executive
#1

Thanks, and I appreciate everyone being on the call today. Dave Jackson, our Acting CFO, is here with me. Now, 2024 was quite a dynamic year—it brought some really strong positives, though unfortunately it also brought some very tough challenges. So what I'd like to do today is take you through the main operating results from last year and our expectations for 2025, and also shed some light on the situation in Mali and how we're thinking about things going forward. Before I go further, though, I want to offer a few remarks about Mali. During the last quarter, we encountered some very difficult circumstances—arguably the most challenging in the company's entire history. It's in moments like these that you really come to appreciate the caliber of the people within the organization, and I'm deeply grateful to every one of our employees, who've demonstrated tremendous resilience and kept our operations running without interruption. In addition, as was noted in December, Terry Holohan is on a leave of absence at this point. That leave concludes at the end of this month, and we anticipate an announcement on his situation shortly after that. So although the company has been through a particularly hard period, I strongly believe that, following careful consideration and an in-depth review of our operations, Resolute is well positioned to generate value for all of our shareholders.

Christopher Eger

executive
#2

Alright, let's get into the presentation. On Slide 3, I'd like to go back over what I consider to be a few of the most important investment highlights for our business. Let's keep in mind that we are an established producer, with more than 300,000 ounces of annual production across 2 mines that are already in operation, and we operate in multiple jurisdictions. Our asset portfolio is very high quality and holds substantial opportunities for growth, and I'll get into more detail about how we see growth for our business. We're putting money into exploration. Last year we had some significant wins in both Senegal and Guinea, and now, obviously, we're deploying into the Ivory Coast. Lastly, despite the challenges we faced last year in Mali, we still closed the year with more than $100 million of liquidity and substantial free cash flow generation, and we expect 2025 to deliver similar results from a cash flow perspective. What that means for us is that we believe the stock is cheap, that we're a very attractive proposition for growth, and that today we have genuinely interesting and, again, attractive valuation metrics across EV/EBITDA, P/NAV and cash flow yields. So moving to the next slide, a few key points on our 2024 results, which, again, we're really excited about.

Christopher Eger

executive
#3

From an operational standpoint, we had an excellent year, with stable operating assets and robust cash flow generation. Above all, our safety metrics were very strong across every measure. TRIFR came in at 2.11, comfortably under the industry averages. Regrettably, we finished a little under guidance at 340,000 ounces against the 345,000 ounces to 365,000 ounces range, though that really stemmed from a difficult year at Mako. Even so, we're quite happy with where we landed. All-in sustaining costs came in at $1,476, also a touch above our guidance. Once more, the driver was really the royalty rate changes we experienced in Mali under the new Mining Code. With a higher gold price environment and steady operations, though, we produced $250 million in operating cash flows and EBITDA of $310 million, a substantial increase over 2024. What that tells us is that steady operations are generating strong cash, and we expect that to carry on well into 2025. Turning now to the details for each site, I wanted to walk through some of the wins we feel we've achieved at both operations, since we found them to be extremely stable all year long.

Christopher Eger

executive
#4

Now if we go to Slide 6, let's begin with Syama. If you look at the sulphide operation, you'll notice we generated 163,000 ounces of gold, which is a bit above the prior year. The reason for that, though, is that our time mill utilization came in at nearly 97%. We put 2.4 million tonnes through the plant. Average grades came in around 2.6, with recoveries at 78%. And as you can see on the left-hand side of the page, we delivered healthy gold output each and every quarter. And honestly, we expect that to keep going in 2025. The sulphide operation and the plant are running very well. And apart from scheduled maintenance downtime, we truly don't foresee -- expect any problems in our sulphide operation. Turning to the oxide operation. We generated 53,000 ounces of gold, which again is a bit below the prior year. And one thing worth noting, as we highlighted earlier, is that oxides at Syama are beginning to run out, and that leads to reduced output with lower grades, and that will carry on going forward. But once more, we put 1.4 million tonnes through the mill. The average grade came in around 1.25 and our recoveries stood at 86%.

