PLS Group Limited (PLS) Earnings Call Transcript & Summary

October 27, 2026

Australian Securities Exchange AU Materials Metals and Mining earnings 59 min

Earnings Call Speaker Segments

Dale Henderson

executive
#1

Thanks, Maggie. Good morning and good evening to all of you, and we appreciate you being with us today. First, I want to acknowledge the traditional owners of the lands where PLS operates: the Whadjuk people of the Noongar Nation here in Perth, along with the Nyamal and Kariyarra peoples in the Pilbara. Our respects go to their elders, past and present. With me today are Brett McFadgen, our Chief Operating Officer, and Alex Willcocks, our Chief Financial Officer. Record production and reduced unit operating costs were delivered in the September quarter. Even with weaker lithium pricing, the business kept generating substantial operating cash. Since the quarter closed, we have approved the P2000 project and finished our second U.S. We've got a bond offering. Also today, we announced a power agreement with Fortescue, and that's expected to further lower operating costs going forward and bring down emissions intensity tied to power. What these moves demonstrate is our strategy being put to work—performing now while putting money into Pilgangoora's long-term competitiveness. We'll take you through the results and the strategic developments, and after that we'll open the line for questions. Moving to Slide 2. Our ability to generate value across the cycle starts with Pilgangoora, a big, long-life operation we own entirely—100%. This development and capital investment sit under our control, and PLS shareholders retain the complete economic interest. P2000 takes that base further. We expect it to raise output capacity to roughly two million tonnes each year, recover a greater share of the ore body, and lessen mining intensity. Lithium in our ore reserves has risen by 31%, which backs the bigger production plan while keeping about twenty years of open pit mine life. The power deal announced today is set to deliver extra cost savings beyond what the P2000 FID assumed, and it will substantially cut emissions intensity tied to power. Colina, together with our downstream partnership in South Korea, gives us further options for growth and diversification, and we will move those forward selectively. As of the end of September, we held AUD 2.2 billion in cash, and the USD 700 million bond was finalized following the quarter's close, which helps us push out and spread our debt maturities further. With those proceeds included, pro forma liquidity comes to roughly AUD 3.7 billion; that financial strength provides us flexibility throughout the investment period and the ability to keep investing through the cycle. Our aim is to deploy this capacity with discipline, enhancing competitiveness and investing for appealing long-term returns for our shareholders. Moving to Slide 3 now. The September quarter saw record production and reduced unit operating costs, set against softer lithium pricing. Output rose to 260,000 tonnes, a 25% increase over the June quarter, helped by solid results at Pilgan and extra output from Ngungaju. The ramp-up at Ngungaju is now finished, right on schedule. Unit costs on an FOB basis dropped 12%, landing at AUD 539 per tonne. Estimated average realized pricing came in at USD 1,809 per tonne on a 5.2% basis. Revenue totaled AUD 563 million, a 24% decline, which mirrors softer pricing and sales volumes hit by the timing of shipments. Since the quarter closed, we've also approved P2000 — I mentioned this briefly earlier — and it should raise production capacity to about 2 million tonnes per annum late in the decade. The Fortescue power agreement we announced today should further enhance that future operating profile, cutting FOB unit cost by an additional AUD 15 to AUD 20 per tonne versus the P2000 FID cost base once supply begins; with that, I'll pass it over to Brett to walk us through safety and operational performance.

Brett McFadgen

executive
#2

Thanks, Dale. Turning to Slide 4. Safety comes first for us. Nothing in production or in financial terms matters more than keeping our people safe and well. By the end of September, our rolling 12-month total recordable injury frequency rate had improved to 2.36, compared with 2.77 at the close of June. Even so, 4 of our people suffered recordable injuries in the quarter. We clearly have to improve. We remain focused on visible leadership and meaningful engagement with our frontline teams, spotting hazards and verifying that critical controls exist and function. This slide also reflects more safety interactions per site leader. Such conversations let us understand the risks wherever the work is done and reinforce safe work practices. Now to Slide 5. Pilgangoora achieved record output of roughly 267,000 tonnes in the September quarter, a 25% rise on the previous quarter, thanks to strong results at Pilgan and extra production from restarting our Ngungaju operations. At Pilgan, better feed quality, gains from ore sorting and steady plant operations underpinned that strong result. Across Pilgangoora, lithia recovery came in at about 75%. Ngungaju restarted in July as planned and met expectations throughout the quarter; it achieved full operational status in October, hitting the ramp-up schedule we set out earlier. Mining rose in line with the mine plan, with 11.5 million tonnes of total material moved, among it 1.5 million tonnes of ore to meet requirements at both plants. Sales totaled roughly 223,000 tonnes, 11% lower than the previous quarter, which reflects shipment timing while customer demand stays strong. It was a strong start to FY '27, though output in any one quarter should not be treated as a run rate for the entire year. Quarterly volumes will fluctuate depending on ore feed characteristics, planned maintenance shutdowns and other operational activities. With those factors in mind, we have today reaffirmed our full year production guidance volumes and unit costs. I'll now hand back to Dale.

