Power Mech Projects Limited (POWERMECH) Earnings Call Transcript & Summary

August 10, 2026

National Stock Exchange of India IN Industrials Construction and Engineering earnings 61 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, ladies and gentlemen, and welcome to the Q1 FY27 earnings conference call for Power Mech Projects Limited. Just a reminder that every participant line is in listen-only mode, and once the presentation wraps up, you'll have a chance to ask questions. <<operator_script>> Kindly be aware that this conference is being recorded. I'll now turn the conference over to Ms. Julie Bhavishkar of Ashika Institutional Equities. Thank you, and the floor is yours, Ms. Bhavishkar.

Juili Baviskar

analyst
#2

Thank you. Good afternoon, and a very warm welcome to everyone. On behalf of Ashika Institutional Equities, I welcome all of you to the Q1 FY27 earnings conference call of POWERMECH Projects Limited. Joining us today is management, represented by Mr. Rohit Sajjan, Executive Director; Mr. N. Nani Arjun, Chief Financial Officer; and Mr. S.K. Ramayya, Director, Business Development. We thank POWERMECH Projects Limited for giving us the opportunity to host this call, and we would now like to hand the floor over to management for their opening remarks, after which we will open the floor for Q&A. Thanks, and over to you, sir.

Nani Aravind

executive
#3

Good evening, everyone. I'm Nani Arvind, the company's CFO. I'd like to offer a warm welcome to each of you who has joined us today for our Q1 FY27 earnings call. We appreciate your taking the time to be part of this discussion as we kick off financial year 2027. The first quarter showed the ongoing strength of our growth trajectory, with better performance across the majority of our core business verticals, with the exception of the ETC business. Our results demonstrate the strength of our integrated business model, our disciplined execution capabilities, and our ongoing emphasis on operational excellence. In Q1 FY27, the company posted total revenue of 1,632 crore, a 26% increase compared with the same quarter a year earlier. That growth came from sustained execution across our core verticals, together with the ramp-up of operations in civil infrastructure, industrial EPC, O&M, and international projects. EBITDA for the quarter stood at 176 crore, a 10.8% margin, which represents a 3% decline year on year. The margin was lower than in the same quarter last year, mainly because of higher material and execution costs stemming from the ongoing Middle East conflict, an increase in royalty costs in the KPM project following the government orders on royalty sharing for seized quantities, and lower margins in the KVP Mining business, primarily due to higher ore burden removal cost from opening new seams during Q1.

Nani Aravind

executive
#4

Output from those seams should climb over the next few quarters, which will help margins. Other income came in lower this quarter. That said, our standalone business posted an 11.3% EBITDA margin versus 10.2% in last year's same quarter. Profit after tax came to 89 crore, an 11% rise over Q1 FY26. After minority interest, profit after tax was 80 crore against 53 crore in Q1 FY26 — a 53% gain over Q1 FY26. That lifted EPS to 25.23 from 16.61 in the matching quarter of financial year ’26. Management feels confident it can hold its full-year target on execution, order book, and margin profile. Turning to the revenue mix, the quarter again showed a well-diversified contribution across our business segments. The Windham business kept growing steadily, adding 431 crore, up 8% year-on-year, helped by new order inflows during the year. The civil segment — roads, railways, and water distribution projects — added 796 crore, a 28% year-on-year increase. Industrial construction brought in 270 crore, down, down 13% year-on-year, which the industrial EPC business offset with its 96 crore contribution. Mining showed a strong positive trend at 84 crore of revenue, 223% year-on-year growth, helped by commencement and a ramp-up of revenue from the KVP mine starting November 2025.

Nani Aravind

executive
#5

Turning now to how revenue broke down in Q1 FY27: by geography, 96% came from domestic operations and 4% from international ones. On the sector side, Power accounted for 51% of revenue, with the Non-Power segment making up the other 46%. Looking at order flow, the company booked roughly 1,864 crore of orders in Q1 FY27 — 1,000 crore of that, which works out to about 15.5% of the annual target. Inflows in the quarter stayed nicely diversified across industrial construction, civil infrastructure, and O&M. Key awards won in the quarter included O&M for Mumbai Monorail, a project that also marks our entry into the highly technical urban mobility space. Total order backlog, including MDO projects, is approximately 55,398 crore. Leaving out MDO orders, the executable order book comes to around 16,229 crore. That gives us solid multi-year revenue visibility spanning industrial construction, civil engineering, EPP, and the oil and gas business. We keep seeing a robust order pipeline across thermal power — covering both construction and maintenance BOP systems — as well as civil infrastructure. So to sum up, we're pleased with the progress made in Q1 and FY27. In Q1 FY27, our diversified order book, strong execution capabilities, and strategic focus on high-value projects keep positioning the company for sustained long-term growth.

Nani Aravind

executive
#6

Improving execution in step with the trajectory we have planned stays one of our main priorities, along with sustaining and strengthening our margin profile by drawing a bigger contribution from O&M, mining, and other businesses with relatively higher margins. We also aim to keep enhancing cash conversion and the efficiency of working capital, maintaining our attention on collections, milestone certifications, and mobilization advances. Given a robust order pipeline and momentum in execution throughout our business, we stay confident about meeting our growth objective and generating long-term value for all our stakeholders. That said, I would now like to invite Mr. Ramayagalu to discuss the key business developments and the outlook for the period ahead.

Sudha Kodandaramaiah

executive
#7

Yes, thanks, Arvind. Building on what Arvind mentioned, there's been an improvement in the total order backlog compared with the figure cited at the close of last year — 15,888 crores — and it now stands at 16,228 crores. That's +2%. Naturally, the civil segment delivered the biggest order improvement, adding roughly 4.4% to the backlog. Then at Rohindam, growth is substantially stronger: a first-quarter order worth 781 crores lifted the backlog by 11.8%, taking it to 3,322 crores. That's a very encouraging signal. And of course, in the EPC segment, electrical, these segments, based on revenue, have to come down. Also in the ETC business there is a — because plenty of opportunities exist, I'll explain that later. So that covers the segment-wise picture, and the domestic market keeps playing a major role, accounting for 98.7% of the order backlog and order bookings, while interest is 1.3%. The power sector also keeps driving business given the enormous capacities and the huge investments now coming into play. Being the expertise we have, a lot of focus from the organization is directed there as well.

