Sarda Energy & Minerals Limited (504614) Earnings Call Transcript & Summary
November 2, 2026
Earnings Call Speaker Segments
Operator
operatorGood day, ladies and gentlemen, and welcome to the Q2 FY '27 earnings call for Sarda Energy & Minerals Limited, hosted by Elara Securities India Private Limited. <<operator_script>> Kindly be aware that this conference is being recorded. I'll now turn the conference over to Ravi Sodah. Thank you, and over to you, sir.
Ravi Sodah
operatorGood evening, everyone. Speaking for Elara Capital, I'm glad to welcome all of you to this call covering Q2 FY '27 results for Sarda Energy & Minerals Limited. Joining us from Sarda Energy are Mr. Pankaj Sarda, our Managing Director; Manish Sarda, Deputy Managing Director; Padam Kumar Jain, Director and CFO; and Nilay Joshi, Executive Director. At this point I'll pass the conference over to Mr. Pankaj Sarda, who will give his opening remarks. Thank you.
Pankaj Sarda
executiveThank you, Mr. Ravi. Good evening, friends, and I appreciate your joining us for the Q2 and H1 FY '27 earnings call. I trust you've had a chance to go through the financial results and investor presentation, which are available on the stock exchanges and on our company website. For SEML, H1 FY '27 was a landmark period, delivering our highest ever half yearly EBITDA of INR 1,326 crores, an increase of roughly 4% year-on-year, along with PAT of INR 799 crores, up about 5%. Total income came in at INR 3,221 crores, while cash profit rose to INR 1,225 crores. In Q2 FY '27, we recalibrated captive power operations to align with market conditions, which allowed us to optimize our portfolio mix. That flexibility helped deliver EBITDA of INR 564 crores and PAT of INR 320 crores, on total income of INR 1,505 crores. This performance, achieved despite planned maintenance shutdowns and operational outages, shows the strength of our underlying businesses and the advantages of our integrated operating model. Let me now walk you through our operational highlights. One key operational highlight this quarter was our entry into manganese ore mining, having secured preferred bidder status for the Avagudem manganese block in Andhra Pradesh. We expect operations to commence in approximately 12 to 14 months.
Pankaj Sarda
executiveAs soon as it's up and running, this mine is going to reinforce our backward integration, give us better security on raw materials, and sharpen our cost competitiveness — which should drive stronger profitability in the ferro alloys business. Right now, our priority is getting the approvals we need so mining can resume. Turning to production, we hit our highest half-yearly pellet output ever — 4,29,059 tonnes at Raipur. At Raipur, the replacement 30-megawatt turbo generator started up in August 2026, and it's running smoothly at full capacity, which supports captive power generation and steel production. At our 600-megawatt thermal power plant, the planned maintenance on one 300-megawatt unit wrapped up after a 47-day shutdown during the quarter. Since we took over this thermal power project asset, we've had to carry out several maintenance shutdowns over the last 2 years, because it was a distressed asset that hadn't received proper maintenance care, and that was holding it back from reaching optimum performance levels. With the maintenance cycles we've completed over the last 2 years, we're now confident the plant will function efficiently, and we expect both cost savings in operations and higher generation going forward. Our hydropower operations put in a strong performance during the quarter, even with lower rainfall in some catchment areas and an 18-day shutdown of the 113-megawatt Sikkim plant from 18th June to 5th July after a transmission tower collapsed.
Pankaj Sarda
executiveIn addition to thermal power, hydropower continues to play a significant role in our long-term energy strategy. Let me give you an update now on our expansion plan. Regarding the 600-megawatt thermal power project, the Ministry of Environment, Forest, and Climate Changes has approved the terms of reference for raising capacity from 600 megawatts to 1,200 megawatts. We anticipate receiving environmental clearance during the current financial year. This brownfield expansion continues to be among our most capital-efficient growth opportunities, backed by existing land, water availability, material handling systems, and power evacuation infrastructure. The approval process for our 3 small hydropower projects in Chhattisgarh, with a combined capacity of 74 megawatts, is moving forward as scheduled. Our 50-megawatt captive solar project is expected to be commissioned next quarter, subject to resolution of right-of-way issues affecting the transmission line. This project will contribute to our captive renewable energy capacity. For our recently acquired 66-megawatt hydropower project in Arunachal Pradesh, most key statutory approvals are in place and critical land acquisition has been completed. Work on the approach road has begun, and we remain confident of meeting the planned project timelines. Turning to mining, development of the Shahpur West high-grade coal mine continues on schedule, with commissioning targeted before the end of the current financial year.
