Schneider Electric Infrastructure Limited (SCHNEIDER) Earnings Call Transcript & Summary
November 6, 2026
Earnings Call Speaker Segments
Operator
operatorGood day, ladies and gentlemen, and welcome to the Q2 and H1 FY '27 earnings conference call of Schneider Electric Infrastructure Limited, hosted by Elara Securities India Private Limited. <<operator_script>> Kindly be aware that this call is being recorded. At this point, I hand the conference over to Mr. Nimish Sundar of Elara Capital. Thank you, and the floor is yours, sir.
Analyst
analystThank you. Elara Capital is glad to have you join us for the Q2 and H1 FY '27 earnings conference call of Schneider Electric Infrastructure. We would like to welcome the management team, represented by Mr. Udai Singh, MD and CEO; Mr. Omkar Prasad, CFO; and Mr. Mohit Agarwal, Head of Investor Relations. Management will now give opening remarks, and after that we will hold a question-and-answer session. Thank you. Sir, over to you.
Udai Singh
executiveThank you so much, and good afternoon everyone — I appreciate you all joining. I'm sure you've received the presentation that we uploaded this morning. I'd like to walk you through those slides we shared earlier, and if I could ask you to turn to Slide #2, where we've laid out the therapies we're very proud to share — reflecting what your company has been doing and how it has been recognized during the quarter that just passed, just to explain what these awards are. On the far left, you'll see the Golden Peacock award — and I'm sure you're aware of the gold, which the institution of directors considered in 1991, supposed to be 1 of the very reward set of people who recognize corporations, where we won an award for excellence in corporate go and next. And this really speaks to what your company has been doing in this area. The second award is equally important, where we were awarded and recognized by the Indian Chamber of Commerce for excellence in sustainability manufacturing. Now these 2 awards really — is it too testimonial of how your company has been performing in these areas and which therefore has also resulted and I would like to speak to you about the third image which you see on the extreme right, is a crystal waiting on E&C.
Udai Singh
executiveWe've performed really well. In this area, CRISIL has actually reassessed us on ESG, and we've brought in a strong player here too. I'd also like to move to the following page, which again covers how the industry has been recognizing us. If you look, there are 2 features you'll see — the summit that took place in Delhi, the Bharat Summit. At power gen India it week, held during the last quarter, we received 2 prestigious awards. One award, if you see, was digital transformation partner in distribution, where basically what we've been attempting in India is to genuinely modernize the grids using one of the best solutions we have for improved resilience, improved transparency and improved control of the grid. And on the right, the second recognition is Energy Technology Partner of the Year. This is 1 megadrop that we are executing in Gujarat for one of the semiconductor setups. I'd now take you to the next slide, if I may ask you to turn to Page 4, which explains how your company has been viewing the India story that lies ahead of us.
Udai Singh
executiveThe place where we genuinely observe persistent demand is here, even with a handful of headwinds that we've all been watching. Still, on the whole, what we've noticed is that this has in fact been favorable for us as the Panorama infant. So, a few quick macro snapshots — if you turn to the slide on the upper left, the main things, and they're quite supportive, start with GDP, which, I'm certain you know, came in at 7.8% for the quarter just passed. Projections put it somewhere in the 6.5% to 7% range, and that tells us CapEx infusion is going to continue, which is a positive for the company. At the same time, we've also been observing the private side, which sits at roughly INR 1 trillion. And here's the good news: the biggest contributor, close to 3/4 of that figure, comes from manufacturing, an area where we feature as a major player. Naturally, electricity demand — if you recall, back in 2014 it stood at around 950 lot, and now it's nearing approximately 140, with expectations that it will soon reach about 2-megawatt hour per capita by 2030. So what does that mean?
Udai Singh
executiveWhat that means is demand is going to be easier to come by. More SC will be produced and distributed, and that tells you the company is headed in the right direction. I would be remiss if I didn't mention a few headwinds the company has been facing — we're watching them and pulling every lever we can to figure out how to soften their impact. The rupee has been appreciating, copper, aluminum and steel are all up by double digits, and the repo rate has turned somewhat unfavorable as well. Even so, what I'd like you to keep your eye on is 4 fundamental pillars — and these 4 fundamental pillars are the ones truly building the megatrends in India. I'd name them as energy transition, I and destabilization, urbanization and make in India. Now, why did we land on these? We landed on them because capital is being folded into programs by government of India that are actually being rolled out in support of these initiatives. Take energy transition, for instance: the non-Brazil foil, which currently stands at 300, is likely to cross 500 in the years ahead.
