Park Aerospace Corp. (PKE) Earnings Call Transcript & Summary
January 14, 2025
Earnings Call Speaker Segments
Brian Shore
executiveThanks, Alicia. Brian here. I’d like to welcome everyone to Park’s investor conference call for the third quarter. Joining me is Mark Esquivel, who serves as our President and COO. We released our Q3 earnings press release just after the close. You’ll want to obtain that, since the news release contains directions for accessing the presentation we are about to review; if you don’t have the presentation, the call will be much less useful. The presentation can be reached through your webcast—I believe that’s the right way to phrase it—and it’s also available on our website. As the operator mentioned earlier, once we finish walking through the presentation, Mark and I would be glad to answer questions. Before we start, a heads-up: I can't say for sure, but walking through these slides will probably take around 45 minutes. Okay, let's get going. Everyone please go to Slide 2, where you'll see the disclaimer about forward-looking statements. If something in there isn't clear, feel free to ask. Our agenda is on Slide 3. Item number one covers the Q3 investor presentation. Supplementary financial information also appears in Appendix 1 toward the back. Normally we skip that part on the investor call, but should anything about those supplementary financials puzzle you, please speak up. The visual on this slide is titled "The Missing Link? Thank you, James Webb Space Telescope." I can't claim to grasp it completely, but I'll give it my best shot. That little box over on the left side is basically a blown-up version of the tiny box sitting more or less in the middle of this picture. And from what I understand, that thing appears to be an incredibly ancient galaxy — only around 1 billion years after the universe came into being, which I believe happened roughly 13.8 billion years back. The problem our scientists all face is that it's way too hot and way too bright for a galaxy of that age, and nobody can explain it. Once again, James Webb is overturning our prior assumptions — basically saying, "Nope, that's incorrect." Honestly, whether James Webb speaks or remains silent isn't something we worry about. Whatever view you hold, whatever you believe — that's not our concern either. Here's how the situation actually stands. It's genuinely thrilling. Some of you may be aware that our proprietary SigmaStrut components sit within the James Webb's framework, and they serve as critical pieces of the James Webb Space Telescope's structure. This is believed to be the missing link. I realize that refers to the connection between primordial galaxies and modern galaxies. I think you’ve got to put modern in <<inaudible>> because modern is not like 10 years old or something like that. But we’ll see, interesting and it’s really so exciting and thrilling for us to be part of it. I'd put this pretty high up on the list of things Park has achieved since we started out — we aren't quite as old as a few of the even more recent galaxies, but we go back to 1954. All right. Let's return to solid ground, or get back down to earth, and turn to Slide 4 to go over what we did this quarter. Take a look at the right-hand column — sorry — we brought in $14,408,000 in revenue, and our gross margin was 26.6%. Anyone familiar with how we operate knows that kind of margin is pretty weak. We're not pleased when margins drop below 30%. So obviously, we're not thrilled with that figure. Adjusted EBITDA landed at $2,414,000. On our Q2 investor call, which took place October 15, we laid out our expectations for Q3. We said sales would land somewhere between $13.5 million and $14.5 million. It looks like we came in just a bit higher than that sales range. But on adjusted EBITDA, we fell well short of the $3 million to $3.3 million we'd talked about — so something is definitely off. Something here just doesn't add up. Let's dig into that. Moving to Slide 5, the top section covers Q3 considerations. So the question is: how come Q3 EBITDA fell well short of the forecast range while Q3 sales came in higher than the range's upper end? Put another way, the usual expectation would be: sure, Q3 revenue landed at the high end, so EBITDA ought to land at the high end too. So let's dig in — and sadly, walking you through this properly requires a handful of slides. So here we go. Alright. Starting with the first checkpoint: as we just mentioned, fiscal '25 Q3 sales came in at $14.4 million, roughly $150,000 above the upper bound of our guidance range. However — and this is a very, very large however — the value of what we produced during Q3, which we refer to as SVP, totaled just $13.2 million, meaning it fell $1.2 million short of Q3 sales. Under normal circumstances SVP wouldn't even come up in conversation unless there were something meaningful behind it, and I want to be clear that SVP does not represent the worth of inventory. That figure represents what the product we sold is worth. Thinking about it this way is useful, since it lets you hold production and sales side by side on equal footing. That's the reason we rely on SVP instead of simply using the inventory value of what gets produced when we look at production. Over at Park, SVP contributes substantially in a positive direction — it meaningfully boosts the bottom line. Because of that, this shortfall in production, or SVP, drags down Q3, or Q3 EBITDA, considerably — roughly $300,000, in fact, when it comes to EBITDA, since production pulls a large chunk of cost into the inventory it produces. So what took place? What caused the production and SVP shortfall in Q3? Okay, a number of factors come into play. First, we're starting up the additional production lines at the new facility. We're pushing through what we anticipated would be a demanding stretch of getting those lines calibrated while they're already operating—and getting them running at full rate on the factory floor. Doing this in a live production setting is an entirely separate challenge. That's truly the point where you work things out, where you make adjustments, where you clear out the problems, which is not the case during trials or qualifications, when nothing is pressing and you can move at whatever pace suits you. Things function quite differently once you're in production. Turning to Slide 6, in the end, we anticipate that the new lines—and this matters—will operate 25% to 50%, possibly even beyond that, more quickly than the lines we have now. It varies by product type. It also varies depending on whether you mean film or tape, but conceptually, just consider it: it's considerably quicker. Still, we have to work through the learning curves we expect in order to get there; yet in the end, that will bring substantial punch to the bottom line by letting us make our products at such a faster rate. The new lines also come with improved controls, which is an additional element. Controls that are better than what the current lines have, able to hold tighter tolerance—which means higher-quality products; in fact, we don't actually need to run—all right, here's an important new point—we don't need to run the new lines at all in order to sustain present production volumes. We're ramping up to get ready for the Juggernaut that's coming.
