Ørsted A/S (ORSTED) Earnings Call Transcript & Summary

November 5, 2025

Nasdaq Copenhagen DK Utilities Independent Power and Renewable Electricity Producers earnings 82 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, and thank you for joining us on Ørsted's Q3 2025 earnings call. During this opening portion, everyone will be muted and can only listen in, and after that we'll open things up for questions and answers. With us today are Rasmus Errboe, our Group President and CEO, and Trond Westlie, our CFO. Gentlemen, go ahead whenever you're ready.

Rasmus Errboe

executive
#2

Good morning, everyone. Through Q3 of this year, we've kept our attention fixed on carrying out the four strategic priorities we laid out in February. Those remain the central focus as we deliver on our strategy. I'll begin by walking through where we stand on each of the four. Priority one is making our capital structure stronger, and with the rights issue wrapped up in early October, we've taken a major step here. That rights issue reinforces our financial footing, lets us concentrate on delivering our six offshore wind farms currently under construction, gives us the financial resilience to handle the persistent trends and uncertainty, and provides the financial strength to chase attractive opportunities in offshore wind that are coming up. I'm extremely pleased and thankful for the robust backing we got from our shareholders on the rights issue, including our majority shareholder, the Danish State. On top of that, we said on November 3 that we've signed an agreement with Apollo to sell a 50% ownership share in both the project and the associated transmission asset for our 2.9 GW Hornsea 3 project in the U.K.. The transaction's total value comes to roughly DKK 39 billion, and it helps us strengthen our capital structure further and represents a major milestone in our partnership and divestment program.

Rasmus Errboe

executive
#3

Supporting our capital structure also hinges heavily on how our operational portfolio keeps performing. Wind speeds so far this year have been under normal levels. Even so, for the first nine months we generated DKK 17 billion of EBITDA, largely because availability improved across our offshore assets. Thanks to the strong day-in, day-out effort of our generation team, we still expect to land full-year earnings between DKK 24 and 27 billion. Delivering our 8.1 GW offshore wind construction portfolio is priority number two, and progress stays solid on all these projects, which once finished will add an annual EBITDA run rate of DKK 11 to 12 billion. I'll walk through the construction details shortly, but first let me flag the Stop Work Order that Revolution Wind got in the U.S. in the third quarter, telling the project to pause offshore work until the Interior Department finishes the review mandated by the executive order from January 20th. Revolution Wind keeps pursuing a full resolution, both through engagement with the U.S.

Rasmus Errboe

executive
#4

We’re also engaging administration and other stakeholders, and we’re doing that through legal proceedings too. Within that legal track, the project brought a lawsuit and asked for a preliminary injunction, and the court granted that on February 22nd. The lawsuit is still ongoing, but offshore activities have restarted and have moved forward well since then. Our third priority is making sure capital allocation stays focused and disciplined, with value always put ahead of volume, and going forward our main focus will be offshore wind in Europe plus selected markets in APAC. As part of that, we’ll shift to a more flexible partnership and financing model so we can improve value creation and make sure risk is diversified. On that basis, we recently signed Memorandum of of Understandings with KOEN and POSCO for our 1.4 GW Incheon offshore wind project in Korea. The goal is to explore cooperation on joint development, construction and operations, including possible equity participation. Lastly, on our fourth priority, we’ve also taken steps to improve our competitiveness by announcing adjustments to our organization. Because our strategic focus has been sharpened for the business going forward, and because we’ll be finalizing our large construction portfolio in the coming years, we’ll adjust our organization accordingly so it becomes more efficient and flexible.

Rasmus Errboe

executive
#5

After we've put all of the efficiency initiatives in place, we expect yearly cost savings of roughly DKK 2 billion starting in 2028. Those savings tied to the efficiency initiatives have been built into our business plan. Moving to slide five, I'll walk through a few of the operational highlights from the first nine months. To begin, I'm pleased with how operations performed, with EBITDA excluding new partnerships and cancellation fees coming in at DKK 17 billion for the first nine months. Even though wind speeds have been under the norm through this year so far, our robust generation performance keeps us on track to deliver our full-year guidance of 24 to 27 billion of EBITDA. The main driver is high availability in our offshore business, which reached 93 for the first nine months versus the same period a year earlier. That's a rise of seven percentage points and therefore delivered a substantial earnings contribution. Market-leading performance from our 10 GW offshore wind fleet is a key priority for us, and we're advancing several measures across our generation organization to boost our output and reduce our cost base via portfolio and operational efficiencies, technological innovation, that standardization and generation excellence during the quarter, we also made progress on the renewable share of our generation for several years.

Rasmus Errboe

executive
#6

Our goal has been for renewables to make up 99% of generation by 2025, and that has held true across the first nine months of the year. The rise in the renewables share came about because we closed our final coal-fueled CHP plant during the second half of 2024, which was another significant milestone in decarbonising our operations. Then, on safety, our ongoing and relentless attention has carried on, and the total recordable injury rate for the first nine months of 2025 stands at 2.5, which is in line with our target. That remains our top priority, and we are running an internal program throughout the entire organization aimed at further boosting training, safety awareness and management focus, all of it designed to lower the incident rate and bring our people home safe every day. Let's move to slide six and an overview of our construction projects. As usual, I will go through the more advanced projects one by one and in greater detail on the following slides, while offering a few comments on the rest of the construction portfolio here. For Borkum Riffgrund 3 in Germany, all foundations and turbines have been installed. Commissioning of the grid connection for Borkum 3 has begun in line with plan.

Rasmus Errboe

executive
#7

We anticipate first power prior to the year's end, and the project should be commissioned near the close of Q1 2026. Construction at Hornsea 3 in the U.K. is moving along nicely. Since last quarter, onshore work at the landfall cable route and the converter stations has advanced in line with schedule. On the offshore side, two HVDC offshore converter stations will be used for the project. Final equipment installation is underway on the first platform in Norway and going well, while the second platform finished its scope in Thailand and is now in transit to Norway to carry out those same final works. Offshore activities have carried on, and during the third quarter we finished removing unexploded ordnances across the entire site. A number of items tied to project delivery remain under close watch. Among them is the installation schedule for the project's grid connection, where we are cooperating closely with National Grid on our onshore grid connection works to support planning of commissioning next year. We also remain focused on manufacturing turbine monopile foundations so delivery stays on plan, which lets us begin installation in 2026.

