Ørsted A/S (ORSTED) Earnings Call Transcript & Summary

August 12, 2021

Nasdaq Copenhagen DK Utilities Independent Power and Renewable Electricity Producers earnings 62 min

Earnings Call Speaker Segments

Operator

operator
#1

Hi everyone, and thanks for joining Ørsted's Q2 2021 earnings call. During this first portion, everyone will be in listen-only mode, and after that we'll open it up for a question and answer session. I'm happy to introduce today's speakers: Mads Nipper, our CEO, and Marianne Wiinholt, our CFO. Gentlemen, go ahead.

Mads Nipper

executive
#2

Thanks so much, and good morning or good afternoon to all of you, and welcome to the Q2 2021 earnings call. I've now been with the Ørsted team for over seven months, and I'm happy to report that during the second quarter of 2021 we kept delivering on a great many significant strategic milestones. It never ceases to amaze me how intensely our company pushes forward on so many critical fronts at the same time. Across the first half of 2021, very low wind speeds throughout our portfolio affected us. We are holding to our full-year EBITDA guidance of DKK 15 billion-16 billion, thanks to strong results at our CHP plants and high earnings from the gas business, along with extra earnings from offshore construction projects that have been finalized. Just recently, in New Jersey's competitive solicitation, we prevailed with a full bid for our 1,148 MW Ocean Wind 2 project, which lifts our firm offshore wind capacity to 18.5 GW and moves us nearer to the new 30 GW by 2030 offshore wind ambition we launched at our Capital Markets Day. That victory is one more concrete illustration that we can and will stay the undisputed leader within offshore wind while creating value for shareholders.

Mads Nipper

executive
#3

During this quarter, we started up a number of important strategic partnerships across Japan, Korea, Norway, and Scotland, which moves us further toward our 2030 aspiration of becoming the world's leading green energy major. Among these partnerships was our Japanese consortium set up together with JWD and Eurus. It also featured an MoU with Korea's POSCO aimed at supporting development of 1.6-gigawatt offshore wind projects off the coast of Incheon City, along with feasibility studies on possible collaboration in renewable hydrogen in Korea. In addition, it covered our consortium formed with Fred. Olsen Renewables and Hafslund Eco in Norway, plus our newest partnership, set up with Falck Renewables and BlueFloat Energy for the ScotWind lease round, where seabed bids were submitted in July. I'd also highlight that the last two of these partnerships affirm our commitment to floating foundations as a technology that complements bottom-fixed offshore wind. As an illustration of how we see bottom-fixed and floating as complementary technologies, we likewise submitted bids for bottom-fixed offshore wind project rights during the ScotWind leasing round as a standalone developer. We further finalized several agreements over the quarter as we wrapped up our 50/50 joint venture with PGE in Poland for the Baltica 2 and 3 projects.

Mads Nipper

executive
#4

We wrapped up the Brookfield Renewable Ireland acquisition, and we also completed the 50% farm down of Borssele 1 & 2 to Norges Bank. Speaking of farm downs, we've now kicked off the structured process for the farm down of our Hornsea 2 project in the U.K., with the goal of closing a deal in 2022 once the asset has been commissioned. Interest from potential partners in our assets remains very strong, and given the partnership transactions completed recently, we're optimistic that we'll also execute a strong deal for Hornsea 2. We've also moved our market-leading renewable hydrogen and green fuels pipeline forward with the start of construction on our first renewable hydrogen project, H2RES. That project will feature an electrolyzer capacity of 2 MW and will draw on our 2 Avedøre Holme wind turbines to investigate how best to pair efficient electrolyzer facilities with fluctuating power supply from offshore wind. In addition, we signed an agreement with HOFOR to source renewable power for the next phases of the Green Fuels for Denmark project. In our onshore business, we commissioned our first large-scale combined solar PV and storage facility, Permian Energy Center, along with our largest onshore wind project to date, the 367-MW Western Trail Wind Farm, both of which are located in Texas.

Mads Nipper

executive
#5

Being one of America's five biggest developers and a fairly new player in the EU, we keep showing that we can build on schedule and within budget, that we can adapt to what customers want by means of hybrid projects, and that taking a portfolio approach to offtake pays off. Turning to onshore, we announced not long ago that Declan Flanagan has chosen to leave his role at the company. It was 12 years after he founded Lincoln Clean Energy and three years after Ørsted's acquisition that Declan concluded a change was timely. The search for onshore's next CEO is now underway, and with immediate effect, Neil O'Donovan, who serves as our Chief Operating Officer of onshore, has taken on the interim CEO role for onshore. During our recent Capital Markets Day, we laid out a bold growth goal: an installed onshore capacity of 17.5 GW by 2030. Our pipeline holds a really robust collection of opportunities that create value, and we stay entirely dedicated to hitting that goal. I have every confidence that the solid team and organization we've assembled will carry on the impressive work witnessed across the last three years. Let's move to slide four now and examine what we achieved in New Jersey more closely.

Mads Nipper

executive
#6

We're really pleased that we came out on top in New Jersey's second competitive offshore wind solicitation. In this case, our Ocean Wind 2 project, at its full 1,148-MW size, was granted a 20-year contract beginning at $84 per megawatt hour in 2029, rising 2% per annum, which works out to a levelized 2017 price of $67 per megawatt hour. Pending a final investment decision, commissioning of the project is anticipated in 2029. In our view, this project shows how we create value in a competitive setting, using our expertise to support customers in hitting their ambitious renewables targets, delivering strong local content, and ultimately carrying out a very attractive project. With this award, the full 2.3 GW capacity of our ocean wind lease area will be put to use. On top of that, with 4.1 GW of awarded capacity, we hold the largest U.S. offshore wind development pipeline, which unlocks significant synergies across procurement, construction, and operation. Beyond the awarded capacity, Ørsted and our partners continue to hold proprietary rights to roughly 4 GW of remaining seabed leases along the U.S. East Coast, which can be used for forthcoming solicitations. Moving to slide five, I'll provide an update on our offshore and onshore construction projects as well as our renewable pipeline.

