executiveGood morning, everyone, and thanks for being here for our Q2 2022 results presentation. I'm Meritxell Pérez, head of investor relations, and with me are our CEO, Raúl Morales, our CFO, José Núñez, and Pablo Otín, who serves as CEO of our Project Development division. We'll go through the Q2 2022 results, and once the presentation wraps up, we'll hold a Q&A session. So with that, I'll turn things over to our CEO, Raúl Morales. Raúl, please go ahead.
Raúl Morales
executiveThank you, Meritxell. Good morning, everyone, and I appreciate all of you being with us today. We're going to bring you up to speed on where the company stands financially and share additional information about what we've been doing. It was a solid quarter. I'm pleased to report that our operational indicators are still robust. Margins in the industrial division have recovered nicely, and we remain on course to meet our guidance for the financial year. By the close of the first half, revenue in the industrial division came to EUR 266 million. On top of that, the EBITDA margin saw a substantial improvement during the second quarter, hitting a positive 6.4%, which works out to a positive 1% for the first half of the year. Through our project development division, we've moved into additional regions and are continuing to successfully develop the megawatts needed to hit our targets. We did not rotate any assets during the period. That said, we announced an agreement in Italy recently to rotate 340 MW. So we'd like to restate our guidance for financial year 2022. We're on the right track to get there. The following slide provides an overview of how we performed financially during the period.
Raúl Morales
executiveWe delivered a robust second quarter, and that reflects the steps we took in response to cost inflation. Revenue came in at EUR 147 million, supported by healthy activity levels across most regions, a rise in tracker ASP, and favorable development in the construction services we provide to clients. Consolidated EBITDA turned positive at +EUR 7.9 million, helped by a substantial gain in the industrial division's margin over the period, even with inflation still posing difficulties. Net profit for the second quarter was +EUR 5.5 million. This positive set of results came amid a context that remains very complicated. Looking ahead, we still foresee elevated costs for energy, materials, and logistics, plus a challenging macro backdrop and geopolitical tensions, with the port congestion and supply chain constraints that follow. Thanks to our three pillars, our business model provides us with flexibility and solidity. First, our vertical integration. We are not merely an industrial player. We are far, far more than that. In addition, our other services let us capture additional value and strengthen the value proposition we offer clients. Second, we are a sustainable company with excellent ESG performance.
Raúl Morales
executiveMajor agencies have given us high ratings, and our activity is focused on contributing positively to the environment and to our local communities. Three sustainability ratings apply to us. In the S&P Global Corporate Sustainability Assessment, our score came in at 76%, MSCI has awarded us an AA score, and according to Sustainalytics our risk ratio is low. Third, we are an innovative company. We know the world is changing, and this industry is changing very rapidly as well. Whether we like it or not, the rules of the game are going to change in the coming years, and we have to be prepared. I'm happy to announce that last week, we launched the first startup coming out of our accelerator. It is called EnviroScale, and it is the first energy sustainability score system capable of identifying the source and the degree of sustainability of the energy we consume. This measurement is based on the blockchain technology, which, together with IoT and AI, guarantees that the information that is recorded is true and verifiable. We are very excited about the launch of this promising project. We expect the coming years to be crucial for our industry, and we are well-positioned to capture value.
Raúl Morales
executiveLet me walk through what happened commercially, on slide eight. Our industrial division's track record keeps getting better — it hit 30.5 gigawatts in the tracker supply business, and 1.7 gigawatts of that came in during the first half of the year. When it comes to the tracker business, our focus stays on margins, not volumes. Turning to the tracker market, trackers should keep gaining share over fixed installation and get to 40% by 2025. In countries where we have a great exposure — Brazil, Spain, or the U.S. — tracker systems already dominate installation. Globally, solar trackers are forecasted to grow 660 gigawatts between 2022 and 2030, with year-over-year growth ranging from 70 gigawatts to 90 gigawatts by 2030. We aren't aiming to be leaders in our market; what we want is good, stabilized margins across all our projects. So we will still maintain our traditional exposure in Latin America and Europe, markets in which we are third. As for the project development division, Pablo will give you an overview of it later on. On our operational indicators in Soltec Industrial, our backlog and pipeline figures continued to be strong. As you know, in our industrial business we define backlog as projects signed, not yet fully completed, projects in which we still have some revenue recognition pending, while pipeline refers to potential future contracts in which we do believe we have a certain chance of success.
