Thanks, Michelle. Hi, everyone, and I appreciate you being with us this morning. First off, I want to point out that a presentation has been put together to go along with what we're talking about, and we'll be referring to it during this call. You can find those slides on our site, investors.portlandgeneral.com. If you look at slide two, a portion of what we say this morning will be forward-looking statements; we want to caution that these statements carry inherent risks and uncertainties, and what actually happens could differ materially from what we expect. To learn about some of the factors that might lead to actual results differing materially, please see our earnings press release along with our latest periodic reports on Forms 10-K and 10-Q, all of which can be found on our website. Now on slide three, Maria Pope, our President and CEO, and Joe Trpik, Senior Vice President of Finance and CFO, are the ones leading today's discussion. Once they finish their prepared remarks, we'll open up the line for your questions. At this point, I'm happy to hand the call over to Maria.

Maria Pope

executive
#2

Hello, everyone, and thanks for being with us this morning. Q3 brought us another solid quarter, and we're staying sharply focused on execution, creating value, and moving our five strategic priorities forward. Let's begin on slide four. Number one, putting money into clean energy objectives that our customers drive. Number two, doing everything we can to hold customer prices down. Number three, backing the expansion of data centers and high-tech industry as part of the region's economic development. Number four, cutting risk through operational execution, system hardening, and wildfire policies, and number five, fostering an energy future that invites investment. Tremendous growth is happening in our industry and at Portland General Electric. High-tech manufacturing and infrastructure investment has produced industrial growth above 8% since 2019, and that figure should only rise, fueling load growth of 3% overall for us through the decade's end. Clean energy remains a priority for Portland General Electric's customers and for our region; affordability is also on our minds as we strive to hold our cost structure flat and keep customer prices down, which in turn gives shareholders stable, competitive returns. Before I turn to this quarter's results, I'll walk through the progress on each of those five priorities. Clean energy. With policy and markets for clean energy shifting so much, our state and our company are moving faster to rise to the occasion. Oregon Governor Tina Kotek released an executive order earlier this month meant to speed up renewable energy development ahead of federal tax credit expiration, a meaningful step that keeps the state moving toward its goals. That aligns with the multi-pronged procurement approach PGE put in place in July to capture the roughly 30% federal tax credits that directly bring customer costs down. Under the 2023 RFP, we ran a price refresh to reflect the effects of the One Big Beautiful Bill and trade tariffs, and that effort ended with an updated shortlist submitted to the Commission earlier this month. That shortlist comes from a disciplined least-cost, least-risk method built to produce reliable, affordable results on schedules that respond to changing legislative requirements. At the same time, we pursued community-based renewable energy as well as bilateral PPAs for energy and capacity, and those efforts are bringing in more projects. Last, we made important headway on the 2025 RFP, which likewise kicked off in July. Bids are all in, and we're now assessing projects and working toward signing contracts in 2026. Each piece of our strategy puts reliable energy delivery to customers first while stretching the window for federal clean energy tax credits as far as possible. To date, within our own clean energy portfolio, we've secured over $1 billion in PTCs and ITCs, and we expect as much as another $1 billion to come from long-term contracts with third parties for energy. That represents just a single piece of how we keep clean energy within reach, enabling customers to realize the full value of high-value clean energy resources at the lowest cost achievable. Excellent results continue to come from our multi-year management initiative, the customer affordability commitment. This work touches every corner of our company, since our focus is on safe, reliable service while restraining customer prices to the greatest extent we can. In a moment, Joe will go into far more detail about our progress. We keep experiencing substantial growth in load, as total load rose above 5% relative to the corresponding quarter a year ago. Our industrial clients, once again spearheaded by data centers plus semiconductor makers, increased their energy consumption by more than 13% while these clients enlarge their current plants and build new locations; this rests on more than 10 years of high-tech production