Thanks, operator. Hello everybody, and we appreciate you being here for Riot Platforms' call covering our second quarter results. I'm Phil McPherson, and I serve as Vice President of Capital Markets and Investor Relations. Joining me from Riot today are our CEO Jason Les, Executive Chairman Benjamin Yi, CFO Colin Yee, and Jason Chung, who is Executive Vice President and Head of Corporate Development and Strategy. You can find our Q2 earnings press release, as well as a corresponding earnings presentation, over on the Riot Investor Relations website. Those documents are intended to complement the prepared remarks we're giving today, and within them you'll find a discussion of certain non-GAAP items. Non-GAAP financial measures we provide should not be viewed as a replacement for, or as better than, financial performance measures prepared under GAAP; we include them as extra clarifying items to help investors gain a deeper understanding of the company's second quarter performance. On today's call, we'll be making forward-looking statements about potential future events. Such statements rest on management's current expectations and assumptions and carry risks and uncertainties. The figures we ultimately report may end up looking quite different, and there are reasons for that spelled out in the press release we issued today about our earnings, in what gets said and asked during this very call, and in the Risk Factors portion of our Form 10-K and our Forms 10-Q — among them the one covering the 3 months ended June 30, 2025, which we'll submit later today — along with additional documents we file with the Securities and Exchange Commission. Having said that, I'll now turn things over to Jason Les, the CEO of Riot Platforms.

Jason Les

executive
#2

Thanks, Phil, and hello everyone on the line this afternoon. I'm glad to take you through what was another very solid quarter for Riot. Before we get into the second quarter earnings, though, I want to lay out Riot's strategic road map and give a bit more context around how our data center business has developed and how we see all of our operations fitting together in a complementary way. Our company, Riot Platforms, is in a position today that we're extremely proud of. Over the past seven years, we have expanded enormously, growing both in scale and in what we can do, and that is the product of many years of dedicated effort, forward-looking planning, and close coordination — all of it intended to secure our own future and take control of where we are headed. As an organization, we have matured and transformed, driven by our ability to build top-tier capabilities, including acquiring land and power, carrying out Bitcoin mining on a scale that matters globally, managing and trading power at volume, engineering, producing, and maintaining essential electrical infrastructure, and maintaining significant reach into worldwide capital markets. We've just brought on board a world-class capability. Jonathan Gibbs has joined us as Riot's Chief Data Center Officer, and we've also hired other very talented people who come from the traditional data center business. This marks the beginning of an exciting new chapter for Riot. With this capability in place, we're about to take the next step in our evolution as a company. Our plan is to build and develop high-performance compute data centers, and through that, we'll transform Riot by creating a data center segment that is robust and scalable. Executing well on this front is Riot's number one priority, and we understand how crucial it is to explain our approach clearly to investors and stakeholders. Let me be clear about what we're not doing: we're not pursuing some kind of pivot toward AI HPC projects with the goal of landing a "deal." What we have done instead is bring on a new data center development capability, and we intend to deploy it across as much of our power portfolio as we possibly can, which will reshape this company over the coming years. That way of thinking guides every choice we make, allowing us to capture this exciting opportunity while staying disciplined and thinking ahead. If you wanted me to compress our strategy into a quick elevator pitch, here's how I'd put it: Riot's business is monetizing megawatts, and our goal is to put as much of our power portfolio to work as we can while getting the most long-term value out of those megawatts. Our operational assets are going to be worth as much as possible, and the way we do that is by getting the most out of every megawatt, making sure no available power goes unused. Having a portfolio of power that's ready for service is a real edge for us, and it's anchored by Rockdale and Corsicana, our operational flagship sites. These aren't just ideas on paper. They're running right now, and that's because of money we put into Bitcoin mining infrastructure earlier. So when it comes to our data center development initiatives, we can execute with more certainty than a traditional developer operating on its own ever could. Our Bitcoin mining capabilities have shown themselves to be essential to this strategy, because they're what's underneath our ready-for-service power portfolio. Thanks to the mining capabilities we've built, we've reached the fortunate situation we're in now, and by leaning on our strengths we can lock in new power sites, handle risk in a profitable way, and at the same time establish a sustainable growth cycle. Because the economics look attractive and data center leases to high-quality tenants carry higher valuation multiples, our preferred final use for those assets is still converting as much of our power portfolio as we can into data centers. How quickly we move from Bitcoin mining into data centers will depend on customer demand trends, whether financing is available, and the broader data center market. At the moment, our focus is on laying a solid groundwork for a future deal pipeline. A number of strengths put us in a remarkable spot: we offer a distinctive combination of large-scale, readily available power in sought-after regions; a robust balance sheet backed by more than 19,000 Bitcoin, $330 million in cash, and considerable capital markets access; seasoned hyperscale data center leadership and development expertise; efficient Bitcoin mining at scale that brings in hundreds of millions of dollars in revenue and cash flow each year; and management and operations teams that are experienced and battle tested. With that framework established, our mission is clear. Riot is going to get the most out of every part of its power portfolio, making sure no capacity sits idle, move power capacity toward data centers in a big way, grow its power assets on purpose, use Bitcoin mining where that makes sense, and give shareholders more exposure to assets that build value. Sitting right where booming compute demand meets Bitcoin's growth, we're in a strategic spot that offers real potential to create value for shareholders; now let's look at the second quarter. We stayed hard at work pushing the build-out of our data center business forward, and we hit an important milestone in that development plan. To put a finer point on it, we said we'd brought on Jonathan Gibbs as our Chief Data Center Officer. When we were looking for someone to head up Riot's main initiative, Jonathan's name kept coming up with strong endorsements from several parties across the industry. Competition for data center talent is fierce, and people with Jonathan's expertise are very sought after. By choosing to come to Riot and take charge of our data center platform, Jonathan shows just how unique the opportunities here are and how capable we are of succeeding. Having someone of Jonathan's caliber join us to push these efforts forward is something we're very thrilled about. In Q2, we kept buying more land surrounding our Corsicana site, bringing our total footprint to 858 acres. Bringing more land into the fold guarantees we're able to put our sizable on-site power access to complete use, ensuring none of it sits idle, which in turn lets Riot capture the greatest possible value from what we see as the nation's top data center development prospect. Market demand continues to be strong, and discussions remain ongoing with those who've shown interest. Even so, throughout Q2 we sustained significant forward movement in our Bitcoin mining business, delivering meaningful efficiency improvements that have made us one of the sector's most efficient players, and we did this while holding expenses in check and adhering to a disciplined approach to capital allocation. Our balance sheet remains robust at Riot, and that has been a foundational element of this company for a long time. When the second quarter ended, we held over 19,000 Bitcoin along with $330 million in cash, putting liquidity at $2.4 billion as of today. Each month, the Bitcoin we mine gets sold to support ongoing operations, and on top of that, we've added capital via a $200 million facility with Coinbase secured by Bitcoin, which allows us to reduce share issuance under our ATM and fund the numerous growth opportunities ahead, driving long-term value for shareholders. The progress we made in Q2 fills me with pride. These figures, combined with the firm's solid financial position and operational capabilities, mean we can continue expanding our data center operations aggressively while optimizing long-term shareholder value. I look forward to providing further updates on how we're doing for the rest of this year and into the future. At this point, I'll turn things over to Riot Platforms' CFO, Colin Yee, who will walk us through the financial results for the second quarter.