Brian Shore
executiveWe've discussed the Juggernaut quite a bit; that comes near the conclusion of the presentation. On Slide 26, once we reach it, we can — it will become quite obvious to you why running the new lines isn't necessary to sustain that production level; that isn't the issue, but bringing things up somewhat prematurely will hurt our P&L over the short time — over the near term. And it's difficult to say. You constantly do your utmost to determine the right moment to ramp, the right moment to ramp, and attempt to make those small tweaks; yet scaling up after it's too late and lacking readiness to back the major programs as they scale up, that Juggernaut, well, everyone understands how that would turn out and it isn't a pretty picture, not a pretty thing to think about. You fall behind and you're sort of doomed. So, you'd rather lean toward being early than being late. And you simply keep making the tweaks as necessary; yet the bottom line is — factoring in the effect on the bottom-line, the bottom line is we had better be prepared for the approaching Juggernaut, that's the single most important thing for us. On Slide 7, bringing up the new lines is now included in our — bringing up new lines at this point is included in our plan to be prepared, but at present, the new lines operate with less efficiency until we move past the learning curves with those new lines and the business scales up. When business scales up, as I mentioned, we don't even have to use the new lines. So, clearly, plenty of additional costs from doing that. The following item, even though Park is extremely lucky to have a unique and committed workforce, wonderful people, a large number of our production staff are fairly new to Park and remain at the early stage and steep portions of the learning curves. So, this is yet another factor. While the new hires undergo training through the learning process, our productivity, which is calculated as production units or dollars per work hour, is temporarily lowered, alright? So that will impact our — let's see, the short-term drop in productivity hurts profitability because it raises our input cost per unit of production, do you follow? Alright. Producing a unit requires more time, so that will impact our bottom-line. And beyond that, this diminished productivity also hurt our Q3 production levels, which added to the shortfall we mentioned, which had a significant effect on our bottom-line. How much are we discussing regarding the productivity or diminished or lowered productivity effect on our profitability? We aren't really stating, but it's significant, alright? Our present staff — continue, bottom of Slide 7. Headcount, 134 versus 124 at the close of Q2. What's happening there? Let's move on to Slide 8. Of course, having more employees does put some short-term strain on our margins, but those additional staff are necessary; we're scaling up ahead of Juggernaut. And in fact, because fewer workers are leaving the company, we've managed to — and this caught us off guard, we've managed to grow our team faster than we had planned. It cuts both ways. But our staff, Sadie, Nancy, and others, are excelling at bringing aboard the best candidates; that matters a lot; we've never had trouble bringing people in, ever — over the past 2 years, but it's selecting the best candidates that — Park is quite a unique, eccentric organization; and I'd estimate 9 out of 10 individuals aren't truly a fit for Park. So, we have to locate that 1 in 10 person; and that's quite meaningful too. Those 10 additional staff likely hit our P&L for $150,000 during just that quarter, roughly speaking. So, that's another major piece of the puzzle. And we hadn't anticipated that happening since, you know, we've discussed quarter after quarter, we're attempting to scale up, attempting to scale up, and it seems so frustrating. You gain a little ground, then you give it back. That's complicated and this is a difficult one. We've sort of been keeping this under wraps. We haven't wished to address it since it's a very delicate matter. But my view, our view is that you're putting in your hard-earned money or your clients' hard-earned money, and you deserve to learn some of these details. So, we must exercise some discretion, but we're choosing this moment to share something quite significant. A delicate matter concerning ArianeGroup's RAYCARB C2B NG Fabric. Keep in mind that Park formed a business partner relationship with the ArianeGroup in January '22, 3 years back, whereby ArianeGroup named Park as its exclusive North American distributor for its proprietary C2B fabric. Park uses this fabric to make ablative materials for missiles and rockets. One of Park's major customers that manufactures the rockets and missiles from the ablative materials, this is ablative materials, a major customer whose product we make using the C2B fabric is undergoing a requalification of the fabric, not Park's material, of the fabric. We won't go into why that is, as I said, everything is very delicate. But this customer along with others keep purchasing and stockpiling large quantities of Park's C2B fabric. Our C2B fabric non-material sales should come to roughly — nearly $7 million, $6.9 million in fiscal '25 — $2.5 million or more the following year, and in fact $3.9 million in our Q4 alone. So, these OEMs, they're clearly dedicated since it's their own risk. I mean, this is their stock, they keep purchasing and purchasing and purchasing, amassing this product; but at the same time, one of the main OEMs is saying, well, we're requalifying the C2B fabric. And here's the thing — let's turn to the top of Slide 9. But until that requalification wraps up, we at Park can't make ablative materials with C2B fabric for this particular customer. So what has to occur? To start with, this program matters so much that it simply must move forward. And second, they are purchasing millions upon millions of dollars' worth of this fabric. So it has to happen — there's no way around it. Yet as long as the requal remains unfinished, we aren't able to manufacture those materials for them. Consequently, during Q3, Park recorded zero sales of ablative materials made with C2B fabric to this customer. Keep in mind that we do sell C2B fabric — so let me be clear: what we're saying is that we sold no materials manufactured using that fabric; we continue selling the fabric itself, and those are two entirely different matters. Remember, Park sells C2B fabric to our customers at a small markup; so we sell the fabric to them, they stockpile all of it, and the margins are small. Our margins — but the margins from producing and selling ablative materials that use C2B fabric are substantial. Let me explain exactly what we're discussing here.
