Good morning, everyone, and welcome to the presentation of our second quarter results for 2026. It has been a solid quarter, one in which we reached a number of significant milestones. Our strategy of pursuing value-creating growth at a rapid pace across the markets where we operate keeps delivering. Through the quarter, we kept bringing projects into operation, we kicked off construction on new ones, and we added further new projects to our backlog. Demand for renewable energy, we believe, will keep rising. Scatec works in countries where the underlying need for clean, reliable, and affordable renewable power is strong and growing. In the markets we serve, renewables are the most competitive energy source around. That rests on ongoing cost reductions and technological innovation across every technology: solar, wind, and batteries. On that basis, we are able to supply not only intermittent power but also flexible and baseload power at competitive prices in the markets where we operate. On top of that, given the difficult conditions currently seen in global energy markets, long-term predictability and energy security matter more and more. That, too, will keep fueling demand for renewables in our markets. So we now see an intention to speed up the energy transition for economic reasons.

Terje Pilskog

executive
#2

The rationale for renewables is growing increasingly compelling and clear to key stakeholders, government officials, and decision-makers in the markets where we operate, and we keep seeing a clear intent to speed up the shift toward renewable energy in those markets. I'll walk you through the quarter's highlights, Hans Jakob will cover the financials, and then we'll return to take questions at the end. Our growth momentum is carrying on, and in the quarter we achieved commercial operation for 3 projects, amounting to 705 megawatts of solar plus 16 megawatt-hours of battery storage. A major milestone for us was hitting COD on the entire Obelisk project — Phase 2 of the Obelisk project. That was achieved ahead of schedule and well within budget. I'll return to this shortly. On the financial side, we posted proportionate revenues of 2.3 billion and EBITDA of 1 billion. In our D&C segment, we recorded revenues of 1.2 billion with an EBITDA of 234 million, on a gross margin of 24%. This strong result once more shows the strength of the integrated model and the strength of our execution capabilities. We also have a record-high backlog and near-term growth.

Terje Pilskog

executive
#3

Given the backlog we currently hold, we're positioned to double our generation capacity within the next 2 to 3 years. Seeing progress across all the main technologies—solar, wind, and battery storage—as well as across multiple countries and multiple geographies is encouraging. As I mentioned, all of these technologies will make up a growing share of future energy systems. It's great to see us keep building experience, capabilities, and a track record across all of these technologies. This morning, we also announced our intention to refinance our most expensive corporate financing. That aligns with our strategy of continuing to take down debt at the corporate level and continuing to reduce our financing costs. Reaching COD for the Obelisk project is a major milestone for us and, obviously, a very proud moment for us. Obelisk is the largest renewable energy project in Africa. We expect it to produce more than 3 terawatt-hours of energy annually, and we also expect it to contribute by reducing CO2 emissions in the range of 1.3 million tonnes annually. Again, this project is evidence of the strength of the integrated business model. With the integrated business model, we're able to move swiftly from development into construction, we're able to control the quality and the pace of construction during the execution phase, and we're able to extract value creation in a capital-efficient manner through the projects.

Terje Pilskog

executive
#4

Obelisk hit COD earlier than planned and came in under the construction budget. Starting from when we signed the PPA in September 2024, it took us roughly nine months to reach financial close and notice to proceed, 17 months to get to Phase 1 COD, with 100% of the battery storage capacity included, and 23 months to reach COD for the entire plant. That's a remarkable accomplishment for our team and for our partners as well, and it also shows how quickly renewables can be deployed, which is a major advantage of renewables. You'll also notice, looking at the figures we've communicated, that the D&C margin communicated at the start of the project was enough to cover the 40% equity stake we have now sold down to in the project, so from that standpoint we're also capital-neutral. That's obviously before the extra value we've captured through strong and disciplined execution and through being able to release contingency and cut costs on the project. Going forward, we intend to use the same model and the same approach on the next three projects we've secured in Egypt. Those projects are, first, what we refer to as the Damietta project, the one with Egypt Aluminium, which in principle is a copy of the Obelisk project, 1.1 gigawatts and 200 megawatt-hours of batteries, where we'll deliver energy to Egypt Aluminium, the biggest aluminium producer in Egypt and the biggest energy consumer in Egypt.