Colin Yee

executive
#3

Thanks, Jason. I'm happy to walk through Riot's second-quarter 2025 financial results. To make things easier to follow, we've put the key metrics on Slide 8, which gives you a snapshot of the important financial and operating figures for Q2. In the second quarter, Riot's self-mining hash rate went up from 33.7 EH/s to 35.4 EH/s, which works out to a 5% gain during the quarter, and during that same stretch the global hash rate climbed 9%. Riot mined 1,426 Bitcoin in Q2, a modest decline from the 1,530 Bitcoin mined in the quarter before, because the worldwide network hash rate expanded more quickly than Riot's deployed hash rate, reflecting our changed strategic emphasis on building out our data center business. So far in 2025, we've grown Bitcoin holdings per million fully diluted shares from 44.3 to 47.4, which equals a Bitcoin yield of 3.7% for the period that closed on June 30, 2025. In Q2, Riot posted total revenue of $153 million, versus $161.4 million in the preceding quarter — a 5% drop quarter-over-quarter — mainly because of reduced Bitcoin production as global hash rate grew faster than our self-mining hash rate. Gross profit came in at $70.3 million for Q2, compared with $73.6 million of gross profit in the quarter before. Gross margin for Q2 was 46%, unchanged from the previous quarter. Net income in Q2 reached $219.5 million, or $0.65 per share, against a net loss of $296.4 million, or $0.90 per share, in the prior quarter. That net income was mostly the result of mark-to-market adjustments tied to quarter-end appreciation in Bitcoin price and marketable securities, which totaled $477 million. For context, Bitcoin ended the first quarter at $82,534, and it ended the second quarter at $107,174, producing a mark-to-market upward adjustment of $470.8 million for the quarter. Net income for the quarter also reflected a $158.1 million loss on contract settlement related to the Rhodium acquisition, depreciation and amortization expense of $83.2 million, noncash stock-based compensation expense of $30.1 million, and got a positive boost from releasing $26 million in restricted cash connected to the post-closing dispute settlement with Northern Data. Non-GAAP adjusted EBITDA for Q2 was $495.3 million, versus a non-GAAP adjusted EBITDA loss of $176.3 million in the prior quarter, which had included $470.8 million in unrealized gain on Bitcoin held. Cash SG&A for the quarter was $45.8 million, including one-time litigation expenses of $14.3 million and advisory fees of $2 million. If you set aside those one-time expenses, Riot's cash SG&A expenses came to $29.5 million — the low end of our earlier guidance for a 2025 run rate of $30 million to $33 million per quarter. In Q2, Bitcoin mining revenue was $140.9 million, essentially matching the prior quarter's Bitcoin mining revenue of $142.9 million. During the quarter, our gross margin from Bitcoin mining came in at 50%, which is up from 48% the quarter before. The higher price of Bitcoin is what fueled this improvement in margin. What stands out most is that Riot's hash rate utilization on a year-over-year basis rose from 61% to 87%, which shows how we've strategically concentrated on making operations better at every one of our sites even while we scaled up our operations considerably, and that now places us among the industry's most efficient operators. Direct cost to mine, leaving out depreciation, came to $48,992 per Bitcoin in the second quarter, and power costs made up $37,767 per Bitcoin of that, or 77% of total direct cost per Bitcoin. Direct non-power costs — covering direct labor, miner insurance, repairs for miners and miner-related equipment, land lease, property taxes, network costs and other utility expenses — added up to $11,225, or 23% per Bitcoin mined, which is a quarter-over-quarter rise from when direct non-power costs represented 18% of total costs. This jump was nearly all due to the 1-year anniversary of finishing phase 1 construction at Corsicana along with the property tax bill assessment that followed, which came to $3.8 million for the quarter and tacked on another $2,650 per Bitcoin in direct non-power costs. Looking ahead, we expect this cost to stay flat at $1.7 million per quarter within our direct non-power costs. Even with this rise in our direct cost to mine, gross profit per Bitcoin mined for the quarter held steady versus the prior quarter because of the higher average price per Bitcoin in the second quarter. At this point I'd like to hand the call over to Jason Chung, EVP of Corporate Development and Strategy.