Mads Nipper

executive
#7

To begin with the offshore and onshore projects we currently have under construction, work is proceeding on all of them in line with the schedule. At Hornsea 2, as of today, 128 of the 165 foundations have been installed at sea, along with 59 of the 165 turbines. Once it is commissioned in the first half of 2022, Hornsea 2 will be the largest offshore wind farm anywhere in the world, surpassing our own Hornsea 1. At Greater Changhua 1 and 2a, offshore construction has begun, with the export cable and the pin piles for the foundations now being installed, and we are continuing to make progress on the related onshore construction. We expect to commission that project on time in the second half of 2022, though the ongoing dynamic COVID-19 restrictions in Taiwan could potentially affect the construction timeline. During the 1st quarter of the year, we found an array cable protection issue at several offshore wind farms of ours across the U.K. and continental Europe. The technical investigation process is moving forward, and our assessments have not changed since our last update and still indicate a total financial impact of around DKK 3 billion across 2021 to 2023, with approximately 1/3 of that expected to be capitalized. We continue to see good progress on our onshore construction program.

Mads Nipper

executive
#8

We do expect to commission Muscle Shoals in Q3 of this year, since that project is in the final stages of testing and commissioning. By year-end, we expect to commission Haystack and our other assets under construction, Kennoxhead 1, Old 300, and Helena Energy Center. They are on track to be commissioned in the first half of 2022. During Q2, we added a 302 MW onshore wind project, Lincoln Land, in MISO, to our construction program. We entered into an agreement to acquire the project in May. We expect to both commission the project and close the transaction by the end of the year. While we continue to have a development-focused culture in our onshore business, we also have proven to buy well, and we see this project bringing diversification benefits and solid value to our portfolio. This brings our installed and under construction renewable capacity for the group to 16.5 GW. For our awarded projects, we are also seeing strong progress. Starting in the U.S., with the increased resources at the Bureau of Ocean Energy Management, or BOEM, and various indications of momentum on both the federal and state levels, we do remain confident that three of our largest U.S.

Mads Nipper

executive
#9

The projects Ocean Wind 1, Revolution Wind, and Sunrise Wind remain on schedule to be commissioned prior to the close of 2025. Notices of intent are already in hand for both Ocean Wind 1 and Revolution Wind, and we expect Sunrise Wind's notice of intent in the third quarter of this year. As we've said before, South Fork should still be commissioned by the end of 2023, after its draft environmental impact statement came out in January 2021, and Skipjack Wind 1 remains on track for its previously updated expectation of 2026, which reflects our updated interconnection landfall plan along with our proposed Maryland 2 project bid. Our awarded projects in Germany, Taiwan, and Poland are likewise continuing on track. That brings us to 25 GW of firm renewable capacity from projects that are commissioned, under construction, or awarded across offshore and onshore. With that, I'm pleased to report that with our 25 GW of firm capacity, 22 GW of substantiated pipeline, and over 35 GW of opportunity pipeline in offshore, we are well on our way toward the 50 GW by 2030 ambition. Let's turn now to slide six and an update on upcoming offshore wind auctions and market developments. We keep seeing numerous auction and tender-based opportunities opening up and being awarded over the coming 6 to 18 months.

Mads Nipper

executive
#10

Following the recent awards we received in Poland and New Jersey, results for Maryland and Japan should come next, in Q4 of this year. For Maryland, we responded to the Maryland Public Service Commission's call for up to 1.2 GW of offshore wind by bidding 760 MW through our Skipjack Wind 2 project. Tied to our already awarded 120 MW Skipjack Wind 1 project, the proposal carries numerous synergies, along with pledges to environmental justice initiatives and commitments to substantial manufacturing operations that will let Maryland establish itself as a significant player in the offshore wind supply chain. In Japan, we put forward three bids alongside our joint venture partners: one with TEPCO in Choshi and two with JWD and Eurus in Noshiro and Yuri Honjo. A total capacity of 1.5 GW is up for auction, split across four zones: 415 MW for Noshiro, 730 MW between Yuri Honjo North and South, and 370 MW for Choshi. For Japan, this auction is an important first step toward its target of 10 GW of offshore wind by 2030 and 45 GW by 2040. As for the rest of the auction timeline, most auctions and tenders should kick off in 2021, with results expected during 2022.

Mads Nipper

executive
#11

As we pursue our goal of making Ørsted a catalyst for change toward a world powered entirely by green energy, it makes me proud to be on a team whose talent, ambition, and determination keep driving the agenda forward — and this quarter was no different. With that, I'll now pass things over to Marianne.

Marianne Wiinholt

executive
#12

Thanks, Mads, and good afternoon from my side as well. We'll begin on slide seven, and I'll walk through the EBITDA for Q2 2021. Group EBITDA came in at DKK 8.2 billion, which is an increase of DKK 5.2 billion. That increase was mainly driven by the DKK 4.5 farm-down gain from divesting Borssele 1 & 2 to Norges Bank. On top of that, Q2 2021 had a positive DKK 150 million effect from no longer reporting under the business performance principle. And Q2 2020, for its part, included earnings from our distribution B2C and City Light businesses, which have since been divested. Adjusting for those effects, earnings in Q2 2021 matched last year. Offshore site earnings took a hit from wind speeds that were well below normal. Wind speed in Q2 2021 was 7.8 m/s, versus a normal wind speed of 8.6 m/s. That gap versus a normal wind quarter works out to a roughly DKK 900 million negative impact on EBITDA. As anticipated, Q2 2021 also felt the negative effect of higher transmission tariffs after the divestment of the offshore transmission assets at Walney Extension and Hornsea 1, along with weaker earnings from Horns Rev 2, since its subsidy period ended in October 2020.

