Riot Platforms, Inc. (RIOT) Earnings Call Transcript & Summary
May 1, 2025
Earnings Call Speaker Segments
Phil McPherson
executiveThanks, Lisa. Hello everyone, and welcome to the First Quarter 2025 Earnings Conference Call for Riot Platforms. I'm Phil McPherson, Vice President of Capital Markets and Investor Relations. Joining me today from Riot are Jason Les, our CEO; Benjamin Yi, Executive Chairman; Colin Yee, our CFO; and Jason Chung, Executive Vice President and Head of Corporate Development and Strategy. Our First Quarter 2025 earnings press release, along with the earnings presentation, is available on the Riot Investor Relations website. These materials are meant to complement today's prepared remarks and include discussion of certain non-GAAP items. Non-GAAP financial measures we provide should not be viewed as a replacement for, or as better than, financial performance measures prepared under GAAP. They are offered as additional clarifying items to help investors gain a deeper understanding of the company's First Quarter 2025 performance. During this call, we'll be making forward-looking statements about potential future events. Such statements reflect management's current expectations and assumptions and carry risks and uncertainties. Actual outcomes could differ materially because of factors covered in today's earnings press release, in comments and responses given during this call, and in the risk factor section of our Form 10-K and Form 10-Q — including for the three months ended March 31, 2025, which will be filed later today — as well as other filings with the Securities and Exchange Commission. With that, I'll hand the call over to Jason Les, CEO of Riot Platforms.
Jason Les
executiveThanks, Phil, and good afternoon to all of you. Before we get into Riot's results for the First Quarter of 2025, I want to start by walking through what Riot accomplished during that quarter, beginning with mining uptime. Across the quarter, our Bitcoin mining operations averaged uptime of close to 90%, which marks a meaningful gain versus earlier periods and reflects the effort our teams have made to boost operating efficiency. Next, the Rhodium asset acquisition and settlement agreement. On April 28, we announced that Riot had purchased certain Rhodium assets — Rhodium being the last hosting customer Riot had — including the whole of Rhodium's mining operations along with access to 125 MW of contracted power at the Rockdale facility. In addition, Riot and Rhodium signed a settlement agreement under which both sides agreed to bring all litigation between them to an end; this deal could boost our hash rate capacity in the near term while also handing us considerable power capacity for future development. On top of that, it will cut operating losses and litigation costs tied to this legacy contract substantially — a contract that came to us through our 2021 acquisition of Whinstone U.S. This strategic purchase fits well with Riot's long-term goals of streamlining operations, bringing ongoing operating costs down significantly, and shifting resources toward our more profitable core business: prudent financial management. Thanks to our strong balance sheet, Riot's use of our ATM program in 2025 year to date has been limited, which has kept dilution of our shareholders in check. Rather than relying on that program, we've accessed other financing sources to cover the capital needed for growth and for operating expenses. In April, for instance, Riot sold our monthly Bitcoin production and also closed our first Bitcoin-collateralized credit facility with Coinbase, which lets us use our strength to lower dilution while keeping a strong balance sheet — still a core pillar of our business strategy. Turning to advancing our AI HPC data center business, Riot made substantial progress this quarter on building that business, and pushing this objective forward remains the top priority for our management team. Along with finishing Altman Solon's feasibility study of Corsicana for data center development, we are growing our site footprint through additional land acquisitions, deepening our internal expertise by adding key people to the team, and moving forward with ongoing engagement with potential counterparties. I take pride in what we achieved in the first quarter of 2025 and look forward to reporting on our progress throughout the year and beyond; with that, I'd like to hand the call over to Colin Yee, CFO of Riot Platforms, to present our Q1 2025 financial update.
Colin Yee
executiveThanks, Jason. It's great to be here to walk through Riot's results for Q1 2025. To make things easier, Slide 6 lays out the key metrics — a quick view of the important financial and operational figures for the first quarter of 2025. I'll pause for a second so everyone can take in that snapshot before I get into the specifics on the slides that follow. In Q1 2025, Riot's self-mining hash rate went up from 31.5 exahash to 33.7 exahash — that's growth of 7% across the quarter, which almost matched the rise in the global hash rate, which climbed 10% during that same span. Even though the worldwide network hash rate expanded a bit faster than Riot's deployed hash rate, Riot still mined 1,530 Bitcoin in the first quarter of 2025, which is up from the 1,516 Bitcoin mined in the quarter before. The reason Riot could mine more Bitcoin than the previous quarter comes down to big gains in how efficiently we operate. So far in 2025, we've grown Bitcoin holdings per million fully diluted shares from 44.3 to 47.4, which works out to a Bitcoin yield of 7% for the period that ended March 31st, 2025. Looking ahead, we'll stay focused on producing an accretive Bitcoin yield so that our shareholders can take part in the long-term value creation opportunity that Bitcoin offers. Riot also closed out the quarter with 19,223 Bitcoin on hand, which is 8% more than the 17,722 Bitcoin we had at the close of 2024; for the first quarter of 2025, Riot posted total