Siemens Energy AG (ENR) Earnings Call Transcript & Summary

February 11, 2026

Deutsche Boerse Xetra DE Industrials Electrical Equipment earnings 60 min

Earnings Call Speaker Segments

Operator

operator
#1

Good morning, everyone, and thank you for joining the Siemens Energy Q1 Fiscal Year 2026 Analyst Call. Please note that this session is being recorded. First, I'd like to point you to the Safe Harbor statement found on page two of the Siemens Energy presentation. This conference call might contain forward-looking statements. Such statements rest on the company's present expectations and particular assumptions, and they are consequently exposed to specific risks and uncertainties. Now, I'll hand things over to your host for today, Mr. Tobias Hang. The floor is yours, sir.

Tobias Hang

executive
#2

Thanks a lot, Moritz. Good morning, and a very warm welcome to the Siemens Energy Q1 Fiscal Year 2026 results and analyst call. As usual, every document went live at 7:00 AM on our website. Our President and CEO, Christian Bruch, along with our CFO, Maria Ferraro, are sitting here with me. Christian and Maria will walk you through the key developments in Q1 fiscal year 2026. That should take roughly 30 minutes. After that, Christian and Maria will be ready to take your questions. We have set aside one hour for the whole conference call. Christian, the floor is yours.

Christian Bruch

executive
#3

Thanks a lot, Tobias, and good morning to all of you, and welcome from my end as well to our quarter one analyst call. We appreciate you being with us today. I'm happy to say that Siemens Energy got off to a very strong start in fiscal year 2026, building on favorable momentum in the market and on successful execution of the backlog. The world's energy system keeps transforming at a faster pace, driven by electrification and growing requirements for security of supply, and our portfolio fits these long-term needs extremely well. During the first quarter, we took in orders worth close to €18 billion, the strongest quarter in our company's history. That demand was broad-based across regions and business areas. Market momentum for our core portfolio remains positive. Consequently, our order backlog has climbed to a record €146 billion, which gives us strong visibility for this fiscal year and beyond. Our very strong free cash flow in this quarter was helped by significant order momentum and by customer prepayments, including reservation agreements, particularly in Gas Services and Grid Technologies. Those businesses keep showing strengths, high market demand, disciplined execution, and, especially in Gas Services, high service intensity, all of which help drive high-quality cash generation.

Christian Bruch

executive
#4

At Siemens Gamesa, we're still moving toward break-even. The operational measures underneath are showing results — notably better productivity in offshore, higher profitability in service, and lower structural costs in onshore. Keep in mind that quarter one profitability also got a boost from some timing effects, which is why it came in less negative than expected; that means the trajectory may not be strictly linear from quarter to quarter this year. I'm also glad to report that we've booked the first order for our SG 7.0 wind turbine, the successor to the 5.X platform. We'll provide six turbines for a 42 MW wind park in Germany. With our underlying markets strong, clear visibility from the order backlog, and a strong start to the year, we are fully on track to hit our fiscal year 2026 guidance. Although the first half of the year is traditionally stronger than the second, this performance clearly shows deeper operational momentum across the company — momentum built on backlog quality, disciplined execution, and exposure to markets with long-term trends. Demand stayed strong and broad-based across every business area and every region in the first quarter. Gas Services had its strongest quarter ever for order intake, booking 102 gas turbines.

Christian Bruch

executive
#5

So that means within a single quarter, we matched over 50% of the unit volume we did last year. Momentum showed up broadly across every turbine frame. All told, we booked roughly 13 GW of new gas turbine orders in quarter one. Of that, 12 GW came from converting existing reservation agreements, and we also added 12 GW in new reservations at the same time. That pushed total commitments up to 80 GW overall, even after we delivered 3 GW during the quarter. On the data center side, our commitments stand at 22 GW, and 15 GW of those are reservation agreements. Let me stress that our growth path isn't dependent on data centers. The demand comes from wider structural trends — electrification, industrial expansion, and the growing need for resilient energy systems. Those fundamentals stayed firmly in place. And while gas turbine demand is particularly strong in the US, data centers account for just one-fourth of our global commitments. About 60% still comes from traditional applications, with the remainder tied to peaking, marine, or FPSO applications. Grid Technologies had another strong quarter, powered by robust demand across products and solutions alike. The US chipped in with a number of data center-related orders totaling a high triple-digit million euro volume.

Christian Bruch

executive
#6

As a quick reminder, we booked roughly €2 billion in that space last year. We also continued to see demand for grid stabilization in the US, which showed up in large FACTS orders totaling a low triple-digit million euro amount. Around the world, customers are speeding up investments in transmission capacity so they can integrate renewables, satisfy growing demand, and improve stability. Recent events make clear how important energy security and resilience are. The sabotage of a cable bridge in Berlin, which left more than 45,000 households and over 2,000 businesses without power for days, along with the winter storms in the US where around 1 million people lost electricity, both show how mission-critical modern grid infrastructure is. Events like these build awareness and boost demand for grid stabilization technologies such as our synchronous condensers. By region, the Americas — and the United States in particular — delivered excellent performance. Orders rose nearly 60% on a comparable basis, and revenue went up by around 25%. As a result, the Americas are now nearly at parity with EMEA in order intake, a remarkable milestone that shows the growing importance of the global energy transition. That said, EMEA stayed very strong as well, with almost 20% growth in both orders and revenue. Major wins in Poland and Turkey further show customer trust in our technology and long-term reliability.

