Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary

October 15, 2024

New York Stock Exchange US Industrials Aerospace and Defense earnings 51 min

Earnings Call Speaker Segments

Brian Shore

executive
#1

Thanks, operator. Hi there. Brian here. Glad you could join us for the second quarter of fiscal '25 investor conference call. Happy to have you with us. Joining me are Matt Farabaugh, our CFO, and Mark Esquivel, President and COO (ph). We put out our earnings via news release just after the market closed. If you don't have it, you'll want to grab it, since the release also contains instructions on how to access the presentation we're about to walk through. That presentation is up on our website too. You'll want it in front of you, or the — to make the discussion more useful. As the operator said earlier, after we're done, we'll go through the presentation, and once that wraps up, we'll happily take your questions. So let's get started. Moving on to Slide 2, which covers our forward-looking disclaimer info. If any part of that forward-looking disclaimer language seems unclear, just let us know. Slide 3 is our table of contents — beginning with Slide 1, we have our investor presentation. After that, supplementary financial information appears as appendix one at the conclusion of the presentation. We're not intending to review that at this moment, but should any of the supplementary financial information be confusing, please tell us. Here's an image — the sharpest picture of Mercury that has ever been taken. To me, that's just a stunning image. Credit goes to the James Webb Space Telescope — which, clearly, is what took that shot. And a lot of you already know this: Sigma Struts, which are proprietary to us, form part of the James Webb Space Telescope's structure, which makes that telescope really dear to us. Moving on to Slide 4, where we cover the quarter's results. Let's look only at the right-hand column for Q2: sales of $16,709,000, gross profit of $4 million out of $757,000, and EBITDA of $3,204,000. Now, real quick — what did we say about Q2 during our Q1 investor call? Our stated sales range was $15.9 million to $16.4 million, so we landed a touch above the top end of it. On the adjusted EBITDA side, our guidance had been $3 million to $3.3 million, and the actual figure came in inside those bounds. Moving along now to Slide 5. As we turn to our quarterly results, here are a few points regarding Q2. Roughly $2.2 million in sales were recorded during Q2 from ArianeGroup RAYCARB, C2B NG product under Park's business partnership with ArianeGroup. As we frequently mention, this material is fabric we buy from ArianeGroup for ablative and missile programs, after which we resell it to OEM customers, with the turnaround happening fairly fast, generally within a couple of weeks. Margins on that piece are pretty thin—basically just a markup. Still, our standard line is: don't sweat it, because once we're actually manufacturing the product and turning out the ablative materials, that's the part where margins look really healthy. That said, ablative material sales in Q2 came to just $750,000. So as you can tell, there's a bit of a mismatch, with far more emphasis sitting on the lower-margin portion and less on the higher-margin portion. Ultimately, naturally, everything does funnel through. In Q2, we carried substantial ongoing costs related to bringing Park's new production facility fully online—you already know the details—and depreciation expenses are part of that. Let's address that with the asterisk here: $1,260 — pardon me, $1,260,000 each year in depreciation expense connected to the new production facility. By definition, this clearly has no effect on