Jason Chung

executive
#4

Thanks, Colin. As we keep growing our data center operations, we think it's valuable for the market to get a clearer picture of how our Bitcoin mining segment performs on its own; turn to Page 11 in the earnings presentation for the second quarter, where we've laid out the underlying run rate profitability for that Bitcoin mining segment during Q2 2025. Down the middle of that slide, a column takes you through each of the main profitability drivers for the Bitcoin mining segment one by one, finishing up with run rate EBITDA for the quarter. The revenue drivers at the top line consist of the average global network hash rate, Riot's average operating hash rate, the average network hash price, and the total Bitcoin we produced in the quarter — all of which, combined, produce reported Bitcoin mining revenue of $140.9 million for the second quarter. As we flagged on the slide before this one, our total direct cost per Bitcoin in Q2 came to $48,992. Applied against the 1,426 Bitcoin mined in that period, that works out to reported gross profit from Bitcoin mining of $71 million, which is 50% on a gross profit margin basis. To arrive at run rate cash SG&A for the quarter, we strip out of total SG&A the effect of noncash charges — mostly stock-based compensation — along with cash SG&A tied to our engineering business, plus nonrecurring expenses that mainly relate to litigation and advisory work. Run rate EBITDA for the Bitcoin mining segment in Q2 came to $45.6 million, a 32% margin. Those figures rest on an average network hash price of $51 per petahash per day during the second quarter, whereas hash price right now sits nearer $60 per petahash per day. Our Bitcoin mining segment shows strong leverage to movements in hash price; to illustrate, if you applied today's hash price of roughly $60 per petahash per day to the second quarter's results, run rate EBITDA for that quarter would have risen by 70%. Meanwhile, we remain focused on keeping costs in check and bringing them down. Noncash charges — chiefly stock-based compensation — are temporarily high right now, but starting midway through next year they'll come down meaningfully and dramatically. We'll give more detailed guidance on how much stock-based compensation is expected to fall in the coming quarter. As Colin said earlier, litigation costs make up most of our nonrecurring cash expenses this quarter — $14.3 million of the $16.3 million total. Litigation costs are tough to predict, but we keep working to bring them down too. Take, for example, the assets from Rhodium that we just bought, plus the settlement deal we reached in the quarter — those have done away with the legal expenses tied to that dispute. One thing worth remembering: these figures apply only to our second quarter, and in past years, the third quarter is when we've generally recorded the biggest drop in direct costs, which means the largest gain in profitability, since that's the stretch when we've usually been in the best position to make full use of our power strategy. At this point I'll hand the call back to Colin so he can pick up the second quarter financial update.

Colin Yee

executive
#5

Jason, thank you. Ahead of reviewing the engineering segment's quarterly financials, I'd like to cover the major strategic benefits this operation brings to Riot. The engineering business provides essential items with lengthy lead times that are used directly in constructing large-scale data center infrastructure. Because we own and operate this business internally, we're able to obtain critical electrical components on schedule and at competitive prices — a meaningful edge as we map out continued expansion across both our Bitcoin mining and data center operations, particularly while other developers are dealing with supply limitations. Also, by bringing E4A Solutions into the fold last year, our engineering division now adds deeper internal know-how when it comes to commissioning, running, and servicing electrical infrastructure. That means we can keep our current gear in service more effectively, cut down on downtime, and stretch out how long our equipment lasts — all of which trims the need for extra CapEx. Since ESS Metron was acquired in December 2021, the direct CapEx savings Riot has seen from it have already hit $18.5 million, and we anticipate further recurring savings far down the road. Let's now turn to the financials. This quarter, the engineering business set a record for order bookings, pushing our backlog up to $118.7 million and positioning us well for a solid back half of 2025. In the quarter, we brought in $10.6 million from engineering revenue, which was down 14% from the $13.9 million we saw the quarter before. That total leaves out $5 million in intercompany purchases that Riot made in Q2 for CapEx. With that said, I'll hand the call back to Jason Les now.