Terje Pilskog

executive
#5

This marks our initial project, and it's the first private PPA in Egypt to carry a sovereign guarantee as well. Next there's Energy Valley, where the PPA was signed in January this year — roughly 2 gigawatts of solar plus 4 gigawatt-hours of battery storage. In this project we'll be placing battery storage at particular grid locations where grid capacity is scarce. Beyond that, the project will also be capable of delivering a portion of the energy around the clock, 24/7. Lastly, there's Shadwan, the 900-megawatt wind project. Across all three of these projects, our intention is to hit financial close and begin construction within the coming six months. That clearly amounts to a sizable pipeline built squarely on the capabilities, the experience, and the partnerships we've been developing in Egypt over the past couple of years. Power production for the quarter reached 1.1 terawatt-hours. That's a 21% increase from 940 gigawatt-hours in the same quarter a year earlier. The increase is mainly due to new projects coming into operation, which added 278 gigawatt-hours during the quarter. During the last 12 months, several projects have reached COD: Grootfontein in South Africa, the Mmamabula solar complex in Botswana, two projects in Tunisia — Sidi Bouzid and Tozeur — and, of course, the Obelisk project in Egypt as well.

Terje Pilskog

executive
#6

Conversely, we saw reduced output from power plants already in operation across the Philippines, Ukraine, and South Africa, and that partially offset what the new projects added. Moving to revenues, power production revenues reached just over 1 billion, marking a 4% decline versus the same quarter a year earlier, once you adjust for the one-off effect in the Philippines tied to last year's tariff adjustment. Revenues from new projects came to 83 million then, and several specific non-recurring effects — particularly in Ukraine and South Africa — offset that. To sum up, the growth portfolio is beginning to make a meaningful contribution. With additional projects hitting COD in the quarters ahead, that new project contribution should keep building, and we anticipate a generation base that grows and becomes increasingly resilient going forward. I'd also like to offer a couple of remarks about our position in the Philippines via SNAP, the JV we hold with the Aboitiz Group. In the Philippines we had a good quarter, and there we keep demonstrating how robust our hydropower and battery storage portfolio is. On volumes, generation came in lower because of hydrology and the early impact of El Niño, with power produced at only 64 gigawatt-hours versus the 106 gigawatt-hours recorded in Q2 last year.

Terje Pilskog

executive
#7

Even with a big drop in water inflow and generation volumes, we still brought in 244 million in revenues for the quarter, compared with 262 million in revenues in the same quarter last year, and EBITDA for the quarter came to 201 million. That really shows the worth of our flexible, diversified generation portfolio, our position in ancillary services, and the merchant operations and trading capabilities we have in SNAP. Ancillary services brought in 199 million in revenues, while contract and spot energy revenues accounted for 45 million. Spot prices during the quarter were also much higher than in the same quarter last year, at 9.6 pesos per kilowatt-hour versus 6 pesos per kilowatt-hour last year. We're also seeing prices in the ancillary services market hold up strongly during the quarter. Obviously, we'll return to the outlook, but the likelihood of a strong El Niño heading into Q4 and on into 2027 remains quite high. On the other hand, we also expect prices to remain elevated in both energy and ancillary services, and by year-end we're aiming to add more battery storage capacity to the portfolio.

Terje Pilskog

executive
#8

Moving on to D&C, performance in that segment was very strong this quarter. As for the construction portfolio, we presently have 792 megawatts of solar and 77 megawatts of wind — reflecting the announcement we made yesterday evening — plus 571 megawatt-hours of battery storage under construction across six markets. That portfolio is high-quality and well-diversified. Turning to financial performance, we posted a D&C gross margin of 24%, which includes the contingency release in Obelisk, and the underlying margin remains a solid 11%. On project milestones, Obelisk Phase 2, Rio Urucuia, and Magat BESS 2 each achieved commercial operation in the quarter, while Sidi Bouzid 2 in Tunisia and Urleasca in Romania have begun construction, adding 120 megawatts of solar and 77 megawatts of wind to our construction portfolio. The remaining contract portfolio is now valued at 3.8 billion, we still hold a significant secured revenue outlook in the D&C segment, and we continue to expect at least 10% to 12% gross margins across the portfolio. Looking ahead, we expect Mogobe BESS and Briger BESS — the two BESS projects in South Africa and the Philippines — to reach commercial operation by the end of this year, with four more projects following in the first half of 2027 across the Philippines, Colombia, and South Africa as well.