Sudha Kodandaramaiah

executive
#8

Non-power accounts for roughly 26.4%. That's the overall picture. Now, regarding the opportunities — what we did at the outset, when we began, was map the opportunity size at 70,000 to 75,000 crores on a broad basis across various segments of the different SBUs: power, non-power, installation, O&M, civil, and then, you know, infrastructure, etc. Now, coming to quarter-wise, there's more focus there, and that has to be looked at based on the real opportunities we're going to get. As of today, we are mapping about 20,500 crores of opportunities in the power sector alone. That's mainly for the installation business, for civil work, structural work, and balance of plant packages. Then, on the infrastructure side, about 8,500 crores. So, quarter-wise, as we progress and all, more opportunities will come up. This is based on the tendering opportunities and the tender notice, as I showed — that's where we have to focus. And so, from the overall perspective, when I speak of the power sector, the overall scenario is like this: we have been tracking about 58,000 megawatts of ordering that has been done in the main phase at VHL and L&T over the last 3 years.

Sudha Kodandaramaiah

executive
#9

This is driven by where our interest lies and where we need to concentrate it. Naturally, capacities may vary depending on how the overall market develops. We are monitoring specific projects. On that basis, you know, the bulk of the orders has gone to BHL, roughly 2.41 lakh crores. L&T, meanwhile, is picking up a substantial number of orders, 42,523 crores. And recently JSW has joined the competition, with two major plants being set up, one at Salboni and the other at Assam. 4 units apiece, 300 megawatts. And they intend to put in a considerable amount, roughly 30,000 crores, across both of those cases. Now, looking at the broader picture of the different players, aside from the state sector and the central sector, it is the private sector that is taking the lead. Adani plans to raise its capacities from 18,330 megawatts up to 42,000 megawatts over 5 to 6 years. And then there is NTPC, which plans to lift its coal-based plant capacity from 67 gigawatts to 91 gigawatts, 91,000 megawatts. And JSW, a recent entrant, currently stands at 5,658. They have an ambitious target of reaching a capacity of 30,000 megawatts within the next 5 to 7 years.

Sudha Kodandaramaiah

executive
#10

So there are other participants as well — state-sector ones such as Singareni ACCL and GSECL, plus Chhattisgarh Generation Company, and then a private player, Mostert Bayer Power, and NSE, the central government. Every one of them has additional capacity coming. DVC too, and HBCCL has already taken action. So what we've done here is map out an opportunity worth roughly 60,000 crores that's available over the next, say, 1 or 2 years. That's as of today, factoring in what has already moved ahead in terms of ordering and so on. The remaining ordering still to be done, for site construction work of that kind, is in tendering. What's left is BHL at about 11,000 megawatts, and then Adani at about 11,200 megawatts — that comes to 22,000 megawatts. And then JSW is planning 6,400 megawatts. Together that should land at 26,000 or something in that range. With that, we anticipate an immediate opportunity of 25 to 30,000 crores, and the following year it can build up further as well. That's precisely where the company's overall focus sits, given the strength we've built, and they are better positioned to capture it by going after the opportunities where they exist.

Sudha Kodandaramaiah

executive
#11

Private-sector opportunities are improving for us as well, since both Adani and JSW concentrate on what gets delivered, and they favor firms such as POWERMECH Projects Limited thanks to our delivery management. Also, we recently secured a sizable assignment from JSW too — the Salmani job, 850 crores for civil infrastructure. Then with Adani, we keep chasing all their ongoing projects, whatever new ordering comes up. I mentioned roughly 11,000 megawatts that they need to finish. So from that angle, this will remain our focus. Then there's the OEM side. On OEM, we've seen 781 crores taken in the first quarter, and the auto backlog has risen by over 11% as well. Versus last year, 297 crores has now become 362 crores. So one encouraging factor could be how much capacity gets added at the new plants, especially in the private sector, because they'll be more keen — names like Adani, Vedanta Group, JSW, JSPL, and others. And we are engaged with all of them.

Sudha Kodandaramaiah

executive
#12

So then, that opportunity is expected—you know, if the government's plan involves raising capacity from the current 228 gigawatts to 291 gigawatts by 2030, which means adding 61 gigawatts, and after that it will rise to 321 gigawatts. So the yearly capacity addition averages 8,000 to 10,000 megawatts. That, therefore, ought to create an opportunity worth 800,000 to 1,000 crores in O&M. And since O&M falls under a renewable-based kind of segment, the contracts already in place will be added and renewed, while new contracts will come in, which will drive growth for the sector and all. And, uh, the other areas we can potentially examine are the non-power sector in terms of it, and then the fresh investments coming in on the mining side. For instance, NMDC is planning an investment of 70,000 crores, and certain tenders have come out. We took part in one tender earlier. We were L1, but they had a problem with the pricing. It has been retendered. We are participating in it again. And, uh, yeah, right now they are calling, uh, what, uh, 3 tenders. One tender we are trying to secure, and another 2 tenders will follow.

Sudha Kodandaramaiah

executive
#13

Also, a significant amount of investment is going to emerge in the steel sector, and we need to watch that across all the players — especially, yes, JSW is planning a very large capacity expansion at their existing plants as well as building a greenfield facility in Maharashtra. And ArcelorMittal is arriving with a massive plant near Vizag — roughly 10 lakh, a very large capacity, around 1.5 lakh crores, a plant of about 10 million ton capacity. Others too, so that is a chance we must look at to grow our business. Then on the mining side, I mentioned NMDC — their new plants coming up on the mining side under a build-operate-transfer model. That is an opportunity, drawing on the experience we are gaining from these kinds of MBBOO contracts. Our expertise and so on can be applied to figure out how we move into that. And then the other infrastructure work in roads and railways — as we know, the government keeps investing there, and we are capturing need-based opportunities in both roads and railways. In railways especially, the maintenance depot shops — we are now getting specialized.