Jason Les

executive
#6

Appreciate that, Colin. As I said at the top, everything Riot does comes down to squeezing the most out of the power we already control. When we finished acquiring the Rhodium asset during Q2, we picked up an additional 125 megawatts of capacity at Rockdale. Our review of that situation led us to a conclusion: the smartest short-term move for that extra power is to build it out for more Bitcoin mining. Accordingly, we just submitted purchase orders to MicroBT for additional miners bound for Rockdale as well as Kentucky; in total, we're buying 10 exahash of the M60S++, MicroBT's highest-efficiency machine, rated at 15.5 joules per terahash. With hash prices where they are today and Riot's cheap energy, we expect this purchase to pay itself back fairly quickly. Because the economics look attractive and data center leases to high-quality tenants carry higher valuation multiples, our longer-term plan for that added capacity is to shift it over to data center use at the right time. Riot's existing cash balance fully covers these capital expenditures through year-end 2025. Because of that bump in 2025 CapEx, we're lifting Riot's fourth quarter 2025 hash rate forecast to 40 exahash from 38.4 exahash, which works out to year-over-year hash rate growth of 26%. Part of the new miner order we discussed earlier is scheduled to come online during Q1 of 2026. Because of that, we're providing an initial hash rate outlook for that same quarter — 45 exahash. With this pace of growth, we believe Riot can maintain approximately its 4% slice of the worldwide Bitcoin network through the first quarter of 2026, all while continuing to prioritize expanding our data center operations. In January 2025, Riot made a formal announcement that it would shift direction and use the 600 megawatts of power it has at Corsicana for data centers supporting high-performance computing. During just seven months, Riot has accomplished the following items. First, we engaged Altman Solon to carry out an in-depth assessment of the Corsicana location. Second, we expanded our Board so that it includes critical know-how regarding infrastructure and data center development. Third, we retained financial advisers to help us with our go-to-market approach, our financing efforts, and our search for strategic partnerships. Fourth, we continued work on the 600-megawatt substation located at Corsicana, where 400 megawatts remain slated for the first quarter of 2026, and the other 200 megawatts should come online during the second half of 2026. Fifth, we strengthened in-house capabilities by bringing on Jonathan Gibbs as Chief Data Center Officer through recruitment, along with additional seasoned data center personnel. And sixth, we advanced the basis of design for our data centers. We're going through each of these actions in a careful, sequential way, so that we're as well positioned as we can be to secure a lease with that tenant and create a data center operation built to endure. Beyond that, combining this with our Bitcoin mining operations — and the ability it gives us to convert power land into income — together with a solid balance sheet, leaves us well placed to continue expanding our power portfolio whenever attractive opportunities arise. For any elite data center team, having the right leaders in place is the cornerstone. Back in June, Jonathan Gibbs came aboard at Riot in the role of Chief Data Center Officer, and he brings over 15 years of worldwide experience directing data center development and operations from start to finish. Over the course of his career, Jonathan has propelled numerous elements of advanced data center development, covering capital planning, infrastructure delivery, operations and customer engagement throughout North America, Europe and Asia. Jonathan has headed cross-functional teams tasked with design, construction, procurement, critical operations, ESG, EHS and sales engineering, and he has successfully guided development of more than 1 gigawatt of capacity, which represents over $17 billion in global investment. Prior to becoming part of our company, he held the role of Executive Vice President of Product Delivery at Prime Data Centers, and in that capacity he was responsible for directing the completion of hyperscale and enterprise data centers throughout the United States. Obtaining the right know-how along with experienced leadership is a crucial move toward attracting potential data center tenants and conducting lease negotiations from a position of credibility and strength. The earlier slide illustrates that developing internal expertise represents a significant milestone in the ongoing expansion of our data center business. With Jonathan now leading the team in that role, we continue to move forward aggressively in order to complete our basis of design and, in the end, finalize the lease in a manner that delivers the greatest possible value for Riot shareholders. Having Jonathan at the helm of our data center platform is something we're very excited about, and we can't wait to tell you more in future quarters regarding what his team is accomplishing and where they're headed. A feasibility study from Altman Solon found that the physical size of the site we have today could get in the way of putting all 1 gigawatt of available power at Corsicana to use for data center operations in the cheapest possible way to build, since the density needs aren't the same as those for Bitcoin mining. We moved fast to fix this. Back in May, we shared that Riot had picked up a 355-acre parcel, which grows the footprint we can develop down the road. Then in July, Riot bought another 238-acre parcel right beside that first 355-acre one, so now there's a 593-acre contiguous block of land sitting near the site we already have. Add it up, and Riot currently controls 858 acres of possible development space in Corsicana. What we're trying to do is build a portfolio that gives us as much flexibility as possible to handle whatever design specs and requirements a prospective tenant might bring. People ask us all the time about how fast we can get to market and what we see as the "window of opportunity." Based on what we're seeing in the market, power availability is going to remain the main bottleneck holding back the huge surge in data center construction, and that situation isn't going away for a long time. If you turn to Page 20 in the earnings presentation, there are 2 charts there. On the left-hand chart, what it shows is that from 2008 through 2023, demand for on-grid energy in the U.S. was basically flat, so very little money went toward improving grid infrastructure. Now compare that to forecasts calling for 2.2% compounded annual demand growth over the coming 5 years — that works out to more than a 10x jump in yearly demand versus the previous 15-year stretch, and it shows a big and widening gap between rising demand and the more constrained growth on the supply side. Alongside that widening power demand gap relative to supply, timelines for securing power in major U.S. markets are substantial: analysts cite lead times of 36 months in Dallas and 42 months in Austin, the two markets where our Corsicana and Rockdale sites sit. In these vital markets where demand is high, Riot has power that is fully permitted and easily accessible, which means we're positioned well at an ideal moment to capitalize on these market trends for the benefit of our shareholders. In closing, we possess numerous strengths that make our position exceptionally strong, because we offer a distinctive combination of considerable power capacity that's ready to use in key jurisdictions with high demand, plus proven and trustworthy leadership in hyperscale data centers along with the ability to develop them, a robust balance sheet backed by over 19,000 Bitcoin and $330 million in cash, and significant entry to capital markets. We also run large-scale, efficient Bitcoin mining that generates hundreds of millions of dollars in revenue and cash flow, along with a seasoned management and operations team that has been through tough challenges. Keeping that framework in mind, our mission is clear. Across our entire power portfolio, Riot will maximize value, working to make sure every bit of our available power capacity and pipeline gets used, so nothing sits stranded. We'll move power capacity toward data centers over time, grow our power assets strategically, use Bitcoin mining where it makes sense, and give our shareholders more exposure to assets that accrete value. Sitting as we do where booming compute demand meets Bitcoin growth, we're strategically placed, and that offers real potential to create shareholder value. At this point we'll take questions. Operator?