and infrastructure buildout throughout the area. We keep planning and carrying out work together with our clients as they expand and bring their operations up to speed. Oregon's data center law getting passed, set to be carried out via regulatory processes that wrap up next March, delivers clarity for rate-making, better cost allocation, and crucially, margin growth from PGE's industrial customers that are expanding quickest. Leveraging this favorable policy, we are putting money into fresh transmission and employing a mix of system improvements. These encompass dynamic line ratings, AI data analytics, plus customer-sided solutions to get the most from new investments and take advantage of current infrastructure. PGE just finished a project alongside AI startup GridCARE that taps flexibility in data center usage, using generative AI forecasting to free up extra system capacity. Also, we completed an innovative arrangement with Calibrant Energy, a distributed storage company, and Align Data Centers, a digital infrastructure company. Under this agreement, a battery system will be provided to Align's campus, which will allow that site to begin operating and expand its business years earlier than originally expected. Oregon's economic vitality depends heavily on high-tech manufacturing and digital infrastructure. Let me emphasize once more that at Portland General Electric, this increase in load is not hypothetical; for many years now, we have been meeting this large and growing customer demand for energy, quarter after quarter. At present, we are working alongside regulators and other stakeholders to ensure that costs are distributed equitably across customer segments. Industrial growth assists us in distributing fixed costs of our system over a bigger base, backing affordability for every customer. Risk management. Wildfire season has formally concluded within our service territory. Our thorough mitigation programs, run all year, carry on as we strive to produce results, fortifying the system, boosting situational awareness, and rolling out technology to safeguard our communities and enhance reliability. We understand that additional action is required to tackle the shared risk posed by wildfires and severe weather; we stay dedicated to collaborating with policymakers to discover substantive answers for these intricate matters. Everyone faces danger from wildfires, and we're working toward operational, legislative, and regulatory outcomes, plus other results, to deliver fixes for the whole of society. An energy future that can be invested in. Last, here's an update on our regulatory proceedings and the proposed change to how our company is structured. During the prior week, we secured the order on the Seaside Alternative Recovery Mechanism covering the largest standalone battery within our system. That order equals a positive outcome and carried support from the memorandum of understanding reached with the parties in the spring. This represents substantial progress in our ongoing collaboration with regulatory stakeholders; we appreciate the Commission's careful review along with the cooperation of staff and interveners. Our efforts related to the Distributed System Plan are moving along on the timeline we set, and we continue to expect that matter will be resolved in the early part of next year. In the same way, the cases concerning PGE's plan to create a holding company and a transmission company are advancing according to expectations. A procedural schedule has now been filed in the docket, and it sets a target of June 2026. The holding company proposal would align PGE's corporate structure with what is typical across the industry. Greater flexibility in financing becomes available through both the holding company and the transmission company, and that added flexibility will deliver advantages to customers as well as shareholders. We expect to keep working with stakeholders toward results that draw investment into Oregon and advance the long-term objectives of both our customers and the state. Now please turn to slide five, where our financial results are shown. For the third quarter, GAAP net income was $103 million, equal to $0.94 per diluted share; excluding GAAP items, net income reached $110 million, or $1.00 per share; that compares with GAAP net income of $94 million in the third quarter of 2024, or $0.90 per diluted share. Just as in Q2, our non-GAAP figures exclude business transformation and optimization costs tied to the customer affordability commitment, along with changes to our corporate structure. This quarter's numbers really show what our company is all about and how dedicated I am to running things tightly, pushing our plan forward, and creating worth for customers, communities, and shareholders. Everyone here is zeroed in on getting things done and producing outcomes, closing out 2025 on a high note and carrying that energy into even more wins down the road. Now, I'll hand things off to Joe. Joe.

