PG&E Corporation (PCG) Earnings Call Transcript & Summary

February 23, 2023

New York Stock Exchange US Utilities Electric Utilities earnings 61 min

Earnings Call Speaker Segments

Jonathan Arnold

executive
#1

Hello, everybody, and thanks for being with us on this call covering PG&E's results for the fourth quarter and the full year 2022. Joining us this morning are Patti Poppe, our Chief Executive Officer, and Chris Foster, Executive Vice President and Chief Financial Officer. Several additional leaders from our team are also here alongside us at our Oakland headquarters. Before we go further, please note that our remarks today will contain forward-looking statements regarding what we expect for future financial results; those statements rest on information management has at present. Key factors that might cause the company's actual financial results to differ are laid out on page two of the presentation for today's fourth quarter and full year earnings call. That presentation additionally provides a reconciliation of non-GAAP to GAAP financial measures. The slides, together with other pertinent materials, are available online at investor.pgecorp.com; we'd also urge you to look over our annual report on Form 10-K covering the year that ended December 31, 2022, which came out earlier this morning. Having said that, I'm pleased to turn the call over to Patti Poppe, our CEO.

Patricia Poppe

executive
#2

Thank you, Jonathan. Good morning, everyone, and I appreciate you taking the time to be with us on what I realize is a hectic morning for earnings. On Slide 3, you're going to notice that today we announced full year 2022 core earnings of $1.10 per share, which landed exactly on guidance. That marked my second year at PG&E, with results coming in on plan. Nothing above, nothing below. As I often put it, we take care of the fine points so that burden isn't yours. Our straightforward, cost-conscious approach is built to get the most work done for our customers and to fulfill what we've promised you, our investors, year in and year out. Our $1.10 EPS for 2022 climbed 10% versus 2021, in line with the plan; we are also restating our 2023 core EPS guidance range of $1.19 to $1.23, which represents a 10% increase at the midpoint, together with the longer-term targets we laid out before of no less than 10% EPS growth in 2024 and no less than 9% for '25 and '26; our intention for no new equity through 2024 is likewise unchanged. As you're aware, the sector-leading EPS growth we deliver rests on strong capital investment and continuous efficiency improvements that benefit the 16 million Californians we serve. Indeed, during 2022, we put $9.6 billion of capital into our system to benefit our customers. Our system has never been safer, and we keep making it safer day after day. I want to express my gratitude to you, our investors, for helping make that happen. The straightforward, cost-conscious approach is what gives us confidence to reaffirm our financial outlook today, even with the very real difficulties that most businesses are confronting in the current inflationary and unpredictable economic climate. Now to Slide 4. We've achieved substantial progress in reducing physical and financial risk. Here are a few highlights. Regarding wildfire mitigation, we recorded a 99% drop in acres burned during 2022 compared with the average across the 3 years immediately preceding the launch of Enhanced Powerline Safety Setting. As we told you last quarter, we successfully made it through severe summer heat conditions. And in January, extreme back-to-back winter storms once again challenged our system, and the PG&E team responded with performance at genuinely historic levels. Beyond tackling physical risks, 2022 proved a major year for mitigating our financial risk. We hit our earnings guidance along with non-fuel O&M cost reductions of 3% net of inflation. That beat our 2% plan and came about despite the toughest inflationary environment many of us have encountered in our careers. In our GRC, we introduced undergrounding while eliminating vegetation management expense, which secures long-term safety while leaving costs unchanged for customers. We completed our $7.5 billion rate-neutral securitization and collaborated with California policymakers during the summer as they enacted constructive legislation backing our 10-year undergrounding plans and extending the operating life of our Diablo Canyon nuclear power plant. We see both of these as good for customers and as proof of the stronger trust we're earning every single day with our stakeholders. When it comes to regulation, we're grateful that the CPUC closed out both the 2022 and 2023 cost of capital proceedings last year. And on the customer savings side, the Net Energy Metering 3.0 decision came out in customers' favor. We figure it takes out roughly $1 billion of cost shift through 2030 compared with NEM 2.0. Over on Slide 5, we've got some highlights from our historic January storm response. Let me stress that this story isn't just about numbers on a page. This was us showing up for our hometowns, and our coworkers perform at their peak when they're tested. Across the first 2 weeks of 2023, when historic back-to-back to back-to-back atmospheric river storms struck, our electric team brought back over 2.8 million customers through multiple waves of outages, and 95% of them were back online within 24 hours during each of those events. January came in as a top 5 storm in PG&E history and brought the biggest contingent of resources we've ever mobilized, including around 7,200 dedicated personnel from 10 states. The strength and speed of our response also meant we saw better customer satisfaction scores than with prior storm-related outages; we've also brought in the standardized emergency management system and Internet command system; and with help from California's Office of Emergency Services, we've been matching the training of our emergency center staff to that of our first responder public safety partners. When the moment arrived, our team and a large group of partners acted with skill and tenacity, protecting and serving one another and our hometown, and we couldn't be prouder of them; on Slide 6, I'll go over our layers of protection against wildfire risk, which begin with our core system hardening, vegetation management, inspections and repairs. When conditions call for it, we add our Enhanced Powerline Safety Settings and our Public Safety Power Shutoffs on top of those. We count these layers of protection, including better situational awareness and coordination with first responders, as delivering over 90% overall wildfire risk reduction. We've already hardened more than 1,200 miles since 2019, and we expect our overall risk reduction to grow further as we pursue our 10,000-mile undergrounding program. In the meantime, we keep hunting for innovative new technology solutions such as partial voltage detection and down conductor technology to keep shrinking that remaining 10%; on Slide 7, we take a closer look at how we did on wildfire risk mitigation in 2022. Historical data show that from 2012 to 2020, that's before we implemented EPSS, 95% of the acres and 100% of the structures burned were tied to ignitions at times when conditions were at R3 or higher. While we were fortunate that 2022 didn't bring significant wind events for the year, there were still 31% more R3 or higher days than in 2018 to 2020. Even with that big jump, the acres affected by utility ignitions dropped 99% in 2022 compared with the same period. Slide 8 shows our straightforward, low-cost approach, and it involves pushing efficiency so there's room to invest in customers. You've heard plenty from us about the lean operating system and the 4 basic plays. During 2023, we're introducing a fifth play—waste elimination, which happens to be my favorite—and we view it as essential for keeping our commitments to customers and investors on track. Customer affordability is our main constraint, and we're intensely focused on it through the bill ownership center we just set up, which Carla Peterman leads. Everyone on the team is examining the full customer bill for ways to save, energy supply costs included, since we know those are top of mind. There's plenty of room for us to cut waste, boost how customers experience us, and make our system cleaner and more resilient, all while bringing costs down. We can deliver more while spending less. Examples just keep accumulating, so I thought I should bring back my story of the month. Let's get into it. This month, the story concerns efforts we're making to boost efficiency in our new business area. Right now, connecting new customers takes far too long from beginning to end. As I said recently to a gathering of California builders, we're capable of doing better, and we will.

