In Q4 FY '26, Steel Authority of India Limited (SAIL) reported a significant improvement in financial performance, with a 5% increase in sales turnover to INR 30,541 crores and a 48% rise in PBT. The company achieved a 43% growth in PAT compared to the previous year. Annual performance also showed strength, with crude steel production up 1% and saleable steel up 7%. The company reduced debt by INR 3,200 crores in Q4 and INR 8,150 crores for the full fiscal year. Management provided guidance for FY '27, expecting sales volume to increase to 22 million tonnes and CapEx to rise to INR 15,000 crores, signaling continued expansion and operational efficiency improvements.
What topics did Steel Authority of India Limited cover?
- Debt Reduction: SAIL reduced debt by INR 3,200 crores in Q4 and INR 8,150 crores for the full fiscal year, aided by inventory liquidation and improved sales volumes.
- Sales Volume and Production: SAIL's saleable steel production grew by 4% in Q4 to 5.3 million tonnes, with annual sales volume reaching a record 19.9 million tonnes, a growth of 11% YoY.
- Profitability Improvement: Profit before tax increased by 44% and profit after tax by 51% for FY '26, driven by operational efficiency and cost optimization.
- CapEx and Expansion Plans: CapEx for FY '27 is guided at INR 15,000 crores, with expansion projects ongoing at IISCO, Bokaro, and Bhilai plants, aiming for significant capacity increases.
- Cost Pressures: Coking coal prices increased in Q1 FY '27, impacting costs by INR 1,400 to INR 1,500 per tonne, though sales prices are expected to offset this.
What were Steel Authority of India Limited's May 16, 2026 results?
- Sales Turnover: INR 30,541 crores (Q4 FY '26, +5% YoY)
- Profit Before Tax (PBT): 48% increase (Q4 FY '26 vs Q4 FY '25)
- Profit After Tax (PAT): 43% increase (Q4 FY '26 vs Q4 FY '25)
- Crude Steel Production: 19.4 million tonnes (FY '26, +1% YoY)
- Saleable Steel Production: 19.2 million tonnes (FY '26, +7% YoY)
- Debt Reduction: INR 8,150 crores (FY '26)
SAIL's strong financial performance in FY '26, driven by operational efficiencies and debt reduction, supports a positive investment thesis. The company's ambitious expansion plans and focus on cost management are key catalysts to watch. However, potential risks include fluctuating steel prices, geopolitical uncertainties, and the ability to maintain high capacity utilization. Monitoring these factors will be crucial for assessing future performance.
Earnings Call Speaker Segments
Operator
operatorGood day, everyone, and welcome to the Q4 FY26 earnings conference call of Steel Authority of India Limited, hosted by Nuvama Institutional Equities. Just a reminder that every participant line is in listen-only mode, and once the presentation wraps up, you'll have a chance to ask questions. <<operator_script>> Kindly be aware that this conference is being recorded. At this point, I'll turn the conference over to Mr. Ashish Kejriwal of Nuvama Institutional Equities. Thank you, and over to you, Mr. Kejriwal.
Ashish Kejriwal
analystThank you, Michelle. Good morning, everyone. Once again, on behalf of Nuvama Institutional Equities, we welcome Dr. Panda and his team, and we appreciate the chance to host this conference call. We are delighted to have Dr. Ashok Panda with us, who has now taken on the role of Chairman and Managing Director of SAIL while also holding additional charge as Director, Finance. On behalf of the investor community, we congratulate you, sir, on this, and we wish that under your leadership SAIL will reach newer heights both financially and operationally. We would also like to mention that we are privileged to have Sri. T.N. Natarajan ji, Director Commercial, who will also be on the call today. So without further ado, I would request Dr. Panda to give his opening remarks, and then we can open the floor for Q&A. Over to you, sir.
Ashok Kumar Panda
executiveOkay, thank you Mr. Ashish, and thanks to everyone joining us on this call. I'll begin with my comments, and after that we can open up the Q&A. Good morning to you all once again. I extend a warm welcome to every investor and analyst participating in this earnings call covering SAIL's financial results for Q4 and the full year FY '25-'26. Before we get to the Q&A, allow me to walk you through the results for the period, and I'll take each item one at a time, starting with the economic scenario. First, the global economic picture. Geopolitical developments in the Middle East have once again unsettled an economic environment that had otherwise been stabilizing, and they are bringing uncertainty and volatility to all of us. Economies around the world have felt the strain, with most of them seeing projections trimmed by virtually every major financial and analytical institution. As a result, the IMF and similar agencies have cut their global GDP projections for calendar year 2026. Even though the projections for the current year, 2026 to 27, sit a little above the prior year, they remain under the '24-'25 levels. Projections for India, too, stay in a raised band of 6.5% to 6.9% according to various agencies. Turning to the global steel industry, its landscape is shaped by economic trends, trade policies, and geopolitical conditions, along with technological advancements.
Ashok Kumar Panda
executiveThat upward trend we saw in the prior quarter could take another hit, and output in Iran has already been affected enough to knock it out of the world's top 10 producer countries. WSA, though, hasn't released its SRO since October 2024. But naturally, steel everywhere is being affected, and particularly so because of the Strait of Hormuz situation — both when it comes to fuel constraints and when it comes to raw material movement through that port. Turning to the Indian steel industry, it keeps enjoying strong demand for steel, with consumption in FY ’25-’26 having risen by nearly 8% compared with the same period a year earlier. Crude steel production growth, on the other hand, has come in at 11%. The industry grew by 8%, yet production growth stands at 11%. That explains why, in the last year, export figures were actually quite high. India closes FY ’25-’26 as a net exporter, with exports slightly above imports. Exports rose by roughly 36%, while imports saw a decline of about 32%. In absolute terms, the two are nearly level — 6.5 million tons against 6.6 million tons. So it comes down to a balancing figure.