EBITDA, but what matters is that it does impact gross profit and gross margin — roughly a 2% hit to gross margin just from that depreciation. And looking at Q2's gross margin, what was it, I believe 28.5%, was that right? Let me verify quickly that I'm giving you the accurate picture — yes, 28.5%. We've always said we don't like seeing it below 30. The depreciation by itself would push it back above 30. But depreciation isn't the only factor — there are results from these other things. Additional things that hit EBITDA, or at least affect it, include the building itself, upkeep, power, coverage, assorted overhead, and the cost of extra Park staff, every one of which comes with the new site. Added costs. My first reaction was that maybe something had gone wrong or this was a one-off mistake. But no — these outlays were budgeted for on purpose. I simply want you to see that we have to spend this money to get the new site running at full capacity, which is what's needed to meet demand from the coming Juggernaut — I'll get into that later on. So none of this is off script, yet these line items will continue to drag on our P&L and our margins right up until that site is fully ramped. Right now, that facility is far from fully used, and that's intentional on our part. We have to keep pushing ahead with it so the Juggernaut's requirements get met and we don't slip behind on the power curve. Turning to Slide 6, missed shipments for Q2 totaled $600,000, which isn't a good number. The causes were issues with international shipping, the supply chain, customers placed on hold, and assorted other matters. Yeah. So things in aerospace aren't especially cheerful these days — it's gotten somewhat harder and more challenging for us, and wars are playing a role too, especially where international shipments are concerned. Regarding Q2, the storm damage had no effect on either sales or our earnings, with one exception: $46,000 in expenses — excuse me, I initially said $64,000, that was my dyslexia acting up — which we reported as a special item in our Q2 earnings release. So other than that $46,000, Q2 earnings and sales saw no impact from the storm damage. Every production line ran at full capacity and remained functional for the entire fiscal Q2, which is pretty extraordinary when you consider that the storm struck during the final two weeks of Q1. Having all lines up and running completely throughout Q2 was therefore truly remarkable — honestly a miracle, and a real testament to our people. Moving on to Slide 7. The leading five, which we go through each quarter. The five biggest customers, in alphabetical order. Aerojet Rocketdyne, these are among the typical names. You might be asking yourself as you hear these names. They have a role in the PAC-3 missile system, Aerospheres, they serve as a representative for IAI, Israeli Aerospace Industries, a customer of ours that matters a great deal, and they built the G280 for Gulfstream. GKN, that ties to the Boeing 787, which isn't actually a plane. It's the GEnx-1B engine that gets used on a plane. Kratos, as you're aware, we discuss each quarter the leading five, I believe; and this time we simply picked one of their aircraft, a BQM-177A. It's a pretty interesting aircraft, honestly, if you go look it up on the web. Middle River Aerostructure Jet — that name is pretty much what you'd expect. When it came to MRAS, the Bombardier Global 8000 is what we went with to represent them. Now on Slide 8, you've got those pie charts showing expected revenues broken out by Aerospace Market segment. The thing that jumps out at me is this: when you look at '22, '23, '24, and '25 so far this year, the pie chart looks almost exactly the same every time.