Joe Trpik

executive
#3

Maria, thanks for that, and good morning to all of you. Our third quarter proved strong once more and shows how well our strategy is working. We're meeting considerable growth in demand while carrying out our cost management initiative with discipline and focus. If you'll turn to slide six, overall load rose 5.5%, and on a weather-adjusted basis it was up 7.3%, versus Q3 2024. Residential load went up 2.2% quarter over quarter, yet weather-adjusted it climbed 6.7%. Our residential customer count grew 1.2%. Commercial load was up 1.3% overall, or 1.9% weather-adjusted. On the industrial side, we had another quarter of significant expansion. Demand for Q3 was up 13%, and on a weather-adjusted basis it was 13.2%. The main driver was again the broad mix of data center and high-tech clients we serve. Given how much load has grown and what we expect for Q4 demand, we are updating our 2025 weather-adjusted load growth guidance to a range of 3.5% to 4.5%. Next, let me walk through the quarter-over-quarter drivers of earnings. Total revenues increased by $0.44. Of that, $0.16 came from demand growth of 5.5%, and $0.28 came from a higher average price of deliveries, which reflects better recovery. Power cost contributed a $0.24 decline. That figure reflects a $0.38 swing: favorable power cost in 2024 that flipped direction in this comparison, offset partly by a $0.14 gain tied to cost-to-serve load during Q3 2025, which came from steady market pricing along with the timing of power cost recovery. Lower operation and maintenance expenses added $0.06 to EPS, and that stems from the ongoing payoff of our cost management efforts as teams keep finding efficiencies and capturing savings throughout the business. A $0.23 reduction came from impacts tied to supporting our continuing rate-based investments and carrying out our financing plan — specifically $0.14 from depreciation and amortization, $0.05 from dilution, and $0.04 from interest expense. Other items gave us a lift of $0.07 per share. That figure includes $0.11 tied to a prior year deferral reserve that didn't repeat, plus $0.04 from assorted miscellaneous items. Then business transformation and optimization expenses pulled things down by $0.06, which left our GAAP EPS at $0.94 per diluted share. Once we adjust for that impact, Q3 2025 non-GAAP EPS comes out to $1.00 per diluted share. Turning to slide seven, let's look at the capital forecast. Our plan stays centered on growing transmission capabilities, optimizing how we distribute power, and keeping the generation fleet reliable. Maria mentioned it earlier, and indeed the 2023 RFP is moving closer to being settled, and the more than 1 gigawatt of solar plus battery projects now on the revised final shortlist is something we feel good about. Fourth-quarter acknowledgment from OPUC has been requested by us, and our expectation remains that these projects will come online by the close of 2027. Once negotiations wrap up and contracts get signed over the next several months, we'll revise our CapEx plan to reflect the incoming 2023 RFP projects. Taken together, these projects bolster our rate-based growth path as we meet the substantial demand we're seeing and further Oregon's clean energy objectives. Let's turn to slide eight, where we cover liquidity and financing. Total liquidity at the end of Q3 was just over $1 billion. Since the previous quarter, our investment-grade credit ratings and outlook have stayed steady. We keep observing robust cash flow metrics, among them a trailing 12-month CFO-to-debt metric above 20%. Regarding financing this quarter, we wrapped up our ATM pricing activity for 2025 to back our base equity need for the year. During August, we drew $49 million, and earlier this month, we drew another $72 million, both for rate-based investment and general corporate purposes; at present we have $137 million of equity priced but not drawn under our ATM, which covers our needs through the end of the year. As talks advance on the 2023 RFP projects, we'll take a hard look at what equity we actually require, and once our final CapEx numbers are set, we'll give you a clear picture of the financing side too. Alongside that, we remain in close coordination with key stakeholders regarding the proposed holding company formation — its purpose being to unlock meaningful flexibility while we chase the most cost-effective funding avenues for customers and shareholders alike. Such a structure could bring down expenses and open up choices in how we pay for essential grid investments, potentially removing the need for future equity related to both base and RFP CapEx. If we look at what we've accomplished across the past three months — or three quarters — and shift our attention to Q4, our results and disciplined execution are something we're proud of. We're making our operations more efficient, moving key regulatory matters forward, and keeping our attention squarely on meeting the rising demand in our region, creating value for customers, and rewarding shareholders. For the fourth quarter, we anticipate that load growth will keep affecting us, power costs will be somewhat favorable, financing tied to CapEx will contribute, and our cost management efforts will pay off. With the results we've posted through Q3 and what we can see ahead for Q4, our plan is still on track; we're restating our 2025 adjusted earnings guidance range of $3.13 to $3.33 per diluted share. What we've accomplished in 2025—supported by our pipeline of rate-based investments, enduring confidence in the territory we serve, and improved operational execution—has also firmed up our longer-term outlook. So because of that, our long-term guidance for EPS and dividend growth stays at 5% to 7%, and we're also holding to 3% growth over the long term through 2029. Looking at the rest of this year and what comes after, we're eager to keep executing our strategic plan: providing service that's safe, reliable, and efficient, pushing forward what matters for our companies, communities, and region, and getting the most value possible for our customers, communities, and shareholders. Operator, at this point we're ready to take questions.

