Appreciate that, Christie. Morning, everyone. Earlier today, PSEG put out its results for the first quarter of 2020. You can find the attachments to the earnings release and the slides that break down the results on PSEG's IR website, and our 10-Q is going to be filed soon. Both the earnings release and the other topics we'll cover on this call include forward-looking statements and estimates that carry various risks and uncertainties; we'll also be talking about non-GAAP operating earnings and non-GAAP adjusted EBITDA, which are not the same as net income as reported under generally accepted accounting principles in the United States. Reconciliations of our non-GAAP financial measures, along with a disclaimer about forward-looking statements, are available on our IR website and are part of today's earnings materials. Now I'd like to hand the call over to Ralph Izzo, who serves as Chairman, President, and Chief Executive Officer of Public Service Enterprise Group. Dan Cregg, Executive Vice President and Chief Financial Officer, is on today's call with Ralph. Once they finish their remarks, we'll open things up for your questions.

Ralph Izzo

executive
#2

Thanks, Carlotta, and I appreciate everyone being here today. Ahead of walking through what happened in the quarter, I want to pause and offer my heartfelt sympathies to anybody listening who has dealt with COVID-19 personally. My thanks go out as well to those in healthcare and emergency first response. For those frontline heroes in New Jersey, PSEG recently gave 50,000 N95 masks along with 200,000 pairs of gloves, which helps restock personal protective equipment. Going forward, I'll just call that PPE. A $2.5 million commitment has also come from the PSEG Foundation, funding grants for regional food banks plus health and social services organizations across our communities. Delivering electric and gas service safely and reliably to our 3.7 million customers in New Jersey and on Long Island has always been PSEG's foremost obligation. New Jersey and Long Island, being part of the New York metropolitan area, rank among the regions hit hardest by COVID-19, yet improvement is now appearing. Among PSEG employees, confirmed COVID-19 incidence rates stay lower than those seen in the general populations of New Jersey and Long Island. Right now, roughly 1% of our workforce is self-monitoring, so personnel availability remains strong, which speaks to how effective the safety protocols we implemented early have been; this matters even more as summer storm season arrives and mutual aid resources could be harder to access. PSEG's COVID-19 response places the continuing safety of our employees and customers at its core. We check our safety protocols routinely against guidance from federal, state, and local health authorities concerning physical distancing, PPE, and extensive cleaning protocols. Although non-essential fieldwork activities have been suspended, PSE&G and PSEG Long Island keep responding to customer outages and emergency service requests, including no heat or no hot water calls. Importantly, work continues on critical energy infrastructure projects that support the system reliability and resilience our customers value. Governor Murphy laid out The Road Back last week, a multistep approach for recovery and restart of the New Jersey economy over the coming weeks and months as conditions permit. Looking forward, we've begun planning a responsible reentry for the PSEG workforce once the states where we operate — New Jersey, New York, Connecticut, and Maryland — start their transition to recovery mode. With that goal in mind, PSEG is carefully preparing changes to our work sites, work practices, and procedures so that employee and customer health and safety are protected. These steps will be taken so we emerge stronger, more nimble, and more resilient once this transition is behind us. Turning to our financial results for the first quarter, the year has gotten off to a good start. PSEG reported $1.03 per share of non-GAAP operating earnings compared with $1.08 per share in the first quarter of 2019. For the quarter, our GAAP earnings came in at $0.88 per share, versus $1.38 per share during the first quarter a year ago. You can find the quarter's details on slide five of the earnings presentation. Among the quarter's drivers was rate base growth stemming from ongoing transmission and distribution infrastructure investment at PSE&G. Another factor was the introduction of Zero Emission Certificates, or ZECs, at PSEG Power, which only started in the second quarter of 2019, partially offset by an expected decrease in Power's capacity prices, along with less favorable weather comparisons at both PSE&G and particularly at Power, resulting from the second mildest first quarter ever recorded in New Jersey. Because most New Jersey businesses, schools, and government buildings temporarily shut down after stay-at-home orders took effect March 21st, the PSE&G service territory saw a weather-normalized drop of roughly 5%-7% in electric load from the end of March through April. Excuse me. That matches the more aggregate data we receive from PJM, indicating demand has fallen by that same 5%-7%. These ranges, plus the usage mix across residential, commercial, and industrial customers, are imprecise, since the absence of smart meters, or AMI, in New Jersey restricts our capacity to analyze demand changes in real time. Even so, we expect this reduction might persist through the second quarter and perhaps beyond. To address this point directly, our volume risk and margin risk are smaller than the decline in PSE&G's kilowatt-hour sales would imply. Three-quarters of total utility margin comes from transmission and residential electric and gas customers. Transmission isn't sensitive to volume, and residential customer margin should be higher while people shelter at home. The other one quarter of margin originates from commercial and industrial customers, which is mostly determined by peak demands and, for gas, is established annually rather than by volumes. Non-residential customer segments account for a considerably smaller share of margin during the lower use shoulder season that spans most of the second quarter. The COVID-19 related demand reduction showed up late in the first quarter, but compounded the negative impact of New Jersey's warm winter. PSEG has navigated these challenges, maintaining our investment program at PSE&G, supplying New Jersey with zero carbon emission power from our nuclear facilities, and delivering efficient cost management throughout our business. Managing a nuclear refueling outage ranks among the largest and most complex projects anyone can take on, even under normal circumstances. I'm happy to say the Salem 2 refueling outage is progressing quite well. Our nuclear team is performing excellently and has narrowed the outage's scope while broadening health screenings to cover non-PSEG crews, protecting every worker at the multi-unit site, which also includes Salem 1 and Hope Creek. When we marked Earth Day's 50th anniversary a month ago, doing so in a virtual format, PSEG put out its first climate report, one built on the framework laid out by the Task Force on Climate-related Financial Disclosures, or TCFD. That document recognizes how climate change keeps affecting PSEG's operations, the territory we serve, and the lives of our customers. It takes pride in describing our backing for keeping nuclear generation alive, our use of energy efficiency to reduce greenhouse gas emissions, and our pushing for sound climate policies — above all, a carbon price. Regarding regulation and policy, a number of positive steps have occurred at both FERC, the Federal Energy Regulatory Commission, and the New Jersey Board of Public Utilities, the BPU, since we last held an earnings call; during March, FERC indicated through a Notice of Proposed Rulemaking that it backs extending transmission incentives and acknowledged the general worth of transmission investments. FERC additionally put forward raising the RTO adder from 50 to 100 basis points for taking part in a regional transmission organization like PJM. The New Jersey Energy Master Plan, completed this past January, observed that the BPU would step up its involvement in transmission ROE and cost allocation proceedings at FERC on behalf of New Jersey ratepayers. We keep collaborating with the BPU on such issues.