Brian Shore

executive
#2

However, the major distinction is '21, and that hinged on the tier 1 — especially our commercial aerospace was really — I'm not sure how to phrase it, I mean, in danger, it nearly appeared as though it wouldn't survive. Moving to Slide 9. Alaina prepares this particular slide for us. Each quarter, Alaina, who leads Customer Service, comes up with genuinely fascinating, cool initiatives to include on this small slide. Regarding the pie chart, covering the initial half-year: radomes, rocket nozzles, drones — for us those count as niche markets within military. Yet even aircraft structures qualify as niche in our view. Now, our present program quickly — David Clark, not a massive customer, though we're fond of them. They produce the helmets used by the Air Force, and we provide materials. Additionally we handle kitting for them, which is a plus. Then there's the Mk30 Canisters intended for Raytheon's ESS system — those involve ablatives. The MK125 Warhead used on the SM-2 and SM-6 — I believe those are simply hypersonic missiles. Actually that one isn't ablatives. Here, it's a single structural component. We're unable to disclose anything further regarding it. The MK41 Vertical Launch System — in fact, components we manufacture using our materials. It appears Alaina concentrated entirely on missiles this quarter. So she probably spent considerable time dreaming about missiles, I suppose; anyway let's continue to — but solid choices. Appreciate it, Alaina. Moving along to Slide 10. GE Aerospace Jet Engine Programs, yet another slide we present each quarter. You need to realize — a few of you have grumbled that we overanalyze matters excessively. New investors join the call every quarter. We must be equitable toward them as well. We aim to find a middle ground here. Thus, indeed, this slide appears every quarter. Our fixed pricing LTA — a requirements contract spanning '19 through '29 with MRAS, a subsidiary of ST Engineering Aerospace, a major aerospace firm based in Singapore. We actually constructed a redundant factory for GE within MRAS, which is now in production and all of that. So what's the situation here? With sole source quality for composite materials, engine nacelles, and thrust reversers. Across these programs, well, every one is a GE engine program. What's the reason? The explanation is that when we originally signed the LTA, MRAS operated as a sub of GE Aerospace. Therefore we had all these GE Aerospace programs at that time. Afterward, GE divested MRAS to ST Engineering, yet we remain on these programs. So let's proceed to — and I won't walk through each program. Should you have any questions regarding it, please tell us. Slide 11, carrying on with GE Aerospace, the MRAS/Park LTA stipulates roughly a 6.5% weighted average price increase taking effect January 1, '25 for the products covered under the LTA. This question comes up constantly — over and over — and my response has been that I'd rather not get into it, though now we're addressing it in a setting like an investor presentation, which is the right place. Park Composite Materials — remember, that's not one we cover. That one gets covered each and every time. Moving to the final item: the Fan Case Containment Wrap used on GE9X engines powering the Boeing 777X aircraft, manufactured using Park's AFP along with additional composite materials. Not long ago, Park booked a purchase order worth roughly $6.5 million covering material for that program. The program, therefore, is in a ramp phase. A sizable order for case wrapped units came in to our customer; obviously we won't get into figures, yet what reached us in PO terms was a slowdown relative to what's still on the way. My guess is considerably more is coming. As a result, this program has moved past being merely developmental. It genuinely is beginning to ramp at this point. Material from Park tied to this program should be brought into the Life of Program. It isn't part of the LTA, since it arrived following the LTA, yet the plan is that we'll simply fold the GE9X program into the Life of Program agreement, which I'll get into shortly. Slide 12. Trying to keep an eye on the clock here. The MRAS/Park LTA got amended so that Three Film Adhesive product forms for composite bond and metal bond are now included. This is truly excellent, because these film adhesive formulations were created via a joint development agreement involving MRAS and GE, and enormous time and effort went into it — but it's excellent since the moment development wraps, we move straight into qualification. That makes it a genuinely wonderful and special thing: qualification with MRAS of two proprietary film adhesive product forms is underway. Why not three? Well — here's how the process works. A qualification with MRAS happens, after which MRAS has to complete a certification process with its own customers on selected programs. The first program MRAS aims to become certified on doesn't involve metal bonds. That explains why no metal bond qualification exists on our side right now. It'll arrive afterward, correct? The Life of Program agreement, which MRAS requested, along with the STE agreement, is being negotiated, and Mark took a team — three Park individuals, I believe — to MRAS a couple of weeks back. We devoted a couple of days. They devoted a couple of days to working through the agreement alongside MRAS, so negotiation is ongoing. At last we achieved some solid progress on it. Still, bear in mind this is their desire — MRAS and STE asked for it. We're glad to participate. They're the party that requested it, and for sound reasons. All right. Let's move to 13, Slide 13. Carrying on with the further — well, a different update now concerning GE Aerospace programs. The A320neo Aircraft Family covers all these variants. I won't list them out loud. There's an enormous, fundamental demand backlog at Airbus for firm orders of the A320neo — 7,253 of them. That is an incredible quantity of planes. The company had been holding to its goal of reaching a monthly delivery pace of 75 aircraft from the A320neo family by '26. Moving to Slide 14, this gives a bit of background on A320neo deliveries across earlier years. You'll notice the high point around '19, and then the pandemic hit and figures dropped. In '23 they recovered to the pre-pandemic level, 571 versus 561; and through September of this year, roughly 396 — actually not roughly 396 compared with 391 for the same period a year ago. Don't turn that into an annual figure, since that doesn't work, because in the aircraft business, for some odd reason, a great many deliveries land in the final quarter. What it really tells us is that we're roughly keeping pace with last year, which is somewhat disappointing. We had hoped to demonstrate at least a modest gain over last year. As you can see, last year came in at 48 planes each month. Now let's move to Slide 15.