Rasmus Errboe

executive
#8

Production has begun on schedule, and multiple suppliers are under contract for the scope; where relevant, we can draw on the flexibility this gives us to reduce risks should they arise. The project's upcoming steps involve kicking off the main offshore installation work in early 2026, beginning with laying the offshore export cable and installing monopile foundations in Poland. Baltica 2 is advancing on schedule, and during the third quarter we are carrying out the first phases of construction. Work has carried on at the onshore substation site, including installation of the export cable's first part. Turbine foundation manufacturing is going well, with 22 finished to date. Production of the four offshore substations is moving forward, and work on the offshore export cable got underway in mid October. Given this progress, project completion has risen to roughly 15%, compared with 10% in Q2. Several items in the installation schedule are under close watch, among them the manufacturing progress of the four offshore substations and fabrication progress on key components for both the onshore and offshore substations.

Rasmus Errboe

executive
#9

We're still on schedule to sail away at the earliest possible point in mid-2026 from Vietnam for the 4 offshore substations. Work at the turbine installation harbor in Poland remains on track as well. We're in close contact with contractors and regulators so that we keep moving forward in line with the present schedule. The upcoming steps involve preparing the seabed — sorry — ahead of turbine foundation installation, which is set to begin during mid-2026. Moving now to Slide 7 for a more detailed update on our Greater Changhua 2b and 4 project in Taiwan. On the whole, installation of the project's remaining scopes has advanced well over the quarter. Generation has started at Greater Changhua 4, and it will keep ramping up as additional turbines are energized during Q4 of this year. As for Greater Changhua 2b, because of the damage to the export cable, we'll only be producing power again starting mid-2026, after the damaged export cable has been replaced. Looking at installation work in the quarter, we've made headway across a number of scopes. That includes turbine installation, where 58 turbines out of the total 66 positions are now in place, with the remainder expected to be finished by the end of 2025. We've installed array cables for 50 of the 66 positions, and during the quarter we mobilized extra vessels to strengthen the installation progress — or process — for the remaining cables, since weather conditions are expected to be more challenging during the winter season.

Rasmus Errboe

executive
#10

Thanks to the progress we made this quarter, the project is now roughly 65% complete, compared with 55% in Q2. Work is still centered on putting in the remaining turbines and array cables, plus swapping out the export cable for the Greater Changhua 2b portion. Moving to slide eight, a status update on our north east program, beginning with Revolution Wind. We made solid headway on this project during the quarter, finishing the replacement monopile installation for the second offshore substation and also completing installation of that offshore substation itself, so both of the project's two offshore substations are now in place, and on turbine installation, we're still moving forward: 52 of the 65 turbines are now installed, and array cable installation has begun and is going well. Given the progress we made this quarter, the project now stands at roughly 85% complete, versus 80% in Q2. Work is continuing across several scopes that matter for hitting the current schedule for the onshore substation, and we're carrying construction activity forward in line with the current schedule.

Rasmus Errboe

executive
#11

We're staying on site to oversee the ongoing build-out of the project, and we expect the onshore substation to be energized early next year. On turbine installation: we'll keep watching the installation rate closely as winter sets in, since weather conditions affect how fast installation can proceed. We expect first power in the first half of 2026, and commissioning in the second half of 2026 remains on schedule. Moving to Slide nine and our Sunrise Wind project, where we've likewise seen solid progress across the various scopes. We finished installing the project's single offshore converter station in September and carried on with turbine foundation work, with 44 — sorry, 44 of the 84 positions now installed. That work will pause soon, as planned, because of time-of-year restrictions on when turbine foundations can go in, and it will pick up again when the next installation season begins in the spring. Turbine installation will start once turbine installation is complete — Installation Revolution Wind: for the onshore substation, commissioning work is advancing as planned, with installation of the nearshore section of the export cable expected over the coming months. Given the progress made during the quarter, the project has now reached a degree of completion of roughly 40%, up from 35% in Q2.

Rasmus Errboe

executive
#12

Our attention is still fixed on the items that matter most for delivering on the present schedule. Work on the remaining turbine foundations is advancing as planned, and by the end of the year we expect every one of those foundations to be finished. As for the export cable, final factory acceptance tests have now been completed for most of the sections, with the last ones due to wrap up by year-end, and installation of the nearshore section will also begin at the end of this year. We keep managing the risks tied to installing the project, and we remain on track for commissioning in the second half of 2027. With that, Trond, I'll hand the word over to you.

Trond Westlie

executive
#13

Thanks, Rasmus, and good afternoon, everyone. As usual, unless I say otherwise, the figures I mention will be denominated in Danish kroner. So ahead of walking through the third quarter development, let's turn to Slide 11, and I'd like to begin with the announcement we made on Monday, since we've signed an agreement with Apollo to sell a 50% stake in our 2.9 gigawatt Hornsea 3 offshore wind farm in the U.K. This transaction strikes a balance across the key objectives for partnerships and divestments, with a focus on capital management, and marks a major milestone for our funding plan. It helps further reinforce our capital structure and secures meaningful headway on our partnership divestment program. The transaction's total value comes to roughly DKK 39 billion, and approximately DKK 20 billion of that total will be paid at closing. The rest is anticipated to be paid under the Construction agreement once certain construction milestones are reached. As for our target proceeds of more than DKK 35 billion across 25 and 26, the DKK 10 billion received under the SBA agreement is what counts toward that target. The total transaction value covers the acquisition of the 50% equity stake, equity share, ownership share, sorry, plus the partner's commitment to fund 50% of the payment under the EPC contract for the wind farm and the offshore transmission cost assets.

Trond Westlie

executive
#14

The upfront non-cash EBITDA impact from this transaction matches what we laid out in the prospectus for the rights issue we just wrapped up, and it also takes into account the rest of the deal, like the earnings we expect from the construction agreement and the service contract between Ørested and the project. Over the project's lifetime, the expected EBITDA effect of the deal is roughly neutral. So with that, let's move to slide 12 and look at EBITDA for the quarter. In the third quarter, our EBITDA came in at DKK 3.1 billion. Allow me to take you through the key developments this quarter. In offshore, total earnings reached DKK 2.2 billion. Site earnings fell, hit by weaker wind speeds and a step down in subsidy levels across all the wind farms, plus reduced power trading earnings. That was partially offset by the full contribution from Gode Wind 3, compensation related to Borkum Riffgrund 3, and better availability rates throughout the portfolio. Earnings from existing partnerships declined because of revised costs for array cable installation at Greater Changhua 4. During the summer, weather conditions were tough, including a typhoon that slowed the installation pace we had planned.

