executiveThanks, operator. I'd like to welcome everyone to the investor conference call for our fourth quarter of fiscal '24. Joining me is Matt Farabaugh, who serves as our Senior Vice President and CFO. You likely saw in the news release about Matt's retirement that the original plan was for him to finish at the close of this month, but he's agreed to remain with us until roughly the middle of July, in time for our Q1 10-Q filing. So Matt, I appreciate that. I believe the earnings release hit the wires around 4:15. Please take a look, since the release contains directions on how to access the presentation we're about to walk through. Once the presentation ends, Matt and I will gladly take whatever questions you have. At the bottom of the presentation's cover page, you'll see a note that we're marking our 70th anniversary. Park was established on March 31, 1954, which was four years ago. Funny enough, someone asked me recently whether I founded the Company, and I thought, wow, I must be really old. But no — I didn't start the Company; I was two years old back then. Let's move to Slide 2. If you've got questions about the forward-looking disclaimer language — oh, I should mention, I forgot to tell you — you'll probably notice it during the presentation: I've got the flu. Even so, we have to keep going, and we'll get through this. A few years ago — it was during COVID, I believe — this happened at one of these investor presentations. I hardly ever fall ill, but it appears that any time I do get sick, it coincides with an investor presentation. So the thought crossed my mind that I hope no psychologists are present who might try to make something of that. Now, on the subject of the forward-looking disclaimer, please tell us if any part of it isn't clear. Slide 3. This is the table of contents: our presentation is included, along with supplementary financial information. We aren't going to go through the supplementary financial information, but should you have any questions about it, simply let us know. So the first place we had — not a factory, a garage, to be exact — was in Woodside, Queens. That's not me embellishing for effect. It genuinely was a garage, an actual one, and it's still a garage right now. We looked it up on Google Maps, and that building hasn't gone anywhere, it's still being used — auto repair, that kind of business, about 2,000 square feet. Then a few years later, I think exactly at the point when the Company moved into a real factory over in Flushing, New York — Flushing, Queens, New York — which I believe was somewhere around 8,000 or 10,000 square feet. That factory is where this photo comes from. That person pointing to the left there, that's Jerry Shore, my dad, and the fellow on the right is Tony Chiesa, who was my father's partner when Park got started; like I mentioned, at times he was almost like a second father to me. What you're looking at are power presses. The business began with nameplates and decker trim. These presses were used to stamp out sheets of nameplates; my father and Tony operated the line, ran the machines, fixed the machines. They kept the machines maintained. They even engineered improvements to the machine; so if you opened a dictionary under hands on, you'd find pictures of these two. So, as you're aware, we go back a long way. In 1960, the company took on the name Park Electrochemical. A lot of folks figured that was because we were in the electronics field, but that isn't the case. Our understanding is that it stayed electronics through '61, while electrochemical points to the anodizing operation we still use — I believe — to create place integrity from selling that business, the initial business in A4, to the general manager working there at the time, they go hand. This dates back quite far, though — this photo probably goes back to somewhere in the mid-50s, I'd say. We refer to it as our founders' photo. So, when we got together with our staff, we had a pretty good session where we walked through a presentation covering many different parts of where this company has come from. There's no room in this call to cover all of that, so for the sake of time I'll just mention one or two points and then keep things moving. Let's move ahead to Slide 4, where we discuss how we did in Q4. Revenue came in at $16.333 million — that's decent. Then you get to gross margin at 27.3%, and it strikes you that something here doesn't add up. That figure is on the low side, particularly given that revenue was okay, and the same pattern shows in EBITDA margin, which sits at 30% like the growth margins, while EBITDA margins come in under 20. During our Q3 call, what did we tell you to expect for Q4? Our sales projection was between $15 million and $16 million. Well, on the sales side, we ended up coming in slightly above that figure. On EBITDA, though, we had guided to $3.2 million to $4 million, and we landed at the low end of that band. Naturally, that raises a question: given that sales beat the high end of our range, why doesn't EBITDA look stronger? One would expect it to be higher. So let's dig into that. To start, regarding those missed shipments—the 565,000 figure—that's consistently the primary reason for shipments not converting over the following period, such as in oil and gas, which you likely can. Alright, let's move on to the next slide. So there's no ambiguity left. Wars in the Middle East and Europe have disrupted international freight. That's not a favorable number, but we're dealing with a real struggle in international freight at the moment. Those figures don't please us, yet that's simply how things stand, put that way. My impression is these generations aren't connected to Q4; so we'll go through a number of points here. Allow me to be clear, these aren't excuses. That's not something we take pleasure in. Excuses aren't something we make. A handful of explanations regarding what took place, you're free to care about them or not, but a number of you may care; so, this initial one matters. Production is something we never discuss, since typically our output and sales track each other quite closely; but Q4 sales, those came to $16.3 million, while our production, which we refer to as sales value production, the sales value of what we produced amounted to just $15.2 million against our sales; and for our P&L that is genuinely a major issue; so — and as you'd expect, the source of that, sales originated from moving inventory by roughly $1 million, which hurt gross profit by $275,000 and EBITDA by about $250,000. What's the reason? Because consider it this way. Had we truly manufactured that product instead of moving it out of inventory, we'd capture the extra absorption of labor and overhead that goes into building the inventory. So, it matters when — this wasn't what we intended; doing this wasn't part of our plan. We simply fell short when it came to our production numbers.
