Thank you, Steven. Good morning, everyone, and thanks for being with us today. Before we get started, I want to note that we released a press release this morning and put together a presentation that supplements what we'll be discussing, and we'll be referring to it during the call. Both the press release and the slides can be found on our website at investors.portlandgeneral.com. If you look at slide 2, a portion of what we say this morning will be forward-looking statements. We want to caution you that those statements carry inherent risks and uncertainties, and actual results could differ materially from what we expect; for a description of some of the factors that might cause actual results to differ materially, please see our press release along with our most recent Forms 10-K and 10-Q, all of which are available on our website. Moving to slide 3, Maria Pope, our President and CEO, and Joe Trpik, our Senior Vice President of Finance and CFO, are leading today's discussion. After they finish their prepared remarks, we'll open the line for your questions. With that, I'll hand things over to Maria.

Maria Pope

executive
#2

Thanks, Erin, and good morning, everyone. We're glad you could be with us today. Our third quarter felt the effect of the coolest summer in 10 years. Even so, we kept executing in a disciplined way: we actively managed power costs, drove efficiencies in O&M, and found further opportunities to run our business more effectively. Importantly, our fundamentals are still solid, with industrial demand up 9% year-over-year, powered by ongoing demand from high-tech and data center customers. In fact, we closed a significant agreement with Verus for a facility of up to 420 megawatts, which should be energized in 2028 and ramp to full capacity by 2033. Turning to the proposed holding company, the Commission released its order on September 25th. While that order gave the go-ahead to some parts of the plan, a number of the conditions attached weren't practical. We've asked for clarification and modifications on two points; we back the proposed rate credit and customer benefits, which come to $83 million. Were it put into effect, the holding company would deliver extra financial flexibility and at the same time keep customer protections and utility financial strength solid. That said, important as it is, neither our growth strategy nor our capital plan nor our present guidance hinges on getting the holding company implemented. Moving on, I'll cover the financial results and the main drivers behind them. This morning we announced GAAP net income for the third quarter of $119 million, equal to $1.00 per diluted share, along with non-GAAP net income of $125 million, or $1.06 per diluted share. Business transformation, optimization, and acquisition-related expenses were left out of our non-GAAP figures, since they don't reflect ongoing operational performance. Historically mild weather characterized the third quarter, as it did the year, with weaker cooling demand during the period and a substantial drop in energy usage among residential and small commercial customers. If you turn to slide 4, we'll go through our strategic priorities. On customer growth: demand remains strong among technology, semiconductor, and data center customers. Starting in July, our new large load tariff raised prices for data centers and other big customers, while cutting them for households and smaller businesses — which places us ahead of numerous utilities nationwide. That tariff added roughly $4 million in incremental margin during Q3 and carries provisions meant to lessen the risk and expense of serving new large loads. In short, at PGE, growth funds growth. We now anticipate about 12% yearly capacity growth from our large load customers through 2030, compared with our earlier forecast of 10%. Backing this growth are contracted customers who either operate facilities that are already energized or are actively moving construction and facility development forward. Building on what I said before, there's a deal in place with Verus covering a plant of as much as 420 megawatts. Under our new large load tariff, it carries safeguards for both customers and shareholders — minimum payment requirements and direct allocation of infrastructure costs that will boost reliability throughout the region. Battery storage is incorporated into this facility as well, providing added flexibility to meet peak demand while maintaining reliability, adding clean energy to the system, and doing everything we can to keep residential and commercial rates low. Verus is working through the permitting steps, and its applications were filed ahead of any moratoriums. We anticipate energization beginning in 2028. Regarding the Washington acquisition: we're continuing to push forward and advance the regulatory review. A close is anticipated in 2027, specifically mid-2027. A major milestone arrived in the third quarter when our participation in the extended day-ahead market, or EDAM—a market PGE helped design and develop—launched successfully. EDAM advances Western energy markets, lowers costs, reduces volatility, and improves reliability; meaningful customer value is what we expect EDAM to deliver, contributing to both reliability and affordability. Customer savings of $14 million are reflected in our 2027 AUT. Our teams did excellent work to reach this milestone, and I'm proud of them—it's another step toward efficient, affordable energy for our customers. On the clean energy side, two contracts have been finalized for projects that aren't bid-based. The first is a build-transfer agreement covering a Biglow site that pairs 200 megawatts of solar with 250 megawatts of battery storage, and we expect to invest roughly $900 million there. The second is also a build-transfer agreement, this one for Salmonfly — 199 megawatts of solar plus 199 megawatts of battery storage — with an anticipated investment of $850 million. Salmonfly is being developed alongside the Confederated Tribes of the Warm Springs. That project helps us run solar and storage in a coordinated way with both our current hydroelectric assets and the ones we co-own. Beyond that, commercial talks keep moving forward on additional projects coming out of the 2025 RFP. And last item this month: we submitted our 2026 clean energy plan along with our integrated resource plan to the Commission. Turning to risk management and wildfires — even with a tough wildfire season across the region, our teams executed our risk management plans, maintained heightened readiness, and responded proactively. On October 26th we announced that fire season had ended in our service territory; we continue to run our year-round wildfire mitigation program, which includes hardening the system, boosting situational awareness, and investing in technology meant to improve reliability and reduce risk. Wildfire risk affects society broadly, and we remain dedicated to collaborating with stakeholders on solutions that bolster public safety, community resilience, and an investable energy future for the Pacific Northwest. In summary, we continue to see robust customer expansion, we're successfully executing on efforts such as EDAM, and we're making headway on clean energy resource prospects; through this work we're positioned to serve our customers, bolster Oregon's growth, and generate long-term value for shareholders. Moving on, I'll turn to slide 5 and cover our 2026 earnings guidance. Due to weather-related headwinds, we are lowering our full-year adjusted earnings guidance to a range of $3.18 to $3.28 per diluted share, down from $3.33 to $3.53. If not for those weather-related headwinds during the second half of the year, we would have landed solidly within our original guidance range. We continue to reaffirm our long-term guidance for earnings and dividend growth of 5% to 7%. At this point I'll hand the call over to Joe, who will take you through our financial results in greater detail. Thank you.