Marianne Wiinholt

executive
#13

Part of the drag was offset by Borssele 1 & 2 generating at full capacity, plus the final 400 MW at Hornsea 1 starting to receive CFDs in April 2021. Underlying earnings from partnerships in Q2 2021 mainly came from adjustments on completed construction projects, whereas the Q2 2020 figure was tied to building Coastal Virginia Offshore Wind and lower CapEx at Hornsea 1. Things went well in onshore, helped by output ramping up at Willow Creek and Plum Creek, and at the Permian Energy Center solar PV farm. That ramp-up was outweighed, however, by weaker winds, costs tied to the Brookfield Renewable Ireland transaction, a credit loss that followed the winter storm period in February 2021, and once more by the Q2 2020 divestment of Oak Solar. Turning to bioenergy and other, underlying earnings rose substantially thanks to very strong results at our CHP plants, where profits were lifted by higher power prices and ancillary services sales spurred by colder weather. In gas and markets and infrastructure, the sharp rise in gas prices produced a net positive impact from revaluing gas at storage along with storage hedges.

Marianne Wiinholt

executive
#14

Moving on to slide eight, I'll briefly review wind speeds throughout Europe during 2021. As I mentioned, during the first half of 2021 we saw wind speeds that were considerably under the norm, and the financial hit from those weak winds in the offshore portfolio through the end of July comes to negative DKK 1.4 billion, with most of that negative effect showing up in Q2 and July. The slide displays how much the wind resource across Europe deviates from the historic norm. Light green and dark blue mean wind speeds under the norm, and in the same way, yellow and red mean wind speeds over it. These wind maps make clear that although wind speeds across most of Europe have fluctuated above and below the norm, the regions where the bulk of our offshore assets sit — specifically the North Sea and the Irish Sea — have seen wind speeds considerably under the norm, particularly in the second quarter, and those weak winds carried on into July. Month-to-month swings in wind speeds are entirely normal, but we consider this extended stretch of 2021 with such low wind speeds to be fairly unusual, though we don't see any structural shifts in our long-term wind speed projections.

Marianne Wiinholt

executive
#15

During Q1 2020, wind speeds came in well above normal, and we achieved DKK 800 million of outperformance relative to a typical wind period. The fact is that wind speeds fluctuate quarter to quarter, yet over time they revert to the mean and stay fairly stable. If we then continue to slide nine and our financial performance and net interest-bearing debt. Net profit for the period came to DKK 5.5 billion, a substantial rise versus last year, driven mainly by the gain on the farm-down of Borssele 1 and 2. Beyond that, net financial income and expenses were a negative DKK 0.4 billion, against a negative DKK 1 billion in Q2 2020. Those lower net expenses stemmed chiefly from reduced interest expenses thanks to the lower net debt. Q2 last year, by contrast, was hurt by the early termination of project finance at our U.S. Block Island projects, which produced a DKK 0.4 billion loss on an interest rate swap. Lastly, tax on profit for the period benefited from an updated assessment of our uncertain tax position and from the U.K. tax rate rising from 19% to 25% starting in 2023. That was partly offset by initial recognition of deferred taxes tied to the tax equity at Permian Energy Center, Muscle Shoals, and our U.S.

Marianne Wiinholt

executive
#16

Turning to the offshore portfolio. Free cash flow came to DKK 1.6 billion for the quarter. Operating cash flow was helped by the tax equity contribution made by our partner at the Permian Energy Center. The divestments concerned the 50% farm-down of Borssele 1 & 2 and the 25% farm-down of Ocean Wind 1, together with the final settlement with GIP concerning the Hornsea 1 transmission divestments. Gross investments reached DKK 12.1 billion, reflecting continued spending on offshore and onshore wind and solar PV farms and the acquisition of Brookfield Renewable Ireland. Net debt finished the second quarter at DKK 12.1 billion, and the reduction in net debt over the quarter mainly came from the positive free cash flow I described a moment ago. Moving to slide 10, you can see our financial and non-financial ratios. FFO to adjusted net debt, our key credit metric, was 63% for the 12-month period ending in June 2021, comfortably above our credit metric target. That metric benefited from the farm-down gain on the Borssele 1 & 2 wind farm. Return on capital employed was 12.5%, and the improvement versus last year stems from a higher EBIT across the 12-month period.

Marianne Wiinholt

executive
#17

We're very much on course to deliver a return on capital employed averaging 11%-12% across the 2020 to 2027 period, which is what we set out at our recent CMD. Our greenhouse gas emission intensity came down thanks to extra offshore and onshore capacity. That gain was partly offset by more power generation from our coal-fueled units, since a regulatory obligation requires us to make all of our energy capacities available to the market. We're still on track to hit our Scope 1 and 2 target of less than 10 grams CO2 equivalents per kilowatt hour in 2025. Moving to safety, we've recorded a 10% reduction in the number of injuries. Consequently, the total recordable injury rate has fallen from 3.7 in the first half of 2020 to 3.1 in this first half. Let's turn to slide 11, where I'll walk through how we're implementing the EU Taxonomy. Under the European Green Deal's aim of becoming the first climate neutral continent by 2050, the EU Commission has set up the EU Taxonomy as a key enabler for scaling up sustainable investments. The Taxonomy is a catalog of environmentally sustainable economic activities. Each one carries criteria for determining whether it contributes sustainably to a sustainable economy.

