Resolute Mining Limited (RSG) Earnings Call Transcript & Summary

January 31, 2023

Australian Securities Exchange AU Materials Metals and Mining earnings 51 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone being on the line, and thanks for joining Resolute Mining Limited’s call on the December 2022 quarterly results and 2023 guidance. <<operator_script>> At this point I’ll turn the conference over to Mr. Terry Holohan, Managing Director and CEO. Please go ahead.

Terence Holohan

executive
#2

Thanks, Rachel, and welcome, everyone, to the call. I'm happy to be here today to report the quarterly activities for December '22. And I think if you've listened to me on these calls before, there are no major surprises for me and everything went according to plan. I think it was a strong quarter for a good year, and we'll highlight that a little bit more. What I plan to do is take you through the highlights. I'll then go through very quickly the ESG, some production information, exploration, then I'll hand over to Doug. He will take you through the finance and corporate, and then I'll go through the 2023 guidance, and then we'll go for Q&A, and I'll do a final wrap at the end. Go straight to the highlights. I think the TRIFR again, a record low for us as a company, 0.41, a significant step down. And as I reported last time, Syama going absolutely fantastic on safety at the moment. Within 8 days, they're going to be 4 years with -- without a lost time incident, which is an amazing record even where they stand at the moment. But I think the guys on there really focusing on safety, and the results speak for themselves there.

Terence Holohan

executive
#3

When we turn to quarterly production, we hit a record 91,777 ounces for the year. There were a couple of hiccups right at the end. If not for those, we'd have exceeded 92,000 ounces. But we held on to the edge we had from the start — in the first and second quarter — and this now marks the fifth consecutive quarter of rising output. That's something we're genuinely excited about. And naturally, we came in above guidance. We had given you 345,000 ounces at $1,425 per ounce. We beat that by roughly 8,000 ounces, though I'd say the bulk of it came early in the year, when we carried out the shutdown and began cleaning the ponds. Then we ran slightly high on costs, 5% up on all-in costs, and Doug will give you more detail on that a bit later. Sales. Strong sales numbers. As you'll recall, we have a hedge book covering 30% of our metal going forward for the life of the loans as covenants on the loans, and we realized $1,817 per ounce on average for the quarter, which is roughly $89 above the spot price. And on net debt, we beat our expectations by around $10 million.

Terence Holohan

executive
#4

We ended at a net figure of $31.6 million. That's something we feel quite good about. In our view it's a solid number, and it places us firmly, we believe, in the same bracket as our peers. Lastly, we've wrapped up our balance sheet there. We also completed the Canaccord and Sprott raise, which went very well out there. It was oversubscribed and saw a pretty big take-up from the retail stock, which was very good. And we've brought in some long-term Tier 1 institutional investors as well, who are very eager to help us and to work alongside us on seeing this turnaround story through to completion and really getting going on a strong growth pattern over the next 2 and 3 years. If you look at the capital and the monies that came in, we've now, subsequent to the quarter, managed to bring our RCF down to 0, and that sits there with a turn through to Q1 '24 with monies available. So all in all, as we stand here today, we have more than $200 million in available liquidity. We also received the final tranche of the Bibiani sale. And on ESG, we completed our certification, which I mentioned we were hoping to achieve in that quarter.

Terence Holohan

executive
#5

We've got that, and it's something we're genuinely proud of — a real milestone for the operations, particularly since those audits were carried out on site. As for our guidance for '23, we're expecting a very similar year. We're looking at roughly 350,000 ounces, with all-in costs a little lower at $1,480. But I'd describe that as a base case — it doesn't include the initiatives we have in the pipeline, and nothing from Syama North, because I think there's a strong chance we could bring some cheaper ounces in from Syama North at some point during the year. That will come about, or at least the information will come through, at the end of this quarter, and I'll be announcing it early in quarter 2 as part of the feasibility study results. And then, of course, there's the big news we put out the other week. The mineral resource that caught us off guard — it surprised our exploration team as well. 34 million tonnes, with an extra 14 million tonnes added to the previous mineral resource. That brings us to 3.81 — sorry, 3.18 million ounces of gold at a grade of 2.9. And more importantly, 1.86 million of that, as things stand now, is in measured and indicated.

Terence Holohan

executive
#6

We also verified that a big block in A21—which we had gotten a hint of during the prior quarter—has now been confirmed through drill holes surrounding it. Consequently, because of that big block, we're heading deeper this year. The lines haven't been completed all the way down to 150 meters yet, but we will return, particularly over that big block area, down to 200 meters. So overall, I'd say it's been a very busy and very exciting quarter for us. From what we can tell, we just checked every box we had actually laid out across the last 18 months. So moving into the operations overview. First, a couple of numbers I want to highlight—ore mined. For the quarter, we mined 1.8. That equals 7 million tonnes per annum. That's the kind of figure we believe we can now squeeze out of the mining operation. I'll get into it a bit later with good grades. Then on the processing side, 1.5, which annualizes to 6. As you'll recall, in the previous year we did 5.6 million tonnes.