Sudha Kodandaramaiah

executive
#14

We've got a couple of projects underway there, and whenever new ones come up, we'll certainly take part in them, in addition to the new railway lines. And then the EPC work in both railways and the road sector. On the international side, the current focus is, of course, the unsettled situation in the Middle East. Last year we mostly saw it on the O&M side, which is quite profitable. We've secured long-term contracts in Nigeria — the Danvota job — and some additional jobs we've picked up among the multiple maintenance jobs, nearly 300 crores, and that's in UAE as well as GCC countries and all. That focus will remain in the current year too, with the hope that things will get better once the conflict — the ongoing conflict — comes to an end. With that, what I can say is that by mapping the opportunities, we can keep looking at how to reach this 10,000 to 12,000 crores of order booking for the current year, based on the opportunities we have and the new ones expected to come. Thank you.

Operator

operator
#15

Can we go ahead and take questions from the line now?

Nani Aravind

executive
#16

Yes.

Operator

operator
#17

Thanks. We’re moving into the Q&A portion now. <<operator_script>> Everyone, please hold for a moment while we put the question queue together. Our first question is from Deepak Poddar at Sapphire Capital. You have the floor.

Deepak Poddar

analyst
#18

Can everyone hear me?

Mahesh Patil

analyst
#19

Sure thing, Deepak.

Operator

operator
#20

Yes, go right ahead.

Deepak Poddar

analyst
#21

Thanks a lot, sir, for giving me this chance. So first off, I wanted to get some clarity on the margin side. I mean, you mentioned a few factors, correct? I mean, the overheads removal cost, plus the royalty, and the raw material cost as well. So what does the situation look like at present? I mean, how should someone view the overall annual EBITDA margins in light of the current situation?

Nani Aravind

executive
#22

Right, so look at the royalty increase from last year — if you compare it against the prior year's quarter presentation, there was an exceptional revenue recognized in Q1 FY26, uh, from the seized quantity where we brought in more revenue. Then afterwards the government issued an order and cut the royalty rates. And this time KPP Mining only began production from November onward, and at first we did about 1.6 million tons of execution during the period through March. And for the current year our target is roughly 3 million tons. We've started the new seams where initially OB removal runs higher — we've just opened those seams — and the matching coal production will begin in the following quarter. On the whole, the stripping ratio stays within the agreed quantity ratio only, but in one quarter you'll see a higher OB cost alongside lower coal production. Later quarters will make that up. Overall, for the, for the year, we'll hold the same EBITDA committed margins of 15 to 16% at KBC mines. And on top of that, lower other income — we have QFP funds at the standalone level, and we're drawing on those QFP funds for the Vashari construction, and we've nearly finished the QFP proceeds.

Nani Aravind

executive
#23

And those that are sitting in, since interest income is produced within our bank, that's why they also recognize other income at a higher level — 3 to 4 crore higher, as before. Now we've finished that, and at present we're not bringing in any revenue from it — revenue comes only from the FDs of Margin One, FDs alone. That's another factor as well. And on the whole, the guidance we projected is a 12.5% margin, which we committed during the current year. We're confident of achieving this margin profile, and we picked up plenty of new orders over the last year in O&M and civil, uh, infra projects, where we secured good margins on those projects. We will, uh, make sure that, you know, we'll deliver this EBITDA margin in the years ahead.

Deepak Poddar

analyst
#24

Right, right, understood — that was quite useful, sir. Then second, regarding MDO, what kind of execution are we aiming for in this year and the next one from MDO?

Analyst

analyst
#25

Hi Deepak, this is Rohit. Regarding the MDO, our plan is to do 3 million tons at our first mine, KBP. And in the case of the second mine, the washery is nearly ready to be commissioned — we're expecting hot commissioning to happen around November or December. Once that happens, we'll reach the full feed of the resource we're producing there. So taking both mines together, we expect to hit 500 crores by the end of this year. That means 3 million tons from the first mine, while the second one will come in at close to 1.2 to 1.3 million tons, since it will only begin ramping up after the washery is commissioned and the full feed becomes available.

Deepak Poddar

analyst
#26

Okay, and then what are your thoughts on FY28?

Analyst

analyst
#27

For FY28, we're looking at 1,100 crores to 1,200 crores. So we'll see a substantial ramp-up, because once that washery is commissioned, we expect to hit pre-gritted capacity KBP at the sale mine — that's 3.5 to 4, since there's also 500, uh, half million tons of Jhama coal we need to produce. So depending on how much Jhama comes in, it seems 3.5 to 4 is really the right figure to target there once the washer is built. And, uh, KBP, the first mine with CCL — this year we'll do 3, and next year we'll ramp it up to 4 to 4.2 million tons.

Deepak Poddar

analyst
#28

Alright, I understand. Now, regarding margin — since a larger portion of your revenue is coming from MDO, what does that imply for margins overall? In other words, how much benefit at the company level could this higher MDO revenue deliver?

Analyst

analyst
#29

So yeah, my view is that in FY28 we ought to be looking at a net margin somewhere between 21% and 23% for the two MDOs combined. And that kind of margin profile should hold steady across the mine's life, with a few bumps here and there whenever we need to put some CapEx back into reinvestment. Uh, at the close of year 7 and again at the close of year 13, there's a conveyor we'll need to build. Other than that, this is the margin profile on average that we'll be seeing.

Deepak Poddar

analyst
#30

So looking ahead to next year, with 1,100 or 1,200, an EBITDA margin of 21 to 23% for MDO is something we can achieve, correct?