Udai Singh
executiveYou've surely seen, I'm certain, the articles and news coverage about India aiming to install roughly 90 gigawatt hours of energy storage systems, where various schemes are backing that expansion — Prama, Surion, the RDS, the recently introduced energy stack, green coating doors, and naturally the viability gap funding for energy storage systems — and in the state transmission givers, those are the areas where we can genuinely watch the sector take off. Meanwhile, looking at AI and digitalization, we have 1.5, 1.6 gigawatt of data centers that are already up and running. And at present we're also hearing from sources that plants exist in the country to raise that to about 7 and 8 over the next 2 to 4 years, which matters enormously to us, because a country like BR would consume that kind of data. And these moves are likewise being backed and getting mandated by the government through acts such as DPP, such as the policy, which got — which is still at the tough stage and business is likely to see the rollout on the national data center, the tax incentives and holidays that are being provided to those who are actually developing these data centers, and so on and so forth.
Udai Singh
executiveAnd now, the second key pillar, along with other important ones, as I mentioned earlier, is urbanization. We're seeing an increasing number of people relocating into towns and cities, which means that as more and more infrastructure comes up — more hotels, residences, offices, more of everything — and naturally, all of this is again being backed, as I said earlier, by the government's smart cities initiative, along with investment being poured into rail infrastructure. There, we're talking about <<inaudible>>, which is expected to drop from 800 to 400. EV penetration, which is likely to reach significant levels, and schemes such as SIM and 2, as well as the PME initiatives, are all receiving support. And finally, there's the government's Make in India program. Now, this essentially aims to drive severance, in our view. It's also meant to boost exports from India. And over the longer term, we foresee the manufacturing sector, which contributes roughly 15% today, likely rising to approximately 25% in the years ahead — say, in about the next 4 years. Now, this too matters greatly, and the government is quite conscious of it, and certain programs — which you should read about on the slide — are the ones that will attempt to do this.
Udai Singh
executiveSo at your company, what we've decided is to adopt and commit to three strategic pillars. These 3 pillars are: to be a technology leader—being a technology leader and delivering those technologies to our customers and other stakeholders that are genuinely a true differentiator. Second, to achieve a very high level of customer differentiation. When I say customer differentiation, the thought is to hold on to and carry out things with the customer at the core—whatever the customer requires or desires at their sites and offices is what we ought to be doing to our best. And the last one is being truly cost competitive. We're the ones focusing and attempting to do more and more things within India and making the supply chain quite effective while staying cost complete. With that, I'd also be very glad to share a few wins that we've actually achieved in the quarter that went by. And I'd like to draw your attention to Page 6, where we discuss how we're working on the new waves of the new emerging segments. Now, new emerging segments, in our view—and every very view—in data centers.
Udai Singh
executiveSo, semiconductors, and we also kept talking about renewables. These 3 areas — basically, in semiconductors we supply the whole powertrain, and that covers the switch gear as well as the transformer. The second one is data centers, a unique thing we've done, which is a skid-mounted gestation. Skidmore stations are now becoming the order of the day, since that cuts commissioning time. It's a plug-and-play solution. And that's something we've uniquely done at this data center in West India, <<inaudible>> is where I would not hesitate to say we've been trying to do whatever we could add the distribution, including the inverter transformers, and this is 1 of the case like that, where we've been supplying this in the plant run by government. Now I'll also take you to the next page, Page 7, where — as I said, if you recall, how do we leverage the Make in India program of the government. Now this is something we should do, is where we are seeing and reaching out to these manufacturing setups and plants with the products we're making all by ourselves in India, now 2 things which you mentioned.
Udai Singh
executiveAnd if you’d notice, this really carries over across the board. We’ve been observing, working on, and reaching out to folks in the metal space, in the material space—which is basically those producing class in automotive and defense, and also in the batches. Now—and if you look at what we’ve also been attempting to do, it’s trying to deliver something with which we can create value, whether that’s AIS panels and metals at their plant in the north, whether it’s in-house, which is nothing other than what they’d be building where we’ve actually been doing this in a setup that makes glass in the south, whether there’s a compact station that we’ve been supplying to West India Bombay and of course defense, which is to a company that’s making and supplying equipment to India name. And the last being the EV battery manufacturer where we’ve been supplying all those solutions, which we manufactured in India by ourselves and suppliers. Now nevertheless, and maybe just to tell you the last just to reinforce what we’ve been trying to do and trying to be present at all places—is how are we powering the upcoming urban infrastructure?
