Power Mech Projects Limited (POWERMECH) Earnings Call Transcript & Summary

November 13, 2025

National Stock Exchange of India IN Industrials Construction and Engineering earnings 67 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, ladies and gentlemen, and welcome to the Q2 FY 2026 earnings conference call for Power Mech Projects Limited. Just a reminder that every participant line will be in listen-only mode, and you'll have a chance to ask questions once the presentation wraps up. If you need help at any point during this call, please signal your operator by pressing star, then zero on your touch-tone phone. Please be aware that this call is being recorded. I'll now hand things over to Teresa John. Thank you, and over to you, ma'am.

Teresa John

analyst
#2

Thanks, Shruti. From everyone at Nirmal Bang Institutional Equities, I'd like to extend a warm welcome to all of you on this Q2 FY 2026 earnings call for Power Mech Projects Limited. Joining us from management today are Mr. Rohit Sajja, Whole-time Director; Mr. S. K. Ramaiah, Director of Business Development; and Mr. N Nani Aravind, Chief Financial Officer. At this point I'll pass things to Aravind for his opening remarks, and after that we'll open the floor for Q&A. Thanks, and over to you, sir.

Aravind N Nani

executive
#3

Good morning, everyone. I'm Aravind, the company's CFO. Joining me are Mr. S. K. Ramaiah, Director of Business Development, and Mr. Sajja Rohit, Director of Business Development and Operations. I'd like to take this chance to welcome all of you to our Q2 FY 2026 Earnings Call. During the Second Quarter of Financial Year 2025 to 2026, the company's performance stayed in line with the targets we set, reflecting steady operational momentum. In Q2 Financial Year 2026, total income came in at INR 1,249 crore, which is a 19% rise over the INR 1,046 crore posted in Q2 FY 2025. EBITDA was INR 158 crore, an 18% increase from INR 134 crore in the same period a year earlier, and profit after tax reached INR 78 crore, growing 12% compared with INR 70 crore in Q2 FY 2025. The EBITDA margin held steady at 12.7% versus 12.8% last year, slightly affected by higher operating costs. The PAT margin fell from 6.7% to 6.3%, mainly because of greater finance and depreciation costs. Turning to the half-year FY 2026, the company put up a strong showing during the first half of FY 2025 to 2026, sustaining growth momentum across key parameters. In half-year FY 2026, total income was INR 2,554 crore, a 24% increase over INR 2,062 crore in half-year FY 2025.

Aravind N Nani

executive
#4

EBITDA came in at INR 340 crore, a 33% increase from INR 257 crore in the same period a year earlier, and profit after tax was INR 159 crore, comparable to INR 131 crore in half-year FY 2025. The EBITDA margin improved from 12.5%-13.3%, helped by the exceptional revenue recognized from the River Bed Mineral Project in the prior quarter. PAT margin, though, dipped slightly from 6.4% to 6.3%, mainly on account of higher finance, depreciation, and tax costs. On the revenue mix for Q2: mechanical business brought in INR 435 crore, up by 90% from INR 229 crore in Q2 FY 2025, driven by strong traction in industrial power construction projects. The civil segment, which includes railways and water distribution projects, posted INR 309 crore, down by 22% from INR 395 crore in Q2 FY 2025, hit by extended rains on key projects and delayed bill certifications in the water division. O&M contributed INR 440 crore, up by 12% from INR 391 crore, aided by new O&M orders received during the year. Electrical business reached INR 22 crore, up 138% from INR 9 crore in last year FY 2025, thanks to execution of railway, civil, and signaling telecommunication works during the year. Mining business came to INR 31 crore, up by 164% from INR 12 crore of last year, supported by higher off-take arrangement from sale.

Aravind N Nani

executive
#5

Other income came in at INR 11 crore versus INR 10 crore in Q2 FY 2025, primarily due to margin money deposits — an increase in those margin money deposits. For the quarter, the geographic split stood at 95% domestic and 5% international, and the power sector's contribution was unchanged at 79%, with the non-power sector making up the remaining 21%. Revenue mix for six months: in the first half of FY 2026, the company's revenue mix comprised the mechanical business at INR 658 crore, a rise of 99% from INR 331 crore in H1 FY 2025, fueled by strong traction in industrial power construction projects. Civil segments, which include railway and water distribution, came to INR 890 crore, a decline of 5% from INR 937 crore in H1 FY 2025, hit by extended rains at key sites and delayed bill certification in the water division. The O&M division posted INR 837 crore, up 14% from INR 732 crore in H1 FY 2025, helped by new order inflows during the period. The electrical business reached INR 89 crore, up 427% from INR 17 crore in off-year FY 2025, reflecting strong execution in railway and civil works and signaling and telecommunication works. Mining business stood at INR 57 crore, up 122% from INR 26 crore in off-year FY 2025, backed by an increased off-take arrangement with sale.

Aravind N Nani

executive
#6

On the other income side, we saw INR 22 crore versus INR 19 crore in off-year FY 2025, and that was mainly because of higher margin money deposits with banks. Turning to the financial parameters, the company has seen a marginal reduction in return on equity, from 3.4% in FY 2025 to 3.37% in FY 2026, largely on account of higher finance and tax costs, which impacted PAC. In a similar way, return on capital employed moved down slightly, from 4.73% to 4.58%, driven by lower operating margins stemming from seasonal factors such as extended rains. With the anticipated normalization in collections, along with continued strong traction in industrial power construction and the ramp-up of MDO revenue from the KBP mines starting Q3, both ROE and ROCE are expected to improve in the coming quarters. The company's negative operating cash flow has improved, going from INR 166 crore negative in off-year FY 2025 to INR 63 crore negative in off-year FY 2026, primarily because of the realization of receivables during the period. The company is actively engaging with the clients to expedite certification and clearance processes, and it is confident of realizing the outstanding dues in the coming months. This is expected to further improve the operating cash flow and reduce the reliance on the working capital limits.

Aravind N Nani

executive
#7

Net current asset days—leaving out cash and cash equivalents—rose to 151 days in FY 2026 from 128 days in FY 2025. The main reasons were delays in waterworks certification and in collecting receivables. Those delays pushed current assets higher. Management is working hard with the client to get certification and payment clearance, and it expects a meaningful improvement in the net working capital delays once certification happens and bills in the water division are realized. Gross and net debt stayed well controlled even with the delays in water bill certification and receivable collection. Gross debt as of 30 September 2025 was INR 839 crore, and net debt was roughly INR 360 crore. The average debt-equity ratio on that same date was 0.37x. The company is concentrating on speeding up certification and recovery of bills in the water division, which should bring net debt and the debt-equity ratio down further over the coming quarters. Order book status: in Q2 FY 2026, the company won new orders totaling INR 1,042 crore. As of 30 September 2025, the order backlog was about INR 53,776 crore, and the executable order—excluding two MDO projects—was INR 14,226 crore. So far in Q3 FY 2026, the company has received new orders worth INR 2,577 crore, lifting the total order backlog to INR 56,353 crore, while the executable order book excluding two MDO projects has grown to INR 16,804 crore.