Nani Aravind

executive
#31

No, no — that's only at the point where we hit peak rate capacity. This is the anticipated 20 to 21% blended weighted average, sir. And, uh,

Analyst

analyst
#32

So in ’28, the following year, one of the mines still won’t be online for us, and we still won’t be at peak rated capacity. That means it’s probably from ’29 when you can see those margins. So the coming year will again land in the 15 to 17 range, and after that it ramps up to 21 to 23.

Deepak Poddar

analyst
#33

For the following year, that figure would land at 15 to 17, and then in FY29, MDO one can might get us to somewhere around 21 to 23%.

Nani Aravind

executive
#34

Yeah, that's right.

Deepak Poddar

analyst
#35

All right, all right. And just one final point regarding the opportunity size you brought up — roughly 25 to 30,000 crores. So does that figure represent what you're bidding, I mean, is that the amount we should expect you to bid going forward?

Sudha Kodandaramaiah

executive
#36

Yes, I believe that's right. Look, at the start we put together an estimate grounded in the opportunity, and that comes from our own internal evaluation. Once the tenders arrive, we then try to size things more precisely, based on what the customer specifies for scope, qualification and similar factors. So the sizing reflects the actual opportunity that has come up. It will evolve quarter by quarter. As of today, I mentioned roughly 20,500 in the power sector, plus 8,000-some crores in the non-power sector, infrastructure and other areas. Each quarter we'll refresh that figure. Depending on tenders won and tenders lost, we then re-update the new opportunities as they arise, and also look at where we can break into new sectors of the business.

Deepak Poddar

analyst
#37

So for this year, that 12,000 crores of order inflow — we're looking at it from this pool of 25,000 to 30,000 crores, right?

Sudha Kodandaramaiah

executive
#38

Within this, a few particular openings exist. The power sector is one, and beyond that we're mapping an additional balance of plant package as well. There are 2 to 3 opportunities on the way. We're engaged closely on those. Then, moving further down, we anticipate growth will be present owing to the extra capacities being added and the new power plants being commissioned. Then, in particular, we hold a really strong relationship with Adani, built on our performance and our working record, and plenty of new plants are being added into their capacity addition plan — Phirpanthi is one, Assam is another, and then additional new projects. And JSW too, so for the 6,400 megawatt project, we're hopeful, you know, that the power sector business should also rise in terms of our installation business as well as the civil and structural business. Then with BHL, we'll be targeting the balance of plant managers, and then more deeply with all the private sectors.

Deepak Poddar

analyst
#39

Alright, alright, alright, I've got it.

Analyst

analyst
#40

And to build on what Ramayya sir just mentioned, Deepak — typically in the power sector, when it comes to your question about 25,000 to 30,000 crore, our strike rate, meaning our success rate, runs at about 60 to 65%. So for most bids we take part in, we anticipate or expect to win, based on historical data and how we're progressing here. That's why we capped this at 30,000 to 35,000 crores in terms of how many projects we bid for and arrive at this figure of 12,000. Just wanted to give you the

Deepak Poddar

analyst
#41

Yeah, yeah, understood, understood. And that really does help. Um, that's everything from me. Best of luck to all of you.

Analyst

analyst
#42

Thanks.

Operator

operator
#43

Thanks. <<operator_script>> The next question is from Madhu Agarwal at Agarwal Family Office. Go ahead, please.

Madhu Sudan Agarwal

analyst
#44

Just to clarify something quickly about the revenue we expect from mining at KDP and Tastraw. Are we lowering that from 600 crore? I believe last quarter we said we'd do 350 from KDP and 150 from Tastraw. Tatra, is that now being revised down to 500 across the two mines?

Nani Aravind

executive
#45

No, combined they come to 500, ma'am. That's the figure we gave — 350 plus 150 from Tatra makes 500 altogether, since there's no down, uh,

Madhu Sudan Agarwal

analyst
#46

Sorry — I made an error with the math there. I apologize.

Nani Aravind

executive
#47

That works for me. Thanks.

Operator

operator
#48

Thanks, and our next question is from Bhagwat at Prosperity Wealth Management Private Limited. Go ahead, please.

CA Bhagwat Nayak

analyst
#49

Thanks for taking the question. We'd appreciate some additional detail on the KRB project — in particular, what revenue you expect that project to generate, and what EBITDA margin it should deliver once the revised royalty structure has been taken into account?

Nani Aravind

executive
#50

The way KRB’s work is structured means we need to make sure that, you know, across the whole corporation that has been allocated the mining activity, we have to ensure there’s no leakage of royalty, and we have to set up our check posts and all the transport vehicles. So people are verifying the royalty, and when a transport vehicle has unpaid royalty, we would collect the seized content. We collected double the penalty. So indirectly, we get the royalty at 2 times the royalty value. Then the government, uh, uh, in the middle of last year, they don’t they, uh, 50% of that royalty penalty collected, the government takes that 50% value and only 50% is passed to the client company. So last year it was used, the seized quantity, which we recognized in our revenue. Subsequently, uh, because of these heavy penalties, the clients aren’t doing that much avoidance — the penalty avoidance isn’t there now. But the seasonal quantity value is very reduced this current year because of these double payment penalties and all. There is one issue, and another is that they raised the royalty rate to 10 per metric ton as an additional royalty payment, and some MITF charges, which they are collecting at 5% of the royalty value.

Nani Aravind

executive
#51

So all of that represents higher costs that you took on over the course of this current year.

CA Bhagwat Nayak

analyst
#52

Could you put a number on the size of the project for us?

Nani Aravind

executive
#53

On the revenue side, um, we posted roughly 700 crore last year. And this year as well, we expect to reach somewhere between 700 and 750 crore from KPMG.

CA Bhagwat Nayak

analyst
#54

All right, and could you tell me the exact EBITDA margin on this particular project?

Nani Aravind

executive
#55

Previously, it was about average. Last year, we achieved roughly 14% EBITDA. In this year's first quarter, it dropped to 10%. That's 10% versus the prior 14%, correct? No — from 14, it will now fall to 10% owing to that extra royalty clause. Q1 stood at 14%, and we anticipate holding at 10 to 11% through year-end. That applies to the rest of the quarters too.