Pankaj Sarda
executiveThe Bartunga Hill coal mine is still on track, and we expect it to open by the close of the next financial year. At the Gare Palma IV/5 and Senduri coal blocks, regulatory approvals are continuing to advance according to plan. We continue to manage our balance sheet prudently, with every ongoing expansion project financed through internal accruals. On both a standalone and a consolidated basis, we remain net debt-free, and as of 30th September 2026 our liquidity exceeded INR 2,600 crores. Our financial strength was reflected further in a 1-notch upgrade of SEML's credit rating by CRISIL, from AA- to AA, along with a 2-notch upgrade at Sarda Metals & Alloys Limited, whose rating went from A to AA-. This strong financial position gives us the flexibility to carry out our growth plans while keeping financial discipline in place. Going forward, timely project execution and deeper integration across mining, energy, and metals remain our priorities. Our increased emphasis on energy reflects its earning potential, and our integrated operations let us respond to market conditions and direct resources toward better returns. We believe this approach will strengthen earnings and visibility and support sustainable value creation. With that, I'll hand over to Mr. Manish Sarda, who will take you through the industry environment and outlook.
Manish Sarda
executiveGood afternoon, everyone, and thank you, Pankaj. Businesses that have dependable generation assets and access to domestic resources keep finding opportunities in India's growing energy needs. Power generation across the country rose 11% year-on-year in the quarter, reaching roughly 536 billion units. Peak power demand climbed 18% to 270 gigawatt, setting a new high for the second quarter. Even as India brings more renewable capacity online, dependable power is still needed at different hours of the day. Solar generation for the quarter was up 39% year-on-year. Given how quickly renewable energy is being developed, we believe a diversified generation portfolio backed by fuel security and efficient operations is well positioned to meet the country's changing energy needs. The government's ongoing emphasis on developing domestic resources makes the opportunity larger for SEML's integrated mining and energy business. By expanding our mining capabilities alongside our power portfolio, we will deepen that integration and reinforce the operating base for growth ahead. Our move into manganese ore mining creates one more opportunity to enhance raw material security and cost competitiveness in ferro alloys. Domestic steel consumption kept rising as well, helped by the country's industrial and infrastructure needs. We continue to concentrate on what our metals and ferro alloys business contributes within the integrated portfolio, with operating decisions steered by profitability and by using our resources efficiently.
Manish Sarda
executiveWith that in mind, we think SEML is strongly positioned thanks to its integrated footprint spanning mining, energy, and metals. Energy accounted for over 73% to 75% of H1 EBITDA, which shows how important it is to our earnings profile. Our focus on this business is backed by existing generation assets, mining capabilities, and a pipeline of expansions. At the same time, our diversified operations let us capture synergies and react to shifts in relative profitability. Looking further out, government programs such as Viksit Bharat 2047, Make in India, and Atmanirbhar Bharat keep supporting investment in manufacturing and industrial infrastructure. Our plans to quadruple mining capacity and double energy generation capacity fit well with these opportunities. Our priority is turning these investments into dependable operations, stronger earnings, and sustainable returns. We are confident that our integrated model and ongoing execution focus will create lasting value for all stakeholders. With that, we would be glad to take your questions. Thank you.
Operator
operator<<operator_script>> Our first question comes from Mallika with Agarwal Investment.
Analyst
analystSo my question is this — in what way is the Avagudem manganese mine going to make raw material integration stronger? And what share of captive requirements is it able to cover? Also, when ought its cost benefits to begin showing up in ferro alloy profitability?