Brian Shore

executive
#3

So, back on June 24, 2024, Airbus said they're delaying their target for hitting a monthly delivery rate of 75 aircraft in the family — moving it from 2026 to 2027. Not a shock, honestly. Airbus pointed to supply chain problems around the world, supply chain problems once again, and in particular, engine availability troubles as a main factor behind the delay. What's amusing about that? Do you recall, about a year or two back, everything was fine with engines? It wasn't only Airbus or the engine manufacturer saying it — the engine was no longer a problem. All was wonderful. Now we're stuck in the mess again when it comes to engines. I'm not sure what to think about that, but at this point engines are right at the center of where the biggest supply chain difficulties emerge. Perhaps it's castings and forgings for those engines, but engines are the issue. Obviously, given that enormous backlog, Airbus would already be producing at a rate of 75 per month. Why is that? How many years — what's the figure, how many planes have been ordered? 6,000 and something, I need to check, sorry. What was that figure — no, sorry, 6,000, 7,200, 7,253, alright; so let's assume they're at 50 today, which maybe they aren't, but let's assume they're at 50 today, that's 600 each year. Well, with 7,000 orders, how many years does that take? Well, the trouble is this, Airbus wants to sell additional planes. So you place an order for a plane, your delivery comes — what, 13 years later, that's not helpful for selling planes; so one reason Airbus wants to raise it to 75 — 75 means 900 each year — that still doesn't mean you order a plane and receive it the following year, but it cuts the lead time significantly, which lets Airbus sell more planes, which is their aim; they want to sell far more planes. So in any case, will Airbus hit its target of 75 deliveries each month? We definitely think they will. Will we get there in 2027? Right now we think they will, we aren't certain it really matters all that much whether that target is reached in 2027 or perhaps 2028. Can you think about Park — the point is we need to be prepared? And the crucial thing is, they will reach that rate, all these orders will be fulfilled. They'll take additional orders, and we simply need to be prepared. And we — not certain what the timing of the ramp will be. I don't think anyone is certain, we just need to be prepared, first of all. Second, those sales will exist and they're amazing sales for Park. 16 approved engines for the A320 aircraft. There's still approved engines for A320neo — that's the CFM LEAP-1A; that's the engine program we're on. Now, regarding the Pratt, Pratt & Whitney PW1100G GTF engine — that one isn't part of that program, it's only on the CFM program. We've discussed the durability problems at length, particularly with the Pratt engine, and we'll get into that here. So, let's see — based on the September '24 issue of Aero Engine news, CFM LEAP-1A holds a 64.4% share of firm engine orders, which is a solid market share. I can't recall exactly, but I believe it was around 62% last quarter. It's been hovering in that 62%, 63%, 64% zone and ticked up last quarter, though that might not hold, I'm not sure — but at minimum it's comfortably above 60%. With A320neo production running at 75 aircraft per month, a 64.4% LEAP-1A share works out to 1,159 LEAP-1A engines annually — just run the numbers. What does that mean in value for Park? Well, I'll turn straight to Slide 34, which gives you a sense of the yearly worth to Park. Right now, this is one of those enormous figures: 8,238 firm LEAP-1A engine orders. That's a huge number of engines. What's one of those firm orders worth to Park? Well, I mean, look at Slide 34 — it shows what we receive per engine. I believe it's roughly $0.25 billion. And that's assuming we keep going to Slide after 29, which — life firm or not — we're pretty confident we will. And it doesn't factor in, doesn't account for, price increases over that period. But conceptually, think about $0.25 billion — does it truly matter to us whether it's '27, '28, '29? It's just a tremendous amount of revenue for Park. And those engines will be sold. They'll be built and sold. They're our engines, that's our program — so when I see people selling the stock at $13, I'm not sure what's going through their heads. Let's move to Slide 17. Airbus, okay — here's one of the variants, the A321XLR. Airbus is opening an additional XLR production line in July; the A321XLR, powered by the LEAP-1A engine, received its EASA type certification in July, and that's really great news, that's good. EASA is Europe's counterpart to the FAA. The first A321XLR delivery is set for later this month to Iberia, and per Airbus, the program has 500 orders — an important program for Park. Let's continue to Slide 18. Okay. Now on to Comac, the Comac 919. That's the single-aisle plane Comac built to take on the 737 and A320, and it uses a different version of the LEAP engines, called the LEAP-1C. I'm not certain, maybe the C stands for Comac; it's a variant of the same engine. That's in the — that's an odd arrangement. Comac intends to reach a production rate of 150 919 aircraft per year by '28. I find that believable; they're pouring enormous sums into production lines. I believe they now have three final assembly lines. I’m told there are more than 1,500 orders placed for the 919 aircraft. That plane, the 919, is currently in service with Air China, China Eastern and China Southern — every one of them a Chinese carrier. Comac obviously intends to expand beyond China with this jet, but so far all of these airplanes are operating inside China. Nine have been handed over up to now, and they’ve accumulated more than 10,000 flight hours. For Park, this is a significant program; we’ll see how it plays out, but both we and our customer regard it as a very important program with substantial upside potential. Let’s move on — let’s turn instead to Slide 19, the 777X aircraft powered by GE9X engines. On August 19, after identifying an engine attachment problem, Boeing grounded its 777X test flight fleet, and that fleet is still grounded while Boeing keeps assessing the issue; these engines reached a record 134,400 pounds of thrust. That’s exactly why those engine tests matter so much. They hold certification for 110,000 pounds. For comparison, the LEAP-1A engine on the A320 produces roughly 32,000 pounds; so these are enormous, enormous, enormous engines with tremendous power. On October 11, 2024, Boeing said it was delaying its first delivery target to ’26 from ’25, citing development challenges, the flight-test pause and the work stoppage. Boeing says — sorry, not Boeing, and based on the data, Boeing had 481 orders for these airplanes. So it’s somewhat of a setback, but what I’d say is, this is very much — this is a clean sheet airplane.

