PLS Group Limited (PLS) Earnings Call Transcript & Summary
July 29, 2026
Earnings Call Speaker Segments
Operator
operatorThanks for joining us today, and welcome to the PLS June quarterly conference call. Right now, everyone is in listen-only mode. Once the speakers finish their presentation, we'll open things up for questions and answers. If you'd like to ask something during that session, press *11 on your phone. An automated message will then confirm that your hand is raised. Should you wish to withdraw your question, just press *11 once more. Please note that this conference is being recorded today. I'll now turn the call over to our first speaker, Dale Henderson, Managing Director and CEO of PLS Group. Go ahead.
Dale Henderson
executiveThank you, Maggie. Good morning and good evening, and thanks to everyone for being with us today. First, I want to acknowledge the traditional owners of the lands where PLS operates: the Whadjuk people of the Noongar nation here in Perth, along with the Nyamal and Kariyarra peoples in the Pilbara, where our Pilgangoora operation sits. We pay our respects to elders past and present. With me today are Brett McFadgen, our Chief Operating Officer, and Alex Willcocks, our Chief Financial Officer. We are reporting a solid operating performance for the June quarter, which underpinned record quarterly sales and several record full-year results. We'll walk you through the main operational, financial, and strategic highlights before we open the lines for questions. Moving to slide two. This slide shows why PLS is well positioned to create value through the cycle. There are four key reasons. First, our asset base and cost position. Pilgangoora is a high-quality, 100% owned Tier 1 asset with a competitive cost position that delivers resilience in weaker markets and substantial operating leverage as pricing improves. Importantly, since we own the asset outright, that value flows directly to our shareholders. Second, our balance sheet. We ended the year with $2.2 billion of cash and approximately $2.8 billion of total liquidity, which gives us flexibility over the timing and funding of growth, and lets us act from a position of strength.
Dale Henderson
executiveThird, execution. In FY26, our operating platform showed just how strong it is. We hit record annual production and sales, came in above production guidance, and produced over $1.36 billion in operating cash margin. Finally, disciplined growth. There are numerous opportunities for us to expand the business, but we'll only move forward on those where strong returns, financial discipline, and, naturally, market conditions back them up. Taken together, these qualities mean PLS is positioned to stay resilient through the cycle and to capture more value as market conditions get better. Now to slide three. The June quarter brought strong sales, better pricing, and considerable cash generation. Record quarterly sales of roughly 250,000 tonnes, along with a 13% rise in realized pricing to US$2,107 per tonne on a 5.2% basis, produced a strong financial result. Revenue climbed 31% to $743 million, and cash margin from operations rose to $579 million for the quarter. We ended the year holding $2.29 billion in cash. For FY26, production came in at a record 880,000 tonnes, a 17% increase over the prior year, and sales hit a record 892,000 tonnes. Combined with better pricing and ongoing cost discipline, cash margin generated from operations was $1.36 billion. Meanwhile, we kept moving our growth options forward, with Ngungaju restarting and work progressing on both the P2000 project and the Colina project.
Dale Henderson
executiveNow, moving to slide four and our FY26 guidance: we hit the mark on every one of the FY26 guidance metrics we set out, which underscores how steady our operating performance has been. Output came in above the upper bound of the range we guided to, helped by strong operational execution and record production during the March quarter. FOB unit operating costs landed close to the bottom of our guided range, which mirrors higher production volumes and the ongoing operational efficiencies achieved via our Cost-Smart Future-Ready program. Importantly, we got there while also absorbing the mobilization and restart costs tied to recommencing the Ngungaju plant. Capital expenditure came in near the top end of guidance, including early spending linked to the Ngungaju restart and greater mine development. Most importantly, we did exactly what we told you we would. That consistency gives us confidence as we head into FY27 and work to advance the next phase of our growth strategy. At this point I want to thank the team and give a shout-out to all the great people at PLS. It's been yet another year of challenges, and even with those challenges, you did it again. Thank you. Thank you as well to our contracting partners, our customers, and community stakeholders. You've been integral to our success in the past and to what we've just achieved this financial year.
Dale Henderson
executiveHaving said that, I'll pass things over to Brett so he can walk us through an update on operations.
Brett McFadgen
executiveThank you, Dale. Turning now to slide five. For us, safety comes first and outranks every operational result. Nothing in production or business performance matters more than how our people are doing. We will not accept any injury, and we stay dedicated to making sure each person returns home safe and healthy daily. During this period, we had two injuries in the June quarter. Even so, our total recordable injury frequency rate came in at 2.77, an improvement from 3.82 the quarter before. That gain shows the effort we have put into engaging frontline leaders and our ongoing use of the critical risk management framework. Now on slide six. Pilgangoora had a solid quarter, with total material mined rising to 10.2 million tonnes and ore mined up to 1.7 million tonnes. This shows better operational efficiency and the planned increase in waste stripping to back the Ngungaju restart, which began on July 1. Plant reliability was solid. Lithium recovery hit 76.8%, consistently high and showing the capability built in through the P1000 expansion. The ore sorter kept performing well, giving us operational flexibility. On sales, record quarterly volumes of just under 250,000 tonnes were reached in spite of congestion at Port Hedland. Ngungaju restarted operations on 1 July, and the ramp-up is tracking on schedule.
Brett McFadgen
executiveNormal production rates at the plant should be achieved in about four months. At this point, I’ll turn things back over to Dale to discuss growth and capital allocation.