Patricia Poppe

executive
#3

Actually, this is yet another ideal use case for our lean operating system — more precisely, eliminating waste. Our developers and builders were brought in by the team to collaborate with us on redesigning processes and to tell us where things hurt. A design thinking workshop was held. And thanks to rapid prototyping, a path is visible toward slashing cycle time by a dramatic amount, boosting our capacity to complete the hook-up both on schedule and faster. Think about all the rework, waste, frustration, and delays we could remove. Here's one problem: right now, 64% of new connection requests that come in wind up getting canceled, and the reasons vary. Far too much engineering gets done before we even know whether it will be used. That burns time and money alike, and it's also disheartening for our skilled engineers when so much of what they produce never comes to fruition; we can greatly enhance the way we serve new customers; and through that, we can unlock additional time and resources to put back into the system. This is merely one of the places where each dollar spent delivers more for customers. That, to me, is what enabling California's prosperity looks like. Let's go to Slide 9. This chart may look familiar — it illustrates our execution across 2021 and 2022. Early in 2021, headwinds hit us. Recovery efforts subsequently pushed us past our plan. All of this belongs to the playbook now in use at PG&E. Our planning is conservative, and we stay nimble, shielding investors from downside risk. And whenever upside appears, we'll redeploy it to benefit customers, which often involves accelerating work and safeguarding later years. Consistency is everything. You can watch it unfold once more in 2022; headwinds came our way, among them a potential cost of capital reset; our conservative planning, however, meant we could more than counterbalance that and other pressures, which let us redeploy once again for our customers while still achieving 10% EPS growth. Using the straightforward, affordable approach, our intention is to steadily manage the work and hit our earnings targets — nothing above, nothing below. And wherever possible, we'll redeploy favorable outcomes within the business for customers and aim to reduce risk in upcoming years, all with an eye toward hitting our steady growth trajectory. A lot of folks ask me, "Patti, what if this occurs or what if that occurs?" At PG&E, this is exactly what we handle. No matter what comes, we possess the ability to stay nimble and adjust to tough, shifting circumstances. That ability can be both taught and acquired. As I've often remarked, we ride the roller coaster so you don't have to. Expect to witness more of the same in 2023 and afterward. On to Slide 10. The advancements achieved during 2022 are evident, reflecting our ongoing effort to establish credibility with regulators and create the predictability required to draw investment capital that benefits our customers. In 2023, we are already encouraged by how quickly the self-insurance matter was settled through our General Rate Case. This creative solution has backing from intervenors and, crucially, may generate as much as $1.8 billion in customer savings across the 4-year GRC period, with up to $300 million of that anticipated during 2023. Beyond that, several significant drivers lie ahead. All 4 blue items shown here carry meaningful advantages for both our customers and the state of California. We will keep pushing daily for prompt, productive results, though PG&E does not place big bets — and I'd like to remind everyone that our planning remains cautious, even as I anticipate additional green check marks appearing on this slide. Now moving to Slide 11, where our 2022 scorecard is presented. Although the Mosquito fire produced no serious injuries and the projected liability sits comfortably inside the insurance coverage we have available, it still prevented us from hitting our objective of 0 CPUC reportable ignitions spanning 100 acres or more. We installed 180 miles of underground lines during the past year, surpassing the 175-mile goal. We also opted to shift capital investment toward maximizing risk reduction over the year, which altered our gas main replacement schedule. Our 2% yearly O&M cost reduction goal was exceeded, overcoming inflation and producing net savings of 3%. To be clear, that figure accounts for inflationary pressure. We believe substantial room exists to sustain a 2% net O&M reduction for many years ahead by operating more efficiently and optimizing value for both customers and investors. Core EPS landed exactly as planned at 10%, and we achieved 6% rate base growth during what marked the concluding year of our GRC cycle. Finally, we were glad that Moody's acknowledged our meaningful headway in reducing risk and strengthening relationships within the state by upgrading our credit outlook to positive earlier this month. On Slide 12, our 2023 report card was unveiled. A notable adjustment involves our primary wildfire metric, where we maintain a target of 0 while adopting the new OEIS metric for catastrophic wildfires; that measure aligns with upcoming wildfire mitigation plans, and we believe it does a superior job of capturing genuinely significant events from the standpoint of both customers and investors. Our 10,000-mile undergrounding commitment and unit cost targets remain unchanged. Later this year, we'll submit our 10-year plan containing further specifics. The 2% O&M reduction initiative should come as no shock, and none of our earlier financial targets through 2026 have been modified. It's great to extend our planning horizon by one more year, 2027, for both rate base and CapEx, so you can see further into where we're headed over the long term. The headline figure for rate base CAGR across 5 years stays at 9.5%, though it now starts from 2022 actuals and extends through 2027. We feel quite positive about the results we achieved during 2022, and we're eager to deliver for you once more in 2023. With that said, I'll pass things to Chris, who'll go through our financial and regulatory matters in greater depth.