Brian Shore

executive
#4

So it makes sense that issues such as the engine attachment problem would arise. It matters enormously that this was caught while the development and certification work was underway, rather than once the plane is up at 38,000 feet carrying 400 people. So for Park, this program really matters. We simply — we send our best wishes to Boeing. Clearly, they are not — they are going through a rough stretch right now, but our hope is that Boeing figures out how to move forward and improve things. Let's move to Slide 20; we can get through this quickly. Nearly everything on it is there as history for context, in the lower right, fiscal '25 Q2, $7.1 million of sales. This is — I ought to read the title, GE aerospace jet engine programs sales history and forecast estimates, $7.1 million in Q2. My sense is our estimate came in slightly under that, though roughly in that range. And our Q3 forecast is $6.25 million to $7 million, that is what we project for Q3; for the year, $23 million to $26 million; we gave that guidance last quarter. We are keeping it for the year. Okay. Let's move to Slide 21, Park's financial performance history and forecast estimates. So once again, the bulk of it is there. Most of the figures on this page are there as our history and context. Fiscal '25 Q2, you already have that figure, $16.7 million, $3.2 million EBITDA. Our Q3 forecast, $13.5 million to $14.25 million in sales, $3 million to $3.3 million EBITDA. Note the footnote subject to supply chain risk and limitations. We'll look at that even more closely on the next slide; so let's move to Slide 22. This slide is identical to the one we showed you last quarter. Everything is historical apart from the forecast estimates. We are not altering the forecast estimates — sorry, forecast estimates for the year. Fairly wide ranges, $60 million to $65 million sales, $13 million to $15 million EBITDA, and this is what we gave last quarter. So I am not changing it. But look at what matters, supply chain limitations affecting aerospace industry. So let me pause for a moment. The aerospace industry is not really in a happy place right now, not much fun. For perspective, the European air show, the big one alternates between Paris and Farnborough each year. Last year it was at Paris, plenty of exuberance, maybe irrational exuberance depending on hindsight regarding all the orders being taken, all the engines — all the airlines and engines being sold. Everyone was very excited about that. Wonderful, wonderful, wonderful. Okay; that's nice; then we jump ahead to Farnborough this year. A very different tone, a very different mood, somewhat glum because everything emerging from Farnborough, supply chain, supply chain, supply chain, supply chain, supply chain. The problem has been solved. One remark, I suppose, came off as somewhat sarcastic: who cares about how many engines — pardon me, how many planes you can — how many orders you're able to book, if you can't build them, what difference does it make? Clearly, that's sarcasm, yet that reflected the mood lately. What's intriguing, I suppose, is if we view things through that lens. Here we go through this sort of déjà vu once more, how many occasions have we heard over the last three, four years. Problems with the supply chain are nearly finished, almost fixed, all will be well; and then we find ourselves right back in the same spot. Why does that happen? I don't know, perhaps it's something psychological. My guess is those problems were never fixed at all. It was merely a hopeful notion, and hopeful thinking spreads easily. One individual mentions it, another individual mentions it, okay fine. Yet issues in the supply chain are plainly not settled. They haven't disappeared and they affect the industry. So simply bear that in mind alongside these forecasts, along with all the risks that we — that you include in the 10-K, but supply chain problems represent a major risk to these forecasts. So — and naturally, we're also ramping up costs for Juggernaut, and that isn't merely a short-term matter holding back, well, not the top line, but rather our bottom line. Let's move along to Slide 23. Let's try to move quickly here a bit, if possible. Updates on General Park, I suppose we're simply covering so much in this presentation, so it might be running a bit long. Regarding the Solution Treater Project, we intend to buy and set up one more solution treater. Why are we doing this? Well, designing and specifying the equipment, installing it, running internal trials, qualifying that equipment for production alongside customers will require roughly three years — three years. So we're fairly worried; we examine the opportunities before us. We examine the programs we're involved in and the opportunities before us, we're worried we'll exhaust our capacity; so we must act now, since it's a three-year timeline. We can't wait for years; if we do that, we're — what's the phrase, screwed, I believe. The project's budget comes to roughly $7.5 million. This is something we chose to pursue and we're proceeding with the project; it will be situated in a new factory. Recall that we mentioned a large area was reserved for a new line. Well, that's where this line will be placed. One more item, these items all connect to each other. They're merely updates. Large OEM suppliers, we're asking our partner, Park's, to team up and negotiate quotes for buying one more manufacturing line to back critical defense programs; this equipment is vital for those programs, so it's required — this OEM is a good deal bigger — somewhat bigger partly since they want to be partners, 50 to 50, let's say $5 million apiece, and right now we're working out the agreement, though we intend to go through with it; it must be done. This extra line is necessary for these military programs. So we're also discussing money a bit since we want to reach that afterward regarding our cash. 24. Slide 24. Not long ago we qualified a crucial, high profile missile defense program. The program could be — pardon me, this program could be bigger for us than the PAC-3 missile program. First revenues are anticipated for Park next year and the program should ramp fast after that. And we likely must spend $1 million in capital investment to back this program; that's a key achievement for Park, to put it that way. I can't — we can't discuss — provide you further specifics on the program, yet you would have heard of it, no doubt. Then the following item: Park recently signed a license agreement with a large OEM to license technology for hypersonic missile programs. As we understand it, Park holds the only licensee, licensee position for this technology; we're presently running manufacturing trials, a major potential opportunity for Park, and it's major underneath. Park will have to make a capital investment of roughly $3 million.