Ralph Izzo

executive
#3

The BPU likewise hasn't fallen behind on the various items on its clean energy agenda. Its energy efficiency transition proceeding is moving ahead with webinars of the stakeholder working group, and one of those takes place today. Regarding how EE programs get administered, BPU staff has moved its position forward so that the yearly targets of 2% electric savings and 0.75% gas savings set by the 2008 Clean Energy Act can be met. Utilities would take the leading role in running these crucial efforts so that usage — and, in turn, emissions and customer bills — comes down in a cost-effective way. Stakeholder feedback on energy efficiency cost recovery is still being weighed by BPU staff. On these topics and other energy efficiency matters, PSE&G has taken part actively in the stakeholder dialogue. A final energy efficiency proposal from BPU staff is anticipated to go before a vote at an agenda meeting scheduled soon. The necessity of AMI has gotten BPU backing as well, and the statewide moratorium on smart meters was recently brought to an end. Procedural schedules have been established by the BPU for the Clean Energy Future proposals, which cover $600 million for Energy Cloud, or advanced metering infrastructure — smart meter, in other words — plus $400 million for electric vehicle energy storage programs. Our aim is to wrap up the AMI, electric vehicle, and energy storage proceedings around the close of this year or as the new year begins. More recently, the BPU took action to look into the Fixed Resource Requirement, or FRR, as a means of meeting the state's future capacity obligations with the resource mix it favors. This BPU step came in reaction to the first December 2019 order, which established replacement rules for the PJM capacity auction and broadened the Minimum Offer Price Rule's application to certain new and existing state-subsidized generating resources — namely offshore wind, solar, and nuclear. You might remember that the recent New Jersey Energy Master Plan named both offshore wind and the New Jersey nuclear units as necessary for the state to reach its carbon reduction goals. PJM's March compliance filing, likewise responding to FERC's December order, put forward a price floor for the New Jersey nuclear units known as the ACR, or Avoidable Cost Rate, which would keep their bidding flexibility fully intact so they can clear in the PJM capacity auction coming up. Were New Jersey to run the FRR auction, broadly speaking, our nuclear units and most of our fossil fleet would gain a choice to bid either in PJM's capacity auction or in a New Jersey FRR. An FRR might be designed with a longer tenor, a preference for zero carbon generation, and locational delivery requirements. In our view, the state could go after an FRR absent legislation, though the call on whether to proceed ultimately rests with them. We plan to take part in this proceeding and to propose designs for the FRR that best hold down the cost impact on New Jersey's customers from FERC's capacity ruling. Our five-year capital plan, ranging from $12 billion to $16 billion, is something we're still dedicated to carrying out, and we won't need to issue equity to do it. From a 2019 year-end base of just over $20 billion, this plan should deliver compound annual growth of 6.5%-8% in PSEG's rate base. I'd add that over 90% of what the utility invests gets recovery of and on capital through either a formula rate or a clause-based mechanism. Toward a joint venture agreement that could involve acquiring a 25% equity stake in Ørsted's Ocean Wind project, which is 1,100 MW, PSEG is carrying on with due diligence and negotiations, and a decision is anticipated this fall. PSEG's net liquidity position has improved as well, finishing March with roughly $4 billion in available liquidity. Our common dividend matters to shareholders, as we always recognize, and with our 113-year track record ever in mind, we're dedicated to keep offering the chance for that dividend to grow consistently and sustainably. For full-year 2020, we are today reaffirming non-GAAP operating earnings guidance of $3.30-$3.50 per share. Normal weather and plant operations for the rest of the year are assumed in our guidance. Keeping solid operations and strong cost control at both the utility and PSEG Power will be necessary because of the quarter's extremely mild weather, the related softness in market demand, and COVID-19's impacts, particularly through the third quarter cooling season. To close, I want to thank each of our 13,000 employees for their remarkable dedication, flexibility, and care for one another and for our customers throughout these many hard weeks. For more details on our financial and operating results, I'll hand the call to Dan. Dan?

