I want to let everyone know that this conference call today is being recorded. At this point, I'd like to turn the conference over to our first speaker, Dale Henderson, who serves as Managing Director and CEO of PLS Group. Please go ahead.

Dale Henderson

executive
#2

Thank you, Maggie. Good morning and good evening, everyone, and thanks for being with us today. First, I'd like to acknowledge the Traditional Owners on whose lands PLS operates — the Whadjuk people of the Noongar nation here in Perth, and the Nyamal and Kariyarra peoples from the Pilbara. We pay our respects to elders past and present. With me today are Brett McFadgen, our Chief Operating Officer, and Alex Willcocks, our Chief Financial Officer. The September quarter delivered record production and lower unit operating costs. Even with weaker lithium pricing, the business continued to generate substantial operating cash. Since the quarter end, we have approved the P2000 project, and we have completed our second U.S. bond offering. Today, we also announced a power agreement with Fortescue that is expected to further reduce future operating costs and power-related emissions intensity. These developments demonstrate our strategy in action, delivering today whilst investing in Pilgangoora's long-term competitiveness. We will take you through the results and strategic developments before opening the line for questions. Moving now to Slide two. Our ability to create value through the cycle starts with Pilgangoora, a large long life operation that we own 100%. We control its development and capital investment, and PLS shareholders retain the full economic interest.

Dale Henderson

executive
#3

P2000 is an extension of that base. We expect it to lift output to roughly two million tons per annum, recover a greater share of the ore body and lessen mining intensity. Lithium in our ore reserves has risen by 31%, which underpins the bigger production profile while keeping about 20 years of open pit mine life. The power agreement announced today is expected to deliver further cost savings beyond the assumptions in the P2000 FID, and it materially reduces the emissions intensity associated with power. Colina, together with our downstream partnership in South Korea, offers extra growth and diversification options that we will advance selectively. We finished September with AUD 2.2 billion in cash, and the US $700 million bond was completed after the quarter end, which further extends and stages our debt maturities. Taking these proceeds into account, pro forma liquidity comes to approximately 3.7 billion. That financial strength gives us flexibility through the investment period and the capacity to invest through the cycle. Our focus is to deploy this capacity with discipline, improving competitiveness and investing for attractive long-term returns for our shareholders. Turning now to Slide three. The September quarter delivered record production and lower unit operating costs against a weaker lithium pricing backdrop. Production came in at 260,000 tons, up 25% on the June quarter, supported by strong performance from Pilgan and additional production from Ngungaju.

Dale Henderson

executive
#4

The ramp-up at Ngungaju is finished, and it happened on schedule. Our FOB unit costs dropped 12%, landing at AUD 539 per ton. Realized pricing averaged an estimated $1,809 per ton on a SC5.2 basis. Revenue came in at AUD 563 million, a 24% decline, which reflects softer pricing along with sales volumes that were impacted by shipment timing. After the quarter closed, we also gave approval to P2000 — something I touched on a moment ago — and it should lift production capacity to roughly two million tons per annum late in the decade. The Fortescue Power Agreement we announced today should further enhance that future operating profile, cutting FOB unit cost by an additional AUD 15 to AUD 20 per ton versus the P2000 FID cost base once supply begins. With that said, I'll pass things to Brett, who will walk us through safety and operational performance.

Brett McFadgen

executive
#5

Thanks, Dale. Turning to Slide 4. Nothing matters more to us than safety. Neither production results nor financial outcomes take precedence over keeping our people safe and well. By the close of September, our Total Recordable Injury Frequency Rate for the rolling 12 months had improved to 2.36, compared with 2.77 at June's end. Even so, 4 of our people suffered recordable injuries in the quarter. We clearly have to do better. We continue to concentrate on visible leadership and meaningful engagement with frontline teams — spotting hazards and verifying that critical controls are in place and functioning. This slide likewise reflects a rise in safety interactions for each site leader. Such conversations give us a chance to grasp the risks wherever the work is carried out and to strengthen safe work practices. Now on to Slide 5. Pilgangoora achieved record output of roughly 267,000 tons during the September quarter — a 25% increase over the preceding quarter — powered by robust results at Pilgan and extra production from bringing our Ngungaju operations back online. At Pilgan, better feed quality, advantages from ore sorting, and steady plant operations underpinned that strong showing. Across Pilgangoora, lithium recovery came in at about 75%. Ngungaju came back into service in July as scheduled and met expectations across the quarter. It achieved full operational status during October, meeting the ramp-up schedule we set out earlier.

Brett McFadgen

executive
#6

We saw mining activity rise consistent with the mine plan, moving 11.5 million tonnes of total material, which included 1.5 million tonnes of ore to support requirements at both plants. Sales came in at roughly 223,000 tonnes, an 11% decline versus the prior quarter, which reflects shipment timing even as customer demand stayed strong. It was a strong start to FY27, though production in any one quarter shouldn't be viewed as the run rate for the entire year. Volumes on a quarterly basis will fluctuate depending on ore feed characteristics, planned maintenance shutdowns, and other operational activities. With all of that in mind, we have today reaffirmed our full-year production guidance volumes and unit costs. I'll now hand back to Dale.