Dale Henderson

executive
#3

Thanks, Brett, and congratulations to you, Chris, and the entire operating team on a cracking quarter. Turning to Slide 6. Our Colina Project in Brazil, which we own outright, offers another chance for growth and geographic diversification. In the quarter, we finished acquiring Lithium Ionic's interests in tenements next to Colina and began infill resource development drilling on that acquired ground. Alongside this, we carried on metallurgical testing, flowsheet development and infrastructure studies. Feasibility Study results are still on track for the December quarter next year. These studies will shape the project's development pathway. Any decision to proceed will hinge on successful study outcomes, funding and supportive market conditions. On to Slide 7. Our chemicals investments give us access to additional markets and opportunities throughout the lithium value chain. We keep advancing these opportunities in a staged and disciplined way. At P-PLS in South Korea, output was moderated to match customer demand and prevailing conversion economics. At our Mid-Stream Demonstration Plant, commissioning moved forward with first ore through the electric calciner, which delivered successful conversion. First product has taken longer than anticipated while the team works through commissioning of the specialized equipment and integration of the plant systems. First lithium phosphate product is now expected in the December quarter this year. With that, I'll hand over to Alex, who will take us through the financial performance.

Alex Willcocks

executive
#4

Thanks, Dale, and morning, everyone. Moving on to Slide 9. Revenue for the September quarter was AUD 563 million, down 24% from the previous quarter. The drop was driven by a realized price 14% lower as of September 30, plus sales volume impacted by shipment timing. Turning to costs: our FOB unit operating cost was AUD 539 per tonne, 12% under the June quarter. That gain came partly from operational and cost efficiencies — a reflection of the cost discipline built into the business via our Cost Smart, Future Ready operating approach — and partly from a larger volume of capitalized waste. We anticipate that unit costs will increase for the rest of FY '27, driven by wet season effects and expected higher diesel prices. The efficiencies we have built in leave us well placed to offset those pressures, and we are still on course to meet full year guidance. Cash margin from operations came to AUD 329 million (sic) AUD 392 million in the September quarter, showing the underlying business can generate cash even with lower realized pricing. Following additional price cuts during October, provisional pricing adjustments on first quarter sales are projected to lower second quarter cash margin by roughly AUD 88 million, according to estimates as of the 26th of October. I'll now move on to capital expenditure. Capital expenditures measured on an accrual basis came to AUD 185 million, which represents a 50% increase versus the previous quarter, largely reflecting pre-FID spending tied to the P2000 expansion. In the same quarter, we made the final FY '26 dividend payment and also financed the purchase of the Colina tenements. We ended September holding AUD 2.2 billion in cash, with total liquidity of AUD 2.7 billion. Combined with operating cash flow we expect going forward, this gives us the ability to fund the P2000 expansion. Since the quarter closed, our second U.S. bond has been completed, which added further strength to that funding capacity. I'll move on now to Slide 10, where I'll discuss financing and the balance sheet position. We've obtained extra long-term financing ahead of a stretch of substantial capital spending, and that bolsters our financial flexibility as we move into the next stage of growth. On the 26th of October, as we announced, we finished a USD 700 million offering of 8% senior unsecured notes maturing in 2032. It was our second issuance in the U.S. debt capital markets. And even with recent market volatility, we were glad to see strong continued backing from high-quality global institutional investors. This financing shows our proactive approach to capital management, adding long-term funding and further diversifying our debt maturity profile. Taking our 2031 and 2032 senior unsecured notes together, the weighted average cost of funds now stands at 7.48% per annum. The notes now carry an average maturity of 5.3 years on a weighted basis. With this added liquidity, we're better positioned to weather swings in the commodity cycle and to exercise more discretion over our investment program and how we prioritize capital allocation. Such choices remain guided by our capital management framework and dividend policy. We'll stay focused on keeping the financial wherewithal to carry out our growth strategy while retaining flexibility as market conditions shift. I'll now turn things back to Dale for the corporate update.