Daniel Cregg

executive
#4

Can everyone hear me now? All right. I'll restart my comments from the top. Apologies for the technical issues. As Ralph said, PSE&G posted non-GAAP operating earnings of $1.03 per share for the first quarter of 2020, compared with $1.08 per share in the same quarter a year ago. On slide 10, we've given you details about how each business contributed to non-GAAP operating earnings this quarter. Slide 11 has a waterfall chart walking you through the quarter-over-quarter net changes in non-GAAP operating earnings by major business. I'll begin going through each company more closely, starting with PSE&G. PSE&G, as slide 13 shows, had net income of $0.87 per share in the first quarter of 2020, versus $0.79 per share in the first quarter of 2019 — a 10% increase year over year. PSE&G's results came from revenue growth tied to ongoing capital investment programs in transmission and distribution, which outweighed the effect of unfavorable winter weather on electric and gas margin. Keep in mind that our gas distribution business has a weather normalization clause that softens the effect of weather-related sales variances relative to normal weather. Growth in transmission rate base added $0.06 per share to first quarter net income, including roughly $0.02 per share of items that will reverse during the second and third quarters of 2020 because of timing of expenses in 2019 true-ups. Gas margin — which reflects recovery of investments made under the Gas System Modernization Program, or GSMP2, plus higher weather normalized gas sales margins — boosted quarter-over-quarter net income comparisons by $0.04. Winter weather, measured by heating degree days, came in 19% warmer than normal and 19% warmer than the first quarter of 2019. The gas weather normalization clause largely offset the negative effect of unfavorable weather on gas margin quarter over quarter; even so, the drop in electric sales and revenue stemming from a large weather difference cut quarter-over-quarter earnings comparisons by $0.02 per share. For the trailing 12 months ended March 31st, weather normalized electric sales and weather normalized firm gas sales each fell about 1%, driven by lower commercial and industrial usage. Residential sales were flat, as customer growth of just under 1% was offset by gains in energy efficiency and solar net metering. As mentioned earlier, PSE&G's capital program is still on schedule, with essential work proceeding on most of our critical reliability and infrastructure replacement projects at our transmission and distribution facilities. PSE&G spent about $600 million in the first quarter and remains on track to hit its full-year planned capital investment program of $2.7 billion. Several important projects continue to move forward, among them the Metuchen/Trenton-Burlington project, whose phase 2 was energized, and the Aldene to Linden project, which recently energized an upgraded circuit linking Aldene and Linden. Both are on plan and on budget. Keeping bills within reach for customers stays a top priority while we make investments in the network, and on that measure PSE&G continues to look strong: as of January 1, 2020, combined electric and gas bills came in at less than 3% of median household income in New Jersey. Back in March, PSE&G paused, on a temporary basis, every service disconnection tied to non-payment that wasn't a safety matter, given the COVID-19 emergency and the money struggles so many of our customers face right now. Customers will be told about the payment assistance programs and bill management tools that exist. Keep in mind that on the electric side, bad debt expense is recovered by us through the societal benefits charge, which gets trued up from time to time. Our net income projection for PSE&G in 2020 is being reaffirmed at $1,310 million-$1,370 million, which is $1.31 billion to $1.37 billion. Turning now to Power. PSE&G Power posted non-GAAP operating earnings of $0.17 per share along with non-GAAP adjusted EBITDA of $201 million. That's against operating earnings of $0.29 per share and adjusted EBITDA of $304 million for the first quarter of 2019. First-quarter net income came to $13 million, equal to $0.02 per share. A pre-tax charge of $20 million, reflecting a lower-of-cost-or-market adjustment on oil inventory, was taken in the first quarter and left out of our non-GAAP figures. For a detailed breakdown of the items affecting PSEG Power's non-GAAP operating earnings and non-GAAP adjusted EBITDA versus net income quarter-over-quarter, see the earnings release and slide 18; slide 19 gives you further detail on generation for the quarter. Compared with the first quarter of 2019, PSE&G Power's first-quarter results took a hit from extremely mild winter weather. A planned drop in PJM capacity revenue cut non-GAAP operating earnings comparisons by $0.11 per share versus Q1 2019. Adding ZEC revenues into first-quarter results contributed $0.07 per share. Weaker generation output for the quarter trimmed comparisons by $0.01 per share, and recontracting pulled results down by $0.01 per share, reflecting a decline of roughly $1 /MWh in the average hedge price against the year-ago quarter. The weather-driven fall in total gas sendout to commercial and industrial customers cut results by $0.04 per share. O&M expense tied to an unplanned outage at Salem Unit 1 brought results down by $0.01 per share. Greater interest expense reduced comparisons by $0.01 per share against the year-ago quarter. Gross margin slipped a bit in the first quarter to $30 /MWh, versus $31 /MWh a year earlier. Power prices came in weaker across PJM, New York, and New England relative to the year-earlier quarter, since winter temperatures averaged 16% higher than in the first quarter of 2019. Average capacity prices for PSEG Power in PJM are scheduled to increase during the second half of 2020. Starting June first, the average PJM capacity price climbs to $168 /MW day, from $116 /MW day. Capacity pricing in ISO New England is set to go down, though adding Bridgeport Harbor 5 — with its capacity lock lasting seven years at $232 /MW day — will soften how much that affects our capacity revenue. Moving on to how Power performed. Overall generation came in 6.5% lower, at 13.2 TW hours, which mirrors the divestiture of the Keystone and Conemaugh Units last autumn. Output from PSEG Power's combined cycle fleet reached 5.1 TW hours, a 16% gain, thanks to Bridgeport Harbor 5 joining the fleet when it began commercial operation in June of 2019. Our three newest combined cycle units — Keys, Sewaren, and Bridgeport — together achieved a solid 81% average capacity factor during the quarter. For Q1, the nuclear fleet ran at a 94.9% average capacity factor, generating 8 TW hours, which equals 61% of overall generation. Greater production at Hope Creek and Salem 2 only partly made up for a repair outage at Salem Unit 1 that lasted a month, so nuclear output fell 2% for the quarter. Salem 2 began its 24th refueling outage on April 11th. That outage has been trimmed to finish a core set of essential tasks, which should cut both how long it lasts and what it costs. PSEG Power still projects yearly output of 50 to 52 TW hours for 2020 through 2022. Across the rest of 2020, Power has hedged roughly 95%-100% of production at an average price of $36 per MWh. For 2021, Power has hedged 55%-60% of forecasted production at an average price of $35 per MWh.