Ashok Kumar Panda
executiveSo, if we turn to how our company has done — SAIL’s performance — there’s growth in total production. And speaking of quarter four of ’25-’26, crude SAIL production rose 4%, reaching 4.9 million tons, compared with 4.7 million tons in the same quarter a year earlier. Sales volume is up as well, by 4%, to 5.3 million tons in quarter four. Sales turnover also increased 5% in quarter four, to 30,541 crores. That’s the thing. Profitability improved too — by 48% in PBT and 48% in PAT terms, versus quarter four of last year. Debt came down by 3200 crores on its own in quarter four of ’25-’26. That covers quarter four performance. Now, looking at the annual performance of ’25-’26 for Steel Authority of India Limited: crude steel production grew 1%, from 19.2 million tons in FY ’24-’25 to 19.4 million tons in FY ’25-’26. Salable steel, though, grew by around 7%, from 17.9 million tons in FY ’24-’25 to 19.2 million tons in FY ’25-’26. The company posted its highest ever sales volume at 19.9 million tons — almost like 20 million tons — which is marginally, I mean it is close to 20 million tons.
Ashok Kumar Panda
executiveProduction is up 7% and sales are up 11%, which represents 11% growth versus the prior year. That is a really encouraging signal, and it has led to a substantial decrease in inventory as well as lower borrowings. This year, sales turnover came in at close to INR110,000 crores, an 8% increase over the prior year. Stock has been cut by roughly 0.9 million tons, of which 0.4 million tons falls in the saleable steel category and 0.5 million tons in the in-process steel category. Altogether, that is close to a million ton. The inventory decrease came about because sales quantities were strong. That explains why borrowings have also declined by about INR8,150 crores in FY ’25-’26, delivering outstanding benefits for us on finance cost. The cost of borrowings, too, has fallen from 7.3% last year to 6.2% this year. This has additionally produced an improvement in interest cost for all of us. So, taking all of this together, PBT profit before tax for ’25-’26 shows growth of 44%, and on PAT numbers, growth stands at 51%.
Ashok Kumar Panda
executiveWhat I'm pointing to here is operational efficiency, inventory liquidation, cost optimization, sales volumes, and so on. So these profit figures come purely from the company's basic operations and sales and from the good efforts the company has made. And I'd like to say that last year, in fact, we had a real price revision contributing to profit, whereas this year nothing of that kind fed into profit. Even so, we have shown an increase of more than 50% in pack compared with the previous year. That demonstrates the potential SAIL has to carry this forward going forward. The domestic market is holding steady on both the demand side and the price side. Of course, it keeps shifting month to month with seasonal effects and sentiment, while the coal price stays range-bound. Coal price is staying on the higher side, range-bound. In fact, we hope margins will keep improving. Beyond that, the Company will keep taking actions on the efficiency improvement and cost reduction front as well. Given this depreciation of the rupee against USD and international steel prices also firming up right now, we believe steel prices will stay at this level and margins will stay good during 26:27.
Ashok Kumar Panda
executiveAnd one more key point for everyone: after quite a long stretch — many years and decades — you can say that the ’25-’26 balance sheet is completely free of qualifications. Following that lengthy period, there are no qualifications in the balance sheet. So we have addressed those qualifications through the developments and, wherever needed, provisioning, et cetera. Thus the whole balance sheet is clean of qualifications. That is the major development during this year, ’25-’26, achieved through the efforts of the finance fraternity. With those words, I hand it back to Mr. Ashish Kejriwal to open the Q&A session.
Operator
operatorThanks a lot, sir. At this point, ladies and gentlemen, we're going to start the question-and-answer portion. <<operator_script>> Our first question comes from Chaitanya Iyer at Goldman Sachs. The line is yours.
Chaitanya Iyer
analystHello there. Can you hear me okay?
Operator
operatorYeah, go ahead.
Chaitanya Iyer
analystHello, and thanks very much for the chance to speak, sir, and congratulations on a strong set of numbers. My first question concerns the lines of business. What sales volume guidance would you give for the next two fiscal years, FY27 and FY28, and, as you know, other capex has risen in FY26. Could you update us on the three expansion plants and say what capex guidance you would provide for the next two fiscal years?
Ashok Kumar Panda
executiveOkay, thanks for asking that. So as I mentioned, sales volume came in at roughly 20 million tons last year. For this year, we're looking at 22 million tons. That's about a 10% target on the higher end, and we're holding to it and gearing up to get there. That's my first answer to your question. Second is capex. In ’25-’26, we wrapped up — the target was INR10,000 crores, and we ended at roughly INR9,100 crores, something in that range. For ’26-’27, guidance is INR15,000 crores. And because our expansion projects are underway across various plants, capex in ’27-’28 will exceed INR20,000 crores. That's what we expect as far as expansions go. Actually, we've cleared three plants. One is the Isco steel plant, where major packages have already been tendered and placed. Another is Bokaro, and the third is Bhilai, which we're just clearing now.
Chaitanya Iyer
analystThanks a lot. And the second question was about undertones. So, as you said, we saw the effect of a downward revision in yield prices. Could you tell us whether there's any further room for that kind of downward revision soon? And, you know, regarding the Bokaro steel plant, can you lay out the factors that were behind the sharp EBITDA recovery quarter on quarter at that plant?