Dale Henderson

executive
#7

Thanks, Brett — and congratulations to you, Chris, and the entire operating team on a cracking quarter. Turning to slide six. Our wholly owned Colina project in Brazil gives us another avenue for growth and geographic diversification. In the quarter, we finished acquiring Lithium Ionic's interests in tenements next to Colina and began infill resource development drilling on that acquired ground. Alongside that work, we carried on with metallurgical testing, flow sheet development, and infrastructure studies. Feasibility study outcomes are still on track for the December quarter next year. Those studies will shape the project's development pathway. Any decision to move ahead will hinge on successful study outcomes, funding, and supportive market conditions. On to slide seven. Our chemicals investments open the door to additional markets and opportunities throughout the lithium value chain. We keep advancing these opportunities in a staged and disciplined manner. At P-PLS in South Korea, output was moderated to match customer demand and prevailing conversion economics. At our midstream demonstration plant, commissioning moved forward with first ore through the electric calciner, which delivered successful conversion. First product has taken longer than anticipated while the team works through commissioning of the specialized equipment and integration of the plant systems.

Dale Henderson

executive
#8

We now expect our first lithium phosphate product to arrive in the December quarter of this year. That said, I'll pass things over to Alex, who will walk us through the financial results.

Alex Willcocks

executive
#9

Thank you, Dale, and good morning to everyone. Let's move to slide nine now. Revenue for the September quarter came in at AUD 563 million, which is a 24% decline from the prior quarter. That reflected a realized price that was 14% lower as at the 30th of September, along with sales volume impacted by shipment timing. On costs, FOB unit operating cost stood at AUD 539 per tonne, 12% below the June quarter. This improvement was helped by operational and cost efficiencies, reflecting the cost discipline embedded throughout the business through our Cost Smart Future Ready way of operating, and also by a greater volume of capitalized waste. We expect unit costs to rise over the remainder of FY27 because of wet season impacts and anticipated increases in diesel prices. The embedded efficiencies put us in a good position to mitigate these pressures, and we will stay on track to achieve full-year guidance. Cash margin from operations was AUD 329 million for the September quarter, showing the underlying business's capacity to generate cash despite lower realized pricing. After further price reductions through October, provisional pricing adjustments on first quarter sales are expected to cut second quarter cash margin by approximately AUD 88 million, based on estimates as at the 26th of October. On capital expenditure, CapEx on an accruals basis was AUD 185 million, up 50% from the prior quarter, driven by pre-FID expenditure on the P2000 expansion.

Alex Willcocks

executive
#10

Also in the quarter, we paid out the final FY26 dividend and financed the purchase of the Colina tenements. We ended September with AUD 2.2 billion in cash and AUD 2.7 billion of total liquidity. Alongside operating cash flows we expect in the future, that gives us the capacity to fund the P2000 expansion. After the quarter closed, finishing our second US bond gave that funding capacity a further boost. I'll turn now to slide 10, where I'll discuss financing and the balance sheet. Ahead of a stretch of major capital investment, we have locked in extra long-term funding, which enhances our financial flexibility as we move into the next growth phase. As we announced on October 26, we finished a US$700 million offering of 8% senior unsecured notes maturing in 2032. That marked our second issuance in the U.S. debt capital markets, and notwithstanding recent volatility in the markets, we were pleased to receive continuing strong backing from high-quality global institutional investors. This financing shows our proactive stance on capital management, bringing in long-term funding and further diversifying the maturity profile of our debt. Taking our 2031 and 2032 senior unsecured notes together, the weighted average cost of funds now stands at 7.48% per annum. Weighted average debt maturity across those notes has been extended to 5.3 years. The extra liquidity bolsters our resilience across the commodity cycle and gives us more flexibility in managing our investment program and capital allocation priorities.

Alex Willcocks

executive
#11

Such choices are still steered by our framework for capital management along with our dividend policy. We will keep concentrating on preserving the financial capacity needed to carry out our growth strategy, while keeping flexibility intact as market conditions shift. At this point I'll return the floor to Dale for the corporate update.

Dale Henderson

executive
#12

Thanks, Alex, and congratulations to you and the whole team on the second bond. Turning to slide 12. Since the quarter closed, we've advanced three complementary initiatives aimed at raising the value we recover from Pilgangoora and making it more competitive over the long term. P2000 pairs higher output with a more efficient approach to the ore body. Better processing capability means more mineralized material can be recovered as ore, which lowers mining intensity and helps bring down long-term unit costs. Under the study assumptions disclosed, the feasibility study backs roughly AUD 1.9 billion of investment, with an incremental post-tax net present value of AUD 2.7 billion. Together with P2000, we're putting money into the access road, the permanent village, and the mine services facility. Those investments should lift productivity and cut costs in the existing operation, while also underpinning its larger scale in the future. Today's power agreement with Fortescue adds a further expected benefit: an AUD 15 to AUD 20 per ton reduction in future FOB operating costs relative to the P2000 FID cost base. That benefit comes on top of the valuation shown here on the slide. This is a substantial investment program aimed at greater production, better productivity, and lower costs. Because PLS owns 100% of Pilgangoora, our shareholders keep the full economic exposure to that larger operating base and to its future returns.