Marianne Wiinholt

executive
#18

At Ørsted, our aim is to serve as a catalyst for change, and we've committed to playing a leading part in the worldwide transformation toward green energy. So we welcome the new reporting framework, and over the course of the year, we've evaluated whether our activities are identifiable under the taxonomy and can thus be classified as taxonomy-eligible. Provided certain sustainability criteria are met — contributing to at least one environmental objective, causing no significant harm to other environmental objectives, and complying with minimum social safeguards — those activities will be classified as taxonomy-aligned. Even though the forthcoming EU requirements for reporting on taxonomy-eligible activities don't take effect until January 2022, we've chosen to disclose approximate levels today for our taxonomy-eligible share of revenue, EBITDA, and gross investments. We intend to finish the criteria screening before year-end, and at that point also report on taxonomy-aligned shares in our annual reports, one year ahead of the requirements. Note that the figures we're disclosing as part of this quarter's results are approximate rather than exact, since some uncertainty remains regarding the final interpretation of the taxonomy. In the first half of 2021, the taxonomy-eligible share of our revenue came in above 65%.

Marianne Wiinholt

executive
#19

The portion of revenue that isn't eligible mainly involved our long-standing legacy operations tied to sourcing and selling gas, fossil-based heat and power generation at our Danish CHPs, plus power sales to end customers. EBITDA's corresponding share came in above 95%, while gross investments accounted for above 99%. Now, moving to slide 12, here's the 2021 outlook. For 2021, we reaffirm our full-year EBITDA guidance of DKK 15 billion-DKK 16 billion, though at present we anticipate a result at the low end of that range, largely because wind speeds were very low in June and July. That guidance presumes normal wind speeds across the remaining five months of the year. As I said before, the negative effect of those low wind speeds on the whole offshore portfolio through the end of July comes to a negative DKK 1.4 billion versus a normal wind year. That negative impact, together with the DKK 0.8 billion warranty provision tied to the cable protection system issue, is partly offset by strong results at our CHP plants and high earnings in our gas business, along with extra earnings from offshore construction projects we've completed.

Marianne Wiinholt

executive
#20

Just like in prior years, our EBITDA guidance excludes any earnings from new partnerships formed during the year. That means the farm-down gain on Borssele 1 & 2 isn't counted in our full-year guidance, and neither is the gain from the Greater Changhua 1 farm down, which we expect to close later this year. Turning to the directional guidance for our business units: we've moved offshore to significantly lower from lower, driven by the very low wind speeds and the warranty provision tied to the cable protection system issue. We also changed the directional guidance for bioenergy and other to higher from previously lower, after the high earnings from CHP plants and gas markets and infrastructure in the first half of 2021. Our gross investment expectations are going up to DKK 39 billion-DKK 41 billion, from the previous level of DKK 32 billion-DKK 34 billion. That increase reflects the Brookfield Renewable Ireland acquisition and the associated CapEx spend for the remainder of 2021, along with the expected acquisition of the fully constructed Lincoln Land project. With that, we'll now take questions. Operator, please.

Operator

operator
#21

That brings our presentation to a close. We're glad to take your questions now. The call must finish by 3:30 P.M. at the latest. Kindly limit yourself to a single question each, and after that you're welcome to rejoin the queue for another one. Should you want to pose a question, just press zero one on your phone's keypad. If you'd rather take your question back, press zero two to cancel it. Deepa Venkateswaran from Bernstein is our first questioner. The line is yours.

Deepa Venkateswaran

analyst
#22

Thanks. I’d like to ask about Lincoln Land Wind. Since you bought it after another party had already built it, that looks somewhat different from the earlier acquisitions you’ve completed. Could you expand on the rationale beyond merely adding MISO diversification, and perhaps discuss how value gets created? Second, should we anticipate additional transactions in which you purchase projects that already exist, or is this better viewed as a one-time situation?

Mads Nipper

executive
#23

Thanks so much, Deepa. I’d like to offer a few remarks on that, and Marianne, please jump in if you have anything to add. Honestly, in my view there are two primary reasons: first, as was noted, this represents a significant diversification into MISO, and second, it’s a project that creates value. By and large, we’ll keep our emphasis on greenfield development—that’s where we excel. Whenever we encounter opportunities such as this one that we think we can acquire on favorable terms and thereby generate value from, we’ll choose to pursue them opportunistically, and that’s what happened here. I should also point out—we haven’t mentioned this—that this transaction actually came with an additional early-stage development opportunity, which brings further value to this acquisition as well.

Deepa Venkateswaran

analyst
#24

Thanks. Was there anything Marianne wanted to add?

Marianne Wiinholt

executive
#25

No, my sense is that it was covered.

Deepa Venkateswaran

analyst
#26

All right, thanks.

Operator

operator
#27

Our following question is from Alberto Gandolfi at Goldman Sachs. Alberto, you have the floor.

Alberto Gandolfi

analyst
#28

Good afternoon, and thanks for taking my question. I'd like to return, if I may, to the subject of equipment. Looking at your slide five, you're on the home stretch, especially offshore at Hornsea 2 and Greater Changhua, but roughly 8.5 GW of awarded projects have not yet entered construction. You've already fixed your top line on those projects. What I'm curious about is whether you could give us, please, additional detail on fixed cost procurement strategies. To be specific, what share of the equipment has been pre-procured at a fixed cost? Do you still need to bring on staff to develop those facilities? Have you already fully locked in any third-party vessels or ships or EPCs that you might require? Maybe you can also speak to — if you've been able — elaborating, extending, sorry, that point to cables, and not just to the turbines. I'm simply trying to work out how we should think about cost inflation on those awarded projects. Thank you so much.

