Thanks, Shannon. Hello, everyone, and good morning. We appreciate you being with us today. Before we get started, I want to note that a presentation has been put together to go along with what we'll be discussing, and we'll be pointing to it during this call. You can find those slides on our site, investors.portlandgeneral.com. If you look at slide 2, a portion of what we say this morning will be forward-looking statements. We want to warn you that these statements carry risks and uncertainties that are inherent, and our actual results could end up materially different from what we expect. To learn about some of the factors that might lead actual results to come in materially different, please see our earnings press release along with our latest periodic reports on Forms 10-K and 10-Q, both of which can be found on our website. Now on slide 3, the people guiding our discussion today are Maria Pope, our President and CEO, and Joe Trpik, our Senior Vice President of Finance and CFO. Once they've finished their prepared remarks, we'll open up the line so you can ask questions. At this point, I'm glad to hand the call over to Maria.

Maria Pope

executive
#2

Hello, everyone, and thanks for being with us this morning. During the first quarter, Portland General Electric shared important updates on our top priorities, which set the stage for dependable performance, careful expense control, and robust delivery in 2025 and afterward. Starting on slide four, I'll cover our financial outcomes and the main factors behind them; in Q1, GAAP net income came to $100 million, equal to $0.91 per share; that's against GAAP net income of $109 million, or $1.08 per share, in the first quarter of 2024, along with non-GAAP net income of $123 million, or $1.21 per share. Results for the first quarter show sustained, powerful demand expansion from high-tech and data center clients, whose activity produced 4.6% growth in total load and 16.4% growth in industrial load versus the corresponding quarter a year earlier. PGE provides service to five major semiconductor companies and more than 10 sizable data center operators located throughout dozens of sites, together accounting for close to one-fourth of all our deliveries. This expansion is fueling significant capital upgrades and improvements throughout our transmission and distribution networks. Such investments push forward vital energy security and resource adequacy objectives that our customers and the communities we serve both share, while also tackling the need to replace aging infrastructure and empowering the economic engine of the area we serve. A large number of these clients have ambitious clean energy targets that match those of our municipal and residential customers, whose support makes our clean energy program ranked first nationwide, as NREL has found. Our approach propels our efforts to construct the dependable, cost-effective, and progressively cleaner grid of tomorrow, encompassing the continuing 2023 and 2025 RFPs and the upcoming 2025 IRP update. The rates customers pay sit at the heart of our approach, and we are monitoring the shifting federal policy environment closely while making the case for extending renewable investment and production tax credits, credit transferability, and additional IRA and IIJA provisions, and we are also tracking the current tariff circumstances intently. Our dedication to tackling system resilience, pushing clean energy forward, and delivering safe, dependable, and affordable power to each customer we serve matters today just as much as it ever has. Shifting to wildfire risk, we are working closely with important stakeholders, among them legislators, the Governor's Office, the OPUC, the Oregon Department of Forestry, first responders, other utilities, and customers, as we pursue solutions for the societal danger posed by wildfires and other severe weather. Our established, year-round wildfire mitigation efforts continue to move ahead as we apply what recent wildfires have taught us and refine our methods before summer arrives. During 2025, we intend to invest more than $120 million in wildfire mitigation, covering capital investments and O&M. We are collaborating with elected officials and stakeholders on legislation aimed at the financial exposure created by wildfires. In February, a bill was put forward to establish a standard of care for utility wildfire mitigation and to set up a safety certificate process overseen by the OPUC and connected to our wildfire mitigation plan. Establishing unambiguous standards for what utilities must do to stop wildfires and protect communities is vital. The rigorous criteria we follow make it less probable that utility infrastructure will ignite wildfires, and they also improve the dependability of service, bring down what customers pay, and deliver economic steadiness for communities across Oregon. It's encouraging to observe ongoing advancement on this significant policy. Although draft legislation to establish a catastrophic wildfire fund hasn't advanced, the continuing conversation with stakeholders amounts to meaningful headway. States in the Pacific Northwest are only now starting to confront the liability questions tied to wildfire danger. As I mentioned during our prior call, achieving these policies could require more than a single session. Our efforts to tackle and control risk—through carrying out our wildfire mitigation plan and pursuing societal answers to the danger posed by wildfire and severe weather—support affordability and safeguard customers. Regarding affordability, multiple areas converge to ease the upward push on customer bills. Growth. By serving more customers, we can distribute operating expenses and investments across a greater volume of business. Cost management. Company-wide efforts to cut O&M expenses are already well along. We are reviewing each program and trimming expenses to keep customer prices as low as we can. Joe will discuss this effort in more depth during his comments. As we talked about on the prior call, we are aiming to update PGE's corporate structure so it can support a holding company. Such a structure is typical in the industry—in fact, it is the most typical—and it will help allow greater flexibility in the way we finance our operations. Looking forward, the Portland General Electric team remains concentrated on running our business with discipline and foresight, carefully managing costs and risk, and pursuing competitive returns so we can successfully draw investment, creating value for customers, communities, and shareholders. With that, I'll hand things over to Joe. Joe.