Dale Henderson

executive
#13

Now I'll walk you through each initiative, beginning with P2000 on slide 13, which we're turning to now. This picture displays the new Jimmagunya processing facility, featuring dry and wet plants that will be constructed next to the Pilgan processing facility. It's going to be our third major processing facility at Pilgangoora. According to the P2000 operating plan, Pilgangoora's total production should average roughly two million tons per annum across the first 10 years at steady state. During that stretch, average FOB unit costs should come in at about AUD 600 per ton in real terms. That figure incorporates the anticipated benefits from the Fortescue power agreement I referenced a moment ago. Initial production from Jimmagunya is targeted for the September quarter of calendar year 2029, after which an approximately 6-month ramp-up to steady state will follow. Turning to slide 14. Pilgangoora has expanded considerably since production commenced. With a long operating life ahead of it, we're putting investment into permanent infrastructure matched to its scale and future needs. The access road upgrade will allow larger road trains to shift from triples to quads. This upgrade has backing through an initial funding commitment of AUD 11 million from the Western Australian Government. We appreciate the state's support for this public access road upgrade, and we're grateful for the Cook government's leadership on shared infrastructure investments of this kind.

Dale Henderson

executive
#14

Turning to the camp — that new village, built to withstand cyclones and featuring 1,200 beds, is going to house our work crews and free up the current village site so we can sequence the mine more efficiently. Now on to the mine services facility. We anticipate that this facility will lift equipment availability and maintenance productivity, while at the same time bringing maintenance costs down. Taken together, these investments should enhance the operation we have today and give us the infrastructure capacity needed to underpin P2000. If you go to slide 15. As we said earlier today, we've announced a 20-year power purchase agreement with Fortescue, and PLS will be its first external customer to hook up to its Green Grid. That agreement secures a minimum of 325 gigawatt hours per annum and backs the extra power needs of our P2000 expansion. Between FY27 and FY29, we expect to put roughly AUD 150 million into connection and network upgrades, with about AUD 20 million of that expensed in FY27, this year. Starting in 2029, the agreement should cut operating costs — as I mentioned earlier — by $15 to $20 per ton. For Pilgangoora, this is the most effective power solution, and it also takes our power strategy a significant step forward. We expect PLS to lower power-related emissions by approximately 80% against our FY23 baseline, and there's a schematic in the slide deck that illustrates this.

Dale Henderson

executive
#15

I want to start by praising Fortescue for the leadership they've shown on this initiative. Solar and other renewables are genuinely the low-cost answer for generating power in a great many places worldwide, and Western Australia is definitely one of them. On top of that, network solutions simply make a great deal of sense. Here we have both of them arriving together, and Fortescue deserves credit for getting this initiative done — and we're thrilled to be their first customer. Once more, congratulations to them for the courage, the conviction, and the fortitude needed to deploy a network at this scale, and we look forward to that low-cost power in the future. Turning to slide 15 — apologies, slide 16. P2000 is expected to place PLS among the largest primary lithium producers globally, with a competitive cost position and a long-life operating asset. The production comparison on the left reflects attributable ownership. Since Pilgangoora is 100% owned by PLS, our shareholders keep the full economic interest in the substantially larger production base. The chart on the right puts Pilgangoora in the second quartile of the forecast 2030 industry cost curve, using the P2000 FID operating profile. This combination matters. Higher production increases our exposure to stronger lithium markets, while competitive costs strengthen our ability to keep operating through weaker market conditions.

Dale Henderson

executive
#16

With roughly 20 years of open-pit mine life under the P2000 plan, those benefits play out over a lengthy operating horizon. Moving to the guidance on slide 18. As Brett noted, our FY 2027 operating guidance is still unchanged when it comes to production volumes and unit operating costs. What's different today is an extra AUD 20 million in FY 2027 for capital expenditure tied to the Fortescue power connection and the related on-site infrastructure. That brings enhancing infrastructure expenditure up to AUD 185 million, and total FY 2027 capital expenditure guidance to somewhere between AUD 1.13 billion and AUD 1.195 billion. The AUD 500 million FY 2027 allocation for P2000 stays the same as the guidance we announced at FID, and that number includes the pre-FID expenditure we announced earlier. Base capital guidance is unchanged as well. Now turning to the lithium market outlook. Lithium pricing is still volatile. Strong long-term demand growth can exist alongside stretches of softer pricing, since prices mirror near-term supply, inventories, purchasing conditions and, above all, sentiment. The cost curve on the right illustrates current spot pricing sitting below the estimated sustaining costs for a meaningful share of industry supply. That creates pressure on operating returns and on the incentive to invest. Steep price declines also weaken confidence in investment.

Dale Henderson

executive
#17

Investors and lenders are turning more wary, which makes capital tougher to obtain—especially for greenfields projects that need significant outlays before any revenue comes in. That poses a problem for supply down the road. The sector requires investment ahead of demand, yet the price cycle can hold back such investment at the very moment projects need to move forward. For PLS, this underscores how much financial strength and an established operating base matter. They provide us with the ability to invest through the cycle where long-term economics warrant it, growing output while enhancing competitiveness. The following slide covers battery economics and adoption trends that underpin that longer-term demand opportunity. Turning now to slide 21. The long-term demand picture begins with battery economics. Worldwide average battery pack prices dropped roughly 90% from 2010 to 2025. That has made electric vehicles and energy storage more competitive and helped drive broader adoption. In September, across the globe, over one in four vehicles sold was electric, with penetration hitting 28%, per Benchmark Mineral Intelligence. Crucially, growth is widening far beyond China. EV sales outside China rose 29% year to date through September, representing 48% of worldwide EV sales, compared with 38% a year earlier. Expansion is proceeding even more quickly in storage.

