Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary

July 16, 2024

New York Stock Exchange US Industrials Aerospace and Defense earnings 44 min

Earnings Call Speaker Segments

Brian Shore

executive
#1

Thanks, Alicia. Brian here. Glad to have everyone joining Park's Fiscal 2025 Q1 Investor Conference Call. Alongside me, like always, are Matt Farabaugh, our CFO, and Mark Esquivel, President and COO. Our published earnings release for the first quarter came out following the close. Take a look at it when you can. Inside that earnings release, you'll find instructions for accessing the presentation we're about to walk through; it's up on our website too, should you prefer that option. The previous investor call, our Q4 call, happened just six weeks back. Yes, six weeks ago. Normally there's a three-month gap between these calls, so today we'll concentrate mainly on what's new and what's been updated. We'll try to avoid rehashing too much from the Q4 call. Naturally, once the presentation wraps up, we'll gladly field whatever questions you have. Moving to slide two. The forward-looking disclaimer. Should anything about that forward-looking disclaimer language be unclear, just let us know. Slide three. Here you'll see a short table of contents. Q1 investor presentation. Following that, supplementary financial information. Like always, we make this available to you, though we won't walk through it or review it on this call. If questions come up about it, though, let us know. We're highlighting the James Webb Space Telescope here. As you're aware, that James Webb was built using Park's proprietary Sigma Struts, and it truly is an amazing instrument. Very recently—only a week or two back—it identified the farthest and most ancient galaxy discovered to date, existing just 290 million years following the Big Bang, which is extremely early. The Big Bang is believed to have taken place roughly 13.8 billion years ago. What matters most is that this shouldn't be possible. Galaxies like that ought not to be present so soon in the universe's evolution. So the James Webb—thanks to the James Webb—is really causing most of our understanding regarding the universe and how it began to be completely overturned. Pretty fascinating. Moving along to slide four. Our results by quarter for fiscal years 2023, 2024, and 2025. Q1. Alright, so you've probably already seen the news release. Sales came in at $13.97 million. Gross profit was slightly above $4 million, with a gross margin of 29.3%. On the EBITDA side, Adjusted EBITDA landed at $2 million, or $2.6 million. I'd like to point out that during the previous quarter, we addressed several factors impacting our earnings over the longer term — things tied to scaling up our operations, what we refer to as a Juggernaut, and getting our new facility up and running. We won't revisit all of those items again, but I did want to make sure you're aware of them. Depreciation tied to the new plant comes to about $1.3 million each year, representing approximately 2.3% of gross margin. Since depreciation is partly embedded within cost of goods sold, it truly does influence gross margin. Of course, as is widely understood, by definition it has zero effect on EBITDA. Let's turn to slide five. Now, slide five. What did we communicate about Q1 during the Q4 investor call on May 30, which took place six weeks ago? We projected sales between $15.75 million and $16.25 million. And as I noted earlier, actual sales reached $14 million. That looks a bit strange, doesn't it? For adjusted EBITDA, the estimate was $3.25 million to $3.75 million, and that figure was our projection. We ended up with EBITDA of $2.6 million; so what happened here? As a reminder, the Q1 sales figure we gave on that Q4 call assumed fully booked sales for Q1, and the Q1 EBITDA projection rested on those same fully booked sales; so clearly, you can see where I'm heading. That said, the bolded language — and this wording comes straight from our Q4 call, so it reads a bit awkwardly — these are statements we made back in Q4. This may sound a little strange, but the damage from the storm to the company's facilities — with the amounts not yet known at that time — is going to impact our sales and EBITDA for the first quarter of fiscal year 2025, and that was covered in a company news release dated May 22, 2024. Once more, I'm saying this on May 30, and although, as the news release noted, a portion of Q1 sales that is not known will move out of Q1 and into Q2 as a result of that storm damage, we don't expect — or rather, we didn't expect — to lose any sales or business from the storm damage, and we still have no expectation of losing any. Alright, let's go to slide 6. Let's turn to the storm and what it damaged. We've learned additional details since then. On Sunday, May 19, around 8:00 P.M. local time, our Park's Newton, Kansas, locations were hit by powerful straight-line winds, reported to have reached 100 miles an hour. As far as we know, this was not a tornado, though straight-line winds can sometimes be more destructive than tornadoes. The best part is that nobody from our team was there when it struck, and there were no injuries. In that respect, the timing worked in our favor. It was probably just one evening out of the whole week — maybe a Saturday — yet at 8:00 P.M. on any other evening, a large number of individuals would have been present at the site. And inside that site, there are refuge areas — shelters designed for storms. However, had folks been outdoors, you know, going to and fro among vehicles at the moment a storm of this kind struck, the result might have been awful; we are incredibly lucky and blessed that things didn't play out that way. Unfortunately, then, the favorable element had to do with when it struck. The damage from the storm occurred just as the last 2 weeks of Q1 were starting. That's the downside when it comes to timing. Consequently, output suffered severe interruption throughout that closing 2-week stretch of the quarter, while shipments—which is to say sales—took a substantial negative hit across that final 2-week period; at this point, we grasp the sizable gap separating our projection and the actual outcome for Q1. Yet Park's team pulled off an amazing recovery effort following the storm and its destruction, and because of our staff, our sites returned to complete operation—using some temporary steps—as of June 3, 2024, which marks day 1 of Park's fiscal 25 Q2. That is merely 2 weeks following when the storm struck. So a truly impressive feat, in my view, regarding storm restoration by Park's workforce. Turning to slide 7. What did the storm harm? Look, I continue receiving inquiries regarding every bit of this, so perhaps portions of it seem familiar to you, maybe dull, yet we haven't actually shared these details, so I'm walking through everything now since I've gotten numerous, numerous questions concerning these various elements of the storm. What got damaged?