Ashok Kumar Panda
executiveOkay. Let me address the first question first. That first question concerns real price. During ’24-’25, we actually had the areas from the last previous two to two years. So that was factored into the profitability of ’24-’25, to the tune of around 1,800 crores. But in ’25-’26 there were no such real price revision areas. I mean, ’24 — as of now, actually, we are running with the provisional price of ’24-’25 and ’25-’26. That takes some time at the government level. So ’24-’25 rail prices will be finalized, which will have its own effect in the ’26-’27 financial year. So that’s about rail price, and rail prices keep changing, actually, depending on the imported floor prices as well as efficiency levels. So sometimes they go up, sometimes they go down. So in ’25-’26 and going forward to ’26-’27, the provisional prices are on the lower side. So in spite of having those lower on the lower side in ’25-’26, still we could post a profit which is with the growth of 50% on the excess of 50%. Coming to Bokaro numbers, Bokaro actually in ’25-’26 they’ve improved, because in ’24-’25 they had a lot of breakdowns and they had a hostive mill, which is a parent mill.
Ashok Kumar Panda
executiveThe capital repair was supposed to take one month, but it ended up lasting two months longer instead. So in ’24-’25, that issue, combined with flat steel prices moving downward — on the downside — meant Bokaro posted a negative figure in ’24-’25, though that wasn't the situation in ’25-’26. In ’25-’26, things have gotten better — the issues in SMS, the melting stuff. All of that was taken care of during ’24-’25. So in ’25-’26, in H2, happily, two things have improved, and they're looking up when it comes to production and to sales volumes too, since they're in flat products. So NSR is much better. That's why there's been a lot of improvement in broken steel fund EBITDA levels, and that will keep going. They'll still do better in ’26-’27. That's what we expect.
Chaitanya Iyer
analystUnderstood. Many thanks, sir. I’ll be in touch with you again.
Operator
operatorThank you. Now we'll move to the next question, which comes from Sumangal Nevatia at Kotak Securities. The line is yours — please go ahead.
Sumangal Nevatia
analystMorning, and thanks for the opportunity. Congrats on the really strong results. My first question concerns prices and costs. Could you give guidance on what realization came in at in 4Q, and based on April and May, what increase you expect in prices or NSR in 1Q27?
Ashok Kumar Panda
executiveRight. So for quarter four, the average NSR on long products came in at INR53,400, while flat was INR51,000. If we set that against April and May: in April, long products' NSR was INR57,600, and flat NSR was INR56,700. For May, mid-month, the expected May long NSR is INR57,000, the same level, INR800, flat also INR56,000. Which means, as you can see, sales price rose by roughly INR4,000 comparing quarter four with April to May.
Sumangal Nevatia
analystAnd sir, the same goes for costs as well, primarily coking coal cost.
Ashok Kumar Panda
executiveIf we look at it, in quarter four the average coking coal price is INR18,200, and that has risen in April and May. The April average price is INR21,000, and the May average price is INR21,800. So there's an increase of roughly, let's say, INR3,000 — INR3,400 to INR3,500 in coking coal prices.
Sumangal Nevatia
analystAll right. And sir, I mean, this is the acquisition. So for the results in the upcoming quarter, which will be based on consumption, will that same increase show up, or will it show up in the quarter after that?
Ashok Kumar Panda
executiveNo, actually it's there because the appellant's prices are the procurement prices, but those will get blended with the inventory we're carrying. So, since the stock level is roughly 30 days' stock, actually. So the stock prices are lower. So the impact will be somewhat smaller relative to the procurement prices in this case.
Sumangal Nevatia
analystAlright. So, broadly speaking, with what's happening in the Middle East and inflation overall, any other cost items coming in — that's an area where we're seeing cost inflation.
Ashok Kumar Panda
executiveLooking at it, the rise may show up where sales are concerned. As far as Steel Authority is concerned, there will be some effect when it comes to fluxes, limestone, and so on, which we purchase from Dubai. So the landed cost there, the CFR cost, is going to rise, since it was roughly, let's say, $23 or $24. <<inaudible>> Now it will come to about $35. But taken across saleable steel overall, the impact will be barely INR100 or INR200. So it's really more about raw metal security than about a price increase. We're working on tying up with the parties so we can obtain larger quantities from the Middle East via diverted routes, and the same goes for fuel. So the fuel concern was present in quarter four, but we've moved past it by using PNG at certain locations and setting up LPG banks at other locations. So that won't be a major challenge for us in quarter one.
Sumangal Nevatia
analystGot it. My second question covers capex and employee cost. First, headcount is coming down at a very healthy rate. So if you could give guidance, factoring in superannuation, what's the outlook for ’27-’28, and with the pay commission revision also coming up, how should we think about fuel cost in — sorry, employee cost in FY27 and FY28, both years?
Ashok Kumar Panda
executiveLook, there are two parts to this. First, headcount is declining. Right now we're at roughly 50,000 employees. Hold on a second. Do you have those figures? Give me a second. I'll get you the numbers too. So that's the reason behind it. As of 1st April 2026, the figure stands at 49,752, versus 53,159 at the start of this year. That works out to a decrease of roughly 3,400. So this benefits us on salary, wages, and headcount. But other items are the usual increments, then gratuity, et cetera, where ceilings have gone up. So that too is putting pressure on it. However, if you look at employee remuneration in the P&L account, it's down by roughly INR200 crores to INR300 crores versus the prior year, for a range of reasons. First is the headcount factor; the second is leave encashment. Many elements fed into that, and as we see it — I mean, comparable reductions will also happen in ’26-’27 and ’27-’28, meaning around 300 to 400 to 500 <<inaudible>> will come down in each of the next two years, but there will be some influx of material, I mean influx of people actually through the induction phase, induction at lower levels.