Brian Shore

executive
#5

I want to pause right there, since none of this is guaranteed. That isn't the bar for us telling you about something. I figure you'd want to hear about significant possibilities for Park. If your preference is to hold off until everything is finalized, that's a different approach, but I doubt that's what I'd really like to hear. So what I'm saying is this might come together, or it might not. A shareholder raised a complaint — well, we discussed a few other programs a couple of years back, didn't that move forward, it didn't occur. Well, sure, we brought it up because it matters, and it looks serious. That didn't mean it was assured to occur. Keep that in mind, alright. Moving to Slide 25. We have separate initiatives in progress spanning calendar years '25 through '30 under the new LTA with GE aerospace, and through this arrangement GE is handing over two additional products to Park, which brings in $3 million of extra revenue. Just so you know, the Juggernaut doesn't factor this in — it's added revenue on its own, and it's not the MRAS LTA but rather the GE aerospace LTA, which stands apart. Regarding a potential JV with a major adhesives company focused on adhesives for the aerospace sector — discussions and negotiations are ongoing. We've held numerous in-person meetings. In fact, I believe one is scheduled for next week at our facility. Also, supporting the joint venture could call for a big commitment of capital — we'll find out. There's another potential JV we're looking at, this one with a large Asian industrial conglomerate, and it would involve making, marketing, and selling some of Park's commercial composite materials products over in Asia. Talks and negotiations are therefore in progress; right now we have a team in Asia, and several meetings have already taken place. A sizable capital contribution could be part of this. This OEM is being pretty aggressive. We're trying to hold it back somewhat. They plainly want to get this done. So it's — I'd say there's perhaps a solid chance it actually goes through. Moving to Slide 26, which is a completely different topic, though it's still an update. About the MRAS supplier scorecard — I should probably avoid packing too much into a single presentation, so apologies for that. Let's talk about the MRAS Supplier Scorecard. Here are Park's scores, which you can look at. That first item was in fact a mistake; it should have read 100. So what do these scores tell us? Why do they matter? We've been told MRAS works with more than 700 suppliers. But are these scores typical for MRAS suppliers? No, I don't believe so — we've been told that the majority of suppliers would consider themselves lucky to reach the 80s. I've heard that said many times, and why is it they don't reach the 80s? Do other suppliers ever manage to hit these scores? I don't think so. So the pattern repeats: Park is MRAS's top supplier out of over 700 — that's what I've been told. What's the mechanism behind that? Is it something decided in a boardroom, or does it come from the boiler room? For Park, this is an extraordinarily unique circumstance. I'm not certain people fully grasp just how unique and how significant an accomplishment this really is. And the fact that Park enjoys this kind of relationship with a business of that kind is genuinely remarkable. You see, our whole philosophy revolves around making customers love us, and for that philosophy to genuinely deliver results, it's less a matter of back-office operations and much more a matter of culture. It depends on Park having incredibly dedicated employees, and that explains why we achieved those scores, why we became their number one supplier and, based at least on what we've been told, their top supplier. So, yeah, I mean, for instance, sorry to use up the time, but just a quick instance. John Moon, I mean, we've been told he owns a house, though we'd never find that out since he never departs from the plant. If anything needs shipping. Regardless of the hour. He isn't going anywhere. He won't leave until that truck has departed the dock, and that sort of commitment; and if you want your customers to love you, you must have individuals like him. The remaining parts of the approach are fine, but for it to actually work, you need to have extremely committed people; so let's move on to Slide 27. Questions regarding — this is a separate subject now. We received some recent questions from investors, all right. So I'll pause for a new section here that we haven't done before. I don't know whether you'd like us to keep doing this, but we figured it would be interesting to add a few of the questions we've gotten from investors concerning our film adhesive product line, which we call Aeroadhere. What benefits does Aeroadhere offer compared to rival products? Well, the aero industry is somewhat odd; it seeks equivalency rather than improvement. Put differently, better isn't really such a positive thing. Let me explain how film adhesive came about. It was developed jointly with GE and MRAS, and we went through a lot of tweaking and refinement to match their requirements. Generally speaking, though, our goal is parity—because anything better than equivalent actually makes life harder for the customer when they try to fold it into their existing programs. So if all we offer is parity, why would anyone buy from Park? The answer is that what they get from Park goes beyond the product itself—it's about the whole way we sell to you, the way we represent Park. What we bring to the table is adaptability, fast response, and a sense of urgency. You'll hear people describe it this way: the customer tells John to jump, and John asks how high. That's not how we operate. When they tell us to jump, we ask how high—that's the product we offer. Sorry, Aeroadhere is a bit of a tongue twister. Investors are asking whether Aeroadhere's margins will come in above or below Park's average margin. The answer is above, and we have a lot of confidence in that. Looking several years ahead, what revenue range are we targeting for Aeroadhere? Honestly, we don't know yet. As for strategy, is the real goal on the revenue side to broaden the lineup of products we sell to customers who build aerospace composite structures? This is exactly why adhesives are so attractive to us: for aerospace composite structures, our product is essential to what customers make. Of course they must buy composite materials in order to build those structures, but adhesives also get applied by them during that manufacturing process. For reference, since revenue is what you're asking about: MRAS intends to certify our film adhesives first on the A320 program, and at present, once that program reaches a rate of 75 airplanes per month, it represents $3 million annually. So let's — and obviously that's not the whole picture; plenty of other opportunities are in development for us, both with MRAS and with additional companies. Moving to Slide 28, any further questions. Can you give us an update on the big new manufacturing project we mentioned during last year's Q4 investor presentation—excuse me, I said Q2, but I meant Q4? Where does that stand now? Has it grown into something bigger? And how come it didn't come up in our Q1 investor presentation? The answer is that the customer who kicked off that project has decided they want it structured as a joint venture focused on aerospace composite structures manufacturing technology—which could be a bigger effort, considerably bigger. So it's a JV along the lines of NewCo, meaning two companies would have ownership, I believe.