Dale Henderson

executive
#18

Battery energy storage installations outside China are up 67% year to date, and they account for 60% of installations worldwide. Those are significant growth rates in a market that keeps getting broader. They show how demand could exceed expectations as uptake speeds up in markets beyond China. A September forecast from Benchmark Minerals puts lithium demand at roughly triple its current level by 2040. Electric vehicles are still the biggest source of demand, and storage is contributing considerable growth. How quickly adoption happens is what counts. If these markets grow faster, the need for extra supply would arrive sooner. Turning to slide 22. Satisfying that rising demand means delivering new projects and also getting performance out of existing operations. Bringing on new supply takes time. The chart on the left tracks timelines from discovery to production across the mining sector, rising from about six years in the 1990s to roughly 18 years for mines that come online in 2020 to 2024. For calendar year 2027, forecasters disagree. Some predict a surplus, while others anticipate a deficit, which mirrors differing assumptions on demand and on how much supply gets delivered. Benchmark Mineral Intelligence projects a deficit of about 100,000 tons of LCE. The downside scenario presented here pinpoints another 400,000 tons of supply put at risk by policy, security, and environmental concerns. Should those shortfalls occur, the deficit in the BMI-based analysis might widen to roughly 500,000 tons on an LCE basis.

Dale Henderson

executive
#19

What matters here is that if supply falls short, the market could become tighter than our current base case assumes. We aim to build resilience across the cycle and keep the ability to invest through it. At Pilgangoora, we're building on a proven operation, infrastructure that's already in place, and what we've learned delivering P680, P1000, and the Ngungaju restart. Our financial strength lets us advance investments on the basis of their long-term economics, even when the market is volatile. In P2000, well, that strategy is put into action, lifting output and enhancing long-term competitiveness. And PLS shareholders keep full economic exposure because we own 100%. Now some closing remarks. The September quarter showed what this business is capable of. Record production, reduced unit operating costs, and significant operating cash generation even with softer lithium prices. Ngungaju's ramp-up is finished, on schedule, and our FY27 production and cost guidance is unchanged. We're now constructing Pilgangoora's next phase. P2000 has been approved, our ore reserve has increased, and our infrastructure and power investments should boost productivity and long-term competitiveness. The US $700 million bond, completed after quarter end, further improves our debt maturity profile and financial flexibility. Taken together, these strengths give us the ability to invest through the cycle and build a bigger, more resilient business.

Dale Henderson

executive
#20

What we need to do at this point is execute safely and efficiently, with discipline on capital. This isn't a new situation for us. Since we hold 100% of Pilgangoora, our shareholders once more keep the entire economic exposure to the operation under construction and to the long-term value we intend to generate. We appreciate your time with us today. That said, I'll pass things back to Maggie so she can open the line for questions. Thank you, Maggie.

Operator

operator
#21

Thank you so much. We'll move on now to the Q&A portion. Just a reminder — if you'd like to ask something, hit star one one on your phone and hold until your name is called. Should you wish to pull your question, just press star one one once more. PLS will allow each person one question plus a single follow-up. Please hold while we put together the Q&A roster. Our first question is from Levi Spry at UBS. Go right ahead.

Levi Spry

analyst
#22

Hello, and good morning to Dale and the team. Appreciate your time following such a strong quarter, and thank you, Alex, for the specifics on the QP adjustments. Regarding the CapEx projections, looking at slide 17, could you help us reason through the underlying forecasts from here?

Dale Henderson

executive
#23

Alex, would you like to handle that one?

Alex Willcocks

executive
#24

Yes, of course. Good morning, Levi, and thank you for raising that. Regarding base CapEx moving forward—I take it the focus here is really an outlook toward FY28. As you might recall, we highlighted that mine development was elevated during this year and is set to stay elevated in the next one as part of the mine planning work. On sustaining capital, we have noted that it currently sits at a peak. My expectation is not that it falls to what we described in the P2000 announcement as the long-run steady state, with sustaining capital somewhere around AUD 40 million to AUD 60 million. I don't believe we will see it come back down from AUD 85 million to AUD 100 million into that AUD 40 million to AUD 60 million range in FY28, though I do expect it to start declining. There are several smaller projects that are value accretive, along with some other projects captured within those figures. In much the same way, infrastructure and projects will keep trending downward, yet FY28 will stay a bit above the long term. I hope that gives you a sense of it. One thing worth flagging—and we will address this further at the December results.

Alex Willcocks

executive
#25

As you know, we announced the updated reserve after the quarter ended, so the quarterly results regarding FOB and mine development CapEx were prepared using the reserve in place as of 30th of September. We're working through all the detailed work at the mine plan stage on what the new reserve and the new strip ratio imply. If there's any update on essentially the accounting split between what goes through FOB and what goes through that CapEx number, which may affect future years, we'll discuss that further at the December quarterly. From a cash perspective, it will be unchanged, but as I mentioned at the P2000, with the strip ratio changing, that does carry some longer-term implications for what fits through FOB versus deferred strip and mine depreciation.