Brian Shore

executive
#2

Every one of the three buildings on our campus had roof damage, and those roofs probably have to be replaced. We got them patched up very fast on a temporary basis, and at this point the roofs are secure. A large number of specialty HVAC units sustained damage or were completely destroyed, and those will need repair. Some repairs are finished, or the units have been replaced. Until the replacements arrive, new units have been ordered. We've had temporary control of temperature and humidity in place. These HVAC units aren't only about keeping people comfortable — we are required to hold certain temperature and humidity limits in specific parts of the plant, the labs, and other areas of the plant where production actually happens. So, let's see where things stand here. Company cars sitting in the parking lot got damaged. Yeah, they weren't damaged where they had been, and they also weren't sitting where they'd been left. They got physically moved, you know, into other sections of the parking area. And the facilities took some minor additional damage, such as the R&D building and its, you know, roll-up doors — the garage door is damaged. What didn't the storm damage? That's probably the bigger question. Looking at the three campus buildings, the structures themselves held up fine — the only exception being that roof damage we discussed earlier. As for the production equipment, it all came through without a scratch. That's clearly a positive. The same goes for the production lab equipment and the R&D lab gear — the storm left them untouched. Now let's turn to slide seven. One thing I should note: every one of these HVAC units is mounted on the roof, and a number of them were literally torn off and thrown down into the parking lot, where they were of course destroyed. When our team arrived at the site, those units had plummeted from the top of the building down to the parking area. That was some storm. On to slide eight. What's the timeline for finishing all the repairs? Six months is a possibility — that's the longest it might take. I can't say for sure, but as we mentioned, every one of our production lab facilities has been up and running at full capacity since June 3, and that continues to be the case. What about insurance? That's another thing — people keep asking us this. Under the company's property insurance policy, there's a wind damage deductible provision of roughly $2.5 million. For fire, the amount is significantly lower, but when it comes to wind damage, that deductible is pretty steep. We chose this deliberately, since we could opt for a far smaller deductible, but doing so would drive up what we pay in premium — our annual premium. Regarding Park's insurance approach, our focus is on protecting against catastrophic events. If it's a smaller loss for Park—say $2 million or $2.5 million—we've got the cash on hand. Self-insuring makes more sense to us, since purchasing coverage in those cases means wagering against the house. Insurers will invariably outsmart us, and over the long run, they'll come out ahead. That's a game we choose not to participate in. A claim was filed by the company under this policy. Any funds recovered via that insurance policy get recognized at the time they're actually received. Let's turn to slide nine. Here's how the storm was reflected in our books. A one-time charge was recorded by the company. In our Q1 report, you'll see a figure of approximately $1.1 million, which primarily captures the write-down of book value for buildings that took on damage, as well as equipment that got damaged or destroyed. People costs of roughly $80,000 tied to those two weeks during the storm were also included in that charge. The situation is that many Park employees were devoting their hours to storm recovery and cleanup work rather than manufacturing and testing products. To put it another way, normally they'd be producing the goods we sell. They remain on the clock, yet no output is being generated, and that's how it became part of the charge. And just so you're aware — if you know anything about Park, I doubt this will surprise you — during those two weeks, everyone paid by the hour received their entire wages. That's not our approach. I realize some companies pay their salaried staff while hourly workers are told to stay home. They get the short end. At Park, we don't do things that way. As for the hourly folks, they, you know, devoted most of that period to recovering from the storm and cleaning up. Equipment that's new or replacing something gets recorded as a capitalized asset once it's bought and put in place. All right, let's turn to slide ten. Q1's total missed shipments — a wild figure — $2.5 million. So what's behind it? Okay, so starting with the weather impact — we had about $1.8 million in orders we couldn't get out the door because of the storm. That's clearly the largest piece. On the Q4 call, I think we threw out a rough figure — maybe around $2 million, somewhere in that ballpark, though I don't remember the exact number. Anyway, it came to $1.8 million. Then there's roughly $300,000 tied to supply chain problems and a few other things. I should explain that one a little, because we've talked before about how we handle our supply chain by keeping stock on hand and giving ourselves more lead time. What happened here is different — one of our bigger vendors is struggling to hit a spec that one of our customers requires. So this isn't about us planning poorly. It was just something that needed time to resolve, and in the end, those situations always do get resolved. We talk about international shipments a lot each quarter; with conflicts going on in the Middle East and Europe, that figure sits at roughly 400,000. Here's a question: how much of the supply chain trouble, both between countries and within them, might have been eased if our Park team hadn't been completely consumed by storm recovery? Honestly, I can't give you a definite answer, but I'd bet it's higher than zero. That recovery work was where our attention had to go. We simply had to get the factory operational again. Our customers depend on getting product. The key point is that we feel incredibly fortunate that the storm didn't injure any of our employees. That piece was the positive side, though the storm's arrival could not have come at a worse moment for our Q1. In that respect, fortune simply wasn't with us. Moving along to slide 11, which covers Park's balance sheet along with its cash position and the record of cash dividends paid. An investor who holds a significant stake in our company once advised me that this topic deserved coverage each quarter. I considered that sound advice, so that's what we do. Our long-term debt stands at zero, and at the close of Q1 we recorded $74.4 million in cash along with market securities. Still, I feel compelled to point out every time that $9.3 million in tax transition installment payments remains outstanding, due from Q1's end through June 2025. As I recall, this ties back to repatriation. In June 2024, a $4.2 million payment went out, though Q1 doesn't capture that. Since June falls within Q2, the figure comes to $9.3 million in total, measured against the cash reported for Q1. But roughly... let me work through it: out of $9.3 million, with $4.2 million already paid, approximately $5.1 million is left, and that amount comes due in June of next year. Fine, moving on. Regarding Park's cash dividend, we have delivered 39 straight years of regular cash dividends paid without interruption, never once skipping a payment or cutting the amount.