Manish Sarda
executiveAlright, so the Avagudem mines that we've recently acquired — it's going to take a bit of time before they're up and running, since we're in the process of filing all the necessary paperwork. And we anticipate being able to save between INR 200 and INR 300 per tonne. That mine holds 4,50,000 tonnes of extractable reserves in total. You see, we typically need only a small quantity of low-grade ore in order to economize our high-grade ore, which we bring in from Australia, Gabon, and South Africa. So we expect that over the coming few months, we'll have a clearer picture of when we can get started, once the paperwork has been filed and everything is complete, and it should save roughly INR 200 to INR 400. The precise figures will emerge once we actually begin mining. But it provides us with raw material security for our low-grade ores over the next 4 to 5 years.
Analyst
analystSir, I just had one — another question. What does the investment look like?
Manish Sarda
executiveSo it was already an operating mine. Someone else was already running it. The lease had expired, and we acquired it via the auction process. And we'll be verifying all of the costs. We have rough estimates. On that basis, we went through the auction, and we took part in it. But it wouldn't be prudent to say anything at this point until we've confirmed what the situation actually is on the ground.
Analyst
analystIs there anything else along those lines you’d like?
Manish Sarda
executiveYes, we are always on the hunt for mines that could give our whole operation greater raw material security, since we operate ferro alloys plants in both Raipur and Visakhapatnam. So we are actively searching in Maharashtra, which is logistically nearer to Raipur, as well as Madhya Pradesh and Maharashtra — all those regions that are closer to Raipur — and in Andhra and Orissa, the areas nearer to our Andhra plant. So we are constantly watching for opportunities. And should an international opportunity in manganese come up as well, we are keeping an eye out for that too.
Analyst
analystNice work on this quarter.
Operator
operator<<operator_script>> Our following question comes from Deepak Kumar, who is an individual investor.
Speaker
unknownMy question is, what distinguishes the 2 shutdowns? One was taken in December and January for 300 megawatt, and the one you have just completed was for 600 megawatt. So what is the difference, and what gets impacted on the top line?
Pankaj Sarda
executiveWe have 2 power generating units, each at 300 megawatts. And in alternating years, each unit generally needs to be taken down for a shutdown. Last year, we took 1 unit down. This year, we've taken the other unit down.
Speaker
unknownSo then, when it comes to the top line, you mentioned that this unit is under a lot of stress, and since we developed it, will that have an effect on our top line?
Pankaj Sarda
executiveNo, it won’t. It’ll go past last year’s generation. It’ll improve our generation capacity even more. Yes, for the quarter, it has had an impact, but across the full year, we will be above last year’s generation.
Speaker
unknownSo for this quarter, we don't need any shutdown, right?
Pankaj Sarda
executiveNo, shutting down isn’t necessary at all. For this quarter and the one after, no shutdown will be needed in the ordinary course.
Speaker
unknownMoving to my next question: you've scheduled a 47-day shutdown for the 600-megawatt plant, and yet your unit performed quite well—you only deferred 200 million units versus the actual figure. So what's the reason behind that? Is this a partial shutdown, or half of one?
Pankaj Sarda
executiveNo, this involves shutting down just 1 unit that's 300 megawatt. A single unit had been running at full capacity.
Speaker
unknownWhat you put in the pamphlet is 600 megawatts to mention. That's the reason I...
Pankaj Sarda
executiveActually, no — the unit that was shut down is a 300-megawatt one. As I mentioned, each year we have to take one unit offline for between 30 days and 40 days, depending on how that unit is doing. Typically, it falls around 30 days.
Operator
operatorMoving on, our next question comes from Tina Maheshwari, who is on the line from OP Equity Advisor.
Analyst
analystCongrats on the result. My question is this: since energy made up more than 75% of H1 EBITDA, how do you expect thermal and hydropower earnings to scale up? And in H2 FY '27, what generation and profitability levels can be reached?
Pankaj Sarda
executiveFor hydro, yes, H2 profitability is definitely on the lower side, given the seasonal conditions. And for thermal, it will be substantially higher, thanks to better market conditions along with greater generation in the second half.
