive product qualified with them. They're bringing on engineers. They're able to put money in — why would they do that unless they intended to place the film adhesive on the programs? Is that too aggressive a read? I don't think it is. Let's keep talking it through. Item five, Passport 20; item six, tied to the 919; and item seven, tied to the ARJ. In each of those cases, we're assuming our film adhesive isn't part of the program. What's the reason for that? Because, I mean, once again it's clear that MRAS had their Film Adhesive products in all of these programs. Nobody wants the situation where they're forced to purchase adhesive film from both brand X and brand Y. So what's the reason behind our approach? It comes down to us taking the cautious route. Why do we base our assumptions on them not being included in the programs? Is that us being conservative? So here's my question to you: when it comes to that $22.5 million figure, would you call that aggressive? Does that strike you as aggressive? I really don't believe it does. All we're doing is running the numbers, everyone. Are there people out there who feel we're pushing too hard, or overselling, or building hype? Where that perception originated, I can't say — honestly, I have no idea. Let's continue on to Slide 35, shall we. This is Park Aerospace Corp.'s financial outlook, mostly built on growth projections for programs where Park holds sole-source qualification, and here's an update. Okay, this looks largely the same as before, though we've refreshed the figure you estimated for GE Programs, or incremental sales, at 32.7% — that's simply running the calculation once more. Footnotes appear on the following slide, Slide 36, and they lay out the math involved here, which we basically already understand; not much has shifted. The $20 million relates to the ADL, Kratos, Valkyrie. Someone mentioned seeing numbers that were high. My reaction is, fine, I understand the source of that information. In my view, this figure is conservative — very conservative, actually. Still, I suppose we'll find out. Turning to non-GE programs' incremental sales — that's intriguing, since as you'll recall, our baseline is 2023, when non-aviation sales came to $32 million, and $8 million lifts that to $40 million. That's what's assumed here. $32 million plus $8 million equals $40 million; that matches what we describe as roughly 5% annually across five years, or thereabouts. So where do we stand in Q1 and Q2? We're at $37.5 million.

Brian Shore

executive
#7

So out of that $8 million, $5.5 million is already in the bag. That covers Q1 and Q2. Now it could come down. I'm not claiming that we're going to — that figure is going to rise from here. But it always does — it depends on when programs are scheduled. That's simply the nature of airspace. Still, I want to make the point again: are we being too aggressive? I don't know. I don't see it that way. As for the remaining math, you can walk through it and follow along on your own, and you'll see how we arrive at $36.5 million of EBITDA for the outlook. Moving along to Slide 36 — I'm not going to go through each of these points individually; my aim is simply to spell out thoroughly the kinds of matters we've already discussed and how the calculations come together. Should anything be unclear, please reach out. On Slide 37, let's take a brief moment there. One thing to remember, and it matters a great deal: what we have here is an outlook, not a forecast. What's the reason for framing it that way? The reason is that numerous other programs we're engaged in aren't included in the outlook. We haven't yet achieved sole-source qualification, though we're pursuing it. Now, certain ones will land and perhaps others won't, yet some certainly will. And a number of those happen to be fairly large, meaningful revenues. Looking at those bullet points — the first one is really significant. As for the second, we've introduced a brand-new Film Adhesive product line. Do you honestly believe we have no intention of selling it? Within the entire forecast, the sole Film Adhesive revenue comes from the A320neo, and that's it. Nothing else at GE. What about other buyers? Do you assume we aren't reaching out to them? Naturally we are, and plenty of customers have shown interest. So in a sense, yes, we truly do intend to offer that product to additional parties. It provides considerable benefit, incidentally — they'd tell you, sure, being qualified on a major program does wonders for your credibility. Regarding that Asian joint venture we mentioned earlier: the structures assembly and integration project has the potential to be substantial, and the technology license could be significant as well. The Israeli Arrow 3 Missile Defense System might also be considerable. So I'd like to reiterate one thing — our outlook contains none of these items. We won't be doing that, and we won't be putting a number on them for you, since some will come through and others won't. Still, a few of these are sizable. They're essentially binary: the result may be 0, or it may be far above 0. What it likely won't be is anything in the middle. Let's turn to Slide 38. All right. So here's where things stand — and it's almost funny how it worked out, but we've got news on all three of the programs that together made up that $20 million figure in the outlook: the ADL program, the Kratos program, and the Park <<inaudible>>. I'd say everything coming in is positive. The one item worth calling out, I suppose, is the replicated Kratos program, which the DOD announced not long ago. For Kratos and for Valkyrie, I see this as really promising new information — truly good news. It really looks like the government is genuinely pushing forward on these unmanned systems. And Valkyrie seems like a strong match — it fits perfectly in that space; any article I've seen on this subject brings up Valkyrie, I mean when it comes to the replicated program. Regarding the PAC-3 missile, demand for it is universal, and the obstacle, I believe, comes down to the supply chain. Let's go to slide — I almost passed over it — 40. Okay. We're on Slide 40, and we're running over on time a little. We're nearly finished. Please give me just a moment. So this is a slide we've presented before, $74.2 million. We're bringing down that transition taxes, toll and payment. During our Q1, we disbursed $3.2 million. That $9.3 million, the way I see it, should be regarded as funds already gone. What I mean is, that one is aged. It's practically like debt. We hold no debt, and yet it's practically like debt. And that money — and it does get settled. There are still two payments left to make. The last of those arrives in June 2025. By that point, the funds will be fully spent. So you should think of that cash as no longer available. Then there's the $6 million tied to the Kratos project, and we'll find out how that turns out. Beyond that, there are many other initiatives — a handful of them were referenced during some of the outlook conversations — that would require funding. So we'll find out how it plays out. Still, it looks like a rough ballpark number, $58 million, $59 million. That's not a projection, but it's roughly the way we think about it: fine, this is the amount of money we've got. This is sort of how much money is committed; and obviously, we hope to be generating cash as well. So that's why I say it isn't a forecast. But for us, it's conceptually important. 41. Our balance sheet cash dividend history and buyback. Each quarter, we go over this. We have 0 long-term debt dividend history. For others, cut or cancel the dividend, Park maintained its regular quarterly cash dividends throughout the pandemic, an economic crisis. Park has paid 38 consecutive years of uninterrupted regular quarterly cash dividends without ever skipping a dividend, reducing dividend amount. Here's a major item, shown in blue: since fiscal 2005 got underway, Park has distributed $586 million — that's $586 million — in cash dividends, equivalent to $28.60 for each share. And, as I'm fond of repeating, for a small enterprise like Park, that's an enormous sum of money. Also, per the announcement made on May 23, 2022, our Board gave the go-ahead for Park to buy as many as 1.5 million shares of the company's stock, and as of May 12, 2023, Park put into effect a Rule 10b5 to 1 program, which reached its expiration, according to its terms, on July 7, 2023. Following that strategy, we bought 221,099 shares of our common stock, paying an average of $13.02 per share, for a total of $2.879 million; then on August 11, 2023, we put another 10b5 to 1 program in place, and by its terms that one expires today. Through that program, not a single share of Park stock has been acquired. And we're basically finishing up now. The Park family — sorry, was that slide 43? Yes. The secret goes on, the secret behind our success goes on. All right. We gave you an update on the Customer Flex Program. We didn't cover it the past two quarters, mainly just to keep things short, but participation is at 62% overall. That's not a negative sign. We've brought in quite a few new people, and qualifying for the Customer Flex program takes a while. So it's still a program that matters a great deal — hugely, hugely important to what we achieve today and down the road. Park family — the Park family's headcount right now is 119. Does that number look a little elevated compared to what you'd normally expect? In the short run, we intend to add 15 more staff members and increase our Park people total to 134 million Park people. So what's going on here? Before we dive into that, though, keep in mind that this will run us about $1 million annually — an added expense?