Brian Shore

executive
#3

To highlight, Park has distributed $594 million, equating to $280.975 per share, in cash dividends from the start of fiscal 2025. My constant remark is that this is an enormous sum for a small enterprise such as Park. Likely even for a large enterprise. $594 million, a significant amount of cash, I'd imagine. Not insignificant, as the saying goes. Moving to slide 12. Fiscal year 2025, Q1 leading five clients, a thing we do regularly. Avio is connected to the Vega launcher. Those are ablative materials. You're likely not shocked to see that. Kratos clearly is tied to Kratos' Firejet, unmanned aircraft, structural materials, materials for the aircraft structures. LifePort, that's linked to Sikorsky; that, and those are materials for interiors. MRAS, Middle River, we're utilizing many various aircraft. We have a highlight for that, or we can't highlight for MRAS. We selected the COMAC ARJ21 materials for nacelles and thrust reversers. NORDAM, the Bombardier Global 7500 business jet. Those are materials for GE Passport 20 primary structures. It's engine components or primary structures for that engine. So let's proceed to slide 13. Won't take much time here. Our, or, pardon, my charts and our charts. The new ones in the center, Q1. I suppose the only point I'll make is commercial somewhat lower, and I believe that's due to, as a ratio, we lost, because of the storm, we lost additional MRAS business, additional commercial business than the non-commercial; we'll address that afterward. Let's move to slide 14. Park's niche military aerospace programs; this is consistently the newest project. I should note, the top five isn't on this project. Let's see, what are we discussing here? The programs themselves, the Aster 30, ablative materials, unsurprisingly, Boeing Osprey, materials for aircraft structures, the McDonnell Douglas Harrier II, materials for aircraft structures, and this SkyKnight system, multi-target, short-range air defense missile; this is intriguing. These are ablative materials, unsurprisingly, for a new program, and we're doing our initial shipment this month in the program, so that's positive news. The pie chart itself, as we always state, radomes, rocket nozzles, drones, those are niche markets for Park's military, but even for us, aircraft structures, we view as a niche market regarding military. Let's go to slide 15. Now, we discussed supply chain extensively last quarter. Why are we doing it once more? Because it's turning into more of a problem, we believe, and it's becoming acknowledged as more of a problem. So we're going to revisit it again and include some extra information. Supply chain challenges, they simply don't want to disappear. Whenever we hear that they're behind us, we discover that they aren't behind us. Didn't we hear back in 2021 that supply chain challenges would be entirely behind us in 2022? I think we did; then we hear in 2022, challenges would be things of the past in 2023. So I believe we caught that. Aerospace sector executives, GE Aerospace and Avolon among them, have said lately that problems in the supply chain are going to last through the close of 2025, maybe beyond. Still, all of that has come out only after the earnings calls for our Q4 presentation. This is genuinely fresh information. Here's another fresh development: Safran is putting up a brand-new turbine blade plant so it can make more turbine blades, given that the supply chain simply isn't delivering. What do supply chain problems actually amount to? What's driving them? Why do they refuse to disappear? Are they at their core labor-related? Have those labor-related problems been fixed? So you might have every wonderful factory plus all the machinery and all the rest, yet absent workers — and not merely workers, but