Joe Trpik

executive
#3

Thanks, Maria, and good morning to all of you. If you'll turn to slide five, our Q1 results show robust demand for energy from industrial customers along with continuing investments in the system. Overall loads for Q1 2025 rose 4.6%, or 4.4% when weather adjusted, versus Q1 2024. Residential load for Q1 2025 fell 0.8% quarter-over-quarter, or 1% weather adjusted. The number of residential customers grew 1.6%, but that gain was offset by energy efficiency, which lowered usage per customer. Commercial load was fairly flat, up slightly by 0.8%, or 0.3% weather adjusted; for the industrial class, we saw yet another quarter of uneven growth this quarter. Our industrial load was up 16.4% on a nominal basis and also 16.4% weather-adjusted, continuing the recent trend of load growth from data centers and semiconductor customers. Those results are consistent with our 2025 plan, so we are reaffirming our 2025 weather-adjusted load growth guidance of 2.5%-3.5%, along with our long-term load growth guidance of 3% through 2029, based on what we currently expect. Now I'll walk through our financial performance quarter-over-quarter. Total revenues rose $0.07, driven by a $0.14 increase from 4.6% growth in deliveries, partly offset by a $0.07 decrease in revenues due to delivery composition changes. Power costs contributed a reduction of $0.08. That figure reflects a $0.17 EPS drop tied to how power costs performed in 2024, which flips direction in this comparison, plus a $0.09 gain from conditions that turned out favorable, producing power costs below what the annual update tariff had projected. All told, Q1 came in a bit under the PCAM baseline. Operating expenses pulled EPS down by $0.18, split into $0.04 of O&M — net of better recovery and deferral-related items, largely because of when wages, benefits and professional service costs landed — $0.11 from depreciation and amortization running higher, and $0.03 from interest expenses rising on larger debt balances that support the capital investments now underway. Wrapping up, there's an $0.11 reduction tied to other items — $0.08 of that stems from dilution caused by recent equity draws, and $0.03 comes from assorted miscellaneous items. Moving to slide six, we'll cover our five-year capital forecast, and nothing there has changed from what we previously disclosed. Our incoming Seaside battery is still slated to enter service at the close of June, and it will round out the battery portfolio we already have during the summer peak. On the regulatory side, we're pushing our Seaside strategy forward in Q2, in line with the expedited option that came out of the 2025 GRC order, since we intend to pursue cost recovery for this valuable asset that will be serving customers shortly. Looking further ahead, we're having productive conversations with parties while we work through what our regulatory approach will look like over the long term. Even though the schedule and size of this are still shifting, our attention is on choices that let us stay true to keeping things affordable while also recouping important capital spending that supports customers. When it comes to planning resources and buying supplies, talks with those who submitted bids under the 2023 RFP are ongoing, and assuming present circumstances hold, we continue to anticipate wrapping up contracts in the latter half of this year and having projects up and running by the close of 2027. Later in the current quarter, we will submit the 2025 IRP update, which will provide support for the 2025 RFP effort; that effort has already gone through its initial stages and will launch in full during the second half of the year. Like Maria said, we're watching how federal policy unfolds, covering tariffs, modifications to the Inflation Reduction Act, tax policy, and other pertinent legislation that could affect our base capital plans or renewable procurement; obviously this is a fast-moving situation, yet we're involved on every front with suppliers, customers, regulators, policymakers, and other stakeholders while we assess the combined effects. Moving to slide seven, where we cover liquidity and financing. At March's close, total liquidity stood at $948 million, and both our credit ratings and outlook are the same as they were a quarter ago. At the close of March, we wrapped up $310 million in first mortgage bonds. We're looking at potentially up to $140 million more in debt financing before the year ends, and that would cover our capital investment plan along with general corporate purposes. In Q1, we priced an additional $87 million via the ATM program as part of deliberately executing our base financing plan, which remains at $300 million each year for 2025 and 2026. Growing customer requirements, advancements in clean energy, and our commitment to keeping things affordable are pushing us toward new approaches that deliver value for both our customers and stakeholders. Broadening our financing flexibility is still a priority, and as Maria pointed out, we're seeking updates to our structure, among them forming a holding company. Having gained solid ground in Q1, our teams stay focused on pushing forward key priorities through the rest of 2025. That covers putting deliberate cost management measures in place to achieve durable efficiencies and the proper cost structure. It rests on what we established in 2024 to pinpoint strategies that boost how efficiently and effectively we work and underpin durable, robust performance. Carrying out this plan is hard yet essential as we discover ways to streamline operations, drawing on tools and technology to accomplish high-impact work more cheaply. This is really important for keeping our promise of affordability for customers and for making our culture stronger, so that we can consistently deliver on what's expected of us. Given how far we've come, we have confidence in what lies ahead and in the plan that underpins both our short-term and longer-term projections. So we are restating our 2025 adjusted earnings guidance of $3.13 to $3.33 for each diluted share, and also our guidance for long-term earnings and dividend growth of 5% to 7%. We expect to keep executing through the remainder of the year, focusing on delivering energy that is safe, reliable, increasingly clean, and affordable to our customers and the communities we serve. Operator, we're now ready for questions.