Aravind N Nani

executive
#8

We keep bidding actively on tenders, and our aim is to lock in INR 10,000 crore of fresh orders by March 2026. We expect order inflow to rise considerably during FY 2026, especially from the power sector, spanning segments such as O&M, mechanical, civil, construction, and BOPEPC. To date we have already booked INR 4,889 crore of orders, which works out to roughly 49% of the annual target. We will keep focusing on high-potential areas — industrial plant operations and maintenance, railway and water infrastructure, and MDO projects — to generate meaningful growth and reinforce our market leadership. Every ongoing project is moving along well and stays on schedule, with the exception of the water division, where slower bill certification, caused by funds not being allocated, has led to delays. For financial year 2026, we have set a revenue target of INR 6,500 crore. Depending on how quickly the MDO business gains traction, EBITDA margins should hold in line with FY 2025 levels, and we are confident of delivering roughly 25% year-on-year revenue growth. We expect margins to stay stable, with possible upside tied to the contribution mix from O&M and mining segments. The order book outlook for this financial year remains strong and supports our growth trajectory.

Aravind N Nani

executive
#9

Power Mech is in a strong position to show execution and conversion of roughly 40% of its opening order book each year. On top of that, the MDO business is ramping up steadily, and we expect both the O&M and MDO segments to be key growth drivers in the years ahead. Turning to our MDO business, the focus is a concern. KBP Mining has finished mobilizing heavy equipment, and mining operations began on 15 April 2025. Through October 2025, the company has achieved about 6.15 cubic meters of overburden removal, and that activity continues as planned. Coal production is expected to start in November 2025. The mine approach roadworks are underway, and the company is targeting a minimum coal dispatch of 1 million tons during the year, with a plan to scale operations up to 1.5 million tons. All land required for mining has been handed over to CCL. At the other second mine, the Kalyaneswari Tasra project, OB removal and coal dispatch operations have been ongoing since January 2024, with approximately 8.7 lakh tons of coal produced and dispatched to the existing washeries as per the sale direction. The project received environmental clearance for the 3.5 million tons per annum washery in October 2024.

Aravind N Nani

executive
#10

Design consultants are now in place. For the railway sidings and washery development, design consultants have been brought on board. The design of the major washery equipment and the finalization of vendors are done. Mobilization of equipment is underway, and civil construction work has started. Completion of the washery construction is targeted for September 2026. The phase one R&R colony, spread over 4.5 acres, is finished and has been handed over to the project-affected families. Handover of the colonies to the project-affected families is ongoing. Approvals for phase two, covering 41.11 acres, are presently being processed. Although current coal off-take in sales stays under plan because of limited external washery capacity, the company is actively engaging stakeholders to resolve these constraints and ramp up production in the months ahead. With that, I now request Mr. Ramaiah Garu to give an update on the key business development initiatives and the future outlook.

S.K. Ramaiah

executive
#11

Yeah, thanks, Aravind.

Aravind N Nani

executive
#12

Go ahead, Guru.

S.K. Ramaiah

executive
#13

Well, Aravind, on the several points you raised — no, I believe, as Aravind correctly put it, this business keeps moving ahead at a bullish pace thanks to government initiatives in infrastructure and new projects, along with many other initiatives that have been undertaken. And at this point, the private sector is also catching up. As a company, we have an all-round spread across many segments: power, infra, then railways, roads, and exports as well. We're well positioned to capture these opportunities, and there can be some variation on a quarter-to-quarter basis when it comes to investments and how the tendering schedule has played out. And in particular, our main areas of focus will be BHEL and then L&T, the EPC contractors that have taken the bulk of orders from developers, NTPC and the generating companies. So a substantial flow is expected there in terms of ordering over the next six months, since the initial order pickup was somewhat slow owing to the engineering phase involved. And that's where we anticipate more opportunities. And the other key developers are the Adani Group, where we have built a substantial presence across many projects at about 6,000 MW and are working on roughly 2,500 worth of opportunities.

S.K. Ramaiah

executive
#14

Apologies — those projects are still underway. On top of that, there's a lot of ordering left to place for the new projects, since Adani is going all in on them. Adani has already picked up over 22,000 MW, while NTPC has taken close to 12,000 MW — actually more than 12,000 MW. Between the two of them, they account for a big share of the 47,000 MW of orders placed over the last 18 months. So a meaningful amount of ordering still lies ahead in the main power plant segment, and that could unlock an opportunity worth somewhere between 30,000 crore and 45,000 crore across ETC, civil, structural, and other miscellaneous projects. One more important point on this capacity build-out: yearly capacity additions, which have risen sharply, are projected to reach 8,000 to 10,000 MW. And in O&M we hold a very strong position and have substantial market penetration. We expect roughly 1,200 to 1,500 lots of opportunities to come up each year over the next five years, driven by the capacity being added. That covers one piece of the power sector business — the roughly 47,000 to 48,000 MW that developers have ordered.

S.K. Ramaiah

executive
#15

However, there's a continuing investment that will come with the new developers. Another 40,000 to 45,000 MW sits there. Depending on the development phase and so on, that probably gets ordered over the next two years. So we anticipate a bullish stretch in power sector development, for our traditional construction business, the civil works, structural works, and other miscellaneous works. And after commissioning, the O&M lasts at least seven to eight years. That's one of the key points. Now, the new business areas we're focusing on are particularly infrastructure, railways, and we're tracking roughly INR 30,000 crore of ongoing opportunities. That should carry us reasonably well toward the targeted program of achieving order booking of around INR 10,000 crore. And the other new investment expected is in the steel sector, which is opening up in a big way. SAIL in particular is planning to invest more than INR 1 lakh crore. And IISCO Burnpur has already begun issuing the pre-tender inquiries, and we are participating in that. That's mostly tied to those station jobs, service jobs, and civil structural work, which is our domain strength.