Terence Holohan

executive
#7

We're kind of nudging that upward slightly every month. We're removing bottlenecks at the Syama oxide plant, still debottlenecking the Mako plant, and those tonnes are growing steadily but surely. And what's also quite encouraging is that although we're pushing tonnes up a bit and grades are roughly the same, we're seeing slightly better recoveries thanks to the focus our metallurgists are putting in at the plant. So, turning to ESG very briefly. Just to note, yes, we did the ISO box-ticking. The 2 ISO certifications we received last year. And I want to remind you that we said by June this year, we'd reach the World Gold Council's Responsible Gold Mining Principles at 100%. We're tracking at 88%. We're ahead of the curve, and we feel comfortable we'll hit 100% by mid-2023. Moving to the operations, let's discuss Syama first, the sulfide operation. I think the key highlights there are, if you look at -- I've discussed the underground mine grade over the last 6 calls. When we began there, we were at some 2.4 grams a tonne. It came up systematically, and remember I was quite excited in the September quarter when we recorded 2.71 grams a tonne.

Terence Holohan

executive
#8

And I told you, once we hit that grade — 2.71 grams a tonne, the grade I was after — that's when we'd begin driving tonnage. And it's really gratifying to see we moved an additional over 100,000 tonnes out of the mine while holding that grade at 2.74 grams a tonne. So that mine is currently running at roughly 2.66 million tonnes per annum, which is above what we'd targeted for this year. We figure the plant will treat around 2.35 grams a tonne, but we have that capability, that flexibility underground in the operation at that grade. And that's what we've spent the last 18 months working on. Also, very importantly, our reconciliations. They were pretty wild at the start when we were at 2.4 grams a tonne. But at 2.74 grams a tonne we're about 4% within — on reconciliation, which is where everyone typically wants to be, under 5%. And looking at processing, also a solid month on tonnage, equivalent to about 2.2 million tonnes per annum. I'd say we're looking at 2.35 million tonnes per annum.

Terence Holohan

executive
#9

We are still dealing with a significant bottleneck in the sulfide circuit. Right now, we're actively working on the crushers, with the intention of beginning to ramp that up, and we're also addressing the mills. But again, given the grade, because we have that additional tonnage, we're able to select out the higher-grade material, and we currently have 2.83 grams per tonne feeding into the processing plant. Grades like these have never been observed from underground before, whether in the ore or in the plant. On the cost side, Doug will cover a bit more detail on the sulfides easing slightly, even though we carried out considerably more underground mining. Our initiatives are beginning to take effect there, and we anticipate that trend will carry on going forward. So I think the other item I mentioned: we've now completely overhauled every one of our trucks since we took over from Byrnecut a year ago, and they're all refurbished, and we're beginning to see productivity gains. And as I said, we really aimed to bring the underground operation's grade up to 2.6 grams per tonne. At present, though, we're tracking at roughly 2.7 grams per tonne. So there's plenty of positive news on that front.

Terence Holohan

executive
#10

On the oxide side, I've been saying all year that grades would improve. And they did — they rose to 1.55 grams per tonne from the mining operation, with much of that coming toward year-end. It happened a bit later than I'd expected, but that trend is still going on right now, this quarter. What really pleases me is that the circuit contributed 17,000 ounces, which is where we began the year and where we expected to land. So we got there. Recoveries held up, slightly lower, but those are getting our attention. The key point is that we're now 6 months ahead on grade control across every one of the satellite pits. As you'll recall, roughly 9 months ago we had essentially no grade control in the operation. We put substantial money and time into that during the first half of the year, and it's given us a great deal of confidence in our forecasts for the coming year. On Mako, solid tonnages. We have a new excavator. We've renewed the contract. As you remember, a new excavator on site — we managed to move quite a large tonnage, 781,000 tonnes.