revenue of $161.4 million, up against $142.6 million in the prior quarter — a 13% rise quarter over quarter. The main drivers here were more uptime and better operating efficiency in our Bitcoin mining business. Gross profit for the first quarter of 2025 came in at $73.6 million, versus gross profit of $55.7 million in the quarter before. Gross margin for the first quarter of 2025 was 46%, up from 39% the prior quarter. Non-GAAP adjusted EBITDA for the first quarter of 2025 was negative $176.3 million, compared with non-GAAP adjusted EBITDA of $296.3 million in the prior quarter. Net loss for the first quarter of 2025 reached $296.4 million, or $0.90 per share, against net income of $136.4 million, or $0.43 per share, in the prior quarter; that net loss was mostly the result of mark-to-market adjustments tied to the quarter-end drop in Bitcoin price and marketable securities, which totaled $271.2 million. For context, Bitcoin's price at the close of the fourth quarter of 2024 stood at $93,354, whereas at the close of the first quarter of 2025 it was $82,534; that produced a mark-to-market downward adjustment of $208 million for the quarter. The net loss for the quarter also reflected depreciation and amortization expense of $77.9 million and non-cash stock-based compensation expense of $29.6 million. For the quarter, cash SG&A came to $41.9 million, which included $8.6 million in one-time litigation expenses along with $3.0 million in advisory fees. Once you strip out those one-time items, Riot's cash SG&A expenses come to $30.6 million, which is consistent with the guidance we gave previously of a run rate between $30 and $33 million each quarter for 2025. Bitcoin mining revenue for the first quarter of 2025 came in at $142.9 million, up 13% from the $126.3 million in Bitcoin mining revenue during the prior quarter. That gain was mostly the result of higher Bitcoin production during the quarter, which came from a 7% rise in our self-mining hash rate along with better operating efficiency. For the quarter, Bitcoin mining gross margin stood at 48%, which was nearly unchanged from the 50% Bitcoin mining gross margin in the prior quarter. Direct cost to mine, excluding depreciation, in the first quarter of 2025 was $43,808 per Bitcoin, and power costs made up $35,313 per Bitcoin of that, or 81% of total direct costs per Bitcoin. On a quarter-over-quarter basis, our net power costs fell from $0.038 a kilowatt-hour to $0.034 a kilowatt-hour as Riot's power strategy kept delivering strong results. Direct non-power costs, which take in direct labor, miner insurance, miner and miner-related equipment repairs, land lease and related property taxes, network costs, and other utility expenses, came to $8,495, or 19% per Bitcoin mined, down from the fourth quarter of 2024, when direct non-power costs represented 21% of total costs. That marks the third quarter in a row in which direct non-power costs, as a share of total direct costs per Bitcoin, have declined, and it's a strong sign of Riot's ability to take advantage of improved economies of scale at our operating facilities. Engineering revenue for the first quarter of 2025 totaled $13.9 million, a 20% increase from the prior quarter's engineering revenue of $11.6 million. Total revenue does not include $6.4 million of intercompany purchases made during the first quarter by Riot for capital expenditures tied to our mining operations. Riot's earlier fiscal year 2025 guidance of $100 million in engineering revenue included roughly $16 million of intercompany purchases, which under GAAP accounting are not part of our reported consolidated results. That said, we remain on track to meet GAAP guidance of $84 million, and we expect revenue to keep rising in the quarters ahead. The engineering division also returned to profitability this quarter, posting a gross profit of $2.1 million, which works out to a gross margin of 15%, compared with a gross loss of $2.4 million in the prior quarter. Our recent acquisition of ESS Solutions has helped drive this profitability rebound in our engineering division, which kept seeing robust demand growth, since this was the first full quarter that incorporated the financial results of ESS Solutions into our engineering business. With that, I'd like to hand the call over to Jason Chung to give an update on our most recent transaction.
Jason Chung
executiveColin, thanks. On April 28th, Riot shared news that it would be acquiring Rhodium's operations along with tangible assets — every ASIC miner included — at the Rockdale site, done through a settlement agreement. That agreement also covered dismissing, by mutual consent, all litigation currently underway, plus a release covering any future claims unrelated to this deal's closing. Consideration for the deal came to $185 million in total, split into $129.9 million paid in cash, the return of a $6.1 million power security deposit from Rhodium, and $49 million issued as Riot common stock. For some background: when Riot bought Whinstone U.S. back in May 2021, it took on certain legacy Whinstone hosting contracts, Rhodium's among them. As this slide lays out, Rhodium previously used about one-half of Building B plus the entirety of Building C at Rockdale, and held contractual rights to 125 MW of power capacity — a sizable share of both the total square footage and the power capacity on-site. That legacy hosting contract alone produced a loss of roughly $14.6 million during 2024, and it still had a term running through December 2030. Through this acquisition and settlement, Riot has now fully left the hosting business behind and holds complete control of the on-site infrastructure plus the 125 MW of power capacity that Rhodium had previously been dedicated at Rockdale. We're currently assessing how best to put this extra capacity to use so we can maximize value from the added infrastructure, power capacity, and on-site assets moving forward. At this point I'll hand the call back to Jason Les.