Udai Singh
executiveSo, what’s the health issue we’re really trying to modernize and transform in the country? And there are 3 cases we’ve mentioned—if you look, 1 is a thermal power plant. Another 1 is the metro in Bombay, and the third 1 is what we’re attempting in terms of uplifting the water infrastructure in the state of MP. Now these were—again, you’d notice that these are all across where, in the thermal power plant, we’ve been supplying the panels, we’re supplying the production systems, including Ula and other skids. We’ve been talking about similar things where, and as I said before, automation panels, the entire control of Mastek transport in Bombay, and the high and highly technical breakers in this segment, which we’re seeing on the extreme right in metals in water. Now while I’ve shared this with 1 of cloud, we will also, at the same breadth, like to also speak about what we’ve been doing in terms of enhancing our brand and doing work in areas of CSR and sustain. Now if you notice what we’ve been trying to do is trying to really drive and sensitize stakeholders in India with our thought leadership programs.
Udai Singh
executiveAnd look, if you notice, we’ve been present in the places where we ought to be—whether that’s part of electricity power generation in India, the Semicon Summit that was held, where the CI fixed power should be complete, and also engagements and interactions with European Union chambers. We’ve also really been attempting to push these thought leadership programs through multiple channels—either by leasing, going to the press, and making something that is relevant for us and in the country. We’re trying to see what we can do when it comes to driving sustainability—like, if you look at the picture, the one at the center on the bottom row is where we’re trying to see how we’ve been attempting to do this and asking some discoms to carry out pilots of equipment that doesn’t have SSI, which is extremely been gas in terms of having very high potential of greenhouse emission. And then what can we do when it comes to really modernizing and supporting and robustifying rigs—because if we are reaching on July, I’m sure you are aware, on 16th of July, the country <<inaudible>> 70 gigawatts of peak demand. Now, how the existing rigs can be modernized is something that is an article that was given in the business standards.
Udai Singh
executiveThe reason I'm bringing this up with all of you right now is that we're working to share these advancements, since we rank among the most advanced technology partners our customers have, and we want to tell them what India requires. And in what manner will it be required? How is that going to be accomplished? And what benefit will it deliver to customers and every stakeholder, the users out there. Now there's one further thing I'd like to mention, and I'd ask you to turn to Page #11, where we launched one of the most advanced breakers produced anywhere in the world. So this is the breaker that we have now begun manufacturing at our Calcutta plant. And this one — we unveiled this breaker in Calcite, and you can see some pictures where we had invited our partners and stakeholders, around 150-odd prepayment, and they were part of this launch where we unveil this vehicle. And just briefly, in summary form, I'd like to talk about what this breaker actually is. Now this is covered on Page 12, and the reason I say this ranks among the most advanced ever produced globally is, first, it has got -- it is a fully dislead sensorized breakup.
Udai Singh
executiveIts lifespan is double what competing breakers on the market offer. It delivers 2x the operations and, naturally, since it is loaded with sensors, maintenance cost comes in 40% lower. This, then, is a breakthrough that, as I would put it, truly sets up the trend for the years ahead. And we feel quite sure that this breaker — manufactured at our Kolkata facility — will in fact be the one driving that trend. Let me now turn to the final slide of my presentation before handing things over to my colleague, Mr. Omkar, simply to share what we have been doing around sustainability. If you look at — and I am referring to Slide #13 — you will see that our NDs at the sites are already 100% sourced by rubles; regrettably, we had 1 minor accident last month. Gender diversity is an area we have been concentrating on, since it matters and is critical to organizational development, and we have edged somewhat closer to 20%. At the same time, I am delighted and proud to report that we have been working in the state of Gujarat, developing the skin.
Udai Singh
executiveJust to give you some context, over the past 2 years we've trained nearly 1,900 of our people through our 16 skill centers. We've also been working to support community centers, the CSCs, the PSCs, and other organizations. And beyond that, a good number of individuals have benefited from the programs we've run. These figures reflect the last 2 and 3 years. And of course — as I mentioned earlier — we've been receiving awards and recognition in forums and on platforms that matter to us and are pertinent here in the country. With that, I sincerely thank you for listening patiently, and I'd now ask my colleague, Mr. Omkar, to walk you through the financial performance for the quarter and the half year that just passed. Over to you, Omkar.