Maria Pope

executive
#4

Good morning, Julien Dumoulin-Smith.

Julien Dumoulin-Smith

analyst
#5

Morning, everyone. Morning, Maria. Thanks a lot, folks, for making room in your schedules. I really do appreciate it. I'd like to kick things off by looking at the way energy deliveries have been moving. I mean, 3.5% — 4.5%, that's a strong trajectory across the entire year. Sure, we've witnessed a fair amount of fluctuation through the years, but based on the picture you're painting, one that's centered on data centers, in what way does that change or reshape any of your more distant outlooks? What sorts of things are you observing when it comes to this? It's clear that neighboring states are likewise experiencing some favorable upward adjustments too.

Maria Pope

executive
#6

Thanks. Julian, indeed, we've been quite lucky that this area has semiconductor production that is both strong and varied, plus a rising count of data centers. The majority of the data center projections we hold come from companies that have already completed construction of their buildings, along with those that are breaking ground and already possess sites. Our pipeline is genuinely robust and confirms our assurance regarding 3% growth over the long haul.

Julien Dumoulin-Smith

analyst
#7

Understood. All right. So far, no wild swings. Got it. Perhaps returning to what happens with the holdco — how do you expect that to move forward from here? I mean, any fresh perspective on that, given how it could clearly affect, Joe, the way you're thinking about financing as we approach 2026 and are only a month away? And separately, any input from that process, and so on. Clearly, it's a significant matter when you consider the priorities for 2026.

Maria Pope

executive
#8

Absolutely. I'll address the holdco schedule and what we're hearing from the parties involved, and then Joe can speak a bit more about financing; we're fielding a lot of questions about the transmission company specifically. There's discussion about what falls under the OPUC's jurisdiction as opposed to FERC's jurisdiction. My sense is that working through all of those questions will take some time, yet we're receiving very few questions concerning the holding company. That might present us with a window of opportunity to split the filings, perhaps extending the transmission company filing somewhat while bringing the holding company filing forward. I'd point out that our filing closely resembles others in the region, and Northwest Natural, not long ago, managed to wrap up their holding company filing ahead of the statutory allotted time. Joe, would you like to say a little about financing, since this gives us some opportunities?

Joe Trpik

executive
#9

Yes. Julien, good morning. When it comes to the holding company, we expect — knowing how the filings are moving forward — that we're going to run that holding company and employ it for financing in much the same way nearly every other utility in our industry has been using such a holding company. Under the appropriate circumstances, we're in agreement that we'll be able to replace some equity requirements. Right now, our financing metrics are solid. I noted that we sit above CFO. The figure we have for CFO at present exceeds 20%. We'll stay deliberate as we move toward the RFP results and as the holding company project or process develops, as Maria said, so that we can truly bring that into line with our financing plans once we gain more clarity.

Julien Dumoulin-Smith

analyst
#10

Great. Many thanks, everyone. Really appreciate it. Just one quick thing, and this is the last one, regarding the refresh along with the 2025 RFP — clearly both are moving forward at the same time — so what are the size and the breadth? What I mean is, the refresh looks like a pretty comparable set of opportunities in your case, yet you have both of these running simultaneously. Could there be a step-up in pace, or how are you viewing the schedule, considering the way all of this has sort of gotten pushed back, so to speak, when you consider future CapEx eventually flowing through?