Chris Foster

executive
#4

Thank you, Patti, and good morning to all of you. As Patti said, we met our financial commitments during this year, finishing full year 2022 at $1.10 in EPS, and we got through the year without any equity issuance. We are also reaffirming the earnings growth guidance we gave for 2023 to 2026, along with our pledge of no equity in 2023 or 2024; this morning I want to share a few updates with you. First, I'll go back over what drove our 2022 financial results and walk through the drivers behind our 2023 guidance. Then I'll give you some updates on how we are performing against our simple, affordable model. Finally, I'll offer a few highlights regarding regulatory, legal and legislative matters. Let's begin on Slide 13. As our full year walk shows, non-GAAP core earnings came to $1.10 per diluted share for the year; we brought in $0.07 from customer capital investments and captured $0.08 in savings through cost reductions; that let us steer through the year's ups and downs and put resources into our system for customers by pulling forward some work from future years and making other sound financial calls so we could deliver right on target for the year. On Slide 14, as we presented last quarter, our 5-year plan budgets for substantial customer investment, roughly 1/3 more than the prior 5 years. We extended this forward to include 2027. And as the orange shows, across the enterprise we plan to devote almost 1/2 of our capital over the next 5 years to risk reduction. That covers system hardening, pipeline replacement and other work that is critical to reducing risk; we prioritize our capital spend using a risk-based approach, tackling the highest risk and customer-centric work first; we also keep our attention on improving our capital to expense ratio over time. When we can make permanent repairs rather than temporary fixes, that ratio improves and we create headroom in the customer bill; this important work in our system also drives earnings per share growth and improves our cash flow from operations. And as the right-hand side of the slide shows, we have identified over $5 billion of incremental investment opportunity that is not yet in the plan. Our intention would be to bring some of this customer-focused spending into the plan as we work to create headroom on the customer bill. And with our simple, affordable model, we can deliver more risk reduction for every customer dollar spent because of our focus on lean, including waste elimination. Given the substantial capital opportunities in our plan, our pending 2023 General Rate Case and our focus on a return to investment-grade ratings, we intend to keep showing progress on our FFO to debt metric as you've seen on our report card slide; we landed at about 12.5% in 2022, showing some good progress there over where we ended 2021 at 10.9%. Moving to Slide 15. The year 2022 brought a distinct set of obstacles that we managed to get past. We encountered inflation, climbing interest rates, severe heat, focused supply chain scarcities, sharp increases in natural gas prices, and record-setting rainfall. Even so, we discovered methods to remain on track. As Patti noted, the effort put in by the teams to deal with the historic storms in late 2022 and early 2023 was remarkable. That is the reason we take such pride in what we are providing to customers and to you, our investors, through our straightforward, reasonably priced approach. Affordability is our sharpest focus, and we recognize it is yours as well. So let's explore the model a bit more. By making a string of sound business choices and building lean capabilities, we managed to surpass our goal of a 2% decrease in non-fuel O&M for 2022, achieving a 3% cut even with inflation. Those savings were used to benefit customers and to reduce risk for 2023. Customers gained substantial savings in vegetation management, which came from better unit costs resulting from a handful of strategic adjustments. To start, we put in place a fresh accountability framework and a uniform pricing system that aids in combining work while enhancing contractor supervision and warranties for rework. After that, we cut our contractor total from 24 down to 14, added new subcontracting controls, and regionalized the work to create a steady, predictable plan. This ought to lead to an improved customer experience. There should be fewer return trips and a reduced cost to deliver for our hometowns, all while still fulfilling every commitment we have. Thanks to these actions, we saved roughly $200 million on vegetation management costs during 2022 compared to budget. We anticipate achieving more than $300 million in cost savings in the current year while still completing the units in the base work plan with better safety and quality. Additionally, in 2022, we reached an average undergrounding unit cost per mile that was comfortably under the $3.75 million target we shared at Investor Day, and also under the baseline of more than $4 million from only a few years back. Further opportunities lie ahead for customers. As shown in our report card, our 2% non-fuel O&M savings continues to be our yearly goal. We are only beginning to find cost savings for our customers, whether that comes from enhancing our capital to expense ratio, removing waste from our processes, or collaborating with stakeholders to identify better solutions for customers, like our self-insurance settlement. And as the 2023 plan column shows, we keep aggressively seeking efficiencies to achieve our yearly 2% non-fuel O&M reduction, which, much like 2022, presumes ongoing inflationary cost pressures. Although our 2% O&M reduction target leaves out fuel, I want to pause and consider the larger bills our customers have faced this winter relative to the previous winter, mostly because of elevated natural gas prices felt throughout the West Coast. All together, when gas prices surged during the winter months, the people handling our procurement managed to deliver savings to customers of far more than $1 billion by taking a set of carefully considered steps—among them a portfolio spread across multiple sources, which covers interstate pipeline capacity that stretches back to the supply basins, plus natural gas storage and financial hedging. To give customers even more help, we've pursued strategies aimed at lowering bills, working alongside federal and state regulators as well as policymakers. Take, for instance, our backing of an earlier schedule for the yearly climate credit, which ought to return more than $90 to the typical customer who has both electric and gas service with us. Now let's turn to the top of Slide 16. Throughout 2022, as you observed, our regulatory and financial results have been improving, since we keep meeting our operational commitments and doing a better job for customers each day. Performance is power, and we take ownership of our performance. The CPUC set our 2022 cost of capital in Q4, so our 2022 ROE stayed the same. In addition, a final decision on our 2023 cost of capital arrived on schedule, which adds certainty because the 10% ROE that was approved remains in effect through 2025. As we had asked, last month the CPUC gave the green light to our self-insurance settlement. We're grateful for that swift ruling, because it lets us steer clear of buying pricey wildlife insurance through commercial insurance markets for no less than the coming 3 years, which saves customers as much as $1.8 billion through 2026.