Ashok Kumar Panda
executiveEach year, there might be a rise of roughly, say, 300 or 200 — those numbers, since we're expanding as well. And on top of that, we've actually rolled out a VR scheme at this point, which is intended to cut the headcount by 500 to 1,000. So that's what we're aiming for. Through that process too, separations will happen, and the numbers will decline. As for the pay division, it takes effect from 1st January 2027. The guideline hasn't come yet from government business, since the committees are still to be formed. So we'll see what kind of guideline emerges from there. Then, actually, we'll review that in quarter four of this year, and we're prepared to absorb those costs, depending on the guidelines we get from the Government Pay Commission.
Sumangal Nevatia
analystAll right, so this INR11,400 crores — where should we expect that to stay roughly flat for ’27?
Ashok Kumar Panda
executiveActually, it will decline this year. What's the figure? I believe it's INR11,589 crores, so in ’25-’26. Manpower will therefore be reduced further. So my sense is that this number will drop again this year. Naturally, we have VRs — voluntary retirements will be there. Some effect may therefore arise from the VRs. Still, on the whole, you can see — you can expect — that it will decline somewhat in ’25-’26. The actual figure is INR11,392 crores. It has fallen. My expectation is that it will fall further in ’26-’27 even with the BRS impact. That's also because total headcount will shrink by 3,000-odd. <<inaudible>>
Sumangal Nevatia
analystUnderstood. So for this year’s volume, could you share what the NSL volume was in the fourth quarter and for the full year?
Ashok Kumar Panda
executiveFor NSL, total volume came to 1.12 million tons. The fourth quarter was actually fairly small — roughly 0.1 million tons, something in that area — since we've largely stopped selling their product, as they're operating independently now. We began selling RINL products in response to a request from RINL. NSL's fourth quarter was 0.48. RINL was 0.48. That's where things stand. Most of NSL's sales actually occurred in the nine-month period, with just a small quantity in January — that's all. As of now, NSL is selling on its own.
Sumangal Nevatia
analystSo for third-party RINL NSL, when you combine them, the fourth quarter comes to half a million tons.
Ashok Kumar Panda
executiveThe figures for the fourth quarter are just 48,000 and 50,000 tons. That's entirely due to RINL, which began operations in February after completing the agreement and so on. So at this point it's gaining momentum.
Sumangal Nevatia
analystAnd, sir, for ’27 as well, that’s going to stay at a very low level.
Ashok Kumar Panda
executiveWhen you mention ’26-’27, what you mean is ’26-’27.
Sumangal Nevatia
analystYes.
Ashok Kumar Panda
executiveSo in ’26-’27, we expect RINL products to sell at roughly 0.6 million tons to 0.7 million tons. For RINL, that will be an increase.
Sumangal Nevatia
analystOkay. Okay. All right. So sir, if you make that adjustment, our volumes come to roughly 19 million tons. That 19 million tons — our own volumes, which we expect to reach 22 million tons — is that the correct way to look at it?
Ashok Kumar Panda
executiveYeah, so we sold about 19.9 million tons last year — roughly 20 million tons. If you subtract 1 million tons, that leaves 19 million tons for us. So from that 19 million tons, we're aiming to reach 22 million tons this year.
Sumangal Nevatia
analystAll right, and if I could just squeeze in one final question. Capital spending is nearly twice as much this year. So are we able to pay out that much — going from roughly INR8,000 crores to INR15,000 crores in FY27?
Ashok Kumar Panda
executiveRight. Our capital expenditure came to roughly INR9,100 crores last year, and for this year we're looking at 15,000 crores. And we will be disbursing it, since this is going to be partly—partly toward the debottlenecking projects, partly toward the AMR projects, and partly toward the expansion projects at East Coast Steel Plant. We are, we are prepared for that. That's what it takes.
Sumangal Nevatia
analystOkay, sir, thank you very much, and best of luck to you.
Ashok Kumar Panda
executiveThanks.
Operator
operatorThank you. <<operator_script>> Our following question comes from Prateek Singh of IIFL Capital, on the line. Please proceed.
Prateek Singh
analystHello, sir, and thank you for the chance to speak. My first question is really just a clarification. Back in 4Q, when you mentioned RINL, was that 0.48 million tons, or was it 48,000 tons?
Ashok Kumar Panda
executive48,000 tons.
Prateek Singh
analystAll right. So for RINL in FY27, the guidance is 0.6 million tons to 0.7 million tons. That comes on top of the 22 million tonnes we’re seeing at present. Is that right?
Ashok Kumar Panda
executiveNo, it falls inside that range. It falls inside that range — '22.
Prateek Singh
analystThat includes 6.7. Right. Okay. So I just want to get a sense of where our crude steel capacity stands at the moment. I mean, we used to think it was around 2021, but now we're talking about selling more than that. So as we speak right now, what is our crude steel capacity, and how do we see that going in ’27 and ’28?
Ashok Kumar Panda
executiveYes. In fact, we turned out roughly 19.43 million tons of crude steel last year. Our capacity stands at 21 million tons, and we're aiming for 22 million tons — actually in excess of that, I believe 22.5 million tons, as far as our target goes for ’26-’27.
Prateek Singh
analystSo that’s with no capacity added at all — it comes purely from debottlenecking. We believe we’ll be able to — this is by way of debottlenecking.