Raúl Morales
executiveAt present, our backlog is EUR 353 million. Delivery volumes were high in the period, with projects from our backlog being converted into revenue. At the same time, sales activity remains strong, and at the end of June we still have a solid backlog of EUR 343 million along with a pipeline of EUR 2.92 billion. In geographic terms, where our backlog is concerned, LATAM was our biggest market as of the end of the semester, at 61% of the total backlog, with North America next at 25% and Europe at 14%. Our pipeline came to EUR 2.92 billion. Looking now at that pipeline, it is more geographically diversified than our backlog. Europe makes up 34% of the total, LATAM accounts for 29%, and North America — basically the U.S. — 20%. With that, I'll hand the call over to Pablo now so he can walk through the project development division.
Pablo Otín
analystThank you, Raul, and good morning everyone. At Powertis, we've maintained our momentum and achieved growth across every region. Here are the main highlights, broken down by region and market. Let's begin with Europe. Italy stands as our biggest European market, and it also ranks among the fastest-growing markets anywhere in the world. Powertis has established itself as a named developer and a benchmark in Italy, with a pipeline of more than 3 gigawatts. In addition, close to 75% of the 2 gigawatts at an advanced stage in Italy now sits under co-development agreements. During 2021, we completed two major transactions with Aquila, amounting to roughly 1.2 gigawatts. In Q2 2022, we kicked off a new process that wrapped up by July. That process produced a new partner in Italy: Azienda Comunale Energia e Ambiente, or ACEA. We take great pride in partnering with ACEA, a leading Italian utility whose main shareholder is the city of Rome, and a company with which we share a great deal in terms of values. ACEA has picked up a 51% interest across 17 projects amounting to 340 MW of PV. Turning to the next European market by volume, we have Spain. The first semester proved complicated, with far too many regulatory shifts. We could have sat idle until the dust settles, but rather than that, we went back through our pipeline and cleaned out the projects carrying a low probability of success.
Pablo Otín
analystWe'll keep doing that over the coming months so we can adjust to new rules. Even with all these shifts, we managed to lock in a 2.4 GW pipeline by quarter-end. On a brighter note, across the second half of 2022 and the first half of 2023, a lot of projects in Spain are going to hit RTB, and there will probably be more asset rotation too, since investment appetite is very big. Also, by the close of Q1, our first project in Murcia began operating, and by the close of Q2, we kicked off construction on our second project. Denmark and Romania are the other two European markets. Both are moving along nicely. Denmark added 509 MW and Romania 286 in the first half of the year. Over on the other side of the Atlantic, we have Brazil, Colombia, Mexico, and the U.S. Let's begin with Brazil. At Powertis, Brazil is the biggest market. Volumes there are high, but it leans heavily on Forex, so the ARR is very volatile. Timing matters most, and the build strategy is critical. Our pipeline in Brazil is large — 5.6 GW at the end of Q2, a 40% increase in the year.
Pablo Otín
analystWe’ve got projects at every stage. Pedranópolis is just about to begin operation, Araxá is under construction and 94% complete, and there are two projects ready to build. Considering how much exposure we have in Brazil overall, we intend to carry out substantial divestments from that pipeline over the next few months. Colombia comes next — our second market in the region — adding 750 MW. During the first semester we made a major greenfield push, and we expect a number of the opportunities we’ve identified to reach early stage before the year is out. Mexico is third, where 188 MW has been secured. Pure greenfield development is the basis of our strategy, and we’ll adjust how quickly we develop in line with actual market conditions. Finally, there’s the U.S. This quarter we are reporting our first project there. Over the summer, green news arrived from Capitol Hill in the shape of the Inflation Reduction Act, or IRA, which carries long-term incentives and tax credits for the industry. The IRA gives the solar industry long-term visibility that is much needed, and it’s very good news for the U.S. solar sector. In short, we are active in most countries where solar is happening.