Dale Henderson
executiveThanks, Brett, and congratulations to you and the team on another strong quarter. Turning to slide seven. We remain disciplined in how we pursue growth. We advance opportunities in stages, keeping flexibility around when and at what scale we invest. P2000 is our main growth option and could substantially expand Pilgangoora's production capacity. As we announced in June, the board approved $175 million in pre-FID expenditure to advance long-lead activities and keep open the opportunity to speed up first ore if a final investment decision is made. We are looking into the added benefits of potentially bringing underground mining into Pilgangoora, and a PFS is underway to examine this. Importantly, the pre-FID expenditure we have committed is not a decision to proceed with the full project. The feasibility study is still on track for outcomes in the December quarter. Moving to slide eight. The Colina project in Brazil gives PLS a diversification opportunity, and it continues to advance through feasibility, with study outcomes expected in the December quarter of '27 next year. We are evaluating investment in some early-stage enabling infrastructure, such as access roads, water supply, and power, to support the project's readiness for future development. Turning now to our downstream activities on slide nine.
Dale Henderson
executiveWe continue to take a staged, disciplined approach in chemicals, which gives us exposure to value creation downstream without putting substantial capital at risk before returns are proven. In South Korea, at PPLS, the plant ran on a batch basis in the June quarter, drawing on lower-cost spodumene inventory from '25. Commissioning has begun at our midstream demonstration plant, and we still expect the first lithium phosphate product in the September quarter. With that, I'll pass things to Alex, who will walk us through the financial performance. Alex, over to you.
Alex Willcocks
executiveThanks, Dale, and good morning, everyone. If you could turn to slide 11, we'll go through the key financial metrics for the period. The June quarter was a solid finish to FY26, showing the underlying strength of our operations and their capacity to generate cash. Revenue came in at $743 million, up 31%, reflecting record sales volume and an uplift in realized price despite FX headwinds. As we flagged previously, FOB unit costs rose to $616 per tonne from $520 in the March quarter. Ongoing benefits from operational efficiencies and Cost-Smart Future-Ready initiatives were offset by costs tied to the Ngungaju restart, as well as fuel price impacts we experienced during the period. Importantly, the Ngungaju restart costs are one-off in nature and will normalize as production ramps up through FY27. Cash margin from operations was strong at $579 million, up 26%. Record sales and strong pricing underpinned strong cash conversion. We ended the year with a cash balance of $2.29 billion, reflecting the combination of operational performance and the retained proceeds from our inaugural bond issuance in April this year. Moving to slide 12, where I'll step through the key cash drivers. The $835 million increase in cash this quarter was underpinned by three things: strong operating cash generation as discussed, planned capital investment, and strategic financing outcomes.
Alex Willcocks
executiveRegarding capex, our cash-basis spend came to $162 million, and on an accruals basis it was $124 million, which breaks down into $53 million for mine development plus $71 million for infrastructure and other sustaining items. Net financing cash flows of $422 million reflect the US$600 million in bond proceeds, net of Australian $375 million RCF repayments, along with lease repayments and interest expense. This leaves us with a cash position of $2.3 billion and total liquidity of $2.8 billion, which includes our undrawn RCF. That puts us in a good spot to back strategic investment in FY27. Turning to full-year performance on slide 13. Our full-year results show PLS's strength and resilience through the cycle, with $1.36 billion of cash margin generated, supported by production performance, disciplined cost management, and pricing recovery. Revenue rose 152% to $1.93 billion, driven by pricing recovery and higher sales volumes, partly offset by FX headwinds. FOB unit operating costs fell 9% year-on-year to $569 per tonne despite Ngungaju restart costs and cost inflation, which reflects the continuing effect of our Cost-Smart Future-Ready program and the operational efficiencies we keep embedding. On a CIF basis, unit operating costs of $739 per tonne were up 1%, with higher royalty expenses from stronger pricing largely offset by FOB performance and lower shipping unit costs.
Alex Willcocks
executiveOur cash margin rose by $1.16 billion compared with the prior year, and that supported the $2.3 billion in cash we held at the end. If you turn to slide 14, it lays out the full-year bridge for cash flow. The $1.36 billion in cash margin from operations encompassed the US$100 million prepayment from Canmax, which shows the confidence our counterparty has in the business. Capital expenditure came to $344 million on a cash basis and $328 million on an accruals basis, both inside our guidance range, and was made up of $146 million for mine development plus $182 million for infrastructure and sustaining capex, including the Pilgangoora warehouse, upgrades to the tailings storage facility, and Ngungaju capital works supporting the restart. Net financing cash flows of $354 million reflect net proceeds from the US bond and RCF repayments of $442 million, partly offset by lease repayments and interest expense. This financial strength is further evidence of disciplined operations through a challenging cycle, and it puts us in a good position to execute with confidence in FY27. I'll now hand back to Dale, who will walk through our strategic priorities and guidance for the year ahead.
Dale Henderson
executiveThanks, Alex. Now on slide 16. As we look at FY27, the first thing we're focused on is getting the most value and cash out of Pilgangoora, and at the same time we want to keep moving our growth portfolio forward in a disciplined way. Within our Operate strategic pillar, the top priority is a safe and successful ramp-up at Ngungaju, while we keep performance strong right across the wider Pilgangoora operation. Within Grow, we'll keep advancing P2000 through the feasibility study and the approved pre-FID work program. Any additional investment will still depend on study outcomes and board approval. Within our Chemicals pillar, we'll support the ongoing operational development of the PPLS JV and move forward with commissioning of the midstream demonstration plant. Within Diversify, we'll take the Colina project forward through its own feasibility study, with completion targeted for the December quarter next year. Taken together, these priorities strike a balance between near-term operational delivery and disciplined investment in PLS's future growth. They're backed by a disciplined approach to capital allocation, which is laid out on slide 17, and that's where we'll go now. One of PLS's key strengths is our balance sheet, but how we deploy capital matters just as much. Our approach is straightforward. First, sustain. We invest the capital needed to operate Pilgangoora safely and to sustain production over the long term.