Christopher Eger

executive
#5

So looking at Syama, we believe we enjoyed quite steady operations throughout the year, which delivered strong results — 260,000 ounces of gold. And as I mentioned, we anticipate that carrying on going forward as we shift from a sulphide/oxide operation into one that is fully sulphide. Now turning to Page 7. I wanted to provide a bit more of an update on where things stand in Mali. To recap, in November 2024, we went through a very tough period with the government. Our CEO, Terry Holohan, along with 2 other individuals, was detained following discussions with the government covering a number of topics. When the detainment ended, we signed a protocol with the government that sets out the framework for discussions going forward. Under that protocol, we will be transitioning to the new Mining Code. We've made payments totaling $160 million to the government to settle prior claims, and we'll be seeking to better understand how the new code affects our business. We're hopeful that, with these payments and the settlement agreement, we are now clearing the way toward improved cooperation with the government.

Christopher Eger

executive
#6

Since that time, we have made considerable efforts to get back into dialogue with the government regarding the new Mining Code. But one thing I did want to highlight is that the government remains to some degree preoccupied with talks involving other mining companies, so our engagement with them has not been at the level we would have hoped for. That said, we have completed a fair amount of analysis regarding what the new Mining Code will mean. And as the final bullet shows, we estimate the code's effect equates to roughly a $250 addition to AISC. And look, as we keep working to engage with the government, we will update shareholders on anything material. We are being especially careful at this point, but we do believe a route exists to take our operations in Mali forward, and we are enthusiastic about the growth opportunities that this offers. So let's turn to Page 8. I also want to provide another update on the progress of the Syama Sulphide Conversion Project. We are genuinely enthusiastic about this project. And during 2024, we have delivered significant achievements. As we stand here today, the project is still within budget and on schedule.

Christopher Eger

executive
#7

We haven't run into any supply chain problems. And despite the difficulties we faced in Mali during Q4, neither the project nor the operations were impacted. A few of the main things we accomplished in 2024 on the SSCP: we finished all key procurement, the bulk of the civils construction is done, and several major items have arrived and are sitting on site — the flotation cells, the ball mills and the crushers, for instance. Later in the presentation I'll share some expectations about what we're doing right now on the SSCP. But as I mentioned, for 2024 we consider the project to be a big success at this point. Turning to the next slide, let me say a bit about our Senegalese operations. We're also quite pleased with how they performed in 2024. The operation produced roughly 125,000 ounces. And honestly, despite the ounces coming in lower than expected, the operations delivered very strong results across the board. Mill utilization was near 100%, and two factors really drove what happened at the operation. First, in Q3 heavy rains flooded the main pit. And second, we had overestimated the grades for the final stages of the operations.

Christopher Eger

executive
#8

Initially, we thought grades would come in near 2.2 grams per tonne, yet actual results are showing 1.8 grams per tonne. That shortfall against guidance stemmed largely from those lower grades, though our operations handled the rain-related difficulties remarkably well, and we anticipate that resilience carrying through into 2025. Turning to exploration work on Page 10. In 2024 we also focused on generating value throughout our exploration asset portfolio. We invested substantial capital across every one of our assets to build value, above all in Senegal, which I will discuss in more detail. Before that, though, we achieved a maiden resource at our Guinea asset in Mansala totaling more than 340,000 ounces. We view that as a highly intriguing deposit and will keep exploring it when the time is right. In Q4 we also formed a joint venture in Ivory Coast through the La Debo project, an area we consider excellent for growing the business. As of today, a maiden resource of roughly 400,000 ounces sits there, compliant with 43-101, and drilling is underway right now as we move into 2025 to expand that deposit.

Christopher Eger

executive
#9

We have a lot of enthusiasm for Ivory Coast, and honestly I see it as one of the next jurisdictions where we'll run an asset. But turning specifically to Senegal on Page 11: as was noted earlier, the Mako mine's current pit is nearing the end of its life. So we're putting substantial effort into developing satellite deposits to prolong Mako's life. In 2024 we spent $4.5 million on in-pit filling and drilling at the Tomboronkoto deposit. And as the graph on Page 11 shows, we believe there are well over 0.5 million ounces available to feed the plant at Mako. And later in the presentation I'll give you some context on what we're doing in 2025, but we see 2024 as having been the right step toward developing the extension of the Mako mine. So with that, I'll hand it over to Dave for a bit more detail on the 2024 financial results.