Greg Lewis

analyst
#7

On the HPC front at Riot, there's certainly plenty to dig into down the road. That said, I wanted to ask about the choice you made. Bitcoin generation was obviously strong this quarter, yet judging by what happened, you took that output and monetized it by selling. Could you walk us through why you went that route, and what your thinking looks like regarding the HODL approach for the second half of the year and perhaps further out?

Jason Chung

executive
#8

Appreciate that, Greg. Jason Chung here. I'll give that a shot. I'd say this quarter offers a nice illustration of the way we approach financing strategy and the various levers at our disposal. Looking back at the last quarter, the 2 levers we pulled on hardest were, first, selling the Bitcoin we produced. Second, we tapped our Bitcoin Stash, borrowing via the Coinbase facility to the tune of $200 million. When we sell what we mine, that brings in more than enough to pay for operations, which in turn opens up extra capacity, or at least lowers how much we need to push into the ATM, and lets us aim any capital we raise squarely at growth opportunities — which in our view will add value for shareholders. So that's roughly the lens we used — how we viewed it during the quarter, and likely a fair picture of how we see it right now too. Should Bitcoin prices climb, that hands us more breathing room regarding leverage, plus the option to think about increasing how much financing we pull from that source. So my sense is, as we keep watching Bitcoin prices move, you'll see us keep capitalizing on shifting market conditions as we weigh what makes the most sense for our capital needs each quarter.

Greg Lewis

analyst
#9

All right, that's really useful. And since you're likely constrained in what you're able to share, perhaps we could spend a moment discussing what the market looks like right now regarding power deals that are available or the ability to sign electricity agreements for — with HPC. Could you speak to how pricing has been behaving and what the trends look like? It seems like lately, some of what we've heard has been around $120 per megawatt. I'm wondering whether that matches what you're seeing in the market. And the real thing I want to ask is, when it comes to sizing, do you see a premium attached to having bigger blocks of power available — meaning, if we compare a deal of a couple hundred megawatts against, say, 0.5 gig plus, does a larger power deal command any kind of premium, just thinking about how a potential transaction might play out?

Jason Les

executive
#10

Yes, Greg, it's Jason Les here. At a broad level, I'd say demand in the data center market is extremely strong. Our perspective remains that the power and infrastructure that currently exists is nowhere near enough to satisfy forecasted demand, and hyperscalers keep announcing bigger CapEx budgets, with serious needs for additional data center capacity that simply can't be met by new power expected to come online. What we're observing is that the consequences of the AI arms race are quite evident. There's a clear trend toward greater compute demand. So we think demand will stay strong, and we're building a business here, constructing a platform capable of serving it. When it comes to monthly rates, many different components feed into what a final lease might look like. It matters to view a deal such as this as the sum of all its parts, rather than relying on one single metric. You'll observe a variety of rental rates, and those tend to correlate somewhat with the kind of tenant involved. Credit risk is often partly baked into those monthly rates. You'll also see term length and other pieces of these agreements; so it's important to evaluate them across all the parts that make them up, not simply the monthly rate on its own. It can span a range, and other elements might improve that deal or leave it worse off from the lessor's standpoint; now, I believe the final piece of your question was whether large-scale power carries a premium. I'm not sure I can say anything at this moment about whether such a premium exists. But what I can tell you is that there is a premium of interest when it comes to large scales of power. When it comes to tenants, the scaling happening across the board is enormous. Hyperscalers now want to secure gigawatts and even more than that. As demand for compute keeps climbing among everyone else, we're seeing neoclouds absorb capacity at the same levels hyperscalers used to, and these days enterprise tenants are also taking capacity at those significant levels. So any tenant focused on long-term growth will be thinking about their expansion pipeline rather than repeatedly having to solve a capacity problem with one provider after another, and what we observe is customers who want access to capacity beyond whatever their initial lease provides. That's how we approach the idea of a premium for capacity. There's a premium that essentially draws customer interest because they see the chance to grow past what another phase of a development or lease would offer. And we've found that to be very helpful when it comes to having productive discussions.