Brian Shore
executiveWe anticipated it, but we had no way of knowing it would occur, so it's outside our hands—the requalification is simply not something we can control. We're the well-intentioned party in the middle attempting to assist, to be of service, yet how fast that requal gets finished is not ours to determine. Still, for some context, during Q3 we thought we'd move $400,000 worth of materials produced using C2B fabric; $400,000, that isn't such a large figure. Really? More than $300,000 once it reached the bottom line, right? So now you can see how this operates. The margins on fabric sales are quite thin, since our markup is modest. Once that fabric gets turned into materials—picture a customer owning fabric on behalf of a customer—the margins become, to borrow a word, enormous, I'd say, all right? That ought to give you some context. As long as the requal remains unfinished, we're stuck with this P&L double whammy: either selling fabric at a small markup, or being unable to earn a very high margin on ablative materials, making the fabric, all right? So right now, completion of the requal is anticipated in March—I put "requal" and "expected" in quotes since it isn't something within our control; there's motivation now, though, because pent-up demand exists for building these rockets and motors and missile systems, and without a fabric they can't do that—they require the material we supply. So, let me check whether I have a note on this. I simply want to know; that's fine; so should it come to pass that requal finishes in March, we anticipate sales to this customer—this one customer alone—of ablative materials, the materials utilized in the fabric, to reach roughly $2.5 million or beyond in '26. As for the contribution from those sales, well, I already described what that looks like; pent-up demand is there. So the moment requal wraps up, we'll be off to the races. And the market won't be the constraint—the constraint will be how much product, how many systems, the customers can turn out. Let's move to Slide 10. We've been hesitant to discuss that—it's quite sensitive—but we felt you truly ought to understand what's happening here, because, as I said, you're putting your hard-earned dollars to work, or your clients' hard-earned dollars, as you might call them, and you deserve to know these things, I believe, at least to some degree, to the degree we can share them. Slide 10, so here's a question. Why didn't we anticipate these developments in Q3? Why didn't we factor them into the Q3 EBITDA forecast we provided? Well, we genuinely did expect to manufacture and ship that $400,000 of ablative materials. That part isn't really our fault; it's simply that requal didn't take place; so I believe we had reasonable grounds to expect it would happen in Q3. That didn't come to pass, and we ended up with a double hit on the P&L. During Q3 we sold $400,000 worth of C2B fabric, and bottom-line wise that barely does anything for us; and on top of that, as we mentioned, we brought people on board faster than we had anticipated, simply because historically it's been tough — we've had a hard time growing our headcount, and our folks are doing a far better job of hiring — firing — sorry, of locating the right candidates, the right individuals for Park, which is somewhat like hunting for a needle in a haystack, I'd say. Most folks simply aren't suited to Park, that's just the reality; but regarding the production shortfall we discussed and the lower productivity we discussed, the responsibility is ours. We ought to have anticipated those things when we handed you the forecast, and we simply missed the mark. Naturally, we gave it our best effort. We missed the mark. Our production and productivity targets were not reached; the fault is ours; we own it. Consequently, Park's employees won't get a bonus for Q3; and to be clear, this isn't about punishing anyone, but Park needed — chose to combine this together; so, when our numbers aren't met, no bonuses come our way. That's just the reality. Now, before you start feeling too sorry for our team, let's move to the top of Slide 11. Still, there's optimism among Park's people regarding the upcoming year and what lies ahead, and our Park family members are going to get goodwill bonuses for the New Year. This isn't tied to the quarter; these will be bonuses, but they won't cost you anything. So, let's proceed to the following item. Q3 carried substantial continuing costs tied to running our new factory, among them depreciation expenses noted in the footnote below. On an annual basis that's roughly 1,000 — sorry, $1,260,000 flowing into gross profit, gross margin, not EBITDA, obviously. Everything else falls under EBITDA — facilities, maintenance, utilities, insurance, overhead expenses, people expenses. But all of that was factored in when we provided our Q3 forecast, at least the parts we were aware of. So, that's the situation there. Missed shipments in Q3 were actually somewhat improved. The production shortfall was considerable; yet if you've followed us lately, over the past few quarters, I believe it's been around $500,000 or $600,000 in shipments. Whether that's a trend I can't say, but we'll accept it, a bit better. The familiar culprits — international shipment problems, supply chain problems, customers on hold problems. What that means is customers aren't settling their bills. Sorry, no shipment goes out for them, plus other miscellaneous problems. Yes, we have a somewhat quirky stance about being compensated for our work. Slide 12. This is simply a routine we perform each quarter for you, or for — perhaps it's — I'm not sure, it's likely okay, since it's consistently those same 5 biggest customers. Just briefly, the Comac 909, that's the name the ARJ21 retail jet now goes by, or rather 901 through 909. That one is MRAS, it's connected to MRAS. Here, the Gulfstream G280, that's Aerospheres, a distributor for Israeli — not aircraft, Israeli aerospace vehicle these days, which produces the G280 business jet under an agreement with Gulfstream. Then in the bottom left, we mention this frequently, the Patriot Missile, though that's Aerojet; and after that, Kratos, naturally, Kratos <<inaudible>> among our particularly valued customers with the Valkyrie there. And the 737 to 800, that's tied to Nordam. It's the WeatherMASTER Radome employed on the 737 line, which includes, I believe, the MAX too. Alright. Let's continue. Let's move to one up here. Slide 13. Our pie charts, I'm not sure about you, I genuinely always enjoy the pie charts. Looking at them, you'd notice that '22, '23 and '24 and '25 were fairly alike when it comes to the breakdown, '21 stands out as quite different. That was the pandemic year. Naturally, aircraft was chaos back then. Keep in mind, planes were flying with maybe two people aboard. We're not — largely not full at all. Okay.