Levi Spry

analyst
#26

Right, thanks — that added detail helps. Perhaps one more question about the market, though. If we're currently going through some kind of destocking cycle where the BESS outlook is concerned, Dale, could you give us some color on how large that might be and how long it could last as we move ahead?

Dale Henderson

executive
#27

Yeah. I don't have my crystal ball with me today. What I can address are a few of the trends, and they're quite constructive. Lithium chemicals inventories are trending downward. We aren't seeing or hearing about any elevated inventories of spodumene concentrate or other primary lithium supply in other locations. There's talk about battery inventories being somewhat elevated further downstream. That said, there's speculation about what that really signifies. Historically, we've watched those inventories rise and fall out of step with fundamentals depending on orders, and right now we may well be seeing a dynamic driven by BESS orders. So where inventories are concerned, the trend looks very constructive. Then, when we consider demand indicators, there's a lot to like. Global EV sales remain a net positive. As for the sub-markets, China receives a lot of attention, as it should, having been the principal growth engine for many years. What isn't getting the same degree of focus is some of the other sub-markets. So the rest of world category and the Asia ex China categories are all advancing in leaps and bounds, with growth rates of the +80% type versus the prior year.

Dale Henderson

executive
#28

That's a plus, then. ESS is also outright very strong, even though it's a smaller piece of the demand stack. So, taking that combination of drawing down inventories, plus strong demand markers, plus hesitance on the supply side, I think this forms a constructive set of conditions for price support. Time will tell, and as you know, Levi, what we see in terms of pricing behavior is it is principally sentiment-driven, not fundamentals-driven. Ultimately, fundamentals prevail, but we do see these phases of sentiment having an outsized impact in both directions, and I think we're going through one of those phases right now.

Levi Spry

analyst
#29

Yes. Thanks, Dale. Appreciate the added detail. Thank you.

Operator

operator
#30

Thanks. Give us a second while we get to the following question. Up next is James Redfern of RBC Capital Markets. Your line is live now.

James Redfern

analyst
#31

Morning, Dale and everyone. Nice work on a solid quarter. I have a couple of questions, if I may. First, staying on the lithium market, I'd like to know at what spodumene price you'd think about slowing the ramp-up, or perhaps even holding back output at the Ngungaju plant? Second, I'm curious about the electricity price under the PPA signed with Fortescue — I realize it's likely confidential, but even a rough indication would help. Thank you.

Dale Henderson

executive
#32

Yes. Hello, James, and thank you for the question. I’ll handle the first one about the market, and Alex can address the power costs. Regarding a possible price point for Ngungaju, we haven’t historically provided guidance on that, because it would of course be a judgment call based not on a near-term outlook but on a midterm outlook. So we don’t have a number in mind to give you there. That said, as today’s results show, we’re generating very strong operational margins at current pricing thanks to our low-cost position. On top of that, we’re well supported by price floors. A number of our recent offtakes include price floor support of US$1,000 per ton. So the set of conditions we’d need to weigh for any changes to the operating platform is different.

Alex Willcocks

executive
#33

Thanks. Good morning, James. On your electricity question, as you said, look, this is a confidential agreement, so I can’t share the details. What you will have seen, though, is that in terms of the impact on FOB costs of between AUD 15 and AUD 20 a ton, it does have a meaningful effect on our costs more broadly. Obviously, that stems from the negotiated outcomes. I think the other element, when we consider any long-term agreement such as this, is that naturally we view it from a returns standpoint, particularly given the capital that is also tied to it, and we are very comfortable that overall it is a project that strongly accretes value.

James Redfern

analyst
#34

All right. Wonderful. Thanks so much. That's great.

Dale Henderson

executive
#35

Thanks, James.

Operator

operator
#36

Thanks. Our next question is from Rahul Anand of Morgan Stanley. Your line is open now.

Rahul Anand

analyst
#37

Hello there. Morning to you, Dale, and everyone on the team. I appreciate the call. For my first question, I wanted to ask about the processing grade, if I may. Clearly, production performance came in very strong, and that's good to see. When I work backwards and calculate the processed grades, I come out at roughly 1.45. That looks quite a bit above even the grade you mined during the last quarter. I just wanted to get a sense of whether that 1.45 head grade going into the mill is sustainable, and how we should think about it. That's my first one, and I'll follow up afterwards. Thank you.

Brett McFadgen

executive
#38

Sure, I'll grab that one, Rahul. So, we've got some solid ROM stocks sitting there, and we're able to blend — mostly for impurities — to truly get the most from our ore source. What comes out of the mine frequently isn't directly proportional to what passes through the mill. We do all we can to deliver the best feed quality to both plants. We've been putting in hard work over the last 2 years to get our stockpiles just right, so we can blend for that ore sorting. That also gives us a boost on grade, since we're taking out all those impurities from the material. It may be somewhat simpler once we move ahead with our new reserves, going from the coarse ore stockpile onward. You likely will be able to see far more easily what is coming through into the plant.