Christian Bruch

executive
#7

For Asia and Australia, we likewise posted order growth above 20%. Revenue came in lower because the comparison base was very strong, driven by a big offshore wind project in Taiwan from the prior year, yet underlying demand is still healthy. Regional diversification remains a priority for us. The well-balanced Gas Services order backlog is a good illustration. The US, Middle East, and Europe make up roughly 80%, split almost evenly across those three. In Gas Services, quarter one orders came 40% from the US, 35% from Europe, and 15% from Middle East and China. Pricing stayed favorable across Gas Services and Grid Technologies and helped drive high-quality, profitable growth, since it is accretive to our backlog margins. In Gas Services, favorable pricing momentum is continuing, with current reservation agreements being signed at higher pricing than current orders. Now let me update you on progress with our Elevate program, which we presented in detail at our Capital Markets Day in November. Our capacity additions are fully on track, and last week we shared more details about our US investment program, which we had already flagged at our Capital Markets Day. I will cover more on that on the next slide. Our Grid Technologies expansion in Europe is also moving along strongly.

Christian Bruch

executive
#8

In Austria, we’ve tripled output of wind transformers, and in January we opened a new facility in Croatia for manufacturing transformer tanks together with our partner KONČAR. Through long-term partnerships, we keep reinforcing the resilience of our supply chain. Our investment in Asta Energy — a company that went public on January 30th — gives us secure access to critical copper components for our grid infrastructure portfolio. Our credit ratings were upgraded by both S&P and Moody’s, which reflects the improved balance sheet, better cash performance, and greater resilience of the company. We’re also pushing ahead with implementing our new operating model — simplifying structures, cutting overhead, and raising accountability throughout the organization. As part of that transformation, we’re also boosting AI capabilities among our workforce so they can work more efficiently and unlock new productivity gains across the company. Across all three pillars, Elevate keeps contributing meaningfully to our performance. You can see that progress in our margin development, cash conversion, and operational stability. Let me give you more detail on our US investment program. We’re currently carrying out investment projects worth around $1 billion to expand manufacturing in the United States and grow our workforce as part of this effort. That also includes strengthening the supply chain and setting up two training centers to qualify our workforce.

Christian Bruch

executive
#9

In six states, we're really bolstering both the Grid Technologies and Gas Services businesses. Over in Mississippi, a new high-voltage switchgear plant is under construction, and we're expanding transformer capacity. In North Carolina, we're restarting gas turbine manufacturing—as we already signaled at the CMD—and growing large transformer capabilities while also broadening research and development. Down in Florida, blade and vane output is being increased, and we're upgrading our innovation center, which includes an AI grid lab done jointly with NVIDIA. In Alabama, production of key generator components is being scaled up. We're also upgrading compression equipment facilities in New York and Texas. This expansion brings 1,500 new jobs, which comes on top of the 12,000 excellent employees we already have in the US. The US represented 29% of our global order volume last year, which underscores its strategic importance. We remain fully committed to backing the growth of electricity in the US market by driving local capacity precisely where the market requires it. Let me spend a moment on Grid Technologies, where scaling is happening at an impressive pace. I take pride in what we've achieved with our new production sites in Austria and Croatia. In Austria, Siemens Energy has opened a new wind transformer plant in Weiz after investing more than €100 million, which creates around 100 new jobs and simultaneously triples our wind transformer production.

Christian Bruch

executive
#10

Construction of that plant took only 13 months, and it brings over 25,000 square meters of additional production floor, which supports yearly output reaching as high as 2,000 offshore wind transformers for buyers across 70 countries. Together with the Weiz facility we have operated for a long time, Siemens Energy today provides transformers for 80% of offshore wind parks worldwide, which reinforces our leading position in this vital part of the energy transition. Turning to Croatia, the launch of the new transformer tank plant close to Zagreb — a joint venture with KONČAR — creates over 400 manufacturing positions and gives us room to build roughly 160 custom large power transformer tanks annually, which makes our global supply chain stronger. That sits within a wider €260 million expansion effort intended to double regional transformer capacity, reaching 45,000 MVA by 2031. The plant additionally reinforces Europe's manufacturing resilience by delivering heavy-duty tanks for HVDC, generator step-up transformer, and autotransformers up to 550 kV, which supports the faster grid buildout needed to integrate renewables at scale. On that note, I will now pass things to Maria.

Maria Ferraro

executive
#11

Thank you, Christian, and good morning to everyone from my end. I'm really glad to be joining all of you here, and let's begin by walking through the details for Q1 of fiscal year 2026. If we turn to slide 10, we'll look at the group's results. Orders came in at a record 17.6 billion, which represents a 34% increase versus a year ago on a comparable basis. Our book-to-bill ratio stood at 1.82. As Christian noted, the order backlog set a fresh record at 146 billion. That compares with 138 billion in Q4 of fiscal year 2025 — an increase of more than 8 billion, which once again provides us with outstanding visibility into fiscal year 2026 and beyond. Revenue came to 9.7 billion, a rise of 12.8% year-over-year on a comparable basis, and every segment contributed to that revenue growth. As a quick note, foreign exchange headwinds — mainly from a weaker US dollar — dragged on the top line by approximately 400 basis points year-over-year. Turning to profit before special items, it amounted to 1.159 million, giving a margin of 12%. That is more than double last year's 5.4%, an improvement of 660 basis points. On the FX effect in profit, just to clarify, when we look at our currency movements, there is no material impact on our profitability. Again, this ties back to what Christian said earlier — it stems from our global footprint, with robust local-for-local sourcing and effective hedging strategies.