Brian Shore
executiveLet's move on to Slide 14. Park is really into specialized military aerospace efforts. These are missile-related programs, and this one here is the newest. So why not zero in on missiles during this quarter? What's fascinating is that many other programs exist which we passed over. To put it another way, we're involved in plenty of missile efforts, yet the ones she picked out are particularly impressive. I'm not going to walk through every single one, but I do want to highlight the one at the bottom — SpaceX. Honestly, I have a lot of affection for that company. That's just my own personal view; so being part of that effort makes me genuinely excited. On the lower right side, there's a small historical note about Lockheed Sunnyvale. Back in 1962, we made something known as multi-layer circuit boards — we created multi-layer circuit boards. As far as I know, we were the first anywhere in the world to do so in 1962 for Lockheed Sunnyvale; they had asked for a way to cut weight on the circuit boards, which were for ICBMs in those early days; and our response was to create what are called multi-layer circuit boards. So our relationship with Lockheed Sunnyvale stretches back a long way, with plenty of history involved. Now let's turn to Slide 15. Alright, this slide is familiar to you, so we won't take up much time here. Regarding GE Aerospace jet engine programs, we held a firm pricing LTA spanning '19 through '29 with Middle River, which is a subsidiary of ST Engineering Aerospace. Naturally, the question becomes: who exactly were they? What was this all about, since every one of these efforts falls under GE Aerospace as well, as most of you are aware by this point. At the time we joined these programs, Middle River operated as a GE Aerospace sub, and roughly five years back GE Aerospace divested Middle River to ST Engineering, though we had already been working on those programs. As for the redundant factory, we informed MRAS and GE back then that once this LTA got signed — which covers sole source status on these programs — we would construct a redundant factory on their behalf; and that's exactly what we did, at a cost of $20 million. The rationale being that we hold sole-source status across these programs, and GE wanted a secure, redundant factory, since they had all their eggs in our basket. So we went ahead with it. That factory has now been producing for a couple of years. We've covered that already. I won't run through every one of these programs, but they're truly all excellent ones. As you said — we simply enjoy participating in these programs. It's a pleasure to be involved in them. If any questions come up, just let us know. Now let's proceed to Slide 16. Moving to the second item, Fan Case Containment Wrap, the GEnx — pardon me, not GEnx, the GE9X engines that go on the 777X aircraft. GEnx, by comparison, is used on the 787 as well as the 747. The GE9X for the 777X is manufactured using our AFP along with other composite materials. And as you're probably aware from our previous discussion, we recently got a purchase order worth $6.5 million for this program. So what that tells us is the program is genuinely beginning to try to get off the ground and move into production, and they're running into their challenges. We'll circle back to that afterward. Moving on — MRAS/LTA gave us a 6.5% weighted average price increase that took effect January 1, so we've only been seeing the benefit of that for the past couple of weeks. The MRAS/LTA was amended, I believe — I'm not sure exactly — roughly a year ago to bring in film adhesive products that we created through our joint development project with GE, and every one of those products is going through qualification right now. Life of Program — we discussed this over the last couple of quarters. We're still working on it. We held another meeting, another negotiation session. Actually, the ball is in our court at this point, since right now we're waiting on some of our suppliers to provide pricing to us. So — I suppose it's in our suppliers' court. Before we can restart our discussions, we need pricing from our suppliers so that we're able to give the correct pricing to MRAS and STE for the Life of Program agreement. Slide 17. Let's discuss updates on jet engine programs. We always begin with the big kahuna, the A320neo aircraft family with all its variants. Airbus has an enormous backlog of 7,221 airplanes. That's simply a massive number of airplanes for any commercial aircraft program, any program — on any program. Airbus, as you're aware, is aiming for a delivery rate of 75 airplanes per month by 2027. And then, let's talk, let's move to 18, a bit more information, let's see how they're performing, go through '18 through '24, how many — I mean this is all A320neo aircraft deliveries, how many are being delivered per year, per month? In '24, Airbus wrapped up with a bang, 602, averaging 50 per month, quite impressive. And really impressive, 92 airplanes delivered in December. And that doesn't mean they're at a rate of 92, because these airplane companies have this sort of practice where they kind of make their year in the final couple of months, but regardless, that's a really big number. And clearly, given this backlog, they were already producing 75 per month, not <<inaudible>> because of supply chain constraints. Aren't we all kind of tired of listening — hearing about supply chain constraints? I am, at least. Slide 19. So, will Airbus hit that goal of 75 airplanes per month? Yes, gosh, you're asking me? Yes, I believe they will. Will they hit it in '27? Well, following a very strong finish to '24, which we just described on January 9, 2025 briefing, just — what, about a week ago, Airbus' commercial aircraft CEO emphatically reiterated Airbus' plan to reach that 75 per month production goal in '27. So, I detect a bit of maybe comic relief. Are we Waiting for Godot? Do you know Waiting for Godot? It's a Samuel Beckett play — he was an Irish existentialist, I believe. I went to see it, and I hated it. It was awful. Sorry, Sam, but I believe he's no longer with us, so he probably won't be too upset with me for saying that. The idea, though, is Godot — which I think is meant to be God. I'm not great with this kind of thing. I got it from somebody — ask someone who's smarter than I am. My understanding is that Godot represents God, and the characters just sit there throughout the play waiting for God, and God never turns up. So that, I believe, is the theme. As I said, if you truly want to grasp it, ask someone smarter than I am, but that's the gist as I see it. Are we Waiting for Godot? In other words, waiting for leasing to ramp up while we sit on our rear end doing nothing? We'd better not be; we'd better be prepared for the Juggernaut, the 75 per month Juggernaut. That's what we're doing. It's a funny thing in Aerospace, you get onto the — one of the programs that we're so thrilled about. And with some of these defense programs, missile programs, <<inaudible>>, sole source, and it's sort of a two-edged sword, because once you're in the program sole sourced, you can't do anything.