Brian Shore
executiveOur goal is to manufacture at the same level as our sales, yet we wouldn't reach that point. There are numerous causes — not trying to make excuses again — but we have staff with less experience. They are building up that experience, leads. Let me offer just a single small illustration of what we mean. A lead with experience understands what is acceptable, say, on a treater line, film line, or tape line, which is essentially the business we're in. This is a continuous operation, so keeping those things running matters greatly; that's just how it works. That experienced lead understands what's acceptable and what isn't. So they'll make the call: no, we need to halt. We have to pick up the pace. If the person on hand lacks know-how, we'll halt the line so they can locate someone—maybe from inquiry—to come inspect it and decide whether to keep running or shut down. Obviously, if I keep the line going and the output is defective, all you're doing is producing waste, which makes no sense. That's just one illustration of the difficulties we faced in our fourth quarter trying to hit the production level we're aiming for. Fortunately, during Q1, output figures were pretty solid right up until the storm arrived, which we'll get into later; continuing on, CTP fabric sales came to $474,000. This is something we've discussed repeatedly, though with that particular item, we simply purchase it and then pass it along to the buyer with a modest price increase. As a result, there is margin on the sale, yet it ends up being quite thin. An unanticipated property tax charge came to $212,000. That tax hits within cost of goods sold. You may not realize that this isn't the sort of levy that normally appears as a tax line inside cost of goods sold. Naturally, it impacts our gross profit or EBITDA. And we had anticipated that happening. There was some kind of dispute, I'm not sure what you'd call it, involving Kansas state authorities, and in the end we settled on a figure and wound up covering the cost too. The fourth quarter came in soft, meaning we absorbed an additional seven days' worth of fixed expenses. Also, the mix of what we sold during Q4 tilted somewhat less favorably. Moving ahead to Slide 6, I'd like to discuss how we did year over year — the full-year comparison — since that's likely more informative than looking quarter against quarter. For fiscal '24, we posted $56 million in sales, a 29.5% gross margin — pardon me, EBITDA — no, gross margin, which isn't all that impressive, along with a 19.6% EBITDA margin. What we're discussing now is quite distinct from what happened in Q4, when specific events—the ones we already walked through—dragged down our margins for that quarter. Looking further out at '24, the focus shifts to the deliberate steps we're taking to build momentum for what we refer to as the juggernaut. So let's dig into that. Please turn to Slide 7. How do our margins stack up against last year? As I mentioned, that's probably a smarter thing to ask than looking at how one quarter compares with the next. Any single quarter will contain particular items that shape the numbers, which means quarter-over-quarter comparisons tend to be less meaningful. When you look year over year, those effects balance out. That's why the year-over-year comparison carries more weight. So, as we ramp up in the juggernaut — and on Slide 32 we discuss the juggernaut, which comes up nearly every quarter — we're playing the long game. Here at Park, we don't manage the business around a single quarter, even though it might surprise you how committed Park's team is to producing exceptional results for you each quarter. I simply want you to keep that in mind; but honestly, if we were focused on the quarter, we never would have entered aerospace in the first place. That was a long — that was a call made by somebody thinking very long term. Not 1 year, not 5 years, not even 10 years; so that's just one illustration of how Park takes the long view; and if we managed our business quarter by quarter, we wouldn't have moved forward with our $20 million factory expansion either. Let's go a bit further, at the top of Slide 8 — I think you need to look at the annual sales history, because obviously we don't require the expansion to support our great business levels. Let's return to Slide 6. If you compare revenue for 2024, which came in at $56 million, against 2020, when we did $60 million, it's clear the growth happened back in '20. Reaching $56 million didn't require any added capacity, since we'd already hit $60 million in 2020. You could say we're carrying the full set of sector costs that were put in place to handle business volumes back in 2016. Those additional expenses are there because we can see what's ahead, and we refuse to fall behind the power curve. Turning back to Slide 8, it was plainly necessary for the juggernaut, the plant, the new plant. On top of that, we're bringing on staff for our new factory expansion and getting ready for what's coming. Our efficiency has taken a hit — my apologies for that; we'll bring on more people and increase output in factoring. The upside, though, is that the new factory lines should eventually deliver greater productivity — running faster and more efficiently than what we have in the current plant. That stands to reason. The earlier lines were engineered back in 2007, or thereabouts. With these new ones, we're able to apply everything we've learned across the past 15 years, which lets us design them to be far more efficient and far more productive. Once we scale up at the factory, that should give a solid boost to the bottom line. On top of that, we're absorbing an extra $1.3 million in annual depreciation tied to the expansion. Naturally, those charges don't hit EBITDA. But here's the thing — they're looking for growth, otherwise they won't affect EBITDA. What they will affect is gross margin, and depreciation is part of gross margin. Using fiscal '24 sales as the base, that works out to about 2.3% on gross margins — 2.3%. So how do we arrive at that? Go back to Slide 8 — my mistake, Slide 6 — where gross margin was 29.5%. What we were trying to show is that you could just add that 2.3% on top. Even without the new factory, that's the depreciation alone. Beyond that, we're also taking on additional overhead from the expansion, and that's simply a fact. Utilities, insurance, anything else you can name. Every one of those items affects both EBITDA and gross margins, and the expansion is the root cause of all of it. Now let's turn to Slide 9. We're also increasing our personnel expenses for juggernaut; equipment and factories aren't the whole story — you need workers. Workers are absolutely necessary. At present, our headcount stands at 126. Our hourly headcount — expenses, I should say — already runs about $800,000 more annually compared with the same time a year ago. That's not going away. It's not a short-term thing; it reflects the additional staff we've brought on as well as some wage inflation. We've just approved hiring five more people for the manufacturing lines and the new factoring. And even that is just for now — it's not where this ends. A great many hires are needed for the juggernaut.