Daniel Cregg

executive
#5

Looking at 2022, Power has locked in hedges covering 25%-30% of its projected generation at an average cost of $35 per MWh. When it comes to PSEG Power's anticipated gross margin for 2020, over 70% is already assured through our stronger hedged position on energy output, capacity revenue locked in from prior auctions, the chance to capture a full year of ZEC revenues, and certain ancillary service payments like reactive power. Our forecast for PSEG Power's non-GAAP operating earnings in 2020 stays at $345 million-$435 million, and non-GAAP adjusted EBITDA remains at $950 million-$1,050 million, both reaffirmed. Within adjusted EBITDA for Q1 2020, there are pre-tax expenses of $35 million tied to buying New Jersey tax credits, while the benefit from that program shows up below EBITDA in income tax expense, and together they produce a net gain of $5 million for the quarter. No comparable transactions occurred in Q1 of 2019. Let me now touch briefly on the first-quarter 2020 results for PSEG Power and Other. Power and Other posted a net loss of $5 million, or $0.01 per share, versus net income of $1 million, flat on a per-share basis, in the same quarter last year. That net loss for Q1 stems from greater interest and tax expenses at the parent, partly offset by continued contributions from PSEG Long Island. For 2020, we reaffirm that the outlook for PSEG Power and Other is unchanged, at a net loss of $5 million. PSEG finished the quarter holding $799 million in cash on its balance sheet. This March, PSEG completed a $300 million variable rate loan maturing in March of 2021. As of March 31st, PSEG could draw $3.2 billion through its $4.2 billion credit facility, which includes a $4 billion revolver extended by one year to March of 2024. Debt at March's end equaled 52% of our consolidated capital, while debt at PSEG Power made up 32% of its capital when the quarter closed. During Q1, PSEG issued $300 million in 10-year, 2.45% secured medium-term loans along with $300 million in 30-year, 3.15% secured medium-term loans. Beyond that, we paid off a $406 million 5.13% note at PSEG Power that came due in April. Also during April, PSEG completed two more term loans amounting to $500 million. For the rest of the year, we face roughly $260 million in PSE&G maturities due in August, plus a $700 million parent maturity in November. Our strong balance sheet and credit metrics allow us to fund our 2020 to 2024 capital investment program internally, with no need to issue new equity. As Ralph said earlier, we reaffirm our full-year 2020 forecast for non-GAAP operating earnings of $3.30-$3.50 per share. That wraps up my comments, and I'll now hand the call back for questions.

Julien Dumoulin-Smith

analyst
#6

Hi there, and good morning. Congrats on keeping it all together.

Ralph Izzo

executive
#7

Thank you. Appreciate it, Julien.

Julien Dumoulin-Smith

analyst
#8

Sure thing. So I was hoping we could go a bit deeper into that Power and PSE&G 2020 reaffirmation. Regarding those cost controls you've built in — I get that things are shifting and it's tough to pin down — what magnitude are you folks thinking about as you reaffirm today? Particularly on the Power segment, since clearly that's mostly hedged, though not completely. I'm simply attempting to grasp the scale you all have in mind for your guidance, considering the pluses and minuses, set against what's clearly a shifting target along with full-year load and average pricing expectations.

Ralph Izzo

executive
#9

Julien, instead of handing you individual components with distinct figures tied to each one. Well, to start, it's nice to hear from you. I trust you and your loved ones are doing fine, and that you're coping with these difficult circumstances too. One example of what we've undertaken is readjusting our nuclear refueling outage. We removed quite a few days. I'm unable to share that figure since I don't believe it's been posted on OASIS; we never had the initial day count. So I'd rather not provide the updated day count. Although O&M rises, because of the work rules required for an outage, and so we only achieved a small O&M savings from making the outage shorter, we boosted many revenue expectations for items such as executive compensation, that sort of thing, by cutting the outage short. You brought up the hedge position, and while the hedges aren't flawless, we stood at roughly 95% hedged for this year. There have been relatively small O&M cuts simply in terms of support services we managed to capture, purely due to altered work practices. Those are the kinds of items at Power in the Utility, since we're only performing essential work for customers. There's been a decrease in O&M tied to certain appliance repair tasks and similar work that the Governor requested we halt; meanwhile, we remain at full speed on the capital program, which as you're aware receives that 90% clause recovery. It's been a mix of factors, and the team is working 24/7 to ensure we're continually adjusting and tweaking. Dan, go ahead and chime in if you'd like.