Terence Holohan

executive
#11

We also achieved the largest volume to date, even though the grade came in a bit lower at 544,000 ounces (sic) tonnes, and at 1.91 grams per tonne, that grade is roughly what we anticipate carrying forward, basically because it reflects the material grade we're encountering in the coming year. This pit offers limited flexibility, and it operates as a closed system. Another very encouraging point is the 92.3% recovery, despite that grade dipping somewhat. I think another key item on Mali -- pardon me, on Mako is that, thanks to all the work on the Mill Slicer, which has delivered the additional tonnes and ensures the rock isn't striking the mill liners, we actually got by with just 3 side linings this year. As you'll recall, historically we've completed 4. We've just finished a reline now as we speak in January. Looking ahead, though, we've cut downtime by 1 SAG reline, which typically means about 4 or 5 days of shutdown we'd otherwise have to take. So we're now at 3 side linings per year going forward. That's a meaningful improvement.

Terence Holohan

executive
#12

Take a look at the exploration side — well, I did report on this, we reported on it a couple of weeks back. Really exciting. This story keeps developing. It's 6 kilometers of contiguous material. I think what surprised everyone is that although geologists have been working on the ground at the Syama project for nearly 40 years, this area — these 85 kilometers — is largely unexplored. The material sits close to the mine, and we believe there's considerably more material still to be found. As I said earlier, we're carrying on, and the increase in the Mineral Reserve is basically more tonnes at roughly the same grades. What we've kept is the measured and indicated at 1.86 million ounces over 3 grams a tonne, but we did find a lot of — averaging 2.8 grams per tonne, and that has gone into Inferred. So that has pulled the grade down somewhat. But we're focused now on pulling our ore reserve numbers together, which ought to be out by the middle of February. On that bigger area, which we know is going to be overfittable and is likely to give us lower strip ratios than we first assumed.

Terence Holohan

executive
#13

I’d rather not go deep into those figures at this stage. The feasibility study is due out near the end of the quarter, and we’ll report on it earlier in Q2. As a quick point on the 3.2 million ounces, roughly 8% is oxide. It isn’t one whole continuous block. It’s blocking things a little. A lot of effort is going into that. So how much we’ll convert to ore reserve, we’ll only know in the middle of February. I can’t really offer any indications right now. So that covers operations, ESG and exploration. I’ll pass it to Doug to walk us through financing and corporate matters. Then I’ll return with the ’23 guidance. Thanks, Doug.

Douglas Warden

executive
#14

Yes. Thanks, Terry. As is typical, my plan is simply to provide a little more color on costs, and then walk you through cash flow, net debt and the hedge book, and Terry will finish up with the guidance as he mentioned. So, just on the December quarter, unit cash costs came in at $1,473 an ounce, which was 6% above the September quarter. That's mainly because of a 19% rise in overburden removes at the oxide operations at Syama, which was needed to access the high-grade material at Tabakoroni. On top of that, we saw a 25% increase in ore mined from underground as the ROM pad stocks were rebuilt after the wet season. So you'll notice there, I believe we've rebuilt stocks by roughly 100,000 tonnes during the quarter. Additionally, we had a 45% increase in underground development meters, which mostly reflects some catch-up during the quarter, where we did 13 -- a bit over 1,300 meters versus Q3, when we did just over 900 meters. We're still feeling pressure on our input costs, like others in the industry. Just to give you a bit of flavor on that, Syama diesel prices averaged USD 1.35 during the quarter. And that was the same number for the half, for the second half.

Douglas Warden

executive
#15

And that represents a meaningful rise from quarter 1, before the conflict in Ukraine began, when we averaged $0.76. For the quarter, HFO prices at the Syama power plant stayed near $0.90 a liter, compared with $0.72 in Q1. Mako costs also climbed, and one item worth noting — more a second half story than just the December quarter, though we did see a slight uptick in November pricing — is ammonium nitrate, which has nearly doubled over the course of 2022 to just over $2,000 a tonne. So that's a significant uplift for us, amounting on a monthly basis to roughly $600,000 or $700,000 versus where we began the year. December all-in sustaining costs came in at $1,547 per ounce, up 2% on the September quarter, largely for the same reasons as cash costs — though there was a small offset tied to noncash charges in the December quarter, related to a reduction in the GIC charge as we pulled fewer ounces through the circuit in Q4 than in Q3. Group all-in sustaining costs for the year were $1,498 per ounce.

Douglas Warden

executive
#16

As Terry said, roughly 5% above the guided figure of $1,425 per ounce, and that guidance figure included a noncash expense of $44 an ounce, mostly tied to the GIC drawdown. Now moving to cash flow for the quarter. The major items, clearly, were the equity raise and the proceeds from the asset sale, and those helped drive the substantial debt repayment Terry already covered. And once you account for — sorry, prior to asset sales, debt service and government dividends, the business produced roughly $8 million of free cash flow during the quarter, and that came after we chose to put $4 million into exploration. Net debt, as Terry noted, thanks in large part to the equity raise, the Bibiani proceeds and free cash flow, dropped by slightly less than $125 million over the quarter, landing at $31.6 million at year-end. Then last, a quick update on the hedge book. The obligation to hedge remains as long as those banking facilities stay in place. But during Q4, as Terry said, we were fairly grateful for the hedge book, since we realized a gold price well above the Sprott — spot thanks to it. At 31 December, though, we had 172,500 ounces in total hedged at an average price of $1,886 an ounce.