Dale Henderson
executiveFor FY27, spending on mine development goes up as we carry out a planned cutback to reach future mining areas, together with our usual sustaining capital and investment in operating infrastructure. Second, enhance. These investments are ones that raise the capability, efficiency, and performance of our long-life asset. That covers opportunities like road infrastructure, accommodation, and mine services facilities. Finally, grow. Growth capital goes toward expanding the business through initiatives such as P2000 in Australia and Colina in Brazil. Importantly, these investments stay staged and remain subject to successful studies, disciplined capital allocation, and appropriate market conditions. Taken together, this framework ensures we keep protecting the strength of the existing business while investing in future growth in a disciplined way. Moving to slide 18. This slide lays out our guidance for FY27. Production rises thanks to the Ngungaju ramp-up, along with continued strong and reliable performance from our Pilgan processing plant, and the two plants together form the expanded Pilgangoora production platform. As for FOB unit operating costs, these are expected to rise modestly on a blended basis, reflecting the relatively higher operating cost of Ngungaju and its ramp-up during the year. We will stay focused on productivity, reliability, and cost efficiency across both plants.
Dale Henderson
executiveOn base capital expenditure, the main focus is mine development, which includes a planned cutback that will roll out across two years so we can reach future mining areas. Sustaining capital is rising as well, which reflects running the two plants and delivering the set of future-focused initiatives that our Cost-Smart Future-Ready program has identified. We expect these modest one-off investments in operational efficiencies to add incremental support to Pilgangoora's low-cost operations going forward. On growth capital, the guidance includes the $175 million pre-FID amount for the P2000 project that was announced previously. I'd note that spending tied to a possible full financial investment decision on P2000, a broader Pilgangoora infrastructure investment, and any Colina early works is excluded from FY27 guidance. Those initiatives are still subject to additional assessment and board approval, and we'll announce them separately as required. Let's move to slide 20 now. Shifting to the market: demand is broadening and growing more resilient, while meaningful new supply is still hard to bring on at the needed pace. These dynamics increasingly benefit established, low-cost lithium producers that have the financial capacity to invest through the cycle. On the demand side, the key development is continued diversification. Electric vehicles are still the main driver, but battery energy storage systems are scaling quickly, and electrification of commercial vehicles is becoming more and more significant.
Dale Henderson
executiveDemand for lithium no longer hinges on just one end use or one region. Through June, worldwide EV sales climbed 2.3% versus a year earlier, and growth was especially robust beyond China. Europe posted a 27% gain; Asia outside China rose 78%; and the rest-of-world segment jumped a massive 122%. More than a quarter of worldwide EV sales now come from Europe. That shows lithium demand is spreading across more regions instead of leaning on one specific market. Inside China, though vehicle sales have slowed, typical battery pack capacity keeps rising. Year to date, pack sizes for battery electric vehicles are up roughly 15%, while plug-in hybrid electric vehicle packs have grown about 31%. So even if unit growth cools, lithium demand can keep expanding, since every vehicle needs more lithium. Government policy is bolstering these trends as well. China aims for EVs to make up 30% of the vehicles on its roads by 2030, with electric trucks hitting 40% penetration during that same span. That confirms electrification is moving past passenger cars into heavier transport uses. Battery energy storage keeps growing as a demand driver.
Dale Henderson
executiveWorldwide installed capacity rose 25% compared with a year earlier, and that figure includes a massive 96% increase across Europe. In our view, this marks a significant structural change, as energy storage keeps becoming essential infrastructure that underpins grid reliability, the integration of renewables, and energy security. A further encouraging indicator emerges from the battery supply chain. CATL, in its latest interim results, said capacity for manufacturing batteries that is currently being built equals roughly 1.5 times the capacity it already operates. Investment on that scale strengthens our conviction that the biggest players in the industry still expect robust demand growth over the long term. Separately, the US Defense Logistics Agency has lately moved to the market to buy battery-grade lithium carbonate for the National Defense Stockpile. Demand may be modest, yet this adds one more source of competition for lithium units and underscores how strategically important a secure lithium supply has become for defense and national security. Turning to supply, the industry is reacting to better pricing by restarting capacity that had been idle and by announcing new projects. Even so, what we have learned tells us that announced tonnes must not be mistaken for delivered tonnes. Delivering meaningful new supply to the market demands financing, permitting, construction, commissioning, customer qualification, and operational ramp-up — a process that takes years, not months.
Dale Henderson
executiveMeanwhile, risks tied to sovereign and policy decisions are on the rise. A recent illustration is Zimbabwe's renewed prohibition on exporting spodumene concentrate starting in '27, which puts roughly 250,000 tonnes of LCE-equivalent supply in jeopardy. That shows future supply is increasingly vulnerable not just to project execution but to government policy as well. Taken together, these demand and supply forces strengthen our conviction that the lithium market will keep going through stretches of tightness and price volatility. That aligns with Benchmark Mineral Intelligence's long-term outlook, which projects lithium demand rising at about 10% per annum through to 2040, exceeding forecast supply growth of roughly 8% per annum. For PLS, such conditions suit the strengths we have intentionally developed: scale, cost-competitiveness, financial strength, and control over the timing of our growth. With that in mind, let me wrap up by recapping what FY26 showed and the priorities that will shape FY27. To conclude, FY26 was a pivotal year for PLS. We achieved record production of 880,000 tonnes, record sales of 892,000 tonnes, and ended the year with total liquidity of about $2.8 billion. Crucially, these results did not come merely from higher lithium prices. They mirror the operating leverage we purposefully created through the downcycle and our team's disciplined execution.