Dale Henderson

executive
#5

Appreciate that, Alex — and well done to you and everyone involved on the second bond. Moving to Slide 12 now. Since the quarter closed, we've pushed forward three complementary initiatives designed to increase the value we get out of Pilgangoora and strengthen its competitiveness over the long run. P2000 combines greater output with a more efficient way of working the ore body. Improved processing capacity allows more mineralized material to be recovered as ore, cutting mining intensity and helping keep unit costs down over time. The Feasibility Study supports an investment of about AUD 1.9 billion, with incremental posttax net present value of AUD 2.7 billion under the study assumptions disclosed. Beyond P2000, we're also investing in the access road, the permanent village and the mine services facility. Those investments ought to boost productivity and reduce costs at the existing operation, while at the same time supporting the bigger scale it will have down the road. And the power agreement we signed today with Fortescue is expected to bring an additional benefit of AUD 15 to AUD 20 per tonne in lower future FOB operating costs compared with the P2000 FID cost base. That benefit sits on top of the valuation shown here on the slide. This is a major investment program focused on higher production, improved productivity and reduced costs. Since PLS holds all of Pilgangoora, the complete economic upside from that expanded operating base—and from what it will earn down the road—stays with our shareholders. Next I'll take you through each initiative one by one, starting with P2000, which is on Slide 13 and where we're heading now; this picture shows the new Jimmagunya processing facility, whose dry and wet plants will be constructed next to the Pilgan processing facility, making it our third major processing facility at Pilgangoora. As outlined in the P2000 operating plan, Pilgangoora's total output is expected to come in at roughly 2 million tonnes per annum on average over the first 10 years at steady state. During that timeframe, we anticipate average FOB unit costs will land at roughly AUD 600 per tonne in real terms, and that number incorporates the benefits we expect from the Fortescue power agreement I referenced earlier. We're aiming for first production at Jimmagunya in the September quarter of calendar year '29, after which there will be a ramp-up of about 6 months to reach steady state. Turning to Slide 14, Pilgangoora has expanded considerably since it started producing, and with a long operating life still ahead, we're putting money into permanent infrastructure that fits its size and what it will need going forward. Upgrading the access road means bigger road trains can run — quads instead of triples. The Western Australian government has put up an initial AUD 11 million for this work, and we appreciate the state backing this public road project, along with the Cook government's leadership when it comes to shared infrastructure spending like this. Now on to the camp: a new village with 1,200 beds, built to cyclone rating, will house our workforce and free up the current village site for more efficient mine sequencing. Turning to the mine services facility — we expect it to boost equipment availability and maintenance productivity while bringing maintenance costs down. All told, we expect these investments to enhance the current operation while delivering the infrastructure capacity needed for P2000. Now on Slide 15. As we said today, a 20-year power purchase agreement with Fortescue has been announced, and PLS becomes its first external customer connected to its Green Grid. That agreement secures a minimum of 325 gigawatt hours per annum and covers the extra power needs of our P2000 expansion. Between FY '27 and FY '29, we expect to invest roughly $150 million in connection and network upgrades, with about $20 million expensed this year in FY '27. Starting in '29, the agreement should lower operating costs, as noted earlier, by $15 to $20 per tonne. This is the best power option for Pilgangoora, and it moves our power strategy forward substantially as well. Against our FY '23 baseline, PLS should reduce emissions tied to power by roughly 80%. A schematic in the slide deck shows how this works. I want to praise Fortescue for leading on this effort. Solar and other renewables are the low-cost answer for generating power in so many places worldwide, and that holds true in Western Australia. Likewise, network solutions just make a great deal of common sense; here the two are coming together, and Fortescue deserves the credit for making this initiative happen, and we're thrilled to be their first customer. We also want to say again how much we admire their courage, conviction, and resilience in building out a network of this size, and we're eager for the low-cost power that lies ahead. Turning now to Slide 15 — apologies, Slide 16. P2000 ought to rank PLS among the biggest primary lithium producers globally, with a cost position that competes well and an operating asset with a long life. The output comparison shown on the left reflects attributable ownership. Since PLS owns Pilgangoora 100%, our shareholders keep the entire economic interest in a production base that is substantially larger. The chart on the right, using the P2000 FID operating profile, positions Pilgangoora in the second quartile of the projected 2030 industry cost curve; this combination is what counts. Higher output gives us more leverage when lithium markets are strong, and our competitive cost position makes it easier to keep operating when conditions weaken; the P2000 plan provides roughly two decades of open pit mine life, so those advantages play out over a lengthy operating window. Moving to guidance on Slide 18. As Brett noted, our FY '27 operating guidance for production volumes and unit operating costs is still unchanged. What's new today is an extra AUD 20 million of FY '27 capital expenditure tied to the Fortescue power connection and the related on-site infrastructure. That brings enhancing infrastructure spending to AUD 185 million, and total FY '27 capital expenditure guidance now sits at between AUD 1.13 billion and AUD 1.195 billion. The AUD 500 million allocated for P2000 in FY '27 is still the same as what we guided to when FID was announced, and that number takes in the pre-FID spending we already disclosed. Our base capital guidance hasn't moved either. Turning now to the lithium market: prices continue to fluctuate. Strong demand growth over the longer term can coexist with periods of weaker pricing, because prices reflect near-term supply inventories, buying conditions and, most of all, sentiment. Over on the right, the cost curve shows that the current spot price is below the estimated sustaining costs for a large portion of industry supply. That drags on operating returns and on the incentive to invest. Steep price declines also damage confidence among investors. Lenders and investors grow warier, which makes capital tougher to obtain, especially for greenfield projects that need significant spending before any revenue comes in. That poses a problem for supply down the road. The industry must invest ahead of demand, yet the price cycle can hold such investment back at precisely the moment projects need to move forward. For PLS, this underscores how much financial strength and an established operating base matter. They give us the ability to keep investing across the cycle wherever long-term economics support it, growing output while also lifting competitiveness. The following slide covers battery economics and adoption trends that underpin that longer-term demand opportunity. Let's move to the next slide, Slide 21. The long-term demand picture begins with battery economics. Worldwide average battery pack prices dropped roughly 90% from 2010 through to '25.