Douglas Warden

executive
#17

And with that, I'll pass it back to Terry, who will walk us through the 2023 guidance. Thanks, Terry.

Terence Holohan

executive
#18

Thanks, Doug, and thanks a lot. So we're looking at a comparable year — 350,000 ounces at roughly $1,480 an ounce. I'd call that really our base case. We're actually aiming a little higher than that. On the Syama circuit, we think 160,000 ounces — you might say that's somewhat low. This year we did 161,000 ounces. But keep in mind, we had 20,000 ounces coming from GIC on the Syama circuit. Much of that came from gold in circuit, concentrates, and so on, which had built up over the years. And we have a fairly large cleanout of the refractory itself, which was holding quite a lot of gold between the bricks. Remember, we swapped it out for a spray-on refractory, so that issue shouldn't come up again. Syama oxide — at this point we have much more confidence. I recall mentioning that we now have 8 months of grade control. We didn't have much grade control in the prior budget. So we gave up a little on grade this year — sorry, last year, at 62,000 ounces. Now we're looking at 73,000 ounces coming through this year. And then Mako, as I said, we're moving through a low-grade patch over the next year. I'll go into a bit more of what we're seeing there — about 117,000 ounces.

Terence Holohan

executive
#19

What we're saying is that with 350,000 ounces, similar targets to this year, we're losing some on Mako, but gaining some on Syama oxides, essentially. If you look at -- just a note on the Syama sulphide with the underground operation. We have, as mentioned, gone ahead slightly now with a bit more development, spent a bit more money there, but we're over 12 months in terms of development there. So we've got all the next levels ready to go. As I mentioned, sulfides, essentially, that is a function of tonnes and grade now. We've got both which we're excited about and essentially trying to debottleneck that plant, and that is ongoing now. We are looking at tertiary crushers on the Syama sulphide circuit. We're working on it as we speak. So we should see some benefits fairly soon, getting slightly higher tonnes through there. In terms of gold in circuits in the ponds, we're now not dealing with some of the concentrates which we stocked up. We do have some residues, but it will be a small contribution this year. So it's all really coming from the underground, the tonnes on the grade. Oxide, as I mentioned, great control gives us a lot more confidence in our numbers compared to last year.

Terence Holohan

executive
#20

And — though we haven’t actually — sorry, that’s thanks to the heavy grade control work we carried out in '22. As I said earlier, we have PFS in progress. We’re beginning to hear figures now and are reviewing numbers. That bigger MRE — Mineral Resource Estimate — that was released has led us to revisit it somewhat and consider the best approach, but we remain on schedule to have it out, at least in draft form, in Q1. We’ll actually be in a position to publish it in Q2 shortly. But we haven’t included any material from that Syama North in our guidance figures for next year — sorry, this year. As I mentioned, Mako, 117,000 ounces. That compares with the 129,000 ounces we’ve just delivered, and a somewhat higher cost. It’s really a grade problem there. We’re moving through a low-grade zone. And — but there are some benefits later on. It will give us a chance to do some in-pit waste dumping afterward, because we have another 2 years remaining after this year on that pit. And it also means we’ll be able to recover a little — a few more ounces and at much better cost further down the track.

Terence Holohan

executive
#21

If you look at the table, we’ve put in there for '24 — we expect to be at 135,000 to 145,000 ounces in '24, and the same again in '25 — but as you can see, costs are dropping quite sharply after this year. Costs are going to be pretty high. This year we’re at peak cost because of that grade. But the grade is going to come back up over the next 2 years. I think that’s probably around — let me just check my notes. Obviously, on exploration, we’re pushing very hard at Syama North, and we’re also pushing hard at Mako, because we remain confident that we can find something to keep that plant running in 3 years’ time, when we begin to run out of underground material — sorry, open pit material — and have to start looking at our stocks — low-grade stocks on service. So we’re still focused on trying to find something there. So we’re still looking at a similar kind of budget, $16 million for 2023 to be spent on exploration. Capital expenditure sustaining is forecast at $34 million, and nonsustaining at about $54 million. Those numbers are there. They can pay — you have the information in the note here to compare with what we’ve done this year or this last year.

Terence Holohan

executive
#22

All right, so that being the case, I’ll turn things over to Q&A now. Thank you, Rachel.