Dale Henderson
executiveLooking ahead to FY27, our priorities are straightforward: we need to bring Ngungaju up safely, keep Pilgan performing strongly, and move P2000 forward so that a decision can be reached in the December quarter. We’re heading into the year with good momentum, financial flexibility, and confidence in what the long term holds for PLS. I want to thank our shareholders for their continued support and for believing in this remarkable market. Thank you for joining us this morning. Brett, Alex, and I would be glad to take your questions now, and at this point I’ll hand over to Maggie so she can open the line for those questions. Thank you, Maggie.
Operator
operatorIf you'd like to ask a question, press *11 on your phone and wait for your name to be announced. Should you wish to withdraw it, just press *11 once more. Please hold while we put together the Q&A roster. Our first question is from Levi Spry of UBS. You may proceed.
Levi Spry
analystMorning, and thanks to Dale, Alex, and Brett for making the time. I might begin with recoveries, an operational question. Those have come in fairly strong over the past few quarters. How should we think about the potential to beat the long-term assumptions of roughly 75% and 67% at the two plants, Pilgan and Ngungaju?
Brett McFadgen
executiveHello Levi. Naturally, now that the Ngungaju plant is back in operation, that facility does have reduced recovery rates, which we have been addressing over the years. When you consider the recoveries, consider them collectively. We examine many factors, including head grade, plant stability, and contamination levels. We are putting in significant effort to raise those recoveries. I would expect recoveries going forward to be around the mid to low 70s, clearly affected by the lower recovery at Ngungaju from the ore we feed into that plant.
Dale Henderson
executiveLevi, just to add — look, that's a great question, and it's one we're wrestling with, because, yeah, as you say, the team's done a fantastic job with lifting recoveries. It's natural to ask what this means for the long-term valuation of the asset. Over the coming months, we will be grappling with this question, because, of course, we've got the P2000 study still working on, and we'll have to take a view as part of that. Of course, we'll be looking at resource and reserve modifying factors as well — this will all come to a head in due course. It's exciting to think about the potential adjustment to the valuation of our asset care of an improved long-term lithium recovery parameter.
Levi Spry
analystThanks. Regarding the P2000, I know the FID is still three or four months off, but what should we be looking for at that point? How quickly can you get moving? Part of what I'm getting at is, sure, a lot of it obviously has to be modeled, but how should we think about capex, or is it mostly a FY28 story?
Dale Henderson
executiveRegarding the P2000, consistent with what we disclosed before and the pre-FID we announced, we indicated first ore in calendar year '29, and that essentially assumes we move as fast as possible. When we announce full FID, we'll restate that timeline, and we'll see how the team performs to determine whether we can pull things to the left. We're definitely pushing for that, but we'll see how it goes. We'll provide a fresh statement on that timeline. Alongside that, of course, will be the capital outlook for the project, which, yeah, right now we can't give you any visibility into until that study is complete.
Levi Spry
analystThanks. Could I just fit in one question about the underground? That was news to me — what's driving the decision to look at that, maybe earlier than expected?
Dale Henderson
executiveSure. At Levi, creating value for shareholders is something we're intensely focused on. With that in mind, we're asking what steps we can take to maximize recovery, while also asking what steps we can take to maximize resource capture in the mine. Underground, we believe, holds potential, but we're truly just beginning to explore that. We felt it was prudent to signal to the market that, yes, we have a PFS underway to explore this. We'll see where that leads us. Given how large the Pilgangoora system is, it's enormous. We've seen that it appears to grow at depth based on some of the deeper drill holes we've seen. It's a very interesting area for us to explore further. We'll see how we go.
Levi Spry
analystExcellent — I appreciate that, and thanks to all of you for making the time.
Dale Henderson
executiveAppreciate that, Levi.
Operator
operatorThanks. Give us a second before we take the following question. Up next is Rahul Anand with Morgan Stanley. Oh,
Rahul Anand
analystHello there. Good morning to Dale, Brett, Alex, and James, and thanks for taking the call. So, I'd like to begin, if I could, with the base capex figure — that range of roughly 450 to 510 for the coming year. I just want to get a sense of how we ought to be thinking about forecasting that as we move ahead. Clearly, there is something of an increase there, both on the sustaining side and with respect to capitalized waste movement, which is continuing. I understand there's also a piece tied to Ngungaju in there. Looking ahead, are there elements inside this capex number that will fall away after this year or next year, or will we simply keep carrying this forward with an inflation component built into it? That's the first question. I'll come back with the second. Thanks.
Brett McFadgen
executiveThanks Rahul. I'll cover the first section and then pass things over to Alex, but definitely on sustaining capital, there are a few one-off Cost-Smart Future-Ready projects, and most of those will likely wrap up in FY27, so it's somewhat inflated there. After that it should settle down going forward, which explains why it's probably a bit above what we'd typically carry. A number of those initiatives are highly value-adding across the operation in terms of cost efficiencies and enhancing our overall outcomes for the shareholders.