Trond Westlie

executive
#15

So because of that, during the third quarter we strengthened our setup for installing the remaining array cables by bringing in additional vessels. That has caused us to revise the earnings we expect under the construction agreement. As we said earlier, we hadn't anticipated any material earnings under the construction agreement, so when we factor in the strengthened installation setup and the costs tied to extending the installation period, that produces an impact in our accounts. After this revision, the business case still had comfortable headroom. Other costs — which include unallocated overhead and fixed cost as well as expense project development costs — went up versus last year, in line with what we expected. A portion of that increase comes from a change in our cost allocation methodology and has no impact on total EBITDA. This cost reallocation is reflected in our full year guidance for 25. On onshore, EBITDA fell by roughly DDK 200 million, mainly because of lower wind speeds, which were partly offset by ramp up generation from new assets within bioenergy, and other earnings from our combined heat and power plants came in higher than last year, driven by higher power prices. Earnings in our gas business rose slightly, driven by higher offtake volumes.

Trond Westlie

executive
#16

No new partnerships were formed during Q3 2025. Moving to Slide 13, impairments for the third quarter came to DKK 1.8 billion in total. Most of that impairment is tied to our offshore projects in the U.S., and it stems from higher tariffs plus added cost stemming from the Stop Work Order for Revolution Win, partially offset by a decline in long-dated U.S. interest rates. The portion of the impairment tied to higher tariffs comes to DKK 2.5 billion, consistent with the range set out in the prospectus issued alongside the rights issue. That figure mirrors recent modifications to U.S. trade policies, among them the raised tariffs on steel and aluminium. The impairment tied to the Stop Work Order comes to DDK 500 million and likewise matches the estimates laid out in the prospectus connected to the rights issue. This mirrors the greater cost for Revolution Wind as well as Sunrise Wind, arising from extension contracts required to finish installing the projects. Those effects are partially offset by a reversal of DKK 1.3 billion, reflecting the decline in long-dated U.S. interest rates, which brings a lower WACC level across our U.S.

Trond Westlie

executive
#17

Turning to offshore and onshore projects. Net profit for the quarter came to negative DKK 1.7 billion, hit by both the lower earnings and the impairments. In Q3 24, net profit was DKK 5.2 billion, with DKK 5.1 billion of that tied to a reversal of a provision connected to Ocean Wind. Once we adjust for impairments and cancellation fees, return on capital employed was 10.2%, down from last year because capital employed was higher. Reported ROIC was 2%, affected by the impairments booked over the last 12 months. Moving to Slide 14, covering net interest bearing debt and credit metrics. By the close of Q3 25, net debt stood at DKK 83 billion, roughly DKK 16 billion higher across the quarter. That rise came mainly from gross investments of DKK 15 billion in building our new renewable project portfolio. The contribution from operating earnings within cash flow from operating activities was more than offset by costs tied to constructing transmission assets in the U.K., along with seasonal movements in other working capital items.

Trond Westlie

executive
#18

The same thing applied during the equivalent quarter a year earlier, since the rights issue wrapped up on 9 October 25. So roughly DKK 60 billion in proceeds will show up in our accounts by full year, provided the deal closes before the end of the year. Net debt will also capture the money coming in from the Hornsea 3 transaction. And on Greater Changhua 2, the project financing package closed in July but didn't move net debt at all, because the cash received was offset by a matching rise in debt. Once the planned equity divestment of that project closes, we expect to deconsolidate the asset together with its associated project financing package, and that will affect the net debt position at that point. Our credit metric, FFO to adjusted net debt, came in at approximately 14% at the close of the third quarter, a modest decline versus the prior quarter. Stronger funds from operation across the rolling 12 months were cancelled out by the growth in adjusted net debt. That metric should climb to well above the 30% target in the coming quarter, as the proceeds arriving from the rights issue and the closing of the Hornsea 3 transaction get reflected in our accounts.

Trond Westlie

executive
#19

Now, to wrap up, let's go to Slide 15 and review our outlook for 25, given the strong operational results we delivered through the first nine months and as we enter a quarter that typically brings higher wind speeds. Our full-year EBITDA guidance, excluding new partnership and cancellation fees, is reiterated at DKK 24 to 27 billion. We also keep our gross investment guidance for 25 unchanged at DKK 50 to 54 billion. That gross investment guidance is sensitive to milestone payments shifting between years as well as to tariff levels. We are continuing to monitor developments around potential tariffs and other regulatory changes, especially those affecting the U.S., and we are continually assessing any financial and broader impacts that may arise. With that, we will now open the line for questions.

Operator

operator
#20

Operator, that brings the presentation to a close, and we'll take questions at this point. The call must wrap up by 1530 at the latest. Each participant gets just one question, please, and after that you're welcome to rejoin the queue for a second one. Our first question is from Kristian Tornøe at SEB. Go right ahead.

Kristian Tornøe

analyst
#21

Yes, thank you. My question concerns how long your offshore wind assets are expected to last. With the Hornsea 3 deal that was announced the other day, as I understand it, you're now considering a lifetime of as much as 35 years for that asset. In the past, you've spoken more about a 25-year lifetime for your offshore wind assets, which is at least the figure I've been using in my model. So essentially, my question is: what lifetime would be appropriate for us to apply when valuing your offshore assets?

Trond Westlie

executive
#22

Regarding how long the capitalized investments last from the outset, we apply depreciation of just under 25 years. Its economic value, naturally, is based on that just-under-25-year depreciation schedule. On the business case itself and the lease term, that's a somewhat separate matter, and it's the piece reflected in the agreement we've been explicit and highly transparent about with Apollo. Naturally, that spans a long period. Consequently, the business case naturally extends beyond the economic value we capitalize at the start, essentially because of maintenance programs, repowering opportunities, and similar factors tied to the area's long lease. You likely need to separate how we capitalize, how we depreciate, and how we truly view the business case.

Operator

operator
#23

The next question is from Harry Wyburd with BNP Paribas. Harry, please go ahead.

Harry Wyburd

analyst
#24

Good afternoon, everyone, and thanks. Let me turn to the Hornsea 3 sell-down, if I may. Thank you for yesterday's call, where we got a bit of education on how the cash flow is profiled. My question is this: since Apollo holds the rights to most of the cash flow over the CFD period, and you hold the rights to most of the cash flow afterward, has a new source of book value risk or volatility now been created? Presumably you may revisit the NPV of those cash flows periodically, depending on discount rates and also on your assumptions for future reversion power prices for the project. So should we expect book value updates on a quarterly basis from here? And if so, could you give us some sense of how material those changes might be relative to the other impairment pluses and minuses you typically run through in a quarter? Then a related question. In modelling cash flow, we're all focused on 2028, when all these projects are up and running. Perhaps, now that the rights issue process has concluded, you could offer a bit of a guide on what 2028 EBITDA guidance might be.