Nick Giles

analyst
#11

It seems obvious by now that Riot won't hurry to finalize an agreement. So credit to you for taking a careful, measured tack. That said, over the past few months, creating a basis of design has sat at the heart of what Riot has been doing on the data center front. So I'd like to know whether you can share specifics about which parts of that document are firmly settled and which ones remain in progress? Things that occur to me include cooling resources, redundancy, and security layout. Any additional detail you can offer would be appreciated.

Jason Les

executive
#12

Sure. To start, adding a seasoned data center executive such as Jonathan Gibbs, together with other personnel we've brought in who carry deep experience in data center development, has helped us a great deal in assembling the basis of design. Naturally, accomplishing this is the project and aim of this team — this data center team. And that basis of design is absolutely fundamental to reaching the market. What we're assembling is the technical strategy and design components that we can then use to have something tangible for conversations with prospective customers and prospective tenants, leading ultimately to a more tailored design and then a lease. So we regard this as one among several milestones, yet a highly important milestone on the path to securing a lease here. We've devoted quite a lot of work to this. Jonathan and his team have, rather, and substantial headway has already been achieved; we anticipate finishing this basis of design before this quarter ends — that is, before the third quarter ends — and then advancing to subsequent steps in our data center strategy.

Nick Giles

analyst
#13

Jason, I appreciate you sharing those details, and it makes me think I should also congratulate Jonathan regarding his new role. For my second question, it's clear that extended procurement windows play a major part in shaping development schedules; so have any requests for proposals gone out to contractors? In other words, to what degree is the tariff situation affecting when that happens?

Jason Les

executive
#14

To start with, when it comes to certain essential infrastructure required for this capacity build-out, we've got that locked in already. What I'm talking about is the 600-megawatt substation currently under construction that will bring the site up to 1 gigawatt. That equipment has been acquired by us. Deliveries of that equipment are already happening, and by 2026 that will get our Corsicana site to 1 gigawatt. So on that front, with that key equipment, our position is quite strong. Regarding additional equipment, we have solid confidence in what we're doing to get ready for it; extended lead times are something we're monitoring for other equipment, though the schedules involved don't catch us off guard. It's largely what we'd anticipate. Furthermore, we've already begun the work of sourcing these long lead items. And now that Jonathan and his team are here, we believe our approach to this is highly strategic. And in the end, our view is that equipment lead times won't stand in the way of our capacity to obtain a lease.

Darren Aftahi

analyst
#15

I wanted to follow up regarding the master site design timeline, which is set to wrap up by the close of this quarter. Could you discuss the prospective tenants you've been in talks with? And I suppose, how essential is that master site design when it comes to their readiness to keep negotiating? To put it differently, will that help speed up negotiations for you? Or are there some who've already been doing parallel diligence on what they require while they wait for that master site design? Then my second question concerns Rockdale — I understand you're upgrading certain rigs there. But could you share some broad, long-term perspective on what else that campus might potentially be used for beyond Bitcoin mining, and where your thinking stands? Is it that you have too much going on with Corsicana and it's sort of on the back burner, or could you pursue these things at the same time and potentially market all your power as a single campus?

Jason Les

executive
#16

Yes, Darren. Regarding the first part of your question, one thing I'd like to clarify is that we're developing a basis of design that we think can accommodate a broad range of customers. It can accommodate hyperscale customers, it can accommodate enterprise customers or neocloud customers. We're focused on keeping as many options open as we can. That's something I think you've heard from us repeatedly during these calls — we take different steps and make choices designed to give our site and our data center the greatest possible room to maneuver, while also securing the strongest terms available. When you're sitting down with serious counterparties, they expect you to come armed with this type of information so that talks can advance in a meaningful way. That's exactly why we view the expansion of this team — especially under Jonathan Gibbs and his onboarding — as essential, and as a hugely significant move we've made in developing this platform. It wouldn't be appropriate for me to say anything about talks that are still in progress. What I can say is that every kind of customer is unique, and they may come at these conversations differently, or reach a certain threshold before sitting down for substantive talks. Once everything wraps up, we're eager to tell the market more, be open about our milestones, walk through the road map for expanding this platform, and in the end get a lease signed. Turning to long term — pardon me, turning to Rockdale, growing our data center operations and getting the most value we can from every one of our power assets is what we're mainly focused on. So for those reasons—the returns you can achieve through data center leasing and the way the market prices that—data centers represent the best possible application for every bit of power we control. The advantage Riot has is an abundance of power capacity to draw on. Even taking the megawatts alone, what we can access at Corsicana on its own adds up to a genuinely large data center campus. That being said, we're not ruling out signing deals at Rockdale as well. What I'd tell you is that right now, we're just prioritizing what we consider the <<inaudible>> with. And once our data center platform gets going and we keep making further headway, that turns all of our power assets — it puts every one of our power assets in the pipeline in position for data center platform growth down the road; so our strategy can be thought of as leveraging Bitcoin mining at places such as Rockdale in order to monetize that power, making sure nothing gets stranded or wasted, converting it into significant cash flows for the company, and then in the end aiming to shift that capacity over to data center leases at the appropriate moment.

Brett Knoblauch

analyst
#17

Could you give us an update on your Bitcoin mining outlook? I'm aware that you raised guidance for the end of this year back in the first quarter as well. Network hash has kept climbing stubbornly. At a high level, where do you expect network hash to go? Do you think there's a point where it plateaus somewhat? And I know you mentioned having 4% share. Is that a goal you want to hold onto over the long term? Or how should we think about it?