Rahul Anand

analyst
#39

Understood. All right. As a follow-up, I wanted to ask about the Fortescue PPA you signed recently. Could you help us understand — you mentioned the cost savings, which is great, but I noticed that it isn't firmed power. I'd just like to know, per megawatt hour, what does it cost you? How does that stack up against your on-site generation? And do you intend to firm it up yourselves, or will you eventually look at firming it? Or will you rely on your diesel back-end or gas back-end to firm that supply? Thanks.

Dale Henderson

executive
#40

Yeah, Rahul. No, thank you for that question. I'll describe it as best I can, since some details remain confidential. The brief response is that backup exists at the site. Naturally, being a remote location, we gradually constructed our own power infrastructure. So that's in place. We noted in today's release that we intend to scale it up a bit. That way we're fully protected on power. And part of the cost benefit we're capturing here comes via that bigger network Fortescue operates. There's considerable complexity in how this is all connected on a commercial basis. The main result, as disclosed today, is a quite material cost reduction of AUD 15 to AUD 20 per tonne. At the same time, it's a very substantial cut in emissions intensity. So for the business, it's a fantastic outcome.

Rahul Anand

analyst
#41

Absolutely, and thanks a lot.

Operator

operator
#42

Thanks. Give us a second while we get to the next question, please. Our next question is from Kate McCutcheon at Bank of America. Your line is now open.

Kate McCutcheon

analyst
#43

Hello, and good morning to Dale and Alex. Sorry to hear that your crystal ball went missing. Those new bonds you issued carry an 8% rate, which is significantly above what we've observed on other miners' bond deals this year. It tacks on roughly another AUD 80 million in interest expense. The stated use is a rather vague general corporate purposes. I'd just love some detail on why you chose this moment to tap the bond market. Is this a defensive move tied to the CapEx for P2000, or could you share any further detail about that call and its timing?

Alex Willcocks

executive
#44

Yes, absolutely. Thank you, Kate, for raising that. The bond aligns quite well with our wider approach to managing capital and making sure our balance sheet stays strong and resilient throughout the cycle. Our funding stance is long-term, and we don't try to tap debt markets at the moment funding is urgently needed. In this case, we decided to move early. What we've observed in bond markets — and you're certainly aware of this — is that the coupon rate depends on both U.S. Treasury rates and credit spreads. Our first issuance, completed in April, was especially well-timed. It landed right at that genuine trough in Treasuries and credit spreads relative to long-term averages. We then considered how U.S. Treasury rates had climbed amid heightened global inflation worries. What we've actually observed is that our PLS credit spread has stayed consistent with our initial bond, and the second bond we placed currently sits well under the wider high yield index spread. We were very happy to have that ongoing long-term backing, and we believed it was an opportune moment to enter the market.

Alex Willcocks

executive
#45

You'd also understand that the bond market has disclosure windows, and at that moment we happened to be inside one—one that wouldn't reopen until roughly the second half of the year, following the half-year results. Taking all of that together, along with our view on broader Treasuries, it all played into when we decided to act. On the wider question of uses, as we've mentioned, P2000 is of course supported by the cash we already held on the balance sheet plus future operating cash flows. What this bond accomplishes is really to make sure we keep flexibility across this next two to three year stretch of significant capital investment. So if we want to go after other avenues of growth, we have the flexibility to do so. It likewise provides the resilience, through a really wide range of market conditions over that period of time, to keep investing in those growth projects without impact. As I said, several factors came together on timing, and on future usage as well.

Kate McCutcheon

analyst
#46

All right, understood. Appreciate the context, Alex. Could I return to what James asked regarding Ngungaju? You chose to bring that operation back online in February. At that point we were above $2,000 per tonne, compared with $1,300 at present. For how long would this price level have to persist before the team might reconsider that decision? Or are you comfortable — in quotation marks — with US $1,300 a tonne and the extra volumes coming from that higher-cost plant?

Dale Henderson

executive
#47

Thanks, Kate. Yes, we feel quite at ease with where things stand right now. Margins are solid throughout the business, as today's quarterly results make clear. That isn't something we're weighing in the near term at this point.

Kate McCutcheon

analyst
#48

All right, Dale, thank you.

Dale Henderson

executive
#49

Appreciate that, Kate.

Operator

operator
#50

Much appreciated. Our following question is from Austin Yun at Macquarie. Your line is open now.

Austin Yun

analyst
#51

Morning, Dale and Alex Willcocks. I just wanted to follow up on the US$700 million bond issuance, hoping to get a bit more color. First, thinking about potential stress testing and the minimum liquidity requirement as you move through peak spending over the next couple of years — does this bond issuance factor into that? How should we think about a comfortable liquidity level when you're assuming a lower pricing environment? Any color you can provide on that would be great. Thank you.

Dale Henderson

executive
#52

Turning to the quarter, total revenue came in at $1.42 billion, up 18% year over year. Product revenue was $980 million, an increase of 22%, while services revenue reached $440 million, growing 9%. Gross margin expanded 150 basis points to 74.2%. Operating expenses were $610 million, or 43% of revenue. Operating income was $443 million, with an operating margin of 31.2%. Diluted earnings per share were $1.87. Free cash flow for the quarter was $512 million. We ended the period with $3.6 billion in cash and marketable securities. Looking ahead to the full year, we expect total revenue of $5.8 billion to $5.9 billion, representing growth of 15% to 17%. For the third quarter specifically, we're guiding to revenue of $1.48 billion to $1.50 billion. Thank you, and we'll now open the line for questions.