Joe Trpik

executive
#3

Maria, thanks. Morning, everybody. Please join me on slide 6, where you'll see that in Q3 we kept delivering on cost control, regulatory recovery, and industrial expansion, despite this being the gentlest summer since 2016. Turning to load trends year over year: nominal total retail energy deliveries were down 3% from Q3 2025, but weather-adjusted they were up 1%. Our technology, semiconductor, and data center customers continue to show strong demand, and we anticipate 12% yearly large customer capacity growth through 2030. Industrial demand again drove results in Q3, rising 5% quarter over quarter and 9% year over year. That mirrors continued appetite from customers in high-tech and data centers. In Q3, we experienced one of the gentlest summers in recent memory. Residential deliveries declined 8.9% on a nominal basis and slipped 0.6% on a weather-adjusted basis, while commercial deliveries were off 5.5% nominally and 2.8% weather-adjusted; our 2026 weather-adjusted load growth guidance is being cut from 1.5% to 2.5% down to 1% to 2%, largely due to shifts in when industrial load ramp-ups occur. Given contractual minimums, we don't anticipate the revised load forecast will materially affect our 2026 revenue. Moving on to the financial results for the third quarter: just as a reminder, our adjusted EPS guidance had been set at $1.20 to $1.32 per share, which put the midpoint at $1.26. When the quarter closed, adjusted EPS actually landed at $1.06. The bulk of that gap is attributable to weather that was unusually mild for this time of year. Now I'll go through the main factors that drove earnings year over year this quarter. Industrial demand subtracted 7 cents, though that was partly offset by ongoing growth from high-tech and data center customers. Residential and commercial load took away 21 cents, mostly because of the mild weather. Power costs added 4 cents; that figure breaks down as a 14 cent drag from favorable power costs in 2025 that reversed in this comparison, plus an 18 cent gain this period, mainly from the expected intra-year timing of revenue collection and power cost recognition. On a quarter-over-quarter basis, weather had a 15 cent EPS impact, which accounts for both the revenue reduction and the offsetting decline in power costs; that sits inside the residential and commercial load and net variable power cost variances. Additional cost recovery contributed 14 cents, reflecting the Seaside battery asset that entered customer rates starting in November 2025 and the distribution system planning recovery that started in April of 2026. Other capital and financing costs tied to our continuing rate base investments reduced earnings by 9 cents, consisting of 1 cent of higher depreciation and amortization, 7 cents for dilution, and 1 cent of additional interest expense. Finally, O&M contributed 11 cents, reflecting continued strong cost management and productivity improvements across the organization. Turning to slide 7, you'll see our capital forecast covering five years, and it incorporates the 2026 and 2027 expenditures tied to the RFP projects we launched in 2023. One thing I'd flag: this outlook leaves out capital outlays for the recently signed Biglow optimization phase 2 and Salmonfly projects, and it likewise excludes any of the additional resource procurement negotiations now in progress in the Washington acquisition, all of which are proceeding as anticipated. Turning to 2027 spending, if we include both of those recently signed projects, our total forecasted capital expenditures come to $2.5 billion; moving on to slide 8 for financing, we're still in a strong position; most of our 2026 financing activity is now complete, which gives us clear visibility into what we need to fund this year. That includes $550 million of equity issued under the forward sale, of which $152 million had been drawn as of September 30th. We're shifting $398 million of the planned equity draw from 2026 into 2027 while the decision on the holding company structure is still pending. There's a $500 million ATM facility we can tap for additional equity support, plus a $350 million 24-month term loan that handles what we need to finance in 2026. And our investment-grade credit ratings haven't changed. As for 2027 financing, we're looking at $350 million to $400 million from tax credit monetization and $150 million to $200 million in equity issuance; the Board of Directors declared in October a quarterly common stock dividend of 55.125 cents per share, a 5% increase on an annualized basis. We remain committed to a competitive dividend that aligns with our 60% to 70% payout target while we balance overall financing needs. The strategy we're pursuing is built around keeping operating cash flows robust and continuing to back customer-centered capital projects, while at the same time steering toward our authorized capital structure. When we look back at what we've accomplished over the last three quarters and ahead to Q4, the discipline behind our execution is something we take pride in. Management actions are being advanced on both operating costs and power costs. Our attention remains on running safely, reliably, and efficiently, on moving our strategic priorities forward, and on creating value for customers, communities, and shareholders. The substantial weather-related and other load effects experienced year-to-date in the first half of the year were successfully addressed through power cost management and by generating efficiencies across the organization. With that in mind, because the latter half of the year saw unusually mild weather, we're updating our adjusted earnings guidance to a range of $3.18 to $3.28 per diluted share. Our long-term guidance for EPS and dividend growth of 5% to 7% is being reaffirmed, and so is our long-term load growth guidance of 3% through 2030. Operator, we're now ready to take questions.