Maria Ferraro

executive
#12

Turning to net income, it climbed to 746 million, which is 494 million higher than a year ago. Special items came in at negative 152 million, largely because of the divestment of the Indian wind business. Still, robust operational results produced a significant overall gain in earnings. Free cash flow hit a record 2.9 billion, almost twice what we delivered last year. The drivers were strong orders, reservation fees, and certain timing effects. Cash flow kept displaying pronounced seasonal tendencies at the outset of our fiscal year. Let's now examine our order backlog a bit more closely. As I noted, the order backlog set a new peak at 146 billion. Service business accounts for 45% of that backlog. Once more, these are recurring, profitable revenues stretching many years into the future. For the present year, revenue coverage is roughly 90% for the rest of the year. For next year already — fiscal year 2027 — we hold coverage of approximately just over 70%. The expanding backlog shows growing resilience thanks to broad-based demand both geographically and across every business. In addition, our order backlog margin improved further, reflecting favorable pricing trends and conditions. So, on the whole, our rising backlog together with a healthy margin once again gives us a solid foundation for financial performance.

Maria Ferraro

executive
#13

Moving on to what's behind free cash flow on the following slide. As I noted, cash flow came in quite strong in this quarter. Pre-tax free cash flow reached 2.9 billion, supported by solid profit growth and customer advance payments, among them reservation a reservation fees. That ties back to the higher order intake we saw. On CapEx, cash out for capital expenditure got off to a slow start, at 347 million year-to-date. Even so, we anticipate capital expenditure of roughly 5% of revenues, or about 2.5 billion, for this fiscal year. A quick update on the anticipated cash out tied to Siemens Gamesa quality: it came to 101 million in the quarter. As a reminder, for the full year we guided to, and continue to expect, a mid-triple-million figure, comparable to fiscal year 2025. So we ended the quarter with 11.8 billion in cash and cash equivalents alongside 3.8 billion of debt, of which 2.4 billion is long-term debt. That gives an adjusted net cash position of 7.6 billion as of the end of Q1. For comparison, the adjusted net cash position stood at 4.8 billion at the end of September, or the prior fiscal year. At our Annual General Meeting, coming up on February 26th, we will propose a dividend of €0.70 per share for fiscal year 2025.

Maria Ferraro

executive
#14

That will lead to roughly 600 million in cash going out, which we expect in the second quarter. Beyond that, the share buyback we announced at the Capital Market Day — as much as 6 billion through fiscal year 2028 — is set to begin in March. Also, just a quick update on our investment-grade credit ratings, which saw upgrades in December 2025. S&P moved us up to BBB with a positive outlook, while Moody's has us at Baa1 with a stable outlook. Turning now to quarterly financial performance, beginning with Gas Services on the next slide. As you can see there, Gas Services turned in an outstanding performance and posted another strong quarter in Q1 of fiscal year 2026. Orders came in at 8.8 billion. That's an 81% increase year-over-year, the highest order intake we've ever had, once again powered by large new unit projects in the US, Poland, Turkey, and Taiwan. Book-to-bill for Q1 came in at an impressive 2.83, which pushed GS's order backlog to a record 60 billion — another all-time high. Q1 saw a very strong gas market for gas turbines greater than 10 MW, with the US and Europe as the largest markets. Gas Services took bookings for a total of 102 gas turbines for power generation and oil and gas in Q1 of fiscal year 2026.

Maria Ferraro

executive
#15

Of those, 19 were large gas turbines, and 83 were industrial gas turbines. In Q1, our market share for gas turbines above 10 MW is 43%, which puts us in the number one spot. Gas Services revenue increased by 13.9%, just under 14%, versus last year, once more powered by robust results in new units, which posted comparable growth of nearly 51%. Profit before special items came to 515 million, with a margin of 16.6%, compared with 14.6% a year earlier, again mirroring better margin quality in the processed order backlog and improved underlying productivity. A small note on seasonality: in GS, our first-half profitability is consistently stronger than the second half, purely because of the service mix. Free cash flow pre-tax reached 1.9 billion, more than double, helped by advance payments, as mentioned on large orders. All in all, a very strong quarter for GS, and now let's look at our Grid Technologies business. Grid Technologies keeps up its strong performance. Orders totaled 6 billion, 22% higher year-over-year, with strong demand particularly in our product business and partly fueled by data centers in the US as well as a large HVDC order in the UK. The book-to-bill ratio was 1.95, again producing a record order backlog of 45 billion.

Maria Ferraro

executive
#16

We brought in revenue of 3.1 billion. That's a 26.9% rise versus a year ago — a meaningful jump, primarily powered by the solutions business, with additional support coming from transformer and switchgear. Profit before special items came to 538 million, giving us a margin of 17.6%. That's 520 basis points higher year-over-year, once more fueled by consistently robust operational performance. Free cash flow pre-tax was 1.8 billion. That's yet another considerable gain of roughly 600 million compared with a year earlier, which mirrors strong operational execution and milestone payments. Yet another robust quarter from our Grid Technologies team. Done. Now let's turn to Transformation of Industry, which once again posted a solid quarter. Orders totaled 1.6 billion, an 11% increase year-over-year, backed by compression and electrification, automation, and digitalization projects, among them a major order in the Middle East. Book-to-bill for Q1 came in at 1.21, leaving us with an order backlog — a stable order backlog — of 8 billion. Revenue was 1.3 billion, again stable on a comparable basis against Q1 of last year. Profit before special items reached 154 million, or 11.8%, unchanged, and free cash flow pre-tax was 94 million. That was only lower because of certain timing effects when measured against the prior year. Thank you to TI, and now let's turn to Siemens Gamesa.