Dave Jackson

executive
#10

Thanks, Chris. I'll take you through the main financial results for the year, and we're really excited to share them with you. There are plenty of figures shown on the page, but I'd like to focus on the notable ones for the year. We closed out the year having sold 336,000 ounces of gold. That came in a bit under the 340,000 ounces we produced, because of how gold sales fell at month-end. All of those were sold at the start of January. As Chris said, we finished slightly under our production guidance, since Mako produced less during the year, though strong results at Syama partly made up for it. Turning to costs, our all-in sustaining costs for the year came in at $1,476 per ounce. That's a modest rise versus 2023 and above group all-in sustaining cost guidance. As Chris explained earlier, the increase is driven mainly by higher royalty rates in Mali, which works out to roughly $50 an ounce at the group level. Moving away from all-in sustaining costs, I want to draw your attention to the graph at the bottom right of the presentation, which shows our 3-year trajectory for EBITDA and revenue.

Dave Jackson

executive
#11

This is a trend that makes us very happy. Across the last 3 years, and particularly during 2024, our EBITDA margin has come up a great deal. Revenue grew 27% compared with 2023, and our EBITDA has almost doubled, reaching $311 million for the full year 2024. Several factors explain the rise in EBITDA. The biggest one was the better realized gold price achieved during the year. It also mirrors the beneficial effect of wrapping up our hedging program in Q1, with every sale from Q2 onward executed at the spot price. And lastly, it shows how well we have succeeded at controlling costs in today's inflationary climate. All in all, we are enthusiastic about the Group's financial results at this point. Our audited financials for the full year come out in March, but I want to take a bit more time to walk through the specifics of our excellent cash flow result, which appears on the following slide. Turning to the waterfall chart, you can see that we produced roughly $250 million of operating cash flow in the business. That is a substantial step up from 2023, when we produced $140 million during the same period. The gain in operating cash flow is largely due to the supportive gold price environment.

Dave Jackson

executive
#12

That said, we've also made meaningful strides throughout the company when it comes to lowering costs. We continue to place heavy emphasis on programs and approaches that save money, with the aim of lifting our operating cash flow even more going forward. With that, let me walk you through a few of the specifics behind how we arrived at our closing cash and bullion balance of $101 million at year-end. Capital expenditure, which includes $20 million for exploration, came to $117 million for the year. That CapEx figure landed roughly $10 million under guidance. As we noted last quarter, though, this was anticipated, reflecting the push of capital tied to SSCP into 2025. Working capital delivered a $37 million inflow for the year. That's an excellent result and reflects considerable effort from our team as we keep pushing to generate cash flow. The inflow mostly stemmed from efforts aimed at trimming consumable stockpiles at Syama and Mako. We've achieved considerable success there, capturing $10 million to $15 million in cash savings. We also made headway working with vendors to lengthen payment terms, which gives us greater access to cash in the near term.

Dave Jackson

executive
#13

Conversely, while working capital came in positive, I should flag that both Mali and Senegal are now experiencing greater tax leakage across our operations. That shows up as delays in receiving VAT refunds, which are accumulating on the balance sheet, and also as more frequent tax audits in both nations, which might lead to cash outflows down the road. Turning to the next item, you'll note the final $25 million installment on the term loan facility, paid during the first quarter of 2024, which cleared all remaining debt from the financing side. Carrying on with cash flow, the balance is completed by a $34 million inflow from the Ravenswood mine sale and the $160 million in settlement payments from Mali. To sum up, the business produced roughly $15 million in positive cash flow during the year. That puts us in a solid net cash position of $66 million at year-end. In light of circumstances in Mali, I'd also like to note that the senior debt facility announced earlier no longer serves its purpose.

Dave Jackson

executive
#14

That facility was mainly intended to give us more flexibility for growth opportunities. Even so, we have kept that flexibility intact by increasing the liquidity the Group can access, having successfully secured larger overdraft facilities in Mali, which lifts our available liquidity above $100 million. That puts us in a very strong position to go after growth opportunities both organic and inorganic, and we are very excited about that. With that said, I will pass it back to Chris, who will take you through the 2025 guidance.

Christopher Eger

executive
#15

Thanks, Dave. Turning now to our 2025 guidance. We'll begin with Syama. If you turn to Page 16, you'll see we're guiding Syama to output of 195,000 to 210,000 ounces, with an AISC between $1,700 and $1,800. Clearly, the new Mining Code is having an effect here, and we estimate it impacts overall cost by roughly $250. But let me give you some background on how we arrived at these figures, because as you'll have noticed in our press release, we've also pushed the start of the SSCP from 2025 to 2026. So, as we worked through the difficulties in Q4, we put a strong emphasis on generating cash flow for 2025 and beyond. One thing we identified is that we still have a fair amount of oxides remaining at Syama, and it makes considerably more sense to finish processing those oxides in the existing plant before we bring the sulphide operations online. So our focus was really on generating the maximum amount of cash. And so it made sense, as I said, to deplete the oxides this year and into the start of next year, and then only turn on the SSCP once the oxides were largely depleted, which we expect to occur in Q1 of 2026.