Julien Dumoulin-Smith

analyst
#4

Hi everyone, good morning. Great to speak with you. Appreciate you making the time.

Joe Trpik

executive
#5

Morning.

Julien Dumoulin-Smith

analyst
#6

Hi there. I just have a quick question—I noticed the 10-Q includes some newly added risk disclosure, and I wanted to probe into it a bit, specifically the mention of certain potential delay risks. Could you shed some light on what's happening with the '25 RFP—does it affect both company-owned generation assets and PPAs, or can you give us a bit more context? Obviously, we've witnessed a range of processes slip in the past, so seeing this as a new novel risk disclosure isn't entirely novel. Again, I'd love to get a better sense of what exactly is going on today.

Joe Trpik

executive
#7

Maria, I'll start us off on that one, Julien. Good morning. What you're really looking at there is us simply noting that there are multiple routes to procuring assets, BTA included, and not only the RFP. In this instance, as you can see, we're just looking into some alternative routes depending on which investments look most attractive. That's the sole distinction here—understanding that our previous approach was a straight RFP.

Maria Pope

executive
#8

Julien, allow me to jump in here. It genuinely stands out to me that you're digging into the risk disclosures in our 10-Q. Something that really bolsters our confidence in the pipeline is the Biglow 2 project we announced today, along with Salmonfly. The total cost per kilowatt comes in quite near what we observed out of 2023, and also near what statistics from across the country show over the last 12 months. Even though inflation and supply chain make us uneasy, our team has executed very strongly.

Julien Dumoulin-Smith

analyst
#9

Great, thanks. If I could just piggyback a bit on the HoldCo dynamics — and again, this is somewhat deep in the weeds as well. Look, I realize OPUC staff has filed in support of certain clarifications regarding the retained earnings cap. Could you speak a bit to some of those alternative cap calculations? Do you view that as an acceptable provision? Again, I come back to some of the caveats you all included in the Q here regarding moving forward and how this might look for reconsideration. I'll keep it open-ended.

Joe Trpik

executive
#10

I'll kick us off here; we remain appreciative of the dialogue from the staff, and what we're focused on is making sure the HoldCo can function on a normal basis — that is, pay dividends and finance itself; we're grateful there's no opposition from parties like AWEC, and I'll just leave it at this: as we work through the math on some of these, we're open to any proposals that, again, simply let it operate effectively. The reason we find ourselves where we are now is that proceeding with the design as it was would not have been prudent, since it didn't allow us to have an effective HoldCo and protect our shareholders and dividends.