Daniel Cregg

executive
#10

Right, I'd say that captures it well. And I believe you'll notice some upside showing up too, insofar as certain hedges carry a reduced cost to serve. If the market sits lower and we're able to use that to back some of the hedges, then some gains might emerge from that. A number of those agreements skew somewhat toward the smaller end, or toward residential, so an increase could appear in that area too, Julien.

Julien Dumoulin-Smith

analyst
#11

Understood. Great. Let me ask a quick second question here. Regarding that offshore wind deal, what's your thinking on how you'll reach an agreement on it? In the end, does the schedule for this get folded into a wider discussion involving FRR and the election, plus how the state approaches it? For you to feel at ease taking part in some capacity, do we require a decision of some sort from the state?

Ralph Izzo

executive
#12

No, thanks, Julien. That's a good question. I'll be more direct than I have been previously, since Ørsted is simply a fantastic company and an extremely valuable partner. Time works in our favor; we're just — I don't want to annoy my Ørsted colleagues if they happen to be listening — but taking each day to discover as much as we can about this business benefits us, and it lets us stretch out the window they've given us to reach that decision. Our starting point was one of comparative ignorance. Essentially, it's about using each day to grow more and more knowledgeable about what developing that project involves. The state is fully dedicated to getting that project built. It seems the federal agencies are too. There have been widely reported holdups across various projects in the company. Ørsted has itself mentioned certain holdups in clearing the federal permits; the FRR truly isn't the issue here at all. The BPU order is very explicit about what the commercial terms for that project are and will be. Given that firmly settled top line, we simply need to figure out what the middle of the income statement looks like when it comes to ongoing operational costs, and then decide at some point in the fall. It's only that, to say it again, time works in our favor when it comes to gathering more and more information and growing more and more knowledgeable.

Julien Dumoulin-Smith

analyst
#13

Understood. Great. As far as you know, there's no new information about when the FRR issue will be resolved?

Ralph Izzo

executive
#14

If I had to guess — and I hope saying "educated" doesn't come across as presumptuous — it's likely the earliest point would be the close of this year, and more probably it carries over into Q1 of the following year. Keep in mind, the state genuinely no longer needs to be concerned about paying twice for capacity, since the nuclear units are now covered, or at minimum for the time being, up until offshore wind is up and running. That won't occur before 2024. The 2021 auction would be the thing you'd need to think about prior to having to activate your FRR, in order to prevent that duplicate capacity payment.

Julien Dumoulin-Smith

analyst
#15

Great. Thanks so much to everyone. Wishing you the best. Keep yourselves safe.

Ralph Izzo

executive
#16

Of course.

Constantine Lednev

analyst
#17

Hello, good morning, everyone. Shar needed to step away, so I'm fielding a few questions here; it's wonderful to get the update that everybody's remaining safe and that work continues. You brought up roughly that 5%-7% load effect that you're observing. If we simply consider something like a prolonged lockdown in New Jersey, let's say the entirety of the second quarter, what would that imply regarding sensitivities for EPS, and given that you understand there are some offsetting dynamics and that only a quarter of the margin is really on C&I? Could you discuss — you touched somewhat on the cost efficiency levers being pulled, but perhaps a bit more specifics on the magnitude relative to that sensitivity.

Daniel Cregg

executive
#18

Constantine, it's been somewhat difficult, and Ralph mentioned in his opening comments that absent AMI, we lack the granularity we'd prefer to have. We know as a fact that in the aggregate, when we examine what the reductions are, we're within that 5%-7% range on a weather-normalized basis. From all signs, we're going to experience an increase on the residential side, and we're going to encounter more difficulties on the C&I side, simply from knowing what's happening. We've essentially examined that sort of trajectory and assumed that we would keep seeing that through the remainder of the year; now, it's going to produce varying effects as you move through the year. You're going to have differing seasonality, you're going to have differing effects as the year progresses. That's what we rely on to try to assess how things would appear. If you consider both the power and utility business together, and you attempt to see what that will do from an EPS standpoint, it ranges on the order of approximately a penny per month from the perspective of impact on enterprise earnings across the summer periods. Then once you reach the fall, into more of a shoulder period, you might observe slightly less impact simply because you have a different dynamic regarding what overall loads are. That's admittedly a rough estimate given the data we possess and how we've managed to forecast it out. As time passes, we'll keep receiving more data and more data from a customer segment perspective and be able to sharpen that. That's the order of magnitude we've witnessed from the standpoint of losses so far and where we believe it might ultimately land. That's a gross margin figure. We're going to take that, and then you would apply taxes to it, and then you're going to proceed through on the cost side. When you consider how this business's costs are structured, a few fairly evident items come to mind — travel being one example. Then there are the more fundamental areas, similar to what Ralph mentioned, where we intend to reduce certain outages. Certain jobs could end up costing more to carry out, yet a portion of that work simply won't happen over this stretch, and that generates savings. We'll keep steering this through the remaining portion of the year. Taking all of that into account, I believe that's precisely what allows us to feel confident in reaffirming guidance.

Constantine Lednev

analyst
#19

All right. That’s logical. Sort of balancing out on each side. Here’s another one, and this may be one for Ralph. You mentioned the NJBPU and getting stakeholders involved regarding ROE. Are there any developments in terms of what kinds of discussions are happening at this point?