Christopher Eger

executive
#16

That was likely the largest change. After that, another thing worth pointing out is that the sulphides are essentially taking the place of the oxides. So as we look toward the near term, we expect output to stay at roughly similar levels, with roughly similar costs. In about 3 to 4 years, when we begin to reach the higher zones -- pardon me, the high-grade zones at Syama North, we expect the production profile may rise. But something people must keep in mind is that those high-grade zones carry very high strip ratios, so from a cash flow perspective they may not be the most economical for the business. So there are other opportunities for us to examine when we look at Syama, and we are carrying out that work. But at this point, we believe the best course is, as I mentioned, to finish the oxide processing, concentrate on sulphide conversion next year, and maximize cash flow in the near term. Just to provide some context for the CapEx figures in the bottom right of the page. Of the non-sustaining CapEx, roughly $30 million of that amount comes from the SSCP, with the remainder being a TSF lift in 2025, which clearly adds quite a bit of cost to the CapEx figures.

Christopher Eger

executive
#17

Within those sustaining figures of $40 million to $45 million, about $25 million is attributable to waste stripping, while the rest covers fleet upgrades, replacements, and similar items. As such, we do expect capital expenditures at Syama to remain robust, both this year and next year. Turning to the next slide, Page 17, I wanted to provide a little more background on what is happening with the SSCP in 2025. As I mentioned on the earlier slides, we have reforecasted and reworked our models, and it made far more sense for us to move the SSCP completion date from July 2025 to H1 2026. So we have slowed the works down in order to push as much spend as possible into next year, so that we can begin the ramp-up of the SSCP in H1 of 2025. So what we plan to complete this year will obviously be the implementation of the CCIL tanks. We are also aiming to have the recrusher circuit finished midyear. We are also aiming to begin works on the flotation cells, but the significant construction and erection work of the ball mill, as I call it, will start in January of next year.

Christopher Eger

executive
#18

We're doing everything we can to keep this project on track for startup next year. As we see it right now, though, we remain very much on budget. We simply need to coordinate with our contractors and rework the schedule so that we push the start into next year — and that lets us maximize cash flows in 2025, which makes far more sense than it did previously. Turning to Page 18, we're looking at Mako. For Mako, 2025 is very much a transition year. As discussed before, Mako is reaching the end of its life with the existing ore body. So we're aiming to finish mining the existing ore body by June, ahead of the rainy season, and after that we'll be processing stockpiles. That's why production comes in at around 80,000 ounces to 90,000 ounces, down from 125,000 ounces this year, but at an attractive AISC of $1,300 to $1,400. As I said, we're looking to wrap up mining by June, and from then until the end of 2027 we'll be processing stockpiles. For context, once we're into the stockpiles, we'll be processing them at a grade of around 0.9 because we won't be mining, obviously, and we think we're still going to generate quite a lot of cash, roughly $100 million per year, but we're obviously focused on extending Mako's life through Tombo or possibly Bantaco.

Christopher Eger

executive
#19

To reiterate, this company is shifting away from mining toward processing stockpiles now, and our teams are fully prepared and equipped for that change. We're also collaborating with the communities as we shrink the workforce to create a far more efficient operation under this new operating profile. Turning to exploration and the next page. Once more, we're genuinely enthusiastic about our exploration efforts. We see enormous value opportunities throughout the company. We've had to sort of select carefully where our money gets spent, and the 2025 focus really sits in 2 jurisdictions: Ivory Coast and Senegal. In Senegal, drilling will play a smaller role in the sense that at Tombo, we've already drilled out the deposit quite thoroughly. So we know there's a lot of gold available to feed through the plan. What's needed at Tombo is continued work with the government to secure approvals for relocating the village, along with getting the studies completed in order to do so. So Tombo is far more about producing studies and producing environmental impact studies and cooperating with the government on displacement of the village, but I'll take you through the time line on the next slide.