Julien Dumoulin-Smith

analyst
#11

Understood. Great. Then one final point on the credit rating front — and clearly this ultimately comes down to a fairly binary outcome regarding precisely which notch thresholds apply. Considering the financing advantage, is that one-notch threshold effectively a red line such that, if the Commission doesn't revise it, you folks would not go ahead with the HoldCo? Once more, I'm just curious about how the rating side connects to your decision to move forward, again, if I may push on this as well.

Joe Trpik

executive
#12

Regarding the order currently in place on the HoldCo as it stands, both the one-notch provision contained in the HoldCo agreement and the dividend restrictions each constitute red lines; that's the reason we responded the way we did. When it comes specifically to the rating agencies, dialogue with them is ongoing. They remain kept up to date by us, and we are working through various scenarios alongside them as we adapt to whatever proposed HoldCo orders come next.

Julien Dumoulin-Smith

analyst
#13

Understood. All right, great. Is there anything about wildfires you could share, given how much happened in California? I'm not sure whether there's something you'd want to highlight ahead of your upcoming session, or perhaps not. It may be a broad question, but I figured I'd ask it here.

Maria Pope

executive
#14

No, thank you Julien. I'd say it comes against the background of a difficult season statewide in Oregon, and also nationwide when it comes to wildfires. As I mentioned during my prepared remarks, our team performed very well. We shut off power several times and kept active watch through one of the lengthiest IMT deployments in our company's history. Obviously, wildfire smoke poses a problem for Oregon — the harm and devastation, much of it on US Forest Service lands or BLM lands — but also for the state economy's overall health. You're able to see in the Oregon business plan, along with the governor's prosperity reports and council work, considerable attention on how to tackle this matter; we look forward to the report the PUC has commissioned. It isn't released yet. I'd anticipate it coming out within the next 2 weeks, and that ought to lay a foundation for some of the legislative work we can pursue this session. We're tracking closely what's happening in California, especially the wildfire conclusions contained in the California Earthquake report produced earlier this year.

Julien Dumoulin-Smith

analyst
#15

Excellent guys. Thank you. Speak soon.

Maria Pope

executive
#16

Thanks, Julien.

Shar Pourreza

analyst
#17

Hey guys, morning.

Maria Pope

executive
#18

Morning, Shar.

Shar Pourreza

analyst
#19

Good morning, good morning. Just a quick one about the HoldCo and the petition. AWEC has come in and isn't opposing the changes you're making to conditions 25 and 26. Are you seeing the same kind of alignment from staff and CUB? Is a resolution ahead of the December 7th acceptance date the base case, or should we be thinking this slides into '27 with a shareholder vote?

Maria Pope

executive
#20

Oh, that's a good question; we're continuing to work through the process. The Commission should come out pretty soon with their decision, and we are monitoring and working through all of the different aspects.

Shar Pourreza

analyst
#21

Understood. Thanks, Maria. So regarding Biglow and the Salmonfly build-transfers, that's $1.75 billion sitting outside the plan, mostly 2027, 2028. What's the right way to think about the equity content there? Is it about 50/50, with the $500 million ATM covering it, or does the HoldCo outcome alter how you'd finance it? Thanks. Yes.

Joe Trpik

executive
#22

Let me begin with our guidance — when we discuss both our 5% to 7%, when we discuss our equity plan here, we always look at this without the HoldCo to begin with. Our growth rates and the affirmation we gave earlier hold exclusive of the HoldCo. As for financing these two projects specifically, we begin with the tax credit we'll get from the 2023 RFP. We said earlier on the call somewhere between $350 or $400 million in tax credits coming from the '23 RFPs. After that we'll turn to debt to finance our draw from the '25 forward, where we had almost $400 million remaining, and then we have minimal new equity. Looking at our equity guidance here, our equity for 2027, even including these projects, rises by roughly $50 million compared with our prior disclosure.

Shar Pourreza

analyst
#23

Understood. That's great. Thanks so much, everyone. I'll wrap up here. Thank you.

Joe Trpik

executive
#24

Thanks a lot.

Steve Fleishman

analyst
#25

Hi. Thanks.

Maria Pope

executive
#26

Thanks, Steve.