Jason Les
executiveAppreciate that, Jason. Riot's capital expenditures for Q1 came to $48.9 million. The bulk of that went toward continuing the 600 MW substation buildout at Corsicana, along with advancing work meant to increase optionality at that site for data center development. Beyond that, some capital expenditures went toward growing Bitcoin mining hash rate at the Kentucky facilities. As part of building out the AI HPC data center business, Riot has now secured the easements needed for municipal water at Corsicana, and the company has also acquired additional land parcels for data center development. On top of that, Riot is working to lock down more fiber capacity for Corsicana, which would take the number of connections from two up to four. Through these early moves on long-lead items, we continue to pursue, as aggressively as we can, an outcome that maximizes value for our data center business. Compared with the guidance we gave before, Riot's 2025 hash rate growth forecast has not changed. Even so, since we recently bought Rhodium's assets at our Rockdale facility, there could be upside to our hash rate forecast. At present, our operations team is conducting a complete assessment of those assets so we can determine how to use this new capacity in the way that maximizes value. After that effort concludes, we will bring investors up to date on what effect these new assets are expected to have on our hash rate guidance. At the start of this year, we brought in Altman Solon—a leading advisor to the data center sector—to carry out a feasibility study. The goals were to confirm whether an AI HPC data center campus could work at our Corsicana site and to identify where improvements might be made. The findings from Altman Solon's study pleased us, and they reinforced our view that having access to substantial power near tier-one markets—exactly what we have at Corsicana—is both rare and highly valuable. According to Altman Solon, four main elements at the Corsicana location make it, in their view, an excellent fit for data center construction. First, secured power. At Corsicana, we've got full approval to pull 1 GW of power, and right now we're building out the infrastructure needed to make that power available. Second, when it comes to owned land, there are 35 acres at Corsicana that can be developed right away for a first-phase data center, and over the next few weeks we expect to close on buying a substantial amount of additional land. Third, the location is appealing: Dallas, a tier-one data center market, sits just 60 mi away, so we're near the core hyperscaler architecture that already exists. And finally, scalability — on top of the 600 MW of capacity available at Corsicana, Riot can expand further using its current portfolio, while our engineering division gives us key advantages for hitting aggressive timelines. Since the dirt work is finished at Corsicana, we have a ready-made route to get our AI HPC data center campus going right away with phase one. On this slide, the map gives you a look at how the site sits today: the Bitcoin mining operation we already run takes up 20 acres, the substation we have now plus the expansion coming later will span 15 acres once it's done, and there's another 35 acres still open. For a first phase, this location is ideal, though we've already moved ahead to lock down additional land for development, which lets us tap into the full 1 GW of power available. We expect to finalize a deal this month for an additional 355 acres, situated less than one mile away from our Corsicana site. We're also exploring multiple avenues to acquire additional land in the immediate vicinity of that facility for future development. When you factor in the advantageous zoning and tax benefits that Navarro County offers, this added acreage provides us with the greatest possible flexibility and enables us to give tenants faster development schedules. Data center development is already a strong fit for the Corsicana facility, and certain major market challenges, such as securing power access, have already been addressed at that location. We're hard at work on additional upgrades to the site so that it becomes even more attractive to prospective tenants. In addition to the progress we've made regarding power and land, water is another area where Corsicana has advanced. We're working on two wells located on-site, along with a municipal water source, which will provide plenty of extra water by 2026. Connectivity is one more area of focus. Right now we're adding more fiber lines to the site so we can ensure strong redundancy and a variety of paths. Thanks to this ongoing progress, our Corsicana location will be positioned as the most appealing complete offering we can provide. We're moving on a tight schedule to reach the essential milestones that Riot needs in order to fulfill its data center business goals. In only the last several months, we have recruited specialists from the industry, strengthened our board of directors with additional know-how, and engaged financial advisors — and through all of it, we kept building out the essential infrastructure pieces required to reach energization in 2026. As the coming quarters unfold, we plan to grow our in-house capabilities even more by making important hires, and we anticipate sharing news before long about a top-tier team that will push execution at the highest level for our data center business. This puts us in position to finalize the design foundation for phase one at the Corsicana data center campus, and ultimately that should lead to us landing a favorable lease agreement with a strong tenant. We're moving quickly on this effort and have been in discussions with multiple parties who are actively conducting due diligence right now. We'll keep providing updates as we hit these important milestones. In closing, our Q1 2025 performance came primarily from Bitcoin mining, and it ranked among our best quarters ever, reflecting better uptime and gains in other efficiency areas. During Q1 2025, Riot's mining expenses stayed basically level compared to Q4 2024, even though network difficulty rose 10%. Our demonstrated power approach keeps giving us an edge over rivals. Because of this approach, we continue to rank among the peers with the lowest cost-to-mine Bitcoin, which is a major point of distinction in our sector. Through efficient Bitcoin production and prudent financial management, we've generated a 7% Bitcoin yield in the year to date. Delivering industry-leading results, minimizing dilution, and achieving our aim of extracting maximum value from each unit of power capacity we possess remain our ongoing priorities. During 2025, our main emphasis is on developing and leasing an AI HPC data center, and we'll keep capitalizing on the tremendously favorable momentum that's already building. We're putting money into creating a design that's prepared to satisfy hyperscaler requirements and to produce the strongest possible data center proposition, since we find ourselves in an advantageous spot with one of the most appealing data center locations you can find anywhere in the nation. I'm eager to share our updates with you; at this point we'll begin taking questions. Operator.
Nick Giles
analystThanks, Operator. Afternoon, everybody, and folks. Congratulations on what you've achieved up to now. First thing I want to ask — correct me if I've got this wrong, but wasn't Riot involved at the very start of the Large Flexible Load Task Force, assuming I'm using the right name? What I'm wondering is what you've mainly taken away from this so far, especially in a situation where you might shift away from electricity loads that bend more easily toward loads, you know, that are more about redundancy.