Alex Willcocks
executiveThanks Brett. Rahul, you also raised questions about the three separate elements that make up this year's base capex guidance. The first one is the mine development portion, which captures the substantial rise in mining activity resulting from the cutback work, and that simply comes down to how the mining activity is phased. As you pointed out, sustaining capital has moved higher. There are a couple of distinct reasons for that. First, the assumption that we're now running the base plants. We have the usual maintenance capital flowing through at both the Ngungaju asset and the Pilgan asset. We also have several Future-Ready initiatives that will be rolled out over the coming year and should be finished within that year. Those are one-off investments aimed at operational efficiencies and reliability improvements. That will factor in as we move ahead into FY28, and we'll clearly give some additional guidance once we reach the right point. The other element on the infrastructure side in FY27 — there are, I'd say, some larger programs of work in FY27. We have the coarse ore stockpile dome activity currently underway. There are several mine water supply upgrades that we're progressing, plus some work on the camp too.
Alex Willcocks
executiveI'd say those are bigger initiatives that also won't be repeated once we get into FY28.
Rahul Anand
analystUnderstood. Alex, if I were to put that in a nutshell, I'd say the sustaining capital piece, measured in dollar millions, looks fairly sticky when it comes to proportions going forward. Then, looking at mine development, that's probably more concentrated across this year and next, and after that it may step down by some percentage, while the infra component is clearly going to be ad hoc. Is that the right way to think about it?
Alex Willcocks
executiveMy take is that this reading is a reasonable one. Brett, would you like to talk about the mining side?
Brett McFadgen
executiveAbsolutely. On the stripping side at the mine, as Dale said, the coming two years carry a very heavy cutback load. After that, mine development drops back and levels off somewhat over the remaining life of the mine. It runs a bit elevated through the next two years.
Rahul Anand
analystUnderstood. Great. Brett, the second question is directed at you, mate. I’m reviewing the guidance for next year and wanted to go over a few of the main points, perhaps. Levi mentioned recovery — I’ll skip that part. Could you possibly walk through some of the underlying assumptions behind that guidance regarding grade and strip ratio? What I’m trying to get at is that, clearly, you ended the year with a cost figure that already sits at the top end of next year’s guidance once Ngungaju is producing. I’m aware there was some work happening on site this quarter that affected the cost figure for this quarter. I just wanted to grasp some of the back-end assumptions within that number so we can run the physicals and reach that cost in our modeling too, and to understand, I suppose, the pinch points in terms of energy and some of the other variables around currency, etc., so we can model it appropriately. Thanks.
Brett McFadgen
executiveI'll cover the physicals side of that, and then Alex can jump in on some of the financial headwinds we're seeing in FY27. Beyond the restart of Ngungaju, which traditionally runs at a somewhat higher operating cost than the Pilgan plant, the effect gets amplified during the restart and ramp-up period. Those elevated costs should be with us for the first few months — four months — as we ramp up, and after that they'll fall to a more sustainable level once we hit those production rates at Ngungaju. The quantum of mine stripping is rising this year as we move into stage six, and we begin to use some of the larger gear. We've already got the larger platform rigs, but it really starts to become a volume-based mining activity. It's an extra 20 million tonnes. That strip ratio does go up from last year to about 5.9, but that is well below the life-of-mine strip ratio of the 7.7. So those impacts in FY27 are certainly coming at us from a physicals viewpoint. Obviously, a lot of our Cost-Smart Future-Ready projects are aimed at those efficiencies and actually getting us down that cost curve, but I'll hand over to Alex for some of the other color on the financials.
Alex Willcocks
executiveThanks, Brett. Rahul, you raised a question about energy prices too. Of course, that has been among the main factors we considered while assembling the guidance. As a quick reminder on the energy side, LNG along with solar battery supplies most of the power for the primary Pilgangoora processing plant. Diesel is primarily consumed by our heavy mining equipment fleet, which delivers the feed into the plant. As you would expect, while preparing this we have examined a variety of diesel price assumptions. For some context, in FY26 diesel ultimately represented roughly 6% of our production costs. We expect that share to rise to between 8% to 10% as we head into FY27, and two factors drive that. First, fuel consumption does increase somewhat because of the Ngungaju plant and extra activity on site, and second, as Brett has already mentioned, mining activity steps up. Part of that involves a consumption element. We have then applied our best estimates for the diesel outlook, factoring in the forward curves as well as an allowance for uncertainty in that area. You will notice that reflected in our guidance figures too.
Alex Willcocks
executiveThose items, plus currency movements, are obviously outside our control, yet we believe we have built a sensible cushion into the guidance range we gave.
Operator
operatorThanks. Please hold briefly while we bring up the next question. Our next participant is Austin Yun of Macquarie.
Austin Yun
analystGood morning, Dale, and to the team. I just have a question regarding production in the near term. It's good to know that Ngungaju is in the restarting phase. I'm just keen to understand how we should think about the volume ramp-up over the near term? Could there be any potential tie-in activities that might lead to lower volumes in the near term? Thank you.
Brett McFadgen
executiveThanks, Austin. No, Ngungaju is a completely standalone facility. It's a plant that's very well known. We had it sitting in care and maintenance, and obviously we took it out of care and maintenance, and we did a great deal of preparatory work to get it running. At this point it's really just a matter of completing those commissionings. What we're doing is carrying a lot of the lessons learned at the Pilgan plant over to that plant and putting them into practice there, so we capture those benefits too. No, there's nothing concerning there. I think with the schedule we have in the plan, we're looking pretty good across the first four weeks of that plan.