Steve Fleishman

analyst
#27

Just to get some clarity — you mentioned we'll be hearing from the Commission soon. Could you give any further detail on the probable timing, and on which of those various options — clarification, rehearing — which way things might go, if at all?

Maria Pope

executive
#28

The date, the outside date, is December 7th, and that's when we'd anticipate hearing from them. My assumption is it will run all the way to December 7th. Considering we went through a process lasting months — a year and a half — and reached a negotiated settlement, so the record holds a great deal of testimony and many expert statements, my hope is that they are reviewing that record and working through things, and they'll come out with their decision on December 7th; we'll know more at that point.

Steve Fleishman

analyst
#29

All right. Another thing I wanted to ask about that. If they do end up addressing those 2 conditions properly, how do you view the fact that they sort of kept double leverage available in the order for a later rate case? Is that simply an acceptable risk in connection with this?

Maria Pope

executive
#30

Steve, I believe we've considered that against what's typical nationwide, and it isn't necessarily something that gets ruled out at other holding companies. That risk is common among certain other utilities, and we'd anticipate resolving it over time. We're likewise transitioning to 5-year rate cases, so I think that a 5-year rate case framework down the road will give investors greater certainty as we go forward.

Steve Fleishman

analyst
#31

Got it. That's helpful. Thank you.

Maria Pope

executive
#32

Thank you.

Chris Ellinghaus

analyst
#33

Hey, good morning everyone. Regarding the HoldCo decision, has there been any way for you to get a sense of whether those two key elements that are sort of in dispute were mistakes by the Commission as it rushed to make adjustments to the settlement, or were they intentional?

Maria Pope

executive
#34

We don't think we have a comment on that. There can't be any ex parte communications from us while this decision is still outstanding. We filed what we believed were clear and pretty minimal recommendations in our clarification hearing filing a number of weeks ago, and we tried to make it as workable as possible given all the discussions over the prior months and the settlement we had previously reached with staff.

Chris Ellinghaus

analyst
#35

Clearly, that settlement had a lot of detail, and it effectively handed the Commission a fairly solid guide for this, yet they chose to go a different way. Do you believe they grasp what that does to investors, and how it influences the cost of capital when they take such actions? Chris,

Joe Trpik

executive
#36

Let me add something here. That is exactly why the clarification exists and, frankly, why our communications exist. Plainly, the material the staff included dealt with that. Even so, we will work through the record here, hoping they gain that clarity. For us, of course, since that is what matters most to us, that is the HoldCo's value which permits the benefits that would flow to customers to be paid. We must ensure they recognize that it is an essential structural step for everything to come together.

Chris Ellinghaus

analyst
#37

All right. Joe, a few of those figures you mentioned stood out when you compare the absolute numbers with the weather-adjusted load numbers. It looks like something else could be going on, since residential weather-adjusted was still down, and total retail sales didn't rise by that much on a weather-adjusted basis either. Can you pinpoint another factor that could be putting downward pressure on load this quarter apart from weather? On

Joe Trpik

executive
#38

for the quarter, just for the quarter, when we look at residential, we came in at 0.6% on a weather-adjusted basis. I would agree with you on a year-to-date basis, Chris, since as you may remember, during the first quarter we saw some unusual load trends that we handled through our plans, and we do agree there were some unusual load patterns. If you look at year-to-date results, those patterns clearly still apply; however, as we revised our, as we revised and went through the third quarter, which is clearly one of our biggest load quarters, once weather was adjusted out on the residential side, it was pretty darn close.

Chris Ellinghaus

analyst
#39

All right.

Maria Pope

executive
#40

Chris, allow me to make one further remark. A major advantage of the UM 2377 large load tariff is that it works essentially as take-or-pay. The capacity payments we receive are fairly substantial, and those gave a positive boost to the bottom line. Energy usage came in somewhat lower from a couple of the data center customers. At times, energy usage by data center customers can be rather uneven.

Chris Ellinghaus

analyst
#41

That gets me thinking, Maria. I've been meaning to ask — do you have a rule of thumb or any view on how extremes in the weather affect data centers, or big load customers generally, given that ambient temperatures could really influence what they need for cooling? And did any of that show up this quarter at all?