Terje Pilskog

executive
#9

I'm really happy with how construction is going on the projects throughout our portfolio, and I believe our team is doing an excellent job maintaining control and moving these projects ahead in a disciplined manner. Let me also take you through our gross portfolio now. We've now hit 5.7 gigawatts of generation capacity in operation. That comes after Obelisk and Rio Urucuia were completed, and it's up from 5 gigawatts only one quarter ago. At present we have 0.9 gigawatts under construction along with a backlog of 5.8 gigawatts, and taken together that gives us a near-term portfolio of 12.3 gigawatts, which represents more than 100% growth that we aim to achieve over the coming two to three years in terms of generation portfolio. Then when it comes to battery storage, the growth is even more remarkable. We have 1.4 gigawatt-hours in operation and 0.6 gigawatt-hours in construction. Beyond that, we have a backlog of 4.8 gigawatt-hours. That brings the near-term portfolio for battery storage to 6.8 gigawatt-hours, and that is almost five times what we have in operation today. This shows the strategic importance and competitiveness of battery storage within power systems, and it will serve as a significant value creation tool and area for us going forward.

Terje Pilskog

executive
#10

Beyond that near-term portfolio, there's also a pipeline of 5.9 gigawatts of generation capacity, plus a pipeline of 2.4 gigawatt-hours of additional storage. That gives us more growth potential and visibility past our backlog. And obviously, beyond that as well, we keep working actively on new project opportunities throughout our markets. As I mentioned, we aim to realize the projects under construction and in backlog over the coming two to three years. All of them meet our hurdles, and they offer attractive returns and margins and can be realized in a capital-efficient way, based on the integrated model I've already discussed. Now let's look at what we're doing in Romania. Romania is emerging as a very promising growth market for renewables, and I want to walk you through some of the rationale for our investments there. First, Romania is a market with attractive renewables growth potential. Right now the market has strong tailwinds and significant renewable energy targets in the range of 8 gigawatts. The drivers for renewable energy growth in that market are obviously increasing electrification, the fact that they are phasing down and have a target to phase down on coal, they have a dedicated CfD scheme, contract for differences scheme, for renewables, and this is a scheme that is being backed by the EU and funded by the EU, and on top of this, there are also incentives for storage.

Terje Pilskog

executive
#11

Second, the market provides contracted revenues that are predictable over the long term. The CfD scheme makes long-term cash flows possible in hard currency, and obviously that lets us apply our traditional model and obtain non-recourse project finance to back these projects. We can also put our traditional integrated model to work, so that over time we can capture value through D&C and other services as well. And finally, Romania offers chances for additional value creation beyond those contracted cash flows. In Romania, a merchant energy market exists with attractive prices, and on top of that, price volatility across both energy sales and ancillary services. We can capture value from this on the basis of a flexible and diversified portfolio of solar, wind, and battery storage, and battery is an essential element of the total portfolio here. Obviously our experience from operating in merchant markets, which we have, for instance, from the Philippines, is also something we can transfer into upcoming growth markets like this one in Romania. Now we have three projects in Romania. We have Dobrun and Sadova, 190 megawatts of solar, and Urleasca wind of 77 megawatts of wind that is already in construction. Today we are also announcing that we have added Buciumeni, a BESS project of 178 gigawatt-hours, to our backlog, which we will also aim to move into construction relatively soon.

Terje Pilskog

executive
#12

So this is a collection of projects that come with appealing long-term contracted revenues, while at the same time the portfolio gives us flexibility to shield ourselves on the downside and to grab upside in the energy market as prices move around. That gives us a solid starting platform for more growth in a market where we see considerable chances to create additional value down the road. With that, I'll pass things to Hans Jakob, who will walk us through the financials.