Jason Les
executiveRight, Nick, I wouldn't go so far as to say Riot was the force behind the Large Flexible Load Task Force. That task force came into being because of legislative action in Texas, though we do get deeply engaged in public policy work. We work hard to stay informed on the ground there and to offer industry insight, expertise, and viewpoints so that regulators can be as successful as possible in achieving their goals. What I can tell you is this: when you consider the Large Flexible Load Task Force, it isn't only about cutting back when prices are high or taking part in ancillary services, even though that makes up a significant portion. There are many technical qualities and characteristics that every large load needs to satisfy on a grid. I believe we've picked up quite a bit regarding the technical aspects and requirements, and I believe we've built a very strong capability when it comes to grasping regulator viewpoints, grasping grid operator requirements, and what they want from any kind of large load. That experience of interacting with grid operators, I think, is among the reasons Riot does so well at securing powered land and running sites at truly unprecedented volumes of power.
Nick Giles
analystJason, thanks for walking through all of that. What I really wanted to ask about next was your take on the possible financial upside. Given that several of these major capital projects appear to be wrapping up, what sort of ultimate gain could a deal deliver? Or should we instead be thinking about some specific CapEx figure tied to them?
Jason Les
executivePinpointing that kind of target feels premature at this point. There are still many ways and variations in which this could take shape. Naturally, our priority is whatever structure delivers the greatest value to shareholders. We aren't ruling out any particular structure, to be clear. What we're doing is evaluating the choices in front of us and figuring out which path extracts the greatest worth from our assets, since we consider those assets to be both limited in supply and highly valuable. So Nick, what the effort currently underway accomplishes is keeping momentum going. The reality that we keep adding to the substation, extending more fiber out to the property, acquiring more acreage, and securing more water — every one of those steps keeps the site moving ahead. You can really frame it as pushing toward what, in a standard development, would be called the powered shell phase. We believe that carrying out these efforts keeps improving how appealing the whole package looks over time. Regarding what you're really asking—what impact does this have on things like development costs or similar details? My sense is that we can't really answer that yet. What we're centered on is maximizing the worth here and making sure we come out as strong as we can in our dealings with hyperscalers.
Nick Giles
analystAll right, that's reasonable. Once more, congratulations on what you've achieved up to now, and I wish you ongoing success.
Jason Les
executiveI appreciate it.
Jason Les
executiveYeah, I'd say demand is still as strong as we've ever seen it. And I think we're beginning to hear more comments from other hyperscalers that back that up. The feedback we keep getting has been really encouraging — and not only from hyperscalers, but from possible financing partners too, who would also be essential to this development. Everybody keeps acknowledging how valuable power is when it can be delivered soon. In this instance, we're talking about 2026. The reality is that roughly 5 GW of data center capacity is currently being used for generative AI. By 2030, the projection is that we'll need around 30 GW. That's quite a large gap to close within a fairly brief window. So because of that, we keep seeing robust demand. There was commentary, I believe, on Meta's earnings call yesterday regarding how they're raising CapEx spend, plus remarks from other hyperscalers that they remain intensely focused on locking down additional data center capacity. We feel encouraged. As a quick follow-up, I know you brought up financing partners. Could you give us a sense of what project-level financing for one of these deals might look like? Would you draw on the Bitcoin treasury, similar to what you described with the April production, or how would that work? Yeah, we'll evaluate whatever option maximizes value and whatever gives us the lowest cost of capital. That's what the decision ultimately hinges on. I wouldn't rule anything out. I think the specifics of a financing deal would really depend on the off-taker terms. Of course, we're not at the point of discussing — we're not yet at the stage of getting into that level of detail, but we think we're very well positioned when it comes to financing sources, with our advisors Evercore and Northland. We genuinely believe the quality of the tenant we ultimately manage to secure will favorably affect both the amount and the quality of financing options open to us. That's why we remain focused not simply on landing a deal in a binary sense, but on pursuing blue chip, very strong counterparties whose cash flows the market will value and which can be securitized. Thanks a lot, guys.
Paul Golding
analystThank you very much. Congratulations on the efficiency getting close to 90%. I'd like to dig into a few of the remarks regarding the HPC focus for this year. How much has the vertical integration with ESS Metron been a topic in conversations, or how much do you view it as adding to timelines or to the capacity to meet an HPC client's expectations? Then, I just wanted to check in on power regarding a few things, one of which is backup generation. In the presentation, you mentioned on-site backup diesel generation. I wanted to understand how you're handling those other items with long lead times — what's your strategy, how much do you currently have in stock, and what's your thinking there? Thanks so much.
Jason Les
executivePaul, thanks for asking about vertical integration. We see this as a truly meaningful advantage for Riot; through ESS Metron, we operate an electrical engineering and manufacturing arm that handles the design and production of essential switchgear. As it happens, that production takes place within the United States, which matters more and more given the push to reduce supply chain risk. Taking over ESS not long ago has boosted our ability to handle electrical contracting, and that particular expertise is, as one would imagine, in extremely short supply when everyone's chasing these data center projects. Another point about ESS: generation work makes up a large share of what they do, which means they're well positioned to help with backup power. As for the reactions we've gotten from counterparties at large, and from the people evaluating the deal, the general sentiment has been positive, I would say, regarding our holding this distinctive skill. When it comes to generators, like I said, that's an area where our engineering group brings know-how and handles it on a regular basis for counterparties. Our view is that we're in a solid spot on that front, and we expect to have solid visibility into that supply chain. As for whether we land backup generation, when that might happen, and how long it would take to arrive, we've got nothing to share at this point. That piece matters a great deal, you know. It's one we'll be watching very carefully so we can push hard on getting things delivered on schedule.