Operator

operator
#23

<<operator_script>> Our initial question is from Reg Spencer at Canaccord.

Reg Spencer

analyst
#24

Terry, congratulations to you and the team on another very good quarter. So it's basically <<inaudible>> starting to sing. My first question is about your all-in sustaining costs. The '23 guidance is below what you reported for the December quarter. Can I ask whether that indicates you expect some inflationary pressures to ease? Or is that lower cost compared with the December quarter more a result of operating efficiencies that you anticipate -- you expect to gain from next year -- or this year, I should say?

Terence Holohan

executive
#25

Thanks, Rich. Yeah, it really comes down to operational efficiencies. We've discussed this across 3 quarters at this point, and we're only now beginning to see the result of having refurbished every one of our vehicles. We have vehicles sitting on standby. At this point we're actually filling the vehicles rather than filling for 3 quarters, and we've got a couple of Epiroc underground trucks under lease hire. So once again we'll have a couple of additional trucks capable of taking 65 tonnes rather than the 58 tonnes. So essentially it's all about productivity. That's what — and I'll note this isn't a new topic. These are initiatives we've been discussing and working on over the last 9 months. But we're only now starting to see them fall into place.

Reg Spencer

analyst
#26

Got it. And if we turn to the factors driving your unit costs — Doug, I raised this, and you also touched on it in your remarks — you're still experiencing some of those pressures. Is there anything suggesting they might be easing? We're picking up commentary from a few of the gold producers focused on Western Australia indicating that they're beginning to see some pressure ease — how does the operating environment look in Africa on that front?

Terence Holohan

executive
#27

Reg, we aren't seeing that happen just yet. Basically, as Doug mentioned, diesel prices in Mali have not yet eased. On top of that, diesel costs in Mako — in Senegal — have actually gone up. For quite a long time, the government there subsidized them pretty heavily, and they removed that subsidy — sorry, took it off as of 1st of January or 2nd of January this year. So we're seeing modest cost increases in that market. As a result, we believe those cost pressures remain with us, and we've incorporated them on that basis. So we are — we're putting a lot of focus on containing costs. We're reviewing our overheads to see how they can be trimmed, along with productivity at the operations. That's genuinely our main driver for this year.

Reg Spencer

analyst
#28

Alright, I had a few questions about Syama North. I assume you'll tell me to hold off until that study comes out in a few weeks, but maybe I'd rather not wait until then. My next question concerns growth capital and nonsustaining capital at Mako. Regarding the $25 million you're guiding for Mako, the stripping costs caught me a little off guard. Beyond what you've already flagged to the market, are there other significant nonsustaining CapEx items we should anticipate across Syama and <<inaudible>> over a 3- or 4-year view?

Terence Holohan

executive
#29

No, Syama is pretty stable. With the prefeasibility study coming out, we're going to revisit that, because as I've said consistently, we're examining modest capital upgrades to the operations phased across roughly 18 months, simply to methodically enhance how the operation runs. So with Syama, I don't believe there are any surprises. We've also filled our tailings dam, though we've kept 6 months of capacity above that. Just in case we run into problems for some reason with pumping into our pit. But in-pit tailings has performed well over the last 2 months. So we don't foresee any issues there. The Mako matter, I think, comes down to this: if you recall, the original Mako mine was designed at $1,250, and then we raised it to a $1,500 pit, and we redid all the figures back in 2019 and expanded it. What really matters now is that the pit that was $1,500 then is a $1,750 pit today given the cost increases. That's a fairly significant jump in cost. I mean, we've talked about this. Ammonia costs, which affect the explosives and so on, those have doubled over the past couple of quarters. And that's really driven by things such as the fertilizers and so forth, which originally came from Russia.

Terence Holohan

executive
#30

They simply aren't showing up anymore. Because of that, we've needed to find supply from other places, and that costs a great deal.

Reg Spencer

analyst
#31

All right, understood. This final one might catch you off guard, but I'll put it out there regardless. If I recall correctly, Ravenswood had certain promissory notes as well as gold-price-linked contingent consideration tied to that <<inaudible>> work from a couple of years back. And once more, a portion of that consideration owed to Resolute depended on an IPO or the acquirers exiting the asset. Do you have any update on where things stand there, given Australian dollar gold is at very high levels? It just struck me that this could be another modest source of potential balance sheet improvement that might flow into Resolute over the near term.

Terence Holohan

executive
#32

Yeah, that's correct. Those remain in effect. Two tickets exist: one arriving from '24 and another in '27. We hadn't really concentrated on them previously since our debt — which was very onus this past year — finally wraps up in Q1 '24. So we left it out to sort of ensure nobody got mixed up and assumed that was yet another credit set to land ahead of the debt coming due. But we'll begin discussing it. They're in place. And I'll simply ask Doug to remind us of the figures. Doug and James are both there, and together they can remind us of the figures.