Hans Jakob Hegge

executive
#13

Thanks, Terje. We posted robust results throughout the group, with elevated D&C activity in a solid quarter, including in the Philippines. I'll take you through the group's financials and how each of our operating segments performed, and I'll also discuss the enhancements we've made to our capital structure. Turning to the quarter at group level, our D&C activity keeps producing healthy revenues, which benefits our proportionate financials. Consolidated revenue came in at 1.37 billion, versus 1.3 billion in the same quarter a year ago. That figure includes 255 million of construction revenues tied to our Lyra JV in South Africa, whose EBITDA margin is lower than that of our power-producing assets. EBITDA came to 824 million, against 1 billion. The shift is chiefly attributable to a one-off in the Philippines during the same quarter last year. Proportionate revenues were 2.3 billion, matching the same quarter a year earlier, while proportionate EBITDA was 1 billion, versus 1.1 billion year-on-year. Now let me walk you through the segments, beginning with power production. We generated revenues of 1 billion, compared with 1.3 billion in the same quarter last year. The main explanation was last year's 231 million one-off in the Philippines linked to the new ancillary services tariff.

Hans Jakob Hegge

executive
#14

EBITDA came in at 805 million. Over the past 12 months, revenues of 4.2 billion and EBITDA of 3.2 billion were delivered. That gap is largely accounted for by lower revenues from divested assets and the one-off in the Philippines. All in all, we're quite happy with the value our operating assets have generated. Turning to development and construction, activity is high, and proportionate revenue reached 1.2 billion versus 976 million last year. EBITDA was 234 million versus 49 million. This stemmed from a 160 million contingency release on Obelisk Phase 2. That contingency release results from executing the project on time and cost-efficiently. The past 12 months' trend affirmed the long-term strength and scalability of our D&C business. D&C revenues over the last 12 months were 6 billion, rising steadily across the last five quarters. Rolling EBITDA finished at 720 million, helped by contributions from high-margin projects, contingencies, and what I'd describe as disciplined cost control. On free cash at group level, the free cash position closed the quarter at 1.6 billion owing to these movements: we collected 334 million in distributions from power plants, produced 211 million of EBITDA from D&C and corporate, saw an 873 million reversal of working capital, chiefly tied to Obelisk, and paid 215 million in interest.

Hans Jakob Hegge

executive
#15

When the quarter wrapped up, roughly 800 million of equity had gone into our growth projects. On top of that, we've raised our RCF — it went from $230 million up to $350 million, and on better terms. That bigger limit gives us a healthy liquidity cushion and will help us carry out the record-high near-term growth portfolio we have spread across geographies. With the new RCF in place, total available liquidity comes to 5.1 billion, which is a strong buffer and lets us hit those strategic targets. I'd also like to thank the banks for their cooperation. Turning to proportionate net debt — beginning with gross corporate debt, it came down to 6.4 billion, whereas net interest-bearing debt went up because cash was reduced, largely from working capital changes and investments. Over time, we've brought debt at the corporate level down a great deal in order to boost financial flexibility and cut interest costs. At the project level, gross debt rose by 100 million, reaching 19.6 billion, on account of new growth projects. Net debt for projects in operation fell by 200 million, and net debt for projects under construction went up by 200 million. Cash held at SPV grew by 200 million, to 3 billion.

Hans Jakob Hegge

executive
#16

Now I'd like to walk you through what we've been doing on bond refinancing, since that's a key element of our plan to fortify the balance sheet and bring financing costs down over time. The chart shows we have four corporate bonds outstanding at present. SCATC04 comes due in '27, and it bears our highest margin — 660 basis points above three months NIBOR. Our plan is to refinance that bond through a new bond issue expected at 1 billion NOK, pushing our maturity profile out to 2031 while achieving better margins. This transaction is fairly straightforward and creates value, because we're swapping our priciest debt for longer-dated financing on improved terms. The wider picture looks encouraging. Across our bond stack, a clear downward trend in financing costs is visible, reflecting how we've grown and strengthened our credit profile. SCATC05 has a margin of 425 basis points, SCATC06 315 basis points, and SCATC07 285 basis points. You see what I mean. This trend reflects progress achieved by also lowering risk and improving financial discipline. Our overarching strategy is plain: Scatec is committed to cutting corporate debt and interest expenses over time, and this refinancing is a concrete step toward that goal.