Maria Ferraro

executive
#17

As Christian already noted, we’re seeing progress in the turnaround at Siemens Gamesa. Orders for the quarter were 1.6 billion. That’s lower than last year because of timing and a big offshore order that was booked in the prior-year quarter. Revenue was 2.4 billion. On a comparable basis, that’s up 3.9%, helped by growth in offshore and service. Profit before special items narrowed to -46 million. That’s a significant improvement from -374 million only a year ago. The positive development was mainly driven by productivity increases in offshore and progress in the service business. In addition, we benefited from prepayments or timing effects during the quarter. Free cash flow pre-tax was -545 million, and again, as a reminder, that included the 101 million quality-related cash out. With that, I’d like to sum up what we achieved in Q1. We got off to a very strong start in the fiscal year across all of our businesses and across all main KPIs: order intake, revenue growth, profitability, and cash flow. Now moving to the next slide, our outlook slide. Here is our outlook for fiscal year 2026 and our targets for fiscal year 2028, both of which remain unchanged. That said, we do acknowledge that the year began with a very strong performance.

Maria Ferraro

executive
#18

We’re also keeping in mind the seasonal pattern, where the first half tends to be stronger than the second and that usually shapes how our results land each year, especially in our Gas Services business. In certain areas, bookings and the cash flow tied to them came in above what had been expected. Still, it’s too soon to reach any firm conclusions based on this momentum from the first quarter. We’ll keep watching how things develop closely and will share an assessment when we reach the half-year mark. With that, thank you for your attention, and I’d like to turn things back to Christian. Thank you.

Christian Bruch

executive
#19

Thanks a lot, Maria. Siemens Energy is in a truly strong position to create lasting value for shareholders in a robust market. We’re seeing genuinely solid structural demand, an order book that’s both at record highs and high quality, and disciplined execution right across every segment. Our long-term value creation depends on five levers: profitable growth, margin expansion, strong cash generation, a resilient balance sheet, and consistent operational excellence. On each one of these, we’re making tangible progress. I’m deeply grateful for our people’s dedication — they make this company a little better every day and support our customers. We understand that we have to deliver, and our full focus is on exactly that: reliable execution and consistent performance. With that, let me hand things back to Tobias for the question-and-answer session. I’m looking forward to your questions.

Tobias Hang

executive
#20

Thanks a lot, Christian and Maria. We'll begin today's Q&A session now. Should you wish to pose a question, kindly press *1 on your telephone keypad. Once more, if you'd like to ask something, please press *1 on your telephone keypad. If you'd rather withdraw your question, press *2. I can see already that quite a large number of questions is lined up in the queue, so right from the outset I'd really like to ask each of you to keep it to one question apiece. The first three to ask will be Alex Jones from Bank of America, Max Yates from Morgan Stanley, and Ajay Patel from Goldman Sachs. Alex, go ahead, please.

Alexander Jones

analyst
#21

Thanks, Tobias, and good morning. Perhaps I could turn to gas orders. During the CMD in November, you mentioned 36 GW of orders across the coming 12 months, yet it’s clear you’ve begun ahead of that run rate, with 13 GW in this quarter. Christian, I believe on the press call earlier you stated you wouldn’t describe Q1 as exceptional or one-off, given how strong market demand is. So, with the demand you’re seeing, is there upside to that 36 GW figure, and could momentum persist at a pace similar to Q1 over the next few quarters? Thank you.

Christian Bruch

executive
#22

Appreciate the question. During the press call, I mentioned that I keep seeing solid momentum in the market. Naturally, it will also come down to how many slots are open to us and how fast '29 fills up. My usual guidance is not to multiply it by four, yet at the same time we are clearly doing our utmost to keep this going. For now, I would still be working from a 36 GW planning base. We could end up above that. That's possible, but it truly hinges on some larger commitments. What stands out in the market right now is, as you can see, multi-train and bigger orders, and that is what shifts the needle when it comes to the gigawatts as well. As Maria mentioned regarding the other comments, it's a little too soon to say how things are developing, but I am certainly bullish about the market on GS.

Alexander Jones

analyst
#23

I appreciate that.

Tobias Hang

executive
#24

Much appreciated. Max Yates gets the following question.

Max Yates

analyst
#25

Thanks. Morning, everybody. My question really had to do with pricing. Can you help us understand what portion of the year-over-year order growth comes from pricing? And then, building on that, we know pricing exists in new equipment, so to speak—could you also address pricing on the longer-term service agreements you're getting alongside these new orders? Are you likewise seeing a meaningful step-up in the service contracts, and in particular the longer-term service agreements you're signing right now with the new equipment? Thank you.

Christian Bruch

executive
#26

Thanks, Max. Clearly, margins have improved compared with a year earlier. And the other point, of course, is what we produce — we're seeing incoming orders come in above the older ones. Pricing on the gas turbine side keeps appreciating. On the service side, I'm just working through that right now. As we've consistently said, this is edging up a bit, as business? And bear one thing in mind: you'll only see that after '28. A lot needed to put this into perspective.

Max Yates

analyst
#27

Appreciate it.

Tobias Hang

executive
#28

Much appreciated. Ajay Patel gets our next question.

Ajay Patel

analyst
#29

Morning, and thank you for the presentation today. I just wanted to ask a question about cash flow. Is there any reason the shape this year doesn't look similar to last year on cash flow? And then, if we do end up running ahead on cash flow, is it fair to assume capital allocation works the same way, with a third of cash flows going toward cash returns? I just want to confirm that link holds if we do end up doing better than we expected. Thanks.

Maria Ferraro

executive
#30

Thanks. Of course, yes — like I said before, we got off to a genuinely great start this year, and we're beginning from a very solid position. I think, perhaps speaking to your question about how to think about the shape of free cash flow and the way it builds, it's obvious that the key drivers are a handful, but definitely the robust order intake. Again, as Christian said earlier, the market remains very favorable. Still, orders had a pretty strong quarter, and we shouldn't take that and times it by four and claim that's what to expect. On top of that, one more thing — I think one of the dynamics that maybe isn't, shall we say, fully grasped is that we have reservation fee agreements, and given how that momentum is developing, that's actually a fairly sizable figure. And also, I'd say one of the efforts we kicked off some time back is examining our operating working capital and figuring out how to unlock cash. That's something that doesn't appear linear in nature in a few of our, let's say, challenging countries, where we've found we've had quite a bit of success collecting some of the overdue payments there.