workers who've been trained to run that machinery — you will not be capable of turning out the goods that must be turned out; therefore supply vanishes, and that, as you're aware, produces the supply chain problems. Moving along to slide 16. We're told the jobless rate isn't too bad, but does that tell the whole tale? No, it doesn't. 7.2 million men who are able-bodied aren't employed, having exited the labor force permanently. Why does that occur? And here's something additional. There's fresh — fresh in this presentation, though not fresh to, well, not fresh to the sector. At the start of the pandemic, aerospace companies cut millions of workers, a large share of them extremely seasoned. Looking back now, that decision wasn't exactly clever. As you're aware, Park didn't let a single worker go, yet Park was evidently quite by itself, by itself on that point. A great many of the seasoned workers aerospace companies let go haven't returned, and in all likelihood never will return. Truly a grim state of affairs. Building aircraft is odd and puzzling. What do you mean when you say that? It has to be absorbed across many years. It isn't something you grasp instinctively. Take the sharpest man around or woman around, drop them into aerospace manufacturing, and they won't work it out purely from instinct. It's just peculiar material that must be picked up across a very, very lengthy stretch of time. What's it like swapping out workers who bring 25 years of aerospace know-how and twenty- for workers bringing 25 days? That isn't a question asked for effect. The outcome isn't particularly good. It's a beast. It's extremely hard, since in certain instances that's exactly what happens. Moving along to slide 17. How's that turning out? Not too great. I recognize the issue. We witness it daily across the sector, and it isn't attractive. I'd just been speaking with a fellow I believe serves as head of engineering at one of our customers, who was sitting down with an OEM, together with his people, and the discussion concerned a few elementary testing procedures for composite materials. Extremely, extremely, extremely elementary. Extremely elementary. I won't reveal what it was, but... And they stared at him as if to say, "What's that?" And he was stunned, you know, "You don't know what that is?" I mean, it wasn't meant as an insult. It's honestly like, wow, you'd figure these folks are intelligent, yet they simply lacked any background. Those who departed while the pandemic was going on likely possessed two decades of know-how. So it was truly sort of — I'm not sure how to describe it — something like eye-opening, you know, to engage in that kind of conversation. What do the continuous difficulties with the supply chain signify for aerospace? Such difficulties are affecting efforts to ramp up programs along with the launch of new ones, as shown by the latest announcement from Airbus, which we will cover further down. What could serve as an illustration of a defense program? What about Patriot missiles? Did you happen to see this lately — that we, the U.S. government — these are foreign military sales, meaning the U.S. government must give its approval. We are moving them away from nations that had signed up to receive Patriot missiles and were meant to get them. We are stripping their Patriot missiles away in order to hand them to Ukraine; then, they said our government said, "Taiwan and Israel are not part of what we're including." Fine, then who exactly is included? Perhaps Japan, perhaps Korea, plenty of European nations. What's the reason for doing this? Why not simply manufacture additional quantities of these missile systems? Since everyone desires them. Well, you know, why aren't we doing it? Owing to constraints and limits within the supply chain.