Brian Shore
executiveWe've raised the number of authorized employees, for the time being, from 133 up to 138, in order to scale up our staffing and the associated costs we have to carry for the juggernaut ahead. On productivity — the way we track it is sales value production, meaning production split by hours, the hourly hours actually worked; that covers every airline, so both indirect and direct; it's going to dip for a while. That's simply how it works, yet in the end it will flip back strongly in a favorable direction once production scales up. What matters most, however, is being prepared for the juggernaut that's coming, and we are. Every one of these steps is needed. So, as I said, this differs from the analysis around Q4, where specific special items had an effect — when you look at the fiscal year figures, it's more a component of our plan, what we intended and planned to do. Let's move ahead to Slide 10, Park's balance sheet, cash and cash dividend history; we carry zero long-term debt. At the close of this fiscal year, Q4 this year, '24 Q4, we reported $77.2 million in cash and marketable securities. But keep in mind, there's $9.3 million in remaining transition tax installment payments owed through June '25. And Matt just informed me that $4.2 million of that gets paid next month. When you get to our balance sheet, you're going to see that cash took a hit. There are two additional payments coming in June of this year, and then one final payment, which lands in June of 2025. So that's a factor you'll probably want to keep in mind. Turning to our cash dividends: Park has delivered 39 straight years of regular quarterly cash dividends without interruption. Throughout that entire stretch, we never missed a dividend or reduced the amount. We're now approaching the four-year mark. Since fiscal year 2005 began, Park has distributed $594 million in cash dividends, which works out to $28.975 per share. For a small company like Park, $594 million is an enormous sum of money. Honestly, that seems like a huge sum coming from Microsoft. I can't really speak to Microsoft's situation, but for a smaller outfit like Park, that's an enormous amount of cash, in my view. Moving to Slide 11. What we do consistently is walk you through our five biggest customers in alphabetical order — aerospace, which connects to the Lockheed Martin Patriot program, matching up with the names in those photos. Patriot, the PAC-3 missile, something we've discussed many times before. Aerosphere, which ties to the Gulfstream G280. So Aerosphere acts as a representative distributor for Israel Aircraft, and they build some of those Gulfstream planes under contract for Gulfstream, such as the 280. Kratos — we'll circle back to them. I believe that comes up on the following page. Middle River — there were many cases we might have picked, but we went with the COMAC 919 and the Nordam group, which is the Boeing 737, 700. What this involves is the WeatherMASTER Radome, and nobody else makes that using our materials. Then we move to Slide 12; here we want to express real gratitude to Kratos. They rank among the top five, yet Kratos gave us this gift. Nobody had ever handed me a present like that. I mean, that object is an aircraft. It's a plane that genuinely flew missions, and they passed it along so it could be shown off or placed at our factory. It's a stunning, stunning aircraft — an unmanned one. I mean, I'm simply overcome when it comes to finding words, and even right now, I'm at a loss for what to say. So, we snapped a small photo and sent it as our thanks to Kratos, but at this point we're doing that thank-you in public. So, let's move ahead to the slide; this is a plane, an aircraft, that the Air Force flies. So, let's move ahead to Slide 13. Here are our pie charts. What's interesting about '24 — '21 was the year of the pandemic. So, as you can tell, commercial aircraft was flat on its back, and that explains why it's so low. Everything else across the remaining years is really steady. To be honest, I was surprised commercial aircraft held up as well as they did in 2024. During Q2 and Q3, we saw those pretty big burn-downs on MRAS, which you mentioned. I think we also had some extra commercial aircraft sales, and that helped us stay steady. Now let's go to Slide 14. Elena puts this together every quarter to highlight a few interesting, lesser-known niche military aerospace programs — some interesting military programs. This is our projected 2024 military revenue, split out by market segment. From our standpoint, radomes, rocket nozzles, and drones are niche markets for us. We also see aircraft structure as a specialized area, even if other companies might view it differently. So when it comes to markets, what we have is Arduino's next-gen short-range interceptor, essentially taking the place of the Stinger missile — you're likely familiar with that one — plus the Boeing EA-18G Growler; for that initiative, we supply radome materials. Then there's the Northrop Grumman LGM-35A Sentinel, known as GBSD, or Ground Based Strategic Deterrent. That name is quite something. Previously it was called ICBM, serving as the successor to the Minuteman 3. We provide materials and components for this effort. So at this point, it's more oriented toward — it's meant for nuclear warheads. We also provide radome materials for the McDonnell Douglas F-15 Eagle program, and structural materials are used in the Boeing P-8 Poseidon, the aircraft replacing the Ryan. Moving on. Let me discuss Slide 15 — apologies. Let me discuss supply chain difficulties. Previously, I've been told this repeatedly — it's come up so often — that yes, supply chain issues are resolved, or they will be shortly, no matter which year it is, and we discover that they aren't. I've lost track of how often I've gone through disclosures from other publicly traded firms that point to — that put supply chain issues front and center as the main explanation for why their results fell short; as far as we're concerned, that's basically what a supply chain issue amounts to in any case. What's behind those issues? Why do they keep hanging around? For us, trouble in the supply chain is fundamentally trouble with staffing. And our staffing trouble has been resolved. Doesn't that get right to the core of it? If the personnel aren't there, you can have all the machines and equipment in the world, yet you still won't reach the production goals you're required to reach, since no one is on hand to perform the work. We continue to hear people say the jobless rate really isn't so bad. So what exactly is happening? One thing worth thinking about: it's been reported widely that 7.2 million able-bodied men — just men, ages 25 to 54 — have completely exited the labor force and aren't even searching for jobs. My guess is many of them departed during the pandemic. Even with help wanted signs all over the place, what's going on, and I don't know whether you have a view on this. I heard about this fellow Charles Payne, he's a — how would you describe it — financial news guy. He said he's acquainted with a man who is 60 years old and not employed. Apparently plenty of people have never held a job their entire lives. The government is obviously enabling this situation. I want to understand what's driving it. Yet we're talking about real people—none of this is a joke. Their lives are getting destroyed. Picture someone spending two years sitting around on the sofa, eating potato chips and watching Oprah, or whatever fills their time for that stretch. When they try to go back to a job, it's impossible. Whatever sharpness they had is gone. That's a real tragedy.