Harry Wyburd

analyst
#25

So that's really the pivotal year when everything is fully operational. But given that, from what I understand, most of the cash flows during that year would be going to Apollo, should we apply a haircut to that for cash flow purposes? Thank you.

Trond Westlie

executive
#26

Alright, let's address the first point first. Regarding the uncertainty around fluctuations in where the provision starts, the one we'll actually apply going forward — on the asymmetry question. Yes, it's true that we need to reassess this each quarter, and those assessments will follow the IFRS rules as they stand today. Any adjustments of that kind will be booked within the financial income line. The second aspect here, of course, is that because we hold both a payable and a receivable in this arrangement, there's an embedded hedge that comes along with it. So I wouldn't say — so basically, yes, some elements of this will be adjusted on a quarterly basis. We don't anticipate that being material, and we're presenting it under current IFRS rules, where it will fall under the financial line on the.

Harry Wyburd

analyst
#27

All right, thanks.

Trond Westlie

executive
#28

Regarding the 28 outlook, we won't be refreshing those expectations for 28 this quickly after the rights issue and the prospectus we put out. Naturally, we'll return to that subject with greater detail when we get to the annual updates in February.

Harry Wyburd

analyst
#29

Thanks. On that cash flow haircut comment — I believe during the project's initial years, 3 years, it was 50/50, and after that it goes back to 70/30 favoring Apollo. But should we make an adjustment to cash flow? Is that the way we ought to think about it? On a proportional basis, we would need to trim the EBITDA you report somewhat, to reflect the fact that in the near term you receive a smaller share of the cash flows. Is that the correct way to look at it?

Trond Westlie

executive
#30

That's what will separate the P&L — the EBITDA P&L — from the cash flow statement. Naturally, in the P&L statement, that will, of course, and the adjustment we're making, right, the loss adjustment we're making at this moment, will, of course, be reversed under EBITDA. Naturally, in our operational cash flow statement, we will, of course, deal with that and be quite specific about the non-cash elements inside it. Okay, thank you very much.

Operator

operator
#31

Our next question comes from Barclays, on the line from Dominic Nash. Go right ahead.

Dominic Nash

analyst
#32

Morning, afternoon. If we could keep questions fairly brief, that would be great. First, on utilization levels for your offshore wind: you always cite output, but my understanding is you don't update us on what the potential output would be before curtailment. I'm curious what level of curtailment you're seeing across your offshore fleet, and what the effect would be if we adjusted for the proper underlying output capability. Second, a simple one: on dividend policy, you haven't provided firm numbers yet. I believe it's 2026 when you start paying a dividend, and consensus in Bloomberg is four krone a share. Are you comfortable with that consensus figure? Thank you.

Rasmus Errboe

executive
#33

Thank you. Thank you. Dominic. Regarding the utilization levels you mentioned, we don't provide guidance on curtailment specific to our offshore wind farms. Curtailment of any kind, whether onshore or offshore. What's evident is that we achieved very strong availability performance over the year — 93% production-based availability, sorry, park availability, for the first nine months, and 94% for Q3. So I'm quite pleased with the underlying performance. But we don't give guidance on curtailment levels. And let me also remind you that different countries have different frameworks for curtailment. For instance, in Germany we get compensated for the vast majority of curtailments from the onshore grid. As for the dividend policy, we've confirmed for some time now that we expect to resume paying dividends by 2027, for accounting year 26, and we'll stick to that, but we won't comment on the dividend's level.

Harry Wyburd

analyst
#34

All right, thanks.

Operator

operator
#35

Mark Freshney from UBS is up next with a question — go right ahead.

Mark Freshney

analyst
#36

Much appreciated. Rasmus, I’d like to follow up on a few remarks you made roughly a month back at a conference. You said there were 2 tracks for handling the stop order on Revolution. One was the legal track, and the other was a negotiated settlement — the dialogue track. Obviously, that was the case. Your large shareholder announced certain deals with the U.S. Department of Defense. Plainly, a negotiated settlement that safeguards Sunrise and Revolution would in every case be better than a courtroom victory. Could you say anything about how those negotiations might be moving along?

Rasmus Errboe

executive
#37

Hi Mark, thanks so much. You're correct that we're working on two tracks. The first is the legal one, where the injunction came through on 22nd September, which let us get back to work. The second is a track of dialogue with, with the relevant people in the administration. That isn't how I operate, Mark — my approach here is the same as it's always been. Namely, I won't discuss specifics of the conversations we may or may not be having about reaching a deal. What we're focused on is arriving at, you could say, a complete solution for, for Revolution Wind, where the Stop Work Order claim remains outstanding. Our attention is on the projects, and I'm pleased by the progress we've made on construction at both Revolution Wind and Sunrise, where the degree of completion has risen from 80 to 85 at Revolution Wind and from 35 to 40 at Sunrise Wind, including installation of all the substations. So that's genuinely where our focus lies.

Mark Freshney

analyst
#38

Thanks. I appreciate that. And if I could just ask one more thing about the credit rating — I mean, my sense is that S&P were holding out for the deal we saw yesterday. Should we be looking for some news on the rating? And based on your modeling, does the Hornsea 3 farm down get you to where you need to be on that? The S&P trip wire, as it were?

Trond Westlie

executive
#39

Mark, yes, we’re familiar with what S&P said in their August update on the rating. And naturally, we’d expect them to feel more at ease now that this agreement has actually been signed and that we’ve essentially stayed on our schedule, with both signing and closing taking place before year end. So hopefully that will have some impact. We’re somewhat unsure about how S&P interprets and evaluates things, since among the three ratings we have, they’re kind of the odd one out. So that evaluation is really something we’d have to leave to them. Sorry, Mark.

Mark Freshney

analyst
#40

Much appreciated. Thanks.

Operator

operator
#41

Our next question comes from Alberto Gandolfi at Goldman Sachs. Please go ahead.

Alberto Gandolfi

analyst
#42

Thanks a lot for the question. I suppose the first part is probably more for Trond and the second one perhaps for Rasmus. It concerns capital structure and capital allocation. So, the first part: after the DKK 20 billion that you will get from the transaction, you know, this week, plus the rights issue, technically at nine months you are essentially free of debt, and naturally the company is still cash flow negative. But my question, the first part of it, is whether your balance sheet is now fully de-risked, and do you see any scenario in which there is a risk that you would have to put in place additional measures to prevent a downgrade to junk? I am just thinking, for example, if the U.S. project never starts, can we say that even under that scenario your balance sheet is now fine? And the second part of the question is that if you could elaborate on the first, I guess then the question would be: if the U.S. project begins to contribute, then you could say that in 2028 your FFO to net debt is incredibly strong. So can you tell us how you are starting to work on the repositioning of Ørsted at that point in time?