Maria Pope

executive
#11

To start, I'd like to take us back to the rationale behind this; because of the one big beautiful bill, we still have investment tax credits along with production tax credits, which have been really significant in bringing down the total expense of clean energy and battery storage across our system. As I mentioned, counting our projects plus third-party contracts, that comes to approximately $2 billion, which is roughly what we can calculate as the benefit delivered back to this area. We are refreshing the 2023 RFP. As you saw, there are numerous tariff problems. We have an RFP centered on PPAs, and also the 2025 RFP. Joe, is there anything further you'd like to add regarding the timeline for when we might get resolution?

Joe Trpik

executive
#12

Julien, I believe the real point you're getting at is that you've touched on how large these two RFPs are. Clearly, the 2023 RFP we brought up contains a bit more than a gigawatt of capacity when you combine the solar and the batteries. That serves as our basis for both this RFP and the 2025 RFP, since we're speeding up the IRP action plan that was submitted, and the most recent midpoint update indicated that altogether we'll require 4,000 MW prior to the decade's end. Of course, you have to subtract. Once you account for the outcome of this 2023 RFP and certain PPAs, well, you'd anticipate that when moving toward the following RFP, in terms of both scale and schedule, ideally quicker, you might be looking at a need around 2,000 MW, possibly a bit more than that. We'll need to wait and find out. Numerous variables come into play there, once again: which additional PPAs get signed, where demand goes, how clean energy policy and plans shift; I'd anticipate a more substantial and vigorous RFP compared with the current one we're in the process of contracting.

Julien Dumoulin-Smith

analyst
#13

OK, everyone. That's where I'll stop. Thanks a lot. Enjoy your weekend.

Maria Pope

executive
#14

Thanks, Julien.

Sophie Karp

analyst
#15

Hello, and good morning, everyone. I appreciate you taking the time to answer my question. There are a few items I'd like to cover. Could there be a situation in which approval comes through for your holding company while the transmission company doesn't get the green light? I ask because you've noted that the questions appear to be clustered around the transmission company's side.

Joe Trpik

executive
#16

Good morning, Sophie. On that point, I'd say it's largely a question of timing — might the hold co and the trans co approval processes end up split apart, with the hold co coming through sooner? Yes, I believe that's the answer. Given the appropriate set of circumstances, that's something we could envision happening. Our expectation over the longer term is that both eventually secure approval, though we could envision a lengthier route for the transco. Much like with our finance, each one serves a very distinct financing purpose. In our view, the hold co is the one that currently generates greater value for both customers and shareholders, while the transco can afford a bit more time. So it's fine for it to take a bit more time to develop.

Sophie Karp

analyst
#17

That's really useful. So the big strategic thing here is transmission, isn't it? It brings those tails into the conversation with the transmission company. What would it take for you to shift CapEx and your focus away from generation RFPs and toward transmission instead? Could someone argue this is a better path to growth, given recovery mechanisms or demand, all sorts of factors you might weigh?

Joe Trpik

executive
#18

As things stand, and as our plan shows, we have $1.8 billion going to transmission spend, and that includes 2025. To your question about whether there'd be a reason to tilt more toward transmission, I do believe our growth is fairly balanced. If doing so truly served what our customers need and the clean energy plan, and also helped with affordability, that might be a situation where we'd push more toward transmission. At present, we're working to meet our customer's needs overall, and that has genuinely been a balanced approach of transmission and generation.

Maria Pope

executive
#19

When we look at the long run, and this has also been true historically, one thing we've learned is that a strong competitive landscape for building generation matters a great deal. We have to keep making progress so that customer prices can be pushed as low as they possibly can be.

Sophie Karp

analyst
#20

Sounds good. Thank you.

Joe Trpik

executive
#21

Thanks, Sophie .

Gregg Orrill

analyst
#22

Thank you.