Chris Foster

executive
#5

Additionally, we submitted a Track 2 settlement within the GRC, and that ought to assist in making the case proceed more smoothly from a procedural standpoint, since the schedule anticipates a final ruling during the third quarter. Our Pacific Generation application continues to advance through the CPUC process, and a schedule has been issued that calls for a proposed decision by no later than the close of November. Although that might mean a final decision does not arrive until 2024, we do not anticipate the timeline laid out in the scoping memo producing any significant alteration to our financial plan. Our perspective remains that this sale presents a chance to raise necessary equity in an efficient manner, as well as a solution delivering benefits to customers via realized tax benefits, which speed up contributions to the customer credit trust. Turning to cost recovery tied to wildfire. During 2022, we received authorization to collect $2.3 billion. The net unresolved balance now stands at roughly $4.7 billion, and I am happy to share that further headway has been made across multiple cost recovery proceedings. To begin, our 2020 WMCE has now been finalized, and those costs are being incorporated into rates. Next, we reached a settlement on our 2021 WMCE that resolves every element except the cost within our vegetation management balancing account. In addition, we submitted our 2022 WMCE application along with a motion seeking interim rate relief. And finally, as shown on this slide, we are advancing through the subsequent steps of 2 key legislative items enacted in 2022. During November, the Department of Energy determined that Diablo Canyon qualifies for federal funding under the Civil Nuclear Credit Program and issued a conditional award totaling $1.1 billion. We regard the NRC staff decision last month requiring a new application as procedural in nature. I would also point out that our team has pursued a parallel approach right from the beginning. NRC staff are expected to reply in March regarding our waiver request, which would permit the units to keep operating past the current operating license expiration date. We intend to submit our new applications to the NRC prior to the close of this year. Last, 2 remarks concerning our headway in resolving legacy legal claims. First, this week we filed a joint motion seeking approval of a settlement reached with the SED that resolves their investigation into the Zogg fire. We keep maintaining that we operated prudently, and we have agreed to give up cost recovery on $140 million, which will be invested across 3 to 5 years mainly in future system enhancements, along with a $10 million penalty directed to the state general fund. Second, we made some modest increases to our wildfire loss accruals for third-party claims this quarter, which include $75 million for the Kincade fire, $25 million for the Zogg fire and $25 million for the Dixie fire. I will remind you that our accrual for the Zogg fire sits well within our available insurance; and we keep booking offsetting receivables for the accrual tied to the Dixie fire; regarding the Dixie fire, we have reached agreements to settle claims, including with the cities and counties. We keep working to settle individual claims fairly via our quick claims process and mediation. In every one of these matters, we stay dedicated to making things right for the communities and customers we serve. California has set up legislative and regulatory pathways that permit constructive results when we do a good job. We know our regulatory agenda with the CPUC is a busy one, and we value the commission's careful deliberation while we work relentlessly toward our safety and reliability objectives and also push forward California's climate leadership. Here on Slide 17, let me pause to remind you that our sensitivity to certain key variables beyond our control is fairly limited. This stems partly from constructive California regulation, such as decoupling for gas and electric. Four elements deliver formulaic commodity recovery with prompt cash collection, a General Rate Case cycle of 4 years and a cost of capital cycle of 3 years. In addition, we're acting on our own through our simple, affordable model and our attention to the bill, which we believe will further reduce financial and regulatory risk as we keep building trust with our customers, regulators and policymakers. Turning to Slide 18. Later this year, we are moving toward hitting the common stock dividend eligibility threshold. As a reminder, prior to declaring a dividend, we must first report $6.2 billion in cumulative non-GAAP core earnings since emerging from Chapter 11, which means beginning in the third quarter of 2020; for this purpose, non-GAAP core earnings refers to GAAP earnings adjusted for certain non-core items laid out in our plan of reorganization. And as we enter 2023, we still anticipate reaching eligibility near midyear. Our plan presently indicates we hit eligibility in the third quarter, though this stays subject to assumptions, among them the timing of regulatory decisions. As for our eventual policy, I'll note that no matter the timing, we intend to recommend to the Board that we begin with a small dividend at first, phasing in growth over time. I'll close here by stressing that we achieved our 10% EPS growth target in 2022, no more and no less. And looking ahead, we keep restating at least 10, 10, 9, 9; and with that, I'll turn it back to Patti.

Patricia Poppe

executive
#6

Thanks, Chris. To wrap up, I want to stress how much ground we covered during 2022. Even so, there's still a great deal left to accomplish; you have plenty to anticipate throughout 2023 and afterward, as we keep writing the following chapter of the PG&E story. To those who hold our stock today and to anyone still evaluating us, we hope you'll think about coming out to California for our 2023 Investor Day, scheduled for May 24 in the Bay Area, with undergrounding site visits throughout Napa County and nearby on May 25; sharing additional specifics about our longer-term financial plan and our investment opportunities is something we're eager to do. We'll dig in and demonstrate some of the tools and technology we use to reduce risk; you'll also get to hear from several of our key California stakeholders about the progress being made; seeing you is something we can hardly wait for. With that said, operator, kindly open the phone lines so we can take questions.