Douglas Warden

executive
#33

Right, thank you, Terry. There's additionally that potential upside from a liquidity event, up to 150 million, which I think is worth pointing out as well. Not much of a real update there, except that private equity owns it, and at some point they'll be seeking an exit. Regarding the 2 amounts Terry mentioned: the AUD 50 million depends on the gold price — the Aussie gold price — and we've essentially met that condition. What remains outstanding is the 500,000 ounces prior to March 2024. A 3-month grace period applies, taking you to June '24, or letting the operation reach that 500,000 ounces of production following the acquisition by June '24, though both are required. I want to emphasize that you do need both: the Aussie gold price contingent piece, and gold price would have to utterly collapse for that not to be achieved. Honestly, that strikes me as nearly impossible at this stage. As for the 500,000 ounces of production — well, I'd call it roughly 50-50 right now. We remain hopeful it will be delivered, but there's still a distance to travel. Then the promissory note is the 2027 amount, accruing interest at 6%, capitalized onto that note and payable either upon a liquidity event or in 2027.

Reg Spencer

analyst
#34

I'll make sure they hear about it. And congratulations once more on a strong quarter.

Terence Holohan

executive
#35

Thanks, Reg.

Operator

operator
#36

Our next question is from Jon Ogden at Eastern Value.

Jon Ogden

analyst
#37

The presentation. A couple of questions — very simple to ask: can you give us any update on the security situation in Mali? It's just that — we've had too though in Burkina, and Wagner Group is evidently in the news as well. They even said that they were given gold production in Burkina. So any thoughts on any deterioration in the security situation or the kind of regulatory situation? I mean, I guess, Mako is probably fine. We don't need to worry about that. And then the second one is, you've done a fantastic job improving operations. But just focusing now on actual cash generated, it seems that you're still kind of just breakeven. I mean, is that how we should think of the operation at the moment with go where it is and the operations where they are? So in other words, to generate cash at this — with the present gold price, you need further improvements in getting costs down. I'll say this because it seems like you're generating USD 25 million a quarter around. However, the add-ons just sort of eats up most of that. And that's including, obviously, exploration, which you obviously need to do, not really optional $10 million in CapEx, which is kind of maintenance CapEx.

Jon Ogden

analyst
#38

Then there's the other piece: working capital, which always appears negative. So I'm just wondering whether you could clarify what that actually is. My expectation would be that it rises once diesel, obviously, starts going out — so that draws working capital in. But you'd think it would level off at some point, and that hasn't happened. So it looks like over the last 7, 8 quarters, I believe 60-something million or more of working capital has been drawn into the business. So perhaps you could comment on that. And then the other add-ons such as VAT, the government dividend, withholding tax and so forth. Just so we can get a sense of where we can actually generate cash in, say, absolute terms.

Terence Holohan

executive
#39

Okay, thanks, Jon. First off, I think I’ll ask Doug to help a bit once we get to the cash side of things, but I can address that briefly to start. Let’s turn to the security situation. Naturally, we’re quite close to it. We have extremely tight contacts on the ground with the families of our employees — 1,000 people — and then the 23 villages in our region with all the regional people, and then obviously in Bamako, where we have an open door with the Minister of Mines, et cetera. So we definitely keep our finger on the pulse there. We don’t see any deterioration in security as far as the operation is concerned. It has always been very quiet in that southeast corner of Mali. Remember, Mali is twice the size of Texas. It’s a big country. A lot of it has always happened in the Timbuktu area, the Sajal area. And with the Wagner coming in, the fact is that they’ve managed to chase the majority of jihadis over to Burkina Faso, and that’s where all the troubles are now. Yes, there have been discussions about the Wagner Group, and mostly mentioned by the Wagner Group themself, that they’re going to get paid in gold mines.

Terence Holohan

executive
#40

Well, that isn't the fact. It has never been tabled at the parliament, and the cabinet has never talked about it. They just smile and laugh about that. So we don't see any change to the security situation. I don't drive there from Bamako to the operation much these days, but we've never had to pull in our geology side of the field as such. But we've got great intel out there, and we've recently had visits -- high-level visits going out to see the mine on a regular occasion. We've got another one coming up, and we're comfortable with that where it is at the moment. We've got insurance auditors on site as we speak at the moment. So we're monitoring extremely carefully. We always have been and we've been on that -- in the country over 4Qs and we've never really seen any change. So we see -- I wouldn't say normal, but no change essentially in the situation. In terms of the operations and cash generation, we think there is space really to focus on our productivities now and improve all our productivities on the mining. It is, to a large extent, a unit operation. We need to get more units out of there.