Joe Trpik

executive
#42

I'll take that one. Data centers, plainly, are less sensitive to weather. You did see a bit of weather, to your point. So far, we haven't shown that. My belief is we've seen a couple of percentage points of difference from weather there, obviously, while on the residential side the reaction is far more extreme. I agree — something we can reflect as we move through guidance going forward is, potentially, as this class grows more significant, trying to give the differing sensitivities, because you're right. As we go along, the residential class, and even the small commercial class, respond far more sharply to weather than these classes do — they're already insulated, correct? They're striving to be as efficient as they can even absent the external factors. Lastly,

Chris Ellinghaus

analyst
#43

Do you have any fresh details on when you expect the 2025 resources? Speaking of the 2025 RFP,

Joe Trpik

executive
#44

there are the two projects we announced just now. As for when these projects will come online, since we're still working through tax credits, their in-service dates differ slightly in 2029; we're also still pursuing the other items on the RFP short list we published at the start of the year, as we keep working to fill what we see as the bucket needed to serve the system reliably.

Chris Ellinghaus

analyst
#45

All right, thanks — I appreciate that.

Aidan Kelly

analyst
#46

Hey everyone, good morning, and thanks for spending some time with us today.

Maria Pope

executive
#47

Good morning.

Joe Trpik

executive
#48

Good morning.

Aidan Kelly

analyst
#49

I suppose, following up on the HoldCo, or the scenario where hypothetically there isn't one, could you walk us through how the Washington acquisition would be financed under the structure that exists today? I guess what I'm asking is whether you see this altering your capex calculus, or would you instead be more inclined to backfill with additional equity in that scenario?

Joe Trpik

executive
#50

To your point, with no HoldCo — I'll begin by noting we had stated that, with the HoldCo, Washington would be accretive in the first full year. Without a HoldCo, our aim would be at minimum break-even to slight accretion in its first full year; we would expect no impact on capital at our PGE side, but we would finance this with a balanced cap structure as it relates to that structure, again assuming no HoldCo.

Aidan Kelly

analyst
#51

Great, that's really useful. So perhaps turning to the Washington utility acquisition, could you describe where the concerns of staff stakeholders are most substantive at present, and maybe what additional commitments you think might be needed to reach a settlement in Washington right now?

Maria Pope

executive
#52

Certainly. Things are progressing very well, and we're working through many significant discussions. Three main areas have come up. The first is CETA compliance, which is clean energy compliance in the state of Washington. The second is the hydro facility that isn't part of the transaction. Those are facilities on the Lewis River off of Mount St. Helens. Then third is the rate credit for customers.

Aidan Kelly

analyst
#53

Excellent. Appreciate you making room for us today. That's all from me.

Maria Pope

executive
#54

Thanks so much.

Joe Trpik

executive
#55

Thanks.

Anthony Crowdell

analyst
#56

Hi there, many thanks. Morning, everyone. I'd like to pick up on what Chris raised, perhaps a couple of speakers back, regarding the capital plan and, I suppose, that elevated cost of equity. Just, setting aside the holding company, or since that hasn't been settled as yet, is there anything different in your capital program simply because of the greater cost of equity — perhaps you folks would need to revisit the capital plan that's currently in place? I've got one more question after this.

Joe Trpik

executive
#57

Appreciate the question. As things stand right now, the capital plan really hasn't changed. Like I said, because we could monetize the tax credits starting in 2023, those RFP projects came on board, and the extra financing expense tied to them barely moves—or only mildly affects—our equity plan. Our view is that existing financings, with no HoldCo, still let us back growth of 5% to 7%. At this moment, I really don't believe it's the right time to argue over revisions to the capital plan.

Maria Pope

executive
#58

We do agree that the present share price, combined with the absence of a holding company, presents difficulties — particularly in light of Oregon's particular clean energy objectives. As Joe mentioned, in the near term we have options available through the tax credits, our strong balance sheet, the ability to draw on equity forward, and additional mechanisms. Our attention is firmly on pushing through the process with the aim of reaching a solid resolution on the holding company that works for everyone.

Anthony Crowdell

analyst
#59

So this is really more about modeling. For most of the calls so far this cycle, we've discussed the possibility of a gap between rate base growth and either earnings growth or the earnings per share CAGR. What I'd like to know is what you'd consider the range, or what's a reasonable modeling assumption for moving from rate base growth to earnings growth at Portland?

Joe Trpik

executive
#60

I don't have anything new on that yet; we'll be looking at it as we move toward the 2027 guidance. That spread is going to stay in place for now, until we finalize and incorporate everything related to 2027.

Anthony Crowdell

analyst
#61

Excellent. Many thanks. See you folks at EEI.

Maria Pope

executive
#62

Thanks.