Shar Pourreza

analyst
#7

Quickly, Patti — regarding how this will unfold and possibly setting up some structure for the Pac Gen equity sale: clearly, some stakeholders have already weighed in early, and the CPUC cut down an issues list during this year. So, do you think there's a chance of a faster outcome through a settlement of some kind, or a partial one, to push things forward more speedily?

Patricia Poppe

executive
#8

Yeah, Shar — once more, since we've stated this quite plainly, we believe the Pac Gen sale represents a genuinely strong choice for customers; it's an extremely effective way to finance this. "Expedited" may be somewhat too ambitious a word; we recognize the commission must gather considerable feedback from stakeholders, and we're willing to allow them the right amount of time for that examination. Still, we believe we've built a very compelling case, and we're optimistic about what's possible.

Shar Pourreza

analyst
#9

And clearly, you've issued a target for a credit metric in the mid- to high teens. Just remind us again — does that figure count the Pac Gen equity sale, or does it leave it out?

Chris Foster

executive
#10

Shar, that's correct. Proceeds from Pac Gen are part of the base plan. And as you might expect, when we take a wider look at the steady position we've maintained regarding mid- to high teens by 2024 on FFO to debt, what's really going to move the needle is probably the GRC. There are the wildfire recoveries we mentioned a short while back, and then, clearly, the underlying CapEx profile too. So I'd regard those as the actual forces driving what we see there for mid- to high teens.

Shar Pourreza

analyst
#11

Understood. So finally, Patti, clearly one of your main points on today's call is that the bill impact will be fairly modest, let's say. Yet a number of the offsets and levers your team has managed to use and has planned are a genuinely positive message. Still, take the more than $800 million of deferrals awaiting approval at this moment. How does that factor into the picture, I suppose?

Patricia Poppe

executive
#12

Yes. Thank you, Shar. A few points from me. To start, there is short-term pressure on bills, which I believe households nationwide are experiencing because of commodity costs and our response to that. As Chris said during the call, the state performed very well, and credit goes to the commission for accelerating the California climate credit to customers so that, in the short term, the commodity impact is offset. And like everyone else, we have clearly watched commodity costs return to a more typical level. That is favorable for customers, and we are pleased about it. Over a longer horizon, though, when we consider all the work that customers need, that is exactly why the simple, affordable model at PG&E matters so much. For many years, we were applying Band-Aid replacements rather than making the lasting, climate-resilient infrastructure investments customers keep requesting. That is why undergrounding matters so much. That is why, with our capital plan, we have provided so much visibility into it, since those infrastructure investments let us lower our expense and enhance that capital-to-expense ratio. Our 3% delivery of O&M savings this year — that comes after inflation, meaning inflation was accounted for, and we still produce 3% beyond it. That is only the start of what this team can do to offset and cut expenses, creating the headroom for the investments we need in genuinely climate-resilient infrastructure. This model is now truly taking shape at PG&E, and customers will gain on affordability from it. And once we add in those legacy costs, they will be offset as well by the cost savings we are achieving. So waste elimination is our theme for this year — showing people how to accomplish more with less and genuinely improving the customer experience at a reduced cost is what the simple, affordable model provides. And we are thrilled to be putting it to use at PG&E.

Steve Fleishman

analyst
#13

I believe you already covered my first question there, Patti — what you're saying is that whenever you discuss O&M costs net of inflation, those figures represent absolute costs. So despite inflation climbing 6%, 7%, 8% during the prior year, your costs — your O&M — actually fell 3%.

Patricia Poppe

executive
#14

That's right, Steve; that's something we take pride in, and I'm proud of the team for all their effort, and we've only just begun, Steve. That's the thrilling part about this waste elimination and our story of the month concerning the new business. The opportunity here is enormous, and the team is incredibly eager to learn. I'm very proud of them. In fact, I visited our waste — our new business center recently, where we're showcasing our waste elimination work; and that team was smiling like they hadn't in quite a while, since they're seeing that they truly can have the tools. To genuinely cut cost while taking on more work, people must learn these techniques, and folks are picking them up quickly. I'm extremely proud of the team.

Steve Fleishman

analyst
#15

When we look at waste elimination, should it be viewed as adding on top of the 2% O&M costs? Or is it simply one component — or does it form one component of getting to that 2%?

Patricia Poppe

executive
#16

Well, it certainly makes it possible for us to achieve that 2% along with every inflationary pressure. So although we label it 2%, it's actually inflation plus 2%. That's what waste elimination provides. And once more, given the ups and downs that hit us — that roller coaster I mention — this is the capability we're able to instill in the team to activate that capacity for cutting waste and soaking up inflation while still hitting 2% plus.

Steve Fleishman

analyst
#17

All right. Now regarding the GRC, might you walk us through what the timeline looks like? Also, are there probably any chances to resolve either certain portions of it down the road, such as the insurance piece, or the entire matter?

Patricia Poppe

executive
#18

Yeah. We have reached a point where reaching a resolution isn't truly feasible right now; we did resolve certain components, including insurance, since it proved extremely beneficial for customers to have that wrapped up early and put those savings to work in '23. Thus, while adhering to the schedule the commission established, we anticipate a proposed decision plus a final one during the third quarter. We recognize the commission has plenty on its agenda, yet we also understand this rate case matters greatly to customers and to our capacity to invest all that infrastructure spending we've discussed for customers' advantage. Therefore, we anticipate the timing will stay on the schedule the commission established.

Steve Fleishman

analyst
#19

Alright, great. And finally, I need to bring this up once more — is there anything fresh you can share regarding the fire victim trustee, specifically how quickly payments are being made and when the rest of the stock sales might occur?