Alberto Gandolfi

analyst
#43

So at that point, is organic growth your priority? Since you probably need to start winning awards within the next 12, 18, or 24 months, I’d guess. Or is it more of a wait-and-see approach to find out what happens in the United States? Thank you.

Trond Westlie

executive
#44

Okay, let me address the first question about capital structure. I'd say your figures are pretty accurate compared with where we stand now and where we'll be by the end of the year. To begin with that, naturally much of the conversation during the rights issue has concerned the downside risk around what will happen in the U.S., and we've been explaining quite a bit about that, given the Stop Work Order and the possibility of receiving further Stop Work Orders. I do believe that, together with the rights issue, we've laid out why we considered DKK 60 billion to be the appropriate amount. We've communicated that we expect this Hornsea 3 transaction to be signed and closed during the year. So that has always formed part of our base case. The downside risk, naturally, is that developments may occur—uncertainties in the U.S. that we simply cannot attach a probability or an estimate to. But as we've consistently said, we've committed so much money into the Sunrise and Revolution projects that shutting them down really isn't a good scenario for us, since our commitment cost is nearly as high as the projects' total cost.

Trond Westlie

executive
#45

So that's the reason we've examined those structures, along with the capital raise, in this context. At this point it's difficult to envision a situation where we'd end up being downgraded to non-investment grade. So the scenarios you'd have to build to actually get us there are, of course, far harder now that Hornsea 3 is in place. Rasmus, over to you.

Rasmus Errboe

executive
#46

Thank you so much. Thanks, Alberto. Yeah, I'd say there are likely two components to your question regarding how we're repositioning ourselves beyond 28. The first piece, Alberto, is that our job is to execute on our plan. That's genuinely where our attention lies. Our plan revolves around four points: maintaining a solid capital structure so we can build out our 8.1 GW of offshore wind projects in the most effective manner; remaining focused and disciplined when it comes to capital allocation, with value always taking precedence over volume; and additionally enhancing our competitiveness. And when you examine how we've advanced on all four of those priorities during Q3, it's clear that's exactly where our efforts are concentrated. So in my opinion, the optimal approach to put ourselves in position for 28 and beyond is to execute on that plan. Once we've delivered on it, we'll find ourselves in a dramatically different place and will be capable of engaging the market from a position of strength at that moment. The second piece concerns how we should be thinking about 2028 and beyond. You brought up various types of growth metrics and what possibilities exist.

Rasmus Errboe

executive
#47

Our optimism regarding the future of European offshore wind is as strong as ever. Specifically, what we observe is a market that is rebasing, along with areas of growth for this sector in Europe. From where I sit, that stretches across three, so to speak. The first is, naturally, the centralized tenders. A figure of 26 is likely somewhat on the low side when it comes to how many tenders are being issued. Yet starting in 27 and beyond, a bit of a step change would occur. So that's one pocket we could go after. Naturally, the second involves maturing the proprietary pipeline we hold. The third bucket is more — I wouldn't describe it as inorganic — but rather, you could say, on a project-by-project basis, collaborations or M&A. Those are, and really always have been, the buckets we look toward whenever we consider growth in offshore wind. Still, patience will be our approach, and we'll put value ahead of volume.

Alberto Gandolfi

analyst
#48

That was really interesting. May I ask one more question? I appreciate it if you'd rather I didn't — go ahead. Thanks a lot. I'm very — this all comes through very clearly. I'm just quite intrigued by what you said about, you know, putting the focus back on Europe and possibly being open to M&A on a project-by-project basis. Might that also take in larger platforms? It's hardly a secret, I think, that a good number of people on this call are probably thinking about Equinor's offshore portfolio. Doing that would remove a competitor, and at that point your balance sheet is very strong. Do you think that's an option worth going after?

Rasmus Errboe

executive
#49

That isn't part of our plans?

Alberto Gandolfi

analyst
#50

I really appreciate it.

Operator

operator
#51

Our following question is from Lars Heindorff at Nordea. T Square, go ahead.

Lars Heindorff

analyst
#52

Good afternoon, and thanks for taking my questions. First, I'd like to ask about how EBITDA relates to operating cash flow. Some of this has come up already, so this may be somewhat of a follow-up. Your guidance for 25 to 27 points to operating cash flow of DKK 50 billion. Taking the midpoint of this year's EBITDA guidance and the minimum guidance you've provided for 26 and 27, that comes to DKK 86 billion of EBITDA over the same period, with a conversion ratio below 60%. So how should we view the relationship between EBITDA and operating cash flow going forward? First and foremost, in the upper nonsense, and I think given how 1, 2, 3 and the first three years have developed, with a 50/50 split, that should be fine. Beyond that, though, it may be too far out. But just to get some sense of what you expect for operating cash flow in the coming years — that's the first part. The second part is just housekeeping, Trond. You mentioned the Changhua transaction. Exactly how much would that affect interest-paying debt this year?

Lars Heindorff

analyst
#53

I appreciate that.

Trond Westlie

executive
#54

All right. Regarding operational cash flow versus EBITDA, three categories of items account for the gap. Those are taxes paid, the reversal of non-cash tax equity within EBITDA, and, basically, working capital from those movements. That's the biggest category — those are the three categories. And then, of course, there are fluctuations tied to working capital changes that also feed in there. But those three items — taxes paid, reversal of non-cash tax equity and EBITDA, and working capital after changes — are the three items that truly drive the bridge between the 50 and the EBITDA figures. So those are the items. As for Changhua 2b and 4 and the transaction, we still aim to sign the deal during the year. But because we can't close the transaction during the year, there won't be any transaction action as such. So no debt reduction will come from that. So the statements we made earlier regarding the DKK 35 billion proceeds guideline that we have for 25 and 26 — we have the DKK 7 billion that we did before half year.

Trond Westlie

executive
#55

At this point we’ve got the DKK 10 billion from Hornsea 3. Then there are two remaining pieces: roughly DKK 20 billion is still left, short by about 20, and that is more or less split evenly between Changhua and the Euro E.U. onshore transaction. So, as I mentioned, Changhua won’t be closed during the year. So no effect, okay.