S.K. Ramaiah

executive
#16

We expect somewhere around INR 8,000 crore to INR 10,000 crore over the coming three to five months. That's a big investment focus for us. Other sectors have opportunities too. Take NMDC, for instance — they've planned INR 50,000 crore of investment to raise iron ore capacity from 50 million tons to 100 million tons. We're talking with NMDC on an ongoing basis. NMDC has also kicked off the tendering process. Three BOT tenders have already been notified: two at NMDC Kirandul, one at Donimalai. That's one area of interest, since demand for iron ore is going to be there, and we'd like to explore how we can get into that business, drawing on the expertise we've built in the MDO business and the BOT business. So those are the two significant developments possible over the next six months, and as I said earlier, the tenders currently underway worth roughly INR 30,000 crore to INR 35,000 crore are on track, and that should position us reasonably well to hit a target of about INR 10,000 crore, and on export jobs as well, on the O&M side and the maintenance side, certain initiatives are being undertaken.

S.K. Ramaiah

executive
#17

That's going to happen, and on the O&M side as well, we had a few wins this year too, and given the commissioning schedule for the remaining new plants and all of that, we're keeping track of it, and that should stay a continuous focus. That's what I wanted to say. Thanks. Thanks to the team.

Operator

operator
#18

Thanks. We’re moving into the Q&A portion now. To ask a question, you can press star and one on your touch-tone phone. If you’d like to drop out of the question queue, press star and two. We ask participants to use handsets when asking a question. Ladies and gentlemen, we’ll pause briefly while the question queue is put together. The first question comes from Vinay at HATHWAY INVESTMENT. Please go ahead.

Vinay Nadkarni

analyst
#19

Yeah, I just wanted to get a sense of how much you have outstanding in receivables from the JJM projects.

Aravind N Nani

executive
#20

The receivable, sir, comes to roughly INR 226 crore.

Vinay Nadkarni

analyst
#21

INR 226 crore. And following that, during the last one year, no funds have been allocated toward this project, and work carried out amounting to INR 220 crore is currently under certification. So INR 446 crore represents the combined total of receivables and WIP. Okay. And how much of your total books consists of unbilled revenues?

Aravind N Nani

executive
#22

220 crore Indian rupees.

Vinay Nadkarni

analyst
#23

No, that applies to JJM projects. But what about the overall picture?

Aravind N Nani

executive
#24

All told, it comes to roughly INR 960 crore.

Vinay Nadkarni

analyst
#25

Okay. And sorry — what was it you were saying?

Aravind N Nani

executive
#26

That's INR 160 crore. And within that, once you take out the INR 220 crore, what's left is roughly INR 700 crore from the regular operation business.

Vinay Nadkarni

analyst
#27

All right, just on one point: your reliance on the power sector, particularly thermal power plants, is quite substantial. Looking long term, in a post-2030 scenario, might we see any sort of decrease there from an environmental standpoint? And how would the company view that? It's a very long-term matter, but still.

S.K. Ramaiah

executive
#28

That's exactly right. In the end, CO2 emissions must decline across the entire scenario. And this is a near-term measure spanning seven to eight years, because to sustain the— I believe we've gone over this reachability question repeatedly. That's precisely why the government's plan involves adding 80,000 to 100,000 MW. But ultimately, what occurs is that these power plants must also operate for at least another 25 to 30 years. Then around 47 to 50, perhaps they'll be seeing a declining trend in emissions along with decommissioning of the plants. But what will exist is ups and downs in the ETC segment business and in civil and structural over the coming five-seven years. Yet afterward, O&M will still be present. As a product of the O&M business, it will rise substantially—as I mentioned, INR 1,200 crore-INR 1,500 crore represents the opportunity, and we hold enormous market penetration and ownership there. That ought to keep climbing in a major wave. So to some degree, that will certainly be offset. But the other scenario is that in the non-power sector, steel sector, infrastructure side, and then petroleum and this one, the oil and gas sector too, new plants are anticipated.

S.K. Ramaiah

executive
#29

And that’s an area where we can potentially seek diversification, drawing on the experience we’ve built up. Take Andhra Pradesh — they’re planning a plant with 60,000 crore of capacity. Then Madhya Pradesh is coming up as well. Steel plants are also being planned. SAIL has spoken to you about 1 lakh crore of investment. ArcelorMittal is coming in. JSW is coming with a huge investment in Maharashtra. So across all these regions, the company already has a certain degree of penetration, expertise and experience. And that will be strengthened in the places where these gaps will definitely emerge. So we’re confident that we will sustain our growth.

Vinay Nadkarni

analyst
#30

Thank you, sir. Many thanks.

Operator

operator
#31

Thanks. Our next question comes from Mohit Kumar at ICICI Securities. Please go ahead.

Mohit Kumar

analyst
#32

Good afternoon, sir. My first question concerns the big BOP opportunity, particularly from companies such as NTPC. So there was Gadarwara, and I believe there was one more, Nabinagar. Then the third one that I think will come up for bidding is Telangana. I don't think we have taken part in those large BOP opportunities, whether Gadarwara or Nabinagar. I just want to understand: is it that we lack pre-qualification for the large opportunities, or do you think it isn't wise for us to bid on the large projects? What is holding us back, such that we aren't even participating in those large tenders?

Rohit Sajja

executive
#33

Yes. Mohit, sir, Rohit here. Thank you for that question. I believe it's quite pertinent, particularly given that we recently secured a BOP order with BHEL for the Singareni Thermal Power Plant in Telangana. So when those tenders were originally conceived, NTPC adopted a somewhat different pre-qualification approach, under which we could only qualify as a consortium partner alongside other players bringing in certain expertise. Then, subsequently, a further evolution took place, and this pre-qualification criterion emerged. And through it, we are qualifying and moving ahead, and NTPC has likewise opted for a bulk tender route, correct? So I think our emphasis is largely on unit capacities where either one unit of 800 MW is being established or two units of 660 MW are being established. And going forward, you should see us taking part in many of these tenders.

Mohit Kumar

analyst
#34

Okay, that covers the latest on this. Got it, got it. So Nabinagar is still outstanding. Nabinagar ought to be coming along within the next one year, which means we should be in a position to take part — is that correct? Is that a fair way to see it? Because as I understand it, Gadarwara and Nabinagar are finished, and we aren't among the participants there. And there's also a big opportunity on their side coming from most of the states, correct? In most of the states, BHEL has won — BHEL has taken the tender. So what does the BHEL pipeline look like at this point? We've been seeing quite a few tenders coming from BHEL's side. Is it only certain types of packages that we're after, or do we also have the ability to handle this CHP, AHP as well? Yeah.