Brian Shore

executive
#8

Alternatively, suppose you take 110 individuals as your reference point, roughly the level we've maintained across the past few quarters — that translates into an additional $1.5 million hitting our P&L. What we're discussing here — and this is the fascinating part — is that this shift can occur fairly rapidly, especially when it comes to the production staff. So why does that happen? To my complete surprise, we began leveraging social media to bring people on board. Glory, Courtney, and Nancy generated some genuinely excellent concepts. I figured, fine, whatever. But what do I really know about any of this? I'm simply not skilled in that area. It has genuinely made a huge difference and helped enormously. And I believe the more significant factor is that the culture of the Park family has really taken root. According to Courtney, it's a wonderful place to work. And we sincerely believe that. Not an easy place to work — a wonderful place to work. I found myself somewhat frustrated since I thought, gosh, we're doing everything correctly. We never lay people off. We cherish our people. Our people are like family to us, and we treat them that way. Why is it so much harder <<inaudible>> people. I think we simply needed to persist a bit longer; and at this point it has taken hold. The message, I believe, has spread. And we've got a queue stretching out the door of individuals — anyone can come work for us at this moment. So that's encouraging; but keep an eye on our costs because we might reach 134 quite fast, particularly among production workers — roughly half of the 15 will be production-type workers. So, all right, that's encouraging. Let's move ahead to Slide 44. I suppose it's encouraging. I mean, when you examine it, Slide 44. As stated earlier, we must prepare ourselves for the Juggernaut, otherwise we too will be overwhelmed. So our wonderful Park people are dedicated to generating profits for owners each quarter; we operate our business for Park's future, for the long haul, not merely for the upcoming quarter. That sort of dedication is perhaps what you'd call enlightened self-interest — I think that's a phrase describing how people understand that, in order for us to have a future, we must generate profits for owners each quarter. If you're an owner, you want people — generating profits for you. But what are we really saying here? We operate a business for the Park's future. Put differently, we're bringing people on or hiring ahead of need. So we're prepared for the Juggernaut and won't be overwhelmed; in other words, they aren't sprinting for the quarter, they're sprinting for what lies ahead. And our intermediate plan involves raising our Park people count to 143 individuals. So let's watch how that unfolds. At Park we're incredibly fortunate and blessed to have the wonderful Park people that we do. At Park, our people have been playing — playing for keeps. And we've now entered our 70th year of playing for keeps. One of our customs is that we always put a spotlight on a team or crew from Park. Today it's our Aerospace Composite Structures crew. I'm stressing this for a reason: right now we're pursuing some major structures and assembly program opportunities, so this crew matters a great deal. We already owe them a bit. This is also a fantastic group since they handle other duties as well; they perform ITAR work. I'm not able to give you an explanation of that — that's not something I'm the right person for. They're part of the Customer Flex Programs, which means they can take on 2 or 3 additional jobs. So it's truly wonderful to have folks like that. In any case, operator, and everyone else, thank you for listening. That wraps up our presentation; we're prepared to field whatever questions may be out there. All right. Well, Brian here once more. Many thanks, operator. Thanks to all of you for tuning in. Don't hesitate to call Matt or me if any follow-up questions come up. Have a good day, and we'll speak with you again before long. Take care. Bye.

Operator

operator
#9

Appreciate it. That brings us to the end of today's call. At this point you're free to hang up your lines. Thanks for joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.