Mahesh Patil

analyst
#56

Alright, alright, alright. I appreciate that response.

Analyst

analyst
#57

Thanks.

Operator

operator
#58

Thanks. Our next question is from Mahesh Patil at ICICI Securities. Please go ahead.

Mahesh Patil

analyst
#59

Just to clarify, in the base quarter Q1 FY26, we recorded that extra royalty payment, correct? I believe there was a penalty of roughly 2.8 billion.

Nani Aravind

executive
#60

That was in place. So for Q1, no royalty sharing applies. Last year's Q1 saw us recognize 51 crore in quantity revenue.

Mahesh Patil

analyst
#61

In the first quarter of last year, right? So because of that, there was this 0.5 billion of a bigger level impact. Is that correct?

Nani Aravind

executive
#62

Yeah, yeah.

Mahesh Patil

analyst
#63

So is this the same project we're discussing at present, the one where the royalty — uh — where the government has reached its decision?

Nani Aravind

executive
#64

No — one factor is the amount seized, the evidence; I mean, violations have gone down now. The quantity has come down too. Earlier, we began just 1 year prior to that — there is a past year — because of the heavy penalty, royalties, without much of that. Seized quantity is declining now — not much of the seized quantity. And after that, they allotted some of the private factors and leveraging activities to new players. There, that penalty clause mainly applies. This is only a minor amount that we're getting from these seized quantities during the current year.

Mahesh Patil

analyst
#65

Thanks. But that's going to fall in the current quarter. Is there a figure that's comparable to last year? Has any penalty amount been booked in this quarter?

Nani Aravind

executive
#66

We've recognized only about 30 crore in season quantity, but when you look at it in value terms versus the prior period, it's very low.

Mahesh Patil

analyst
#67

So there wasn't really anything one-off in this quarter, correct?

Nani Aravind

executive
#68

Yes.

Mahesh Patil

analyst
#69

All right, so on the margin side, I believe you also brought up some effect from costs rising because of the, uh, Iran conflict, correct? So if you could just put a number on that, and I just wanted to get a sense — don't we have an escalation cost for this?

Nani Aravind

executive
#70

So look, on the mining side, if you take it as a standalone level, uh, our EBITDA margin is better than it was last year, uh, thanks to the new orders that came in, and, uh, and we keep costs under control at the handle level. The biggest thing we consume is diesel, and that's where it hits profitability.

Mahesh Patil

analyst
#71

Alright, I believe we've hit 84 CR in revenue. That's from mining, correct? So for this quarter, could we get a breakdown of that? A breakdown, uh, uh, ABP,

Nani Aravind

executive
#72

We came in at approximately 57.5 crores.

Mahesh Patil

analyst
#73

All right, thanks — I really appreciate it. Apologies, just one final question. Hello? Yes, um, look, even with the margin in Q1, we remain confident about hitting our 7.5% guidance. So where does that confidence come from? Is it purely the mining production ramp-up, or is there something else that makes us so sure we'll get there?

Nani Aravind

executive
#74

Regarding KVP, the agreement specifies 1.5 million, yet we're aiming higher—clients are prepared to take as much as 3 million tons this year. Conservatively, we projected 350 crore in revenue, uh, on a production-average basis, though we could exceed that as well. So we're putting forward a 350 projection, and we're confident about hitting our revenue target.

Mahesh Patil

analyst
#75

Right, so that's the main thing driving margin — and it's what gets us to the level we've guided to, correct?

Nani Aravind

executive
#76

By Q4, our Vashi facility should also be up and running, and we expect that Tasla will have at least 1 or 2 months of production in as well. Taken together, the two of them — we'll be aiming for roughly 500 crores.

Mahesh Patil

analyst
#77

Understood, sir. Thank you.

Operator

operator
#78

Thanks. Thanks. Our next question is from Mudith Pandhari at IIFL Capital. Please go ahead.

Mudit Bhandari

analyst
#79

Hi there, thank you for asking. So, as we mentioned before—and on this call as well—there are going to be numerous projects from NTPC and Adani coming through, such as Lara, Yumna Nagar, Raigad, Mahan, or Mirzapur. I believe we secured Singreni and Mirzapur. So could you share some detail on the various projects—say, over the past one year, how many were awarded and how many did we win, in terms of whether awarding has been delayed, or any other scope where another player picked up some other scope of work? So what has the history looked like? And going forward, let's say within the next 1 year, which major projects are we targeting?

Sudha Kodandaramaiah

executive
#80

So, as I mentioned before, I would try to get into whatever tendering has come out of the tracking I discussed—roughly 58,000 megawatts of tendering that BHL and Adani have completed. Of that 58,000, nearly 28,000 to 30,000 megawatts is done. The tenders currently underway, or opportunities we're tracking as of today, total about 24,000 megawatts. That's where the opportunity lies relative to what I said earlier—the near-term opportunity is roughly 20,500 crores, as of today. But there are around a dozen projects in the pipeline for tendering from BHL, then Adani, JSW, and tenders are also expected from L&T. To some extent, BHL's tendering has slipped for various reasons, and there are packaging issues as well. Unlike a vertical composite package—an integrated package that Adani provides as an end-to-end construction solution, which suits our execution philosophy—we prefer to work where the package size is larger. And there's the added benefit of doing that work alongside taking on the civil and structural work. So most of the projects—whether in Mahan, then Mirzapur, and now Raipur, and what's expected in JSP, or JSP as well—we are planning to handle both the civil structural and the mechanical work.

Sudha Kodandaramaiah

executive
#81

So because of that, we're keeping a close eye on both Adani and JSW and watching how things develop into BHL. That's where we've mapped out that opportunity. And going forward, we remain more bullish on the Adani and JSW jobs.

