executiveGood afternoon, everyone, and welcome to the first half 2021 results conference call for Soltec Power Holdings. I'm Meritxell Pérez de Castro-Acuña, Head of Investor Relations, and with me today, as always, are Soltec's CEO, Raúl Morales, Powertis' CEO, Pablo Otín, and Soltec CFO, José Núñez. They'll walk you through the H1 and Q2 2021 results, and after that, we'll have time for Q&A. Starting now, you can submit your questions on the platform. Thank you, and I'll now pass things over to Raúl. Raúl, please go ahead.
Raúl Morales
executiveThank you, Meritxell, and good afternoon to all of you. We'll begin with the period's key points. I'm on page 5 now. Revenues for the first half of the year came to EUR 87.1 million. Adjusted EBITDA for that same half was minus EUR 19.1 million, with net profit at minus EUR 19.9 million. Net profit pro forma was minus EUR 16.9 million. As José Núñez will detail, the pro forma net profit figure excludes the temporary net effect of Brazilian reais hedging derivatives that were closed at the start of June across several projects. Turning to the second quarter, revenues were EUR 58.6 million, up 7% compared with Q2 2020 and 106% higher than the first quarter. We're emphasizing the second quarter because Q1 revenues showed lower activity levels. As anticipated, second-quarter revenues rose compared with the prior quarter, and the year's second half should outperform the first, with a target of EUR 395 million to EUR 440 million for the full year. José Núñez, our CFO, will provide further detail later. Our operational indicators continue to post record figures. That reflects both the strength of our business and the sustained strong demand for our products.
Raúl Morales
executiveAt Soltec Industrial, the backlog kept increasing, reaching EUR 363 million, while the pipeline hit EUR 2.9 billion during that time. Regarding Powertis, which is part of the Project Development division, we rotated 679 MW across Spain and Italy in the first six months of this year, as Pablo will detail later on. The pipeline went on expanding considerably, now at 7,100 MW, and we've moved into a new market, Denmark. Allow me to recall that on September 8th, we issued our guidance for the whole of 2021. For Soltec Industrial, revenues are anticipated to land between EUR 395 million and EUR 440 million. On EBITDA margins, our expectation for Soltec Industrial is a range of -1% to 1%. The biggest adjustment occurs in the Industrial division's margins, largely because of present circumstances in the sea freight market, the supply of personnel in the areas where we operate, and shortages affecting some electronic components. This isn't a revenue issue. Our backlog has kept climbing to record highs. We're witnessing robust demand for our products throughout the third and fourth quarters of the year. As for Powertis, we anticipate a pipeline of 10 GW for the full year, consistent with what we expected, along with assets rotated either partly or fully in the 600-1,000 MW range.
Raúl Morales
executiveWith regard to those conditions just mentioned, we've examined the opportunity cost tied to or connected with the rotating assets at a very early stage, and we chose to delay some rotations so we can pursue improved margins. Moving to slide six, allow me to walk through the global disruptions the industry is currently experiencing, how they affect our manufacturing process, and what steps we're taking to mitigate them. A shortage of electronic components could add to supply chain pressure during the 2nd half of the year. Raw material prices are rising, chiefly steel. As we've said on multiple occasions, we pass steel prices through to our clients. In addition, we're requiring extra guarantees to make sure commitments are honored. When it comes to delivery of our tracker, I want to stress that it's being hit by what is for us the most significant disruption, namely shifting conditions in international logistics. Lastly, installation. What we're seeing here is a shortage of qualified personnel in certain countries. Furthermore, mobility restrictions in certain regions have helped fuel this bottleneck. The two biggest disruptions for us today are logistics and the shortage of qualified personnel in certain countries.
Raúl Morales
executiveAs we said, we're working hard to soften these effects. To sidestep the impact of price shifts in international logistics, we're altering the delivery terms and conditions on our products. That means free on board, or different origins close to destination, so the logistics hit is minimized. Where we can, we use break bulk rather than containers. We're also signing new agreements with suppliers that give us more flexibility internationally, giving priority to those nearer the projects in order to cut freight movements and also lower their environmental impact. We're taking further steps as well to help us get profitability back. First, we're making changes in the international structure to meet these new challenges, including separating tracker supply from services to improve accountability. Second, we're changing the Powertis business model too, temporarily reducing asset rotation to achieve higher value. This rests on the notion that in the current environment we can be more efficient through greater integration, covering the whole value chain. For instance, rotating at COD. Pablo will give you more detail later on. I'm now on page number seven. We're seizing on the disruptions just mentioned to sharpen our value proposition and strengthen our organization so we capture value.