Ralph Izzo

executive
#20

Yes, Constantine. I’ll repeat what I said a short while ago. It’s good to hear from you, and I hope you and your family are doing well too. I’d rather not get into specifics about the talks with the BPU concerning transmission ROE, but it’s enough to say we remain in discussions. The reason behind that is simply that New Jersey’s economy is struggling at the moment. I believe the BPU understands this presents a strong chance to potentially return a great deal of money to customers through a decrease in the ROE we’re permitted. Instead of getting involved in a drawn-out FERC litigation, which could take a number of years before that rate relief happened, this is an opportune moment to proceed; we’d be on board with that. That said, we’ve made it very plain to the BPU what we consider an appropriate return, and we won’t agree to anything unless it aligns with that view of an appropriate return. I’m certain they see it the same way. Fortunately, talks are still ongoing, and both sides acknowledge there might be a mutually beneficial outcome if we can close the remaining distance between us. I apologize for not providing a particular figure or a particular response at this moment, Constantine, but the character of that exchange prevents me from doing so. Everyone involved understands that resolving this would greatly help a lot of people. If that proves impossible, then fine. It will be settled somewhere else. If we had technical problems earlier, I’m hoping we didn’t just go quiet once more.

Constantine Lednev

analyst
#21

Oh, my apologies for that. I happened to have my line muted. Just a single very quick question for Dan. For the rest of the year, is there still any volumetric exposure tied to the power hedges, or is that essentially fully hedged out?

Daniel Cregg

executive
#22

Certain hedges of ours carry volumetric aspects. Volumetric aspects also exist in parts of our generation; that's the way I'd want you to view it, Constantine. Nuclear units will operate the way nuclear units do. After that, our gas units, with capacity factors that are pretty significant, will continue to follow load. In the same way, we'll have certain block hedges in place. We'll also have certain load deals in place; the sum of our hedge portfolio is made up of those. I believe you have the capability for part of your generation to flex in response to load changes. I believe you have certain hedges of yours that will behave the same way; they won't move in absolute lockstep. I believe those hedges will perform well for the fleet we possess. You'll notice some of them operating in approximate tandem.

Constantine Lednev

analyst
#23

That's great. I appreciate it, everyone. Please take care of yourselves.

Daniel Cregg

executive
#24

I appreciate that, Constantine. Same to you.

Carlotta Chan

executive
#25

Christie, let's go to the next question.

Steve Fleishman

analyst
#26

Yeah, hello, and good morning. I'm hoping you're able to hear me.

Daniel Cregg

executive
#27

Yep. Yes, we can hear you, and we're hearing you just fine.

Steve Fleishman

analyst
#28

Hi there. Ralph, over these past few weeks, I believe I've seen your face on television about as often as I've seen my own family. It's been a pleasure. Nice to see you. A few items. Regarding the 2020 guidance, you brought up the ongoing solid operations and expense management. Are you simply signaling that pressures exist and there isn't the usual cushion, or what exactly are you attempting to stress with that?

Ralph Izzo

executive
#29

There's nothing beyond what we stated in that spot, Steve. The flexibility available to you comes through outage duration, and that assists on two fronts: the cost tied to the outage and the chance to capture margin. Within the utilities, what you can do is this — by performing fewer O&M activities and more capital work, you gain from the clause recovery linked to that capital while also gaining from lower O&M. When you cut certain non-essential services, you get some overtime savings. It's genuinely a mix of such items. No single particular line stands out. Incidentally, that television ad you watched was captured by my spouse using an iPhone. We cut costs right there, in case you were wondering. We nearly racked up a bill from a divorce lawyer — that turned out fine; we got past it. I realize everyone wants to ask, alright, what steps are we taking to reach $0.05? What steps are we taking to reach $0.03? That simply isn't how it functions; it's truly an endless emphasis on many minor items that accumulate. As for the guidance range, per what Dan mentioned, we'll be pushing against roughly $0.01 per share should this present demand-reduction pattern persist, with a smaller impact following the summer. That's the hurdle we're up against; when we provide a $0.20 range, we retain sufficient flexibility within it, given that sort of headwind alongside certain offsets, to reaffirm.

Steve Fleishman

analyst
#30

Okay, so regarding those New Jersey capital programs that sit outside the base rate case — with the schedules you currently have in hand, how confident are you that a meaningful portion of that spending will begin, or actually happen, during 2021?

Ralph Izzo

executive
#31

I'd say my confidence is high. Let me explain the reasoning, since I've mentioned this to you previously. Even with truly exceptional stewardship from Governor Murphy, this state got handed an extremely difficult situation. Ours is a state with high population density, so because of how many people live here per square mile, the impact from COVID-19 has been more severe than in any other state except New York. That brings enormous social consequences, health consequences, and economic consequences too. As a business, we're arguably in the strongest position to assist with those economic consequences, correct? The energy efficiency filing we submitted carries enormous upside, including as many as 5,000 jobs that might result from it, plus lower bills for customers and advantages for shareholders. You cannot identify anything else delivering that combination of benefits. Previously — I'm not claiming the same thing happens this time — but previously, back in 2008, when the economy went into a downturn, the BPU wanted to speed up certain aging infrastructure replacement work as a way to stimulate the economy. We will definitely bring that up with them again. We have capacity to accomplish additional work on the electric distribution side beyond what we're currently doing, and that's valuable work to pursue while also keeping in mind some of the economic effects our state is going through. My sense is that people generally see us as an entity capable of supporting economic recovery. As you're aware, at this moment we anticipate settling the energy efficiency piece by September of this year.

Steve Fleishman

analyst
#32

All right, that's good. Thanks. Take care.