Operator
operator<<operator_script>> Our following question comes from Atharv, who is calling as an individual investor.
Speaker
unknownI'd like to ask you this: now that we've hit record actual pellet production, how much room is there to push capacity utilization even higher? And in H2 FY '27, how do you expect pellet demand realizations and margins to develop?
Pankaj Sarda
executiveRegarding capacity utilization, for thermal power plants — IPP thermal power plants — it's going to get better during the second half, as we've already mentioned. The reason is that during the first half, utilization levels were lower. As for the rest of the other plants, it varies; with steel plants, that is. For iron ore pellet, things should stay more or less along the same lines. Sponge iron as well should stay along the same lines. When it comes to billets and wire, that will hinge on market conditions — specifically, at what price we can sell the power. If we're selling power at remunerative prices, production may be lower. If we're getting a normal price for power realization, then we may see higher production from — in the steel billet and wire.
Speaker
unknownAnd I had one more thing as well. My follow-up question is this: what's the situation with the realization in steel, and what are you expecting over the next few quarters?
Pankaj Sarda
executiveManish?
Manish Sarda
executiveYes. Can you hear me?
Speaker
unknownIs this coming through okay? I'd like to ask about the steel realization and what your expectations are for the quarters ahead?
Manish Sarda
executiveSteel, when you look at it, is generally strong at the moment, and the flat segment in particular is holding up better than the long sections. We're also hopeful that steel stays firm through the coming quarter and that realizations hold at decent levels. However, we're dealing with a serious problem on logistics costs, driven by elevated crude prices. So the next quarter is somewhat hard to predict, but demand is still holding up better.
Speaker
unknownCould you put a number on the logistics cost?
Manish Sarda
executiveWhat's the way to put a number on logistics costs? Take all that imported coal arriving from South Africa — typically, freight runs about $18 to $22 for a vessel of 50,000 tonnes. Right now, bulk freight is sitting near $36 to $38. So the increase is easy to picture. That makes coal somewhat pricier when it comes to producing steel. Coking coal out of Australia has climbed very, very high. This time of year brings plenty of flooding in Australia, which hits the coking coal mines, and prices in December are usually elevated — the December-Jan period. So the raw material side will feel a bit of a squeeze from the logistics problems. Beyond that, though, the steel cycle appears to be in good shape.
Pankaj Sarda
executiveAnd I’d also like to mention here that India’s mining sites have been flooded as well, due to the intense monsoon rains we experienced. So for that reason too, output capacity at most mines is at its lowest point. That’s why raw material prices in the country have climbed so sharply as a result. This should ease over the next 2 to 3 months.
Manish Sarda
executiveWhen you look at flat steel prices, they're sitting near INR 75,000 to INR 77,000. And for long product pricing in Mumbai, at some locations, it's even approaching INR 54,000. So pricing has gone up considerably, but in the coming quarters all of us need to gauge how tight the squeeze will get, and whether the tensions in West Asia might ease, since that would relieve a great deal of the pressure on logistics.
Pankaj Sarda
executiveThat said, a portion of the coal we need is being supplied by our captive coal mines.
Manish Sarda
executiveYes, that's correct. We own coal mines ourselves, and our own needs are covered by them, so we're somewhat isolated.
Speaker
unknownWell done on the great results for H1.
Operator
operatorOur next question comes from Kamlesh Bagmar, who is calling in from Lotus Asset Management.
Kamlesh Bagmar
analystSir, just a single housekeeping item from me. What realization did we record on hydropower sales and on thermal power sales for SKS during this quarter? And looking ahead, what level of realizations should we expect? Which realization figures ought we to build into our assumptions?
Pankaj Sarda
executiveThis quarter, thermal power realization came in at roughly INR 5.30.
Kamlesh Bagmar
analystAnd what about hydropower, sir?
Pankaj Sarda
executiveAnd when it comes to hydropower, that figure came in above INR 6.
Kamlesh Bagmar
analystAnd as we move ahead—how we're contracting, whether through PPAs or bilateral arrangements and all of that—next year, or in the second half, what realizations can we factor in there? Because there's just so much <<inaudible>> in the market.