Joe Trpik

executive
#63

Thanks.

Gregg Orrill

analyst
#64

Morning, and thank you. Perhaps a bit of housekeeping on the capex plan and about what the Biglow and Salmonfly projects were signed on in October. Was that why they weren't included in the $7.4 billion capex plan?

Joe Trpik

executive
#65

Correct, Gregg. Not to get into the accounting or disclosures side, our capex table that we use in investor materials has always been lined up with the liquidity and capital resources footnote in the 10-Q. The 10-Q reflects an as-of date, and we've tried to provide, hopefully, fairly adequate disclosures in both the investor deck and the 10-Q so that it's layered through. That's the sole reason — because both agreements carry effective dates within the last couple of days here.

Gregg Orrill

analyst
#66

Do you give any guidance on how those projects would affect the EPS growth rate guidance?

Joe Trpik

executive
#67

As of right now, clearly we've provided guidance on the equity financing plan, and we've reaffirmed our 5% to 7% for right now. At this moment, what we've said historically here, which is consistent, is that in years with meaningful RFPs, we expect to hit a growth rate at our midpoint or generally at our midpoint or better here, and these RFP projects don't alter that.

Gregg Orrill

analyst
#68

Thank you. I appreciate that.

David Rold

analyst
#69

Hi, thanks for the question. I’m just looking at the implied guide for 4Q, and I was wondering whether you could help us bridge how you get there a bit better, with more granularity. In other words, if we took your slide 6 and rolled it forward one quarter, comparing last year with last year or even with 2024, what puts and takes would you flag that kind of ground your confidence in the Q4 number for this year, just given that it’s such a meaningful step-up from recent quarters?

Joe Trpik

executive
#70

Sorry, I didn’t mean to talk too soon there,

David Rold

analyst
#71

David.

Joe Trpik

executive
#72

Good morning. I always enjoy these roll-forward questions, since I get to simply lay out the numbers here. Between last year's fourth quarter and this one, there's a significant shift. As a reminder, the fourth quarter of last year saw a fairly substantial weather impact, mostly in December. If you consider it, the largest puts and takes come down to weather, correct? A weather-normal assumption by itself accounts for 17 cents. As for the timing of the DSP, the distribution system planning recovery, and Seaside — that was just a partial quarter previously. The DSP and Seaside are what will drive it; we see a change, or rather a more favorable shift, in net variable power costs. We also have extra cost management, and the final item is simply the mechanical timing of how costs flow through the AUT. Taking all of this together, the vast bulk of the variance when you compare the fourth quarter of last year with what we expect for this year's fourth quarter sits in margin. There's a small amount on the capex side within O&M management, but most of it comes from those margin items I just listed, along with some O&M favorability.

David Rold

analyst
#73

All right, thanks.

JC Vidales

analyst
#74

Hello there, good morning. I just want a quick clarification. Suppose the Commission acted in line with what staff recommended on the 22nd — would that suffice for you to accept the Commission's order if they simply proceed and approve those staff recommendations? Or would you view that as an unacceptable recommendation?

Joe Trpik

executive
#75

Were we to get those recommendations including the one-notch credit downgrade ahead of a dividend stop, that is something we could not accept. A one-notch downgrade, as everybody knows, happens at times across the entire sector and in the normal course of business, and having a normal-course-of-business item put dividends at risk is simply not something we are willing to accept at all.

JC Vidales

analyst
#76

Great. Now, regarding the Washington piece, I believe that utility is earning somewhere in the mid single digits. Do you think that is sufficient for it to either break even or be slightly accretive absent a HoldCo? I think so.

Joe Trpik

executive
#77

I think I touched on this a bit earlier. Clearly, our plan here, as we said, was that it would be accretive in the first full year with a HoldCo. Our remark was that this transaction does not require a HoldCo, which we fully support. We said that without a HoldCo, it would take somewhat longer to become accretive. Still, as we keep moving forward, our aim is for the first full year of the WashCo to at least break even. That is what we are targeting. We believe that if we achieve our operational goals here, that result is attainable.

JC Vidales

analyst
#78

So, following up on that, assuming it wraps up in the middle of 2027, when do you think you'd be filing your first rate case in Washington?

Joe Trpik

executive
#79

We're still working out the timing on that. My sense is that the point at which we'd file a rate case might actually be addressed within this agreement itself, though I can't give you a specific date right now.

JC Vidales

analyst
#80

Excellent. Thanks very much. We'll see everyone at EEI.