Omkar Prasad
executiveThanks, Udai. Many thanks, and good afternoon to all of you. I'll stick with just the financial update. I'll begin with the highlights, which you'll find on Page #15. We'll begin with orders for H1 — if you look at the solid growth, because you must have noticed that in Q1 we were lagging on orders. And in Q2, we managed to pick up orders where the like-to-like comparison comes in at more than 50% plus. So the orders we closed this quarter stand at 1,265, and the 1 turns into 2,180, which is genuinely good growth. In this solid growth, the contribution — as Udai pointed out — is coming from an emerging segment making a good contribution to this order backlog. Moving on to sales, as we discussed on the Q1 earnings call, we had a lag in execution during Q1 owing to the dependency on the customer being able to accelerate sales this quarter. And in this quarter, we managed to achieve close to 20% growth Y-o-Y, touching around INR 780 crores. And for H1, we are close to 12.5%, which is INR 1,400 crores. On EBIT, again, I will say that from one sequential quarter to the next, we have been able to improve.
Omkar Prasad
executiveYou've probably noticed that, because of negative operating leverage, profit stood at only about 4% in Q1. In Q2 we managed 7.2%, and for H1 overall it's 6.2%. On top of that, just to confirm, for the KMC capacity expansion that the Board approved last week, we've begun capitalizing partially, so you'll see an increase in that decision on the next Slide 14, Slide #16, where we show Q2 performance. Turning to sales, we said we grew 20%. Other income — when you look at it, this is income, and we also include the income from the deposit, which is the cash we hold with the bank. Material costs remained under stress even this quarter. While we're on top of all the measures we're taking, we try to keep all probable protection in relation to customer pricing, but pressure continues. If you look at like-to-like — even in preceding quarters, commodity costs such as copper and transformer oil went up, and there was slight relief on silver, which is a much smaller component in our entity.
Omkar Prasad
executiveHowever, both corporate and transformer costs will keep rising, including on a sequential-quarter basis and versus the same quarter a year earlier. On employee cost, when you look at that figure in terms of 25% growth, let me explain that in Q1, the way we described the increases, it was due to inflation, plus what we have here, the headcount increase coming from certain engineering costs and engineering people — whether they work for us or work for the group, and we recharge these costs. So those are the increases given, but overall employee cost went up only in proportion to the claim platins that we have. On other expense, if I tell you 2 things: first, while you will see a 22% increase, again, there is an increase in line with inflation, plus we have a certain cost that gets recorded in foreign currency, and foreign currency has had an impact that increased our expense on this line. And additionally, we have a temporary, or in the timing, accounting provisions done within other expenses. We expect that the timing temporary difference, which is based on the accounting policy we apply every quarter — so that has increased in this Q2 results.
Omkar Prasad
executiveRegarding the decision we discussed, the KBC plant is the main one for which we began capitalizing. On finance cost, again, just to confirm for you, there is no incremental borrowing. The finance cost went up solely due to a change in the rate we pay, which is based on the RBA rate and the declared rate. In the prior year, a gain arose because of the RBI date, as they charge it. And in this year, there is an impact since 6.1% becomes 6.7% interest, from what I understand. No exceptional item. Tax expense, nothing to call out. Our ETR remains the same. So overall, the profit we closed at was INR 30 crores versus INR 52 crores, largely — the 43% drop you see, 1 obviously comes from material cost. And all the other expenses, we expect that in H2 we'll be able to leverage it through operations and revenue for sure. Next quarter, when we refer to Page #17, this is the H1 results, where you see sales grew 12%, material costs, again, because in Q1, you saw that it was understated due to continued distress. We try to take all the mitigating actions, how we can pass these on to customer pricing.
Omkar Prasad
executiveWe also anticipate that geopolitical tensions will ease and pricing will decline going forward. So both of those factors will certainly benefit us over the next few quarters. Regarding employee costs, other expenses, and depreciation, there is nothing particular to highlight — I've already given more detail along the same lines. Our costs have gone up, and we expect to leverage that cost base in H2 as revenue grows, or to gain some operational benefits. That covers it. I'll now turn things over to the operator for your questions. Thank you.
Operator
operator<<operator_script>> Our first question comes from Sameer Thakur at AMBIT Capital.
Sameer Thakur
analystTo start off, I'd like to ask: during this quarter, what share of the legacy backlog was tied to oil prices? And what amount sits in the backlog at present? That's my first question. Can you hear me?