Brian Shore
executiveAlright, that's likely the kind of thing you're expecting regarding our investor presentation, though from time to time I'll share my perspective on a topic like that. Moving ahead to Slide 16. What does this mean for Park when it comes to supply chain problems? Well, we've discovered approaches to handle supply chain difficulties through improved planning, deliberately holding larger inventory amounts, and giving suppliers extended lead times; however, these problems remain a significant obstacle for us and they take up a great deal of our time and energy. So yes, we are coping with it, but it requires substantial effort. But what do the persistent supply chain difficulties mean for the aerospace sector overall — perhaps Park can handle it with considerable effort. Yet the aerospace industry keeps battling supply chain problems; such obstacles are affecting program ramp-ups and the launch of new programs. Demand exists, but the industry is simply not meeting the level of demand. Where is this headed? Is a resolution anywhere on the horizon? I have no idea. Do you know what it is? If there is one, what might it be? I don't know. Perhaps you could apply my deals. I'm not joking. I don't know. I have no idea what the answer is. On to Slide 17. This is something we won't spend a lot of time on. You see this slide from us every quarter. It covers firm pricing for GE Aviation Jet Engine Programs under a pricing LTA requirements contract running from '19 through ‘29 with Middle River Aerostructure Systems, MRAS, which is a subsidiary of ST Engineer Aerospace. So we always need to make this point clear — it confuses people, since all these GE entities are involved. Actually, the title on the slide reads GE Aviation engineering programs, and each program shown below it is a GE Aviation program. So how do they connect? The connection is that Middle River operated as a GE Aviation subsidiary on these programs, and then GE divested it. I think these days we should be saying GE Aerospace — my apologies. About half a decade ago, if my memory serves, GE divested MRAS to ST Engineering, a prominent aerospace company based in Singapore. Even so, MRAS and Park continue backing those same programs just as they did during the period of GE Aviation's ownership. I'm not going to revisit those programs that we talked about quite a while ago; instead, I'll simply point out one striking image. The 747 initiative got scrapped. A number of spare parts were sold by us. This picture really appeals to me since it shows how big those missiles appear compared with the sky visible in the background here. And every one of those cells is pure Park content. Turning now to Slide 18. Indeed, we're aware that the initial check item needs to be addressed, and we do so every quarter. The next thing to check off is the containment wrap for the fan case, or the GE9X, which we make using our AFP composite materials. We also talked about that as we're just now entering the quarter. But here's something fairly new — MRAS is in the process of qualifying three product forms of Park's proprietary film adhesive formulation. Turning to the next subject, the MRAS Park LTA — that's the LTA referenced on the slide earlier — and back in '29, it was recently revised so that three Park film adhesive product forms are now included, covering both composite bond and metal bond. That's a fantastic arrangement, since this film adhesive line came about through a joint development agreement involving GE and MRAS, and it's genuinely terrific when a product we create moves straight into qualification on programs of real importance. The tricky part is that you come up with something new at the R&D stage. It's an excellent product. So what I'm getting at is it's sort of threefold in the sense that, on the far end, nobody — you have to land a program, I think, 20 years. Not 20 years — 20 seconds is what separates the moment our product is done from when it heads into qualification. There's a rather distinctive situation involving that particular customer — for instance, a program agreement that MRAS and STE require. Work on that agreement is ongoing right now. We've gone over this before. As for when it becomes effective at Park, I'm not certain what to rely on. Let's turn to Slide 19. We'll go over a handful of the jet engine initiatives from GE Aviation. Let's start with the biggest one of all, the A320neo. There's a huge number of A320 aircraft in Airbus's backlog — 7,170. I'm not sure if that's something you knew about. What an incredibly large number. And here's what's problematic for Airbus. Say their current production pace is around 50 each month. That works out to six per year, right? So, what does that total up to in terms of years of backlog—roughly a dozen years? That means placing an order for a new one would involve a twelve-year wait. That's not useful; their goal is to sell many more of these, so they really have to shorten lead times. That's why they're working so hard to hit seventy-five a month, which comes to around nine hundred a year. So I run the numbers, take 7,171 and divide it by 900—that's an improvement. It's not going to happen overnight, but it's much better; that's their motivation. And as I see it, you can hear other views from other folks. My belief is that Airbus is extremely committed to reaching that seventy-five per month. Also, at their yearly shareholder gathering on April 25 — actually, correction: their first quarter investor call took place on April 25, while the shareholder meeting was April 10. During that call, they reiterated their objective of reaching a production pace of 75 A320 family jets each month by 2026. Possibly late in 2026, I'm not certain, but sometime during that year. So how has the ramp-up progressed up to now? This is despite everything happening across every region, along with constraints affecting the supply chain — supply chain issues, that is. Let's move ahead to Slide 20. Actually, in my view, they're performing quite well — quite well indeed. Here's how many A320neo fuel aircraft Airbus handed over annually, listed by calendar year. As you can see, those figures keep climbing. They get to '19. They reach a high of 561, and then suddenly the pandemic strikes, causing them to fall back down. Take a look at '23. That's 571 versus 561. So in '23, they actually went beyond the production levels seen before the pandemic for the first time. So during '23, for the first time since the pandemic started, Airbus managed to bring A320 production and delivery rates back to pre-finance levels. That's a major milestone and a really impressive achievement for Airbus — congratulations to them, because it happened despite all the supply chain problems that were present the entire time. We're notwithstanding them. In April '24, year-to-date, Airbus delivered 167 airplanes. I realize it's been four months, however, during both March and April of '24, they handed over 51 aircraft. So please don't let yourself be thrown off, since the start of a year tends to be sluggish and then things build toward the finish; that pattern isn't something Airbus is behind. Speaking purely for myself, this is only my personal view, I have no way to confirm it. That's just my take. My hunch is that across this year they will likely average somewhere around 55. Again, that's only what I think, and it isn't — Airbus hasn't stated what their plan for this year will be. Their projection is that as of the close of 2025, and again as of the close of 2026, they expect to be operating at a rate of 75.