Brian Shore
executiveOkay, so we're dependent on the OEMs increasing production. It's not as if we can just phone Airbus and tell them to make more aircraft, or Boeing, or Comac, or some of those defense contractors. So it works both ways. What's important for us is what we said before: you simply cannot predict it with any precision. Our task is only to make certain we're ready. If we're not ready, we've got a problem. If we're ready somewhat early, that's okay — it hurts our P&L for a period of time, but not being ready isn't something even worth discussing. Let's go to Slide 20. So this is pretty much what we already know — the A320 family has two engine options that are approved for it. You've got the CFM LEAP-1A on one side, and a Pratt engine on the other. And one quick thing, and I'm not sure if this comes at the right point in the conversation, but back on December 6 of 2024, GE put out word that CFM's new high-pressure turbine durability kit for the LEAP-1A had been certified by both the FAA and EASA, Europe's equivalent of the FAA. That matters a lot, because durability is exactly where both of these engines — the Pratt and the CFM — have had issues. Regarding the Pratt, I'm not trying to be unfair, yet the durability issues have been substantial and severe. That creates a real difficulty for airlines. No carrier wants aircraft grounded owing to problems with durability. It simply doesn't work for them. So this is truly a positive development, since while I believe Pratt is working to reach that standard, GE is achieving quite encouraging advances on durability, possibly even creating some separation from its rival. However, our components go only into the CFM LEAP-1A section of the A320 program. Within the current A320 program, we provide nothing for planes powered by Pratt engines. Aero Engine News reports that as of November 30, CFM's LEAP-1A accounted for 63.9% of firm orders placed with the A320neo aircraft family. For a very, very long time, LEAP has ranked number one in market share. We monitor this on a monthly basis, and the figure tends to fluctuate somewhere in the 60 to 65 range. That represents a solid market share. When you look at the delivery rate of 75 airplanes per month, a 63.9% share works out to 1,150 LEAP engines annually. How much does that mean for Park? For Park, that amounts to a great deal of money — a lot of clams, or whatever term you prefer. Moving to Slide 21, let's carry on with this same topic. Okay, so regarding the Aero Engine News information, as of November 30, there were 8,148 firm orders for the LEAP-1A engine. If you aren't familiar with this, it's difficult to grasp, but an order book that size is basically unprecedented. So what do those firm engine orders mean in terms of value, Park? The answer is an enormous amount. We'll get into it afterward, but Slide 37 provides a sense of the revenue we generate per unit. It truly is substantial. And obviously, that represents a massive number; and obviously, Airbus wants to deliver more aircraft while CFM wants to deliver more engines. That's the current count of confirmed orders they hold, and they still have more to come. So, let's move on to the following topic, the A321XLR; we're still discussing the A320 family here. This is a fresh version. It just arrived — we're only getting started at this moment. The initial handover happened in October, which is great. The first passenger-carrying trip took place in November of last year. The first passenger-carrying crossing of the Atlantic occurred on November 14. And after that, as stated by Airbus, it holds more than 550 confirmed orders. This is a truly thrilling initiative for Park to be involved in. Keep in mind the entire concept — the thinking behind this plane, far superior — it's a narrow body, yet it offers excellent range and significantly improved payload, carrying more passengers, more luggage. So, it might go head-to-head with the dual-aisle, the wide-body jets, or at least that's the idea behind it. So, a fairly thrilling initiative, in my view. And Boeing has not up to now, they stated that they will take steps to go up against that XLR. So, the XLR occupies that niche by itself for however long, I suppose, they'll remain unchallenged. Slide 22, <<inaudible>> time's up, we're not performing great. The Comac 919, let's discuss Comac alongside the A320. This relies on a different variant of the LEAP powerplant, specifically the LEAP-1C. A Chinese company set a goal of delivering 54 919s during '25, then 84 in '26, followed by 110 in '27 and 126 in '28; thus, their plan involves ramping upward; by '28 they want to reach a build rate of 150 aircraft; note these figures refer to planes, not engines. Reportedly, they've accumulated over 1,000 orders for this aircraft. For Park, this counts as a very big deal, and I want to take a moment to underline that point. At present, three different Chinese airlines fly the 919. For now, it largely serves routes inside China; and plenty of people assumed this jet was meant solely for that country. No, you shouldn't say such a thing to Comac. They've reportedly delivered 16 of them, so they're just getting started, though progress is happening. And here's a big one: they say they're aiming to get EASA certification — that's the European approval — during 2025. Whatever happened to the idea that this was a plane only for China? You shouldn't say that around Comac, because that's not their view. So I think this is going to be a really exciting initiative for Park — that's how I'd put it. In '26, we're looking at Southeast Asian routes, not just China. Turning to Slide 23: the 777X with the 9X engines. In August, the FAA grounded the 777X for a short time after issues with engine attachments came to light. September 6, 2024, one aircraft from the 777X test fleet supposedly went back into the air and I've come across several pieces about that, but it's odd, I haven't seen much verification of it. Alright, if you come across anything regarding that, tell me, since I'm still attempting — we're still attempting to work out what is happening in that situation. Boeing's existing certification, the initial handover goal for the 777X is '26, and as of '24, they possess slightly more than — September '24, slightly more than 500 orders. For Park, this is a genuinely significant initiative, which is the reason we call attention to it. We haven't spent much time on this topic, so I'll touch on it quickly: the Global 7500/8000, which uses Passport 20 engines, just marked its 200th aircraft delivery. Now on Slide 24, you'll recognize this again. So what are we looking at? It's a record of GE Aerospace jet engine program sales, plus projected figures. Let's head straight to the lower right corner. We've devoted a lot of time to the historical portion, and we're pressed for time at this point. First, for Q3, we should note $6.9 million in sales across GE programs, while Q4 is projected at just $5 million to $5.60 million. That's somewhat of a soft quarter; Q1 was $5 million, but keep in mind, that resulted from the storm damage; Q2 and Q3, roughly $7 million. So, anticipating not a strong quarter in Q4.