Dale Henderson

executive
#6

That has made electric vehicles and energy storage more competitive and helped drive broader adoption. In September, worldwide, over 1 in 4 vehicles sold were electric, and penetration hit 28%, per Benchmark Mineral Intelligence. Importantly, growth is expanding well past China. EV sales outside China rose 29% year-to-date through September, making up 48% of global EV sales, compared with 38% a year earlier. Storage is expanding even more quickly. Battery energy storage installations outside China climbed 67% year-to-date, accounting for 60% of installations worldwide. These are strong growth rates across a market that keeps getting broader; they underscore how demand could exceed expectations as adoption speeds up in markets beyond China. Benchmark Minerals' September forecast has lithium demand almost tripling by 2040. Electric vehicles remain the largest demand driver, while storage is adding significant growth. What matters now is how quickly adoption happens. Faster growth in these markets would bring forward the need for additional supply. Moving to Slide 22. Meeting that growing demand requires both bringing new projects online and improving the performance of existing operations. New supply takes time. The chart on the left shows discovery-to-production timelines for the mining industry, climbing from around 6 years in the '90s to about 18 years for mines that began producing in 2020 to '24. For calendar year '27, forecasters don't agree. Opinions diverge — a few anticipate a glut, others a shortfall — since people are working from different premises about consumption and how much supply actually gets delivered. Benchmark Mineral Intelligence puts the gap at roughly 100,000 tonnes of LCE on the deficit side. The pessimistic case we've laid out here identifies another 400,000 tonnes of supply exposed to policy, security and environmental risks. If those losses materialize, the shortfall in the BMI-based analysis might stretch to somewhere near 500,000 tonnes measured in LCE. The key point is that underdelivery of supply has the potential to make the market tighter than today's baseline expectations suggest. Our approach, then, is to build resilience across the cycle and preserve our ability to invest throughout it. With Pilgangoora, we're expanding on an operation that's already established, infrastructure that's in place, and what we learned from delivering P680, P1000 and the Ngungaju restart. The strength of our finances allows us to push investments forward on the basis of their long-term economics, even when the market swings. In P2000 — well, that's this strategy in action: more production and better long-term competitiveness, while PLS shareholders keep full economic exposure because we own 100%. Now, a few closing remarks. The September quarter demonstrated what this business can do: record output, low unit operating costs and strong operating cash generation, even with lithium pricing weaker. Ngungaju's ramp-up finished on schedule, and our FY '27 production and cost guidance is unchanged; we're now building Pilgangoora's next phase. P2000 has received approval, our ore reserve is larger, and we expect our investments in infrastructure and power to boost productivity and long-term competitiveness. The USD 700 million bond, which closed following the end of the quarter, adds further strength to our debt maturity profile and financial flexibility. Taken together, those advantages give us what is needed to continue investing throughout the cycle and to build a larger business that can withstand more. Our task now is to execute safely and efficiently, with capital discipline; this is familiar ground for us. Since we now own 100% of Pilgangoora, our shareholders once more hold the complete economic interest in the operation under construction and in the long-term value we are trying to build. I appreciate your time with us today. So with that, I will pass things back to Maggie, who will open the lines for your questions. Thank you, Maggie.

Levi Spry

analyst
#7

Quite a strong quarter, and I appreciate the specifics on those QP adjustments, Alex. On the CapEx forecast, looking at Slide 17, could you help us think through the base forecast from here?

Dale Henderson

executive
#8

Would you like to handle that, Alex?