Jason Les

executive
#18

I'd say the 4% share isn't a mandate for us. It's something we see ourselves landing at simply given the growth we've laid out and a near-term estimate of global network hash rate over the next 6 to 12 months. But we absolutely don't intend to always hold a certain percentage. Going back to the first part of your question, I believe Bitcoin miners will encounter the same scaling challenges data centers do. There's a very limited amount of power. And what I think we're seeing, and we're excited about, is that data center customers pay a lot more for that than Bitcoin miners ultimately would. So while Bitcoin miners have other options for power that data centers don't, I think they'll also be constrained in how they scale, which could have a positive impact on hash price in the future. At Riot, what we're focusing on is maximizing the value across our power portfolio, trying to maximize the value of all of our megawatts without straining any capacity; so what we shared with the growth we have going on in Kentucky and the hash rate growth we have at Rockdale, that — those are moves in accordance with that strategy, and I think represent measured growth of our Bitcoin mining segment. We're looking at approximately 26% year-over-year growth from '24 to '25 and then approximately 10% growth from 2025 to 2026.

Brett Knoblauch

analyst
#19

Great, that helps. And then perhaps regarding Corsicana — from many of our discussions, the impression I get is that this could be among the top AI HPC data center locations anywhere, maybe even the very best. When you're evaluating prospective customers, or thinking about what to do with that remaining 600 megawatts, or the full gigawatt, are you hearing comparable things?

Jason Les

executive
#20

With the launch of this data center platform, our emphasis is on creating a solid base. We want to begin on the right foot. Establishing that solid base requires securing the correct deal, one we can then build the pipeline upon right from the beginning. That said, it doesn't mean we must have all 600 megawatts, or execute a lease covering all 600 megawatts, in order to create that initial base — that initial move toward creating a solid base. We're viewing this capacity and developing it through a phased strategy; we expect to build it in separate segments, and we'll share more on that later. And because the site holds such substantial capacity, it's possible that in the end a single tenant could want all of it. I addressed this in an earlier question. The amount of growth concentrated at one site is, in our view, quite compelling to numerous customers who possess very strong demand forecasts; so how the segmentation ultimately shakes out remains to be seen, but we're taking this to market with a design we think can address a broad swath of the market — hyperscale customers, enterprise customers, and neoclouds. What matters to us is starting from a solid foundation; and then in the end, as I said once more, there's ample room for growth here and the possibility of doing a bigger deal from that point.

Paul Golding

analyst
#21

I'd like to inquire about Corsicana and go deeper into a few of the infrastructure pieces. On the 2025 CapEx slide, I saw a waterline project that's supposed to wrap up in Q2 '26. And when I look at the substation development line item for Corsicana overall, I was hoping you might elaborate on any infrastructure elements at Corsicana that could still be playing into talks that remain open with prospective tenant counterparties, rather than those deals already being inked. And it would also help us grasp how much water access is already locked in, considering the retention pond you've got and how much that matters for HPC and AI liquid cooling.

Jason Les

executive
#22

To begin with water, Paul, like you pointed out, we've got a sizable retention pond, which lets us tap a great deal of the water that simply falls naturally at the site. This is Texas, yet it still receives plenty of rain. We've obtained the plans as well as the approvals needed to construct the water line, and in the end that will — that plays a role in giving us the greatest flexibility to meet customer demands. On the data center technology front, what we observe is that cooling technologies are getting increasingly water efficient over time. To stay flexible, we didn't want to count on that. So we're locking in sufficient water that we think would be plenty for a whole 1 gigawatt development, should somebody require that quantity of water to pull off whatever cooling strategies they have or that they need. Regarding Corsicana's infrastructure, I'd say we're in a strong spot and likely hold a substantial advantage over where other data center developers may be at this point; we decided years back, really, to go ahead and procure this equipment; so it's arriving now. That meaningfully, I think, de-risks the amount — sorry, de-risks the timeline for bringing that power online, and on top of that, we already have this approved. We already have FEA for it. Everything is incorporated and set to go; so That, in my view, places us well whenever we talk with tenants, since this power isn't hypothetical. This power isn't waiting on particular steps to occur. This power is arriving within the next 6 months and growing from there.

Paul Golding

analyst
#23

Great. And maybe a follow-up on that point. On this call we've discussed pricing — what pricing could look like in the market, along with premiums, or a premium tied to demand. You've also addressed, during the call, what data center customers require, and that plays into this build concept. As you have those conversations, I just wanted to confirm: is the plan still — or is what you're pursuing still — the choice to put up the facility and the power infrastructure for these tenants under a yield-on-cost or build-to-suit structure? Or are inbounds coming to you? Or are you weighing inbounds in which somebody else does the construction and leases the power and the infrastructure?

Jason Les

executive
#24

Our philosophy at Riot has been to get the most value we can out of our assets. And we think that build-to-suit model will be the top way to get the most value from our asset portfolio, particularly at Corsicana. With that said, we have no intention of developing the site past an initial stage absent a lease; building out a site on spec isn't something we're looking to do; we believe that by nailing down the design here, grasping what that looks like alongside customers, and then being able to take the first steps to get things moving, which we've already accomplished by constructing the substation and the water, these would be foundational steps at any data center, and we're willing to put in investment so we can get things moving and reach the point of securing the lease, but we aren't looking to construct a site on spec and assume all of that risk with no lease in hand.