Brian Shore
executiveEssentially, everything's already been claimed, so we can see fairly clearly what's coming. For the year '24 — which is fiscal '25 — we're looking at somewhere between $24 and $24.5 million. Compare that with about $21 million in '24, and in '23 it was, what, $22.3 million; so the trend is moving in a favorable direction. We're also giving a fiscal '26 projection. Roughly $30 million — $28 million to $32 million; this is a preliminary forecast. But I'd like you to grasp that it's based on what our customer has told us. And these figures are the low ones. We get three versions: low, middle and high. What our customer hands over to you is the low set. We'll just have to wait and see how things turn out, and we'll keep everyone updated. Moving along to item 25 now. All right, let's take this a bit slower; next up is Park's track record on financial results along with projected figures. Everything here pertains to Park. As you're already aware, we've gone over fiscal '25 Q3 previously. For Q4, the projection is $15.5 million to $16.3 million, with sales between $3.3 million and $3.9 million in EBITDA. If you simply calculate it, across the first three quarters, fiscal '25 comes to roughly $60.5 million to $61.5 million for the year, and $11.5 million to $12.2 million annually. That said, we'll get into the full year on the upcoming slide. So the Q4 EBITDA figures are looking quite strong. What's driving that? Okay, so if you recall, there was that $400,000 in C2B ablative materials we'd planned to move during Q3 — that's now on the schedule for Q4 instead. Fingers crossed on that one. But do you remember the contribution level and how big the production plan was? Keep in mind, we came up short on output during Q3 — we had a production shortfall. So really, we drew down inventory to get those sales. Actually — let me correct myself — finished goods inventory. At the close of Q2, finished goods stood at $1.7 million, and by the end of Q3 they were around $700,000, meaning we used up roughly $700,000 worth. So going into Q4, the goal is to replenish that stock and add a bit more on top. Keep in mind that output from our factories gives a solid boost to the earnings we report at the end of the day. As I see it, we stand a good chance of meeting the manufacturing goal we set for this quarter, since the team is working to build inventory ahead of schedule — that's the best way to describe it — and results so far look encouraging. On the manufacturing side, I expect we'll manage fine. That should give a lift to our earnings performance rather than drag it down. Regarding your inventory question, there was a significant increase in Q3 relative to Q2. The reason for that was C2B inventory that was in transit — a substantial portion of it landed on our balance sheet when Q3 closed. Finished goods inventory, on the other hand, declined considerably. One more thing I'd like to point out: as you're hearing this, we've put plans in place for Q4, and footnote 3 there shows $3.9 million in C2B fabric sales, which is a large amount. But just over $1 million — about $1.1 million of it — could be in jeopardy, because the French government has to sign off. That matters a lot to our bottom line, because this business actually earns better margins than the majority of what we bring in from C2B fabric sales. So it might fall through. This is another case where we're simply playing the nice guy and lending a hand, yet it involves the French government along with a major OEM, and they're all working to get it done. They claim it will get done, and if the French government's approval comes through in Q4 — or if it doesn't — then we lose the sale, and that sale moves into Q1. I figured you should have that context. All right, moving along to Slide 26. I apologize for how much time this is taking, but there always seems to be plenty of material to get through. This next slide is another one where I'd like to take things a bit more slowly. Let's turn our attention to the figures for the year, I suppose. There's a perspective here that I find rather interesting. Let's examine the key themes. So, constraints in the supply chain that are having an impact on aerospace. If you look at the revenue line, during fiscal '20, prior to the pandemic, we posted $60 million. After that, it dropped to $46 million. Then in '21, '22, '23, and '24, those years show a real battle to recover following the pandemic. Because of this, the aerospace sector is driving up expenses for the Juggernaut. That factor mostly affects the bottom line when we consider fiscal '25, which we've already discussed. On top of that, fiscal '25 contains $6.9 million from C2B fabric sales, and those naturally carry a lower margin. That helps clarify, at least in part, why the margin figures aren't what — why the EBITDA figures aren't what you would anticipate. So, when you compare things to fiscal '20 — our revenue for '25 should land at roughly the same level as '20, possibly slightly above it, though earnings would come in a bit under that. Then keep in mind that we booked $6.9 million from C2B fabric sales, and back in '20 we essentially had zero of those, so that factor alone accounts for the gap. Let me also flag one more item: I believe during Q1 we shared a full-year outlook with you, somewhere around $60 million to $65 million on the top-line, and we intend to hit that, give or take. On the bottom-line EBITDA, we also guided to $13 million to $15 million. And we won't hit that target. Back when Q1 results came out and we shared our projection for the full year, we were counting on a significant volume of C2B material sales, and that simply hasn't happened. That's one factor — among the reasons — behind our decision to bring you up to speed on where things stand with the requal. It's entirely tied to that requalification. As for their inventory — like I said, quite a lot — the OEM accumulated enormous amounts of C2B fabric, but until requal is complete, we're unable to produce it. And that really took a toll on our earnings for this fiscal year. And this wasn't something we anticipated at the time we provided that forecast — I believe it was when we announced Q1 in July. So that accounts for it — sure, we ought to have realized our Juggernaut ramp-up expenses were coming, and we did, however we had no idea we'd fall that far short on the C2B materials. And we'll accept responsibility for whatever falls within our control. But that piece isn't our fault. I'm saying it isn't on us. That didn't occur. We're the ones acting in good faith, attempting to assist, yet you're talking about two enormous companies that need to work out how to complete this requal. And they will complete it. They must complete it. They've got plenty of incentive; but we can't manufacture those materials until that takes place; and I've already given you a sense of the margins on those materials.