Brian Shore

executive
#4

Naturally, that's what we'd want — not taking from one to give to another, but supplying everyone who needs them. These are all approved nations, after all. You aren't handing Patriot missiles to adversaries. Still, the demand exists, and the industry isn't keeping up with it. So where does this lead? Does any fix appear on the horizon? Yes, possibly. I've got a few ideas on the matter. I won't detail them at this moment, but it's possible. What does that mean for Park? Here at Park, we've discovered methods to handle our supply chain difficulties through improved planning, deliberately holding larger stockpiles, and granting suppliers extended lead times. Even so, those supply chain problems presented a significant hurdle for us and drained a great deal of our time and effort. Crucially, in certain instances, such as the 2 examples just referenced, the programs Park provides into are getting hurt by supply chain limitations and problems that have nothing to do with our supply chain. These are simply supply chain problems those OEMs face that aren't connected to our own particular supply chain, and they harm those programs. Moving to slide 18. Let's shift direction here. We don't devote much time to this slide since we go over it each quarter. I believe we ought to, simply to offer you the perspective. GE Aerospace — we made a change. It previously was GE Aviation. GE Aerospace jet engine programs are such a vital piece of Park's business, so we go over this each quarter. Just a few fundamentals: firm pricing LTA; it's a requirements contract spanning 2019 to 2029 with Middle River Aerostructure Systems. MRAS, a sub of ST Engineering. We always clarify this — what is this really about? Every one of these programs belongs to GE Aerospace. How did this come about? Well, when we acquired these programs, MRAS was a sub of GE Aerospace, and afterward GE Aerospace, I'm not sure, 3, 4, 5 years back, I can't recall, sold MRAS to ST Engineering, yet they remain the GE programs. Incidentally, I think we brought this up previously, but under this LTA, our pricing rises on January 1, 2025. So, redundant factory — we constructed a redundant factory that's now in production, and we're sole source on composite materials for these programs. We won't dig into the programs; we discuss it each quarter. Nice photo of the legendary Boeing 747 engine nacelle. I love this photo since you gain a sense of how large these nacelles are, because you see this fellow in the background — he looks rather small, right? Let's proceed to slide 19. We don't need to go over the first item. The second item: containment wrap for GE9X engines. That's something that might be a significant program for Park, utilizing our AFP materials. The third and fourth items concern our film adhesive, product forms currently in qualification, and additionally they've been added to the LTA. MRAS and ST Engineering asked for a life-of-program agreement. That agreement is still being worked out. What would a life-of-program agreement mean for Park? Well, likely quite a bit, though—... If it happens, my own view is that we are on these programs. Whether an agreement exists or not, we will be on these programs, even though MRAS and ST intend for us to have a life and program agreement. They are the parties who asked for it, and it remains in progress. I suppose that is all I will say on that for now. Let's move to slide 20. An update on GE Aerospace engine programs. The first is the A320 aircraft family; that is the Big Kahuna, I suppose. Airbus has this enormous backlog. We are updating this figure, 7,137. That is simply a huge number of airplanes. If you follow aerospace, commercial aerospace, that is an enormous number of airplanes. Airbus is maintaining, and this is a key point, that it intends to reach a rate of 75 neo-family aircraft deliveries per month in 2026. They restated that, and reinforced that intention, during their recent annual meeting and their first quarter investor call, 75 per month, 26. Let's move to slide 21. We do not need to walk through this. Just a bit of background on delivery rates. I suppose the interesting point is that in 2023, Airbus at last surpassed 19, which is a pre-pandemic year, and then in the first six months of 2024, comparable to the first six months of 2023, slightly higher, but not, you know, meaningfully. Clearly, given this enormous, enormous backlog, Airbus would already be at that rate of 75 per month, if not for supply chain constraints and limitations. Let's move to slide 22. Here is the big news. On June 24, 2024, I mean, this is only a few weeks ago, right? Airbus unexpectedly announced that it is pushing its goal of reaching 75 A320 aircraft family, that rate, from 26 to 27, the 75 aircraft family delivery rate for 26 to 27. Now, unsurprisingly, what did Airbus emphasize? Supply chain issues and limitations as the main reason for the pushout. But what is surprising is that Airbus emphasized engine availability tied to both the Pratt and the CFM engines as the primary supply chain culprit. Why is that surprising? Because that was the situation, Airbus was saying that was the situation, the engines were the limitation. I think perhaps a couple of years ago, you know, the engines were the limitation, and then maybe about a year ago, they said: Wait, we are fine with engines. Everything is fine with engines. The new limitation, what was it? It was castings and forgings, materials, electronics, like perhaps semiconductors, and I forgot one other item. I do not recall, but it was not, well, not engines anymore. You know, not engines anymore. So good, we are fine with engines; that was wonderful. Then what happens? We are back to discussing engines as the main problem. Airbus went on to say that engine supply, which is now significantly more integrated in recent weeks — in recent weeks — and that Airbus will ultimately be left with gliders. Do you know what that means? These planes are going to be parked on the ramp without any engines. Gliders — that's what they're called, gliders. Airbus also said the engine shortfall is a new situation that we didn't anticipate. So wow, this really caught Airbus off guard. Somewhat shocking. This delay to the 75 A320neo per month goal is definitely a setback and a letdown, perhaps a bit of an embarrassment for Airbus. But delaying the goal will give Airbus more leeway and runway to hit its new target, perhaps a more realistic target. And we think Airbus will be more dedicated than ever to reaching this new target without further delays or delays; that's just our view. I mean, I can't speak on Airbus's behalf, but I believe they're somewhat embarrassed by this and likely quite upset about it; and my guess is they're going to be very, very, very dedicated to not delaying it and delaying that 75 per month target any further. Let's move on to slide 23. What about the engines for the A320neo aircraft family?