Patricia Poppe

executive
#20

Yeah. No, nothing really new has come our way. It's clear to us that the fire victim's trust shares our goal of keeping customers safe. When the company does well, that allows them to take care of the victims covered under that trust. So — but when it comes to timing there, we don't have any updates.

Julien Dumoulin-Smith

analyst
#21

So, first thing I'd like to raise is a question about '27. I realize you moved the 9.5% rate base CAGR forward to 2027, and you avoided saying anything about EPS. I realize you previously had that discussion regarding 10% versus 9%. You divided that quite distinctly. I also value the schedule for the existing GRC and what it implies for '27. But to simply pose the question, what's your thinking on '27 EPS growth and carrying the EPS CAGR forward too, so to speak?

Patricia Poppe

executive
#22

Yes. Julien, my view — the way I see 2027 is the plentiful investment chance we have that benefits customers. So we've been fairly open about our at least 10, at least 10, at least 9, at least 9; we'll stay on that EPS growth path, but we have to — our attention sits on building the finest long-term capital investment plan that lets customers get the infrastructure they've been awaiting and the cost mix from our cost savings that we keep achieving, which allows that investment without placing too heavy a burden on customers regarding affordability; so we're clearly focused on a long-term infrastructure investment plan at the lowest possible cost for our customers.

Julien Dumoulin-Smith

analyst
#23

Understood. My guess is that with the GRC involved, and as the paths for rate base and EPS eventually settle into a more typical pattern, the lean might land nearer to 9 rather than 10.

Patricia Poppe

executive
#24

Honestly, Julien, that's simply something we'll need to wait and find out about.

Julien Dumoulin-Smith

analyst
#25

That's reasonable. Understood.

Patricia Poppe

executive
#26

Clearly, a major focus for us is reducing physical risk across our network, while also putting in place the investments customers need.

Julien Dumoulin-Smith

analyst
#27

Of course. I get it. Patti, you brought this up during your prepared remarks — the interconnections and your narrative — and considering some of the feedback that's circulating, I figured it was quite pertinent. I'd love to hear your take on the load growth you're observing. Within that 1% to 3%, where are you leaning? Also, could you speak to any pent-up load growth that perhaps hasn't materialized yet due to those interconnection delays? That said, I recognize transportation electrification is part of that 1% to 3%. But on the whole, given these tailwinds, where are you trending looking forward?

Patricia Poppe

executive
#28

Yes. Like we've stated, we expect 1% to 3% load growth over time, weighted more toward the later portion of our plan rather than the earlier portion, though load growth is certainly occurring. In fact, stop the presses, Julien — 23% of all new vehicle sales in our service area during 2022 were EVs. 23%. To me, that figure is surprising. That's an increase from 16% in 2021. So the EV evolution is unquestionably taking place in California and unquestionably taking place in our service area. In fact, the state stood at 20% EV penetration; we hit 23% in 2022. So with all that said, we hold a very bullish view on the EV role in load growth. Each EV is roughly equivalent to half a house — put differently, 2 EVs equal a new household in our service area. Load growth potential absolutely exists. Our forecasts capture that. And you're correct, we must become really proficient at constructing this capacity for our industrial and residential customers as additional fleets electrify — big — a school bus. So I was just — actually, we were just inside one of the electric school buses last week. That school bus is a megawatt, and Oakland Public Schools intends to add electric school buses to their fleet. So here we are in our hometown, ensuring they'll be ready — all of that is opportunity for us. And so as we collaborate with our regulators, ensuring we have a dynamic regulatory environment where we can, in fact, prepare for that capacity investment, staying ahead of it is quite exciting for customers. And so regarding interconnection, we're continuing to track alongside that investment, but we foresee genuine forecasted growth in the years ahead, and that's exciting for us.

Nick Campanella

analyst
#29

I'd like to focus on undergrounding. At this point, roughly 300 miles have been completed. There's a 10-year plan that will be submitted shortly, but you've also made a change to the GRC. I believe an intra-quarter update may have taken some underground work out of capital. So first, I suppose, could you just comment on whether, as you've moved through this program, you're encountering higher cost pressures, or whether you're finding efficiencies through what you've learned? And then second, with the GRC shift, how should we think about your capacity to reach the target of approximately 2,000 miles?

Patricia Poppe

executive
#30

Excellent question. Naturally, our undergrounding plan has us quite enthusiastic. And a few key clarifications are worth making for everybody. First, our mileage was lowered after discussions with our main stakeholders. Earning the right to perform that underground work is necessary. We need to demonstrate that we can actually achieve it at the unit cost we've outlined. I'm glad to say that during 2022, the 180 miles we completed came in at a unit cost below what we had projected; therefore, the team is clearly getting better at efficiency. And it feels as though we're only beginning and truly have the scope and scale of program that will reliably produce the unit costs we're projecting. Our 10-year plan will be released later in the year, and it will make mileage and unit cost targets clear. I'd also like to remind everybody that, look, from the standpoint of risk reduction and customer satisfaction, this undergrounding program matters greatly, yet it isn't a big bet. Undergrounding accounts for under 20% of our overall capital plan. It's flexible and dynamic by nature; we will be collaborating with our regulators and those stakeholders to ensure we perform undergrounding at a pace they support. I remind myself that the Golden Gate Bridge wasn't constructed in a year. It was constructed over time, and it's beloved, and that's what will happen with our undergrounding program. It will be constructed over time, and it will be beloved. And we must earn the right to expand those miles year after year after year. So we're highly focused on doing that well; we have a program structure in place that has delivered real savings in our wildfire mitigation through vegetation management inspections. The same leadership team is heading the undergrounding program. So we expect big things from Peter and the team as they develop our undergrounding program to customers' benefit. I hope that helps.