Omkar Prasad
executiveYes, yes, we can hear you. All right. While — I don’t believe we’ll be in a position to state the number, I can offer you confidence in this: given how our order backlog is structured, large orders phase out over a period of 6 to 12 months, and a portion of the orders — those large ones — extend beyond 12 months. So that’s the aging. For any ETO or any design tied to a specific customer, the typical duration is 5 to 6 months, and that is the backlog we maintain. Then certain orders, clearly, run 5 to 12 months. So the mix is something I’d describe as 20%, 25% of our order backlog generally shifting into the more than 1 year bucket.
Sameer Thakur
analystAll right, the second question is about how much you've raised prices, and what share of the backlog is now protected by price variation clauses — that's the second part.
Omkar Prasad
executiveOkay, I'll break this into a few different pieces. First, for sure, we raise prices where we've got a more standard product — the increase goes through, and then naturally the market has to accept it. So at the point we lift the price, we also raise our standard cost, and after that we update the pricing we give customers. That's one part, but it takes time for customers to absorb it, since there's inventory plus other factors out there, and they need some time before they adopt the new pricing. The second part relates more to projects and equipment, when we're talking about more ET products and more projects. These are — all of these projects are tender based. And when we say tender, the decision is made more on an L1 basis, and some of the competitiveness — many orders come with prescriptions without a very cent clause, specifically the POC, PSU or any remaining contracts, which come in and prescribe that no recent clause should be added. It has to be there, the firm price. In those cases, we certainly try to build in some contingency. But sometimes, given how we see volatility in the commodity, it's still having an impact, so we don't — we intend to include 100%.
Omkar Prasad
executiveHowever, because of the customer contracts and what the tender requires, we can enforce the variation clause across every one of those agreements.
Sameer Thakur
analystAnd what percentage would those contracts—I mean, the projects—represent?
Omkar Prasad
executiveSo, when you look at our projects, the overall business is nearly 60%, 65% overall — I'm referring to, if you look at the mix, we do service, we also do our standard products, and projects have reached close to 65%. So from that, we're at close to, I'd say, 20%, 25% that we're able to protect.
Operator
operator<<operator_script>> Our following question comes from Mr. <<inaudible>>, who is calling in from Neesha Investment Advisory.
Analyst
analystMy question is this — I was hoping to get <<inaudible>> out of the single <<inaudible>>?
Operator
operatorCould you repeat your question? Your audio is cutting out.
Analyst
analystCan everyone hear me?
Operator
operatorWe can hear you now, sir. Could you please repeat your question?
Analyst
analystI'd just like to ask about the CB components — how much revenue came from the single foldable phone, from the locomotive side, and from the site side? And could you also give me a rough idea of the industry size for this component? Let's begin with <<inaudible>>.
Udai Singh
executiveSo Mr. <<inaudible>>, if I got that right, what you're asking is how many ports are in the breakers — so these are 3, 4 vehicles. And these are medium moats. That's one. And 2 is we do quite a lot, and we serve locomotives as well, late. And these brakes are also made in Kolkata. So, your question is about the size. Now, the size of the market in terms of volume, I'd say it's close to — and I'm talking about medium-voltage breakers, which get used in air insulated with boards, maybe anywhere, say, about 60,000, 55,000, INR 60,000. That's what the market size is in 11, 24 and 36 plus.
Operator
operatorOur next question comes from Mr. Jay at AMBIT Capital.
Jay Negandhi
analystCan everyone hear me okay?
Operator
operatorYes, sir.
Jay Negandhi
analystYes. So first, I’d like to get a handle on order intake in this quarter. Was there any big order or a one-off order, essentially, coming from any of our emerging end markets? Or is that 12 billion to 13 billion order a run rate we can regard as sustainable for the quarters ahead too?
Udai Singh
executiveLook, Mr. Jay, it wouldn't really be right for me to flatly declare whether there's a big one-off or not, because the business we're in is always cyclical. It hinges on the country's CapEx cycle. In some quarters, we do receive certain large value orders — large by our own definition, the way we define large. In other quarters, we don't get those 1 single or 2 large value orders. The quarter just gone by, of course, was similar. So I wouldn't single this quarter out. And if you're asking about the future, as I said in the presentation, sitting inside the company and watching how the market is evolving, we are seeing demand that is sustained, and we're also conscious of the fact that there are certain headwinds and certain uncertainties around it. So I hope I've answered your question, and perhaps at <<inaudible>>.