Maria Pope

executive
#4

Good morning , Julien.

Julien Dumoulin-Smith

analyst
#5

Hi there, good morning, everyone. Thanks so much. Hello again, and I appreciate you making the time. I wanted to circle back to the legislative side and the wildfire situation. Clearly, you've already heard the earlier remarks. How are you viewing the headway being made, and even more crucially, in which areas are things moving forward versus where they aren't — particularly when it comes to setting expectations, for this year or the next one, just to establish the foundation? Since that clearly serves as the key prerequisite for several of the decisions that follow, correct? Such as a HoldCo, it appears, from a timing standpoint.

Maria Pope

executive
#6

Your point about timing is exactly right. As for the headway being made, something that has become quite clear is that plenty of legislators truly had no idea about the broad wildfire mitigation plans we had implemented, the big expansion in vegetation management, and the system hardening efforts we've carried out across recent years. There was considerable conversation about what it genuinely requires, the expenses, and the substantial cost escalation over the past couple of years tied to preventing and mitigating wildfires. Another thing I find notable is that wildfires show up in vastly different ways depending on which region of the state you're in; we've had many conversations involving experts and others. The area where we've truly performed well concerns a certificate process, and that has proven extremely valuable for creating a widely recognized and clearly understood standard of care, similar to what exists in medicine, engineering, or numerous other disciplines. The area needing far more effort from us involves a fund, plus the caps on liability tied to drawing from that kind of fund, so that customers are able to reach funds far more quickly than they could via alternative routes. There's considerably more work ahead on that front, and I believe the ongoing talks, extending beyond the legislative session, ought to prove quite fruitful.