Nick Campanella

analyst
#31

Sure. It's great to watch this plan take shape. So, a fast one about credit. Congrats, I suppose, on receiving that positive outlook from Moody's. What do you think the agencies want to see at this point? Do they need additional time, one more fire season, before we return to IG, or is it driven more by metrics, since those metrics certainly appear to be trending favorably.

Chris Foster

executive
#32

Of course. Nick, my sense is — Moody's essentially confirmed this as well — that when we examine our financial metrics, they already sit squarely within investment-grade range. So my sense is that among the agencies, the focus is commonly placed on how much we're lowering physical risk. Patti covered the year-over-year gains in our Enhanced Powerline Safety Settings and the obvious payoff those bring. And beyond that, I believe there's also a wish to keep seeing momentum and fresh data points alongside our policymakers. During the last year, we undeniably advanced several key customer-friendly initiatives, namely the undergrounding program and the Diablo Canyon operating life extension, when it came to new policy. And my sense is we simply need to carry that momentum forward into this year. That might span wildfire-related recoveries at the CPUC, obviously our General Rate Case, and the Pacific Generation filing at the CPUC too.

David Arcaro

analyst
#33

Could you talk a bit about where the upside CapEx opportunities stand — the $5 billion you described related to transmission investment distribution? What's the timeline for when we might see firmer figures on that? Might it land inside the 5-year plan? Or does it perhaps stretch the CapEx runway further out from here? And are there any milestones we should watch as you assess some of those upside opportunities?

Patricia Poppe

executive
#34

Yes. Thanks, David. The reason we shared that potential upside is simply to convey that infrastructure capital demand across the system is plentiful. So finding ways to offset costs really falls to us. Anything in the bill not tied to capital investment is something we can trim, which would free up potential headroom for the infrastructure investment customers need and benefit from. Take the insurance settlement we discussed; over time that delivers substantial savings for customers. That's the kind of item that generates headroom, letting us enable more capital without putting pressure on customer bills. Now, we filed a General Rate Case. It matters. Its outcome later this year will be significant. It will give more visibility into precisely which capital our commission supports us investing in. After that, we'll keep showing this waste elimination capability. So if we begin delivering O&M savings above 2%, or other savings that create headroom, that opens room for capital investment that doesn't pressure customer bills. That's the simple, affordable model at work. And it's dynamic in that respect — if we find additional customer savings, we'll then work with our regulators to approve additional capital to deploy for customers' benefit.

David Arcaro

analyst
#35

All right, got it. That helps. Next, I wanted to ask about how you approach lowering wildfire danger — it's a wide-ranging effort with many pieces. Could you talk about the new ideas you're pursuing when it comes to cutting fire risk, whether that means technologies or fresh use cases you're currently looking into that might sit on top of the programs you already have in place?

Patricia Poppe

executive
#36

I'm really happy you brought that up, since we plan to put a spotlight on it during our Investor Day this coming May — May 24 and 25 — and we would love for you to attend, and anybody listening on this call is invited as well. A few of the items that get us excited include our partial voltage detection, which taps into our smart meter technology to address service line risk. Then there's our down conductor technology, and we're broadening how that program gets developed. Over the past year, our teams achieved some significant breakthroughs. Credit goes to our advanced technology team for all the effort they've put in. You'll be able to see it for yourself once you come out. So there's plenty of innovation and technology — naturally, all the data science sitting behind our EPSS and our PSPS is genuinely remarkable to grasp at a deeper level — and that's what makes us confident as we move through the year, no matter what environmental conditions surround us, be it dry, wet, hot, or cold, because we're constructing infrastructure and the ability to adjust to those shifting conditions and protect people. I feel immense pride in the team and in what we've accomplished; that progress keeps coming, and we'll be showing it off at our Investor Day this May. Please come out and see us.

Richard Sunderland

analyst
#37

This is Rich Sunderland, filling in for Jeremy. I just have one brief follow-up regarding that $5 billion in CapEx upside. I'd like to hear a bit more about those opportunities and what the overall pool of possibilities looks like. Regarding the $5 billion specifically, is that amount sized for what you believe you could incorporate over the near to medium term? And does a bigger opportunity set exist that you're still evaluating?

Chris Foster

executive
#38

Rich, glad to address that. Let me handle the second part first and say that a bigger opportunity set does exist. But once more, like Patti said, remember that our emphasis is squarely on that simple, affordable model overall, which incorporates the affordability constraint for customers, correct? So we must always bear that in mind as we proceed. When we examine the opportunities themselves, I genuinely believe that what we referenced earlier regarding electrification growth is quite unique to us. Consequently, when we consider that, the EV penetration opportunity you clearly see us highlight within that $5 billion of capacity-based investments. And that is truly where we identify targeted investments we can undertake that will help the regions where you're witnessing not only a need for wildfire risk reduction, but additionally in certain suburban communities where we're observing a fairly dramatic EV uptake. Thus, the opportunity there, I would say, does begin to arrive in the medium term and merely grows as we move further out.

Richard Sunderland

analyst
#39

Got it, that's crystal clear. Then maybe one final thing — though I suppose I might be getting ahead of whatever gets shared at the Analyst Day. Is that where you'd speak to EPS growth out to 2027? I realize somebody raised this already.

Chris Foster

executive
#40

Absolutely. I believe I'll need to hand that one over to you. Come join us in person. We definitely intend to provide additional detail on that longer-range capital plan. So show up, and we can tell you more then.

Gregg Orrill

analyst
#41

Regarding the effort to extend Diablo Canyon, what should we keep an eye on at the NRC and at the state level?