Mads Nipper

executive
#29

Sure, Alberto — I'll give it a shot. It's clearly a fairly complicated matter, but as a quick entry point, I'd say that generally the effect of cost inflation over the short and midterm is on the more moderate side. Many of these projects, obviously, are being built quite a few years out into the future, so if current inflation rates either hold or, worse still, keep climbing, then naturally that does have an impact. As we laid out at our Capital Markets Day, there are a number of things we're doing on these projects to make sure we create predictability and certainty around what our cost levels will be. That will never secure the full cost — there will always be some exposure. In this case, yes, we did secure vessels for some of these upcoming projects. We've worked with cable manufacturers for a while and have settled prices on some of that, also for HVDC cables. We're also locking in some of the heavier raw material categories such as steel. I believe we said that for up to 70% of the near-term U.S. construction projects, or nearer-term U.S. construction projects, we actually already have that transparency.

Mads Nipper

executive
#30

So what we aim to do, naturally, is secure those supplier agreements as early as we can, so that we can establish that transparency. Of course, if you consider projects that will be built right through 2029 — that being the latest one — then naturally some exposure exists. We do think we're generally in a good position, particularly when measured against many industrial companies as well as some of our supply chain partners. Our exposure is smaller, with a moderate effect in the short to midterm, though naturally this is something we're watching very closely indeed. I believe this is about as far as we can take it, Marianne, unless you'd like to add something, since it really is an approach taken project by project.

Operator

operator
#31

Our following question is from Robert Pulleyn of Morgan Stanley. You have the floor.

Rob Pulleyn

analyst
#32

Hello, and thanks. Good afternoon, everyone. My sense is that cost inflation may have run its course. If I could just ask about the CapEx guidance: the prior figure was DKK 32 billion to DKK 34 billion, while the new range is DKK 39 billion to DKK 41 billion. Brookfield, as I understand it, accounts for roughly DKK 4.2 billion. Then there is the Lincoln acquisition. I was simply wondering if you could confirm whether any other movements factor into your CapEx guidance that we ought to know about. Specifically, does that uplift include any inflation affecting existing CapEx expectations for 2021? That is my one question. Thank you.

Marianne Wiinholt

executive
#33

Yes, sure, I can address that. No, the rise is purely a result of those 2 items you brought up. The Brookfield — the purchase price, plus the CapEx laid out for the rest of the year. That comes to roughly DKK 5. The final 2 is Lincoln Land. That's all it is. There's no cost inflation baked into that figure.

Rob Pulleyn

analyst
#34

Excellent. That's wonderful to hear. I'll hand it over now. Thanks.

Operator

operator
#35

Kristian Johansen from Danske Bank has the next question. The line is yours.

Kristian Johansen

analyst
#36

Yes, thanks. My question concerns your earnings in bioenergy and other. I'm just curious about the dynamics here: if power prices remain where they are now and gas prices do the same, should we anticipate that this business will keep delivering an elevated level of earnings?

Marianne Wiinholt

executive
#37

You get two distinct responses depending on which area you mean. Yes, on bioenergy, these prices work in our favor. Should these price levels persist, earnings will be elevated. As for the gas business, that is, as I have said on many occasions, a margin business. Those positive swings that come from storage revaluation and from hedging those storages are, in a sense, timing effects that will net out over time. Earnings in that business are positive, but the volatility is not the same as what you will see in the CHP piece.

Mads Nipper

executive
#38

Karen, let me just add a quick point. Keep in mind too that the stronger-than-expected Q2 in bioenergy came from the level of power prices, clearly, but it also came from the unusually cold spring Denmark had, with April and the first half of May as well. On top of that, we produced and sold a notably larger share of value-creating heat from those plants, and that also fed into the very strong Q2 performance.

Kristian Johansen

analyst
#39

Got it, thanks.

Operator

operator
#40

Our next question is from Sam Arie at UBS. Sam, please go ahead.

Sam Arie

analyst
#41

Thank you so much. I appreciate the presentation today. I think you did a very clear job explaining the quarterly results and the effect of wind speed. On that, I have no questions. At this point I would just like to pose one broader question, returning once more to that very interesting page five of yours. On its right-hand side, you present the substantiated pipeline, which also appeared in the CMD slides. My assumption is that every bit of it will be built, and what I want to ask is this: when it comes to auctions and so forth, is the only open issue one of timing — which assets get built, and when? Looking at the wider global picture, with the IPCC report this week and all the rest, it is difficult to imagine that the 22 GW shown there will not get built. Could you say a little about whether anything within it is competitive — that is, perhaps 1 GW there that you could somehow lose to another party — or whether all 22 GW are rights that only you can develop? And can you tell us a little about the cost of adding 1 GW to that substantiated pipeline?

Sam Arie

analyst
#42

Put another way, how much growth should we be anticipating from that substantiated pipeline as we move ahead?

Mads Nipper

executive
#43

Much appreciated.

Sam Arie

analyst
#44

This is slightly off the Q2 topic, but I would really appreciate hearing your thoughts on those. Thanks.