Julien Dumoulin-Smith

analyst
#7

Great. Thanks; and if I could just piggyback on that very briefly regarding your current position — I mean, that 5%-7% CAGR is out there, and of course it hinges on the financing materializing with some degree of dilution. When you consider the choice to proceed with CapEx as things look today, I simply wanted to gauge your confidence, correct? We've heard public remarks from others saying the priority will be affordability. Meanwhile, we aren't seeing the wildfire legislation actually followed through on, whether during 2025, or perhaps it comes in 2026. At what stage do you say, "Look, we're going to scale back on growth because the larger framework is signaling that we should reevaluate"? I mean, it's a tough environment. I value what you all are doing, particularly when it comes to containing costs, and I want to call that out. Yet at the same time, there are so many distinct pressure points. Is there some specific point where you say, "We're going to reassess"?

Maria Pope

executive
#8

Yeah, I believe that's a fair question, Julien. It's something we keep asking ourselves. As a quick reminder, we discussed this rather thoroughly on the February first quarter call, and before that too. We always anticipated that the conversation concerning tackling wildfire in Oregon would require two sessions. I'm extremely grateful to Representatives Marsh and Mannix for the relentless effort they've put in on both bills, but especially on safety certification. As we proceed, you're correct. We're examining our capacity to appropriately recover costs and provide competitive returns along with competitive growth for investors.

Julien Dumoulin-Smith

analyst
#9

Great. So perhaps only one more brief question regarding the schedule for those RFPs and whatever fresh information you might have, since it's clear that your forecast depends heavily on this. If you could simply shed some light on what you're observing in that area, that would be all from me.

Maria Pope

executive
#10

The talks are going as well as we could possibly hope. Sure, there's plenty of commotion in the worldwide, domestic, and broader settings, yet the number of people we serve keeps rising. Those customers remain committed to clean energy, and we're eager to wrap up these discussions over the remaining months of this year and start up projects around 2027. Worth mentioning is that from the most recent facilities we've added, the benefits of battery storage are already proving enormous; in fact, during some windows we've recorded slightly below 10% supplied by our battery storage, which lets us provide cheaper power to customers and truly capitalize on the swings seen throughout the West.

Julien Dumoulin-Smith

analyst
#11

Great. Hey, appreciate you making room for us. Keep pushing through. We'll talk before long, okay? Wishing you all the best.

Maria Pope

executive
#12

Thank you, Julian.

Maria Pope

executive
#13

Morning.

Michael Lonegan

analyst
#14

Yes, morning, and thanks for fielding this. Clearly, industrial sales have been rising sharply, powered by semiconductors plus data centers. You've restated that 3% load growth projection for the long term. With tariffs and worries surrounding economic development, I'm curious whether you're ready for a possible deceleration in that load growth and in capital projects. Could you discuss what choices exist on the capital side, possible reallocation, and additionally what you anticipate regarding capital inflation?

Maria Pope

executive
#15

Yes. To begin, when it comes to our industrial base, three main areas matter. First, one quarter of it consists of truly traditional industrial customers. One quarter — our fastest expanding segment — is data centers. By far, that's the quickest growing segment. Roughly half, then, is semiconductors. We're monitoring the worldwide semiconductor market very closely. Across those three sectors combined, we stay quite confident about our growth going forward. As for inflation generally, costs affecting us have actually shown a moderating trend. My guess is our customers are experiencing something fairly similar. Naturally, that leaves out all the tariff-related discussions happening both nationally and globally.

Michael Lonegan

analyst
#16

Wonderful, thank you. You've mentioned turning tax credits into cash as a way to handle your financing strategy. I'm just curious, what amount of that monetization is built into your plan on an annual basis right now? And if transferability were to disappear entirely, how would you go about filling that hole? Would it possibly mean issuing more equity?

Maria Pope

executive
#17

Yes. Joe, would you like to take that one?