Patricia Poppe

executive
#42

To begin with, we ought to keep watching for advancement, since we're still moving forward on that front. The NRC truly has a significant task to carry out, and we don't want them taking any shortcuts. Their attention is on safety and on ensuring Diablo Canyon will satisfy the safety expectations and standards; so we'll collaborate with them; our relationship with the NRC is excellent, and we're eager to work with them on the relicensing process. That's a crucial piece of the process. Several other state-based regulatory proceedings are going to take place. And let me remind everyone, we're — we want to offer some thanks and recognition to our state, to our state legislature, and to our governor for having the wisdom to propose extending the life of Diablo Canyon power plant. That is a high-performing nuclear facility, GHG-free baseload energy that benefits all of California. So we definitely will be working closely with all the various regulators to make sure we achieve positive progress on that. And so that carries on through the remainder of the year.

Ryan Levine

analyst
#43

There are a few things I'd like to ask Patti. Over the last 12 months, what's happened with the rate at which hookups get canceled? With resources being limited, how do you decide which interconnects get priority? And then, regarding the remarks about a fresh approach to the playbook, is any of that process being revisited?

Patricia Poppe

executive
#44

Yes, that process gets revisited daily. Look, doing business with us needs to be simpler. I've held a few different sessions with our builders in California; they're essential to the state's prosperity. So we supply them with power, and through new housing, they supply California with power. Our alignment with them is strong. Together with them, we're searching for faster tools and methods; and seeing our new business process map along with simple adjustments that can be implemented immediately is truly remarkable, so that choosing whom to energize and whom not to energize stops being necessary. The real issue is how to energize people more quickly and make that process more streamlined. So, as I mentioned, take those jobs as an example — they get canceled for many different reasons, perhaps the customer decides to abandon their project altogether, which has nothing to do with us. Yet we've completed the full engineering. So we're exploring ways to apply a lighter engineering touch early on, just to provide the estimate people require, and to ensure engineering only happens on jobs that will actually be completed. In hours and dollars, that's an enormous cost saving. And it lets us complete the work on schedule for those builders who will finish their projects; so both capacity and new business represent really exciting load growth opportunities for us, and the progress achieved in such a short time is quite impressive. We're eager to show that progress during this year and to keep moving ahead.

Ryan Levine

analyst
#45

Thanks for the remarks. What I'm really attempting to do is gauge how significant those postponements are relative to the moment you took on your currency — in other words, have you seen anything meaningful shift in the way customers link up with one another, or is there any detail you could offer about what headway might come going forward?

Patricia Poppe

executive
#46

Yeah. What we're experiencing, I'd say, is rising need, and that's a positive thing. Construction is underway across California. You hear people describe a mass departure from California. From my vantage point, that's not what I'm witnessing; growth in both customers and capacity is substantial around here; so the — clearly, those extra electric vehicles I mentioned mean we have to put money into capacity at the substation level, yet we likewise project added load on the transmission side; plus we keep finding chances to put up additional houses across wider areas within California; and at PG&E we intend to match our construction pace and the strides we're making. That's exactly what our lean operating system gives us — the basis for seeing our demand clearly and for removing inefficiency, which lets us serve that demand. These are fairly thrilling days at PG&E.

Analyst

analyst
#47

Great. First off, I was curious whether we might receive some sort of update regarding the Zogg trial. My understanding is that it's scheduled to kick off in June. What kind of timeframe should we anticipate prior to a final ruling being handed down in that case? Also, previously, I believe you mentioned that estimates for liability might triple. Does that remain your perspective regarding how far liability might rise should you be found responsible?

Patricia Poppe

executive
#48

Thank you, Paul. To begin, regarding that topic, I simply wish to emphasize that our hearts go out to those harmed by the Zogg fire along with every one of the wildfires. Such environmental catastrophes bring immense suffering, and we treat them with seriousness; we're striving to do whatever we can so our system becomes safer and faster. Simultaneously, I am aware that my colleagues are no criminals, and it's our belief that these aren't criminal issues. With all that said, we do — the date for trial has been scheduled for June 6. We anticipate roughly 6 weeks; and we aren't anticipating any extra liabilities since we genuinely intend to prevail. I believe it matters to recognize that our arborist, our colleagues, our vegetation management crew labors each and every day so the system becomes safer and faster. And they hold no other goal except achieving precisely that. Thus, we intend to protect our stance aggressively.

Analyst

analyst
#49

So, the trial itself would last 6 weeks, but after that, it could take as long as a year for the judge to issue a decision, or...

Patricia Poppe

executive
#50

Yes, Paul, that's difficult to predict. Obviously, we'll keep everyone updated as things progress.

Analyst

analyst
#51

When it comes to disallowed interest, could you kind of separate out the liabilities or those disallowed rate base items — over at the utility — that feed into that math?

Chris Foster

executive
#52

Paul, this is Chris. I'd be glad to go through that with you away from the call. I can even hand you the bill itself. As you're aware, there's a roll-up we include in the appendices of our materials, and I'd be glad to set aside time with you to lay that out. The unrecoverable interest expense, as we mentioned today, falls in a range of $370 million to $430 million.

Patricia Poppe

executive
#53

Thanks, Lisa, and thanks to all of you for the questions and the backing. I simply want to remind everybody that when you put money into PG&E, you're putting money into California's safety and prosperity, and we're grateful for that; your support truly means a lot to us. And at PG&E, we are certainly sensing the momentum. Our 2022 results make us proud, we're penning the following chapter of our redemption story, and we hope you'll join us for the ride. We can't wait to see you out in California in May — please stay safe.

Operator

operator
#54

That brings us to the end of what we had to share today. We appreciate everyone taking part, and at this point you're free to leave the call.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete PG&E Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to PG&E Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in PG&E Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.