Mads Nipper

executive
#45

Much appreciated, Sam. If I take the last part first: we aren't able to state a cost, since answering that is genuinely not possible. What upcoming seabed auctions will ultimately bring in is unknown to us — be it upfront payments, be it market development, be it just commitments to carry out local development. Providing an average figure for that is honestly close to impossible. You're correct that, if we focus mainly on the 12 GW of offshore farm or substantiated pipeline, most of it actually consists of proprietary seabed leases, which in all likelihood will materialize — or, put differently, it's improbable that they won't. Some portions of that are also things we are developing jointly. Our Japanese pieces, for instance, would be included there as well. That would of course mean a risk exists that some portion won't materialize. Most of it will, chiefly a question of timing, yet there are also certain parts where a risk exists that it won't materialize, and that we will therefore carry on. We will, naturally, work hard to keep taking some from what we call the substantiated pipeline and shift it into the firm pipeline, so that it keeps rising and we protect our capacity to deliver the 30 GW in offshore and the 50 GW in total.

Marianne Wiinholt

executive
#46

We're also quite confident that the bulk of the onshore pipeline is going to get constructed as well.

Mads Nipper

executive
#47

Yes.

Marianne Wiinholt

executive
#48

In none of those areas are we facing any competitor.

Mads Nipper

executive
#49

That is a number.

Sam Arie

analyst
#50

Right.

Mads Nipper

executive
#51

We're quite at ease with that pipeline. A smaller portion of it probably won't get built, though we're also aware that we keep working to grow that pipeline steadily.

Sam Arie

analyst
#52

Alright, that's great. I'd really like to keep going with this, but honestly, you've covered quite a bit already, so I'll simply say thank you so much. I'm certain we'll pick this conversation back up next—

Mads Nipper

executive
#53

Sure, glad to.

Operator

operator
#54

John Musk from Royal Bank of Canada has the next question. Go ahead, please.

John Musk

analyst
#55

Good afternoon, everyone. I'd just like to get a sense from you of what you believe investors will be seeking going forward. Is it necessary to satisfy all three criteria — revenue, EBITDA, and CapEx? Clearly, the revenue figure is significantly lower, and that's perhaps a bit of a surprise to me. Given how you answered the first question, do you need to take any action on that front? Beyond making further divestitures of those businesses that don't comply, is there any lever you can pull to affect it?

Marianne Wiinholt

executive
#56

That's a great question, John, and thanks for asking it. All three are areas we'll be concentrating on, and in our view each of the three carries equal weight — and we believe the markets likewise regard all three as important. On the revenue side, we're sitting at 65, which in some ways could look low next to the EBITDA figure. That number is going to come down. We have a reduction target in place for Scope 3 emissions. A great deal of gas will, in a sense, be phased out as those contracts reach expiry. We've also been scaling back the customer business, as seen in the divestment we completed last year. Over time, the revenue portion will rise substantially. One difficulty we face is that we aren't always able to tell whether what we're selling is green power or black power. Where we can't make that distinction, we can't, in a sense, label it eligible, so it lands in the black column, so to speak. As we mature, that figure will climb considerably. From what we gather, being above 50% is, for the time being, in a sense, something lots of companies would be aiming for. Naturally, our own target sits significantly above that level.

John Musk

analyst
#57

Are you ready to share a goal for that — what figure on the revenue side?

Marianne Wiinholt

executive
#58

No. Because the Taxonomy still isn't fully clear in some ways and some details are still missing, we haven't established a target.

Mads Nipper

executive
#59

Even though it isn't the largest piece of that remaining 35% of non-eligible, keep in mind that we've made a commitment that our final coal-fired combined heat and power plant will be decommissioned in 2023. That portion is going to disappear over a relatively short term.

John Musk

analyst
#60

Alright, thank you so much.

Operator

operator
#61

Our next question is from Dominic Nash at Barclays. Please go ahead.

Dominic Nash

analyst
#62

Good afternoon, and thanks for giving me the chance to ask something. May I pose a question about power prices? It's somewhat along the lines of the inflation questions asked earlier. Looking at the forward curves, it's clear they've risen sharply in emerging markets. How exposed might you be, and how does your hedging policy apply to your assets that sell into this? Over the medium term, given today's substantially higher power prices, will that affect the assumptions you feed into your numbers when bidding in these PPA auctions over the shorter term? At present, are you simply holding to the long term, still at the same power price as 12 months ago?

Marianne Wiinholt

executive
#63

Yes. You could put it that way — given where we stand, with subsidies, PPAs, and a very high hedging percentage, our merchant exposure is limited. So essentially, we don't gain from today's elevated power prices, which obviously isn't favorable in this market, though it has worked to our advantage in plenty of other situations. Our hedge ratio is above 90%, and the remaining exposure is quite small, since most of it, as I mentioned, consists of subsidies. The opportunity for us lies in our hedging strategy: as we roll forward quarter by quarter, we can now lock in higher levels in year three and year four, for instance, than was possible just six months ago. That doesn't alter our long-term power price view. So when we bid in these auctions, we still rely, in a sense, on the same fundamental models we use for long-term power prices.

Dominic Nash

analyst
#64

Much appreciated.

Operator

operator
#65

Our following question is from Jakob Magnussen of Danske Bank. Please proceed.

Jakob Magnussen

analyst
#66

Thanks a lot. My question concerns your adjusted net interest-bearing debt. In the past, asset retirement obligations were part of how you defined adjusted debt, at their net value. Looking at your table in note 13, those are no longer included, which gives you a lower number for net interest-bearing debt on an adjusted basis. That, in turn, also makes your FFO to adjusted net debt look better. I was just wondering why you've stopped including those asset retirement obligations in your definition.

Marianne Wiinholt

executive
#67

Yeah, that's good.

Jakob Magnussen

analyst
#68

Appreciate it.