Terence Holohan

executive
#41

We’re aware that, at the margin, the underground portion is generating gold at roughly $1,000 per ounce, though there are substantial overhead costs associated with it. So, in a systematic way, if we’re able, across the next 2 years, to enhance how Syama operates—from, say, 225,000 ounces to 280,000 ounces, perhaps 300,000 ounces—then the cost—the all-in costs—will decline in a systematic manner as a result. On exploration: yes, we are allocating a sizable amount of money toward that right now. We’re directing roughly $10 million into Syama, since we definitely believe that—I mean, we hold 20 million tonnes of—22 million tonnes of underground material as ore reserve. And now we’ve unexpectedly gained this Syama North material, which is a comparable kind of material. It sits at surface. It has relatively—it has medium strip ratios. It is softer than the underground material, and its recovery is somewhat higher. So I believe the prefeasibility study will conclude, well, don’t drive your mine underground excessively, keep it at its current level, but it is beginning to perform well. And every expansion should be addressed via the sulfide—sorry, the Syama North. So I think that will provide us with an enormous degree of flexibility and some consequent cost reductions.

Terence Holohan

executive
#42

And then, yes, working capital. We've had a few scares in that area, particularly at Syama. We figured we'd be facing ECOWAS sanctions once more on the 1st of January owing to that group of so-called mercenaries being held in Mali — 46 people, if I remember correctly. But they got released and that passed, though we did manage to build up stock. Because whenever something like that occurs, the maintenance fellows get somewhat worked up. But basically, we've — there are a few other payments we've made that Doug can elaborate on. Still, my view is that working cap has really peaked at this point and we ought to begin seeing that come down from here on. We're holding plenty of materials in stores. And just as an illustration, we're refurbishing new cone crushers on the tertiary circuit — on the sulfide circuit, and the majority of those spares are in fact being drawn from the stores. We didn't need to purchase the items. We have a great deal of equipment sitting in stores right now. So some rationalization is needed there, and I believe you'll see the gains from that.

Terence Holohan

executive
#43

Maybe, Doug, you could add a bit more detail on the VAT, dividends, and withholding tax items. And perhaps a little more detail as well on the working capital.

Douglas Warden

executive
#44

Yes. Thanks, Terry. Yes. Look, regarding working capital, I think you've addressed most of it really. But what I'd add is that when the balance sheet is published in late February, you'll see creditors have decreased over the year. At the end of last year they began the year at just under $92 million, and that figure will be below $70 million. So that has been a drain on cash. In our view, that's a more normal level of creditors. Obviously, we're not -- we don't want to be too prompt a payer of our suppliers. But I think where we stood as a business this time last year, that credit number was well north of 2 months of supply or cash costs. So we've reduced that into a more reasonable space. And as Terry mentioned, with everything that has happened in Mali over the course of this year, ECOWAS sanctions at the beginning of the year, which were lifted in July and then the threat of ECOWAS sanctions being brought towards the end of last year around those Cote d'Ivoire prisoners that were released, we obviously want to be quite cautious in our stock levels and make sure that we have sufficient stocks and consumables to combat anything that might come our way in terms of additional sanctions.

Douglas Warden

executive
#45

So that has shown an improvement. And clearly, should you face a 70% or 80% rise in fuel expenses, with diesel prices climbing over the course of the year, simply keeping the same quantity of fuel onsite will end up costing you considerably more. So that represents a cash drain. And after that, the consumables I mentioned that we must keep in stock besides fuel have likewise gone up considerably, 25% to 30%. And for items such as ammonium nitrate, doubling. So higher prices, carrying slightly larger quantities in store stock, and paying down creditors during the year have each played a part in the figure that you, quite rightly, brought up across the last 12 months. That has been a cash drain as we move forward. And I realize I've mentioned this previously, but we've kept experiencing some of these difficulties, we would anticipate that settling down, and wouldn't foresee that being a major cash drain as we head into next year -- or into this year, I should say. What else did you want me to address, Terry, sorry? VAT. Yes. So we're still dealing with VAT in Mali. So we keep, I suppose, holding conversations with the government regarding the VAT refund.