Raúl Morales
executiveOne of Soltec Power Holdings' highly relevant strengths is vertical integration and worldwide diversification, which let us capture value across the entire chain and steer clear of risks in particular countries. Global disruption is helping us implement new measures efficiently so the company adapts to these fresh challenges and refines our processes. We are adjusting the development strategy to boost profitability by postponing the rotation of certain assets. In innovation, we remain at the industry's forefront. In the course of 2021, we launched a new product, SFOne, a one-peak configuration tracker designed for flexibility and to fit the needs and requirements of each market and each customer. Last but not least, we recently launched a new concept, the Ecovoltaic, so we can develop sustainable solar plants having a positive impact on the environment, the economy, and the local communities where they are situated. As shown on page nine, we have achieved a track record of 9.3 GW, which positions Soltec Power Holdings as the third global tracker supplier by accumulated gigawatts. Turning to our diversification, Latin America represents 46% of delivered gigawatts, then North America at 26%, Europe at 18%, the Middle East at 7%, and Asia Pacific at 3%.
Raúl Morales
executiveTurning to the business on page number 10, we keep posting record highs for both our backlog and our pipeline. By the close of June 2021, backlog stood at EUR 363 million — up 91% year-on-year — representing 3.7 GW. Even with market conditions proving difficult, we are showing a strong ability to close contracts. A solid illustration is the project we signed recently with Moss & Associates, which bolsters our standing in the U.S. market, a key market in the solar and tracker industry. Our pipeline likewise grew 35% year-on-year, hitting EUR 2.9 billion, which corresponds to over 25 GW. Powertis is adding EUR 26.8 million, or 225 MW, to Soltec's backlog, and EUR 720 million, or 1.6 GW, to the pipeline. Given how strong these operational indicators are, we can expect revenues for the third and fourth quarter of 2021 to show a significant rise in solar tracker supply compared with the first half of the year. With that, I'll hand things over to Pablo.
Pablo Otín
analystThank you, Raúl. Good afternoon to everyone. It's a pleasure to join you all today. Over the course of the year, Powertis achieved meaningful headway toward the objectives we set for 2021 — specifically, reaching a 10 GW portfolio, doubling how many markets we serve, and carrying on with our strategy of rotating assets. At the close of the first half, our pipeline came to 7.1 GW. Backlog amounts to 722 MW. Those projects are entirely de-risked, and construction could begin on them within the coming 6 - 2 months. Another 887 MW sits at an advanced stage. A large share of those projects has already been partly rotated and generates cash flow for the company. Then we have 2,048 MW of projects at an early stage, along with 3,426 MW of identified opportunities. Early-stage development projects carry a completion probability below 30%. To sum up, we are expanding in Brazil and Spain as forecast, and considerably quicker than expected in Italy. Regarding Italy specifically, we expect the company to exceed the 2 GW target during this 2021, which would place Powertis among the leading developers in that country. At present, Powertis operates in six markets: Brazil, Spain, Italy, Colombia, Denmark, and the U.S. In the months ahead, our aims are to broaden our footprint into new markets — chiefly Colombia and the U.S. — and to establish the groundwork for additional expansion.
Pablo Otín
analystFor the company to succeed over the long term, this expansion strategy matters a great deal, since from 2023 onward those new markets are going to be the main drivers of Powertis' P&L. By turning ourselves into a global developer, we lower our exposure to any single market and to possible regulatory shifts — like the ones we recently ran into in Spain through Royal Decree 17-2021 of September 14, which set the clearing prices for energy that certain technologies and projects sell into the spot market. A few days after publication, the Royal Decree was clarified, and those amendments seem to have lessened the ultimate effect on the solar industry. I want to point out that right now, no Powertis project is impacted by Royal Decree 17-2021. Turning to megawatts rotated, Powertis had sold 679 MW as of June 30th, mostly in Spain and Italy. That number counts 249 MW we transferred in December 2020 but booked in Q1 2021. Most of the megawatts transacted during 2021 are coming out of Italy, and that trend will carry on for the rest of the year. Our Italian portfolio is very strong, and we have completed further closings through Q3 2021.