Hans Jakob Hegge

executive
#17

Let me now walk you through what we expect going forward. Our guidance for full-year EBITDA stays as it was. For the power production segment, we project full-year output of between 5.05 and 5.35 terawatt-hours, a figure that is 50 gigawatt-hours below our prior estimate, reflecting weaker hydrology anticipated in the Philippines. Our full-year EBITDA estimate remains at a midpoint of 3.75 billion, since the reduced production should be offset by stronger reserve market prices. No FX adjustments were made this quarter, given that the quarterly FX impacts are limited. Looking at the third quarter, we anticipate total power production of 1,500 to 1,600 gigawatt-hours and EBITDA in the Philippines of between 320 and 420 million NOK. In the D&C segment, the remaining contract value, as Terje mentioned, stands at 3.8 billion, mainly tied to Taskdu in South Africa, Barcelosa in Colombia, and Sidi Bouzid 2 in Tunisia. The estimated gross margin remains 10% to 12% on average across the portfolio of projects currently under construction. At corporate level, expected full-year EBITDA is still negative NOK 125, 135. These estimates reflect a strong base of operating assets, high construction activity, and healthy cost control. I'll now hand it over to you, Terje, to take us through the summary.

Terje Pilskog

executive
#18

Thank you, Hans Jakob. To sum up, our gross portfolio remains at a record level, and we will keep pushing those assets toward financial close and on into construction. As we've mentioned, this should leave us well placed to double generation capacity within the coming two to three years, while expanding battery storage capacity fivefold across that same two-to-three-year window. At this point, I believe we've demonstrated what we can execute in Egypt and in every other country where we operate, and from an execution standpoint we're likewise prepared to go after this portfolio and begin construction on these various projects. On top of that, we have financial flexibility. We keep reinforcing our financial standing and adding flexibility as we move ahead and manage this portfolio. In my view, we're strongly positioned to carry this growth forward from here. Thank you. I think we'll now take questions. Thank you, Terje, Hans Jakob. Yes, we'll open up for Q&A at this point. We'll begin with questions from the room, and we also have a number of questions from those listening online.

Terje Pilskog

executive
#19

If you'd like to pose a question, simply raise your hand. Yes. Andreas.

Andreas Nygård

analyst
#20

Andreas Nygård from Nordea here. I’ve got one question about the FIDs you expect to reach in the second half of ’26. At this point you have a 3.8 billion contract backlog for D&C. Should those FIDs be reached, how much do you anticipate adding to that contract backlog during the second half of this year?

Hans Jakob Hegge

executive
#21

We haven't given any guidance past the contract value—we'll need to return with more specifics later. That's my brief response on that.

Andreas Nygård

analyst
#22

Then I have a second question: when it comes to data centers, is that currently something in your pipeline?

Terje Pilskog

executive
#23

Data centers aren't specifically in the pipeline, and of course it always depends on what gets counted when you ask whether data centers are in our pipelines. Obviously, data centers are also always being planned and developed in the countries where we operate, and they will contribute to demand for renewable energy in the markets where we are as well. We definitely see benefits for us too from the current global growth in data centers.

Andreas Nygård

analyst
#24

Since you're there in person—in Egypt and South Africa, for example—how have the conversations about data centers changed across the past 6 to 12 months, and how big could the opportunity be for prospective clients of yours in that area?

Terje Pilskog

executive
#25

I think we won't offer any speculation on that at this point. As I mentioned, we clearly do see data center activity moving in our region and in our countries as well. So we'd rather return to that with more specifics once there's something concrete on it.