Marianne Wiinholt

executive
#69

That's a fair question. As you know, we're rated by three agencies. Just one of those three folds these asset retirement obligations into its definition. The most stringent of the three doesn't. So in a sense, we aim for something that sits between what these three agencies require. And we concluded the correct approach was, in a way, to leave it out, given that two of them don't count it. As I mentioned, the toughest one doesn't. That's why. We had been penalizing ourselves a bit too severely.

Jakob Magnussen

analyst
#70

So you're still sticking with that 25% lower boundary target?

Marianne Wiinholt

executive
#71

Yes, that’s correct.

Jakob Magnussen

analyst
#72

All right, thank you.

Operator

operator
#73

Our following question is from Louis Boujard at Oddo BHF. Louis, you have the floor.

Louis Boujard

analyst
#74

Good afternoon, and thanks for taking my question. On the short-term guidance, I'd like a bit more color. Could you give a little more detail on what you mean by higher or significantly higher, or lower or significantly lower — is that an absolute number or a percentage? More specifically, looking at onshore, for example, you're DKK 100 million below last year. At the same time, you expect higher. I know some commissioning is going to kick in during the second half. Meanwhile, consensus, I think, is already at DKK 1.65 billion on that figure. Compared with the DKK 1.1 billion you posted last year, is DKK 1.65 billion significantly higher, or only higher?

Marianne Wiinholt

executive
#75

Yes. I’ll try to add a bit more color first on the guidance, because I think it’s quite relevant for you to understand, in a way, why we can stick to our guidance when we have these DKK 2.2 billion impact from the cable protection and the lower wind. I’ll start there, and then I’ll go a little bit more into detail with your other part of the question. Yes. Here we say that, in a way, when we started with the first guidance 2015 to 2016, we were at the upper end of the range. Let’s say we were at 16. You deduct the DKK 2.2 from these two negative effects I just referred to. The question is, what is it that can offset these very big negative impacts? It is approximately DKK 500 million better result from construction gains, which the major part comes from the Hornsea 1 transmission asset divestment, where we got this final calculation from the authorities, which gave us a higher gain on that. DKK 500 million from construction gains. We are DKK 600 million higher on our CHPs, compared to what we estimated when we started the year. We always use the forward curve when you calculate this, but in a way, the prices are significantly higher.

Marianne Wiinholt

executive
#76

What's left on the positive side to reach the bottom of the range comes from revaluing storage because of elevated gas prices. It's the effect of the Brookfield and Lincoln Land acquisition, and after that it's lower cost. That gets us to the bottom end of the range. Then, in a sense, you're asking what definition we apply to higher and lower, and to significantly higher and lower. That we haven't disclosed. Internally we have some strict rules, but it isn't something—perhaps one day we'll disclose it, but as things stand, in a sense, we've decided not to. Sorry about that. I hope the first part of my answer was useful for your question.

Louis Boujard

analyst
#77

Yes. Thanks for addressing the first part of that.

Operator

operator
#78

As one last reminder, if you'd like to pose a question, just hit 0 1 on your phone keypad at this point. Our following question is from Sam Arie, once more with UBS. Please proceed.

Sam Arie

analyst
#79

Oh, hello. My apologies — I just had to come back for a single follow-up tied to what we discussed earlier. Sorry for pulling us away from Q2 once more and returning to the subject of the future. On that substantiated pipeline shown on page five of your deck, I had asked whether you might describe the cost involved in growing it, and your reply was that it's very difficult. Could you share what it has cost to construct the 22 GW sitting there? I don't know whether that figure has been provided previously, but it would be quite interesting to learn. My reason for asking: a question I often receive regarding valuation is how much the business would be worth assuming you never won another project — the ex-growth valuation, so to speak. In my view, anyone examining the shares through that lens should add the value of the pipeline assets, since even hypothetically, if you didn't develop them, they would still carry value and someone else would. I'm simply curious whether you can give us, roughly speaking, how much invested capital sits in the substantiated pipeline.

Mads Nipper

executive
#80

Once more, providing a highly precise figure isn’t really possible, but take, for instance, the U.K. seabed leases for Hornsea 3 and 4, and the North American seabed as well—when those were acquired, the price paid was in fact extremely low.

Marianne Wiinholt

executive
#81

Basically zero.

Mads Nipper

executive
#82

Almost nothing, extremely small. As of today, it accounts for more than 8 GW of validated pipelines. You could say that very little is committed there. Then, when we acquire a stake in a development project — as we are doing now, for instance, in Japan — if someone else has been advancing that project, we would make a payment for it, though also a fairly modest one. I think it's reasonable to say that the present — and again, I'm mainly referring to offshore here — but the price attached to the existing 12 gigawatt is in fact small. It's a low price tag.

Marianne Wiinholt

executive
#83

Yeah. If we were to sell it today—

Mads Nipper

executive
#84

That is completely different.

Marianne Wiinholt

executive
#85

The situation is completely different. We haven’t spent much on these seabed rights. Naturally, we do incur costs for obtaining the EIAs and for the entire permitting process, and those are expensed. When you consider Hornsea 2, Hornsea 3, and Hornsea 4 together, we are discussing many DKK billion, in a sense. That represents a substantial sum we are spending and taking through the P&L.

Mads Nipper

executive
#86

Yes.

Marianne Wiinholt

executive
#87

Yeah.

Mads Nipper

executive
#88

And as Marianne mentioned, the value of that asset today, if we were to divest it — which we have no plans to do — would be completely different, given what has happened since then, especially with the recent seabed auctions.