Pablo Otín
analystTurning to Brazil, the present market backdrop makes asset rotation difficult at this early point. So we accept that keeping those projects and rotating them later is the better path for the company. Powertis is constructing 2 projects in Brazil, adding up to 225 MW. In Spain, in addition to the projects we have in partnership with TotalEnergies, we have succeeded in building a highly attractive and valuable portfolio. New build projects there are becoming scarcer, and our 2021 achievements make us very proud. As I mentioned earlier, Royal Decree-Law 17-2021 does not affect us. On new markets, we remain at an early stage, and contributions will begin to appear over the coming months. I will now pass things to José Núñez, who will walk through the key financial metrics for the period.
José Núñez
executiveThanks, Pablo. Good afternoon, everyone. We'll now turn to our financials for the first half and for Q2 2021. First, a brief look at the key metrics for the quarter. Slide 16 shows revenues rising 7% in the second quarter of 2021 to EUR 58.6 million, versus Q2 2020. Adjusted EBITDA, though, fell EUR 3.9 million, landing at negative EUR 12 million. By the end of June, the backlog booked by Soltec Industrial had hit a fresh record of EUR 363 million, as was explained earlier. Slide 17 breaks things out by quarter for Soltec Power Holdings and its two divisions, Soltec Industrial and Powertis. Delays stemming from higher prices for raw materials and solar PV equipment weighed on consolidated revenues in the first quarter, yet Q2 2021 showed a modest recovery. Turning to consolidated EBITDA and net profit, both were affected by the disruptions Raúl Morales already described. Consolidated adjusted EBITDA came in at negative EUR 19.1 million for H1 2021, of which negative EUR 17.9 million was from Soltec Industrial and positive EUR 0.4 million from Powertis. It's worth noting, I think, that this consolidated adjusted EBITDA figure also takes in the corporate expenses of Soltec Power Holdings along with the consolidation adjustments.
José Núñez
executiveFor the first half of 2021, net profit came in at negative EUR 19.9 million, and pro forma net profit was negative EUR 16.9. That pro forma figure leaves out the temporary net effect of Brazilian reais hedging derivatives that were closed at the start of June for a number of projects — Casablanca, Futura, Araxá, and Pernambucas. Because at the end of June we didn't have the impact of the underlying liabilities those instruments were meant to hedge, and the mark-to-market valuation of those instruments produced a short-term negative result that no longer applies. Let me give you some further detail on the second quarter results, on slide 18. As I explained earlier, consolidated revenues in the second quarter came to EUR 58.6 million, which is EUR 3.7 million more than in Q2 2020. Consolidated adjusted EBITDA was negative EUR 12 million, down EUR 3.9 million from the Q2 2020 figure. Net profit totaled negative EUR 15.3 million at the close of Q2 2021, versus negative EUR 9 million at the close of the same period in 2020, and pro forma net profit for the quarter was negative EUR 12.3 million. Soltec Industrial sales rose to EUR 59.6 million. EBITDA was negative EUR 9.3 million, and net profit and pro forma net profit were negative EUR 13.9 million and negative EUR 10.9 million, respectively.
José Núñez
executiveOn the other side, Powertis recorded an EBITDA of negative EUR 1.7 million and a net profit of negative EUR 0.5 million, which came from lower asset rotation during the quarter. If you look at slide 19, we can review how cash was generated in H1 2021. The year opened with EUR 125.7 million in cash. Operating activities brought in EUR 17.5 million of cash inflows. Investment activities contributed another EUR 0.3 million, whereas financing activities used up EUR 13.6 million, which left us with a cash position of EUR 130.2 million as of June 30th, also taking into account the impact of exchange rate movements. Moving to slide 20, you can see that we ended June 2021 with a net cash position of EUR 20.4 million, made up of EUR 109.9 million in gross debt — primarily owed to credit institutions — and a cash position of EUR 130.2 million. As we described on the call held at the start of September, because we don't anticipate rotating the two assets currently under development in Brazil, Araxá and Pernambucas, before construction finishes, our net financial debt at year-end will be affected as a result, producing an estimated increase of EUR 120 million-EUR 130 million.
José Núñez
executiveSo with no more delay, I'll hand things back over to Raúl, who will give the closing remarks. Raúl?