Austin Yun
analystThanks, appreciate it. Turning to the second question, which is about the P2000. Your update points out that a number of separate work streams are being progressed within the pre-FID study. If that project does get the go-ahead, I'd just like to get a clearer picture: for each of those work streams, is there a particular order? How should we view the capex investment profile? Would it be relatively concentrated, or would it instead be spread out over several years, with a portion of it occurring even after the project has been commissioned? Thank you.
Dale Henderson
executiveHello Austin. Regarding P2000, we’ll give a qualitative explanation of that when the study result comes out. Broadly speaking, most of the capital usually comes once work shifts to site execution, and the timing there will become clearer with the study outcome. My guess is that the majority of it would land roughly one year after FID, assuming FID happens. Within that, I’d say the mid-to-back end would see the biggest capital draw, though clearly at the front end you’d have items such as earthworks, long-lead equipment, steel procurement, and so on. I can’t give you more detail than that right now.
Austin Yun
analystThat's fine, no problem at all. Thanks — I'll skip my turn.
Dale Henderson
executiveAppreciate that, Austin.
Operator
operatorThanks. Give us a second while we get to the next question. Up now is Lyndon Fagan with JPMorgan. The floor is yours. Oh,
Lyndon Fagan
analystThanks a lot, and good morning. I was hoping you could give me a bit of a rundown on the stockpile strategy, if that's alright. Obviously I can see that for quite a while now, the ore mined has been much higher than the ore processed. I'm just wondering, I suppose, how large the stockpiles are, how much you need to, I guess, grow them into P2000, and I guess what happens after P2000 with all of that? Thanks.
Brett McFadgen
executiveThanks Lyndon. I'd say our mining and stockpiling approach is roughly where we want it to be, and we have a decent level of flexibility in front of both processing plants — Ngungaju and Pilgan. What's added in there is a portion of the contact ore that's now coming up, which we're blending in. Some of the ore we mine also contains that contact ore. Right now, it runs through at a blend rate of roughly 20% to 25%. Clearly, P2000 is the option we're considering to handle that contact ore down the road. It genuinely provides that flexibility and makes sure that any disruptions at the mine, or anything similar, weather effects, let us ensure we aren't affected on the plant side. Yeah.
Dale Henderson
executiveLyndon, I’ll add just one point there. Part of what Brett and the team have accomplished over the years involves evolving the operation to be more bespoke and better attuned to varying ore characteristics. Brett and his team have pursued a quite intentional strategy of shifting to a different stockpile approach aimed at maximizing lithium recoveries. That is partly why we are seeing some of the strong results. We have shifted to a more sophisticated feed strategy, and that is flowing through to the bottom line thanks to those higher recoveries. As Brett said, we are not looking to raise those stockpiles at that level. The operating setup suits the processing capacity we have at this time.
Lyndon Fagan
analystAppreciate it. So, a follow-up question here. Wesfarmers has clearly given their project the green light. Capital intensity on that one appears fairly high. I suppose if the street is putting you somewhere in the $2 billion to $2.5 billion range, that's a pretty sizeable gap. Obviously, P2000 is a larger project and gains from certain economies of scale, but I'm wondering whether you might offer any observations about those differences, or whether we actually need to rethink the all-in spend on your side?
Dale Henderson
executiveHonestly, I can't offer anything particularly useful regarding what Wesfarmers is doing. I wouldn't connect their actions with ours. I've definitely made that clear to Paul, our project director — told him not to get any ideas. Naturally, we're squarely focused on delivering efficient capital intensity, and we'll use every tool at our disposal to ensure our shareholders' dollars go as far as possible. As I said, I wouldn't link what Wesfarmers announced with the direction we're taking.
Lyndon Fagan
analystAppreciate it.
Operator
operatorThanks. Our next question comes from Hugo Nicolaci at Goldman Sachs. Go right ahead.
Hugo Nicolaci
analystGood morning, Dale, Alex, and Brett. I appreciate the update you gave us today. Brett, my first question is for you, about how processing performed during the quarter. The processing head grade that's implied keeps coming in much higher than the mined grade that was reported. Would I be correct to conclude that the recovery you report is measured after ore sorting, and if that's the case, what figure would your recovery have reached relative to the mined grade?
Brett McFadgen
executiveThanks, Hugo. That's correct. The recovery we're seeing comes after ore sorting. As we've discussed previously, that approach of stockpiling and figuring out how to get the most from the resource so those recoveries benefit as much as possible definitely has a role to play. Look, I'm not going to go back and run every number on the pre-sorting side to examine recovery, but what we focus on is getting the most out of those ore sorters for the technology they actually perform, and they're genuinely doing an excellent job of ejecting contaminants, which then lets that processing plant get a really good run of the ore. It's all about creating the best ability to deliver the best ore to the plant and achieve the maximum recovery from it. It's somewhat difficult depending on what sort of levels of contact we're running and where that ore is coming from, as well as the geometallurgical makeup of it.
Hugo Nicolaci
analystUnderstood. That will naturally differ based on the mix, of course. I'm not sure, but if you had to give a rough estimate, would you put the recovery gain from the ore sorting component at somewhere around a 2% to 5% uplift compared with what it would be otherwise?