Paul Golding
analystThank you, Jason. I'd like to fit in a single administrative item too, if possible. According to the deck, you've got 1 GW that's been approved. Clearly, that represents all of the Corsicana site as it stands today. And then moving on to HPC, 1 GW is completely under contract as well. My assumption is that this means an additional 400, rather than shifting some Bitcoin mining capacity around. Is that right?
Jason Les
executiveThe point we're making with that slide is that 1 GW has received approval. Right now, 400 MW is in use for Bitcoin mining, while 600 MW remains open for an AI HPC data center arrangement. That said, should the economics prove appealing and developments move forward along those lines, then, as you know, potentially all 1 GW could come into play. The goal, you know, is simply to get the most value possible out of that asset as a whole.
Paul Golding
analystGreat. Thanks so much, Jason.
Jason Les
executiveThank you.
Ben Sommers
analystHi, everyone. Hope you're having a good afternoon. I appreciate you taking my questions. Regarding that new $100 million facility with Coinbase, I'm just a bit curious — why is now the right time for this, and how should we be thinking about the capital strategy going forward from here?
Jason Les
executiveSure, I'll pass that along to Jason Chung.
Jason Chung
executiveAlright, thank you Jason, and I appreciate the question. I believe what we did on the financing side during this quarter offers a solid window into how we view each of the various funding avenues at our disposal; usage of the ATM was quite restricted, which meant only very slight dilution for our shareholders. On the occasions we did sell into the ATM, the average price we got was $13.05 for each share. Our timing feels fairly favorable to us when we made those limited ATM sales; beyond that, we took two additional actions, correct? During April, we also began selling the Bitcoin we produce each month, which brought in extra capital. And then, with the Coinbase facility, we've, you know, unlocked yet another financing path that, once again, avoids going through the ATM. Given that market valuations look somewhat weak right now, we have been exploring these alternative funding routes quite actively; we will keep pursuing other market opportunities aggressively whenever they arise; that is bounded on the debt side, on the leverage side, by what we said earlier — aiming for a maximum of 40% debt to Bitcoin on our balance sheet so we preserve what strikes us as a reasonably comfortable margin of safety there.
Ben Sommers
analystGreat, thanks. For my second question, regarding worldwide hash, do you have any perspective on how worldwide hash might move given the tariffs we're seeing right now? Might that create chances for your company to grab more market share, in 2025 or afterward?
Jason Les
executiveYes, Ben, my sense is that tariffs are going to broadly affect quite a few miners' expansion strategies. Some miners are already commenting publicly about rethinking their projections for growing hash rate, I believe. For several years now, Riot has been positioned well, going back to 2023, when we signed a long-term agreement to buy miners from MicroBT produced at their facilities in the U.S. That has genuinely shielded us from tariffs, at least regarding our 2025 hash rate growth targets up to this point. The way I see the opening for Riot is this: since expanding Bitcoin mining operations may become pricier, the global network hash rate might not climb as fast near the end of the year, if Bitcoin's price stays at its current level. Naturally, should the price rise, that would likely encourage additional development. Given where Riot stands today and what we have underway, we capture solid market share from our present position. Our cheap operations will guarantee we keep a healthy margin despite any swings in hash price.
Ben Sommers
analystThank you, sir. I appreciate you fielding my questions.
Darren Aftahi
analystHey, everyone. Thanks for taking my questions. To start, if I could, Jason, you mentioned there are many moving pieces involved with buying additional land, expanding your water capabilities somewhat, and then redundant fiber. I suppose my first question concerns, once the substation is in place at the existing pad you have in the deck, what capacity in theory exists for HPC at that location? What steps would need to be taken to make that other parcel of land you're currently in the process of acquiring usable? What timeline could we consider regarding phases in theory? How does that fit together with lease negotiations? Thanks.
Jason Les
executiveYeah. With the quantity of land available there, you can pursue a number of development strategies. On density, you can be extremely aggressive. Higher cost and possible constraints on future-proofing the design could be the trade-off. Alternatively, you know, the reason we're acquiring additional land is that the more footprint you have at your disposal, the more options for development you gain. Conversations with potential tenants and hyperscalers become really helpful because of the fact that we have a substation coming online and a development pad already finished — this isn't a greenfield exercise for a first phase. You can start on a first phase and, you know, pursue additional phases concurrently. Some civil work would be the primary thing we'd need to accomplish to prepare those additional phases. You know, we're not just buying development pads there. To get those sites ready for development, civil work would need to be completed, plus some electrical work. I think, you know, based on what we've typically seen in the market, large players and large tenants want multi-phase developments. The offering becomes possible because of the fact that we could begin with one immediately and then be able to proceed with additional phases concurrently later on. You know, we don't have, like, firm guidance on what I can tell you is what's achievable on that site, on that footprint. You know, I think roughly 100 MW-200 MW of critical IT load, depending on that tenant's preference, could be done there. You know, with greater expense, greater capital expense, you could achieve greater density there. For us, the name of the game is enhancing the optionality of the site, making it as successful a position as possible when we're engaging with hyperscalers.