Christopher Eger

executive
#20

So really, as I mentioned, the main exploration focus is going to be in Senegal, where we'll be drilling at Bantaco. We believe there's gold in that region, but obviously we need to run a proper drill campaign, and we'll get back to you in due course if we think there's a mine at Bantaco that could sit alongside Tombo. Then the other exciting area is Ivory Coast. At the La Debo project in Ivory Coast, we're planning to spend at least $3 million, because we feel that's a genuinely interesting area and we can deliver a mine there in the coming years. And we definitely want to have a presence in Ivory Coast down the road. But let me give you a bit more detail on Tomboronkoto by moving to the next slide. So on the next slide, I want to share some further specifics about the plan for Tombo. The Tombo project isn't cheap — the cost comes in at at least $80 million to $100 million, because of relocating the village as well as moving a national road. So a great deal of work has to be done to bring this satellite deposit into production.

Christopher Eger

executive
#21

We have several studies that must be finished, and we've started them, and we are well along in getting them done, including a PFS — all of which are required to persuade the government to relocate the village. So one thing we've done is clearly work with the government and try to get them involved in grasping what the loss of the Mako mine would mean. But given the shifting situation in Senegal with a new government installed in 2024, we're hitting a few obstacles. So look below is, I'd call it, an ambitious schedule we've assembled for Tombo, covering the development of the studies, the relocation of the village and, obviously, through to processing ore at Tombo at the Mako mine. I'd say this is an ambitious schedule. A number of steps have to take place, but we're very much applying a full-court press to try to make this happen, because we recognize that by the end of December '27, we will run out of stockpiles, and we'll need to find a solution for Mako. So turning to Page 21 and looking at the total group guidance for the business.

Christopher Eger

executive
#22

So what do all these moving pieces mean for us? For 2025, we're looking at total production of 275,000 to 300,000 ounces of gold, with an AISC between $1,650 and $1,750. That AISC is an all-in AISC, so it includes corporate and exploration expenses. Even though the AISC number is rising because of the new code in Mali, we still expect to produce substantial free cash — well over $100 million at today's gold price. So look, we're really excited about rebuilding the business and building a healthy cash balance by the end of this year so we can keep exploring growth opportunities across the company. Exploration in 2025 will be very much focused on growth — the studies at Tombo, a fair amount of drilling at Bantaco to understand what we have in Senegal, and finally, continued advancements at the La Debo project in Ivory Coast, as explained on the previous slides. So look, in conclusion, we're moving to the final slide. Why are we excited about our business? As I said at the very beginning, we are a multi-asset producer with a strong track record of growth. We're well established in West Africa.

Christopher Eger

executive
#23

As I mentioned, we hold a great deal of ounces in the ground — 10 million ounces at Syama. Our balance sheet is quite strong, with an attractive net cash position. We also have a considerable number of growth opportunities. We feel we are in the process of rebuilding our relationship with Mali, though we are applying extra diligence to how the broader political situation in West Africa develops. And in the end, when we consider our share price and our valuation metrics, we believe we can generate substantial value for our shareholders going forward. With that said, I'll hand things over to the operator for questions, please.

Operator

operator
#24

<<operator_script>> Our first question comes from Andrew Bowler at Macquarie.

Andrew Bowler

analyst
#25

I have a couple of questions on taxes. First, probably an easy one: what amount of cash tax was paid during the second half of '24? It doesn't look like it was much. Second, you mention a VAT receivable and some leakage leaving the business going forward. Does that mean you won't be able to offset corporate tax payables against VAT receivables the way you did before? And I'm assuming that's a step change after the settlement payment with the government.

Christopher Eger

executive
#26

Andrew, this is Chris. Good to speak with you. So perhaps I'll begin with VAT, and then I'll have Dave address your question about tax payments for H2. On VAT, the receivable balances are still being calculated, and we hope and expect that they will come back. We believe there's a strong probability of that happening in Senegal, though we have seen delays. We did receive some VAT refunds last year, but they came on a delayed basis. So I wouldn't say that going forward, we should expect no offsets. I just think this needs to be modeled with the assumption that delays will occur. In Mali, it's somewhat trickier. We haven't gotten VAT refunds for some time. They are still being calculated and recorded on the balance sheet as owed. But the timing of when we'll have those VAT amounts available for offsets is really anyone's guess. Under law, we are owed them back. But obviously, we need to keep working with the government to get those back to us. So, I wouldn't say they're gone, but obviously they're more difficult to obtain. Dave?

Andrew Bowler

analyst
#27

So the net effect — apologies, the net effect would clearly be that tax payments speed up toward a more normalized corporate rate in FY '25 and after that — calendar year '25 and after that?