S.K. Ramaiah

executive
#35

Look, we've built know-how not just in the conventional ETC business, the O&M business, and the power sector. We've also built the expertise to handle one of the key packages within balance of plant, plus the supporting packages for coal handling as well. That is, we've completed roughly 4 or 5 contracts. And we've picked up that experience along the way. That ought to stand us in good stead, but fundamentally, BHEL's outlook will be that they'll keep driving the orders because L&T is there. Unless the government makes a policy decision to bring the equipment in from outside, I don't think that's going to happen, and BHEL had this wherewithal capacity to do 16,000 to 18,000, 16,000 MW per year a couple of years back, and naturally, we've witnessed the downward trend and all those things happening. Now it has picked up, and looking at the long-term investment, at least 7 to 8 years, BHEL should be ramping up their capacity. They should be reasonably able to bid for all these things. They'll keep being a key player because, as I said, the 47,000 MW that has been ordered by the developers. Still some substantial ordering has to be done by the various vendors like Adani and even NTPC for the new tenders, what they're going to call.

S.K. Ramaiah

executive
#36

And then you have the utility companies—all of them—holding a share above 12,000 MW. That capacity must be added too. Naturally, they've begun placing orders to some degree. After that comes the remaining ordering tied to the 46,000 MW of new developments I mentioned, which are going to move forward. So these 46,000 MW represent a significant portion of the orders expected to arrive over at least the coming two to three years, and BHEL should capture a reasonably large share, with L&T picking up some as well, and we ought to have a long-term plan in place for executing at minimum eight to 10,000 MW over the next 10 years,

Aravind N Nani

executive
#37

Then Mohit, sir, to build on what you said, sir: the BOP package we recently secured requires us to build a coal handling plant and an ash handling plant — expertise we've honed over the years as a construction company — and now we're simply bringing engineering in as an added capability. We've teamed up with Tata Consulting Engineers, TCE, and procurement, of course, is a commercial activity in any case, which is why we're entering this space. Also, moving ahead, as I mentioned before, we'd like to take part in state utility projects that are either separating the BTG and BOP or handing the whole plant to an EPC player such as BHEL. And in that case, we're happy to subcontract under BHEL or L&T to handle the BOP EPC works and the BTG erection works.

Mohit Kumar

analyst
#38

Got it, sir. Thanks, and best of luck to you. Thanks.

Aravind N Nani

executive
#39

Thank you.

Operator

operator
#40

Thanks. Our following question comes from Mahesh Patel at ICICI Securities. Go ahead.

Mahesh Patel

executive
#41

Yeah. Hello, sir. Thanks for the chance. So my first question concerns the steel opportunity you brought up, right? Just if you could explain what exactly we are doing there and how big our opportunity is in terms of, if we consider the cost of a steel plant, say, CapEx for one MTP, how much would our opportunity be, if you can quantify?

S.K. Ramaiah

executive
#42

Since the government's long-term investment strategy involves roughly INR 10 lakh crore over the coming five to seven years. Since steel capacity right now stands at 200 million tons, and production last year came in at 102 million tons. By 2030 to 2032, that needs to rise by 300 million tons of capacity addition. And as we've observed, a 4 to 5 million steel plant requires somewhere around INR 35 to 45 thousand crore in investments. And every player, for instance, SAIL has a clear plan in place that they established. First, I believe it's IISCO 14. They'll have a plan for the Bokaro and then Bokaro expansions as well. ArcelorMittal is arriving with the greenfield plant in Andhra Pradesh, and some expansions will be there. JSW Mittal and JSW, and then JSPL, both are planning capacity additions. Some new players are also coming up. For example, Rashmi Group is coming with an investment of about INR 10,000 crore. There is a group available in this one, Balarim-based mining groups also. They are also planning investment of about INR 15,000 crore-INR 20,000 crore. Therefore, the total investment of more than INR 3 lakh crore will happen because of the continued growth of the upward series into the growth of the economy.

S.K. Ramaiah

executive
#43

With economic expansion, demand for steel will naturally need to be present as well. In fact, a lot of steel suppliers are voicing the same complaint: "Why are we bringing in material from abroad too?" So we already have experience from constructing steel plants at JSW Dolvi and then JSW Vijayanagar, and at present we are handling some work at JSPL, and our construction know-how, our O&M know-how, and our project management know-how, which we have built up over the years in the power sector, will be put to good use in the steel sector, and in mining too, for instance L&DC jobs and the mine site facilities that they are going to build. So this is where we hold a fairly bullish view on these two areas.

Mahesh Patel

executive
#44

And sir, regarding MDO, what production level should we expect in FY 2026 and 2027?

Aravind N Nani

executive
#45

First, the mine we acquired — CCL, Central Coalfields Limited. Before March 2026, we expect to produce 1 to 1.2 million, and that should translate into INR 140 crore to INR 150 crore in top line. The second mine, the one we took with SAIL — the 4 million metric tons per annum one — before March 2026 we anticipate doing 360 to 400,000 tons. We're already on track there. Half of that is already done. In terms of total, this should translate to INR 57 crore to INR 65 crore.

Mahesh Patel

executive
#46

Alright, thank you very much.

Aravind N Nani

executive
#47

In FY 2027, both mines are going to ramp up substantially. During FY 2027, at the KTMPL mine, the 4 million metric tons per annum with SAIL — we expect to hit peak rated capacity there. The first mine where we're doing 1 million will be scaled up to between 2.5 and 3 million by FY 2027, which works out to a combined top line of INR 550 crore to INR 600 crore.

Operator

operator
#48

Thanks. Our next question comes from Pratish with Lucky Investment Managers. Go ahead.

Analyst

analyst
#49

Sir, just an observation, and I’m not sure how the company views this. If you look at the last half—basically what is now the first half—and also the second half of last year, you can see financial deleverage starting to kick in as debt rises because some receivables have been stuck, working capital has been expanded, and investment has been made in the coal assets, which is not yielding the desired revenue. If you look even at your coal business, the coal plants have been postponed by more than 1, 1.5 years easily. So how are we reviewing this situation? You may have your 15%-20% top line growth, but nothing is flowing down to the bottom line. So how should we, as management, be viewing this situation? What did you say? What are the guardrails? What steps have been taken?

Aravind N Nani

executive
#50

The big jump in working capital utilization comes from spending on Jal Jeevan Mission water receivables. If you look at March, I had a receivable of roughly INR 287 crore, and as of September, it stands at 200.

Analyst

analyst
#51

So we’re aware of the figures. Those figures are known to us. What ought we to do? We have the figures. We understand the incremental opportunity in the inflow.

Aravind N Nani

executive
#52

We're working on this with the government, sir. Not long ago, we met the Chief Minister of the UP government, who convened all the clients, and they gave us assurance that these bills would be certified within a couple of months. The release of funds from the state funds is being delayed by them. So we're hopeful that by March we'll get all of this under control and bring down our working capital utilization tied to that receivable, sir.

Analyst

analyst
#53

We hadn't been involved in water. We wound up paying for a number of these projects at the staggering. So is there any review process that you've put in place incrementally?