Ashok Kumar Panda
executiveAnd we're getting 100% capacity out of the facilities we currently have.
Prateek Singh
analystAnd when is that new capacity going to come online, sir, to support any further growth?
Ashok Kumar Panda
executiveAnd when fresh capacity begins to arrive, that's 3 years out — so we're talking ’30-’31.
Prateek Singh
analystWe can assume that the ’27 volume number will lastly remain same in ’28-’29 as well.
Ashok Kumar Panda
executiveI mean, what's actually going on here is that it comes from deep bottling—not really the bottling side through operational efficiencies. We're attempting to push past what our capacities allow. So when we look at 22.5 million tons this year, that can rise again to 23 million tons down the road. So we have our own efficiency levels that let us—we've got more flexibility and efficiency levels that let us stretch past our capacities. So that's what happens across all the facilities we just stabilized.
Operator
operatorIf you could please get back in the queue for a follow-up, I'd appreciate it.
Ashok Kumar Panda
executiveYes.
Prateek Singh
analystAlright.
Operator
operatorThanks. <<operator_script>> Our following question comes from Pinakin Parekh at HSBC. The line is yours.
Pinakin Parekh
analystYes, thanks a lot. So my first question is whether you could provide a somewhat medium-term capex outlook. You mentioned INR15,000 crores for this year, and that it will rise further. So across the coming three to four years, what capex does SAIL intend to spend, and how would those amounts ramp up?
Ashok Kumar Panda
executiveSo, that capex for ’26-’27 stands at INR15,000 crores, and it’s going to rise as our expansion moves forward. As I’ve stated plainly, our IISCO expansion is at an advanced stage. They’ve been formed up, and the groundwork is about to begin there. Once that groundwork gets going, the expenditures will be made, and spending will begin climbing from ’27-’28 onward. A bit of it will land in quarter four of ’26-’27, and after that Bokaro and then Bhilai will join in. But there, most of the spending will come perhaps from ’28-’29, that’s my guess. So that actually means in ’26-’27 we’ll spend roughly INR15,000 crores. In ’27-’28 it could be about INR18,000 crores, INR19,000 crores, and beyond that it will head toward nearly INR20,000 crores to INR25,000 crores each year once expansion at these three plants takes its own effect, and we’ll manage that through our fund management activities.
Pinakin Parekh
analystUnderstood, sir. My second question, then, concerns the employee cost guidance you provided. That figure wouldn't factor in any provisions for the wage revision you'll be making in Q4, correct? In the past, wage revision has come in at roughly 15% or so, and that would come on top of the guidance you're giving.
Ashok Kumar Panda
executiveSo, as I’ve made clear, the government notification and so on will actually come regarding the pay division. And once that happens, we’ll make a provision in quarter four of next year, ’26-’27. So those figures will only be known when we receive the guidelines. And that will be over and above the figure we’re discussing right now.
Pinakin Parekh
analystThanks a lot.
Ashok Kumar Panda
executiveI appreciate it.
Operator
operatorMuch appreciated. Our following inquiry comes from Darshan Mehta of Dolat Capital, who is on the line. Kindly proceed.
Darshan Mehta
analystHi there. Yes, thank you for the chance to ask. Sir, my first question is this: looking at the PPD, I notice our co-cred has improved by close to 20 kg over the past two years. I get that some of that might come from high PCI. But is there anything else I'm overlooking? For instance, have we made gains on grades or something like that? Or could you walk me through the reason?
Ashok Kumar Panda
executiveRight, so the cause is really the fall in CO grade, which comes from higher PCI as well as from raising oxygen enrichment in the blast furnaces. Those are the two levers we're using as we try to bring the coke rate down. Even though the coke rate has dropped by 20 kg and so on across the years, we're still not happy with that. We need to cut it by another 20 kg in ’26-’27.
Darshan Mehta
analystFor '26-'27, you're saying the aim is to cut that by over 20 kg, that's what you're saying.
Ashok Kumar Panda
executiveYes, yes, yes.
Darshan Mehta
analystRight. And to build on that point, regarding BF productivity specifically, I'd say it has gotten significantly better over the past two years. So what's behind that improvement?
Ashok Kumar Panda
executiveThat comes down to how efficiently we're running the furnaces, along with shutting the inefficient ones and raising output from the larger furnaces. Those are the 2 reasons.
Darshan Mehta
analystAll right, so what you're essentially saying is that output is higher from the smaller furnaces than from the larger ones. Is that what…
Ashok Kumar Panda
executiveWe've shut down the smaller furnaces, and we've begun ramping up from the larger ones. Those are the reasons.
Darshan Mehta
analystAlright. Alright, sir. And sir, in addition, I’m…
Operator
operatorMy apologies for cutting in. Sir, kindly get in line.
Darshan Mehta
analystYeah, yeah.
Operator
operatorThanks. Our next question comes from Rashi <<inaudible>> at Citigroup. Please go ahead.
Rashi
analystThanks. I just want to get a bit of clarity on the volume side. At present, what's your capacity utilization?
Ashok Kumar Panda
executiveOn the volume side, as I mentioned, our capacity actually stands at 21 million tons of crude steel, though our target is 22 million tons in ’26-’27.
Rashi
analystTo get this right, within those 22 million tons, you've got 0.6 from…
Operator
operatorMy apologies for cutting in. I can't hear you clearly. Could you please pick up your handset?
Ashok Kumar Panda
executive22.5 million tons — 22.5 million tons. And that figure also takes in 0.6 million tons from RINL.