Brett McFadgen
executiveWhat we're seeing, for sure, is an outcome that beats expectations with our ore sorters. We're collaborating quite effectively with TOMRA, and we truly are extracting the value from those ore sorters to take out the contaminants and achieve that upgrade. I wouldn't attach a figure to it at this point, but what we're examining is simply every place we can make improvements through using that technology, which delivers that downstream benefit.
Hugo Nicolaci
analystUnderstood, thanks. One more clarification about processing — I note that your ore mining figure is in wet tonnes while your processed figure is in dry tonnes. Is that still at roughly 5% moisture, and perhaps some of the difference comes from that as well?
Brett McFadgen
executiveThat's approximately right, Hugo. Pretty close.
Hugo Nicolaci
analystThanks. Now, on the fiscal '27 guidance — would you have basically given roughly what you assumed for Ngungaju tonnes in '27? My guess is that it'll be under 200,000 tonnes since you're ramping up, but then also, what have you assumed for recoveries continuing at the Pilgan plant — should we be taking the mid-70s going forward to hit that low-70s average you mentioned across the asset?
Brett McFadgen
executiveLook, we don't run the two circuits separately and speak to each one on its own. We genuinely operate them as one unit. As we've mentioned previously, we're targeting the low 70s for overall recovery. Obviously, with Ngungaju, we know it's a plant with lower recovery, but as a system, we use both plants to get the best product outcome and then the best recovery from both of them going forward.
Operator
operatorThanks. Give us a second while we take the next question. Up next is Glyn Lawcock of Barrenjoey.
Glyn Lawcock
analystMorning, Dale. Dale, I just picked up on the fact that you mentioned the access road, the permanent village, and the HME facility are all conditional on board approval. Could you give us some clarity on what sort of capital outlay we should be anticipating for those? Is it probable that they'll be presented to the board during this financial year '27, and might we see extra expenditure on them this year?
Dale Henderson
executiveHello, Glyn. Appreciate you looking into this. Regarding whether it might reach the board during this year — yes, and that's the reason we tried to really drive the point home on slide 18, since we have a few line items listed there that require board sign-off. It certainly could happen this year. Clearly, the P2000 is planned for the December quarter, and we may aim to make some of these other possible investments at roughly the same time, or we'll just see how things progress. There's a great deal under evaluation right now. On your question about the quantum, I can't offer any guidance on that, as we're heavily immersed in the study phase. What we've tried to do is at least provide a bit of a framework for what it might look like. In one of the earlier releases — the Macquarie presentation, I believe, on slide 12 — we laid out the access road length at 24 km, the village size, an 800-bed camp that can serve as a base-scale camp with the option of potentially expanding it further to support P2000, and a small amount of detail on the mine services facility.
Dale Henderson
executiveI realize this doesn’t provide you with capital figures, but it does give you a sense of the size. Regrettably, we’re unable to share much beyond that until those studies are finished.
Glyn Lawcock
analystDoes a figure of $200 million make you nervous?
Dale Henderson
executiveThere isn't much that frightens me, Glyn, but I can't give you any guidance on that.
Glyn Lawcock
analystAll right. The following question I have concerns mine development, which you've covered. I simply want to confirm my understanding of how you view P2000 and mine development. I'm not asking for a quantum, but the $1.2 billion figure for P2000 is already out in the market, and that will change. We all understand that. Did that cover only the plant? Should we therefore think that the mine development spend you've mentioned for the next two years includes nothing for P2000, and that beyond the plant figure we ought to expect additional stripping as well? Is that the correct way to think about what we'll get at the end of the year?
Dale Henderson
executiveRegarding, yeah, returning to that initial study we completed in '24, yeah, I wouldn't place too much weight on it, since clearly quite a bit has shifted, not just where cost inputs are concerned, but also how we're approaching the development. The processing technology keeps advancing, and both the scale and the feed strategy have kept advancing as well. That's partly from continuing to do additional test work, but partly too because we've learned plenty and achieved strong results via the ore sorting. Naturally, that element carries into the new investment case. The '24 study doesn't offer much of a guide regarding what we can bring back to the market, which you rightly pointed out. Thank you for that. As for the make-up of what's included and excluded, again, you'll need to wait for the study outcome. Sorry, Glyn. I know everyone's eager to get the details, but we'll present it all in the single release.
Operator
operatorThanks. Please hold on a second while we get to the next question. Up now is Thiago Ojea with Citi.
Thiago Ojea
analystMorning, everyone, and thanks for taking my questions. Assuming this health market keeps holding up, your cash generation looks pretty strong. I'm curious whether there's any flexibility to maybe pull Colina forward. In the current environment, I know the IRR on that project ought to be extremely high. On that note, how should we broadly think about capital allocation? How would you weigh your organic growth opportunities against potential M&A? Thank you.
Dale Henderson
executiveAppreciate the question. I'll take that first, and then hand it to Alex. Look, thanks for pointing out the cash generation happening here, because if you'll give me a quick moment, it's simply an extraordinary strength of this business. That $1.3 billion of cash margin through operations is remarkable, and it comes from the scale. We have leverage and scale. We have a low cost position. All of it is flowing through to the bottom line. Of that cash margin, well, more than 40% was generated in the last quarter. When you consider, well, what the headline realized pricing was last quarter versus this quarter, it looks something similar. You form your own view of forward pricing when you sort of drag that to the right. It's pretty remarkable what could be possible through this business. Of course, with 100% ownership, well, that flows directly through to our shareholders. We don't have any JV splits or any of that sort of carry on, so it's a wonderful position to be in. Now, turning to your question about bringing forward Colina, the short answer is we're doing what we can there anyways. What that looks like in the first instance is we want to grow what's on the ground first.