Raúl Morales
executiveThanks, José. To sum up the main point for the presentation: revenue visibility for 2021 is still strong, supported by the record levels in our backlog. Global disruption continues to affect the sector, and we need to call attention to shifts in international logistics conditions as well as the shortage of personnel resources. We put out our guidance for the year not long ago. That reflects the visibility we have for the year, factoring in the global disruption I have been talking about. Still, let me stress that business prospects for the midterm are unchanged, in spite of the current disruption. There is significant growth potential in renewable energies, and more specifically in solar energy. This is a reality worldwide. Soltec is completely dedicated to ESG. We recently introduced the Ecovoltaic concept to describe our projects that are entirely aligned with the environment and the communities in which they are located. We are a sustainable business, and our commitment is as strong as it has ever been. Thank you.
Meritxell Pérez de Castro-Acuña
executiveAll right, thanks, Raúl. I believe we’re ready to move on to the Q&A portion now, beginning with the questions we’ve gathered up to this point. We’ll start with the first one, which comes from Jorge Guimarães at JB Capital. José, please go ahead.
José Núñez
executiveGood afternoon. Jorge, we've got a number of questions. I'll handle the first 2, and after that Pablo and Raúl will take the remaining ones. Question one: it looks like cash flow generation in Q2 came from working capital, specifically client advances — how sustainable is that? Well, that isn't completely accurate. If you actually go through our financials, a meaningful share also comes from advances to suppliers. There are advances from customers as well as advances to suppliers. As a matter of fact, advances to suppliers total roughly EUR 17 million. Essentially, what we've managed to achieve, irrespective of how the first half of the year came out, is better management of the company's collections and payments — ultimately, the customer cash flow. We anticipate this trend carrying on, more or less along the same lines, over the months ahead. Question two: how much full year 2021 tracker volume is implied by the revenue guidance for Soltec Industrial? As we said on our previous call, essentially about 4 GW. Okay. Slightly under 4 GW. I'll now hand things over to Raul.
Raúl Morales
executiveAlright, so the third question is about our volume expectation for Soltec Industrial in 2022 — 4 GW? Well, clearly, since 4 GW is what we're expecting for this year, next year is going to be above that level. We still need to assess our prospects, but it will be somewhat greater than 4 GW, without a doubt.
Pablo Otín
analystFour questions. Good afternoon, Jorge. What do you expect the average selling price per megawatt in Powertis to be going forward? We're keeping the same guidance we gave on the previous call, where we lowered the expectation for Brazil from 4x - 6x to 2x - 3x. For Spain and Italy, we maintain the guidance as we move forward. Question number five. On a recurring basis, what percentage of projects do you expect to sell at RTB/COD each year? At the moment, as we speak, the only view we've changed is for Brazil. More specifically, we've changed our view for Araxá and Pirapora, two projects that we anticipate rotating at RTB and are now moving to COD. There are no changes for the rest of the markets.
Raúl Morales
executiveAlright. The next question comes from Virginia Santamaria. First, is it feasible to install 3 GW of trackers during the second half of 2021? Well, it isn't about installing — what we're discussing is supply. Obviously, to reach the expected volume of 4 GW, given that in the first half of the year we delivered about one, yes, we are going to deliver 3 GW in the second half of the year. Yeah.
José Núñez
executiveTaking the second question: regarding Powertis, what's the CapEx required to move the assets you're keeping—not rotating—from RTB to COD? As I said earlier in the presentation, that figure comes to between EUR 120 million and EUR 130 million. That's the effect we're estimating on our net financial debt, and it represents the entire CapEx for those projects. Moving to question number three, which notes that your net debt is set to rise and asks whether you see a risk of being unable to provide warranties for new orders. As you'll recall, we hold a bank warranty line totaling EUR 110 million. That facility is available for us to draw on, clearly, and its size doesn't change depending on whatever net financial debt level we happen to carry at a given moment. Clearly, should we require extra warranties because activity could peak above what we presently anticipate, we'd need to approach the market and seek more. As things stand, according to our estimates, the amount we have today—EUR 120 million—ought to be sufficient to handle the volume we might require going forward.
Raúl Morales
executiveQuestion four is whether tracker ASPs will rise because of higher input costs. Yes, average selling prices are going up — we're passing along all the added expenses for transportation and steel. Prices are rising, indeed.
Meritxell Pérez de Castro-Acuña
executiveMoving on, we have a question from Jorge Guimarães at JB Capital, and it's directed to Raul.
Raúl Morales
executiveNumber three. What does the present logistics picture mean for cost per MW sold? Well, that hinges on the Incoterm, since, as we mentioned earlier, our strategy is now shifting toward either FOB or delivered at place, but with manufacturing located nearer to the projects. Let's say it isn't easy to pin down an exact figure, but in certain instances, where the Incoterm is delivered at place, we've observed as much as $0.05 or $0.05 a watt — so that high. Naturally, if we supply on an FOB basis, the transportation cost comes in very low.