Brian Shore

executive
#5

So, as everyone's aware, Park is involved with the CFM LEAP-1A engine. The Pratt engine—the Pratt PW1100G—isn't something we're part of. We won't be supplying that. Right, regarding that second point, we got past it. There's zero content for us on the Pratt, meaning the A320neo planes that use Pratt powerplants. Moving to bullet item three: based on what the July 2024 issue of your—this is hot-off-the-press—Aero-Engine News says, the CFM LEAP-1A's share of firm engine orders for the A320neo family comes to 63.5% as of May 31. If deliveries hit 75 A320 family jets each month—well, my feeling is I'm quite confident Airbus will reach that figure; the timing is just unclear. A 63.5% LEAP-1A share works out to 1,143 LEAP-1A engines annually. What does that bring to Park? There's a thing we refer to as a juggernaut slide—take a look at it afterward. Now here's a stunner. Right now, get this, there are 8,156 firm orders for LEAP-1A engines. Aero-Engine News is the source. It's extremely up to date. So over at CFM, every one of those engines will get built—no question in my mind; sure, additional orders will come too, but all of those will be manufactured. So how does that affect Park? I don't need to guess, going back to the—check the juggernaut slide, perhaps $250 million. So I'm not sure. Does it truly matter all that much if it's 2026, 2027, whatever the figures turn out to be, 2028? Those air—those engines are going to be manufactured; and from where I sit, that's what counts; that's what makes us feel Park is incredibly lucky, that we're extremely well qualified on those engines. Those engines belong to us; those engines are going to be manufactured, so getting fixated on which quarter is pointless, and we simply lack that knowledge. We've been fairly transparent on this, and we can't share what we don't have. Sure, we might make a small guess, but for us, what matters most is that those engines get manufactured and manufactured using Park materials. Let's move to slide 24. The A321XLR—that's a version within the A320neo aircraft family. Airbus anticipates it will enter service by the close of 2024; and just today I came across a piece saying certification is anticipated in quote, coming days, unquote; that sounds quite imminent. This could be a highly significant program for Park. The COMAC C919, yet another potentially very significant program for Park. It uses a LEAP engine, though a distinct type of LEAP engine, referred to as LEAP-1C, built by CFM. COMAC intends to reach a production rate of 150 C919 aircraft per year in 2028; they've gotten more than 1,500 orders for the C919 aircraft, as stated by COMAC. COMAC said it is expanding its C919 aircraft production lines inside the—check this out—330,000-square-meter facility in Pudong, China, which sits near Shanghai. So, I suppose a couple weeks back, one of MRAS's top people—someone I collaborate with pretty closely—had just gone to see that site, and afterward I sat down with him, and I was very, very impressed. It's similar to what happens in China. I'm not sure whether you've had any experience there. They construct an entire city to back a major program. That's their approach; that's exactly what they're doing now. And he felt quite sure they'll reach that figure of 150 airplanes annually, which of course works out to 300 engines, and possibly beyond that. This fellow tends to lean a bit skeptical, you know—not the pie in the sky sort. So, yeah, as you can see, once we reach the juggernaut, we're shifting that number to 300 from 200. Those are engines, clearly, tied to 150 airplanes. That's a genuinely huge, significant potential program for Park. So, another thing I want to bring up—I only saw it today. It arrived after press time. Airbus has just raised its 20-year forecast, and now anticipates 42,430 airplane deliveries across the coming 20 years. Single aisle, 33,510; wide bodies, 8,920. Perhaps they're correct, perhaps not, but regardless of how you look at it, that's an enormous quantity of airplanes. A lot of airplanes. You see CFM powering the Airbus A220 aircraft family and the COMAC C919 aircraft. What that tells us is that these two programs both rely on that CFM, the CFM LEAP engine, so it's truly on CFM to raise their production rates in order to support these two very exciting programs. Let's hope that happens. Let's move ahead to slide 25. Boeing 777X with the GE9X engines. Boeing anticipates certification for that next year. Here's something entirely new, the second check item. Boeing has just obtained a TIA, Type Inspection Authorization, for the 777X from the FAA. That's really—that's a big deal; and it just performed its first certification test flight for the 777X last Friday; that's breaking news; it's genuinely encouraging because, you know, certain people worry that Boeing, you know, faces a string of issues that might stall the 777X. We certainly hope it doesn't, since it's such an important program, a potential program for Park. To me, you know, if I were Boeing, and I'm not, you know, I'd be thinking I really want to do everything possible to get focused on this program, because this is their chance to be a leader for a long, long, long time. Even if they resolve the problems with this MAX, they're still not a leader; they're trailing the Airbus. This is a program where they lead. There's nothing comparable when it comes to payload and range capability, and those are the two key, you know, criteria for an airplane like this. Nothing like it, and nobody's even attempting to develop anything comparable. Boeing, therefore, could enjoy genuine market dominance in this segment for many years to come thanks to this plane; plus, assuming it moves ahead, it represents an excellent initiative for Park. Moving to slide 26. Alright, this particular slide appears in every quarterly presentation. What's different this time? Just $5 million in sales from GE Aerospace and the Engine program during Q1. As we mentioned back when we provided our Q4 guidance, prior to the storm, our figure stood at $6.3 million. What caused that gap? The simple answer is that everything is already under contract. We had $6.3 million on the books, yet shipped merely $5 million; consequently, $1.3 million that had been booked never went out the door owing to the storm. For Q2, our projection is $6.25 million-$6.75 million, and essentially all of that is booked; that doesn't guarantee it will materialize. I'm merely pointing out that it's booked. No additional sales are required on our end to reach those figures; we're trying something somewhat different here. We're providing a full-year outlook. This is something we haven't done for a good while. Mark and I, as you know, spent the weekend wrestling with this, attempting to determine what to share with you, yet we did want to offer you something covering the year. We settled on $23 million-$26 million; we believed and whenever we do this, keep in mind, with our forecasts, we aren't handing you a conservative figure we can then exceed and look like heroes. That's not our style.