Alex Willcocks

executive
#9

Yes, of course. Good morning, Levi, and thank you for that question. Regarding base CapEx as we move forward, my assumption is that what you're really asking about is an outlook for FY '28. As you might recall, we noted that mine development was elevated during this year and will stay elevated through next year as part of the mine planning work. On sustaining capital, we have noted that it sits at a high point. I don't expect it to fall to what we described in the P2000 announcement as long-run steady-state sustaining capital, roughly $40 million to $60 million. I don't believe we'll see it come back down from $85 million to $100 million into that $40 million to $60 million range in FY '28, though I do expect it to start declining. There are several smaller projects that add value, along with some other projects captured within those figures. In a comparable fashion, infrastructure and projects will keep trending lower, but FY '28 will still be somewhat above the long term. So hopefully that gives you a sense of it. One thing to highlight, and we'll address this further at the December results: as you're aware, we announced the updated reserve after the quarter end. As a result, the quarterly results for the FOB and the mine development CapEx were prepared using the reserve that was in place as of 30th of September. We are working through all the detailed work by mine plan stage on what the new reserve and the new strip ratio mean; and if there is any update on essentially the accounting split between what runs through FOB and what runs through that CapEx figure, which could affect future years, we'll discuss it further at the December quarterly. From a cash standpoint, it will stay the same. But as I mentioned regarding the P2000 with the strip ratio changing, that does carry some longer-term implications for what runs through FOB versus deferred strip and managed depreciation.

Levi Spry

analyst
#10

Right, great, and perhaps just one more quick question about the market. If we're currently in some kind of destocking phase regarding the BESS outlook, Dale, could you give us some sense of how big that might be and how long it could last going forward?

Dale Henderson

executive
#11

Yeah, that would be — I don't have my crystal ball on me today. But what I can talk to is a few of the trends, and those are quite constructive. We're observing a downward trend in lithium chemicals inventories, and we aren't seeing or hearing about any elevated inventories of spodumene concentrate or other primary lithium supply in other places. There's some discussion about battery inventories being slightly elevated downstream. That said, there's speculation about what that really means. Historically, we've seen that rise and fall out of step with fundamentals depending on orders, and right now we may well be seeing a dynamic driven by BESS orders; so on an inventory basis, the trend looks very constructive. Then when we turn our attention to demand indicators, there's plenty to like. Global EV sales remain a net positive. As for the submarkets, China receives a lot of attention, as it should, having been the principal growth engine for many years; but what isn't getting the same focus is some of the other submarkets within the rest of world category. The Asia, ex-China, categories are all advancing by leaps and bounds, with growth rates versus the prior year in the order of plus 80%. So those are positive. BESS is also outright very strong, even though it's a small component of the demand stack. So when you consider this combination of drawing down inventories, plus strong demand markets, plus hesitance on the supply side, I think that forms a constructive set of conditions for price support. Time will tell. And as you know, Levi, what we observe in terms of pricing behavior is that it's principally driven by sentiment, not by fundamentals. Ultimately, fundamentals prevail, but we do see these phases of sentiment having an outsized impact in both directions. And I think we're going through one of those phases right now.

James Redfern

analyst
#12

Nice work on a solid quarter. I have 2 questions, if you don't mind. For the first, staying on the lithium market, I'd like to know at what spodumene price you'd think about slowing the ramp-up or perhaps even cutting output at the Ngungaju plant. Then my second one is just that I'd be curious about — it's likely confidential, but even a rough sense of the electricity price under the PPA signed with Fortescue, please?

Dale Henderson

executive
#13

Yes, hello, James. Appreciate it. I'll handle the first one about the market, and Alex can address the power costs. Sure, when it comes to a possible price threshold for Ngungaju, in the past we haven't provided guidance on that, since that would of course be a judgment call resting on a midterm outlook rather than a near-term one. So there's no number we have in mind for you on that. That said, as today's results show, we're generating very, very robust operational margins at current pricing thanks to our low-cost position. And beyond that, of course, we're well supported thanks to price floors. A number of our recent offtakes carry price floor support of USD 1,000 per tonne. So the set of conditions we'd weigh for any changes to the operating platform is different.

Alex Willcocks

executive
#14

Thanks. Good morning, James. Regarding your question about electricity, as you mentioned, that agreement is confidential, so I can't share specifics. What you will have observed, however, is that in terms of how it affects FOB costs, somewhere between $15 and $20 a tonne, it makes a meaningful difference to our costs more broadly. And clearly, that stems from the outcomes we negotiated. I think the other element is that whenever we consider a long-term agreement of this kind, we naturally evaluate it from a returns standpoint, especially given the capital that is also tied to it. And we're very comfortable that overall this is a strongly value-accretive project.