Maria Ferraro

executive
#31

To repeat what I said, we got off to a solid start this year. In certain areas that ties back to volume, though we'd like somewhat clearer visibility as the year goes on, and we'll follow up with you.

Tobias Hang

executive
#32

All right, thank you very much, Ajay. Our following three questions will come from Sebastian Growe at BNP Paribas, Richard Dawson at Berenberg, and Gael de-Bray at Deutsche Bank. Sebastian, the floor is yours.

Sebastian Growe

analyst
#33

Thanks, Tobias. Hello, Maria. Hi, Christian. My question concerns the GT segment, where momentum appears very strong on both orders and execution, and not least on free cash flow. How should we think about the order pipeline in that business? Are you in a similarly favorable position as for GS, that is, to sell slots to customers as well? What I'm trying to better understand here is what explains the massive free cash flow strength in the quarter in GT in particular, and how it might trend from here. If I may just quickly follow up on one of your earlier remarks, Maria, that there's a sizable impact from those reservation fee agreements. Could you quantify those? Thank you.

Christian Bruch

executive
#34

Perhaps you'd go with cash. I hope we caught your question correctly, Sebastian, since the audio quality was extremely poor. If what you asked about was order pipeline momentum in GT—if I've understood you right—that is clearly something that remains strong as well, and every quarter you can bet on which one leads, gas or grid, but in that respect I'd say both appear very strong. Data centers play a role there too, perhaps less distinctly; it's more about general grid replacement and stabilization. I certainly view this as a strong outlook for the year as well, and I think we also said at the Capital Market Day that we expect orders to come in above last year's level.

Maria Ferraro

executive
#35

Exactly. Perhaps I could just build on what Christian said regarding GT. Profit also plays a role there, and it's driven by robust orders too, which we expect and keep expecting in Grid Technologies. On the GT slide we also noted that part of it involved milestone payments, and some of those moved into Q1 as well. Naturally, we anticipate very strong operational and underlying performance in GT, and all of that is in fact reflected in their very strong free cash flow, let's say. There's also a reservation fee component for GT. I think that matters as well. It plays a role, let's say, when delivery can perhaps be expedited even further. On reservation fees, no, we don't disclose the amount of reservation fees, which of course changes in line with, as Christian laid out earlier, how much, let's say in GS, how many gigawatts are reserved, and so on. The reason is simply that it varies. It's quite variable depending on the contract, the size, and the customer.

Sebastian Growe

analyst
#36

Thanks to the two of you. I appreciate it.

Tobias Hang

executive
#37

Thanks, Sebastian. We'll take our next question from Richard Dawson at Berenberg, please.

Richard Dawson

analyst
#38

Hello, good morning, and thanks for taking my question. Just to follow up on those reservation agreements — have you begun to notice any customers perhaps hesitating about signing one, especially in gas turbines, where the delivery lead time is so long? Could you comment on how Q2 is shaping up for those reservation agreements? Thank you.

Christian Bruch

executive
#39

So how are things shaping up — sorry?

Richard Dawson

analyst
#40

Regarding the second quarter.

Christian Bruch

executive
#41

The second quarter is looking good. Q2 is coming together—sorry about that. Clearly, the main issue is delivery timing. That's what every customer wants to know first, and it's clearly tied to 2028 and 2029. The further out you go—2030, 2031, and meanwhile all the way to 2032—the more hesitation there obviously is compared with agreeing right away, since everyone wants delivery in 2028 or 2029. Still, in that respect, I'd say the basic appetite for the reservation agreement hasn't shifted. It's more a matter of whether you can deliver certain things, and clearly we're doing everything possible to bridge things for customers. I see this carrying on at the same level in quarter two as well. That said, we do have to acknowledge that our delivery times, obviously, keep getting longer, and that's simply the reality. Let's say I was out last week meeting plenty of customers myself—interest remains as high as it was before.

Richard Dawson

analyst
#42

That's wonderful. Thanks so much.

Tobias Hang

executive
#43

Much appreciated. Our following question comes from Gael de-Bray at Deutsche Bank.

Gaël de-Bray

analyst
#44

Hello. Good morning, and thanks a lot for taking my questions. I'm wondering whether the service revenue in the gas division, which was flattish this quarter, matched what you yourselves had expected, and how we ought to view that for the rest of the year. Since that's probably a very short question, I have a second one about pricing. You've touched on this a bit already, but when I look at the backlog rising by 10 GW sequentially and by 6 billion in value terms, my back-of-the-envelope math suggests a price per gigawatt of roughly €600 million this quarter, which is a major step-up versus what we saw last year, I believe. Maybe you could comment on that, because I think you said prices were only rising slightly. Thank you.

Christian Bruch

executive
#45

Taking that last question, my feedback would be no — I wouldn’t break it down here, because I think it starts getting confusing when you look at the backlog and try to apply the percentages. I’d hold off from breaking it down in more detail.

Maria Ferraro

executive
#46

Sure, and I’ll address the point you raised about service revenue. As we said, on an overall basis, revenue faced a fairly significant FX headwind of 400 bps, and by the way, that’s directly tied to service revenue, as you’re aware. We have a big installed fleet in the US, and that does factor in. Once you strip out the FX effect, we actually don’t see it as sluggish at all. For the quarter, it’s, let’s say, marginally flat. There were a few one-off items from the prior year, and for the fiscal year, consistent with pricing, we do expect growth, and that’s precisely what we laid out at the Capital Market Day. It comes down to FX, Gael.