Lars Heindorff

analyst
#56

To follow up on the first part — the conversion from EBITDA to operating cash flow — is it fair to assume that when you reach 28, which will be the first year, at least as things look right now with no offshore capex, you'll still have that same relationship, which is roughly a bit under 60% cash conversion from EBITDA to operating cash flow?

Trond Westlie

executive
#57

I have to return to that point, since the 11 to 12 from those six projects won’t be split evenly, given how much tax equity enters into that gross-up. So I’m not really in a position to give you guidance on it at the moment.

Alberto Gandolfi

analyst
#58

Thanks.

Operator

operator
#59

Our next question comes from Deepa Venkateswaran at Bernstein. The line is yours — please proceed.

Deepa Venkateswaran

analyst
#60

Thanks. I'd like to press you a little on what Equinor's CEO has been saying regarding offshore wind and Ørsted — he's been discussing new business models, the need for consolidation, and industrial cooperation with Ørsted. What's your view on any cooperation with Equinor, and in what form and over what timeline? That's the question. If you can't answer that, then I have another question I'd like to ask.

Rasmus Errboe

executive
#61

I'll take a shot at that, Deepa. Thanks so much. First off, we're obviously extremely happy about the backing we keep getting from Equinor in its role as our second biggest shareholder. There's no question in our minds on that. And naturally, I've also taken note of the remarks you're referring to regarding where our attention lies at the moment. What I'm concentrated on today is executing our plan and delivering our strategy each quarter, built around the 4 priorities I laid out earlier. Like any responsible management team, when you look further ahead, you'd naturally review every option that could enhance value for shareholders. Absolutely no doubt about that. I remain confident that our business model is still very well suited to offshore wind.

Deepa Venkateswaran

analyst
#62

Alright, thanks.

Operator

operator
#63

Moving on to the next question, which is from Jenny Ping at Citi. Jenny, the floor is yours.

Jenny Ping

analyst
#64

Thank you very much. So I have two questions that are somewhat connected. First, regarding the negative construction EBITDA you reported in 3Q, which you say relates to the Greater Changhua 4 project, and given some of the cost overruns you mentioned, should we expect this to stay at this magnitude effectively until the project reaches COD in 2026? So a negative DKK 3,400 million each quarter, and then, linked to that, going back to the Apollo deal, Rasmus, clearly this is a fully EPC wrapped project where you will take on any overspend and any delay risk. So what kind of comfort can you offer investors that this project has been operationally de-risked as we enter the full construction phase, to minimize any delays and overruns that ultimately will be borne by Ørsted? Thanks.

Trond Westlie

executive
#65

This is only about the negative figure, or the construction agreement provision we recorded in Q3. That naturally represents the entire loss we anticipate on the Changhua 4 construction agreement. So it isn't something that repeats — it's our estimate of the complete, complete loss on that construction agreement.

Rasmus Errboe

executive
#66

Hi Jenny. And regarding Hornsea 3, you're correct that in how we've handled the CA, you could describe it as our standard approach, where we wrap certain portions of construction risk, just as that's also our usual model on the OMA side, where we own for ourselves and for our partner. On Hornsea 3, things are moving strongly in line with the plan. Of course, it's a really large project — 197 positions — yet it sits within our core market and in a zone where we feel comfortable operating. A few of the areas we've concentrated on from the start, from a construction-risk standpoint if you like, are going quite well. The onshore converter stations and the cable landfall are making progress. That's a crucial point of focus for us. Plus ensuring that we're able to deliver. And that National Grid can deliver on schedule too. We've no reason to think otherwise by the time we reach that point in 27 — monopiles have been a major focus for us. At this stage we have enough robustness in the supply chain for that project. On the monopile side, we have roughly a handful of monopile suppliers involved in the project.

Rasmus Errboe

executive
#67

Haizea W, Haizea Steel, Wind, just to name some of them. And we have a lot of flexibility when it comes to ensuring that if one isn't precisely on schedule, another can step in and deliver. And we're beginning to see monopiles manufactured with a couple of those involved. So that's very much on track. Half of the export cables are done. Offshore monopile installation is set to begin in Q2, and also, as I mentioned earlier, the 2 offshore converter stations are coming along as planned. One is already in Norway, having come from Thailand, and the other is en route. One thing that both of us and I have been concentrating on — and this is my final point — Jenny has also, right from the start, been very focused on installation vessels. We have 3 installation vessels that will carry out the work on Hornsea 3, and one of them is now finished here in September. So within Q3. That's very good. Another one is engaged on different projects. So one of the 2 turbine installation vessels, the Wind Peak, is currently working for Sofia and. And on the East Anglia THREE. So that's all fine. And then the final one is in production, and we expect it to be finished by year-end.

Rasmus Errboe

executive
#68

Across the board, I’d say construction — and along with it, construction risk — is moving forward as planned.

Jenny Ping

analyst
#69

I appreciate it.

Operator

operator
#70

Our next question comes from Jacob Pedersen, who is on the line from Sydbank. Jacob, please go ahead.

Jacob Pedersen

analyst
#71

Hey, guys. I’ve just got one question about Baltica 3. In your presentation, it’s still listed as part of your offshore pipeline. Where does that project stand at the moment, and will it have any part in closing the gap in new installations that still exists after 2027, or would it make more sense for you to pursue other auctions instead?

Rasmus Errboe

executive
#72

Thanks. Thanks, Jacob. As you're aware, Baltica 3 is a project that we own jointly with our partner PGE. That partnership continues to please us a great deal. And with PGE, we're also progressing Baltica 2. As you know, we placed Baltica 3 into reconfiguration a few years back now. The reason was that, as the project stands within our portfolio, we didn't perceive enough value to take it forward. That remains true today. The project is in reconfiguration, and we'll only take it forward if we see a substantial uplift in value. So it's one of the options sitting in our portfolio. But as I've said previously, it would also need to stack up against our other opportunities. We're very strict about value over volume, and about capital discipline and allocation as well. So that's what I can tell you regarding Baltica 3 at this point.

Jacob Pedersen

analyst
#73

Alright, if I could, a follow-up question. Just a bit of housekeeping. The expense from the rights issue — will that show up in financing cost in Q4, or has it already been captured in the Q3 figures?

Trond Westlie

executive
#74

That will show up in the Q4 figures. That said, the prospectus contained a solid estimate. So I believe you're able to. Should you want an estimate, that one is available for your use.

Rasmus Errboe

executive
#75

Right.

Jacob Pedersen

analyst
#76

Yeah, thank you.

Operator

operator
#77

Olly Jeffery from Deutsche Bank has the next question. The line is yours.