Pablo Otín
analystEvery one of these efforts shows up in the tables, and the table is on slide 12. Our projects span the whole development funnel. On the left-hand side of the slide, you can see how things progressed during 2022. Let's begin with backlog. In 2022, backlog volume stayed the same, yet its quality improved considerably. The 722 MW now covers projects that are operating, projects under construction, and projects ready to build. Advanced stage projects are up 268% versus the same period last year, while early stage rose 33% year-on-year, largely because of contributions from new regions. Turning to the tables on the right-hand side of the slide, we closed the first semester with 5 MW operating, 225 MW under construction in Brazil — 112 of which were connected just a few days ago — 488 MW ready to build, and 3.3 GW at advanced stage. The remainder of the pipeline, 2.7, sits at early stage, and 6.2 is made up of identified opportunities. Our pipeline is well-balanced, and we are diversified geographically. Europe accounts for 48% of the projects, and the Americas for 52%. Our local development teams are among our main differentiators and have turned into a key competitive advantage. Because of them, Powertis has established itself as a key developer in every market where we operate.
Pablo Otín
analystSlide thirteen is likely the most critical one. Everything discussed up to now boils down to this: projects that are operating or under construction, plus Powertis's portfolio of RTBs. Since the IPO, we've more than doubled the company's size, expanding from 6 GW to nearly 13 by the close of Q2 2022. The projects shown here were developed, installed, and built by Powertis and Soltec, and they constitute the foundation of Soltec Asset Management. On the left side is La Asomada, a project situated in Murcia, Spain, and our first asset in operation. Powertis developed this project from scratch, while Soltec Industrial supplied the SF7 trackers and delivered the construction services. This project forms part of our joint venture with TotalEnergies. In Brazil, we have Araxá and Pedranópolis, which we built in parallel. Pedranópolis is complete. Araxá nearly so. As with Spain, Soltec Industrial delivered the construction services and supplied the tracker — in this instance, the 1P tracker, or SF1. We expect Araxá to begin operating by the fourth quarter. The PPA is 100% secure, financing has closed for both assets, and we take pride in how these assets were executed in a very challenging environment in Brazil.
Pablo Otín
analystHaving said that, I'll now hand things over to José Núñez.
José Núñez
executiveThanks, Pablo. Good morning, all. We'll turn now to the following part of the presentation: the H1 2022 financial results. Slide 15 gives us a brief overview of Soltec Power Holdings' financial results for the first half of the year, and also broken out by quarter. As Raúl mentioned earlier, consolidated revenues came to EUR 245 million, up 181% against H1 2021, driven by higher activity levels in 2022 than in the prior year. Quarterly consolidated revenues have risen both quarter-on-quarter and year-on-year, amounting to EUR 147 million in Q2 2022, a 150% year-on-year rise from the Q2 2021 figure. Adjusted EBITDA for the first half of the year is negative EUR 5.1 million, a EUR 14 million improvement versus 2021, while the Q2 number improved markedly, hitting EUR 7.9 million, almost EUR 20 million above Q2 2021. Lastly, consolidated net profit was negative EUR 10 million at the close of June 2022, versus negative EUR 19.9 million at the end of the same period a year earlier, while the Q2 2022 figure came in at positive EUR 5.5 million, compared with a negative EUR 15.5 million in Q2 2021.
José Núñez
executiveAs you can see, it's worth noting the substantial improvement the company saw in Q2 2022, which already showed the positive effect of the steps we took to lessen the disruptions in our Industrial Division. The Project Development division, as expected, contributed negatively because there was no asset rotation during the period. That's only a temporary situation, since it will reverse as soon as assets get sold, and we'll look at that later when I discuss our most recent agreement with ACEA in Italy. On the next slide, 16, we can see how revenues in our Industrial division hit EUR 266 million by the end of H1 2022, a 202% increase versus H1 2021. Revenues in Q2 2022 also rose substantially, almost 150% year-on-year, to EUR 148.6 million. The steps we put in place at the end of last year lifted our EBITDA margins in the second quarter to 6.4%. As expected, the price we signed under these new conditions has let us improve our profitability in 2022. Overall, by the end of H1 2022, our EBITDA margin was close to 1%, and we're optimistic, since we are seeing how the measures we implemented with great effort are now starting to deliver.
José Núñez
executiveMoving to slide 17, you can see how sales and EBITDA margins for our Industrial Division have evolved quarter by quarter from the start of 2018. Looking first at revenues, activity levels have clearly been recovering since the middle of last year, and that's been driven by strong demand. Turning to EBITDA margins, our Industrial business went from negative 30% at the start of 2021 to a positive 6.4% in Q2 2022. That demonstrates how margins have begun to normalize as contracts signed under the new conditions introduced last year get executed. We expect that trend to carry on through 2022. We're 100% focused on restoring margins in our Industrial division, so we keep taking action across our entire value chain to be better prepared for the disruptions still visible in the market. Moving to slide 18, we can look at how our sales broke down at the end of H1 2022. The left side of the slide shows the distribution by activity, and the right side shows the distribution by geography.