Christopher Eger

executive
#28

You've got it exactly right, yes.

Andrew Bowler

analyst
#29

And then, just to make things clear regarding those cash tax payments in the second half, they don't appear to be particularly large for calendar year '24.

Dave Jackson

executive
#30

Andrew, my apologies — could you say the final portion of that question once more, please?

Andrew Bowler

analyst
#31

Regarding cash tax payments in the second half of calendar year '24, they don't appear to have been all that significant — I'm just trying to get a sense of the kind of step change.

Dave Jackson

executive
#32

For the second half, the figure came to roughly $10 million.

Operator

operator
#33

Next up, we have a question coming from Reg Spencer at Canaccord.

Reg Spencer

analyst
#34

I have a handful of questions. So if this becomes tedious, I can set it aside and handle a few of them offline. So I may just work through them quickly, if I can. Regarding the new structure involving the government interest at Syama and the preference shares, am I right to assume that this means they receive a dividend ahead of any interco loan repayments that might be in place? And for modeling purposes, should we assume that those — any dividends from the operation's profits are paid out quarterly or on a half-yearly basis?

Christopher Eger

executive
#35

Reg, so not really. From what we understand, the mechanism is that it's paid yearly. What the pref share does allow, though, is essentially a fixed computation based on the business's net income at year-end. So if we brought in $50 million, for instance, we'd get 20% of that $50 million in net income. That's the purpose behind the preferred shares. So it's less about actual cash flow generation and more about what shows up as net income on the income statement for the Syama asset, if that makes sense.

Reg Spencer

analyst
#36

That’s right. And to be clear, any payments would be made on a delayed basis or in the following…

Christopher Eger

executive
#37

Actually, intercompany debt payments can be made at any point during the year. That doesn’t affect what I’d refer to as the dividend calculation. So the two are somewhat distinct, correct? The dividend calculation, once more, relies solely on what appears on the income statement, and after that you’re able to shift cash around the business whenever we do so on a routine basis.

Reg Spencer

analyst
#38

Alright, moving on to the local development fund contributions. I'm aware that a few of the original press releases you folks issued late last year didn't mention this. That 3.75% figure, which is levered against revenue — might it be viewed as a royalty with a different <<inaudible>> attached? And to make sure I have this right, does that development fund contribution sit inside the $250 increase, the roughly equivalent costs you called out?

Christopher Eger

executive
#39

Reg, on the second part, yes is the answer. That figure includes it. The intent is for it to be a genuine community development fund. However, we still lack the details about how such a fund operates. What I mean is which recipients we pay, and the way oversight happens. A committee is supposed to exist to assist with monitoring how that fund is spent. Those are all elements and particulars about which no information has come to us. As a result, we have not begun making payments into that fund, though we expect that we ourselves and, honestly, every mining company will need to do so eventually, since it is part of the new mining code.

Reg Spencer

analyst
#40

Understood. That's a decent transition into what I want to ask next, I suppose. Chris, when does the new code's application actually take effect? Is January 1 the start date? Or is there a window — since it sounds like, particularly regarding the development fund contributions, certain elements still need to be sorted out?

Christopher Eger

executive
#41

Yes, Reg, you're spot on there. As you're aware from the earlier press releases, we signed the protocol — I believe that was November 20th, or the 18th, somewhere around then. We were given a 3-month period to collaborate with the government on putting the new Mining Code into effect and getting every detail finalized. That deadline arrives in February — roughly mid-February. We've been attempting to secure a meeting with the government for those talks. However, owing to what I'd describe as their engagements with other mining operators in Mali, they've instructed us to hold off until they finish their conversations with those others, after which it's our turn. So we stand ready to sit down with them, though my sense is that the real implementation of the new Mining Code — and grasping particular elements of it — will slip past February. Still, I honestly couldn't tell you what the correct date would be.

Reg Spencer

analyst
#42

That's likely all from me — there are a couple of other small items, but I'll just send you an email afterward.

Operator

operator
#43

And our following question comes from Justin Chan, who is with SCP Resource Finance.

Justin Chan

analyst
#44

Starting with the cash flow waterfall slide — comparing it to Q3, I notice the $160 million Bali settlement, but the bar that used to be in that spot was a $17.6 million government dividend, and nothing similar appears now. So for modeling purposes, I want to ask: does that $160 million settlement already reflect the $17.6 million in dividends you've paid, or did you simply remove the government dividend bar for presentation reasons? I'm just trying to...