Douglas Warden

executive
#46

Everyone knows that in Mali our VAT does not get refunded. That represents a substantial burden, which the cash flow waterfall chart makes clear. So getting that sorted out is a major priority for us. Several claims have been filed against Resolute, and those have been offset against the VAT receivable. You're able to see that on our balance sheet at 30 June and at 31 December last year. I should say, though, that this remains a matter under negotiation. The government dividend, meanwhile, is the 10% dividend we pay to the Senegal East government with respect to Mako. It isn't paid all at once in 1 hit. Instead it trickles out across the year. That's the biggest piece of it. And obviously you should see the interest bill decline, even though interest rates have risen considerably. Clearly we've reduced the debt by more than that increase. So we'd expect it to fall further as we go forward.

Analyst

analyst
#47

If you wouldn't mind, I have just a couple more questions. Apologies, I'm somewhat new to this VAT matter — could you provide a little more detail on it, specifically what the percent is, where your money is going out and where it ought to be coming back in. It isn't. I mean, if you could just walk us through the entire situation. And then give us some sense of how much is flowing out across the year and whether that will carry on into 2023. So right now, it's effectively a cash outflow, which should be occurring where it is, just so I can quantify it? And second, if — 2023 — sorry, I missed the CapEx there. I mean, so this year CapEx should be fairly minimal? I mean just Syama North, if that happens, is just prestrip basically and there's no need to rejig the mill. So it's basically just the prestrip cost to get going on Syama North, is that correct? And then Mako is pretty good, so we should just be fairly minimal in CapEx? And what's the next potential big chunk of CapEx? And when would that be, if you can — so those are just a couple of other ones.

Analyst

analyst
#48

It would be great if you could address those.

Terence Holohan

executive
#49

Doug, would you like to handle this one?

Douglas Warden

executive
#50

Yes, absolutely, Terry. I’m not sure whether you’d like to weigh in on future capital as well. The capital guidance provided there consists of $34 million in sustaining capital, plus another $54 million in nonsustaining capital, and that figure includes the $25 million tied to Mako stripping costs, which deliver benefits over the longer term — which is why those costs sit in nonsustaining. So that applies to the year ahead. A substantial portion of it relates to stripping costs. As you noted, beyond routine maintenance CapEx, things like replacing light vehicles and similar items, there aren’t any major components driving that number. That said, the cost of acquiring the Mako power plant is captured within that nonsustaining category, and it’s also referenced in the discussion on Page 10. On the VAT side, Mali’s government does not reimburse the VAT we pay. Under the legislation they ought to, yet given where the company’s — where the country’s finances stand, they don’t refund VAT to any of the gold producers, so far as we know. We then apply other taxes and royalties against that VAT balance. The net cash outflow, though, hinges on the cash and the capital — pardon me, the OpEx and the CapEx spending across the year, but broadly you can think of it as roughly $30 million annually, more or less, subject to what the spend levels turn out to be.

Douglas Warden

executive
#51

It's well above — well, that's $2.5 million — figures in the $2 million to $2.5 million per month range, depending on how spending rates run. So we don't — it isn't a case where we're content with things, and we have an arrangement with the Malian government that has come up before, which we're attempting to get executed so the VAT would be eased, though right now it isn't refunded. And that certainly draws on our cash, without question.

Analyst

analyst
#52

Sorry, so is that roughly $30 million net once you've offset some other taxes? So you wind up with net...

Douglas Warden

executive
#53

That's right.

Analyst

analyst
#54

All right, apologies — what percentage is that, and what kind of items does it actually cover? Where exactly does that VAT factor in?

Douglas Warden

executive
#55

Yes, that's 18%, and it works much like the GST we're familiar with, or VAT in the U.K. — it applies to goods and services. It's comparable to the GST that we...

Operator

operator
#56

Thanks. At this point we have no more questions. I'll turn things back over to Mr. Holohan for some closing remarks.

Terence Holohan

executive
#57

Alright. Thank you, Rachel. So, to sum up, we view this as yet another solid quarter — number 5 — and a solid year. We believe we've turned the corner. On Syama, we've delivered a nominal profit. Naturally, we expect that to grow, and we'll stay focused on the matters we went through this evening. We see that as an ideal base for organic growth at Syama, since every one of the boxes we've discussed across the past 18 months has now been ticked. Looking ahead to where we're headed, we believe tonnages have risen. Grades have risen. Exploration is running well, and this year we expect the emphasis to be on bringing unit costs down. That really is the main priority for this year. And then, of course, the PFS will be released in Q1. It will address enhancement opportunities, and that's a project we'll be reviewing. Low capital. We've consistently said it would come in under $50 million, but the IRR ought to be fairly substantial, given that Syama North sits directly above the mine — directly above the processing plant. Good. Many thanks to all of you, and have a good day.

Operator

operator
#58

Thanks. That brings today's conference to a close. We appreciate everyone joining us. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Resolute Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Resolute Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Resolute Mining Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.