Dale Henderson
executiveWe have drilling capital allocated that we intend to increase that, and after that we aim to determine the right scale for the processing operation to accomplish that. Our focus is on getting the most value out of the resource and then getting the most value capture through a plant sized correctly for all the proper processing equipment. We are moving that forward as fast as we can, but the December quarter of next year is the fastest it can happen in that respect. With that, I will pass it to Alex on the
Alex Willcocks
executiveThanks, Dale. On your wider question about capital allocation, Tiago, as you would expect, we'll naturally review every project — organic or inorganic — through both a returns lens and a shareholder lens. We're in a very strong position, having ended the year with $2.3 billion of cash on the balance sheet. That puts us in a really good position for the decisions coming up regarding P2000 and, as Dale mentioned, the timing of Colina really depends on the study and would follow 12 months after that. We'll stay flexible and preserve flexibility on the balance sheet, so that if opportunities arise that we believe represent the right long-term investments for shareholders, we have the flexibility to act on them. As always, it depends on what those opportunities are and where they come from. We will keep looking at every aspect of growth, but those decisions will really be returns-led.
Operator
operatorThanks. Given the schedule, we’re moving on to questions from the webcast. James, over to you.
James Fuller
executiveThanks, Maggie. We’ve got a few questions coming in from the webcast. Could you let us know whether dividends are something we should expect, and if so, when they would likely be payable?
Dale Henderson
executiveOn the dividend question, the board is going to look at that when it comes to the full-year results, and on timing — if a dividend is going to be paid, the timing will be made known as part of that release.
James Fuller
executiveThanks, Dale. Moving to the next question: has PLS thought about entering into offtake agreements with OEMs like CATL, BYD, and others?
Dale Henderson
executiveYeah, that's the short answer. We're still engaging broadly right across every part of the supply chain, including some very recent discussions, and there's really strong appetite when it comes to locking in volume from PLS — in that respect, we're in an enviable position.
James Fuller
executiveThanks. In what way do you gauge whether the midstream product strategy is working? And what do you expect to gain from it? Yes.
Dale Henderson
executiveThat's a tough one to respond to off the cuff, but basically it comes down to a demonstration plant. Our goal is to generate a broad set of learnings across many dimensions, and all of it serves a single purpose: figuring out how we can capture additional margin and additional value nearer to the resource by way of these value-adding steps. In the end, what we'll be examining at that demonstration plant includes items such as varying feed strategies, varying set points in the processing flow, grasping the quality effects when it comes to the product coming out the back end, and essential to this will be various trials, along with collaborating with supply chain partners, among them the first offtake we have signed up there.
James Fuller
executiveThanks. What kind of market conditions would have to be in place before you'd give the go-ahead on P2000?
Dale Henderson
executiveWhat we find encouraging about the direction we believe the P2000 is taking—and the study results will make all of this clear—is that it works as a scale project, and the first study, released in '24, demonstrated a unit cost advantage stemming from that scale. We hope that pattern carries through in the next study update. The implication is that regardless of market conditions, there is a rationale for investment, since it strengthens our business, shifts us to the left of the cost curve, and displaces competitors in the market, ultimately, through downcycles. That said, the prevailing market price and the market outlook are going to be a key element of that decision, and we'll address that question once the study is delivered.
James Fuller
executiveThanks. Would you consider sodium-ion batteries a competitive threat to PLS?
Dale Henderson
executiveWe keep examining sodium-ion alongside the other technologies competing in this space. From time to time, sodium-ion receives a lot of attention. Our perspective matches what experts across the board are telling us and what we observe: sodium-ion can serve as an energy storage device, but for particular applications it is fundamentally far less energy-dense — nearly half as much. That translates into suitability for different use cases, and it has not yet achieved scale in the market, and it fundamentally carries higher costs in some respects, plus the fact that it is twice the size means you need twice everything, if not more, to accommodate that technology. That does not worry us. The specialists who weigh in on this regard it as a minor portion of tomorrow's supply mix, and our view is consistent with that.
James Fuller
executiveFor our final question: could you walk us through the reasons behind the stock's sharp swings?
Dale Henderson
executiveI wish we could give you a definitive answer on that. Look, at the highest level, lithium is a young industry, and it's growing from a small base. The one constant in this industry has been volatility. Attribute that to a young industry expanding quickly, and we expect that pattern to persist until the industry reaches greater scale and the supply chains are fully built out. Until then, it doesn't bother us in the slightest. As for PLS, we've been structured not just to handle volatility but to take advantage of it, and that's precisely what you're seeing right now. We've invested counter-cyclically, cut our cost base, built scale — we have more scale and a lower cost position — and here we are reaping the rewards. With Ngungaju back on, we have that swing capacity coming online. We just generated $579 million in operating cash margin for the June quarter alone. Headline pricing remains roughly similar. We're here to capitalize on that volatility, and obviously, for the benefit of our shareholders. It's an exciting time for the company and an exciting market. Great question to finish on. With that, that's a wrap.
Dale Henderson
executiveI appreciate everyone joining us to hear about the results for our June quarter, which was a very strong one and brings to a close a year that has broken records for both volume and sales, a fantastic set of outcomes, and we look forward to speaking with you again when we present the full-year results in a couple of months' time.
Operator
operatorThanks. That brings us to the end of today's conference call. We appreciate everyone joining us. You're welcome to disconnect at this point. Have a wonderful day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete PLS Group Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to PLS Group Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in PLS Group Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.