Brian Shore
executiveMoving to slide 21. Right, we've already addressed that one. Given that enormous backlog, Airbus would be building A320neo planes at 75 a month right now, were it not for limitations and constraints in the supply chain. Once more — what happened to that narrative that supply chain troubles are behind us? I'm not buying it. Now, what about Boeing? In what way do Boeing's difficulties and struggles with the MAX affect the prospects for the A320neo family, and the single aisle market share as well? In my view, it hinges on whether Airbus is prepared to attempt pushing that figure beyond 75. There's plenty of reporting out there about it. They're considering it, yet no announcement has been made. So then, what about the engines for the A320 aircraft? That's a key question for Park. As a recap, the A320neo comes with two approved engine choices, specifically the CFM LEAP-1A engine, the program Park is involved in, and the Pratt engine, the PW1100G engine, a program Park is not involved in. So, that second bullet item has just been covered. On the third bullet item, per the May '24 edition of your own engine news, our buyable monthly edition, CFM LEAP-1A's market share for engine orders for the 20 neo family of aircraft stands at 63.1% as of March 24. Slide 22 — at a delivery rate of 75 A320neo per month, a 63.1% LEAP market share works out to 1,136 LEAP engines per year. What does that mean in value for Park? We'll get to that on Slide 32. At present there are 8,132 firm LEAP-1A engine orders. That's a large number of engines. Were those firm orders valuable to Park? I don't know. You could look at Slide 32, but roughly a quarter $1 billion, I'd guess. No — that isn't precise, since this is Slide 32; we're assuming pricing of 25 to 29. So, keep in mind that pricing won't apply for the ongoing months. It also assumes film leases run program, not on it yet, we're qualifying. But another thing is that our pricing after 29 is clearly going to be higher; that's what MRAS and Park expect; so, we haven't factored in that some of these engines will be delivered after 29; and we don't have a contract after 2019. So, I suppose you could say, well, maybe it's not 29. My opinion is that it's highly, highly, highly, highly likely we'll be supplying this program for a long time after 29, along with all the other MRAS programs. One of those firm orders with the Park — we just talked about that. There are widely reported serious durability issues with the Pratt PW1100G, and we've discussed this before; so, all these issues — in fact, market share between the Pratt and Leap engine, an interesting question, we don't know. And perhaps the answer resembles the Boeing question regarding Airbus A320 generally. Is LEAP something Can is ready to build, or would CFM prefer to attempt manufacturing additional LEAP engines? I already know what the response is. In the meantime, CFM is shipping new LEAP-1A engines featuring a redesigned reverse bleed air system, which delivers even better durability. So you can see this contrast: Pratt is dealing with quite significant durability problems while CFM keeps advancing and enhancing durability. Moving to Slide 23, we have the A320XLR version within the A320 family. We've discussed this, and each quarter we've reviewed it, inspected and serviced at the close of '24. Boeing has no response planned. Airbus holds 550 orders for this plane, a potentially significant program for Park. Let's turn our attention more toward the 919, though. The 919, this is Slide 23, powered by CFM LEAP-1C Engines. For the 919, that's the sole engine option. It isn't like the A320, where two engines are certified. COMAC intends to reach a capture rate of 150 919 aircraft over five years. When you check our juggernaut slide, we're projecting below that figure. COMAC has been reported to have 15 under orders. Pinning that number down is genuinely difficult, but it's one report I came across. China Southern recently placed an order for another 100 airplanes, moving to Slide 24. COMAC has just delivered its sixth unit. COMAC is said to be growing its 919 production line. This matters a great deal. Now consider what was recently reported: China's CAAC, which is similar to the China FAA, is targeting 2025 EASA — that's the European certification body — for the 919 aircraft. That is an extremely, extremely significant development, since the assumption was this would be a China-only airplane. It's obvious that China and COMAC aren't thinking that way at all; they intend to challenge Boeing and Air Bus in the single aisle space. This might become a major program, an important program, an important program for Park. And as I mentioned, they're expanding production lines, so to me these things carry weight. The final item is the ARJ COMAC, ARJ21 Regional Jet. We don't devote much time to that one. We'll accept it — 35 aircraft reported newly delivered across '22 and '23. We'll return to them later. The remainder of the program is progressing well, a solid program for Park. Continuing on Slide 25, the 777X aircraft with GE9X engines. We've gone over this for many quarters now, anticipating certification in '25. Certain people doubt that, but we'll find out. I'm referring to the airplane. We anticipate roughly $1.7 million from this program during this calendar year '24. And, we'll see. There could be somewhat of a gap once we finish with the crude production, just as there may be a near period of waiting for the program to begin really ramping up. This next check item, we've carved that many times, and the next check item, Boeing S481 open orders for this airplane. Moving on to the next item on our list, and the 777X orders keep rolling in quite well, despite Boeing's continuing difficulties; plus this could be a really important program for Park. So we're keeping our fingers crossed for it. Slide 26. All right. What's this about? Here we have GE Aviation Jet Engine Program sales history along with forecast estimates. Going through the entire history, Q4 of '24 in the latest quarter, 7.6 million. My recollection is we'd projected 7.5 million, so roughly in line with that figure. For all of '24, despite a solid Q4, it comes to just 21.1 million; that's due to those burn down quarters in Q2 and Q3. I'm referring to fiscal '24. So, $21 million, that's a low figure, not a good one. versus the year before, the previous year $23 million to $22.3 million; so we had predicted $6.3 million for that's actually a strong figure. You look at the $7.6 million in Q4, but I suppose it's a decent figure. Yet it's truly critical that we now read this, the footnote right here, closely. The amount is completely, that amount is completely booked for Q1.