Pankaj Sarda
executiveThe audio on your end isn't coming through clearly.
Manish Sarda
executiveYeah, the voice is pretty muffled.
Kamlesh Bagmar
analystSir, I’d like to ask what realizations we can factor in for the coming year, for both hydro as well as thermal.
Pankaj Sarda
executiveFor the back half, pricing ought to come in considerably stronger compared with what we delivered in Q1, since the situation around power demand looks quite different.
Kamlesh Bagmar
analystAnd sir, on thermal, what percentage of capacity do we have tied up at this point?
Pankaj Sarda
executiveWe've secured 60% of the power we have available to sell.
Kamlesh Bagmar
analystIn hydro, for example — I think Sikkim and that other part is still untied there.
Pankaj Sarda
executiveYes, Sikkim is untied.
Kamlesh Bagmar
analystAnd what we'd like to do is...
Pankaj Sarda
executiveBut as for the remaining hydro projects — leaving Sikkim aside — every one of those is basically stuck.
Manish Sarda
executiveSikkim, as far as strategy goes, we don't have that — it isn't in place.
Operator
operator<<operator_script>> Our following question comes from Deepak Kumar, who is an individual investor.
Speaker
unknown<<inaudible>>
Pankaj Sarda
executive<<foreign_lang>> the pricing is stronger than the levels we saw during July and August. <<foreign_lang>> this is due to the fact that we scheduled our shutdown during the rainy season, a period when prices are not at their peak.
Speaker
unknownThis time, you didn't give any indication either.
Pankaj Sarda
executiveNo, it was hinted at. No, no. It was — even during the previous investor call, there was mention that a shutdown would be taken.
Operator
operatorOur following question comes from Vivek Sharma at KNM Advisor.
Analyst
analystTo start, well done on these results — you've just posted your best first-half EBITDA, north of INR 1,300 crores. I'd like to ask about what the main growth drivers are that could keep this momentum going? That's the first thing. And second, what revenue and EBITDA growth targets are you expecting for the whole of FY '27?
Pankaj Sarda
executiveThe better results, especially coming out of hydropower and thermal power, have played a part in the stronger profitability. We look for that to carry on through the second half as well. Putting an exact number on it is going to be quite hard, since the pricing picture is shifting constantly across every segment.
Analyst
analystSo is it possible for us to exceed INR 2,500 crore in FY '27?
Pankaj Sarda
executiveWe aren’t providing any forward guidance.
Manish Sarda
executiveThat is quite speculative, honestly, so we aren't providing any forward guidance on numbers.
Operator
operatorOur next question comes from Priyansh Lakhotia, who is an individual investor.
Speaker
unknownMy first question is this: when we look at segment revenue on a quarter-on-quarter basis, steel revenue has fallen by roughly INR 49 crore, while power sales are lower by INR 138 crore. So for a like-for-like view of how these segments actually performed, I believe we need to strip out the effects of the 300 megawatt power unit being shut down and the 30 megawatt turbine replacement in steel. Could you therefore tell us how much revenue the power segment lost in Q2 because of the shutdown of that 300 megawatt plant? And how much revenue loss in quarter 2 came from the turbine replacement?
Pankaj Sarda
executiveIf we assume production of 400 crore units annually, that's INR 400 crore from 1 unit in 1 quarter. So with 25 crore units, roughly INR 130 crores, INR 140 crores of revenue was lost due to the unit's shutdown.
Speaker
unknownIs that regarding the 300 megawatt one?
Pankaj Sarda
executiveYeah, 300 megawatt.
Speaker
unknownSo roughly 120. And what about the steel segment?
Pankaj Sarda
executiveOn the steel side, our billet plant and wire rod plant have been idle — the reason being that we were selling that power into the market instead. That's what drove the revenue shortfall.
Speaker
unknownAnd following on from that, do you expect any additional plant shutdowns over the next 12 months? If so, which quarter, and how much capacity should be factored in for these 3 segments — across all 3 segments?