Brian Shore

executive
#6

Regarding our strategy — what exactly is it? Someone asked whether we actually have one. The answer is yes. It's known as the egg strategy. We're definitely not going to spend time explaining it right now, but reach out if you'd like to hear about it; it would likely take 5 minutes during a future presentation. It's a simple strategy. Not an elegant one, just very simple. So there's nothing — we'd tell you it will catch you off guard, but we can walk through it if you want. Moving to Slide 29, a different subject: our buyback authorization, which we announced on May 23, 22, when Park's Board approved the purchase of 1.5 million shares. Through that authorization, we bought 551,729 shares in total, at an average price of $12.94, for a total cost of $7.1 million. So we are putting some real money into this. In the highlights, though, recent buyback activity under the authorization since July 26, '24 — and why does July 26 matter? That's once the blackout ended, the Q1 blackout was lifted. We bought 331,180 shares of common stock, at an average price of $12.88, for a total cost of $4.251 million. As I said, we are putting some real money into this now. Why are we doing it? Why are we doing it? Because we believed the price was stupid, ridiculous. Buying stock isn't really our preference. We would rather deploy our cash to seize all the opportunities in front of us. But when the share price is — when we feel it's stupid and ridiculous, we don't believe we have much of a choice. Will we purchase more? I don't know, we'll have to wait and see, perhaps. So let's continue — that's our buyback program. Slide 30. An incredible cash dividend history: 39 consecutive years of dividends. We've paid $596 million, or $29.10 per share, since fiscal '25. So there's a bit of a thing here as we're developing a concept anyway. We have a regular dividend payable on November 5. That's not right. It should be paid on November 5, 2024. So, apologies, that's a typo I just caught. And we'll have paid $598.6 million at that point. Then it appears there's another typo. The next regular dividend is planned to be declared by Park's Board around January 9 — that's obviously '25. Sorry about this — and paid around February 4, '25, and that falls within the fiscal year. Someone won't get paid this week for these mistakes. Unfortunately, I think that someone is me, because I'm the one who made them, so sorry about that. But the concept is that during this fiscal year, if you look at the highlighted language, by the end of this fiscal year, we'll have paid, rather, $601.1 million in dividends since '25, and also $29.35 per share since '25. Do the math: '05 to '25, that's 21 years. So if you want to do the math, divide $601.1 million by 21 — sorry, that's 21 years — 21 years, yeah. Sorry. Two decades plus one year, so take $601.1 million and split it by 21, which gives you $28.6 million annually, just as a point of reference. Should you instead divide $29.35 by 21, the result is $1.40 per share each year in dividends distributed since — based on the average disbursed since fiscal '25, when '25 began. Moving along to Slide 31, covering our balance sheet. Long-term debt is zero for us, and cash stands at $72 million. That was just addressed. One remaining transition tax installment of $5.1 million is due in June of '25. When we consider our cash, there are certain known or probable outlays of $5.1 million — probable isn't the right word, it's certain, that tax payment in June. That must be paid. The share buyback in fiscal '25, Q3 during the quarter we're in now, amounting to $2.4 million, has already been disbursed, making it a certain item. For the Solution Treater project, $7.5 million, which is an estimate. The contribution toward the OEM partnership comes to roughly — well, $5 million, which is the figure under discussion. That brings us to a round figure of $20 million, so subtracting $20 million from $72 million leaves $52 million; let's proceed to Slide 32. Considering that $52 million, it excludes numerous other matters already covered. Many items, which we won't repeat here, appear on that list and have largely been addressed earlier in this presentation. Certain ones among them will occur, others won't. There's also — probably — extra spending on the new plant once production truly begins; regardless of how many hours go into trials and qualification, when production starts, you discover additional needs that may arise. So further investment could be necessary for plant equipment. So how do we view our cash position? Our view is that cash isn't unlimited, and we believe spending must be handled prudently. Proceeding to Slide 33, the Juggernaut, which we've gone over during the past three quarters, so we'll move quickly. The financial outlook for GE Aerospace jet engine programs and for Park, the Juggernaut. What about timing? It's uncertain, yet it's on its way, nothing can halt it. You'd best prepare. On to Slide 34. The sole modification here, thankfully, involves the GE9X program. We raised that figure, based on particular inputs received from our customer. We've been told of greater rates, yet that rests on particular inputs, rate inputs, coming from our customer. As stated before, no further detailed information will be given, since disclosing how many airplanes Boeing and GE intend to build annually truly isn't our place — that's for them, not us. So let's move to the following slide, 35, Park Aerospace Corp high level conceptual financial outlook. Our starting point is a baseline year of fiscal '24. The projected incremental sales for GE programs — this is simply arithmetic, using the figure from the previous slide and deducting the '24 sales, which I believe came to $21 million in incremental sales, leaving $37.6 million. Estimated — pardon me, non-GE programs, incremental sales of $15 million. So here we attempted something slightly different; previously, we'd separate it into programs where we hold sole-source qualification versus another program we anticipate winning and additional sales we expect to produce. We simply placed it all into a single large category, $15 million. As the footnote notes, we consider that a conservative figure given every opportunity we're pursuing. The overall amount here, as you can see, is $108.6 million. The EBITDA contribution stemming from the incremental sales comes to $19.7 million; that's calculated using a contribution rate, I believe, of 37.5%. The extra $4 million, we've covered that previously, pertains to our base year, which is rather inefficient since we're running far below the efficiency of the new plant; and for numerous reasons we've addressed before, which we won't revisit here. Slide 36, merely a footnote to the slide we just reviewed, so we won't walk through those. And that brings the presentation to a close. Thank you for listening.