Brian Shore
executiveHere's the outlook, though Q1 GE Aviation programs are going to take a hit from an unspecified level of storm damage at the company's facilities that was reported on May 22, and the Company relocated. We'll circle back to that once we get into the Park forecast more broadly. So for now, let's continue. Slide 27, burn downs, aerospace industry management, the day of reckoning that can't be avoided. So, inventory burn downs are something we've lived through. You're likely sick of hearing about them; we're certainly sick of discussing them. At some point we talked about the very odd inventory management practices in the aerospace industry. I think the term I used wasn't "odd" — in an earlier version of my remarks, I went with something a little more gentle. My point is that you're likely tired of hearing about these matters, and believe me, so are we. And we've known this all along: when odd inventory practices get burned down, that can absolutely create serious, even severe, distortions and disruptions for business planning and expectations. Yet ultimately, sources and disruptions are, of necessity, temporary and short-lived. Why? Because at some point, end program demand has to take over. I mean, there's no way around it. It's just your math. Let's move on to Slide 28. At some point, Nicole, that moment we can't escape will come. Eventually, what the aircraft and the programs require is going to take charge and set the pace for how much we do and what we do. It's bound to happen — there's no way around it. And here's the real point: from what's reaching us right now, I mean very recently, that moment is coming pretty quickly, one way or another; what we picked up not long ago points to '25. Calendar years is what we mean. That's a sizable step up for the A220 program, a sizable one. We'd been kind of stuck dealing with burn downs and inventory adjustments, and what we're hearing now is that our inventory has been burned down. There's none left. We don't want our inventory. So, look, when it comes to our customers, the amount of our product sitting in their stockpiles is really quite minimal. There's not much left for them to draw down at this point. Yet what we're now picking up on is that they've got certain completed structures on hand, or perhaps they're doing whatever it is their own clients tend to do — so that's a bit frustrating, honestly. Still, these customers of ours have received instructions to brace themselves for a significant increase come '25, and they've likewise been informed that by '26 — the tail end of '26 — Airbus is going to reach that pace of 75 airplanes per month. So my sense is that the moment of truth here isn't too distant. We'll find out. The upside, though, is that even without knowing the exact date that reckoning would arrive, we were certain it was on its way; from our standpoint, there's no avoiding it. Nothing can halt it. Picture a locomotive that nothing can stop — a freight train. The fortunate part is that here at Park, we didn't sit around waiting. The fortunate part is that we were already gearing up ahead of that reckoning, gearing up ahead of the juggernaut approaching us. Let's turn to Slide 29. Here it is. Park Financial, both the historical record and our projections; the history portion we'll skip. We've essentially covered fiscal year '24 Q4 in general terms already, so those numbers have been addressed. Let's turn to what we had projected for the first quarter. That projection was put together before the storm hit, and it's genuinely unfortunate, because Q1 had been looking like it would be a very solid quarter. What's the reason? Mostly because none of the things that dragged down Q4 were affecting Q1. Our production plans called for output that was at least as high as what we expected to sell. And to be honest, I thought both sales and EBITDA would come in at the upper end of the range for Q1. So the storm could not have picked a worse moment. Q1 was set up to be an excellent quarter, but we should go ahead to Slide 30 and walk through that big footnote. The sales estimate for Q1 of '25 assumes that all Q1 sales are fully booked. Our projection for EBITDA in the first quarter of 2025 depends on those sales being fully booked. That said, Q1 sales and EBITDA are going to be reduced by some amount we can't yet quantify, following the storm damage that the Company described in a news release on May 22, 2024. Even so, as we've said, some portion of fiscal Q1 sales — we don't know how much — will shift over into Q2 as a result of that storm damage. The Company doesn't anticipate losing any business or sales from the storm damage. Let's go a little deeper on this. It was a pretty significant event for us, but our team did a truly outstanding job getting the plant operational again. Every hot melt line in both the old and new factory is running at full capacity, along with the tape lines and the film lines; we're on the verge of restarting the solution treaters. No, I'd call it a pretty amazing effort from them, pretty amazing effort. But those were, the figure I'll simply estimate right now somewhat, yet my estimate is the top-line will land in the 13s, not 16s. So a huge, huge hit to the quarter; typically we make a great deal late in the quarter, ship a great deal late in the quarter. And we lack the inventory, so we could only sell whatever we made, and making wasn't possible. Regarding what that facility was capable of turning out: during the previous week our income statement was fairly unattractive, because output was almost nonexistent even though we kept the entire workforce on. Everybody got their full wages for that week. What we did was call all of them in so they could assist with cleaning up and similar tasks. Even so, things are bouncing back nicely, though Q1 is going to be chaotic. It's unfortunate, but these situations arise. In my opinion, the team performed admirably. The thing I care about most is that no one sustained an injury — to me, that was paramount. So let's move on to Slide 31. An update and financial outlook for the Park and GE programs. We don't need to go through the whole thing. Clearly, we've been over it, more or less each quarter. One item, though: when exactly do the outlooks land? That's something we've basically already addressed. I'm not certain, but the juggernaut is on its way. Nothing can halt it. It had better be prepared. Perhaps it arrives soon. Perhaps not within this calendar year, but my guess would be the following year. Which means calendar '25. We'll find out; so, moving along to Slide 32; here's the juggernaut slide, and we won't dig into the specifics since we've already covered it 3x or 4x. A few things I'd like to note. When it comes to the A320neo, we're working with an assumption of 1,080 units. That figure is based on 75 planes being built each month, and it also assumes the LEAF engine captures 60% of the market. You may remember we talked about something around 63.2? I'm not sure of the exact number. So what we've decided is to lower it to 60, and the reason for doing that is we won't have to update this every quarter, since that market share is going to move each quarter. This way, we'll just use 60 — a somewhat lower number, 60%. And that means we won't need to change the presentation every quarter.