Rashi
analystOkay, so on a like-for-like basis, looking purely at volumes from sales — if I take out the RINL and NMC volume this year, you're sitting at roughly 18.8 million tons of sales. And basically what you're saying is that pure sales volumes will rise from 18.8 million tons to upwards of 21 million tons this year.
Ashok Kumar Panda
executiveRight. What I'm saying instead is that it moves from 18.8 million tons — or nearly 19 million tons — up to 22 million tons, from 19 million tons to 22 million tons. That's the goal we've set, and it leaves out NMDC, NSL, and RINL.
Rashi
analystThat 22 million tons figure doesn't include RINL.
Ashok Kumar Panda
executiveNo, RINL isn't part of that 22 million tons.
Rashi
analystAll right, so that is…
Ashok Kumar Panda
executiveThe 22.5 million tons figure includes RINL.
Rashi
analystGot it — thanks. On that, what blend did you apply to the NSR for longer-than-flat? And separately, what was the blended NSR for the quarter?
Ashok Kumar Panda
executiveFor the fourth quarter, blended NSR came in at INR52,000 per ton, and in April it's roughly INR57,000 for April and May.
Rashi
analystAlright, and this will be my final question. Regarding the capital expenditure you brought up for IISCO, Bokaro, and Bhilai — if you were to break that down, how much capex applies to each of those projects individually: IISCO, Bokaro, and Bhilai?
Ashok Kumar Panda
executiveIISCO's capex comes to roughly INR36,000 crores — perhaps INR35,000 crores — while Bhilai, not yet announced, sits at about INR30,000 crores, and Bokaro lands somewhere near INR18,000 crores, or thereabouts.
Rashi
analystAnd what capacities would those be?
Ashok Kumar Panda
executiveAt IISCO, the matching capacity comes to roughly 4.5 million tons. For Bhilai, you're looking at about 3.5 million tons. Bokaro will likewise be at approximately 3 million tons.
Rashi
analystGot it. Thanks.
Operator
operatorThanks. We'll take the next question from Pallav Agarwal at Antique Stock Broking. The line is yours — go ahead.
Pallav Agarwal
analystMorning, and nice work on the strong results. On the EBITDA bridge in the presentation, I believe there’s also some raw material savings between the third and fourth quarters. Could you quantify that—I assume it mainly comes from coking coal cost. So can you put a number on what coking coal consumption cost was in Q3 and in Q4?
Ashok Kumar Panda
executiveSo, between Q3 and Q4, on raw metal — you're asking whether the price effect there is negative. In fact, coal prices in Q4 were higher than they were in quarter three, and that hit us by 272 crores. But when it comes to raw metal usage, improved usage in quarter four gave us a gain of roughly INR429 crores. So that has offset the impact of the input price increase.
Pallav Agarwal
analystAll right, so that comes down to PCI being lower and higher, plus a greater amount of oxygen.
Ashok Kumar Panda
executiveSince there’s more oxygen, higher PCI, and improved use of iron ore, and so on. And with quarter four being a dry month while production stayed fairly high, all the equipment was in good shape in quarter four after the capital repair. So performance came out stronger — operational efficiency improved, you could say, for that reason.
Pallav Agarwal
analystYes, sir. And also, regarding the iron ore mines we operate — is there any exposure at all to those mines reaching expiry in 2030, or will we avoid that issue stemming from the varying lease terms on our side?
Ashok Kumar Panda
executiveWe aren't dealing with measurement issues. From our perspective, output will rise since we produced 38 million tons last year, and this year we've maintained a target of 56 million tons, part of which will be sold. Looking ahead, we're working to ramp up to 80 million tons. So there aren't major problems. There are isolated cases, isolated issues. Those we're addressing as far as renewals go. On major renewals, no issues apart from the Chiria matter, which everyone is aware of. At Chiria mines, we're focused on securing that mining lease. It isn't a renewal. In fact, it's a new mining lease, so that would boost our capacity. But even so, today, whatever mining capacity we have, we're going to ramp up, and our mines are good enough. And there are no renewal issues there? No major renewal issues in those.
Pallav Agarwal
analystAbsolutely, and thanks for taking the question.
Operator
operatorThanks. We’ll take the next question from Ritesh Shah at Investec, who’s on the line. Go ahead.
Ritesh Shah
analystYeah. Hi sir. Thanks for the chance. So, three questions, sir. The first one: is there some way a government could allocate iron or a lease to any company? This is given that after the MMDR auctions, that's one route, but is it possible — say, if there's a backward district — for the government to allocate an iron ore mine to a company?
Ashok Kumar Panda
executiveA mine can be handed over by the government to any private firm via the auction mechanism, using the NPP process. So a defined procedure exists for doing that, and they are able to do it. As for allocation to publicity, that takes a separate route. The methodology differs. Everything differs.
Ritesh Shah
analystOkay, sir, I’m not sure I follow. You mentioned that allocation for the private sector can be done.
Ashok Kumar Panda
executiveYou can allocate via the auction route.
Ritesh Shah
analystJust via the auction channel. All right, all right. Yeah. Sir, my second question is this: sir, you mentioned a rail price revision, with the benefit probably arriving in FY27. If you had to consider, say, spot prices or the average pricing, is there a figure you would want to share? How large might the benefit be owing to the real price revision in FY27?
Ashok Kumar Panda
executiveWhat I actually said was that during ’24-’25, we had a rail price revision area of INR1,800 crores, and that amount went into the P&L account for ’24-’25. In ’25-’26, there really isn’t any price revision area. So even without that INR1,800 crores advantage in ’25-’26, we still posted 50% additional profit compared with ’24-’25. As for ’26-’27, we can’t say anything about whether we’ll benefit from rail price revision or whether rail price revision will turn negative for us. So at this point in time, things aren’t very clear.