Maria Pope

executive
#23

Good morning, Gregg.

Gregg Orrill

analyst
#24

Looking at the year-to-date and the financing plan, what assumptions sit inside your growth rate guidance regarding the commitments you've made around RFPs, and how are you weighing tax credit monetization against equity? What's your thinking there?

Joe Trpik

executive
#25

Sure. When it comes to the financing plan, here's where we stand. On the RFPs right now, we're assuming a structure split evenly, 50/50, and that figure is net of monetizing tax credits, which historically has run at a 30% credit. Just this year, we've turned roughly $150 million in tax credits into cash to cover what we need for financing. To your point — forgive me for throwing out another 50%, right? — our track record on RFPs has come in at roughly half of all the projects.

Gregg Orrill

analyst
#26

All right. Perhaps I could ask one more thing too. How are you viewing the expansion of the reliability contingency event structure, and where does that stand?

Joe Trpik

executive
#27

Right now, as part of the PCAM filing, we're engaged in talks regarding the RCE. In our view, the reliability contingency event has proven to be a fairly steady and useful instrument so far. We keep our attention on it and remain in conversation with them. Would we want a mechanism of that kind to move forward so that energy cost is better aligned? Certainly, since it assists in backing our broader strategy for pricing energy more efficiently. That conversation is ongoing at present. I'm not sure I truly wish to estimate its odds. I recognize this is more of a wider conversation about the way to tackle energy costs in this jurisdiction. I'll simply note it's a valuable instrument. It serves us well at this time, and we'll keep striving toward making it as up-to-date and effective an energy recovery mechanism as possible alongside our regulator.

Maria Pope

executive
#28

Greg, I want to expand on that point a bit. The incidents we experienced in January 2024 affected other utilities in the area as well, and we observed comparable problems throughout the whole Pacific Northwest and West Coast when it came to energy markets. Our exposure to those storms was fairly comparable to that of other utilities. Over a longer horizon, we're pursuing participation in the California Independent System Operator's energy day-ahead market. Our target for going live is October of next year. That is going to substantially transform how we procure energy overall. I'm not entirely convinced that the PCAM mechanism alongside the RCE will remain the optimal approach moving forward. We will need to bring the state's policies into line with the wider market, since we're increasingly focused on scheduling and optimization of energy rather than managing and purchasing energy.

Gregg Orrill

analyst
#29

Thanks. Appreciate you taking the question.

Maria Pope

executive
#30

Good morning, Shar.

Constantin Gonciulea

analyst
#31

Hello there. Morning to everyone. This is Constantin speaking on behalf of Shar. I appreciate you letting me ask. Perhaps we can do a small bit of tidying up first. Given roughly a 5% increase in load for the quarter and the rise across the entire year, does that warrant inclusion in our financial projections? At what point would this stronger load growth begin to carry greater weight inside the underlying financial plan?

Joe Trpik

executive
#32

Morning, Constantin. Yes. Regarding load growth, and your inquiry about how it pushes more into the plan, that happens once we provide clarity and secure the tariff tied to margin. At present, the fresh data center tariff sits with regulators awaiting finalization. Having the ability to capitalize on that expansion at a steadier margin yields two outcomes. First, it offsets expenses for our residential and other customers. Second, should this growth materialize, it will add incremental worth; on our end, we're somewhat in a holding pattern. We anticipate that tariff. It will come whenever it comes. That moment will serve as a solid checkpoint for realizing some value. I think that's set for March.

Constantin Gonciulea

analyst
#33

All right, so that's roughly the point at which you'd begin folding some of that into the forward-looking financial plans?

Joe Trpik

executive
#34

Yeah, I believe that's where you'd start to be in a position to spot it — assuming that growth keeps showing up, you'd begin to price that growth somewhat differently, and then you could start figuring out whether incremental value exists in it.

Constantin Gonciulea

analyst
#35

Alright, that's great.

Joe Trpik

executive
#36

The reason being, your cost structure will be straightforward.