Jay Negandhi
analystOkay, so for my next question, I'd like to see if you can help us put a number on the price increases we've implemented, and how does that pass-through flow through with a delay? And on that basis, how should we think about margin recovery over the quarters ahead?
Omkar Prasad
executiveOkay, Mr. Jay. I believe Mr. Sameer <<inaudible>> has the same questions. On price recovery — clearly, whenever we go through tendering, we always build in the costing for whatever we have to supply or deliver to customers. So on that particular day, we do recover everything. What happens following the tendering and once we've received the order from the customer — it all hinges on how the commodity moves at the time we procure, and that takes a period of 3 to 6 months. So that's what creates the impact. And as I already explained to Mr. Sameer, how recent plus plays into our business, and as you can say, we have a factor through which we can take recovery from the customer, or what we had to take a hit on in our <<inaudible>>.
Operator
operator<<operator_script>> Our following question comes from Ms. Pavna at YES Securities.
Ms. Pavna
analystNice work on those results. I have just one question about the broader data center picture. There's plenty of discouraging coverage out there concerning data centers, plus your comments on how challenging the conditions are — the tight supply of power, water, all of that. So could you shed some light on how demand is trending on the data center side, and what the inquiry pipeline looks like? What's your view of the outlook in the U.S., and then specifically in India?
Udai Singh
executiveThanks, Pavna, for that question. No — honestly, if you ask me, there’s a lot of news in the market these days. I’m showing you what happened previously in certain parts of the U.S. For us, as we observe in India, logically, the data is increasing. The data is returning. I think the country sets itself apart as 1 of the largest data user. This is also visible when in reality we haven’t really been using AI so much — as we call it, it’s lesser of AI, missile large language models — and therefore, we genuinely see an upward trend in data even though we keep reading a few articles here and there where people are somewhat opposing data centers coming up in certain locations. But the country needs it. The government wants it under PPA — this is the guideline — the data has to be kept in hard in Indian <<inaudible>>. So, to summarize my response, I will say there will be data requirements coming. There will be data centers, which will be built. Whether today we are sitting at 1.7%, expected to be anywhere between 8 by 2030.
Udai Singh
executiveWhether it ends up being 8% or something else — only time is going to answer that. Still, on the whole, I'd say the data center gives us a pretty solid amount of upside, enough to matter.
Operator
operatorOur next question comes from Mr. Bal Chandra at Motilal Oswal.
Bal Chandra
analystSir, apologies—I joined the call late. For this quarter, our inflow stands at roughly INR 1 crore 65 crores. And when we look at it against last year, and even the prior quarter—like last quarter, there was a jump from INR 1,700 crores to INR 900 crore, and from INR 900 crores to INR 5 crore. So is it fair to assume our new norm for the run rate on quarterly inflows will sit in this range, or was there a one-off in this order?
Omkar Prasad
executiveHonestly, sir, that really depends — it comes down to when customers make their decisions, and as you'd understand, some of it is direct engagement with customers, some goes through contractors, which is what we do for large jobs.
Udai Singh
executiveIt's <<inaudible>> to quantify. Yet on the whole, as we observe — and you must have noticed this too — we're going up quarter-on-quarter. So we're keeping our fingers crossed. At the same time, though, we've also been somewhat watchful about what kind of exposure we take on — I think a question came up a while back about the variations built into the contract, and Mr. Omkar replied then that there are certain cases where we haven't been able to build it in. So we're mindful of the fact that RMI will be a bit volatile in the days ahead, better than it was, but it will still remain an important element and factor to consider. So we're being a little selective and perhaps avoiding exposure where we see bigger risk. So, to answer you, we're hopeful of carrying on in this area. As for how much, time will tell. But as we see it, India is on the right path, and that momentum keeps going. So overall, I think we see something similar taking place. To what extent is something I won't be able to say.
Analyst
analystDid you see any larger ticket-size orders come through during this quarter?
Udai Singh
executiveNot really, sir. It depends on what you'd consider large, but not really, since I answered this a while back.
Operator
operatorOur next question comes from Sameer Thakur, who is on the line from AMBIT Capital.
Sameer Thakur
analystIs this coming through clearly at your end?
Udai Singh
executiveYes, I’m able to do that. Please carry on.
Sameer Thakur
analystAll right, coming back to data centers. At what point are they placing orders, and what are you observing on the ground? I believe at some earlier point you mentioned roughly 3 gigawatts under construction or something along those lines. So any figure on that would be useful.