Rahul Anand

analyst
#15

To start off, I'd like to ask about the processing grade. The production numbers were clearly quite robust, which is good to see. When I work backwards from the processed grades, I come out at roughly 1.45%. That looks noticeably above even what you mined during the prior quarter. So I'd just like to get a handle on whether that 1.45% head grade going into the mill is sustainable, and how we ought to think about it. That's my first one, and I'll follow up afterwards.

Brett McFadgen

executive
#16

Sure, Rahul, I'll field that question. So, we’ve got some solid ROM stocks available, and we can blend primarily to manage impurities and really maximize what our ore sorters achieve. As a result, what frequently comes out of the mine isn’t directly proportional to what passes through the mill. That said, we do everything possible to provide the best feed quality to both plants. Over the past couple of years, we’ve worked hard to get our stockpiles just right so we can blend for that ore sorting, and that also gives us a boost on grade because we’re taking out all those impurities from the material. Once our new reserves are in place — moving ahead from the coarse ore stockpile — it should become somewhat simpler, and you'll likely get a much clearer picture of what is flowing into the plant.

Rahul Anand

analyst
#17

Then as a follow-up, I wanted to ask about the Fortescue PPA you've just signed. Could you help us understand — you mentioned the cost savings, which sound great, but I notice that it isn't firmed power. So I'd like to know, per megawatt-hour, what does it cost you? And how does that stack up against your on-site generation, I suppose? Also, do you intend to firm it up yourselves, or eventually look into firming? Or will you rely on your diesel back end or gas back end to firm that supply?

Dale Henderson

executive
#18

Yes, Rahul, thanks for asking, and I'll describe it as far as we can, since some details are confidential; but really, the short answer is that we do have backup at site. Obviously, being a remote site, we've progressively built out our own power systems; so that's in place. And we've noted in today's release that we'll look to scale that up a bit. So this ensures we're absolutely covered for power. And then part of the cost benefit we're leveraging here comes courtesy of that larger network Fortescue has. Now there's a lot of complexity in how this is all tied together commercially. But really the key outcome is, as we've disclosed today, it's a unit cost reduction, quite material, $15 to $20 per tonne. And then in parallel, it's a very material step-down in emissions intensity. So it's a fantastic outcome for the business.

Kate McCutcheon

analyst
#19

Sorry to hear about your crystal ball being lost. Regarding those new bonds you issued, 8% is significantly above other bond issuances we have observed from miners during this year. And I suppose it adds roughly another AUD 80 million to your interest costs. You have provided a vague use around general corporate purposes. I am just keen for some colour on when you decided to tap the bond market there. Is it defensive, given the CapEx spend for P2000? Or can you add any further colour around that decision and its timing?

Alex Willcocks

executive
#20

Yes, certainly. Thanks, Kate, for that question. So look, this bond really fits with our broader approach to managing capital and making sure our balance sheet stays genuinely strong and resilient through the cycle. We take a long-term view on funding, and we don't try to tap debt markets at the moment funding is immediately needed. So in this case, we decided to act ahead of time. What we've seen in the bond markets—and as you know well, obviously—is that the coupon rate hinges on both the U.S. Treasury rate and credit spreads. Our first issue, which we finished in April, was especially well-timed. It landed at a real low point in both Treasuries and credit spreads relative to long-term averages. After that, we of course took note of climbing U.S. Treasury yields and growing inflation worries worldwide. What we've observed in practice, though, is that our PLS credit spread has held steady relative to our first bond, and at present — the second bond we issued came in far under the wider high-yield index spread. So we were genuinely glad to keep that long-term backing, and we judged the moment favorable for tapping the market. You'd also recognize that the bond market has specific disclosure windows, and at the moment we happened to be inside one—one that would have stayed shut until the second half of the year, once the half-year results came out. So taking all of that together, along with how we see the broader Treasuries market shaping up, those factors all played into when we chose to act. On the wider question of how the money gets used, as we've noted before, P2000 is of course supported by cash we already held on the balance sheet plus the operating cash flows we expect going forward. What this bond accomplishes, then, is to genuinely secure our ability to stay flexible across the coming 2- to 3-year stretch of major capital investment. If we wanted to chase different growth opportunities, though, we could — and that latitude also makes us durable enough that across a very broad spectrum of market conditions during that stretch, we keep putting money into those growth projects without disruption. So, as I mentioned, several elements are converging around timing as well as how things get used down the road.

Kate McCutcheon

analyst
#21

And may I return briefly to what James asked about Ngungaju? You chose to restart it in February, when you were above $2,000 a tonne, compared with $1,300 today. How long does this price level have to hold before the team might look at that again? Or are you "happy" at $1,300 a tonne plus that extra tonne under a higher cost plan?