Ritesh Shah
analystThanks. And sir, only one final question. You mentioned flats at INR51,000 and long sizes at INR53,400 for Q4, so I just wanted to get a sense of how much of that came from the price hikes that were implemented during March.
Ashok Kumar Panda
executiveDuring March, pricing for long products stood at INR55,500, while flat products came in at INR52,778.
Ritesh Shah
analystSir, I’m asking about the price increase that took place between 1st of March and, say, 31st of March, since there may be a benefit that will come into Q1.
Ashok Kumar Panda
executiveSo that works out to roughly INR1,400 a ton.
Ritesh Shah
analystSo that applies to longs as well as flats, correct?
Ashok Kumar Panda
executiveFor flat, that comes to INR1,400.
Ritesh Shah
analystAnd what about the longs?
Ashok Kumar Panda
executiveOne thousand five hundred rupees.
Ritesh Shah
analystAll right, that's great. I really appreciate your response, sir. Thanks a lot.
Operator
operatorThanks. Our following question comes from Parthiv Jhonsa at Anand Rathi, on the line. Go right ahead.
Parthiv Jhonsa
analystHello, and good morning, sir. Thanks for giving me the chance to ask. My first question concerns your debt levels. Given that, as you know, your balance sheet is in one of its strongest positions, and after a great many years, and, you know, you just mentioned that, you know, in the next year, ’27, your capex is INR15,000 crores, and eventually it will go to INR20,000 crores, INR22,000 crores over the following couple of years. Considering, you know, that your cash flows sit at similar levels, would that mean you will be funding a lot of this capex, you know, apart from intel accrual, with the majority of the capex coming in through debt basically over the next couple of years?
Ashok Kumar Panda
executiveRight. Let me say that we are actually working to increase both our steel output and our sales, and given a favorable market we'll aim to lift our profitability. Cost reduction will be a focus for us too. So looking ahead to ’26-’27, capex guidance stands at INR15,000 crores. Say it comes in at INR14,000 crores, or INR15,000 crores, we'll figure out how to cover it through internal accruals, since that is my — that is our own target. In other words, then, we will actually seek to raise profitability to a level where cash flows improve, meaning profit plus depreciation should generate a cash flow that can probably handle a large portion of this year's capex. But going forward, going forward, we are trying to hold profitability at that same level, and on top of that, the additional amount will come from long-term loans.
Parthiv Jhonsa
analystAll right. But you're looking at the cash flows, at the cash flow being sustained at the current level with steel prices staying roughly the same. Right. If steel prices happen to fall — maybe in the next couple of quarters, or a couple of years further out — then, even so, I think your balance sheet would have to — at the end of the day, you might need to borrow a larger amount.
Ashok Kumar Panda
executiveThat's what I'm getting at. Really, we're trying to raise our profitability on average across the years, because steel prices move differently in different quarters during the year, and it isn't just a journey of steel price. It's a journey of steel price plus coal price, and on top of that, our own operational efficiencies. We'll be focusing more on operational efficiency as well as on the special steel component so that we ramp up our kind of profitability as well. So this profitability, on an average over the year, across the various quarters in the year, should stay at a high level, by which we can fund our capex through internal equivalent. That's our expectation in this year, and we're working towards that.
Parthiv Jhonsa
analystAlright, so my second question relates to the guidance you’ve provided. What you’ve essentially put out there is 22 million tons, 22.5 million tons. In theory, you know, you’re sitting at an installed capacity of roughly 21.5 million tons. Even if you, you know, factor in a couple of minutes of debottlenecking, capacity utilization ends up above 90%, at 95%, which is practically unheard of in this industry. So how do you essentially justify that? At 21.5 million tons, or perhaps 22.5 million tons, you’re going to achieve utilization above 100% when theoretically that isn’t possible.
Ashok Kumar Panda
executiveActually, in steelmaking and ironmaking, theoretical calculations don't really hold up. That's what we've found through experience. When you provide better enablers and raw metals, BA productivity and blast furnace productivity levels go well past their DPR capacities. If DPR says 2.3, they can easily reach 3.3 productivity. That's what's happening with us, with JSW, with Tata Steel, and everyone. So there's inherently no theoretical capacity for a blast furnace or steel melt shop. It's just enablers, the raw metal, and the practices we improve, which let us easily exceed 100%. We've already witnessed this before, and more such things will be demonstrated going forward in the future.
Parthiv Jhonsa
analystAlso, if possible, could you share any threshold or cap that applies to leverage or to the net debt-to-equity ratio?
Ashok Kumar Panda
executiveAt present, our net debt-to-equity sits at roughly 0.33. Currently, the figure stands at 0.37. And as you mentioned, during this year we're working to lift profitability through a range of measures, and the debt level ought not to rise this year. That's the way we're viewing it. So if that holds, then 0.37 will drop further in '26-'27 should that play out. That, then, should leave substantial headroom for big capital expenditures down the road.
Parthiv Jhonsa
analystThat's really useful, sir. Thanks a lot, and good luck.
Ashok Kumar Panda
executiveAppreciate it.
Operator
operatorThanks. Our next question comes from Rajesh Majumdar at 36O ONE Capital. Your line is open.