Brian Shore
executiveThat by itself would account for the gap relative to our projection of $13 million to $15 million, which we provided when we shared the fiscal year outlook at the time of our Q1 announcement back in July. Apologies for going slowly, but there's a lot of ground to cover. General Park updates, Slide 27. Mostly, these are just items we discussed previously. And in part, we're including these — the updates because otherwise folks ask, "What's going on? Does that indicate this is no longer an active effort?" So, we're trying to prevent that. Solution Treater project, so it remains a top-priority active project. Continuing on, a key original equipment manufacturer asked Park to join them in acquiring an additional production line. The cost comes to $5 million, or $5 million each. We want to reveal at this point that the OEM in question is ArianeGroup. We thought it was important for you to be aware of that, and to also mention that we expect $75 million in contract — in sales through 2034 as part of the deal currently being worked out with them. That covers the latest developments. Turning to Slide 28. As we've addressed before, this concerns a vital, prominent, sizable and heavily prioritized missile defense initiative and its progress. We hold Sole Source Qualified status within this prominent effort; and we've already talked about what holding Sole Source Qualified status involves. We anticipate more money coming in during this year, and after that it should climb further. What exactly is this program? Are you familiar with the next-generation Iron Dome? Moving on to our next point: Park recently signed a licensing deal with an OEM covering hypersonic missile technology. There isn't a lot new to report. We remain in Phase 2, and up to this point — regarding the manufacturing trial — things have gone well. Let's continue with the Slide 29 updates; that deal with GE Aerospace, we're not referring to the MRAS agreement here, we mean GE Aerospace. We've gone over this before. Now, the sole piece of news is that the agreement has been finalized and signed — during our previous conversation, it was still being worked out; as for the following item, we can bypass it since there isn't really anything new to share. Then, regarding the final item, the Supplier Scorecard for MRAS: 100, 100, 100. So what does that actually tell us? I think it's difficult for most folks to grasp the true weight of that, just how meaningful it is, since you simply don't hear about this happening — at least based on what I've been told. So, let's not spend too much time on it, since we're short on time here. Let's move ahead to Slide 30. There's a fresh priority here, and it matters a lot — plus we need to pace ourselves on it as well. That priority is a heightened focus on the military and defense sectors. What's driving that shift? Consider how few brand-new commercial airplane efforts are currently underway. There's the 777X, and we're involved in that one. Then there's the Comac 929 — we can't talk about it, though for reasons we assume we'll never be a participant in it; past that, we have no further information, and maybe Boeing will launch another plane, but that's still undecided. Still, big chances are emerging — and they already have emerged on our end within military and defense sectors, particularly around significant new missile initiatives. So where do we direct our attention? We also work with ablative materials and things used in hypersonics. At the moment, we're part of several missile programs that are both prominent and critical, in the areas of ablatives and hypersonics. Some of these efforts are rather sizable. Turning to Slide 31. Unfortunately, because these efforts are highly sensitive and classified, we aren't in a position to provide specifics right now. We genuinely regret that, but as I mentioned, these efforts are very sensitive. When we're permitted, we'll tell you more; at this point, it's enough to say that Park is engaged in several prominent programs, including three involving missiles and hypersonics in which Park's materials are being closely evaluated. Any single one of these initiatives has the potential to generate at least $10 million in yearly revenue for Park, so this is not the kind of thing I would dismiss lightly. Another thing to remember is that Park is a genuinely all-American business, which matters given that we're talking about military and defense work. Turning to Slide 32, let's look at recent investor questions. One investor wanted to know about the Fan Case Containment Wrap for the 9X engines — specifically, we used to talk about the redesign risk that the Fan Case might get designed out, so why has that topic disappeared from our discussions? It's possible we're mistaken, but our view is that the window for that has closed, and the program is going to proceed using the containment wrap with the Fan Case design as it currently stands. Someone also sent in a question regarding our strategy. I'm not quite sure how to address it, since I'd like to take you through it, but we're very short on time, and even a quick overview of our strategy would likely need five minutes at minimum. So I'm not certain what the best approach is. We'll sort that out afterward. Moving to Slide 33. On the topic of our buyback, there isn't much new to report. Since the Q3 investor call, we haven't purchased any stock. And what's the reason for that? So following the — my apologies — the Q2 investor call, and this one is the Q3 investor call, that Q2 call happened back in October, and afterward the stock appeared to bounce back, reaching what looked like stronger levels. Our thinking was to ease up a bit and allow other buyers into the stock rather than having it be only us. I'm only partly kidding when I say that. Still, one thing worth flagging: across Q3, we did in fact purchase roughly 180,000 shares, and the total cost came to $2,363,000; that essentially accounts for why cash moved between Q2 and Q3. Admittedly, lots of other items can shift the numbers, yet that item by itself explains the cash change. So no — as I mentioned, nothing further has been bought back through the authorization after October 10, which is roughly the point when we put out Q2. We'll just have to wait and see. Will we purchase additional shares? I really hope not, since that means spending our cash, but should the share price fall to those ridiculous lows — and it has been hovering around those ridiculous lows these past few days — we'd think — we might think there's no other option. On Slide 34, an amazing track record of cash dividends. To save time, we can skip this one, so let's move to the final slide. The regular cash dividend we declared on December 9 — that's the final arrow item — is scheduled for payment on February 4, 2025, and pay it we will. At that point, the cumulative cash dividends distributed since fiscal 2005 will reach $601.1 million. So we'll have crossed the $600 million mark. That's a huge amount, as I like to say, for a company as small as Park. Now if you look at Slide 35, covering our balance sheet and cash: we have no long-term debt on our books, and cash stood at $70 million at the close of Q3. Also remember that we still have $5.1 million outstanding, with a single transition tax installment left to pay in June.