Brian Shore

executive
#6

We're telling you, this is our expectation for what's going to occur. To the greatest extent we're able, this is our belief. Plenty of problems, plenty of dangers, plenty of unknowns, but that's informative — we're doing our utmost to explain what we believe will take place. Let's move along to slide 27. So we'll discuss Q2. We covered Q1 already, so there's no need to revisit it. For Q2, our projection is $15.9 million-$16.4 million. Roughly $16.8 million is booked, but keep in mind, near the close of a quarter, we invariably lose some at the very end since it doesn't go out or, you know, problems with international shipments, supply chain, that sort of thing. EBITDA, the guidance is $3 million, $3.3. Slightly low, but I simply want you, you know, to be aware that $2.5 million of C2B fabric sales fall in Q2. The sales, $2.5 million. Remember, that's where, for big OEMs, we purchase this, this fabric, and we move it to them quite fast with a tiny markup. So extremely slim margin. Now, we actually, once we actually employ our product to create material for them, then the margins are very, very appealing. So that's yet another item Mark and I sort of wrestled with over the weekend. And let's proceed to slide 28. Once again, we're doing something we haven't done lately, which is providing an annual forecast. Let's examine the sales history first, because I believe it's quite fascinating. If you begin at 2017 through '20, it appears to be nearly $10 million each year, you know, 31.8, whatever, 40, 51, 60, around $10 million annually. An investor, which is, we spoke with last week, posed an intriguing question to me, and it's amusing, no one had ever calculated it previously. "What do you think, where do you think we'd be now following the pandemic?" Very intriguing question, because I replied, "Well, I don't know. It seems we're, we were expanding $10 million annually. I don't know where we halted, so we'd likely be at $90-$100 million in 2024. I suppose if you simply extrapolate, we never know, or it's hypothetical. Can't go back and rewrite history." But then you can observe in 2021, the pandemic year, and 2022, 2023, 2024, we're still not out of escaping the pandemic malaise. The pandemic's finished, but we messed the things up so terribly with all the people we hired, creating these... Sorry, all the people we fired, or not Park, the industry fired, laid off, let go of, you know, so we're truly battling to recover due to all these supply chain problems that we created by perhaps not responding, reacting to the pandemic in the best way. Now, it's not a criticism because at the time, the pandemic was so frightening, so scary that, you know, we can't really blame people for reacting the way they did. Looking back now, I can admit our response probably wasn't ideal. So in this presentation, we had actually intended to give you a forecast covering three years. However, once Airbus pushed back its target of 75 airplanes per month, and with supply chain problems running high, we lost our nerve and backed off from that. What that leaves you with is a forecast for 25: $60 million to $65 million, with EBITDA of $13 million and $15 million. And yes, we're accepting some risk here, since uncertainty is so widespread. Still, our approach is to do our utmost to tell you what we believe will occur, rather than hand you a conservative figure we can surpass so we look like heroes and all that. Key points near the bottom: constraints in the supply chain are weighing on the aerospace sector. Right, we just covered that when examining how the top line progresses. Moving on, rising costs