Meritxell Pérez de Castro-Acuña
executiveAlright. We'll take our next question from Virginia Santamaria at Santander. The first one goes to Raúl.
Raúl Morales
executiveThe question is, “Do you see Iberdrola’s announcement today to halt its renewables investment in Spain given government’s announcement? Does this affect you?” For us specifically, that isn’t the issue, because normally all these decisions are made many months ahead of time, and we had no project with them in Spain, so it will not affect us. The second part of the question, “Do you expect others to follow?” Obviously, it’s impossible to know what others are going to do. We believe this is a temporary situation that has to be clarified in the next few months, and we are positive about this.
Pablo Otín
analystQuestion number two: for assets in Powertis that have already been rotated, do you still need to book anything in the second semester of 2021, or has everything been recognized at this point? For assets sold during the first semester, we have no pending recognitions. We do, however, have further rotations coming due in this year's third and fourth quarters. There's another question. Regarding Powertis, you mention Colombia, but it doesn't appear on the slides. In Colombia, we entered that market during the first semester, so we would begin showing growth in that market in the third and fourth quarter results of 2021.
Meritxell Pérez de Castro-Acuña
executiveAll right. Our next question comes from Miguel Medina at Armanex. This one's directed to José.
José Núñez
executiveGood afternoon, Miguel. The question asks whether we'll keep hedging Brazilian reais for development activity in Brazil going forward, and it notes that hedging the real against the U.S. dollar looks cheap right now, then asks if that affects the project's IRR. Let me give a quick summary of what we do when it comes to hedging foreign exchange fluctuations. Our policy, in essence, is to hedge any potential open position we might carry, on development activity as well as on industrial activity. The remark we made in the presentation about the pro forma net profit calculation relates, in essence, to industrial activity rather than to development activity — just so that's clear on that particular point, okay? As I said, our policy is essentially to hedge against those variations. We do so on each and every occasion, as soon as we're able. Okay.
Meritxell Pérez de Castro-Acuña
executiveAll right. Our next question comes from Jan Richter at Berenberg. Jan, this one's directed to Pablo.
Pablo Otín
analystWhat makes selling early-stage assets in Brazil tougher? Unfortunately, there isn't a single easy answer, and we could spend hours talking about it. The reality is that we're facing a highly volatile stretch right when we need to begin building those assets, which essentially pushes us to rethink the strategy and carry the projects through to COD. I'd say it isn't any one factor. It's several factors combining that hit us at the moment we must act on particular projects.
Meritxell Pérez de Castro-Acuña
executiveOur next question comes from Adoc Belluca at Bank of America Securities, and it's directed to Raúl Morales.
Raúl Morales
executiveSo, on the question of implied ASPs for H1 2021 compared with H1 2020 and whether they mirror the same pattern as steel prices, which have risen more sharply — could you help us make sense of that? Well, clearly, it isn't linear. A tracker price consists of more than steel prices alone. Certain components have no connection to the steel price. Also, we don't deliver the same type of trackers in every situation, and those trackers don't contain an identical quantity of steel, since that hinges on the wind standard or the wind speed for the project in question. Making a comparison with ASPs is difficult. It varies — particularly when we have a large project affected by, say, a greater quantity of steel. It isn't linear.
Meritxell Pérez de Castro-Acuña
executiveKevin Dunn from Numis has the next question, and it's also directed at Raul.
Raúl Morales
executiveWith the industry facing such major cost inflation, is there any danger that projects slip out of next year and into 2023 while developers hold off until pricing settles down? Can developers still achieve the returns that would make them want to build entirely new projects, considering where trackers, modules, and freight prices stand right now? That is something we obviously can't move forward, since nobody can say what will happen in 2023. We've witnessed this before, and our view is that the majority of these projects have little room left to postpone. It might be a risk, but in my view that impact is limited. What we might see is some developers renegotiating certain PPAs, which makes more sense than launching brand-new projects from scratch.
Meritxell Pérez de Castro-Acuña
executiveAll right, thank you, Raúl. At this moment we don’t have any additional questions on the platform. Should anything else come up, you’re always welcome to reach the Investor Relations department at any time. Thanks to everyone for your interest in Soltec Power Holdings, and have a very nice day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Soltec Power Holdings, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Soltec Power Holdings, S.A. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Soltec Power Holdings, S.A. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.