Brian Shore
executiveWhether that call was right or wrong, I can't say, but it's the path we took. Footnote four shows this clearly. Another adjustment involved raising ARJ21, 72. As I mentioned, 35 airplanes went out the door in the prior year. The year before that equals, clearly, 2 engines. To 70 engine, 2 engines for each airplane. Every one of these programs involves airplanes with 2 engines; and, well, we figure a few additional spares are needed; that's likely still fairly conservative in there. They're continuing to work toward ramping up somewhat. 919, as you recall, COMAC stated they'd reach 150 units annually, 4 or 5 years. That works out to three hundred engines rather than two hundred, so on the whole we see it as relatively conservative. Regarding the GE9X assumption, we're not going to disclose the unit count, though honestly, in my opinion, it's fairly conservative. Now, the juggernaut slide. Turning to Slide 33. We'll go through it fast; we just updated this slide, the financial outlook, using growth projections for programs that were sole source qualified. The footnotes give some explanation of the math, but we start with our base case for fiscal '24. And then we have the incremental program sales — I mean, fiscal '24 only included roughly $21 million for us. So, a significant amount of incremental GE program sales, 15 million. We chose to drop mention of particular programs, since we felt uneasy. We felt. We're disclosing for customers and perhaps they'd prefer not; so, we're combining everything into a single figure, 15 million incremental sales versus 7 million a year ago, non, this covers non-GE programs. Twelve months back, it was about 35 million. So we expect growth of 20% over some 3 or 4 year period. We view that as a reasonably cautious forecast. Other than the 4 million, the rest is just calculation. I should mention that when we previously did this, the figure was around 2.5 million. However, this is based on 11 million EBITDA, which is an extremely low number considering how our costs climb as we scale up the factory and scale up our costs to prepare for the juggernaut. Therefore, it gives us a rough EBITDA projection of 35 million. All the footnotes appear on Slide 34, and I'll pass over them. It's simply arithmetic. But truly, if you have any questions, let us know. Slides 35 and 36 were part of what we showed you for Q3. My understanding is that they match this new, significant manufacturing effort exactly. The only addition is the last bullet on slide 36, covering manufacturing project initiatives that we're actively reviewing and discussing with the customer. The point we're making is that this project is moving along quite actively, and the customer is very motivated. As a result, we think there's a solid chance it will in fact come to pass. As the two slides make clear, this is a sizable project. Let's move ahead to slide 37. Like I mentioned, we held a small gathering at the factory to mark our 70th year — that's the photo in the upper left — where I gave a short presentation on Park's history for the employees, talking about what makes this company special and the truly remarkable achievements we've racked up over the decades. What I told them is that whether you've been here just seven days or one month, you're still part of the Park family, and you get to share in those accomplishments and all those amazing things exactly the same as anyone else. Upper right — so once the presentation wrapped up, since I was the one presenting, quite a few employees approached me afterward and had some really kind words to share. Someone once shared with me—and I can still recall his exact phrasing—that Park's held tremendous significance for him and his loved ones. He expressed gratitude toward me for it. And honestly, operating any Park business brings plenty of unusual situations and nonsense you have to handle, yet moments like that give me a real sense of purpose. Over at the top right area, a young fellow approached, introduced himself as Javaris, and mentioned that he works as a treater operator. He'd only been on the job for seven days. I responded by noting he must be our most recent hire. So I told him, "Alright, Javaris—you and I, along with everyone else, are going to cut the cake together." During our R&D gathering, we enjoyed a lovely cake and sliced it as a group. The image underneath speaks for itself—it's simply a team shot of our staff, specifically those located in Kansas. Sadly, Mark couldn't join us, though everyone else you'd typically associate with Kansas is present. I'm positioned in the rear row since the tolls team, or rather, Corey arranged the photography. He mentioned that the tolls group had to stand at the back. So, if you spot me, give a shout—I'm on the back left. Operator, that wraps up what we prepared. If anyone has questions, we're glad to take them.
Nick Ripostella
analystAnd Brian, I'm relieved that, like you mentioned, nobody was injured by the storm, and thank goodness it wasn't any worse. I've got more of a big-picture question for you. With the programs you're involved in, what lies ahead, and the possible new opportunities, I'm curious: do you expect Park to remain a company with no debt? Or might there come a point when you'd think about taking on borrowed money? The reason I'm asking is that if the share price weren't capturing the potential, perhaps you could act more aggressively in buying back stock; I'm not suggesting right now, but if the stock fails to capture the bright future, remains at this level or drops further, would you think about acting more aggressively and perhaps adding leverage?