Brian Shore
executiveAlright, let's run a quick calculation here. How should we be thinking about our cash position? When we look at these 3 figures, we began with — $5.1 million, that one's certain. Solution treater, most likely a go. Contribution toward the OEM partnership, also most likely a go. There are additional items we'll likely put money into as well, other projects and opportunities, but these carry a higher probability. So we take that $17.6 million, we take our numbers, $70 million, and we conclude, yes, we're probably looking at $52.4 million that we genuinely have available. That's the reason I was saying we truly don't want to purchase additional stock, since we want to hold onto that money for opportunities; however, should the stock drop to ridiculous levels, we'll feel — or rather, we may feel, I should say, may feel pushed to step in and acquire more shares. 36, we can move through this very fast. This is — these are the identical slides we've provided to you over the past few quarters. Why bother doing it? Because otherwise, someone will ask, what happened here? Have you stopped supporting this Juggernaut to financial outlook? And we haven't. So, 36, you know Slide 36. 37, the sole difference on Slide 37 is this, as I mentioned, the ARJ21, the Comac regional jet now named the C909. And then, on Slide 38, I simply want to point out on Slide 38 and 39, there are a few questions regarding the $15 million figure, estimated non-GE programs incremental sales. We believe that figure is conservative, particularly given the opportunities we're currently seeing on these missile and defense programs. So — and the only item we're emphasizing on slide — pardon me, the footnotes on Slide 39, it's simply that the $15 million figure is conservative. So once more, I apologize for spending so long walking through the presentation. Operator, we'd be glad to take questions now, if there are any.
Nick Ripostella
analystGood afternoon, Brian, and once more I want to express my gratitude for how open you were regarding the quarter's problems. That means a lot; and as usual, I'm quite pleased with your approach to share repurchase, and the wording about purchasing it when it becomes stupid is exactly correct. I believe the shareholder base is patient enough at this point and grasps what the upside is. So, those prices might not arrive for quite a while. But just one quick thing, and I might have posed this to you previously. On earlier conference calls there were slides featuring Park content on a SpaceX product, and clearly, there's Blue Origin. Can Park still have content in that? I'm simply curious about it. And my second thing is, I might have posed this before too, do you believe that in any respect, Comac product and what you provide might be impacted by hostilities between the U.S. and China, and so on? Or do they basically, they require your stuff? And so, that's all. Thank you very much.
Brian Shore
executiveThank you, Nick. Happy New Year, incidentally. Yeah, in the slide, it mentions the — we adore niche military programs. I think we do make reference to a SpaceX program. Personally, I truly adore that company. The other one was Blue Origin. Was that the other one you meant? Sorry.
Nick Ripostella
analystCorrect.
Brian Shore
executiveMark, care to jump in regarding Blue Origin? My sense is that we're somewhat involved, though perhaps not to a large degree.
Mark Esquivel
executiveYes. Brian, we've collaborated with them on certain things. Within our parts division, we've set up a small framework for them. It's quite specialized. The quantity involved is substantial; we've established a modest setup on their behalf. Also, a project was completed by us a number of years back; we were exploring strut technology involving composites, yet they proceeded to choose a metal strut rather than that.
Mark Esquivel
executiveCorrect.
Brian Shore
executiveSo, regarding metal — indeed, we handled design and construction for a few struts, yet we didn't make it through the down selection for that program. As a result, we do have a link there, and we keep communicating with them, while also continuing to search for additional chances.
Brian Shore
executiveAll right, thank you. Personally, I'm a big fan of SpaceX — I simply adore that business. They operate quite unlike a standard aerospace firm. In a good sense, I'd place Kratos in that same bucket too, as being distinct in a beneficial manner. So the more collaboration we can have with those folks, especially, the more pleased — at least I know I'll be. With Comac, that's clearly a fair and obvious thing to ask; we'll simply need to wait and observe the outcome. I'd be pretty stunned if anything could move fast, since the 919 represents a genuine flagship initiative for China. I'm no authority on how they do things culturally, yet that matters greatly to them. That standing of being viewed with respect and <<inaudible>>; plus for them to shift course on materials for the 919 effort would carry such huge risk and might set that effort back by years. So we'll just have to watch and find out. I can't say, though I'd remain doubtful about anything occurring shortly. Now regarding the Chinese, as you're aware, they discuss building their very own powerplant. And I'm not convinced that's truly tied to trade friction. That could relate more to CFM. From where I sit, CFM had better ensure they deliver sufficient motors to China, because otherwise, they'll simply hand the Chinese added incentive to create an engine faster. So that's merely my view. I might be mistaken, yet that's how I see it. We constantly feel uneasy and worried, but I wouldn't claim that would be — for me personally at least our — among the leading 10 worries that we'd forfeit Comac's business due to trade friction pitting America against China. We'll need to observe how that plays out. Much of it might unfold in directions other than what folks expect too, we'll need to observe how that plays out. But I'm not sure what more to add on it, other than, I suppose, perhaps for context, not among my leading 10 worries at this moment when you consider it. Any further question, Nick, or does that assist you somewhat?
Nick Ripostella
analystNo. Alright, I really appreciate it.
Brian Shore
executiveAlright, thanks, Nick.
Brian Shore
executiveThanks a lot, operator; and I appreciate everyone tuning in and sticking with us through a full 60 minutes. Also, on behalf of the entire team here at Park, all of us at Park, I want to extend our warmest wishes to you for 2025 — a very happy New Year to each of you and to your loved ones. Thanks again, and farewell.
Operator
operatorThat wraps up the teleconference for today. At this point, you're free to hang up your lines. We appreciate you taking part.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Park Aerospace Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Park Aerospace Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Park Aerospace Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.