Gaël de-Bray

analyst
#47

Much appreciated.

Tobias Hang

executive
#48

Thanks a lot. We'll take the next three questions from Philip Buller at J.P. Morgan, William Mackie at Kepler Cheuvreux, and Lucas Ferhani at Jefferies. Phil, go ahead, please.

Phil Buller

analyst
#49

Thanks. Morning, everyone. Clearly, demand right now is quite robust. I wanted to inquire about how supply is looking, if I may. CapEx, as you mentioned, got off to a somewhat slow start. It's 3.6% of sales against a 5% guidance for the year, I believe. Is there anything we ought to take from that? Could there be any supply constraints as you ramp output, maybe in GS or possibly in GT, or has anything shifted versus your expectations on the supply side? Thanks.

Christian Bruch

executive
#50

Thanks. Regarding the capacity build-out, no, nothing should be inferred from that. It's more, shall we say, the usual phasing — when planning starts, when contractors receive their contracts. That's business as usual. At the moment, we really have no worries when it comes to executing our own capacity expansions. On the supply chain, yes, that's something we have to monitor very closely. We saw some negative supply chain effects in quarter one, particularly, obviously, on the gas turbine side. Not surprisingly, the supply chain is also a market for the relevant supplier, which is good. We obviously see them raising prices there as well. We keep working with our suppliers on what can be done to expand the supply chain — co-investing and similar measures. Given the impressive demand on the gas services side, this will stay with us over the next two years, I'd say. You'll see it on the customer side too. That's not so much us — it's really the EPC contractors, the civil works and so on, that push up the total installed cost. We'll need to keep a very careful eye on this, but we're on it, and that was also why we put further money into Florida for our blade and vane manufacturing.

Phil Buller

analyst
#51

That’s excellent. Thank you so much.

Tobias Hang

executive
#52

Thank you very much. Our next question comes from Will Mackie. Please proceed.

William Mackie

analyst
#53

Morning, everyone. Thanks for taking my question. Mine builds on Phil's, really. Can we check in, or could you remind us where things stand on your capacity to meet demand in '26 and '27 in GS and GT? What I mean is, what should we be planning or thinking about when it comes to gigawatt install or deliveries across large and industrial turbines, and across the main elements of the product business in GT? Thank you.

Christian Bruch

executive
#54

Will, I have to say that you're stretching my memory a bit. I'm doing the best I can. The major item in '26 that comes online is on the mid-sized gas turbine — that's the increase in Finspång, which is the SGT, which will come in toward the end of the year. The large gas turbine pieces obviously all come in '27. Also keep in mind that the numbers we showed at the Capital Market Day also included a steam portion for the larger gas turbines. Regarding delivery for '25, rather than state a wrong number now, I think we need to get back to you on the exact planning. Tobias will follow up with you on that one.

William Mackie

analyst
#55

Thanks.

Tobias Hang

executive
#56

Much appreciated. We'll now take the following question from Lucas Ferhani. You have the floor.

Lucas Ferhani

analyst
#57

Thanks. Morning, and I appreciate you taking the question. Mine is about the SGRE business. On those timing effects you mentioned regarding margin, could you provide a little more detail on what exactly they are, and perhaps the figure behind them — what would the underlying margin come out to? Then, on the onshore order side, it's a solid start, but I'd like to know what you've budgeted for full-year '26 onshore order intake. What would you consider a successful outcome for the relaunch? Thank you.

Maria Ferraro

executive
#58

Let me give that a try. I really do apologize, since hearing you was hard, and I hope I got it right. The first portion of your question, I believe, concerned the one-time effects or the timing effects in the quarter one profit, and the second portion concerned order intake for onshore. I'll begin with the Q1 profit. Probably the majority is more from Q2. Again, to give some context on that, overall the range was likely in the neighborhood of a mid-double-digit amount. A few examples include certain hedging effects, positive hedging effects. Naturally, those get reversed or evened out as well, naturally, while we keep executing in the quarters ahead. There was, as you'd expect for a large project business such as Siemens Gamesa, some project benefits and shifts. It does happen, right, that customers take over projects even sooner than anticipated, and that is what occurred in Q1 as well. Again, somewhat to offset that, and something to bear in mind when you consider things quarter by quarter, there is, naturally, continuing uncertainty around tariffs. We mentioned that last year, that in the wind power business, in fact, the tariff impact was the most substantial among all of ours.

Maria Ferraro

executive
#59

Naturally, we are monitoring that situation very closely. Once more, the tariff-related assumptions we have for this year are completely reflected in the guidance we've provided. At this stage nothing points to anything, but nothing extra was recorded in Q1 regarding wind power, though it might materialize in later quarters. Regarding Q1 orders, and again on the onshore side, Q1 matched the prior year. Keep in mind, as Christian just noted, some orders are on the way. We're now seeing some, let's say, traction with the new frames, yet it was in line with last year. I believe it came to 0.8 billion, just under 1 billion, and that was as expected.

Christian Bruch

executive
#60

Just to give a quick sense of where we stand: we're on the path toward the goal we've set for ourselves. Our aim is to reach the order intake we saw last year. One thing to remember is that we set a limit for ourselves — we said, this is how many turbines we intend to sell in the first phase — and we're making sure, of course, that we truly put everything to the test and proceed with great care. On that front, that's the key point. I'd say we are right on plan.

Tobias Hang

executive
#61

Thank you very much. The following 3 questions will come from Chris Leonard at UBS, Sean McLoughlin at HSBC, and Alex Virgo at Evercore. Chris, go right ahead.