Darren Aftahi
analystGreat. If I could just fit in one more, regarding the Rhodium building, how likely is it that it might serve a purpose besides Bitcoin? I suppose what's the process for deciding between possibly retrofitting that 125 for HPC or instead tapping existing capacity at your Corsicana that you recently finished building? Thanks.
Jason Les
executiveI think, you know, it's too soon to say precisely what we'll do with the assets and the power capacity that we bought; we aim to pick the value-maximizing strategy for these assets. The fact that this forms part of a substation already constructed means that, you know, it might also suit an AI HPC data center development. It will possess all the same characteristics as a Corsicana, which is why our main focus is on Corsicana. What we gain that's truly valuable from this acquisition is we remove the ongoing hosting loss. We remove the ongoing litigation loss. We obtain a meaningful amount of power that we can determine what to do with. As I said, we'll pick the value-maximizing strategy for that capacity. To be more specific, in answering your question, Darren, I don't believe we'd retrofit that building for AI HPC, but we have land accessible around there. We could, we have the possibility to build, you know, a data center development or building around there to simply use the power that's already available, should that be the route we selected. Still too soon to say.
Darren Aftahi
analystThat's useful, thanks.
Reggie Smith
analystHi, thanks. I've got two things. First, you mentioned tariffs, and my understanding is that was about ASIC pricing. I'm wondering whether the power infrastructure segment has any exposure to increased tariffs. I have a follow-up. Thanks.
Jason Les
executiveYes. Reggie, that's a fair question; regarding power infrastructure, it really depends on which component you mean, correct? If you look at, say, the switchgear area and the parts our engineering division made, those are manufactured here at home. From the OEM, at minimum, purchases wouldn't face tariffs. However, they do have their own parts that they buy to assemble this equipment. Tariffs are such a shifting picture that perspectives genuinely keep evolving. Opinions shift daily. It's premature to state what the effect would be, or how our engineering division and its parts would be affected. Looking wider, at other providers of electrical infrastructure, especially when it comes to high-voltage transformers, naturally there would be an effect on the price of transformers made in China, or other electrical gear originating from China. Across the market we're witnessing many developments. We're monitoring it very closely. It's too soon to determine the total impact.
Reggie Smith
analystI understand, that makes sense. This might be difficult to respond to, but I've been thinking about, well, milestones as you go along, particularly ones involving clients on the HPC side. When we consider roughly the coming 12 months, what sorts of things ought we to watch for that would signal you're making progress? Clearly, no dates need to be provided, but what kinds of announcements ought we to anticipate or consider?
Jason Les
executiveYeah, Reggie, that's a fair question. I believe what you'll observe is us persisting in the effort to assemble an in-house group so we can maximize our chances here. That doesn't automatically imply we'd construct something of this kind independently. Developing expertise internally would enhance and bolster our capacity to thrive within a JV-style arrangement too. We will keep striving to grow that group; we're engaged in finishing a basis of design regarding what a prospective data center might be; that way, we possess something more tangible to hold conversations about. We believe that would prove quite beneficial. Naturally, the final milestone, the finish line, would be obtaining a lease with a tenant. As you know, they'd hold the final say on requirements regarding what a design ought to be. As you know, we'd collaborate with them regarding what that design would be. Furthermore, financing would also represent a significant milestone along that path. We're genuinely concentrated on this. We hold a strong conviction regarding the opportunity here. We believe there's an excellent chance for Riot to establish an AI HPC data center business; that stands as our priority. I think we're positioned quite well to achieve success in that endeavor.
Reggie Smith
analystThat's very clear. I'm not certain whether you're able to share this, or whether something else might occur, but regarding that tenant agreement, are there any kind of milestones that could trigger a deal or come before one that we should be watching for? I don't know whether it's an open-ended negotiating period. What does that process usually look like? Does a lease simply get announced with no advance signal to the market?
Jason Les
executiveReggie, my guess is you'd hear something about an LOI prior to a lease being signed. A lease in this kind of arrangement is a pretty significant endeavor. Usually, before anything else happens, the two sides sign what's called an LOI. I'm not able to share the specifics of what that LOI would contain at this point, but in all likelihood, that document would come ahead of any lease agreement.
Reggie Smith
analystUnderstood. All right. That's clear. Great. Thanks, everyone.
Jason Les
executiveThanks.
Bill Papanastasiou
analystGood evening, and thank you for taking my questions, gentlemen. Regarding the first one, I was hoping you might provide a little more detail on how you expect cash OpEx to trend following the Rhodium settlement. Is that $27 million-$30 million quarterly SG&A goal still applicable, or could it land even lower during the second half of 2025, given that the settlement has now been completed?