Alex Willcocks

executive
#53

Yes. Thank you. Good morning, Austin, and I appreciate the question. Regarding how we approach liquidity, we look at it in two parts. First, throughout this investment phase, and second, beyond it, when the company is essentially twice the size it is now. Broadly speaking, we consider our minimum liquidity threshold to be about AUD 1 billion. Our thinking there is really roughly AUD 500 million held as cash alongside AUD 500 million available under the undrawn RCF. That is obviously one of the considerations, then, when we assess what constitutes an appropriate degree of balance sheet resilience across the cycle.

Austin Yun

analyst
#54

Great, that's very clear. I just have one quick follow-up question about upstream. We're aware there's potential or concern regarding demand downstream. I'd love to get some color from your interactions with your refineries. Are you seeing any tightness when it comes to spodumene supply? There's been speculation that certain other spodumene producers might be having difficulty delivering the tons they promised over the next 3 to 6 months. Have you observed any shifts in behavior when you're working with your customers? Thank you.

Dale Henderson

executive
#55

Yes, Austin. On the recent enquiries we’ve had for spodumene, demand is strong. It’s not at fever pitch, but there’s definitely — no doubt — robust demand, and from PLS’s point of view, placing volumes has been no problem whatsoever. As for whether we’re seeing distress among some of the other suppliers, it’s genuinely difficult to form a conclusive view on that. I think that’s the reason there’s some overhang in certain of these regions. Rules have shifted in Zimbabwe, and there are question marks over where that leads. Mali is a similar story. Naturally, as you’re aware, a number of the Chinese mines are still sitting in the off position. Across all of those, there are question marks about whether operations can be restarted or whether things will be shut down. So that overhang exists. Some chemical converters are very focused on stable, reliable suppliers such as PLS for their supply. What we wanted to achieve with the materials today is really to show, through that waterfall, just how significant some of this supply — which could come under pressure — might be. Because, yes, it isn’t immaterial. So time will tell.

Austin Yun

analyst
#56

All right. Yeah, that's fine.

Dale Henderson

executive
#57

Appreciate that, Austin.

Operator

operator
#58

Thanks. Our next question is from Thiago Ojea at Citi. Your line is open now.

Thiago Ojea

analyst
#59

Morning, hello. First question from me: our cost outcome has been really robust. When we consider where the current cost sits, the midpoint—taking the guidance's implied midpoint—that's AUD 620. That comes to 15% higher than September. Even the guidance's lowest end would sit AUD 50 above the September quarter. Could you share a bit more detail on how you expect costs to unfold across the year? That's my first question. Thanks.

Alex Willcocks

executive
#60

Good morning, Thiago, and thanks for asking. As Brett mentioned, when you examine a single quarter's result, you have to keep in mind that it covers only that one quarter, and multiple factors feed into it. Clearly, output during this period was especially robust. It also hinges on the recovery rates we get at the plants, which depend on where we stand in terms of mining work and shutdowns. A major element this quarter is that, weather-wise, conditions were probably among the most stable we've had for operating. For comparison, in the September quarter of last year, FOB came in at AUD 540. Once more, that figure sat well below the overall result. So how do we view this? We feel genuinely good about the operational cost efficiencies achieved during this quarter. Those gains are now embedded, we can see. That, I believe, positions us strongly for the remainder of the year, when some of those weather-related effects may begin to show. Another factor visible in our full-year guidance — something we flagged when issuing it — is that we clearly needed to build in an assumption about diesel prices.

Alex Willcocks

executive
#61

Looking at the September quarter, diesel costs ended up a bit lower than what I'd mentioned before—I'd talked about a range of 8%-10% for diesel, and we came in slightly under that this quarter. However, considering where diesel futures are pointing now, I anticipate we'll be near the upper end of that range during the December quarter. After that, it's anyone's guess—honestly, we'd likely need Dale Henderson's crystal ball to say precisely where diesel prices will settle going forward. So there are several different factors at play there. Performance this quarter has really pleased us. It positions us well, but full-year guidance remains unchanged given a number of those pressures coming through.

Thiago Ojea

analyst
#62

Got it. For my follow-up, let's return to that PPA arrangement with Fortescue. I realize you're not able to say precisely what the power cost per megawatt is, but could you at least give us a rough sense of how much lower it would be compared with the existing LNG and diesel blend? And if the Green Grid is delayed, what would become of that $15-$20 cost saving? Thank you.

Dale Henderson

executive
#63

Thanks, Thiago Ojea. On this power agreement, the timing is essentially simultaneous with P2000 coming online — or the power will arrive slightly before P2000. That's because there's a lead time involved for the Green Grid build-out, the transmission lines, and so on. So what we laid out today compares the benefit we anticipate in the future against that future case. In other words, P2000 versus P2000 with this power. We've discussed the capacity we can access there — the 300 plus — and the cost of 15 to 20 bucks a ton. That's how we've framed it, since it's the most relevant. On the question about the impact of delays: we have base load covered by the existing facilities, which I mentioned earlier and which we're looking to expand. That covers us off in the event the grid was late. However, we don't expect the grid to be late, given our discussions with Fortescue and their timelines. They seem to have a good handle on their scheduling when they are looking to bring things online. For those reasons, I think we are in a really good standing.