Joe Trpik

executive
#18

When it comes to the base plan, the sole tax credits actually baked into our financing are those tied to the Seaside project, which is just about to come online. Beyond that, there are no further ITCs or PTCs in the base plan or in the investments within it. I should note that we do have a modest monetization of our PTCs as time goes on, though these aren't material to how we're financed. Turning to growth, if we think about possibly taking part in the RFP, we'd expect ITCs could be part of it, but we view them primarily as something that lowers costs for our customers, and beyond that they clearly can ease some strain on our financing. I'd add that with the ITCs and PTCs we've already monetized and those still to come, we keep seeing robust appetite for monetizing such investments. Put simply, apart from Seaside, the base plan doesn't hinge on the ITCs. Over the long run, the ITCs are really just as much about keeping things affordable for our customers and getting effective pricing.

Michael Lonegan

analyst
#19

Great. Thanks for taking my question.

Maria Pope

executive
#20

Thank you.

Maria Pope

executive
#21

Morning.

Richard Sunderland

analyst
#22

Hi, morning. I appreciate you making room for me. To follow up on what we were saying about the RFP, is there any reason, or any opportunity, to shift people or money away from the 2023 RFP toward the 2025 RFP so that pricing gets refreshed for things like tariffs or supply chain effects?

Joe Trpik

executive
#23

Thank you. Morning. On the question of pricing, the situation is fairly similar to 2021, when adjustments of this kind were already being considered. Right now, we don't believe we need to push anything forward. Our process is quite flexible. What we're discussing with the RFP group today still takes these unknowns into account. At least as of now, we think the existing RFP process gives us sufficient tools to make adjustments as we go through 2021. You may remember that pricing went up in some cases, and there was also some clarity around the IRA. Once the RFP process had moved into selection, we were able to handle a net increase.

Richard Sunderland

analyst
#24

Understood. Is the same situation applicable to the batteries included in the 2023 RFP? To put it another way, do those come from China?

Joe Trpik

executive
#25

When it comes to the batteries, the source locations haven't been made public by us as of now. Still, it's clear that a majority of batteries generally originate from abroad. Through our conversations with the counterparties, we're considering approaches to handle how tariffs might affect their batteries, in the event they do carry that exposure. Those talks are ongoing, and we remain on schedule to complete these RFPs in the latter half of the year.

Richard Sunderland

analyst
#26

All right, understood. That's useful. Going back to a few things you said in the opening remarks, Maria — I recall you brought up growth as one way of tackling affordability. I'd like to hear a bit more, I suppose, about how things work with data center customers and how you land on the right framework with them around minimum guarantees, total costs, and kind of steering clear of that cross-subsidization hitting existing ratepayers. What does the whole picture look like when it comes to paying your fair share, if that makes sense?

Maria Pope

executive
#27

That's a great question, and it's one we devote a great deal of time to discussing in both the regulatory and the legislative arenas. As a matter of fact, legislation addressing this is in play right now. On the whole, the effect shows up in a few areas. The first is simply infrastructure in general. As you can see, we've carved out a distinct transmission segment within our capitalization table. It's really these new large customers, data centers especially, that are fueling much of the demand for transmission buildouts — truly for the first time in what can be decades across our service territory. There's an overall benefit for system reliability; when it comes to distribution, there's certainly some effect there, but above all, what you really observe is a shift in the market price of power as rising demand originates from data centers, whether we serve them or other utilities in the Pacific Northwest. We need to be doing more direct procurement for those. We already have some programs that permit that, and we're working directly with customers. I'd add that data centers also deliver added stability to the grid. Some data centers of ours are bringing battery storage. Some have backup, many have backup generation; that's something we've been working on for years and it has sped up our virtual power plant process.

Richard Sunderland

analyst
#28

Great. Thank you so much.

Maria Pope

executive
#29

Thank you.

Nathan Richardson

analyst
#30

Hey, everybody. How are you?

Maria Pope

executive
#31

Good morning.

Nathan Richardson

analyst
#32

I have two short things to ask. Let me just get something straight. From what I understood, you mentioned plans to move ahead quickly with the Seaside matter. I'd like to know whether any additional specifics are available on that.