Aravind N Nani

executive
#54

Regarding the balance sheet, as things stand right now, no new loans have been taken on, and we did raise a QIP of INR 240 crore. That INR 200 crore fund is still with us, so we're drawing on it for the current year. Borrowing will only be raised next year, sir. By then we'll also have collected our existing receivables and completed the certifications, and we'll bring this back to normal.

Analyst

analyst
#55

Alright. And looking at how you’ll actually execute on revenue outside of mining this year, in FY 2026, what does that look like?

Aravind N Nani

executive
#56

So not counting mining, roughly INR 256 crore — and from the regular business we can get to somewhere around INR 6,000 crore to INR 6,200 crore, sir. From the mining business, what we projected is INR 250 crore.

Analyst

analyst
#57

What did the mining business come to last year?

Aravind N Nani

executive
#58

Sir, the figure for last year stood at roughly INR 84 crore.

Analyst

analyst
#59

Roughly INR 84 crore.

Aravind N Nani

executive
#60

So essentially, INR 5,160 crore in EPC, and that grows to essentially INR 6,200 crore. Yes.

Analyst

analyst
#61

Alright, thanks, sir.

Operator

operator
#62

Thanks. We’ll take the next question from Hitalisha at Shriram Mutual Fund. Go ahead.

Analyst

analyst
#63

Hi there. Yeah, thanks for giving me the chance to ask. I was hoping you could tell me how the order book and the order inflow break down across the different segments — civil and mechanical, O&M, and all the rest of them? Hello?

Aravind N Nani

executive
#64

One minute — I’ll ask that. As of 30th September, the total is INR 14,226 crore, made up of roughly INR 1,700 crore from the mechanical business and the power erection business. INR 9,000 crore comes from both power and civil, plus infra civil. O&M accounts for around INR 2,700 crore. The electrical business is around INR 800 crore. So domestically we have about INR 14,000 crore, and international orders are around INR 220 crore. On the power side, then, the mix is INR 8,300 crore from power, and infra is around INR 5,900 crore.

Analyst

analyst
#65

Right, sir. And what about the order inflow?

Aravind N Nani

executive
#66

Regarding order inflow, our projection for this year stands at INR 10,000 crore. In the erection business, we're projecting roughly INR 2,000 crore. The civil business should contribute INR 2,400 crore. O&M comes in at about INR 2,600 crore. The electrical business accounts for approximately INR 300 crore. Beyond that, as a new initiative, we're launching solar and other green energy projects that we're targeting. During the year, we received orders worth around INR 159 crore. BOP EPC is around INR 2,550 crore. That total of roughly INR 10,000 crore represents a blend across various segments.

Analyst

analyst
#67

So these orders are expected, correct?

Aravind N Nani

executive
#68

When you add up the orders, we've already booked INR 4,900 crore, and the remainder we expect to come in for March.

Analyst

analyst
#69

Could you break down that INR 4,900 crore across those segments for us?

Aravind N Nani

executive
#70

So within that, we booked roughly INR 49 crore from mechanical business, INR 1,500 crore from civil business, and INR 761 crore from O&M business through September. Up to now, orders totaling about INR 2,570 crore have come in from BOP EPC. And for the mechanical new SBU addition of EPC, we added approximately INR 2,550.

Analyst

analyst
#71

All right, thanks a lot. For those big projects you just went through, what's the timeline for getting them done?

Aravind N Nani

executive
#72

Typically, that takes 2 to 2.5 years. That's the usual pattern. Generally speaking, 2 to 3 years is typical. As for the EPC, the figure is 38 months. So for the BOP EPC, it comes to roughly 3.5 years.

Analyst

analyst
#73

Alright, thank you, sir.

Operator

operator
#74

Thanks. Our next question comes from Parani at Avendus Spark. Go ahead.

Analyst

analyst
#75

Morning, sir. Can you hear me okay?

S.K. Ramaiah

executive
#76

Yes, sir.

Analyst

analyst
#77

Let me ask a conceptual question about the power sector. First, if a project costs roughly INR 10 crore per MW on the thermal side, what scope does Power Mech have, say, to obtain opportunity orders out of that INR 10 crore per MW?

S.K. Ramaiah

executive
#78

That's right. The IDC cost can be part of that INR 10 crore per MW figure. EPC cost, though, may come to INR 8.5 crore, and that depends on how responsibility is scoped. For a single unit it could be higher than for two units; sub-units may run a bit lower. As things stand now, the largest order BHEL has received is INR 8.3 crore for 800 MW, 1 to 6.0 per MW. Turning to what opportunity this holds for Power Mech, the business splits into two sectors. On the main plant side, the main plant side, total investment could be roughly 55% of that INR 8.5 crore. And typically the service portion of it, we could say something like INR 1,000 crore would come in the main plant for each unit, for each plant of two units. That is, suppose 1,600 MW is there, about INR 1,000 crore could be the opportunity there. That's the main plant. And the balance of plant entails all the opportunities available, whether we wish to bid on the service side of the business or on the balance of plant of the business, subject to the qualification. And the balance of plant will be anywhere between INR 3.5 crore-INR 4 crore.

S.K. Ramaiah

executive
#79

Also, in certain segments, when tendered separately, we’re able to bid for coal handling and material handling as well, and after that civil structures, and then for other miscellaneous civil works such as IDCT, cooling towers, and various other jobs, structural jobs, etc. So we can say that including the civil works, structural works, and then the service portion by installation, we can safely take 25%-30% as the opportunity available on this side.

Analyst

analyst
#80

Sorry, so that's 30% of INR 8.5 crore?

S.K. Ramaiah

executive
#81

On the whole, that's the highest we can go.

Analyst

analyst
#82

All right, so that's 30% of INR 8.5 crore. That happens while the project is being built, and O&M falls within the operational period, correct?

S.K. Ramaiah

executive
#83

The operations and maintenance opportunity is going to fall in the range of INR 11 lakhs to INR 15 lakhs for each MW annually. And there's another point: the BOP comes as a full package, as I mentioned earlier. That creates an entire opportunity amounting to 40%-45% of INR 8.2 crore for the BO.

Analyst

analyst
#84

Okay, so on the next question — you said roughly 46,000 MW is still to be awarded over the coming year, and about 12,000 MW more from state utilities. Can I broadly assume around 40% of that total opportunity counts as ours over the long term, during construction?

S.K. Ramaiah

executive
#85

Over the past 18 months, total ordering — currently being executed at different stages — amounts to roughly 47,500 MW. So what I was saying is that this is, you could say, largely ordered under the EPC mode on the main plant side. And where Adani is concerned, they've gone a different way. They order the main plant from the equipment supplier, while the balance of plant and the service job they award themselves. So that too presents an opportunity for a contract like this. Beyond that.