Sam Arie

analyst
#89

Right, thanks for clearing that up, since I was about to cut in there, Mads, for a moment and ask whether you were talking the shares down for a minute. I think the way you put that point now is quite interesting. It's somewhat similar to what we discussed on the RWE call earlier today regarding their carbon hedges — some of which they entered at very low values at a time when the market didn't see the value, but which they now carry on the balance sheet and which are clearly worth massively more.

Marianne Wiinholt

executive
#90

Yeah.

Sam Arie

analyst
#91

To me, the worth of that substantiated pipeline is a big subject that we ought to keep talking about.

Mads Nipper

executive
#92

That's an extremely valuable asset, in my view. Being able to bid into the upcoming round — the U.K.'s CfD AR4, for instance — using our Hornsea 3 lease is something that will let us, and we're firmly convinced of this, both be very competitive and also have a project that creates a great deal of value. That clearly puts us in a privileged position.

Sam Arie

analyst
#93

That sounds great. Let's hope that event comes through, and I appreciate you getting back to us with those additional answers.

Operator

operator
#94

And we have a further question from Kristian Johansen at Danske Bank. Please go ahead.

Kristian Johansen

analyst
#95

Yes, thanks. On that German zero-subsidy bid — I believe it's now called Borkum Riffgrund 3. From what I remember when you received the allocation, a FID needed to be taken by 2021. Could you remind me if that's right, and if so, where that project stands?

Marianne Wiinholt

executive
#96

You’ve got it right, Kristian. We’re expecting to reach FID in Q4, and we’re well on track to do that.

Mads Nipper

executive
#97

We can also mention that we're making strong progress on getting power purchase agreements in place for that project.

Marianne Wiinholt

executive
#98

Extremely well, yeah.

Kristian Johansen

analyst
#99

That was basically what I was going to ask next. My question was more about whether you've already lined up enough PPAs for that project, or if you still need to lock in more of them before you take FID.

Marianne Wiinholt

executive
#100

We can say this is a really appealing asset, so we’re well covered.

Kristian Johansen

analyst
#101

Got it. Thanks.

Operator

operator
#102

Our following question is from Dominic Nash at Barclays. Please proceed.

Dominic Nash

analyst
#103

Yes, thanks for the follow-up. What I want to ask about is the OFTOs in the U.K. — from what I understand, they have roughly a 20-year contract with you. I believe they're currently in consultation with Ofgem regarding what happens in year 21. I'd be interested to hear your view on what level of remuneration you'll need to offer the OFTO owners, and when should we expect the consultation response? Thank you.

Marianne Wiinholt

executive
#104

Is it Hornsea 2 OFTO that you're referring to now? I'm slightly unclear about the question. Apologies for that.

Dominic Nash

analyst
#105

No, every single one of them. Each of your wind farms is hooked up to transmission assets, but my understanding is that those contracts only run for 20 years.

Marianne Wiinholt

executive
#106

Right. All of that is finalized and agreed. The transmission fees we pay are fixed, and the agreement itself is fixed. In a sense, this is an entirely regulated process, and the one thing that matters to us is, in a way, what return requirement the buyer has. Since a lower return requirement works in our favor. After that, it comes down to whether the allocation price gets approved — meaning whether we end up with some cost that isn't covered. Those are the only uncertainties. Everything else, from where we sit, is fully regulated and certain.

Dominic Nash

analyst
#107

Oh, all right. Perhaps I missed that, but I wasn't aware we had already settled on a price for 2021. I was under the impression that it was still being discussed.

Marianne Wiinholt

executive
#108

Yes. We actually have visibility into what's known as TNUoS for that entire span at the point when the divestment happens, since that gets factored into the entire system.

Dominic Nash

analyst
#109

Alright, thanks.

Operator

operator
#110

There's an additional follow-up question coming from Deepa Venkateswaran at Bernstein. Please proceed.

Deepa Venkateswaran

analyst
#111

Thanks. I'd like to follow up regarding cost inflation, especially since turbine contracts include a cost-indexation component that gets passed through automatically. I just wanted to verify with you — clearly, you've discussed hedging on the U.S. projects, but taking a wider view, when exactly do you fix your costs? With the German project, where you haven't taken FID and no firm order has been placed, my assumption is that indexation would currently be working against you. I just wanted to discuss the indexation we're seeing and how that relates to the way you manage your risks.

Marianne Wiinholt

executive
#112

Correct, Deepa, that's accurate. In a sense, we do carry that steel exposure. We handle it on a case-by-case basis. At times, we've actually gone ahead and hedged, as we did with the U.S. portfolio. For Germany, we haven't done so. Yes, that's right — we do have exposure there. In a sense, it's our decision as to when we lock it in. That is, in a way, already reflected — these elevated prices are incorporated into the business case on which we'll take FID in Q4.

Deepa Venkateswaran

analyst
#113

Right. So I assume that with power prices getting better, any PPAs you're able to sign at this point could come in at a stronger price.

Marianne Wiinholt

executive
#114

Right, that's how it works.

Deepa Venkateswaran

analyst
#115

The roughly 10% that could represent the rise.

Marianne Wiinholt

executive
#116

Yes. That's correct.

Deepa Venkateswaran

analyst
#117

Alright.

Marianne Wiinholt

executive
#118

Right.

Deepa Venkateswaran

analyst
#119

All right, thanks.

Operator

operator
#120

Since nobody else has anything to ask, I’ll return it to the speakers so they can give their closing remarks.

Mads Nipper

executive
#121

Yes, thank you. That's all we have time for, so I'd just like to say thank you so much for the great questions and the insightful questions. Thank you for your trust and your support, and have a great day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ørsted A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ørsted A/S earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ørsted A/S or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.