Olly Jeffery

analyst
#78

Hello, and thank you. Good afternoon. First off, from what I understand, Judge Lamberth is handling Revolution Wind. So Judge Lamberth, the one who issued the preliminary injunction, will probably be the author of a detailed opinion that we have not yet gotten. And should the Trump administration decide to appeal that injunction, it would in all likelihood do so only once that detailed opinion has been written. Do you broadly agree with that assessment? My second question concerns the Section 232 investigation into wind components. Has anything moved on that front, and can you say at all whether additional tariffs, if they come, would carry any material consequence when it comes to impairments, or is that not a risk?

Rasmus Errboe

executive
#79

Thanks, Olly. I’ll handle the appeal, and then I’ll leave the tariff matter to Trond and keep my remarks fairly short. Olly, I don’t want to speculate about possible legal results, whether an appeal will be filed, or, if one is, when that might happen. We are relying on the injunction Judge Lamberth granted us on 22nd September; we got straight back to work, and that remains very much where our attention is. As I mentioned earlier, though, we still have two paths underway: the legal route and the conversation route. Our goal is to secure a complete solution for Revolution Wind.

Trond Westlie

executive
#80

To be clear, it's quite difficult to have a firm view of where the tariff goes in the US. So what we've taken into consideration is, of course, the June 4th announcement, the 19th announcement and the 21st announcement. That means we've looked at the inquiry into the specific imports for wind turbines and associated parts. We've included the more than 400 items that they put on the list as such. We've also taken into account the 50% level, and that's really the elements we can do as a best estimate as of now. And that's what we've included in our best estimate. That gets us to the DKK 2.5 billion of impairment effect in the third quarter.

Olly Jeffery

analyst
#81

Appreciate it.

Operator

operator
#82

Our next question comes from Roald Hartvigsen at Clarksons Securities. The line is yours.

Roald Hartvigsen

analyst
#83

Good afternoon, gentlemen, and thanks for letting me ask about gross investments. You've kept your DKK 50 to 54 billion guidance unchanged, and since roughly DKK 40 billion has already been spent this year, the low end of that range implies just an extra DKK 10 billion in the final quarter — quite a material step down versus the DKK 15 billion this quarter. Reported CapEx figures have historically been quite high in the year-end quarter, and the full one to three projects will still be on your books, I guess for at least part of the quarter or so. Can you help us reconcile that expected drop in investment level from the third quarter and give some color on the assumptions embedded in especially the lower end of the gross investment guidance range here? Thanks.

Trond Westlie

executive
#84

You do need to view the whole guidance in context — essentially DKK 50 billion to DKK 54 billion — and if you go with the higher figure, gross investments in the fourth quarter would end up at roughly the same level as in the third quarter, if you treat that as one possible outcome. That said, the key point here isn't really the timing of whether a payment lands on 20th December or 10th January. What matters is that across all three years our investment level sits at approximately DKK 145 billion. As we've mentioned before, we expect DKK 50 billion to DKK 54 billion this year, which means it will be in the 50 range for the two consecutive years of 26 and 27. So I'd stress that we shouldn't be Razor Sharp about 31st of December. But our best estimate right now, and the sensitivity we have around year-end payment timing, falls between DKK 50 billion and DKK 54 billion.

Roald Hartvigsen

analyst
#85

Thanks. That's all I had to cover.

Operator

operator
#86

Rob Pulleyn of Morgan Stanley has the next question. The line is yours — go ahead.

Rob Pulleyn

analyst
#87

Thank you. A lot of ground has already been covered. So may I just dig into something fairly granular on slide 23 — I noticed a few of those figures have shifted since 2Q. When we look at the sensitivity to the 10% ITC bonus, Sunrise and Revolution now total DKK 6 billion, and I believe that used to be DKK 4.6 billion. And the sensitivity to a 50 basis points move in WACC now stands at DKK 2.1 billion, whereas before it was lower. I'm just curious what's driving that. And may I also seek one clarification from earlier, since the audio was somewhat crackly. Did you confirm that you hope to announce the Changhua 2 deal in 2025? I know you said you expect to close it in 2026, but will the disposal still take place this year? Thank you very much.

Trond Westlie

executive
#88

Regarding slide 23, the rationale behind those adjustments stems, naturally, from shifts in certain CapEx figures. As for the specific components, I don't really carry the gross figures around in my head. So to get the more granular detail on that, you'd need to reach out to IR. On the Changhua transaction: yes, our ambition remains to sign that deal within this year, and then to close it once we have COD in Q3 of next year.

Rob Pulleyn

analyst
#89

I appreciate it.

Operator

operator
#90

Our next question comes from David Paz at Wolfe. Your line is open now, Mr. Paz — please go ahead with your question.

David Paz

analyst
#91

Apologies for the earlier trouble—hopefully I’m coming through clearly now. Thanks for making the time. I just wanted to ask a couple of quick follow-ups on Revolution Wind. First, regarding the DKK 5 billion: since August, has that figure been revised as far as the remaining investment goes? My understanding is that was your share. Second, of the three items you listed—the onshore substation, the remaining turbines, and the array cables—which would you describe as first and last? Put differently, what’s the critical path? If you could give us some detail on that, especially since you noted the onshore substation is substantially, substantially complete, I’d appreciate it. What is it that gets you to a second-half 2026 COD? Thank you.

Trond Westlie

executive
#92

Regarding the CapEx for Revolution — yes, our total CapEx, and our 50% share of it, is 20, and as of last quarter we had spent roughly DKK 15 billion of that amount. So the DKK 5 billion left on our side, DKK 10 billion altogether for Revolution, has more or less been paid over the course of this time, basically. But what I think matters more is that we've gotten far enough along on Revolution that the commitment we hold on the entire value is in place. So whether we've paid it or not doesn't really matter much when you look at the timing of things. It's more about the timing of things.

Rasmus Errboe

executive
#93

Regarding what remains on the critical path for Revolution Wind, the onshore substation is still the item sitting there. Progress is being made on it. As I mentioned, we have 52 turbines installed and 41 of the 65 array cables done. And as I noted, we anticipate the onshore substation will be energized early next year. The reason it remains on the critical path is this: once that onshore substation is energized, you essentially proceed area by area through the wind park — beginning with the export cables, then moving to the offshore substations, and after that the turbines, when it comes to electrification and hard commissioning of those turbines. That carries us to what we expect for COD. So the onshore substation is still on the critical path.

David Paz

analyst
#94

Alright, I appreciate that — thanks for the detail.