Dale Henderson

executive
#22

Yes. Thank you, Kate. Yes, we're very comfortable with where levels sit currently. We're earning strong margins throughout the operation, as the quarterly results show; and yes, that's not part of near-term thinking at this stage.

Austin Yun

analyst
#23

I just want to follow up on the $700 million bond issuance and hopefully get a bit more detail. First, as we consider potential stress testing and the minimum liquidity requirement while working through the peak spending over the next couple of years, does this bond issuance factor into that? And when you assume a lower price environment, how should we think about a comfortable liquidity level, if you can offer any color on that?

Alex Willcocks

executive
#24

Austin, thanks for the question. Regarding how we think about liquidity, particularly through this investment period, we look at it in 2 pieces: one, during this investment period, but also beyond the investment period, essentially being a business that is double the size we are today. So we think broadly about our minimum liquidity level. We would want to maintain around $1 billion. The way we think about that is really around $500 million in cash and $500 million in the undrawn RCF. And so that obviously is one of the factors when we think about what the appropriate level of balance sheet resilience is that we want through the cycle.

Austin Yun

analyst
#25

And a quick follow-up on the upstream side—we're aware there's potential or concern about downstream demand. I'd like to get some color from your engagement with your refineries. Are you seeing any tightness in spodumene supply? There's been speculation that certain other spodumene producers may be struggling to deliver the tonnes they promised over the next 3 to 6 months. When you're dealing with your customers, have you noticed any changing behavior?

Dale Henderson

executive
#26

Yes, Austin—regarding recent calls for spodumene, demand is strong. It isn't at fever pitch, but without question there's certainly strong demand, and from PLS's perspective, placing volumes is not an issue at all. As to whether we're hearing of distress among some of the other suppliers, getting a conclusive read on that is hard. I think the reason is that there's some overhang in certain of these regions. Rules are changing in Zimbabwe, and there are question marks about where that leads. Mali is a similar story as well. And of course, as you know, some of the Chinese mines have stayed in the off position; all of those now carry question marks over whether things can be brought back on or will be turned off. So that overhang exists. And so some chemical converters are very much looking toward stable, reliable suppliers like PLS for supply. What we sought to do with the materials today is actually demonstrate, with that waterfall, how significant some of this supply that could come under pressure might be, because it's not immaterial. So time will tell.

Thiago Ojea

analyst
#27

First off, I want to ask: our cost results came in really strong. Looking at where the cost midpoint sits now, and at the guidance, the implied midpoint of $620 would be 15% higher than September. Even the low end of the guidance would land $50 above the September quarter. So could you give us a bit more detail on how you expect costs to play out across the year? That's my first question.

Alex Willcocks

executive
#28

Good morning, Thiago. Thanks for asking. As Brett mentioned, it's key to remember that a quarterly result covers only that one quarter, and multiple factors influence it. Production during this period was notably robust. Results also hinge on the recoveries we get through the plants, which depend on where we stand with mining and shutdown work. A major element this quarter was weather—from that standpoint, operating conditions were probably among the most stable we've had for any quarter. For comparison, in the September quarter of last year, the reported FOB was $540, so that figure was considerably below the overall results. What's our current view on this? We're quite happy with the operational and cost efficiencies achieved during this quarter, and we've seen them become embedded. That, I believe, positions us strongly for the remainder of the year, and we might begin to see some of those varying weather-related effects. The second element we considered when reviewing the full-year guidance—and we flagged this at the time we issued it—is that we obviously need to build in an assumption about diesel prices. Now, looking at the September quarter, diesel cost has landed probably just under what I earlier described as an 8% to 10% range for diesel. For this quarter, we came in slightly below that. But as I now look at the outlook for diesel futures, I expect we'll be near the upper end of that range in the December quarter. And beyond that, honestly, we'd need Dale's crystal ball to predict precisely where diesel prices will settle down the road. So there are several different factors feeding into that. This quarter's results make us quite happy. It positions us favorably, yet with several of those pressures materializing, our full-year guidance remains unchanged.

Thiago Ojea

analyst
#29

Got it. Turning to my follow-up, I'd like to revisit the PPA arrangement with Fortescue. I realize you're not able to say precisely what the power cost per megawatt will be, but could you at least give us a rough sense of how much cheaper this would be compared with the existing LNG and diesel plant? And if the Green Grid runs behind schedule, what happens then to that $15 to $20 cost saving?