Brian Shore
executiveThe share price, I mean, I track it when we track it. I mean, it's difficult to determine why it may be rising or falling. I agree with what you're implying, that it certainly; so, the share price, I have no idea why it moves up or down slightly, but I definitely agree with location. That doesn't capture the value of the Company. And I suppose the way I think about it is that, in the end, you'll have to. And I believe, in the end, as the numbers work out, the numbers we're discussing, that the world, the market will acknowledge the value of the Company. Until that point, I suppose, we'll simply do everything we can to clarify what we're doing, and some folks will get it. Maybe some folks won't agree. I don't know. When it comes to taking on debt, Nick, at this moment, we don't see a need for that. We finished our expansion. Since you already know, we funded that purchase, and just that on its own is going to drive what we refer to as the juggernaut, a really substantial jump in revenue. Turning to the second initiative we've been mentioning, my recollection is that we put the figure at somewhere around $6 million to $10 million for capital, though we never got into working capital. What we were describing was equipment, the facility, those kinds of items. Working capital, on the other hand, might be sizable — possibly in the neighborhood of $15 million. That should give you a little more to work with. Would we be willing to borrow? We believed there was a valid justification for taking that step, and an opportunity existed that mattered enough to warrant borrowing. So overall, carrying debt has never really been our style. Holding cash has always been our approach rather than taking on obligations. We've consistently kept cash on hand, and that makes us comfortable. And you really appreciate having it when you run into something like — what's the term? — a black swan event such as the pandemic. Still, we aren't so rigidly against debt that we'd rule it out entirely if we judged the situation to be compelling enough.
Chip Rewey
analystCould you expand a bit on what might be recoverable from the storm? You mentioned bringing on additional staff. What portion of that could realistically be recouped in Q2 and Q3, on both the top line and the bottom line? My guess is that a chunk of the profit just gets consumed since you need to keep those employees, which makes sense. Then second, regarding that added opportunity you brought up around center opportunities — is there any timeline for when you'd expect a bid or possibly an award?
Brian Shore
executiveLosing business isn't something we anticipate, and every piece of business we were meant to have — every sale, to phrase it differently — that slipped away in Q1 will land in Q2, not Q3. On the profit side, things look somewhat different. Suppose, purely hypothetically, we land at $13.5 million for Q1 when our expectation was above $16 million. The bottom line outcome will differ considerably compared to a scenario where $13.5 million was the plan. It was roughly level throughout the quarter, then we were tracking toward $16 million, and then during the final two weeks everything dropped to zero. So a certain portion of profit won't be recouped, even if no sales are lost. Every sale that was lost in Q1 will show up in Q2. I'm not sure whether that addresses what you asked, and I can't put a number on it. I try to quantify it — well, perhaps I didn't. If I didn't, my intention was to. So allow me to do so now. On the sales side, we figure we'll probably land in the 13s versus our plan of 16; so we'd consider that over $2 million in sales is lost for Q1. That entire amount will shift into Q2. Estimating the profit piece is far harder for us right now. Even at the close of the quarter, the situation remains quite fluid. Turning to the new project, this isn't about an award. It isn't a case where we're bidding against others. I simply want that to be clear; however, the customer requires that project operational by '26. So that's roughly the timeframe you could keep in mind. That comes from their side, not ours. That isn't much time in reality, since plenty of work remains to reach that point.
Chip Rewey
analystAnd to build on that point — if you aren't in the running for it, is this business you believe you can win, or is it something you're simply hoping will be handed to you? And should they be looking for deliveries in '26, when would you have to begin committing any capital — toward the end of this year, or at the start of next year? Then on the storm insurance — regarding the storm, did any coverage exist of any type, whether for capital or for business interruption?
Brian Shore
executiveYes. We carry insurance. The wind damage policy — it falls under wind damage — carries a deductible that's pretty high. And we chose that on purpose, because when you consider insurance, we hold cash, we've got a solid balance sheet. Our thinking is about the cash that comes in. We don't want to take a position against the banks; we deliberately set our deductible at a pretty high level, reasoning that if we lowered it, clearly the premium would climb substantially, and in the end the insurance carriers come out ahead, since they always do. So the deductible is pretty high, yet we still anticipate recovering something from insurance. Business interruption coverage is also part of it, though right now we don't have figures, since quantifying our loss is extremely hard — not just regarding this interruption, but also the repairs at the facility. As for the roof, it's currently intact and secure, but it will still need replacing down the road. So, on the question about that project — this is a customer we're extremely close with, and I'm not free to say which one. They've been speaking with us exclusively, at great length, about how it would get done. Their timing is '26. From where they sit, that's what they require. I have to be cautious. This project is highly confidential, so I'd rather not say too much, because I don't want to let it slip. But yes, I mean, that's a good question. My sense is that next year, we'd have to begin ramping up the capital so we could satisfy that requirement by perhaps the start of next year. It might still not come together, but I'd say there's a strong chance it will, because this customer is highly motivated, and they aren't discussing it with anybody else.
Brian Shore
executiveThanks. Brian Shore here, obviously. I really appreciate you tuning in. Enjoy the rest of your day. Should anything else come up that you'd like to ask about, don't hesitate to give us a call. We'd gladly do our best to assist with those. Take care this afternoon, and we'll be in touch before long. Thanks.
Operator
operatorThat wraps up the call for today. At this point, you're free to hang up your phones. We appreciate everyone for joining in.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.