Chris Leonard

analyst
#62

Hi, thanks for taking my question. Perhaps building on the wind side, with a focus on European offshore wind development, do you have any comment about what we should expect regarding potential UK offshore wind order allocation for you in '26 or '27? Likewise, any remarks on the recent European plans for the North Sea would also be helpful. Thanks.

Christian Bruch

executive
#63

Appreciate the question. A few thoughts on offshore wind. If you check the quarter one order intake — and worth pointing out too — there was also an offshore order in Poland that added to the order intake in quarter one. On UK auction round seven, discussions are still going on, not yet fully clarified, and it's too early to say. Yes, we're clearly also examining certain projects there, and talks continue. Regarding the 15 GW that came out of the North Sea Summit, or 15 GW per year from the North Sea Summit, yes, I think this will clearly be great for the offshore industry, good momentum. We now have to see how that gets converted into auction schemes. You may be aware that Germany brought its scheme forward and is re-discussing the framework, which is fundamentally a good thing, because ultimately it isn't about the auction, it's about the FID. My expectation is that from this North Sea Summit we'll clearly see momentum building in the offshore industry as we go forward, potentially not in '26, more likely coming in '27, '28.

Chris Leonard

analyst
#64

That’s useful. Thanks.

Tobias Hang

executive
#65

Much appreciated. Sean McLoughlin gets our next question.

Sean McLoughlin

analyst
#66

Thanks. Morning. I wanted to ask about the gas turbine mix. For a new mid-sized turbine, what lead time are you quoting right now, and how does that stack up against the lead times on a heavy-duty equivalent?

Christian Bruch

executive
#67

It really depends on the kind of mid-size unit and the kind of turbine involved, and on keeping some flexibility there, let's say. Like I mentioned earlier, there are a few slots here and there in '27 and '28 as well, which we attempt to balance, and those involve mid-sized gas turbines, then with multiple trains. There's also a fair number of reservation agreements covering the mid-sized gas turbines. Today, I'd say you're looking at let's say at minimum a year shorter compared with the large gas turbines, purely because of where the supply chain stands.

Sean McLoughlin

analyst
#68

Thanks. If I could, a quick follow-up. Thinking about how much the major hyperscalers have ramped up their CapEx commitments, I suppose that raises the question of urgency. Are you seeing greater interest in mid-sized turbines that they can get their hands on faster, or does the mix still span all of your turbine types? Thank you.

Christian Bruch

executive
#69

No, absolutely. Let's say timing is the dominant decision factor right now. If you can deliver faster, smaller turbines, they go for more smaller turbines. You also see some solutions which I deem not ideal from an efficiency perspective, if I look on lots of small gas engines or so, which we do not do ourselves, but I see some solutions discussed just to bring power to the sites. What we are seeing is and what is really, really good for us, we're seeing a very strong demand across all different frames of gas turbines, even below the mid-sized gas turbines. In that regard, we can play the full breadth of our portfolio, and that's super.

Sean McLoughlin

analyst
#70

I appreciate that.

Tobias Hang

executive
#71

Much appreciated. Our following question comes from Alex Virgo.

Alexander Virgo

analyst
#72

Thank you so much. Good morning, Christian and Maria. Appreciate you taking my question. I was hoping you might be able to elaborate just a bit more on that final point — the 83 units you had in industrial turbines, and the color regarding order backlog exposure to hyperscalers. Could you perhaps speak a little to whether that figure within industrial turbines is genuinely what is driving and underpinning the hyperscaler exposure? As something of an extension to that, your US peer has just signed a large framework agreement — a multi-unit framework agreement — and I think you alluded, Christian, to that in what may have been an earlier answer or in your prepared remarks; you spoke about the trend toward multi-units in the context of the customer discussions you're having. I was wondering whether you could give us a sense of whether it's likely that you're able to sign something similar, or whether you're seeing that in the discussions you're having. Thank you very much.

Christian Bruch

executive
#73

Thanks, Alex. I also hope I heard you correctly there, since the call quality is poor at times. Looking at the, how should I put it, the variety within the order book, and this is what I believe I heard from you, Alex, regarding the different areas. Obviously, it's fairly evenly spread across the frames. Yes, the largest portion by numbers, clearly more than 50%, is the mid-sized gas turbines. You have it spread fairly evenly really across the various regions. Roughly 40% is US, as I said, 35% EU, 15% Middle East and China. If you look at the order book for what we currently have, roughly two-thirds is new unit, one-third is service. That's roughly the distribution around it. If you take the data centers on the '29 on the orders, and if you talk about the 29 GW of reservation agreements which we have outstanding, only half of this is data centers, and half of this is conventional businesses, what we're seeing, which also means only half of this is US. This is obviously the diversity which we have in the order book. Was there a second part of the question?

Christian Bruch

executive
#74

Regarding multi-unit — multi-unit, thanks for that. On multi-unit contracts, yes, definitely, that's something we observe. It isn't only in data centers that we observe it. Certain applications exist where we don't communicate this so prominently, since not every customer wants that. Bigger multi-unit contracts also exist beyond the data center framework, which we have taken and will keep taking. Within the data center area we additionally see framework agreements spanning several years, and clearly plenty of units are under discussion and likewise being concluded into our order book.

Tobias Hang

executive
#75

Thank you very much. We now have three final questions, and they'll come from Vivek Midha at Citi, then Vlad Sergievskii at Barclays, and finally a follow-up from Phil Buller. Vivek, the floor is yours.

Vivek Midha

analyst
#76

Thanks a lot, Tobias, and good morning. I hope I’m coming through clearly. I wanted to ask about Grid. A 17.6% margin is quite strong and sits in the upper half of the full-year guidance range. In the past, Grid hasn’t been a business with especially obvious seasonality. Should we treat the upper half of that range as a better indication of the full-year margin? Could you also discuss the ongoing fixed-cost degression effects you mentioned last year, compared with pricing impact and similar factors? Thank you.