Mudit Bhandari

analyst
#82

Understood. I was checking whether there were any projects you're targeting, but that's fine. And there

Sudha Kodandaramaiah

executive
#83

There are projects we already have—for instance, with Adani, Pirpanthi is one, and then there's another project. With JSW, Alibaug is one, and there's another project as well. Then, you know, additional projects need to be developed for them, and those are expected to come up for tendering. And BHEL, yes—given the packaging philosophy that has to be involved, we need to take a call on that. Then, on the balance of plant packages, there are certain specific projects that were—that are targeting Durgapur, that's one. So these are all very specific projects that work is ongoing on.

Mudit Bhandari

analyst
#84

Understood, sir — many thanks. And when we mention being affected by the rise in raw metal prices, which particular raw metal do we mean? Is it mainly the commodity, or is there something else as well?

Analyst

analyst
#85

No — one factor is that certain base metals have gotten more expensive. That has had a direct effect on the cost of raw materials such as steel and alloy steel. And because of — you know, when the war broke out in its early stages, in February and March, LNG prices spiked as well. That, too, has fed through into higher costs for the gases we rely on in construction. And of course, as you can see with recent prices, crude has moved up and down, and there has also been a rise in diesel — the diesel price — over the last 2 months, which we use predominantly on our mining projects. So those 3 are the main ones.

Mudit Bhandari

analyst
#86

Understood, sir. And here's the final one.

Nani Aravind

executive
#87

We do have PVC clauses that offset the majority of these cost increases, though those clauses occasionally take effect a quarter later, once the indices are updated. And sometimes, in the case of a private client, we typically try to reach out right away, and most of the increase has already been factored in. A portion of the increase has been factored in.

Mudit Bhandari

analyst
#88

Understood, sir. So at the console level for FY27, what revenue figure should we expect? And the second part of my question: in this particular Q, O&M came in somewhat lower, at just 413 crores. When I look at quarterly run rates across the past few quarters, uh, that number was a bit higher. Is there a specific reason for this, or is it simply a quarterly effect?

Sudha Kodandaramaiah

executive
#89

Could you say that question again for the second half? The second part?

Mudit Bhandari

analyst
#90

Okay, so regarding the second part, during this first quarter of FY27, O&M revenue came in at just 413 crores, and looking back over the past few quarters, that figure was somewhat above these levels. So is there a particular reason for this, or is it simply a quarterly impact and a quarterly phenomenon?

Nani Aravind

executive
#91

So last year, we actually handled a few one-time special projects involving overhauling the power plant. That's why their revenue came in on the higher side in the last quarter and the prior year. And as for one-time jobs, even in this year, we'll take them as they come, and we'll hit that number when we do. But right now, this projected figure is based on the orders I currently have.

Mudit Bhandari

analyst
#92

Yeah, and regarding that,

Nani Aravind

executive
#93

Sir, regarding R&D and certain R&D projects — renovation and modernization work at a few plants that some IPPs have bought — we were also earning revenue from those plants around last year, and we have already commissioned them. They have been, and for some of those, we have already secured long-term contracts. So because of that, there is also a slight decrease in revenue. And the overall guidance for FY27 is 7,300 crores, and we are on track to achieve that.

Mudit Bhandari

analyst
#94

Wishing you all the very best.

Executive

executive
#95

When you look at it on a total year-over-year basis, we're aiming for roughly 28% growth momentum. The figure was approximately 1760 last year, and this year our target is about 2089. So there is some quarter-to-quarter fluctuation, yet by year-end we'll achieve that growth of more than 20 — only 20% plus revenue growth is what we'll get.

Mudit Bhandari

analyst
#96

Much appreciated, sir. We're hunting for that number now.

Operator

operator
#97

Thanks. Our next question is from Avinav Mandovara at Equitas Investments. Avinav, go ahead.

Abhinav Mandowara

analyst
#98

Hey there, hi. My first question was about how much it matters that gas costs and base metal prices in India have been climbing. So, are our contracts structured as pass-through, variably linked, or fixed-rate?

Analyst

analyst
#99

Abhinav, could you say that again? I couldn't hear you clearly. Would you mind repeating the question?

Abhinav Mandowara

analyst
#100

Okay, I’ll ask this again. My question was about whether our contracts carry variable rates or fixed rates. As we can see, costs like access fees and base metals have gone up, and that has had an effect on our margin.

Rohit Sajja

analyst
#101

Right, so the majority of those contracts include PVC clauses, which makes them variable contracts. At times, though, the compensation doesn’t match how much market prices have risen, since updating the index takes a while. In those situations, particularly with private clients, we raise it with the client and review whatever hasn’t been factored in or protected under the formula. We address any erroneous increases, and sometimes clients pay back. So in most cases, clients are paying back.

Sudha Kodandaramaiah

executive
#102

No, actually, to build on what both of you said, basically most contracts include a price variation clause covering the contract period and the extension period, and there's also an element called fixed cost compensation, more on cost. That's a fixed amount as well. But what happens is when the bulk of the work gets done after the contract period, that's when the problem comes up. And in such a case, you know, we have to turn to claims management. And of course, under very unforeseen circumstances, we can also invoke the arbitration and dispute resolution mechanisms. That's an exception case. Generally, we try to settle it. And as Roy said, private customers, they try to settle it and pay across whatever is reasonable, or they'll try to do it in a business way that future jobs will take it and then some kind of understanding gets reached on that. But in the public sector, there are rules for them. Therefore, they have to go by that. And then as a last resort, we have to resort to dispute resolution, putting a proper claim when we find the additional cost have exceeded our own, whatever our cost we are incurring.

Abhinav Mandowara

analyst
#103

Hi there, this is Ria speaking. I’d like to get a sense, for a bill in nature, of how sizable those larger contracts are — how do the receivables on major contracts such as Adani and VSR look, and what quantity of orders remains pending at these facilities?

Analyst

analyst
#104

You'll need to ask that again. Your voice was fading, and we couldn't quite make out what you said.

Abhinav Mandowara

analyst
#105

Hi there, can everyone hear me okay?