Andreas Nygård

analyst
#26

Thanks. Does anybody else in the room want to ask something? No. So we'll move to questions from those listening online. There's one on Egypt Green Hydrogen. What's the newest update there? When do you expect an FID, and are things on track for the delivery that's planned under the H2Global mechanism?

Terje Pilskog

executive
#27

Yes, regarding the EGH project, we and our partner Fertiglobe have everything ready to go, and at this point we're waiting on some regulatory clarifications from the EU. Once we receive those, we'll be in a position to proceed, and we'll likewise be able to fulfill the contractual commitments Fertiglobe holds with H2Global. A question concerning El Niño in the Philippines: could you discuss what impact El Niño, and possibly a super El Niño, is expected to have on the Philippines business as well as other geographies, such as Brazil? Thank you. I believe every one of our present views on El Niño and weather more broadly is reflected in our outlook and our guidance regarding what we see ahead. As we mentioned in today's presentation, the likelihood of a strong El Niño toward the end of this year and the start of next year remains high, but beyond that, as we've shown, in the case of the Philippines we have a technology portfolio, and there is flexibility in how we operate within that market, and there are additional ways to manage that portfolio. Thank you, Terje. One from, two questions from Jørgen Lande.

Terje Pilskog

executive
#28

Morning. Now that the Obelisk project has been handed over well into Q3, is it right to think more contingency releases will come in Q3 as well? Clearly this is our Q2 report, and we are releasing a considerable amount of contingencies right now at the close of Q2, yet at the end of Q2 the project still wasn't finished. Whether any further amount will come is conditional on finishing the project with no surprises as we approach the end. One more on Egypt. Good morning. Now that the Obelisk project is delivered, your construction team in Egypt has nothing to do. What factors remain to be cleared before construction can begin on Energy Valley and/or Egypt Aluminium? On permitting and on securing everything required to move those projects forward, all is in place. What we are working on at present, obviously, is getting the EPC part ready, the execution part, and also completing the processes with the lending banks so that we get through and finalize every agreement with the lenders, that we complete due diligence with the lenders, and that is a process we must work through. In addition, certain lenders have disclosure periods that we have to wait out.

Terje Pilskog

executive
#29

When we’ve gotten through all of that — which, in my view, is largely administrative work, since we’ve dealt with these matters repeatedly in the past — we’ll be in a position to reach financial close. As I mentioned, we anticipate that occurring across all 3 of these projects within the coming 6 months. Two questions came in from Anees Seyed. With consolidated net interest-bearing debt rising and total liquidity on a consolidated basis falling, could you give us more detail about how net debt and liquidity are expected to trend through the second half of 2026, including what project distributions, working capital, and possible asset rotations would contribute?

Hans Jakob Hegge

executive
#30

I'll go back to what I mentioned during the first quarter: this is going to fluctuate over time given how busy we are. On the whole, our liquidity position is solid, and we've also upsized the RCF, so. The direction of travel is that debt has come down gradually, but NIBD will also move with cash and working capital, just as it did this quarter. Could you take us through how the Taskdu construction contract is accounted for? We booked 255 million of revenues in the consolidated accounts. Just give us a bit of explanation on the effects there. Yeah. Lyra isn't consolidated; when an entity isn't consolidated, the revenues and the EPC contract get recognized in the consolidated accounts. Unfortunately, under IFRS we cannot include 100% of the margin in the consolidated accounts — per IFRS, only 50% of the margin can be recognized there. This one is for those who are deep into accounting. Yeah. One question on Colombia. How do you view the new administration in Colombia? Do you expect any shift in energy policy?

Terje Pilskog

executive
#31

I won't say anything about policy shifts in Colombia at this point. It feels too soon, but up to now we haven't observed any signs of change there. That's another item also tied to this Taskdu project. I can simply verify that the cost of sales shown in the console is connected to the Taskdu project. That was what was asked. With that, all the questions have been covered. I think we'll wrap up the presentation now and thank everybody for tuning in. Thank you. Thank you.

Hans Jakob Hegge

executive
#32

Appreciate it.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Scatec ASA transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Scatec ASA earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Scatec ASA or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.