Daniel Cregg

executive
#33

Thanks. Cheers.

Ralph Izzo

executive
#34

Appreciate that, Steve.

Jonathan Arnold

analyst
#35

Hello there. Morning, everyone. Nice to have you on the line.

Ralph Izzo

executive
#36

Likewise, Jonathan.

Jonathan Arnold

analyst
#37

Just one brief item, and Ralph, did I understand you properly? What I believe you're describing is that nearly every bit of the capital work going on right now keeps moving forward because it falls under an essential designation, yet what you're actually being forced to scale back is mostly operations and maintenance kinds of work. Is that accurate? And are there certain pieces of the capital program that will likewise have to make up some ground once conditions return to normal?

Ralph Izzo

executive
#38

No, you've got it right, Jonathan. You heard me correctly.

Jonathan Arnold

analyst
#39

That counted as one. Ralph, during your prepared remarks you said there are certain worries you have regarding mutual aid, and how things will play out once we move deeper into the year and into storm season. Could you perhaps describe a few of the steps you're taking or considering as you work to handle that?

Ralph Izzo

executive
#40

To start, I'm amazed you could figure out those remarks were prepared. I assumed you knew that. Yeah, no. We got a small taste of this, Jonathan. Roughly 2 or so weeks back, a major storm came through. There were strong winds and plenty of rain, but it arrived before the trees had fully leafed out. We avoided a bit of a bullet there, but ordinarily, when a storm is on its way, what you do is line up contractors and other utilities unlikely to be hit since they aren't in the storm's path, so they can stage a workforce. Maybe it's simply having them ready to depart from wherever they currently are, or you might even bring them into New Jersey and position them there. We managed to lock in roughly 40% of what we requested. It came down to, honestly, utilities not wanting to put their own employees at risk given their exposure to jobs, plus travel restrictions imposed on certain contractors. If that happens once the trees are fully leafed out and the wind blows, then we'll need to communicate at length with customers about some of the probable delays they'll face in getting restored.

Jonathan Arnold

analyst
#41

All right, understood. So at this stage, you're essentially identifying the problem rather than describing some method by which it could be resolved.

Ralph Izzo

executive
#42

Correct.

Jonathan Arnold

analyst
#43

Alright. Appreciate it, Ralph. You've already covered all the other points, Ralph. Thanks.

Ralph Izzo

executive
#44

Thanks.

Jeremy Tonet

analyst
#45

Good morning. Thanks for having me.

Ralph Izzo

executive
#46

Good morning.

Jeremy Tonet

analyst
#47

I'd like to revisit FRR for a moment, if that's alright. In your view, how will the short-term cost behavior of an FRR compared with the PJM capacity auction shape how the BPU assesses the longer-run matter of paying twice for capacity?

Ralph Izzo

executive
#48

We're looking into a number of different elements alongside the BPU, just as they're looking into those elements alongside plenty of other parties. I didn't intend to imply that we're the only group they're speaking with. That isn't true. They've announced a formal proceeding. It's possible that the price you'd observe in New Jersey would differ from what you'd observe across PJM as a whole. Since you only have to procure a 15% or 16% reserve margin rather than the bigger reserve margin that exists throughout the broader PJM, the overall sum of money customers pay could end up smaller, correct? Consider a scenario where New Jersey's price is higher, yet you purchase a smaller quantity, so each unit costs more, but there are fewer units, meaning the two multiplied together come out cheaper within the state. If you simply examined the state's offshore wind goals, then considered what capacity prices in Eastern MAAC have typically been, and then accounted for what capacity value PJM might assign to offshore wind, you'd rapidly arrive at eight or even nine figures within only a few years in terms of additional charges borne by New Jersey customers because offshore wind can't clear the auction. So you have those two possible sources of savings, correct? The first saving comes from not having to pay twice. That represents the eight to nine figures tied to offshore wind capacity that won't receive recognition from PJM and wouldn't be able to clear the auction at the proposed ACRs. The second is simply the reality that because New Jersey only needs to procure a 15% or 16% reserve margin, savings could arise there too. The state stands to gain this twofold benefit provided it structures the FRR competitively in a manner that acknowledges the carbon-free resources it has pledged to obtain.

Jeremy Tonet

analyst
#49

Excellent, that's a big help. Thanks for that. Just one additional item, if I may. Any perspective you could offer on when you expect settlement talks might get underway regarding the CEF proceeding.

Ralph Izzo

executive
#50

Sure, our discussions with the board staff have gone well. They understand our priorities, and we've made it plain: we're looking for indifference when it comes to energy efficiency investments; ideally, the board would give us an incentive. I might have just invented a word there. At a minimum, whether we put money into a circuit, a meter, or energy efficiency, we ought to be indifferent, and that approach has succeeded elsewhere. Fixed cost recovery has to be there, since energy efficiency's profitability is far less than the fixed cost you lose when a kilowatt hour sale is avoided, and other forward-looking states have acknowledged this. Finally, we want the state to acknowledge how important it is that the asset's useful life line up with its depreciable life, which is simply sound rate-making practice that we use across our $30 billion in rate base systemwide. Those, in my view, are the three essential pieces. You've got far more flexibility regarding, well, what portion of this do you wish to pursue? Our program is sized to hit the Clean Energy Act's targets. Doing more is possible, but should the state prefer not to meet the Clean Energy Act's targets or to phase that in at a slower pace, it might request that we do less. It encourages me that the state provided a $110 million bridge covering only these next six months, as we await resolution of the settlement discussions. Consider $110 million across six months, and set that beside the $40 million per year we've averaged, and that's clearly a good move in the right direction. I'm not attempting to hint at anything beyond, plainly, rising enthusiasm for energy efficiency. By September we'll have a clearer picture, and that's far sooner than you might expect. Hope that's useful, Jeremy. Once again, since these are confidential settlement discussions, I must be cautious about the amount of detail I provide, as I don't believe that would be fair to the other parties.