Jason Les
executiveBill, the guidance we provided for run rate SG&A in 2025 was $30 million-$33 million each quarter; that number does not include one-off non-run rate expenses like the litigation expenses you're referring to; forecasting those is truly quite difficult. They show up so irregularly, and new milestones continue to arise. Consider what happened this quarter. All of a sudden we were dealing with an acquisition plus a settlement agreement involving Rhodium, all while a bankruptcy case they had going was still moving forward. A year ago, we never could have predicted that. But then, out of nowhere, a whole set of costs comes along with it. Our guidance for SG&A on a run-rate basis—$30 million to $33 million, and that's cash SG&A—is something we're comfortable with. When it comes to what it takes just to keep the business running, things like litigation or special advisory fees of any kind are far less predictable. We've still got active litigation going with GMO, one of our former hosting customers. It's quite likely we'll rack up litigation costs there, but pinning down an amount is really tough. At this point, we're not in a position to offer any guidance on that.
Bill Papanastasiou
analystThanks for that explanation, and I apologize. I had that target figure wrong. During the previous earnings call, it was stated that all kinds of deal structure possibilities were being examined by you folks so that shareholder value could be maximized. Since that last update, has your evaluation of those possibilities shifted, and have you managed to further thin out that set of choices? How at ease are you with it?
Jason Les
executiveYes. As you pointed out, Bill, the choices that will maximize our assets' value are the ones we lean toward most. Looking at it that way, we are honing in — zeroing in on a build-to-suit data center as the best route for us. Our view is that such a structure can come in all kinds of forms, ranging from us handling development entirely on our own to leaning completely on a JV infrastructure development partner, or something in the middle. Under any of those circumstances, though, having a financing partner is essential. That is something our advisors, Evercore and Northland, have helped with enormously; we have gotten robust interest from prospective financing partners owing to the quality of. It would mean stronger internal capabilities than the ones we had when 2025 began. We are quickly building up a data center team, and we are putting improved capabilities on the table for more serious talks. With all of that said, should a situation exist in which a different structure or choice, for instance a powered shell or leased land, delivers maximum value, we remain quite willing to pursue it. That is not what the marketplace is showing us right now. What we are aiming to do is maximize our capacity to succeed with a build-to-suit data center choice. We will monitor any possible deal structures and maintain an open-minded stance.
Bill Papanastasiou
analystThat's helpful context, thanks.
Martin Toner
analystThanks for the question. Now that you're taking a more flexible approach to how you raise capital, should we think about some kind of range for how much mined Bitcoin you'll decide to keep on hand going forward?
Jason Les
executiveMartin, the way we see it is that we're sitting in a wonderful spot — we've built things so that we've got plenty of financing levers available at all times. Running an ATM is something we can do. Our Bitcoin balance is substantial. Thanks to what the Coinbase facility showed us, we can use a very low-risk instrument to borrow against those holdings. Other forms of financing are also being explored by us. As you pointed out, we're able to sell from what we produce each month while keeping a very strong Bitcoin balance. How we approach this, Martin, is by examining our capital requirements and attempting to select the cheapest capital, the option that dilutes least, at any given moment. Over the past month, that meant selling what we produced monthly. You know, we might keep doing so in the months ahead, though that's something we assess continuously. We're simply always reviewing where our best position sits among all the choices available to us. It's a blessing to be in a spot where so many levers can be picked from daily.
Martin Toner
analystGot it, thanks. As for this nearby Corsicana, I'm guessing it's going to have to pass through, you know, the usual kind of sign-off procedure before your team is able to begin construction?
Jason Les
executiveNot at all — there isn't any kind of regulatory approval step involved. The authority we need is already granted for the site we operate. When we go ahead and purchase more property, that's simply a straightforward real estate deal. It only provides us with extra acreage.
Martin Toner
analystAll right.
Jason Les
executiveRegarding how we'd apply the electricity generated under the PPA we already have.
Martin Toner
analystIt's perfectly fungible with the existing assets that are already approved.
Jason Les
executiveYes.
Martin Toner
analystAwesome. Thanks.
Mike Grondahl
analystHey, everyone. Thank you. When you talk with prospective tenants, is there any feedback that's interesting or useful coming from them regarding the Corsicana location? And following up on that, right now, do one or two possible tenants stand out, or is it more of an open field at this moment?
Jason Les
executiveWell, let me take your second question first, Mike. A number of hyperscalers, and even big firms outside the hyperscaler category, urgently need powered data center capacity so they can hit their growth goals. I'd say, particularly since our site's location makes it suitable for generative AI training, inference, or cloud applications, sitting 60 mi from Dallas' tier-one data center, there are many different uses for that site. From our standpoint, the entire hyperscaler universe, and beyond it, represents our possible tenants for this Corsicana facility. On the feedback side, what our advisors have told us lines up closely with what tenants have said. That's the reason we've been focused on upgrading the land, bringing in water, and adding more fiber connectivity. Those weren't items that were blocking us, but we've received input about how to make the offering more attractive and place ourselves in the strongest possible spot to succeed. Our site is excellent. In its current state, it's very well positioned. Alongside holding these discussions, we've been pursuing various efforts to strengthen the overall offering and put ourselves in the best position to succeed.
Mike Grondahl
analystUnderstood. Thanks, that helps.
Brian Dobson
analystHey there. I really appreciate you letting me ask something. I was hoping you might share a bit of insight and offer some detail regarding what you view as the main force behind the, shall we say, fairly recent rise in worldwide hash. Could you maybe give your thoughts on the source of that, what parts of the world it's coming from, and whether you believe it can continue? From what we can see, it certainly looks that way.