Joe Trpik

executive
#81

Okay, thank you.

Maria Pope

executive
#82

Thank you.

Travis Miller

analyst
#83

Hi everyone, thank you. A couple of quick modeling questions here. Regarding the large load tariff, what is the impact, or what will it be, on net revenue and/or earnings, either for the remainder of this year or for next year?

Joe Trpik

executive
#84

Good morning. I'll take that first. Maria might want to add something here. In the third quarter — the first quarter in which the large load tariff has been active — I believe we disclosed a figure of around $4 million. For the second half of the year, we think it could be the same, potentially a little bit more. Then next year, as we work through it, obviously we haven't provided guidance. There's no reason to believe those kinds of numbers wouldn't happen for the first part of the year. Just as a reminder, all of this gets rolled into a rate case. One of the more important factors with the large load tariff, as much as we discuss the additional charging and the balancing for the data centers, is that residential customers also saw a bit of a rate credit reduction of around 1% here, which came through beginning at that same period of time.

Travis Miller

analyst
#85

Perfect; now a broader question about your system: as you see it today regarding energy supplied by renewables and the resulting requirement for capacity, especially clean capacity, should we anticipate that most incremental projects will include some form of battery solution? Again, just given the current balance of energy and capacity on your system?

Maria Pope

executive
#86

That's an excellent question; we've been quite fortunate to be ahead of the curve in deploying battery storage, and today it's a genuinely important element of our reliability mix. Adding batteries to existing renewable facilities, as well as alongside additional renewables, lets us make better use of existing transmission across the system and truly generate positive synergies; we'd expect to keep adding batteries. The more you add, the more you reach a point of somewhat diminishing returns. One factor is the capacity that many of those customers bring, as part of UM 2377 and all of our large load work. As I mentioned, Verus is bringing battery storage to their project, and other data centers of ours are doing the same thing. We're also monitoring very closely the run-up in battery storage prices and feel fortunate to have as much as we do in construction and moving forward at the prior pricing.

Joe Trpik

executive
#87

On the numbers side, I really believe that as we go through those 2025 RFPs and PPAs that others have out there, we'll end up with more than 1,000 megawatts of batteries on a system whose peak load sits at roughly 4,500 megawatts today. And even at present, with the standalone batteries we already have, that's a fairly impressive battery population for the system as a whole.

Travis Miller

analyst
#88

Great, those are sizable figures in relative terms, so that covers everything I needed. Many thanks.

Paul Fremont

analyst
#89

Hi, thanks. I'm just wondering what you intend to do with your ownership stake in Colstrip. Do you still expect to leave ownership of that plant behind in 2028?

Joe Trpik

executive
#90

Morning. Morning, Paul. How are you doing? As for Colstrip, we still hold Colstrip and our interest in it. At present we have no plan to divest Colstrip. We are aware that, as Oregon law currently stands, the electrons tied to Colstrip, or the power produced from coal generation, is not to be delivered for retail load, at least in the way it is written right now. We are just currently working with all the constituents on what the best alternatives are regarding the future status of that plant for us.

Paul Fremont

analyst
#91

If selling to retail customers weren't possible, would you still think about keeping ownership of the plant?

Joe Trpik

executive
#92

Honestly, we'll just need to engage with the regulators. Given where the law stands and the ownership interest involved, I think that'll be a genuinely interesting conversation to have. We're willing to cooperate with them. Of course, it's low-cost power, but from Oregon's perspective, it doesn't count as clean energy. We're ready to work through a lot of different scenarios regarding how that gets handled and how we settle our structure with Colstrip.

Paul Fremont

analyst
#93

Great, thanks.

Maria Pope

executive
#94

Thanks a lot. Obviously, as was discussed earlier today, there's still plenty of work ahead on the holding company structure. As we've mentioned too, we've raised the growth rate for our data centers from 10% to 12%, supported by genuinely strong outcomes from our large load tariff. Two exciting RFP projects are advancing and are helping offset some of the other capital reductions for this year. Turning to O&M, we've beaten our targets, with solid operating performance, and through the day-ahead market we're seeing excellent results on the power cost side. We appreciate everyone's time this morning, and we look forward to seeing you all at EEI in a couple of weeks. Thank you.

Operator

operator
#95

We appreciate everyone joining us on today's call. That brings the program to a close. You're welcome to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Portland General Electric Company transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Portland General Electric Company earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Portland General Electric Company or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.