Constantin Gonciulea

analyst
#37

One more question regarding the 2025 RFP process. You mentioned certain takeaways are being folded into it. Because this process moves in cycles and given what generation requires, should we adjust our long-term modeling in any way—things such as volumes or ownership—particularly after what happened in 2023?

Joe Trpik

executive
#38

On ownership and matters of that sort, I don't believe so. What I'd say is we keep collaborating with the Commission through an approach that has multiple fronts. If you were to ask me at this moment what the central point is for 2025, I'd say this: we've sped things up, correct? What's different now is that rather than running the RFP sequentially, we're running it concurrently, with the goal of maximizing the value of available credits. That's baked into the design. We'll keep striving to strike a balance in procurement between ownership and PPAs. At present, the biggest shift is extracting as much tax credit benefit as possible from these projects. That might mean moving projects ahead of the date requested under the RFP. Beyond that, I don't anticipate further adjustments, apart from carrying on our work with every stakeholder to stay aligned with the market.

Constantin Gonciulea

analyst
#39

Great. That's ideal. Thanks.

Paul Fremont

analyst
#40

Much appreciated. For 2025, you mentioned roughly $150 million in tax credits, and I believe you've referenced something like $2 billion. Could you provide an approximate yearly figure for the tax credits you anticipate capturing?

Maria Pope

executive
#41

Essentially, what we're examining is a range starting at 30% and going higher for renewable energy projects and battery storage; our ongoing priority will be to capture the maximum amount of both ITCs and PTCs that are available. We decide between the two by evaluating net present value. Solar and batteries have a tendency to favor ITCs somewhat more, while wind has a tendency to favor PTCs somewhat more. This represents a key method through which we're returning federal funds to lower customer prices for renewable energy and generating investment opportunities with the state of Oregon and across the region.

Joe Trpik

executive
#42

Paul, I should also mention that some cyclicality exists because of how these cash flows work. When we take on these projects, the ITCs will arrive for the RFP. Clearly, the thing we're discussing at this point, and what you're observing in this year's cash flows, includes both the leftover ITCs originating from last year's Constable project and the ITCs tied to the Seaside project in this year. If you look at it on an annualized basis, what serves as our foundation is the PTCs connected to our wind projects — roughly $50 million per year. That cyclicality would involve the ITCs stemming from RFP projects, at minimum. That's how cash flows stand right now.

Paul Fremont

analyst
#43

Regarding wildfires, when the legislature took action last year, I believe someone put forward a plan to establish a fund worth $800 million. Would that figure strike you as sufficient, and is a wildfire fund of $800 million the kind of thing you'd want lawmakers to set up? What else would you be looking for them to do?

Maria Pope

executive
#44

Sure. Legislators and stakeholders throughout the state and the region remain in active dialogue with us. This isn't solely a matter of legislation. Regulation plays a part in the approach too. A short session lies ahead in the coming year. It runs roughly five weeks. Statewide priorities are numerous, so results from the legislature might be greater in 2027 than in 2026. When it comes to regulation, our collaboration with regulators and staff on solutions carries on. To begin with, everything we undertake operationally to lower wildfire risk. Our wildfire plan lays all of that out, and clearly, the recovery tied to it, plus standard of care, and additionally self-insurance mechanisms and similar items.

Paul Fremont

analyst
#45

Great. For our final question this year, could you tell us whether you anticipate any regulatory lag when it comes to earning your authorized ROE? Should lag exist, what amount in basis points do you think that would come to for this year?

Joe Trpik

executive
#46

Through the method we've used this year — the Seaside battery method plus cost management — we've attempted to apply some downward pressure to narrow that lag. Our estimate is that we're now at roughly 70 basis points or fewer, which is what we anticipate seeing at present and going forward, as we strike a balance among a variety of regulatory filings and cost management.

Paul Fremont

analyst
#47

My apologies — did I hear you say 3 basis points?

Joe Trpik

executive
#48

That's not what I said. What I said was 70 basis points.