Udai Singh
executiveYes, Sameer, that's a similar situation. So, as I was mentioning, roughly 1.6 gigawatts is already operational. Then the country's estimates show this capacity rising to around 8 gigawatts, since not many industry exports have quantified it. And we're also attempting to gather information from that same group of experts about what stage these projects are at, the ones that will bring India to 8 megawatts, and we were informed that somewhere around 2.5 to 3 door, which is where the projects are reaching financial closure or have already been financially closed and work is underway. So that stays as is, I would say.
Sameer Thakur
analystThen on the second question — do you have any goal for exports? How should we think about the revenue mix maybe 2 or 3 years out from now? I think you're adding capacity in Kolkata, and that site also serves export markets too. So I just wanted to go back over that.
Udai Singh
executiveRight, so exports are definitely part of our plans. What I mean is, there's some infrastructure we're putting in place with exports in mind as well. And those CapEx programs we're working on — the way we've conceived them — are on track. and we'll help make sure those exports come in as planned.
Sameer Thakur
analystAll right. And I was just hoping to get the canister exposure — something like 20% or 15% of revenue, if I'm not mistaken?
Udai Singh
executiveOmkar should be able to provide that information.
Omkar Prasad
executiveI'm not sure — look, when it comes to the multiple phases, Mr. Sameer, even at Target we had a Phase 1 that was approved roughly 3 years ago. And now Phase 2 has been approved. Right. So it's all progressive, moving upward. That means when you look at the percentage, it also depends on how much we're growing in the domestic market. So naturally, we expect that investment in Kolkata will speed up growth. At the same time, we also expect the domestic market to grow as well. So the percentage could shift going forward, okay? But right now, the mix is close to what you mentioned — the 12%, 13%. And we don't expect that mix to change meaningfully, since both markets are improving.
Operator
operatorOur next question comes from Jay Negandhi with AMBIT Capital.
Jay Negandhi
analystSir, my first question is that I'd like to get a sense of how much potential remains to be drawn from the IDS scheme. We understand it was extended earlier this year. So how much of the funds has already been deployed, and how much of it is, like, still yet to be ordered, so that we can bid for it and we can win from that?
Udai Singh
executiveTo start with, let me address the PIB side, where those exposures and this investment are always visible — the online dispersal, which is genuinely updated. You're correct that the program has been extended by another 2 years. As for the outlay under this scheme, if I'm not mistaken, it's roughly INR 18,000 crores for the current year, out of INR 3,000 crores, which was originally the scheme <<inaudible>>. So I wouldn't have the exact figure, the latest number, as our press then take a look at that site. But what I recall is around INR 18,000 crores is what is going to get consumed, and that's where it offers us the potential to do.
Jay Negandhi
analystOkay, got it. And one quick follow-up question about exports. I just wanted to get a sense of the margin difference between domestic orders and export orders — if you could give us some indication there.
Omkar Prasad
executiveIt really depends. When it comes to export, we operate on arms and price, right — that's the transfer pricing rule. Domestically, it's always competitive, it depends — clearly, we have an internal benchmark, but it's always on an L1 basis as well. The good part is that the export side leaves margin behind. What it gives you is the upside in revenue and the operating benefits, the operating dividend benefits. So that route is always positive to <<inaudible>>.
Operator
operatorAditya Deorah with Divisha Investments has the next question.
Aditya Deorah
analystMy question concerns the Kolkata medium-voltage capacity, or the complex we've established there. Sir, what prompted us to raise the BI capacity over 3 months — as announced, if I'm not <<inaudible>> in July, when we announced an expansion from 1.8 to 2.5 lakhs, and then in October we went for yet another expansion, to 3.75 lakh units per year. So what's the reason behind that?
Udai Singh
executiveThe explanation is straightforward, sir: we've witnessed demand emerging. We've observed that demand. If you recall, back in Q3 of '23, we launched this initiative of injecting CapEx and producing interrupters. Previously we used to manufacture 85,000 pieces, and we began working on a plan aimed at raising capacity to roughly 180,000, 185,000. And as we were building up — since it takes time to get that <<inaudible>> facility up — we came to realize demand was coming in. So we added some more money and did not take it to 2.5, as we'll keep investing, and perhaps what we're trying to do is be more feature ready, because we foresee that by the time these facilities are up, there will be global demand for these elements that we're producing in Kolkata. That's why we are — right now, we have raised this by another 1.25x.
Aditya Deorah
analystAnd sir, is there any timeline for when we intend to move it from the Sollak facility over to our new facility, and what's the existing capacity of the <<inaudible>>?