Maria Ferraro

executive
#77

Thank you, Vivek, for that, and for posing a question about the really strong profit performance at Grid Technologies. Perhaps just a brief lead-in first. They posted a robust margin in the first quarter. There are also some underlying items, such as FX hedging at times, one-time favorable effects, though I don't want to dwell on those too much for Grid Technologies. What they've accomplished, and what they keep doing, is to execute very efficiently through their backlog, focusing on areas like productivity. Fundamentally, we're seeing a very steady and favorable trajectory, and in fact that's visible not just quarter-over-quarter but year-over-year as well. It was high. I'd really point to their guidance of 16% to 18%, right, and watch how that, let's say, develops quite stably over the coming quarters.

Vivek Midha

analyst
#78

Thanks so much.

Tobias Hang

executive
#79

Thank you very much. Vlad is up next with our following question.

Vladimir Sergievskii

analyst
#80

Yeah, good morning, and thanks a lot for taking my question. Gas turbine orders were obviously exceptionally strong in the first quarter. Could you give us a sense of how much that extended your backlog duration in Gas Services? And then a more conceptual question: is there a natural limit to how long backlog duration could get to? Is there a point where it becomes harder for customers to plan that far upfront?

Christian Bruch

executive
#81

Yeah, do you want to handle that, or?

Maria Ferraro

executive
#82

Why don't I handle the first one, Vlad? And once more, please set us straight. Again, it was somewhat hard to catch. Regarding the backlog, as I displayed earlier, the 146 billion, with 45% of it being service, this fits really well with the Gas Services backlog. I believe we demonstrated that rather clearly at the Capital Market Day as well, where we observed an improvement in margin not only for new units but for service too. The good thing about the Gas Services backlog, which stands at 60 billion, incidentally, an all-time high for them, is that when you look at new units, you typically have — depending on frame size, and I think Christian described that well a moment ago — it hinges on the frame size how long something stays in our backlog before final execution. Big frames take three years, perhaps three to four years, while the smaller frames are likely between 12 and 24. What's genuinely great about the Gas Services backlog is the service portion within it, and that carries an average duration across our long-term service program contracts of roughly 13 to 14 years. When I speak of visibility in the 146 billion backlog, I'm not merely referring to next year or the one after — I'm really talking about the visibility we have stretching toward the end of the decade and past it.

Maria Ferraro

executive
#83

To reiterate, I believe that 10 billion of the backlog we currently see will still be worked through by the close of the fiscal year, if you look at it that way. After that, an extra amount—let's say above that, somewhere between 10 and 20 billion—would be carried out into the following fiscal year 2027, as a rough guideline. Once more, everything hinges on how much we replenish the backlog and, naturally, what we complete within it. Thank you for asking.

Tobias Hang

executive
#84

Much appreciated. Phil gets the final question one more time.

Phil Buller

analyst
#85

Hi, thanks for the follow-up. I think a lot of these questions are attempting to break apart the more traditional customer environment in GS from the data center customer. I was hoping just to get a little clarification. I think you said a quarter of the backlog is now data center for new units, but for those traditional customers, is the book-to-bill in Q1 comfortably above one? On reservation agreements, I know you don't disclose what the cash component is, but are there any reservation payments at all coming from traditional customer sets, and are you seeing signs of price elasticity specifically for that traditional customer set? I know in aggregate pricing is very good, but I'm just trying to drill down on the situation for that more traditional customer set, please. Thanks.

Christian Bruch

executive
#86

Thanks. In the first quarter, gas revenue comes to about 3 billion, correct? Order intake stands at 8.8 billion. Yes, that's right. On a strictly conventional basis, book-to-bill is above one, which is also why I gave that 25% indication. We're comfortable with the other existing markets as well. That's why I keep saying we don't depend on data centers — they're the cream on the cake. Of course, if you get an early slot, so to speak, you can earn quite nice profits on that. Looking ahead, and also when it comes to reservation agreements, these matters are likewise being discussed with classical customers. For utility-driven customers, the timing pressure is somewhat more flexible, I'd say. Bear in mind, we now have the upcoming 10 GW discussion in Germany, right? Certainly, we're already incorporating that into long-term planning, we intend to serve this market, and we will be in it. All of this is being taken into account at present. Overall, I'd say it's a good market for gas.

Phil Buller

analyst
#87

Much appreciated.

Tobias Hang

executive
#88

That brings the Q&A portion to a close. Christian, I’m not sure whether you’d like to offer a few closing remarks right at the end.

Christian Bruch

executive
#89

No, it's also just an invitation to the AGM, or to join us there, to look back and also look ahead. No, thank you so much for being part of this call. It's been an interesting quarter. I'm very, very proud of our organization and how they executed through a demanding period, I have to say, given the geopolitics and everything and the heavy workload. Many thanks to everyone who was on the call, and many thanks to the team purple here at Siemens Energy.

Tobias Hang

executive
#90

Thanks a lot, Christian. That brings us to the end of today’s call. Should anything come up, feel free to get in touch with the Investor Relations team at any time. Thanks, everyone. Bye-bye.

Operator

operator
#91

Today’s conference call ends here. Thanks for joining us, ladies and gentlemen. A replay of this call can be found in the Investor Relations areas of the Siemens Energy website. The site address is www.siemens-energy.com/investorrelations. Have a nice day. Bye-bye.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Siemens Energy AG transcript — plus 131,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Siemens Energy AG earnings transcripts and 131,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Siemens Energy AG or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.