Paul Fremont

analyst
#49

70 basis points. My mistake. Alright.

Joe Trpik

executive
#50

Correct. Just to keep in mind, that reflects a narrowing compared with what we'd seen in prior periods.

Paul Fremont

analyst
#51

So going forward, you'd anticipate keeping things around that same mark — that 70 basis points ahead?

Joe Trpik

executive
#52

Correct, that's our plan. As our cost management efforts keep maturing, we intend to keep pushing that figure lower. Once we're fully executing and deep into the cost management program in 2026, we'd look for at least a bit more of a squeeze there.

Paul Fremont

analyst
#53

So in different terms, how low might that figure go?

Joe Trpik

executive
#54

The specific amount hasn't been made public by us. What I'd say is that we view this as a trade-off as well. When we consider the coming year, with the DSP serving as our regulatory strategy alongside cost management and other factors, we tend to treat these as a collection of levers that support our ongoing effort to stay inside our earnings range. Being as disciplined as possible is something we aim for.

Paul Fremont

analyst
#55

I really appreciate it. That's all I have.

Maria Pope

executive
#56

Thanks.

Maria Pope

executive
#57

Good morning, George.

George Sanoulis

analyst
#58

Appreciate you fielding my question. Good morning. The DSP was submitted in July, I realize that, but I'm curious whether you'd held any early conversations with stakeholders prior to submitting it. Since the Seaside case wrapped up with an outcome that was balanced, might we expect something similar in the Distributed System Plan case?

Joe Trpik

executive
#59

Good morning, George. When it comes to the DSP, in line with how the Seaside filing went, an MOU existed. There's an MOU we've got with them. That MOU also covers the DSP. From a POV standpoint, just to recall, the rationale behind how we handled the DSP was truly about creating clarity for stakeholders, correct? The DSP is a docket that's been filed and accepted, setting out more or less our action plans for the distribution. We believed you reach that clarity by saying there will be a case centered on projects that are agreed to deliver benefits for customers. Applying that, and then turning to Seaside — with Seaside, we believed the MOU truly, and having an MOU plus putting in the time beforehand, genuinely let us hold a focused conversation and a constructive conversation and result when we consider both the testimony and some of the intervenor interwork. We'd anticipate that carrying on here with the DSP.

George Sanoulis

analyst
#60

Great. Thanks for laying that out so clearly. Could you share a bit about your intentions for GridCARE — what early trials you've already run or intend to run, and when you anticipate measurable effects that would free up extra system capacity?

Maria Pope

executive
#61

Sure. To begin with, the chance we've identified through working alongside GridCARE genuinely excites us. It grew out of efforts alongside other emerging businesses and forward-thinking firms connected to Silicon Valley and Stanford School of Engineering. What the initiative does, in essence, is absorb a massive volume of information through artificial intelligence-driven analysis. It calls for computing power beyond what most setups can handle, which is why we turned to Stanford for that effort. At present, roughly 80 MW has been unlocked, though only within a fairly limited slice of our network; we anticipate moving further. I'd add that artificial intelligence-driven analysis isn't the whole story. Dynamic line ratings matter too, since they supply far more detail about temperature and wind speeds, allowing more capacity to be freed up. Placing battery storage at various points throughout our service territory amplifies what we can accomplish, letting us extract the greatest possible capacity from transmission infrastructure both existing and new.

George Sanoulis

analyst
#62

Excellent. That’s all from me. Thanks very much.

Maria Pope

executive
#63

Thanks.

Maria Pope

executive
#64

Thanks. I’m grateful to each of you for being here with us today. We value the attention you’re giving Portland General, and we look forward to speaking with you before long. Specifically, I expect a good number of you will be present at EEI in Florida before much time passes. Many thanks. Enjoy the rest of your day, and have a pleasant weekend.

Operator

operator
#65

That brings us to the end of today's conference call. We appreciate your participation, and you're welcome to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Portland General Electric Company transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Portland General Electric Company earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Portland General Electric Company or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.