Brian Shore

executive
#7

Operator, we're happy to take questions at this time.

Nick Ripostella

analyst
#8

Good afternoon, Brian. To start, regarding the buyback, I really value how sensible you are with it. I see plenty of smaller firms paying too much for their own shares, at times twice what they're going for in the market right now, and then stating in their release that they're giving cash back to shareholders, when in reality they wiped out value. So you've shown a lot of wisdom, and I'm grateful for that. Then, a few quarters back, I believe you mentioned something about possibly adding automation at a new site. I've been doing a lot of reading and watching regarding robots and other automated setups in factories; so could you share your view—do you think at some point you'd be at a disadvantage without automation at the plants, or I'd just like to hear how you see it. And credit to the team working there. It demonstrates that certain operations have an excellent culture and don't require a union. You've created a strong company in that respect. Thank you.

Brian Shore

executive
#9

I really appreciate those remarks, Nick. Thank you. When it comes to automation, if you came to see our plant, you'd notice we run those lines nonstop with typically around 4 employees; so it's not like an assembly line where you'd think many of these steps and methods might be automated, lowering expenses, perhaps boosting productivity. One of the areas—so that doesn't mean we lack interest, but I'd say the chances for a Park-style business are possibly not as strong in terms of bang for the buck as other types of businesses would be. Yet we also discussed automation regarding that project, the manufacturing one that has since turned into a possible technology JV. And there automation would be absolutely central, in my view. So that project still needs to get underway, as I mentioned, upon transforming. It's a bigger, different sort of project, but I think that one would include a good deal of automation.

Nick Ripostella

analyst
#10

All right, thanks. Is there time for one additional question from me?

Brian Shore

executive
#11

Of course.

Nick Ripostella

analyst
#12

I realize this is tough to put into words, but at what point would Airbus' planned increase in deliveries over the coming calendar year leave you disappointed? If the figure came in below whatever it turns out to be — 52, 54, 50 — at what level would that let you down?

Brian Shore

executive
#13

I'm not certain I follow what you're asking. Are you referring to our yearly sales, or...

Nick Ripostella

analyst
#14

No, I was talking about those deliveries you just described (ph).

Brian Shore

executive
#15

Are you asking about the monthly figure — the rate for each month?

Nick Ripostella

analyst
#16

Yeah, that's right.

Brian Shore

executive
#17

All right. Yeah, so we're already let down, honestly. That makes it a tough one to respond to. It's become pretty clear that the supply chain is a bigger known problem now, likely zero along. My guess is maybe we hit 50 this year, versus 48 last year. I've come across every sort of forecast out there. I mean, clearly we'd love to see 75, so perhaps that isn't a great answer. It would be good if they reached 55 next year. I'm not sure whether that's useful. But if they don't, we're already let down. So any figure below 75 probably leaves us disappointed. Still, the main thing is that we stick with it and are set for the ramp, because from where we sit, there's no doubt they'll reach 75 — given all the orders they've got, it simply wouldn't add up for them not to hit 75. So what matters most for us is being prepared for that, and that's truly critical. Which means we have to bring the new facility up to speed. That's the reason we're doing it right now, though we're also sort of enduring the extra expense of ramping a facility that's still running at a really low rate.

Nick Ripostella

analyst
#18

All right. Thanks. Yeah. And like you mentioned earlier, this is something that plays out over the long haul. And I truly appreciated what you said about the stock price being stupid — and it definitely did get pretty stupid at one point; so, I'm grateful for that. Thanks a lot, Brian.

Brian Shore

analyst
#19

Thanks, Nick. Great to hear from you.

Brian Shore

executive
#20

All right. Well, thanks, operator. I just want to apologize that it took so long. What I think happened is we attempted to fit too much into this presentation. Everything we went through was meaningful and information that a lot of you probably want to know about, but even so, maybe we showed more than we could pick. So I'm sorry about that. Anyway, thank you so much for listening. We hope your day goes very well. We'll be in touch soon. Good-bye.

Operator

operator
#21

That brings the teleconference to a close. At this point, you're free to hang up your lines. Once more, we appreciate you joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.