Pankaj Sarda
executiveAs for this year, we don't expect any thermal power plant shutdown in the next half year. Next year, 1 unit will definitely be shut down again for 30 days—30-40 days, whatever it is—depending on the unit's condition. For the current financial year, no major shutdown is planned.
Speaker
unknownMy second question is this: during Q1 and Q2, what did power realize on average per unit in the spot market for the Sikkim hydropower project? And for the Sikkim hydropower, what was the average realization per unit in the spot market during the month of October?
Pankaj Sarda
executiveThose October numbers might not be easy to get right away. Across 6 months, we've brought in over INR 6 per unit from the Sikkim hydropower project.
Speaker
unknownIt was above INR 6 for each unit, right? And that applied to both Q1 and Q2?
Pankaj Sarda
executiveYes — adding up to 6 months.
Speaker
unknownAlright, six months. And for the SKS Power Thermal Plant, what was that same average realization power per unit in the spot market — and likewise for Q1, Q2, and October?
Pankaj Sarda
executiveIt came in at INR 5.28. As for the SKS Power Project, we brought in INR 5.42 during the second quarter.
Speaker
unknownNo — that’s for the SKS Power Thermal Plant.
Pankaj Sarda
executiveYeah, yeah.
Speaker
unknownAnd that was 5 rupees as well, correct?
Pankaj Sarda
executiveIt's above INR 5. Somewhere between INR 5.20 and INR 5.50 — roughly in that INR 5.20 to INR 5.50 band.
Speaker
unknownSomewhere in the range of INR 5.20 to INR 5.50. Then, for my last question, I'd like to know how the average realization for iron ore pellets looked in Q1, in Q2, and in October.
Pankaj Sarda
executiveFor quarter 1, that figure came to roughly INR 10,000, and in quarter 2 it was a bit lower — around INR 9,800 per tonne.
Operator
operator<<operator_script>> Our following question comes from Hina Parekh, who is calling in from Star Investments.
Analyst
analystMy question concerned the SKS plant. So now that the maintenance program at SKS is done, what utilization levels and incremental generation is that 600 megawatt thermal power plant able to reach in the coming H2 of FY '27?
Pankaj Sarda
executiveCould you say that question again, please?
Analyst
analystPardon me? Could you ask me that again?
Pankaj Sarda
executiveYes, absolutely, go right ahead.
Analyst
analystYes, that question concerns the SKS plant. So now that the maintenance program at SKS has finished, what utilization levels and incremental generation is the thermal power able to achieve in H2?
Pankaj Sarda
executiveDuring the first half, we hit 202 crore units. And across the full year, we're expecting to go past 420 crores.
Analyst
analystFour hundred, correct?
Pankaj Sarda
executiveFor the entire year, it comes to 20 crores.
Analyst
analystI had another question. What's the latest on the SKS environmental clearance?
Manish Sarda
executiveMa'am, as I also noted in my opening remarks, we've received the TOR — the terms of reference — from the MoEF, and we expect to obtain the environment clearance during this financial year.
Analyst
analystI believe that covers everything—I mean, the majority of it has been addressed. Many thanks, and best wishes to you.
Operator
operatorSince nobody has any additional questions, I'd like at this point to pass the conference back to Mr. Jain for his closing remarks.
Padam Jain
executiveThanks to all of you for joining today's earnings call. We finished the first half with record EBITDA, better profitability, and advancement on our strategic priorities. Energy remains the foundation of our earnings. Record pellet production shows what our operating asset can do. And moving into manganese ore mining boosts our chance for greater integration. Our attention stays on carrying out our expansion plans while keeping financial discipline and a strong balance sheet. Thank you for your ongoing support. Should you have any additional questions, please contact us or our investor relations team. We look forward to talking with you again next quarter. Have a wonderful evening. Thank you.
Operator
operatorMuch appreciated. That brings this call to a close on behalf of Sarda Energy & Minerals. We’re grateful you joined us, and at this point you can go ahead and disconnect your lines. Thanks again.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Sarda Energy & Minerals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Sarda Energy & Minerals Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Sarda Energy & Minerals Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.