Dale Henderson

executive
#30

Thank you, Thiago. Regarding this power agreement, the timing lines up essentially with when P2000 comes online. Actually, the power will arrive before P2000, and since building out the Green Grid and the transmission lines, et cetera, involves lead time, what we laid out today compares the benefit we anticipate down the road against that future scenario, meaning P2000 versus P2000 paired with this power. We've discussed the capacity available to us there, the 300-plus, and the $15 to $20 a tonne cost, so that's how we've framed it, since that framing is the most relevant. On your question about what delays would mean, the existing facilities give us baseload coverage, and as I said earlier, we're seeking to expand them. That therefore covers us in the event the grid was late. Still, we don't anticipate the grid being late, based on our discussions with Fortescue and their time lines; they seem to have a solid grasp of their schedule and of when they're looking to bring things online; for those reasons, I think we're in a really good standing.

Glyn Lawcock

analyst
#31

So first, about the cost opportunity — you can see, obviously, that the PPA today was a good one, maybe. What other opportunities do you figure you have out there? Because it sounds like you'll still be running some gas-fired power backup. So obviously you're trucking gas in. Is there maybe a chance to pipe the gas in and save costs there? And anything else you could do that might help lift or drop the $600 cost base?

Dale Henderson

executive
#32

Okay, Glyn. Thanks for exploring this. Yes. The good news is, yes, there are more cost-out opportunities to go, and I'll rattle off a couple and Brett might want to weigh in as well. To begin with power: the agreement we signed today will supply P2000, so we don't anticipate leaning heavily on backup power in any significant volume. That means the piped LNG opportunity and similar options aren't really in play—we'll be relying on the PPA. That said, as I noted earlier, if something goes wrong for any reason, we do have that backup coverage. Additional cost-reduction possibilities might include autonomous mining, continued gains in lithia recoveries, and eventually at port we're very keen on the thought of shifting to a bulk outload facility—we've discussed that with PPA regarding Lumsden Point. Those are a few of the initiatives. What else have we got, Brett?

Brett McFadgen

executive
#33

It seems you've taken most of my points, Dale. The only thing left to mention is the quad road trains we discussed, so we're working toward securing better pricing on goods and services along with the roadwork update. Our strategy will provide a strong advantage for us, and we'll keep pursuing our own miner strategy as we move into the mobile maintenance strategy; those are a few areas we consistently target, Glyn. As you're aware, our Cost Smart, Future Ready program remains part of that effort too. And clearly, this PPA creates additional downstream electrification opportunities for us as they materialize. So that's quite exciting.

Glyn Lawcock

analyst
#34

Then perhaps one quick follow-up, if I may, regarding what everyone is discussing about the cost for the quarter and for the year. But here's my question, I suppose, looking at it — if you examine first quarter production, it really only annualizes at about the midpoint of guidance. So the hope would be that you hold volume at this level every quarter. Obviously, weather will need to be dealt with over the months ahead. I'm just trying to get a sense, then — is all of it diesel? How much of the deferred strip was an incremental increase relative to normal in order to bring the cost down? And does that imply you won't capitalize as much stripping in future quarters too? How much extra did you capitalize this quarter, perhaps?

Alex Willcocks

executive
#35

Morning, Glyn. Two parts. So regarding production, what we will — or what we expect to see going forward is obviously that Ngungaju is in ramp-up. And so what we expect to see is that Ngungaju tonnes over the following 3 quarters will be at a higher level, and that probably will offset what we're saying about the Pilgan plant having had a particularly strong quarter this quarter. So there is some detail behind the total production figure. Diesel — look, it depends where pricing goes; that will have an impact. As for capitalized waste and its impact, that is more of a callout versus the June quarter. We spoke to the fact that this year, we were going to see an uplift. We have seen that uplift. It probably won't be quite the same benefit as we move through the following 3 quarters, but it will still remain higher than the previous year. So there are a few different moving pieces within that.

Glyn Lawcock

analyst
#36

And apologies, perhaps a clearer way to put the question is: how much per tonne in dollar terms do you believe you gained from the extra deferred stripping?

Alex Willcocks

executive
#37

Yes...

Glyn Lawcock

analyst
#38

And is that going to stay the same?

Alex Willcocks

executive
#39

Well, as I mentioned, my expectation is that it stays above where it was last year; however, my sense is that in quarter 2, 3 and 4, it will come in a bit below what quarter 1 showed, though we don't give that granular a breakdown.

Dale Henderson

executive
#40

Thanks, everyone, for joining today to hear about our September quarter results, which were a really strong set of outcomes on both production and cost, in fact record-breaking; and after the quarter ended, a couple of fantastic releases: a second U.S. bond amounting to $700 million, the power agreement we announced today, a fantastic set of outcomes, which combined with P2000 and the infrastructure announcements sets us up for a fantastic future. Thanks all for your time, and I look forward to your tuning in, in the future.

Operator

operator
#41

That brings us to the end of today's conference call. Thanks for joining us. You can disconnect at this point. Have a wonderful day, everybody.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete PLS Group Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to PLS Group Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in PLS Group Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.