tied to the Juggernaut. That won't impact the top line, though it does hit the bottom line, since we incur those costs ahead of the sales, and clearly that leaves our company, our company, temporarily less profitable. Let's move to slide 29. All right, our main aerospace engines and programs, plus the revenue outlook, the Juggernaut; we've discussed this across multiple quarters now. When exactly will this outlook materialize? We can't say for certain, yet the Juggernaut is still on its way. Nothing can halt it, and we'd better be prepared. So, as you know, we could burn plenty of time debating which quarter it lands in, and we simply don't have that answer. That said, I'll share one thought with you: in my view, Park is incredibly, incredibly, incredibly, incredibly lucky to hold sole source qualification on these fantastic programs, these fantastic programs; so when will they, you know, reach the moon? We can't say. Yet these programs are really — these are the programs you want to be part of, and we are extremely fortunate and lucky to be part of them; so perhaps, perhaps not in certain other programs we won't name, but you likely catch my drift. Let's move to slide 30. Here's the Juggernaut. Only a few modifications here that I... Well, a few items I'd like to point out. To start, A320neo. Look, we're planning around that 1,080 figure. What that reflects is a 60% market share for the LEAP engine, at 75 airplanes per month. Simply run the numbers. Go ahead, take a look, you can work it out mentally. What does that come to? 900 airplanes per year times 2 engines, which is 1,800 times 0.6. That gives 1,080 — meaning 60% market share. There's your 1,080; now, earlier in the presentation, we noted, "Well, it isn't truly 60%, it's 63.5%, and that works out to 1,140 to 1,143." But we'll stick with 1,080 so we avoid having to update and revise this page, this slide, each time we present, because month to month, that percentage, that market share percentage, will shift. Someone commented that I was attempting to be cautious. That's not the case, honestly. We simply didn't want to deal with the routine of, each quarter, needing to revise or alter the figure shown on the slide, since the share of the market we receive from Aero Engine News is going to shift month to month. You'll also see with the C919, previously 200 units, and now it's 300 units; regarding the ARJ21, we left the 72 unchanged, though I'd like to note a recent report indicating COMAC delivered 35 airplanes per year in both 2022 and 2023. Clearly that equals 70 engines, and spares aren't factored in, so at some point we might raise that figure; right now we aren't doing so. All right, moving ahead to slide 31, our Park maintenance crew. Thank you to the Park maintenance crew for heading up this storm recovery and cleanup effort. Great guys. You can likely tell just by looking at them. I should also mention this isn't entirely representative, because as we said earlier, it's truly all the hourly people who worked on the storm recovery and cleanup. All right, operator, that wraps up the review of the presentation. Should anyone have questions, we'd be glad to take them.

Brian Shore

executive
#7

Alright, thanks, operator, and I appreciate every one of you tuning in to our Q1 investor call and walking through the presentation alongside us. Have a wonderful day, everyone. Should any follow-up questions come up, just reach out by phone. Thanks so much. Take care.

Operator

operator
#8

Thanks a lot; that brings today's call to a close. You're free to hang up now. We appreciate everyone joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.