Aravind N Nani

executive
#86

To respond to your question overall, sir, in this capacity, 55% is going to be the opportunity for us.

Analyst

analyst
#87

Got it. So 46 plus 12 comes to roughly 15 MW. That's 15 MW if I

Aravind N Nani

executive
#88

We’re looking at 8.5 to 9 into 60%.

Analyst

analyst
#89

Right. 8.5 into 60%. Understood. That works out to roughly INR 3 lakh crore, yes — around that figure. All right, fine, understood. Fine. So my next question concerns whether we can genuinely anticipate that 46,000 MW and 12,000 MW of thermal capacity that's coming up. Given that storage capacity is ramping up, or becoming more widespread, is there any certainty this will actually go ahead? And do you see any slippage, or a scenario where it doesn't really materialize over the coming three to five years?

S.K. Ramaiah

executive
#90

The CE and the Power Ministry are doing the planning. And the customers have also been identified, such as Adani; NTPC has expansion plans at Patratu, Meja, then Obra, Nabinagar; Tata Power has plans; Vedanta has plans. Then, for instance, SJV and Buxar plan to add one more unit. KL, Coal India also wants to get into the power sector. Then JSW and JSPL are both planning it. NLC is planning too. For all these players, whether brownfield or greenfield, they're going to put up these projects. That's how the capacity has been arrived at. It's a question of, in terms of timing and execution, it's normally a development process in terms of environmental clearance, land acquisition, investment, achieving the financial closure. This, we've all seen, there are certain, there can always be certain things in that which can take the project forward or there's some slowness. But these capacities are a must to balance the grid capacity for another seven, eight years it should be established.

Aravind N Nani

executive
#91

That was definitely something we thought would come up.

Analyst

analyst
#92

All right, sir. One last question from me. We've sized this opportunity at INR 3 lakh crore for that 58 GW over, let's say, the medium to long term — so what market share would we roughly expect, or what do we anticipate winning, across this 5- to 7-year span on that INR 3 lakh crore opportunity?

S.K. Ramaiah

executive
#93

Yeah, as I mentioned, you could go toward the higher end — roughly 30% on the services portion, meaning the civil and structural installation services. And when it comes to balance of plant, we can easily capture around 35%-40%, 45%.

Analyst

analyst
#94

When you say that, you mean market share, correct?

S.K. Ramaiah

executive
#95

All of it qualifies there.

Aravind N Nani

executive
#96

Right. That's the total available market once more. Yet from this INR 2 lakh crore — close to INR 3 lakh crore — we expect to bid on projects worth no less than INR 2 lakh crore, sir. And when it comes to the power sector, our hit ratio has traditionally sat at 50%-60%.

Analyst

analyst
#97

Right. Understood. Basically, INR 1 lakh crore — INR 2 lakh crore would bid, with INR 1 lakh crore potentially coming in.

Aravind N Nani

executive
#98

The number I provided is somewhat cautious—that's the idealistic case.

Analyst

analyst
#99

Got it. Excellent. Thanks a lot. Thanks a lot, and best of luck.

Operator

operator
#100

Thank you. Thanks a lot. We now take a question from Deepak Poddar, who is calling in from Sapphire Capital. The line is yours.

Deepak Poddar

analyst
#101

Yes. Can you hear me, sir?

Aravind N Nani

executive
#102

Sure thing, Deepak.

Deepak Poddar

analyst
#103

Yeah. Thanks a lot for giving me the chance. So first off, I just wanted to get a handle on the MDO side — you mentioned, I believe, roughly INR 225 crore to INR 250 crore this year, and then INR 550 crore to INR 600 crore next year, in terms of execution that we might carry out on the MDO side, with both mines combined. So what kind of margin profile are we looking at, both for this year and for next year, at the MDO level?

Aravind N Nani

executive
#104

Production has only just begun, since Tasra isn't online yet — we're running at just a small capacity, turning out roughly 50 to 60 thousand tons each month. KBP only came on stream this year and will ramp up gradually. So blended together, we'd expect an average EBITDA of around 15%-16%.

S.K. Ramaiah

executive
#105

Also, Deepak, the bulk of our margins across both mines will only come through once we hit PRC. At Tasra, we're looking at reaching PRC in FY 2027 — March of FY 2027. The washery should be commissioned at that same point, commercial operations of the washery will be declared, and that's when the full mining fee comes in. EBITDA is expected to reach 26%-28% around then. On the first mine, CCL, at 5 million metric tons per annum, we expect to get to 5 million metric tons per annum in FY 2028. The ramp-up will be gradual. At present we're running at roughly 14 to 16, and it will climb all the way to 20 to 22 at this mine once peak rated capacity is achieved.

Deepak Poddar

analyst
#106

Got it. So when we're below peak capacity — I mean, for this year, at a scale of roughly INR 250 crore at MDO — we're still expecting a 15%-16% margin, right?

Aravind N Nani

executive
#107

Yes. At a turnover scale of INR 250 crore, that works out to a margin of 14%-16%.

Deepak Poddar

analyst
#108

Got it. So then for next year, at the SAIL mine, you're still expecting to hit peak PRC during FY 2027 itself. So on that basis, at INR 550 crore to INR 600 crore in FY 2027, is a 19%-20% EBITDA margin achievable there?

Aravind N Nani

executive
#109

PRC on March 27 — so we'll be ramping up from the current 60,000 per month, which works out to 360,000 per annum. Over the final five months of the financial year, we'll ramp from 360,000 up to 4 million metric tons, right? The washery is also going to be commissioned. Our target is to commission it by July next year, and we want to declare COD by September. We want to be ready around the time the washery is commissioned. We want to produce — we want to enhance the capacity. By the time the washery is commissioned, we want to be ready for 2 million metric tons per annum. And once it's commissioned, we want to ramp up to 4 million metric tons by end of March in five months. That's the plan.

Deepak Poddar

analyst
#110

So at peak, if you combine both mines together, revenue could be roughly INR 1,800 crore to INR 2,000 crore annually. Is that a fair assumption? Add another INR 2,000 crore on account of escalation and all of that. Then at INR 2,000 crore, what — an EBITDA margin of 25% is what we might be investing at peak?

Aravind N Nani

executive
#111

Yes, sir. 23% to 24%. And 23%–25% as well.

Deepak Poddar

analyst
#112

And when do you expect that peak MDO of INR 2,000 crore to be reached — in FY 2029 or FY 2028?

S.K. Ramaiah

executive
#113

Regarding fiscal 2028 — both MDOs and PRC, peak rated capacity will be reached by FY 2028, but at the same mine, we're going to hit PRC by FY 2027. And it will keep going through 28 as well. However, the 5 million metric tons per annum CCL mine will reach PRC in FY 2028, toward the end of FY 2028.