Rajesh Majumdar
analystYes. Morning, sir, and thank you for the chance to speak. Sir, my first question concerned the steep cut in debt during this quarter. That was accomplished partly through selling off some inventories. So, given how sharply steel prices have risen and with the monsoon season approaching, do we expect some inventory build-up at this point, which would push working capital up somewhat again over the next few months?
Ashok Kumar Panda
executiveYeah. What we’re looking at — actually, on a personal level, we see no inventory increase in quarter one, though that’s a wish list. Again, it hinges on market conditions and geopolitical situations. For quarter one, we are looking at zero-zero. I mean, let’s examine that. Let’s see how it turns out. So, quarter one after quarter one, quarter two becomes a little sluggish, and again it will start picking up from quarter three onwards. Thus quarter three and quarter four will have a good amount of inventory reduction. So quarter two will be quite challenging as compared to quarter one. We are making our strategies towards that to see how less increase of inventory can take place during quarter one and mostly in quarter two so that all of that can be taken care of in quarter three and quarter four. We will attempt it for the reduction in inventory.
Rajesh Majumdar
analystAnd sir, my second question concerns the stainless steel operation we have. It's still losing money, and we have no expansion plans. So, do we have any plans regarding Salem? What do you intend to do with this asset?
Ashok Kumar Panda
executiveOkay, so where Salem is concerned, yes, you're right — they are losing money. But we're working on it: we have a plan in place to stem those losses and lift the EBITDA levels there. The key issue there is operational efficiency at the CR mill. At the CR mill, yield currently sits at just 84%, 83%, and we're aiming to push that up to 90%. We've also taken a few other steps, such as switching from LPG to PNG, which has delivered fairly solid gains. And we're looking at substituting costlier power with cheaper sources as well — that's the third one. As a result, production costs should come down. Fourth, we're trying to ramp up output at the mills, since they have spare capacity. Compared with the SMS, both the CR mill and the SR mill have spare capacity. So we'll feed stainless steel slabs sourced from imports to raise their capacity and their output. Management's guidance, then, is to raise production at the Salem steel plant, which will bring the losses down and put more stainless steel into the market. Once that's done, we'll examine whether further expansion there is feasible.
Rajesh Majumdar
analystAnd BISL? <<inaudible>>
Ashok Kumar Panda
executiveBISL is on that disinvestment list at the moment. So we're seeking some comfort from the government. Once we have that, we'll have some plan for specialty still.
Rajesh Majumdar
analystAlright, thank you.
Operator
operatorThanks very much, everyone. That question will be the final one for today. At this point, I'd like to give the conference back to Mr. Ashish Kejriwal so he can offer his closing remarks. Many thanks, and the floor is yours.
Ashish Kejriwal
analystYes. Thank you, Michelle, and thanks to all of you. Sir, I have one last quick question. There are two parts to it. First, given the sort of price increase we saw through April — and I should note that May was more or less, I'd say, a rollover from April — so, looking at where prices stand now, do you see any chance of a demand slowdown, or are buyers pushing back against the price hikes, and also given how government capex played out in the fourth quarter, do you think there might be some slowdown there, particularly in this environment amid the Middle East crisis? That's the first one. And second, on cost, you mentioned the rise in coking coal costs in the first quarter. But on overall cost guidance, if you could help us — what sort of cost increase are you seeing in the first quarter compared with the fourth quarter? That would be helpful. Thank you.
Ashok Kumar Panda
executiveOkay, so I'll walk you through my explanations, starting with demand. Broadly speaking, demand stays subdued in quarter one and quarter two, as we've all witnessed, since it follows stronger sales in quarter four. So destocking activity occurs in quarter one, which is happening now, and this time around it's present as well. Price levels sit at roughly the same point because internationally prices are climbing, and the dollar against the rupee is also weakening. As a result, landed cost stays fairly elevated. As far as flat prices go, we also have a safeguard duty in place, which is why the landed cost of imported goods is lower. That explains why imports aren't coming in at that large a volume. Still, demand is somewhat muted. It holds within those ranges across quarter one and quarter two, but afterward it begins rising again. So that covers the demand side. On the cost side, as we've mentioned, imported coal rates have gone up. So in April, roughly — say about how much — the quarter four average is approximately INR19,500, and at present it stands at INR21,500.
Ashok Kumar Panda
executiveSo you could say it's roughly an INR2,000 rise in quarter one versus quarter four. When you have that INR2,000 increase, it means the effect on production cost lands somewhere near INR1,400 to INR1,500, if you take into account coal development, blending with indigenous coal, et cetera, all combined. So as you can see, they indicate the cost impact will come to about INR1,400 to INR1,500 per ton. That, then, is the impact in quarter one arising from that. However, the NSR, the sales price levels, are providing support for this, and beyond that we'll need to lift our sales volumes so that inventory doesn't sit there, and it will give us working capital comfort for the company.
Ashish Kejriwal
analystPerfect. Thanks a lot — in that case, I’d like to ask you for our closing remarks.
Ashok Kumar Panda
executiveOkay, thanks a lot. I appreciate everyone staying with us through the patient hearing and the Q&A sessions. Despite a challenging situation abroad, the domestic market has stayed fairly steady, and the company keeps taking steps to improve efficiency and cut costs. Looking ahead, we hope to deliver stronger results and greater value addition for all our stakeholders. The Company is also committed to sustainable performance, with focus on decarbonization, better capacity utilization, value addition, and cost competitiveness both this year and in the future. I thank all our investors for the faith they have placed in us, and I hope that continues going forward. Thank you very much.
Operator
operator<<operator_signoff>>
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Steel Authority of India Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Steel Authority of India Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Steel Authority of India Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.