Christopher Eger

executive
#45

Actually, Justin, let me handle this one. For how we’re presenting it, we effectively placed that $17 million within operating cash flows, since it concerns withholding taxes on dividends that we remit to the government as part of its ownership stake. In effect, it is a tax payment. That’s why every tax payment sits under operating cash flows. Given how large the settlement was, we simply wanted to rearrange things so the picture stays easier to follow. Still, that is the right way to view it.

Justin Chan

analyst
#46

Alright. No, that’s okay. Yeah, I only wanted to confirm that I wasn’t meant to net or anything like that, given what you said. Okay. That clears things up on that front. And then just regarding — and for Mako, for your mining during the first half, I can see the ounce guidance. That figure of 1.8 grams you brought up — does that still apply — is that what you anticipate for the remnant, what you’ll be mining through the rest of Mako? Or yes, could you provide guidance on what you’re expecting?

Christopher Eger

executive
#47

Yes. Look, from the ore body, it's about 1.8 grams per tonne. So through mining, let's say, June of this year, that's what we expect. And then it will decline gradually to 0.9 grams per tonne, which is basically the average grade of the stockpiles we still have remaining until 2027.

Justin Chan

analyst
#48

Okay, on H1 head grade — is most of that ore sourced from the ore body, so you're at 1.8, or is it a bit below that?

Christopher Eger

executive
#49

That's right — it comes from the ore body.

Justin Chan

analyst
#50

All right, understood. I believe those are — yes, perhaps only the final item. Regarding the fuel surcharge going forward and how we should think about it, is that $10 million to $15 million annually at, I suppose, current — is that at today's fuel levels? Will it shift dynamically as oil prices change?

Christopher Eger

executive
#51

Not truly, no. Within the area of our current operations, it stays fairly steady. Once we are running the SSCP, that figure will matter more down the road, and we won't be adding it once we are in full sulphide operation, since we will be drawing more power, yet it will come to roughly that $15 million effect compared with how things stood previously. What this amounts to is that previously, the fuel we had carried an extra duty that came with an exemption. That exemption is now gone. As a result, we must pay extra taxes on fuel.

Operator

operator
#52

<<operator_script>> Moving on, Cody Hayden of Berenberg is our next participant.

Cody Hayden

analyst
#53

I’ve just got one question. Regarding Syama, I was hoping you could help break down that extra $250 per ounce. I know we sort of discussed it before in relation to the development fund contribution, but I was hoping you could just sort of explain it for me and how you sort of arrived at that figure, just so I can understand it better, please.

Christopher Eger

executive
#54

Sure, Cody. Look, it's straightforward. There are really three components. The first is roughly $100 because royalty rates went up. We moved from an effective 6% to 10%, 10.5%. So that's 4% on, obviously, about $800 million. Then another 4% comes from the foundation payments. So that's another $100. So you've got $100 on AISC from royalties, $100 from the foundation payments. And then the remaining $50-odd comes from the fuel exoneration we lost. There are other small bits and pieces. For instance, we need to use far more local contractors, and local content rules will possibly affect operations through fewer suppliers. So we're seeing a slight rise in what I call operating costs from some of these ships, but the big items are the three I just mentioned.

Operator

operator
#55

Since we have no additional questions on the line at this time, I’d like to pass things along so questions can be taken through the webcast.

Executive

executive
#56

Will you be looking to bring down the trade payables during H1 2025 that you said had built up across H2 2024?

Christopher Eger

executive
#57

So, you know, if we look at AP and consider some of the things Dave mentioned regarding working capital, we're really aiming at what you'd call a standard across the industry of 60 days for accounts payables. So it's fine with us if accounts payables rise to that level, but at the same time we don't want to build up any kind of pile of payables past 60 days. So the goal is to hold it at 60 days.

Executive

executive
#58

Excellent. That covers everything from the webcast audience. I'll now return things to the room so we can wrap up with some closing remarks.

Christopher Eger

executive
#59

Thanks a lot. So, as we walked through the presentation, there’s quite a bit happening across the business, both as ’24 wrapped up and into ’25. As I said, operations are now really stable. We’re collaborating with the governments to clear up some points for our business going forward. But as I mentioned, we’re very encouraged and excited by what we’re seeing for ’25, and we believe it will be a strong year. So thanks very much for your time, and we look forward to the next one. Cheers.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Resolute Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Resolute Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Resolute Mining Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.