Operator

operator
#95

Our next follow-up comes from Mark Freshney at UBS — Mark, the line is yours, go ahead.

Mark Freshney

analyst
#96

Hi there. Thanks. On the matter of subsea cable security, we're aware that considerable effort is underway across the industry, within government, and at the NATO level to safeguard those cables. From where you sit, though, has any of your subsea cable infrastructure been deliberately sabotaged, to your knowledge? And when you consider this at board level as a business risk, what is your own internal approach to addressing it?

Rasmus Errboe

executive
#97

Thank you. Thanks, Mark. As you can surely understand, I won't get overly detailed on this one. So I won't be addressing, say, effects on specific cables and similar items. What I can tell you is that security, along with collaborating with governments—and you brought up NATO earlier—has been embedded in how we've approached development in Europe for a very long time. Governments are seeking discussions and solutions around defense coexistence, and we observe strong cooperation among the relevant authorities in the markets where we operate, as well as the sector, ourselves included, to create effective mitigations from a coexistence standpoint. That's the furthest I can go regarding defence.

Mark Freshney

analyst
#98

Thanks.

Operator

operator
#99

Dominic Nash from Barclays is on the line with a follow-up question. Go right ahead.

Dominic Nash

analyst
#100

Thanks. Yeah, I appreciate the follow-up. It concerns Hornsea 3 and those figures that came out, you know, sort of yesterday. I just want a bit of clarification on them, if you wouldn't mind helping me. So could you — could you check whether my math holds up? Basically you're saying DKK 20 billion has been spent so far. Apollo is paying you 10 billion for what you've spent as of today. Fine. You also say there's DKK 70 billion to DKK 75 billion of CapEx still remaining on the project. So that's 90 to 95 in total, and I believe you said roughly a third of that is transmission. But then if you take Apollo's DKK 39 billion contribution and DKK 10 billion has gone toward buying into the project for historics, that leaves at least DKK 29 billion. How does that DKK 29 billion square with the DKK 70 billion to DKK 75 billion still to come at 50% ownership? And on that point, I think transmission may be the piece that's a little odd. Is it inside or outside the cash amount they're putting in, and is there some debt tied to it, or do you have another route to get that financed?

Dominic Nash

analyst
#101

Thanks.

Trond Westlie

executive
#102

Dominique, just as a place to begin — it's a little hard to track your math over the phone, but I believe one key piece of it is that DKK 70 billion–DKK 75 billion is the whole project rather than what's left. Still, if you take the remainder of your math to the IR team, I think they'll be in a better position to walk you through it.

Dominic Nash

analyst
#103

Thanks so much.

Operator

operator
#104

Next up, we have a follow-up from Deepa Venkateswaran, who is on the line from Bernstein. Please proceed.

Deepa Venkateswaran

analyst
#105

Thanks for letting me ask a follow-up. My question concerns the legal proceedings in the U.S. for Revolution Wind. The Stop Work Orders permitted you to begin construction. That appears to be progressing nicely, but what happens if you complete building the project without having resolved the underlying Stop Work Order challenge? Are you able to begin selling the power and so forth and energize, or does it more or less grind to a halt and, you know, in some scenario — I don't know — if you lose the appeal at a later stage, after 1 or 2 years, would you then be compelled to decommission? I'm simply wondering what happens given that you are now constructing and thus far the legal process could take far longer to conclude. It might take longer than your construction timeline. So if you could just expand on those scenarios. Thank you.

Rasmus Errboe

executive
#106

Thanks, Deepa. I'll keep this short. With the injunction relief in place, we can carry on with the project, keep building, and generate power as well.

Operator

operator
#107

Our next follow-up comes from Lars Heindorff at Nordea, who is on the line. Please proceed.

Lars Heindorff

analyst
#108

Hi there, thanks for letting me ask a follow-up, and I feel quite lucky to come right after Deepa’s question, since mine also concerns Revolution Wind. So, work began on August 22. The injunction was filed on December 17. That was 49 days ago — sorry, 49 days. And if I have this right, you’ve put up about 7 turbines during that stretch. For Revolution Wind, you still have 13 turbines to install. How long do you think that will take?

Rasmus Errboe

executive
#109

Thanks. Thanks, Lars. So regarding the guidance we provide on progress: essentially, we guide on the COD. But naturally, as is always the case, it also matters when all the turbines get installed and when you're able to achieve first power. And that we expect during H1.

Lars Heindorff

analyst
#110

Is it reasonable to think that in normal conditions installation takes 1.5 to two days, and then during the winter period it would be longer — four days, something along those lines? Would that be a fair assumption?

Rasmus Errboe

executive
#111

Lars, I’m looking forward to walking you through where construction stands once we close out the year, and we’ll be very specific at that point about how far we’ve gotten on turbine installation as well. Things are progressing quite nicely at the moment, though naturally we’re also heading into a stretch with greater weather uncertainty. Even so, at this point turbine installation on Revolution Wind is going really, really well.

Lars Heindorff

analyst
#112

Okay, thanks.

Operator

operator
#113

Our next follow-up comes from Rob Pulleyn at Morgan Stanley. The line is yours.

Rob Pulleyn

analyst
#114

Alright, thanks. One question from me: regarding the onshore U.S. business — I realize this is somewhat off the track we've followed so far in the rights issue process. You mentioned essentially carving it out legally and financially as a separate standalone entity. Does that remain the plan, and are there any additional strategic intentions for it, given the situation? Naturally, power is in somewhat short supply in the U.S., and there's a fair amount of optimism surrounding that market. Many thanks.

Rasmus Errboe

executive
#115

Thanks. Thanks, Rob. You're correct that we've moved forward with separating our U.S. onshore business, and as of 1st of October, that onshore business has become a standalone unit reporting to our Global Development Chief, while the Americas onshore business will keep focusing on developing and operating projects within the U.S. We have a pipeline of 6 to 7 GW of projects with capacities meeting the definition of IRS qualification through 2029, and there are plenty of opportunities in the market, plus the two projects we have under construction. So all 300 best in Texas and also Badger Wind in North Dakota are progressing really well.

Operator

operator
#116

That was the final question, ladies and gentlemen. At this point, I'd like to hand the conference back to CEO Rasmus Errboe for any closing remarks.

Rasmus Errboe

executive
#117

Thanks so much, everyone, for being here. As always, we value the engagement and the interest, and should anything else come to mind, feel free to contact our IR team — they'll be available to handle any questions you have. Thanks again. Take care and have a wonderful day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ørsted A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ørsted A/S earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ørsted A/S or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.