Deepak Poddar

analyst
#114

Got it, and that makes sense. So essentially, what you're anticipating is a substantial increase in mining revenue between FY 2027 and FY 2028 — a big step up starting in FY 2028, correct?

Aravind N Nani

executive
#115

Yes. That's right. Precisely.

Deepak Poddar

analyst
#116

Got it. Second, you mentioned the mix of your business. At present, 75% comes from the power sector, correct? So you're now exploring new opportunities in steel. And you also brought up railways, right? So how do we expect your business mix to shift from that 75% power share? And for all these new sectors, what does the margin profile look like?

Aravind N Nani

executive
#117

Regarding the margin profile, sir, right now, on average, in construction, we're achieving as much as 10% — that's the EBITDA margin we're producing. And O&M and MDO, once peak rated capacity is reached, are the primary drivers behind lifting our EBITDA margin. O&M delivers roughly 15%–16% of margins on average. As for the business mix at present: power is the focus over the coming two to three years. More power orders will arrive. And at the same time, we're also examining the steel opportunities. So more or less, margins will be 5% here and there. We're holding at the same percentage levels. Okay. So the 75% will continue? Yeah.

Rohit Sajja

executive
#118

Yeah. Yeah. That 75% will keep going, with power, thermal capacity additions, and O&M capacity additions also serving as a big driver for EBITDA as well. There's going to be a modest EBITDA improvement, since the O&M mix keeps getting added as new capacity comes online each year. And international O&M is performing well too. We're hitting solid profitability levels there. So international O&M is expanding at 25%-30% year on year, CAGR. So that's a good sign as well. So we see this adding slightly to the EBITDA margin.

Deepak Poddar

analyst
#119

Okay, got it. And I just have one final minor point from my end. You discussed the outlook for this year. Is there anything you'd like to mention regarding FY 2027 too, considering the scaling up and the fact that the high-margin revenue mix is going to rise for FY 2027?

Aravind N Nani

executive
#120

For this year, we had projected roughly 25%. On a year-over-year basis, we're projecting 25% growth, but since volume is going up and we'll be adding more MDO business over the next year, we're projecting somewhere in the 20%-25% range only, sir. Perhaps in the range of around INR 7,500 crore-INR 8,000 crore.

Deepak Poddar

analyst
#121

And how does the margin profile look?

Aravind N Nani

executive
#122

It’ll go up, sir—probably somewhere in the 0.25% to 0.5% area. That depends on how MDO and the O&M business are mixed.

Deepak Poddar

analyst
#123

Could you repeat that figure for the jump? We couldn't hear you.

Aravind N Nani

executive
#124

A quarter to half a percent. Whenever you like. That's fair enough.

Deepak Poddar

analyst
#125

Regarding EBITDA, that's fair enough. That's quite useful, sir. Wishing you all the very best. Many thanks.

Aravind N Nani

executive
#126

Thanks, sir. Shashi? Can you hear me? Hello? I think it's one hour.

Operator

operator
#127

Hello there. Madam Shashi, we’ve unmuted your line.

Analyst

analyst
#128

Yeah. Hi there.

Aravind N Nani

executive
#129

Yes. Go ahead, ma'am.

Analyst

analyst
#130

Right. So for a few quarters now, we've been seeing headwinds in the electrical segment. So what I'd like to get a handle on is what those headwinds actually are.

Aravind N Nani

executive
#131

We were awarded railway signaling, telecommunication, and overhead electrification work in Chhattisgarh. Two packages — two projects — came to us in the course of last year. So the execution of those and the material supply we delivered during the year, along with our ongoing work on these projects, is what drove revenue higher than the prior year.

Analyst

analyst
#132

All right, so should we expect these to keep going, or is there any improvement anticipated in this segment?

Aravind N Nani

executive
#133

Right. On transmission distribution, we’re gradually winding things down. It doesn’t fit within all the annual. We’re progressively shutting down the projects that already exist, and we’re picking up the new jobs in railway works, and going forward this team will carry out all these techno-cum-civil-cum-techno works — they’ll take those up under the division, and they’ll execute them. We are targeting in some projects.

Analyst

analyst
#134

So those segments are going to take the place of this one.

Aravind N Nani

executive
#135

Right.

Analyst

analyst
#136

I'd also like to get a sense of what the opportunity looks like in renewable energy — things like nuclear, battery energy storage, pumped storage, and so on. If you could share something on that.

Aravind N Nani

executive
#137

Ma'am, we're still actively focused on renewable energy projects, but there's also been a great deal of irrational bidding out there. Our main emphasis had been on solar and battery energy storage systems on a BOOT basis. However, we're seeing plenty of erratic bidding trends at the moment. As a result, we've slowed down our bidding for projects in that space. That said, you will see us in a handful of bids, and our focus on solar plus battery energy storage systems continues. Now, this marks a small pivot from what we were doing before on a standalone basis. At this point, we want to bring these areas of expertise together and bid for a few projects. Again, with healthy discounts and healthy utilities.

Analyst

analyst
#138

Could you give us a figure on the potential opportunity you see in solar and battery energy?

Aravind N Nani

executive
#139

Look, in FY 2026 we've already secured a Kusum Yojana project with 13.5 MW of AC capacity. Going into next year, we intend to scale that up to 100 MW of solar plus roughly 200 to 250 MW of MWh in battery energy storage system capacity. Those are the figures we're working with. That's the projection for FY 2027.

Analyst

analyst
#140

Thanks, sir — that was genuinely useful. And sir, for the projects you're currently handling, do you foresee any cost escalations that could have an impact on the margin?

Aravind N Nani

executive
#141

For most of the contracts we hold that are set up with price escalation, that increase gets passed through. As a result, we aren't losing any money. There's no cost escalation stemming from the escalation. The escalation amount is coming to us from the clients.

Analyst

analyst
#142

Alright. Thank you, sir.

Operator

operator
#143

Thanks. Our following question comes from Preet at Wealth Advisor. Go ahead.

Analyst

analyst
#144

Yeah. Hi. Sorry I dialed in a bit late, so maybe I missed it. But did you provide any guidance for the full year about hitting that INR 6,500 crore turnover? Is that still on track, or are we changing your guidance?

Aravind N Nani

executive
#145

This again, that INR 6,500 crore figure is tied to the MDO projections as well. There may be maybe 1% or 2% of slippage because of securing the new orders that we had anticipated during the year. Most likely, we may reach a business level of around INR 6,200 crore-INR 6,300 crore during the year.

Analyst

analyst
#146

Yes. Yes. Yes. Sir,

Aravind N Nani

executive
#147

That still amounts to 18% growth.