Jason Les
executiveYeah, Brian, that's a solid question. You know, there's invariably a delay from the moment hash rate gets deployed versus when market signals appear. So here we sit on May 1. Roughly six months back, Bitcoin truly began its surge, both ahead of the election and following it; for miners who noticed that bump in hash price at that time and chose to respond, their hash rate is arriving now. I believe we're witnessing worldwide expansion in hash rate. You know, I can't point to any specific region that I'd describe as, you know, a distinct global hotbed. I think there's still strong, ongoing growth within the United States. Quite a few of our publicly traded competitors have already achieved considerable hash rate growth during this year and have additional efforts in progress. It appeared to me that publicly traded Bitcoin miners keep driving a large portion of worldwide hash rate growth.
Brian Dobson
analystRight, of course. I really appreciate that context. So, from what we understand, certain areas around the world are driving that ahead. That means a lot to us. Many thanks.
Joe Flynn
analystHey, everyone. I was wondering if you might be able to give a bit more detail on the early buildout work taking place at that location. You mentioned it briefly, but more specifically, I wanted to know whether bringing in a fiber line was something a customer asked for, and what that whole process involves — for example, handing it off to an OSP vendor — plus any expected completion timeframes would be useful.
Jason Les
executiveSure, Joe, that's a solid question. No prospective tenant requested it; instead, this is something we spotted along the way that would strengthen our capacity to get a lease signed faster and get a data center at that location fully utilized sooner. We've simply been reviewing input we've received about what we can do to make the site's offering better and boost our chances of securing a lease with strong economics alongside a strong tenant; in our view, extra fiber could likely be finished in roughly 12 months. A third party would be engaged by us to handle that work. The upside is that, given where the Corsicana site sits, 60 mi away from the tier-one market in Dallas, there's a considerable amount of fiber available for us to access in that vicinity to bring on more lines. That makes it far less intimidating a task than it might be in a location that's more remote. Another intriguing point is that, since our two sites sit so close together, we could even potentially run dark fiber linking the two. Should a tenant want a substantial amount of capacity and have interest in both sites, they might end up with a 1.7-gigawatt campus linked by their own fiber running between them. This area works well for us to pull this off. We're engaging outside help to assist us in getting it done. Completing the extra fiber would probably take roughly 12 months.
Joe Flynn
analystThat’s actually great detail. It makes sense why this is framed as something longer term. I believe during one of the visits to your site, you mentioned the possibility of generating power on location. The deck, I think, refers to using generators, but there’s also been quite a bit of interest in these microgrids. So do you see, in the end, a chance to operate natural gas turbines as a redundancy source alongside your grid connection? Any additional detail would be useful.
Jason Les
executiveYes. Based on what we’ve already done, Joe, we believe diesel generation would be the best method for delivering backup redundant power at the Corsicana facility. Given what we can do through ESS, as I mentioned in response to the earlier question, they have significant expertise in natural gas generation. If a chance existed to rely on gas for that purpose, I’m sorry. If we were able to use gas for backup generation with natural gas, that would be something where we’d be very well positioned alongside them; for Corsicana, it would probably be helpful.
Joe Flynn
analystOkay. Thank you.
John Todaro
analystThanks for taking my question. I wanted to revisit a couple of items that came up before. You said there's no LOI in place at this time. I'd just like to have that confirmed. So, as of now, no LOI. On the second item, you indicated you'd be quite open to a powered shell, yet you didn't believe the market was interested in that at present. You know, I think we picked up some indication that hyperscalers may be nudging Bitcoin miners toward doing a powered shell. It would be interesting if that isn't the situation, if what they want is a full-stack build. I'd love some color on both of those.
Jason Les
executiveYes, John; so no LOI is in place at this time. Regarding what I said about a powered shell, my intent was to convey that we don't see that as a value-maximizing path for Riot in particular. There is, you know, for instance, considerable interest in simply leasing land. Based on what we're seeing at present, that wouldn't maximize value for Riot; we stay open to it, you know, should the right deal structure present itself. I believe the hyperscalers out there are considering every kind of option; they want to simply lease powered land. They want to take powered shells, and they're also considering build-to-suit data centers. As a management team, our goal is to maximize the value of our assets, keeping an eyes-wide-open approach to however that might look. What we're seeing at present is that a build-to-suit data center is probably the best route for Riot to achieve that.
John Todaro
analystI see. So would I be right in sensing that, should they prefer a powered shell rather than that, you might simply go ahead with Bitcoin mining at Corsicana? Is that basically the second possibility?
Jason Les
executiveAt this moment, that isn't really how we're framing it. Honestly, John, this direction is one we're quite dedicated to. Our confidence is high that a data center at Corsicana can be built successfully by us. It strikes us as an offering with real appeal; we're in the process of assembling a team capable of getting a build delivered here. That, I believe, is a meaningful point of distinction Riot will bring into these discussions. And no, HPC or Bitcoin mining isn't on our minds at present. The data center route is where our commitment lies.
John Todaro
analystGot it. That’s clear. All right. Thanks, everyone.
Jason Les
executiveThanks.
Phil McPherson
executiveAppreciate that, Lisa. And hey, thanks to all of you for being here for Riot's Q1 earnings call; we're eager to share news on how we're doing going forward. All the best.
Operator
operatorThank you all for participating in today's conference. You can now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Riot Platforms, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Riot Platforms, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Riot Platforms, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.