Jeremy Tonet

analyst
#51

That's useful. I appreciate the detail on that. Thank you.

Paul Patterson

analyst
#52

Hello there, good morning.

Ralph Izzo

executive
#53

Hi, Paul. I hope you're doing well.

Paul Patterson

analyst
#54

I'm holding up okay, thanks. If I could just build a bit on what we were saying about the FRR, from everything you've laid out, plus what the commission and others have been indicating, it seems quite probable they'll end up choosing the FRR path. Should we be viewing it that way?

Ralph Izzo

executive
#55

Well, the ultimate call belongs to them, but to me that's the sensible route for the state to take. Given an energy agenda that's clearly very ambitious and carbon-free, the idea of New Jersey paying two times for capacity would be baffling to me. At these ACRs, new solar and offshore wind won't clear the auction.

Paul Patterson

analyst
#56

All right.

Ralph Izzo

executive
#57

My sense is that the state would have a strong incentive to pursue an FRR.

Paul Patterson

analyst
#58

All right, that's clear. I suppose something else I was kind of curious about, as a bit of a follow-up, is that you brought up the boost from building out infrastructure that your team has delivered before. Joe too brought up the ROE transmission conversation you're having with the commission. I'm kind of curious, how ought we to think about what I believe is likely — though maybe you'd push back — that there will be considerable budget strain, even with help from the federal government in New Jersey. How ought we to think about, like, the possible fiscal difficulties the state will run into, and how do we weigh the two matters you raised — namely, first, perhaps not wanting to see large rate effects, and second, likely wanting to see economic activity spurred? Do you get what I mean?

Ralph Izzo

executive
#59

Yes, I do. Were it up to me and I were drafting a script, which I'm not, but what we're certainly telling policymakers is that moving your transmission ROE to a sensible level would still represent a quite appealing annual give back of rates to customers. Major spending on energy efficiency likewise places additional money in customers' pockets through bill reductions. Putting money into infrastructure lets us hire contractors and other people, and in doing that work, it gets repaid across 40 and 60 years, since that's the lifespan of these assets. You get both expense savings via transmission ROE reset and energy efficiency, plus payroll increases via energy efficiency and payroll increases via infrastructure investment, the latter of which is repaid across many decades because that is the asset's life. All of it, if handled correctly, yields net reductions in bills and the creation of thousands of jobs; that isn't alchemy, it's simply the hard reality and the benefits tied to energy efficiency, rate relief, and infrastructure investment. I'd do that in a heartbeat, and we are having those sorts of conversations. It will be the BPU's call, however, to decide.

Paul Patterson

analyst
#60

Great. Many thanks. I truly value that. Keep going strong.

Ralph Izzo

executive
#61

Stay well. I believe we've reached the scheduled time. To wrap up, I'd like to leave you with three points. I realize saying this now sounds like a tired cliché, but honestly, my pride in our team couldn't be greater — from handling a nuclear outage without compromising health and safety and with negligible consequences, completing that work within the deadline, to the storm recovery effort I referenced earlier regarding that rainfall. The numbers from our call center have actually improved compared to before. We finished closing the books right on schedule. Our communications staff are operating from their homes yet still making sure employees know what's happening. A special mention, just as Steve Fleishman brought up, goes to my wife for her excellent camera operation in helping get our commercial broadcast. Incidentally, people aren't putting in five-day weeks now. Throughout this period they're on the job 24 by 7 and still somehow accomplishing everything, so my pride in them is immense. I sincerely want to express gratitude to the policymakers and decision-makers at the BPU and within New Jersey government. They've acknowledged how essential the work we perform is; they've enabled us to continue our capital projects by maintaining proper social distancing and taking the necessary precautions. We've treated the trust they placed in us very seriously. Our infection rates remain below those of the general public, even though roughly half our workforce is regularly out in the field performing their duties. The BPU, operating remotely, has maintained their procedural schedules. We now have procedural schedules not only for all of CEF, not only for energy efficiency, but also for AMI, electric vehicles, and battery storage — plus they've embraced the task of resolving an FRR and involved us in an ROE conversation concerning transmission. People in state government are accomplishing remarkable things when it comes to confronting these difficulties that each of us experiences personally, all while ensuring the trains run on schedule and even adding extra trains to the timetable. Even with these hard times, I'm simply amazed by what everyone is achieving in responding to this challenge. To each of you listening, should you have friends or relatives working in healthcare services or delivering those services to others, kindly convey our gratitude to them on our behalf, along with our respect and admiration for everything they do. We'll be seeing some of you virtually, as I understand it, at different meetings and conferences, and we'll use Zoom or Webex or whatever platform works, then I hope we can meet face-to-face before too long. Thank you, take care, and remain safe. Stay well.

Operator

operator
#62

Everyone, that brings today’s call to a close. You’re welcome to hang up now, and thanks for joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Public Service Enterprise Group Incorporated transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Public Service Enterprise Group Incorporated earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Public Service Enterprise Group Incorporated or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.