Reggie Smith

analyst
#25

Jason, well done on the quarter. I want to pick up where the previous question left off, and I appreciate that you folks are interested in actually building to suit. But my question, I suppose, is whether there's greater demand right now from parties who simply want to purchase power outright. So if that were the approach you took, do you believe this plot, or your capacity, would already have been sold by now, if that makes sense? I'm attempting to determine whether the sticking point — or the reason the deal hasn't closed — is that there's some back-and-forth about a miner simply selling power outright as opposed to a build-to-suit kind of arrangement? And then I have one more question after that.

Jason Les

executive
#26

Yes, Reggie; so we truly — we think what we hold is extraordinarily valuable. And I believe all the information we're observing in the marketplace regarding data center leasing confirms that view. So maximizing the value of that matters a great deal to us. When you talk about, say, doing something along the lines of leasing-powered land — sure, demand for lease-powered land is huge, but the value I believe you could pull out of that would be, in my opinion, pretty substantially different from what I think investors are looking for in this kind of data center opportunity. Given the assets we have, the balance sheet we have, and now the team we have, we're in a great spot to build a data center platform and go after the value-maximizing approach we see with this build-to-suit model. Anything that maximizes value, we're open to it. We aren't anywhere near having any kind of talks at this point, yet this path strikes us as the strongest one to follow from here on out, which explains why we're handling this the way we are.

Reggie Smith

analyst
#27

That's clear. Could I squeeze in one final question? Among the things we've discussed that we believed set you apart from competing operators is your proximity to Dallas and Austin. When you evaluate or size up your properties, how much weight does closeness to either of those cities carry in deciding how appealing it is to team up with Riot rather than somebody else? What I'm really asking is whether location still commands a premium.

Jason Les

executive
#28

Right, Reggie, location matters a great deal. Dallas ranks among — it's a Tier-1 data center market. Among the nation's data center markets, it's one of the most sought-after. That's the reason I'd say Corsicana carries so much value. You get strong connectivity, minimal latency, plus the capacity to bring workers and talent onto that site with relative ease as — my apologies, unlike sites that sit further out. Because of that, Rockdale strikes us as an appealing site too. As for Austin and San Antonio, neither counts as a Tier-1 market at this point, yet given the data center CapEx investments we're seeing, combined with projected AI software revenue and the margins AI software service providers project and manage to capture, our view is that this will shift eventually; so holding these 2 sites, with Corsicana close to a big market right now and Rockdale close to what I'd call a rising, emerging market, I believe, renders those sites highly appealing and lets them — thanks to those factors lets them potentially secure stronger economics than competing projects.

Mike Grondahl

analyst
#29

Nice work bringing Jonathan Gibbs on board. When you look at this summer and fall, what would you rank as his top two areas of focus?

Jason Les

executive
#30

Without question, our number one focus is standing up this data center platform. To get there, I'd split that into a pair of objectives. First is growing the team. Jonathan supplies the essential leadership that lets us pull that off. We've brought in additional people who are seasoned in data center design and development. Right now, we're adding even more talent. Why does this matter? Because we need to deepen our expertise. We need to strengthen our platform until the way it looks, feels, and behaves matches what hyperscale, enterprise, and neocloud customers anticipate; that's the top priority. Then, running alongside it—I won't say one outranks the other—is finishing the basis of design at Corsicana. That lets us hold richer conversations with prospective tenants, push the design ahead, engage different customers as needed, and genuinely get the key pieces of negotiation moving. So, two objectives. The first is standing up the data center platform, which means growing the team and completing the design.

Stephen Glagola

analyst
#31

What kind of impact will Texas Senate Bill 6's new mandates — things like grid modernization, sharing of costs, disclosure of required backup generation, curtailment duties, and so on — have on the cost structure and the operations of your mining and HPC work at Corsicana and at Rockdale?

Jason Les

executive
#32

The first thing worth pointing out is that at both locations, FEAs are already secured. So our expectation is that no renegotiation of those FEAs will be needed because of this change or because of this new legislation. A great deal of exploratory work and information gathering gets kicked off by this legislation; that's something Riot, our highly skilled public policy group, our power group and our industry partners are all deeply engaged in. Examining the 4CP program is one element of SB6. Riot takes part in that in order to lower our transmission charges; as the working groups from this legislation move forward, that program might be revised. We don't — our hope, and the goal we're working toward, is making sure this ultimately doesn't have too big an effect on our transmission charges. There are many varying proposals for how that program might be altered. So I think it's genuinely premature to speculate about that. When it comes to the remaining requirements, my sense is that new FEAs and new interconnection agreements will probably bear the brunt more than we will, but it's something we're monitoring very closely and making certain that we're good stewards of the grid, we're strong industry partners and we're doing everything we can to support the grid and provide them with the data and the reliability that they require.

Phil McPherson

executive
#33

Thanks, operator, and thanks to all of you for being with us on this call for the second quarter. We’re eager to bring you up to date on additional progress in our business when we hold the call for the third quarter in October.

Operator

operator
#34

This concludes today's conference. Thank you for your participation, and you may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Riot Platforms, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Riot Platforms, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Riot Platforms, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.