Analyst

analyst
#106

Yep, yep, we can hear you. Yes, that’s improved now.

Abhinav Mandowara

analyst
#107

Yeah, I just wanted to get a handle on the order backlog from Adani, LTPC, and PSG, since those are the bigger customers. And then my second question has to do with receivables — given that our order size is growing, what kind of receivables are we seeing? Uh, has the payment cycle shifted at all, or what does the payment cycle look like now for the current customers?

Sudha Kodandaramaiah

executive
#108

Sure, so what I can say on that is that we have a broad classification. On the installation side, our backlog is 1,586 crores. For civil and power, it's 4,282 crores. On O&M, which is largely private sector, that comes to roughly 3,500 crores. And balance of plant, what we're doing with BHEL, is around 2,625 crores. Then there are specific backlogs: railways at 780 crores, electrical balance work at 684 crores. And then other sectors, like roads and drinking water, roughly 900 crores, 1,000 crores, sorry. So like that, we have a breakup of the pending work still to be completed in the backlogs available.

Nani Aravind

executive
#109

So looking at Adani, we've got roughly 2,400 crore in outstanding items — that's the total value of pending items — and right now we're executing 14 orders. On the BHL side, it's about 5,300, uh, with 5 major projects that we're currently running. So those two are the big ones. And as you can see, our exposure isn't very large. With Vedanta, another private player, we've completed 6 projects, and there's a backlog of orders worth around 1,551 crore.

Abhinav Mandowara

analyst
#110

And that Adani 2,400 — over what number of years is that spread? And the same question for BHL.

Nani Aravind

executive
#111

On those other timelines you mentioned — the order execution timeline — typically the range is 2 to 3 years between them. For wind down, they generally give 3 to 5 years, and for construction, civil and all that, it's 2 to 3 years between. For all our closing order book, you can take 2 and a half years as the execution period. You can take that as the average.

Abhinav Mandowara

analyst
#112

Understood. What's the payment cycle we're on right now, and are any of the bigger, larger players running late, or do we have different terms with them?

Nani Aravind

executive
#113

No, usually Adani and the other private players, once the bill is submitted, they take an additional 15 to 30 days. At first they'll pay 70% when the bill comes in, and then, before the month ends, they pay the remaining 30%. For BHL, the window is 30 days starting once we've submitted the bill to them.

Sudha Kodandaramaiah

executive
#114

For most of the contracts, it's within 30 days after the certified bills get matched, and then the payment becomes due.

Abhinav Mandowara

analyst
#115

Right. And do you have any figure for retention?

Nani Aravind

executive
#116

My apologies,

Abhinav Mandowara

analyst
#117

Is there any retention money?

Nani Aravind

executive
#118

On retention broadly, there's 5% general retention money in place. Under the agreement clauses, we submit a bank guarantee and we collect that money together with the running bill, man. There's no deduction. They do deduct, uh, but, uh, they release the money against the bank guarantee. Got it.

Abhinav Mandowara

analyst
#119

Regarding that final question, for this current year the margin is slightly around 0.5%, and taking into account roughly 2021 through 24.

Nani Aravind

executive
#120

So, look, the MDO margin is going to be 15%, but right now that piece makes up just 5 to 6% of total turnover. For the other 95%, if you look at the standalone average, you could figure somewhere in the 10% to 11% range — blended with the O&M business, it comes to roughly 12% to 13% at the standalone level.

Abhinav Mandowara

analyst
#121

Understood, understood. I believe that would be useful. I’ll reconnect with you afterward for any additional questions.

Nani Aravind

executive
#122

Appreciate it.

Operator

operator
#123

Thanks. Our next question is from Suhas Naik at Creda Capital. Go ahead, please.

Suhas Naik

analyst
#124

Hello, thanks. Could you tell us how you see the O&M business scaling up over the next 2 to 3 years, and what sort of margins we get at operating level in that business?

Sudha Kodandaramaiah

executive
#125

I mean, I think O&M keeps powering the business — both the top line and the bottom line — and we've watched it compound further, at 30 to 35%, 30% of our overall business. And the big driver behind O&M remains the capacity additions, as I mentioned earlier, which are going to take place over the next 5 to 6 years at a rate of 8,000 to 10,000 megawatts. And there, you know, the significance of O&M lies in outsourcing from the private sector and whatever plants are getting commissioned. Say there's a plan for Adani to complete more than 20,000 megawatts, 1,000 megawatts. Then JSWP has plants. And then Vedanta has plants too. So these plants will definitely come up for, uh, uh, co-investment. That's long-term outsourcing. And, uh, we — the size of the opportunity will be roughly 800 crores per annum. And then, uh, that hinges on how much outsourcing actually happens. And we expect most of the private sector projects that get commissioned will come for outsourcing. And the public sector — that's a question of how they take it up as a policy matter. But what we've seen recently is that about 5 projects, 5 plants, we're working on for long-term O&M.

Sudha Kodandaramaiah

executive
#126

That signals that the public sector will also want to expand the O&M profile, so their plants are run better, with improved margins and outsourcing rather than in-house management. And we anticipate additional opportunities. Opportunities in the public sector as well. So growth is going to be there. From what we have observed, growth will keep being present on the OEM side over the next 5 to 6 years.

Suhas Naik

analyst
#127

And how do margins look? What type of margins do we get in this business?

Sudha Kodandaramaiah

executive
#128

Yeah, near that, we're looking at 18 to 20%.

Suhas Naik

analyst
#129

That's great. And one more question — this is about how much we can execute, in terms of both human capital and the balance sheet. Based on our current strength, in both manpower and balance sheet, how many orders are we able to execute on a yearly basis?