Udai Singh
executiveYes, sir, across the next few quarters it will go according to the plan, and that's what we're attempting, since our real aim is to avoid upsetting the commitments we've made to our customers. So for that reason, we're working to identify the right moment at which this asset should be moved from 1 location to another within part.
Aditya Deorah
analystThis is something I've raised previously — after the capacity and expansion announcement, will there be additional room remaining at Kolkata NBC for further expansion, or have we finished there?
Udai Singh
executiveNo, we do have some room, but space isn't really lacking in Kolkata anyway. So we could look at doing it somewhere else too.
Operator
operatorOur next question comes from Parag Prakash, who is calling in from PH Financials.
Parag Prakash
analystHello?
Operator
operatorYes, please proceed with your question.
Analyst
analystThank you for the chance to speak. Sir, I just wanted to ask about margin guidance. Our peak margin has dropped from roughly 3%, 3% to about 34%, 35% now. So looking ahead, what sort of margin expectation can one have? Because for the past 3, 4 quarters, our margin has been shrinking. So I would like gross profit margin — when I say margins, I mean gross profit margin, given your escalating costs for various metals. So I would like your view on what margins we could expect going forward, sir?
Omkar Prasad
executiveSo <<inaudible>>, I think giving guidance as such isn't really possible for us. What I can assure you, though, is that the margin is being diluted largely for external geopolitical reasons tied to commodities — mainly copper, and also transform mobile and steel metals, all right? And unfortunately, we don't see that coming down. So the backlog we began with this year had a good, solid impact. Then again, we keep moving on that impact and it keeps increasing rather than reducing, okay? So when we embed the price — the recent price plus certain factoring — the price still goes beyond that expectation. So specifically on material margin, if you carve out the commodity price, then our margin is well on track, and we will also try to leverage it against operating costs, where we can take some benefit from the higher revenue.
Analyst
analystRegarding the order booking, sir, what exactly are we doing at the earth margin, or at the margin — what is it that we're doing?
Omkar Prasad
executiveNo, no. As I mentioned earlier, I believe I already made this clear: in my present costing approach, whenever we tender for anything, I always use the prevailing price index and additionally build in some contingency for potential increases. So all of that is incorporated into the current order. What's happening is this — suppose, for instance, I booked something in April. Take the price I used for costing purposes; that was sufficient at the time. Unfortunately, though, when I get to execution in June, it has risen a further 10%. Right. So we would offset a certain amount of contingency, but we can't offset 100% of it, since we didn't anticipate that it would rise more than 10% from one quarter to the next as well. Right. So that's the only thing — but let me assure you that with the current costing, the tendering we do always uses the latest price.
Analyst
analystAlright. And regarding that cost escalation clause — is it included in our order? Or what’s the way it works, sir? Could you give me <<inaudible>>?
Omkar Prasad
executiveYes. That was a question from — Sameer as well, from AMBIT — and we made it clear that when it comes to cross discretions, we always aim for 100%, but we don't manage to achieve that because of the tender document itself, which neither mandates nor includes that close requirement. If I insist that it is close, then I end up ineligible, since I can't act contrary to the tender or the comments. Okay. So at some point, we have to make a call that, okay, either we bid or we don't bid, because many PSUs, many large contracts, they do say they need a farm price. So we try to push most of the cloud price variations in most of the content, but the success rate today is not that encouraging overall.
Operator
operatorLadies and gentlemen, that brings us to the end of the questions for today. At this point, I'll turn the conference over to Mr. Nimish Shah for some closing comments.
Analyst
analystThank you. We'd like to express our appreciation to the leadership team at Schneider Electric Infrastructure Limited for the chance to host this call. Thanks as well to everyone who took part and joined us. At this point, I'll turn the conference over to the management team for any closing remarks. Thank you.
Udai Singh
executiveI truly appreciate everyone taking the time to join and review the presentation that was uploaded this morning. I want to wish each of you the very best of health and happiness, and a very, very happy Diwali to all of you. Thank you so much.
Omkar Prasad
executiveThanks to all of you, and happy Diwali to each of you. I appreciate you spending part of your day with us.
Operator
operatorAppreciate it very much, everyone. Speaking for Elara Securities India Private Limited, that brings this call to a close. Thanks for being with us, and you can go ahead and disconnect your lines now. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Schneider Electric Infrastructure Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Schneider Electric Infrastructure Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Schneider Electric Infrastructure Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.