Analyst

analyst
#148

Yeah. Yeah. For sure, sir. I'd say growth of 20%-25% remains pretty solid. My other question was on the margin side again. Might we see a bump of 0.25% or 0.5% for FY 2026 compared with FY 2025? Is that something that could happen?

Aravind N Nani

executive
#149

Broadly speaking, we expect to land around the same figure as last year, sir. It really hinges on the blend of any fresh Goindam orders, and a rise in MDO could push that number up, potentially. As things stand right now, though, our estimate is that it holds steady at last year's level.

Analyst

analyst
#150

Got it. And are there any plans on our end for raising funds?

Aravind N Nani

executive
#151

Right now, no, sir. Should any fresh opportunities arise or any chances to invest come along, then we would likely go to the market.

Analyst

analyst
#152

Where would net debt stand right now?

Aravind N Nani

executive
#153

Roughly INR 360 crore, sir. Our net debt stands at approximately INR 300 crore.

Analyst

analyst
#154

Understood. Understood. Along similar lines, for FY 2027 we ought to see an 18%-20% rise in top line, together with a margin improvement of at least 0.5%, given MD orders as well.

Aravind N Nani

executive
#155

Yeah. We’re projecting along the same 20%-25% range between. We’re also projecting that for the next year. Yeah. And the margin increase isn’t 0.5%, sir. It’s 0.25%-0.5%.

Analyst

analyst
#156

Alright. Alright. Got it. Got it. Great. Thanks, sir. Appreciate it.

Operator

operator
#157

Thanks. Our following question comes from Vinay at Hathway Investments. Go ahead.

Vinay Nadkarni

analyst
#158

Yes, just to clarify one point. In your earlier response, you mentioned that the opportunity for you in electrical, in the power sector, is roughly INR 1 lakh crore. Over what period would that be — 3 to 5 years? What timeframe applies to this INR 1 lakh crore?

Aravind N Nani

executive
#159

No. Here's how it works. The opportunity that was mentioned comes from the balance ordering still to be done on the main EPC orders that have already been placed — some of those items, like main plant services work, balance of plant work, then structural work, civil work. Largely, that is still to be ordered — BHEL has to order it, Adani has to order, and NTPC also has to order. The other thing we said was that new investments and developments will come at 46,000 MW of new plants. That has to take shape. It will be there continuously over the next couple of years. And where EPC orders have been placed by NTPC, Adani, and utility companies over the last six months or one year, more ordering has to happen there because they had to ramp up the ordering. And that is where we said that initially, we can have about INR 40 thousand crore-INR 50 thousand crore right away. And the remaining INR 40 thousand crore-INR 50 thousand crore will develop over the next couple of years.

Vinay Nadkarni

analyst
#160

So even if I take INR 1 lakh crore across six or seven years, that comes to roughly INR 14,000 crore annually. I mean, not in that same linear way, but is that the figure? Or am I misunderstanding it?

S.K. Ramaiah

executive
#161

That ought to be more or less fine.

Vinay Nadkarni

analyst
#162

And that applies just to 75% of your business.

S.K. Ramaiah

executive
#163

There's also potential there that will accumulate annually, amounting to INR 1,500 crore.

Vinay Nadkarni

analyst
#164

Right now we're running at roughly INR 6,500 crore annually. So is that the kind of jump you have in mind?

Aravind N Nani

executive
#165

Yeah.

Vinay Nadkarni

analyst
#166

Alright, thank you. Thanks a lot.

Operator

operator
#167

Thanks. Our next question comes from Amay Sharda, who is on the line from Purnartha Investment Advisors. Go ahead, please.

Amay Sharda

analyst
#168

Hello, and thanks for taking my question. I only have one thing I'd like to ask. What caused the mechanical segment's revenue to jump so sharply, reaching INR 435 crore? Also, should we expect that level to hold up through the remainder of the year too?

Aravind N Nani

executive
#169

Right. So, you know, over the course of this year, there was a slowdown that hit the FGD orders, which is a concern. And then all at once, a government directive came through. They issued a direction. The Udupi project, which had been moving along slowly, and now Adani has instructed that this project be finished by March. Because of that, they began carrying out this execution starting from last Q2 onward. That led to greater execution within the power sector.

Amay Sharda

analyst
#170

How large is the Udupi project?

Aravind N Nani

executive
#171

Roughly INR 936 crore.

Amay Sharda

analyst
#172

Are we supposed to finish that during this financial year?

Aravind N Nani

executive
#173

Regarding this fiscal year. Yes. Correct.

Amay Sharda

analyst
#174

And we anticipate that this momentum will carry on through the remainder of the year.

Aravind N Nani

executive
#175

Yeah. Yeah. Before March, it will be complete. We can expect this level of order execution through March.

Amay Sharda

analyst
#176

All right, all right, thanks a lot. Thanks.

Operator

operator
#177

Thanks. Because of the time limits, that brings us to the final question. At this point I'll pass the conference back to management for closing remarks. Please go ahead, sir.

Aravind N Nani

executive
#178

Thank you, madam. Appreciate the investor community and our colleagues who are here. As Aravind and Rohit projected, and given the very interesting questions and everything we discussed, it's fair to say we're reasonably assured of staying on track to hit the ordering target of about INR 10,000 crore, since we're almost near that 50% by the end of this beginning of the third quarter, and with many more opportunities coming up and new business segments that we're looking at. On the revenue side, the third and fourth quarters, as we've seen, will always have upstream in them. That's where INR 6,200 crore would reasonably be possible. With these kinds of opportunities and the investments coming in, particularly in the power sector, steel sector, infrastructure side, railways, and other segments, perhaps we will continue to. We'll keep focusing on growth over the coming couple of years. And another area we might consider as an interesting diversification is data centers. Of course, developing data centers and the software portion of that is different. But the hardware portion is an interesting point, because these data centers require a lot of power capacity, substations, which is our specialization.

Aravind N Nani

executive
#179

After that, quite a bit of infrastructure work and development is required, along with civil works, and then additional facilities and balancing facilities. So that's a segment we can put to good use, drawing on the expertise we're building up. There are also other sectors that, as I mentioned separately, could emerge. And aside from the steel plants, all of those areas will be open to us.

Operator

operator
#180

Thanks. Thanks. That brings this conference to a close on behalf of Nirmal Bang Equities Private Limited. We appreciate your participation. You can go ahead and disconnect your line now.

Rohit Sajja

executive
#181

Thanks.

S.K. Ramaiah

executive
#182

Thanks.

Aravind N Nani

executive
#183

Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Power Mech Projects Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Power Mech Projects Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Power Mech Projects Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.