Sudha Kodandaramaiah

executive
#130

Okay, so first, there’s the financial capacity side and working capital management. I’ll also cover the physical capacities. The organization has a very large HR base and client base, with roughly 4,000 engineers and then a workforce of about 45,000 to 50,000. Uh, that’s the basic point. And another key aspect is the two aspects of the project — this one, management and construction management. We have highly specialized groups in each of these segments. And they also take up the adequate plans and requisite inputs, the planning needed for executing the new projects. That way, in fact, you know, the organization’s capacity enhancement resources are quite substantial. Last time, about 1 year back, we had around 40,000 headcount. Today it has risen to 50,000 based on the manpower requirement in the increased O&M business and also some of the new installation jobs that have come up in the private sector, power as well. And another equally important capacity requirement is in terms of handling equipment, construction equipment in civil mechanical, cranes, and then across all the civil area equipment that I keep continuously updating. We are providing a capital budget for that, for new add-on capacities. That way — and then only in exception cases where the capacities are very high crane, it’s like 500-ton capacity or 700-ton capacity — we resort to hiring.

Sudha Kodandaramaiah

executive
#131

Beyond that, in-house capabilities handle 80 to 90%.

Nani Aravind

executive
#132

Beyond what you mentioned, sir, on the working capital need — roughly 30% of our revenue comes from the wind-up business, where there’s no material involvement or equipment requirement. So that 1-month salary is just the money needed to keep those employees. For the other 70% of the business, our EPC business, which we entered recently — earlier most of it was done through construction contracts via LCs and so on. We handle the materials. So at the current level of working capital limits, with the present stock, you can achieve up to 10,000 crore of revenue. The only thing is we need to add 100 to 120 crore of CapEx each year for the requirement, for new orders.

Suhas Naik

analyst
#133

Great. One final question concerns how operating margin is going to trend. What we’re referring to is that we’re moving further into BPOs, more balance of plants, then you have MDOs, and the third one is O&M. Every one of those businesses is going to carry a higher margin. So at the company level, should we expect the margin profile to get better as we head into ’28 and ’29?

Nani Aravind

executive
#134

Right, since it hinges on how our O&M and mining business are mixed. On a year-on-year basis, your EBITDA margin is going to rise. So we're aiming for roughly a 0.5% increase each year, uh, and through, through 2030. And beyond 2030, it will reach nearly 14% EBITDA margin, up from the current 12.5%.

Suhas Naik

analyst
#135

Appreciate it, sir. And thanks for answering.

Nani Aravind

executive
#136

Thanks.

Operator

operator
#137

Thanks. Our next question is from Dhananjay at Centrum Broking Mumbai. Go ahead, please.

Dhananjay Mishra

analyst
#138

Thanks for giving me the chance. Sir, during this quarter, the ETC business — I mean, on the revenue side, it has dropped from 250 crore down to 217 crore. And on top of that, we had no order inflow at all in this segment. So how do you view the overall revenue for this segment? Since last year we saw very strong growth — on an annual basis we did roughly 1,300 crore from the ETC segment. So given the order pipelines, how do you expect this segment to perform in the current quarter?

Nani Aravind

executive
#139

Regarding the major segment, sir, we previously handled the Athena and Vedanta projects along with FGD projects. Due to the accident that occurred at the Athena project last year — about 3 to 4 months back — we saw a revenue impact in Q1. Now they have recently begun the work again in our operations, and that will be covered starting in Q2. As for FGD, we have nearly finished the major works and are close to completion. Perhaps this quarter we will try to close out all the remaining FGD balance works as well. Because of this, revenue in the ETC business is comparatively lower. And then again, on EPC, internally our erection and civil teams are working on the in-house EPC business internally, and that will come under the EPC turnover of 96 crore once they are engaged with the EPC works.

Analyst

analyst
#140

Also, the shortfall we'll see here in Q1 on power plant construction is partly due to some of the skill being diverted toward industrial construction EPC — the BOB EPC project we've taken up with BHEL. It's similar work in nature, so we're applying the same skill to carry out some amount of the work there. So you'll see some growth there, but overall — power construction and EPC combined — you'll see good growth. Club both of them together and you'll see 20 to 22% growth. If it's only power plant construction, erection, testing, commissioning, we believe we've maximized our execution potential. We're able to execute 14 to 15 boilers, 800-megawatt boilers, around at the same time. And we plan for this to increase by only 1 or 2 boilers year on year, which will contribute only a minor increase of 5 to 7% growth here. But on the other hand, EPG is going to grow at 22 to 22%. So an average growth of 14 to 15% is what can be expected from the power sector.

Sudha Kodandaramaiah

executive
#141

Turning to backlog — if you look at the earlier trend, during 2024 to 25 our backlog stood at 14,387 crores, and we brought in revenue of more than 6,000 crores. So as of today, backlog sits at 60,228. Viewed from that perspective, even 40% plus of incoming new orders ought to deliver reasonable growth in the current year as well.

Operator

operator
#142

Mr. Lalit Jay, have you finished with your questions? Ladies and gentlemen, because of time limits, we've now reached the conclusion of the question and answer session. At this point I turn the conference back to management for closing remarks.

Sudha Kodandaramaiah

executive
#143

Okay, thank you for joining us, everyone. I believe at the start of this quarter we've gotten a clear picture of where the company needs to head. Moving into power supply through diversification is a massive opportunity, and fresh possibilities will emerge in that area. We'll also keep up our ongoing investment in the power sector, with 2 gigawatts of announced investment over the coming 7 to 8 years — 6 years. That remains a key focus for us, along with the O&M opportunities that will arise from the new plants. Beyond that, there's attention on infrastructure, on railways, and on other sectors that could become steadier. As for the international business, we're performing quite well on O&M maintenance jobs, with better margins. We expect that new opportunities emerging in West Africa, the Middle East, and GCC countries should let us grow in the international sector as well. And certainly, 2 to 3 new opportunities are being worked on closely with the EPC contractors over there, and that will add substantially to what you'd call the installation jobs and service jobs — similar to what we did back in 2023 to 24 — and those will return to the pipeline once this field becomes operational there.

Operator

operator
#144

<<operator_signoff>>

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Power Mech Projects Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Power Mech Projects Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Power Mech Projects Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.