Maria Pope

executive
#33

Of course. Of course.

Joe Trpik

executive
#34

Right. Yes, it is indeed our intention — as you might remember — under that 2025 GRC which was put forward to us. It's somewhat unusual, since this isn't a thing we've ever done before. We're currently wrapping up the specifics together with the other party via productive discussions; our expectation is that it gets submitted at some point over the next several months, days, year or so, shortly. It's fairly straightforward, insofar as it merely spells out the mechanism for when and how that cost gets recovered. We believe the discussions have proven fruitful so far, and we're eager to get this filed and to keep moving ahead with it.

Nathan Richardson

analyst
#35

Understood, that's clear. One final item. Looking at it in sequence, the equity layer appears to have declined somewhat. I'm wondering what your expectation is for where things stand at year-end, given the equity issuance happening now and the plan. The second part of that: what's your view on the path back to 50%, and is there a rough timeline you can give?

Joe Trpik

executive
#36

Like we said earlier, we've reduced our balance tied to a particular state drawdown; through the ATM we've put out as much as $100 million to this point, correct? To date, our capital plan calls for $300 million. The market's present pricing, while it isn't the level we'd prefer, is at a point where we feel we can keep making solid investments without diluting shareholders. Our sense is that moving ahead, we stay dedicated and believe that even with prices like these, we're able to progress toward a 50/50 capitalization structure in the future.

Nathan Richardson

analyst
#37

Got it. Thank you very much.

Maria Pope

executive
#38

Thank you.

Anthony Crowdell

analyst
#39

Hello there, good morning everyone. What I want to ask probably builds on that previous question, and Julien's was about the holdco. Joe, I believe you brought up aiming for that 50/50. Is setting up the holding company a prerequisite for getting to 50/50?

Joe Trpik

executive
#40

On that point, the answer is no. The way we intend to fund things and our approach for reaching 50/50 — which clearly sits at the utility level — operates independently and has nothing to do with any holdco approach. It's simply our plain plan.

Anthony Crowdell

analyst
#41

Regarding setting up the holding company, do you have a specific debt target you'd aim to keep at that level?

Joe Trpik

executive
#42

Getting into details on that right now is premature. Clearly, our intent in using the holding company is to provide flexibility so we can keep financing efficiently and managing costs for the customer. So far, nothing concrete exists beyond the aim that the holding company will deliver flexibility and keep supporting customer value; throughout this process — which, as I believe we've said, could last as long as a year — we anticipate gaining more clarity, and we expect to remain inside our sensible norms for structures of that kind.

Anthony Crowdell

analyst
#43

Regarding Oregon, I don't know whether regulators there have any concerns about double leverage, in the event that the equity-to-debt ratios at the holdco aren't the same as the opco's.

Joe Trpik

executive
#44

As of now, nothing particular comes to mind on that front. That said, my sense is that in the course of engaging with the regulator in that state, we'll bring clarity by way of agreements and stipulations addressing how the holding company will operate. As for whether specific provisions on that matter exist, my belief is that they do not.

Anthony Crowdell

analyst
#45

Excellent, I really appreciate you answering my questions.

Maria Pope

executive
#46

Good morning, Gregg.

Gregg Orrill

analyst
#47

Morning, and thanks. I might be asking about something you've already covered. When exactly do you plan to move ahead with the HoldCo proposal?

Maria Pope

executive
#48

We expect to submit a filing sometime in the later portion of Q2.

Gregg Orrill

analyst
#49

Alright, that was my sole question. Thank you.

Maria Pope

executive
#50

Wonderful. Appreciate it, Gregg.

Maria Pope

executive
#51

We’re glad you could all be with us today, and we appreciate your interest in Portland General Electric; we’re looking forward to connecting with everyone soon. Thanks so much.

Operator

operator
#52

This concludes today's conference call. Thank you for your participation. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Portland General Electric Company transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Portland General Electric Company earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Portland General Electric Company or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.