Thiago Ojea

analyst
#64

I appreciate that.

Operator

operator
#65

Thanks. Give us a second while we get to the following question. Up next is Glyn Lawcock with Barrenjoey. Your line is open now.

Glyn Lawcock

analyst
#66

Morning, Dale. First, on the cost opportunity — the PPA today was obviously a good one, maybe you’d agree. What other opportunities do you think are out there? It sounds like you’ll still be running some gas-fired power back up, so obviously you’re trucking gas in. Is there an opportunity perhaps to pipe that gas in and save on costs there? Anything else you could do that might help reduce the AUD 600 cost base? Thanks.

Dale Henderson

executive
#67

Yes. Hello, Glyn. Appreciate you looking into this. The positive side is that additional cost-reduction chances do exist, and I'll list a few quickly, and Brett may also want to add his thoughts. Let's begin with power. The agreement we signed today will supply power for P2000. We don't anticipate relying on that backup power in any significant volume. The opportunity involving piped LNG and similar options isn't present. We will depend on the PPA. That said, as noted before, for some reason there's a situation where we have that backup coverage. Additional cost-reduction possibilities might include autonomous mining, continued gains in lithium recoveries, naturally, at port. Eventually, we really like the concept of transitioning to a bulk loading facility, and we've held talks with Pilbara Ports Authority regarding that for Lumsden Point. Those are a few initiatives. What else do we have, Brett?

Brett McFadgen

executive
#68

Dale, you've basically taken the wind out of my sails here.

Dale Henderson

executive
#69

Alright.

Brett McFadgen

executive
#70

Beyond that, there's the quad road train we've discussed — so we're also moving toward securing goods and services at a better price, along with the roadwork update. The strategy we're pursuing will deliver a genuinely strong advantage for us. We'll keep advancing our owner miner strategy and shift into the mobile maintenance strategy. As you know, Glyn, there's quite a lot we consistently pursue. Our Cost Smart Future Ready program remains part of that mix too. And of course, this PPA creates further downstream electrification opportunities for us as they come to fruition. It's quite exciting.

Glyn Lawcock

analyst
#71

All right, that's excellent. So perhaps just one follow-up, if I may, regarding what everyone is discussing about the cost for the quarter and for the year. But I suppose it's a question, looking at it this way. If you look at first quarter production, it really only annualizes at about roughly your midpoint of guidance. So one would hope you'll hold volume at this level each quarter. Obviously, there will be weather to contend with in the months ahead. Just trying to understand then, is it all diesel? How much of the deferred strip was an incremental increase relative to normal to bring the cost down? Does that mean you won't capitalize as much stripping in future quarters as well? How much was it that you capitalized this quarter, additional, perhaps? Thanks.

Alex Willcocks

executive
#72

Yeah. Morning, Glyn. Two things. Regarding production, what we anticipate going forward is clearly Ngungaju being in ramp-up. What we'd expect is that Ngungaju tonnage across the next three quarters will sit at a higher level, and that likely offsets what we're noting about the Pilgan plant having had a particularly strong quarter this time around. There's a bit of detail underlying the total production figures. On diesel, look, it hinges on where pricing heads, and that will have an impact. As for capitalized waste and its effect, that's more of a call-out compared with the June quarter. We spoke to the fact that this year we were going to see an uplift. That uplift has shown up. It probably won't deliver quite the same benefit as we move through the coming three quarters, but it will still stay higher than the prior year. So a few different moving pieces in there.

Glyn Lawcock

analyst
#73

Let me put that question differently—what AUD-per-ton advantage do you believe came from the extra deferred stripping?

Alex Willcocks

executive
#74

Yeah, that’s not something we

Glyn Lawcock

analyst
#75

And is that going to stay the same?

Alex Willcocks

executive
#76

As I mentioned, I expect that figure to stay above where it was a year ago. Still, in my view, once we move through the second, third, and fourth quarters, it should come in a bit below the level from quarter 1 — though we don't give guidance at that granularity.

Glyn Lawcock

analyst
#77

Okay, thank you.

Dale Henderson

executive
#78

Much appreciated, Glyn.

Operator

operator
#79

Thanks. That brings our question-and-answer portion to an end. I'll turn things back over to Dale now for some closing comments.

Dale Henderson

executive
#80

Thanks, everyone, for joining us today to go over what we delivered in the September quarter. The production and cost results were really strong — in fact, they set records. After the quarter closed, we had a couple of great announcements. There's a second U.S. bond, tied to a power agreement worth US$700 million that we announced today. These results are excellent, and when you put them together with P2000 and the infrastructure announcements, they position us well for a great future. I appreciate your time, and I look forward to your joining us again down the road.

Operator

operator
#81

That brings us to the end of the conference call for today. Thanks for joining us. You can go ahead and disconnect at this point. Everyone, have a great day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete PLS Group Limited transcript — plus 133,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to PLS Group Limited earnings transcripts and 133,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in PLS Group Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.