José Núñez
executiveSo as you can see, at the close of the first half of the year, supply accounted for 78% of our sales, while construction services had grown to 22%. And as you'll notice, construction services keep gaining relative weight as time goes on. For certain customers, they're a highly attractive add-on. Turning to geography, LATAM is out in front, representing 63% of our sales — 36% of that from Brazil, with the remaining 27% coming from the rest of South America — followed by North America, where we booked 24% of our sales. Let's now move to our project development division. On slide 19, you can see negative EBITDA both in H1 2022 and on a quarterly basis as well. That said, this is a temporary situation, and it will be reversed as soon as the assets are sold. In fact, during the third quarter of this year, we already signed an agreement with ACEA in Italy for co-development of solar PV projects. Under this agreement, 340 MW of early-stage development projects will be transferred through 17 SPVs in Southern Italy, plus an additional 170 MW of capacity for energy storage. ACEA will acquire 51% of the equity in these projects, while the remaining 49% stays in the hands of Powertis. Powertis will continue developing the transferred project portfolio, and Soltec Industrial holds certain rights to supply the trackers and construction services once those projects reach ready-to-build status.
José Núñez
executiveThe ACEA deal comes on top of other recent Aquila transactions in Italy. As you might remember, 1,193 MW in total has already been rotated under the Aquila agreement across the past couple of years, and some revenue recognition is still pending on those projects because certain development milestones have yet to be reached. Slide 20 gives you a summary of our H1 2022 cash flow statement. As you can see, we began the year at close to EUR 36.2 million. EUR 6.1 million was consumed by operating activities. Financing activities brought in another EUR 59.6 million. EUR 74.3 million went to investment activities, mostly put into the Araxá and Pedranópolis projects in Brazil. A small variation of EUR 6.1 million came from exchange rate. Consequently, cash at the end of June 2022 came to EUR 21.5 million in total. Moving to slide 21, we have calculated net financial debt as of June 30, 2022. On the left-hand side of the slide, you can see how it splits between corporate debt tied to the industrial business and debt tied to the projects developed mainly in Brazil. Soltec Industrial carried gross financial debt of EUR 88.4 million, related mainly to the revolving credit facility signed last year, which, by the way, matures on February 2024.
José Núñez
executiveWhen we look at Project Development, there's project debt tied to the projects we have under construction in Brazil, and that comes to EUR 49.3 million. For the Araxá and Pedranópolis projects, BNDES has secured financing amounting to a total of BRL 323 million reais, which is roughly EUR 60 million. On top of that, our Project Development business carries other liabilities adding up to EUR 17 million. Cash and cash equivalents came in at twenty-seven point nine million euros, so our net financial debt stood at EUR 147.5 million as of June 2022. With that, I'll hand the floor back to Raúl for the closing remarks.
Raúl Morales
executiveThank you, José. Let me give you a summary. It's been a solid quarter, but there's still plenty left to do and plenty of value to unlock from our divisions. We keep discussing the most important measures, and we need to take them so we're able to face the new times ahead and the disruption still sitting on the table. We're starting to see a tipping point. In this quarter, we saw margins in the Industrial divisions start to consolidate and stabilize, with strong operational indicators. On top of that, we have a stronger Project Development division, with a robust and diversified pipeline and tier-one agreements around the world. Our business model's core is vertical integration. Integration has been essential to our differentiation, essential to preventing risks, essential to capturing value, essential to continuing to grow, and essential to balancing our results. We've seen good investor appetite for our projects and for our trackers as well. And finally, to wrap up, I'd like to emphasize that we're maintaining our guidance for the year, while thanking all our employees for their commitment and our investors for their trust, which I personally truly appreciate. Thank you very much.
Meritxell Pérez
executiveAll right, thanks a lot, Raúl. At this point we can open things up for questions and answers. There are questions waiting on the platform. The first one is from JB Capital Markets, Jorge Guimarães. Go ahead, José.
José Núñez
executiveMorning, Jorge. You've raised two questions. On the first: if we take the midpoint of the fiscal year 2022 EBITDA guidance for Soltec Industrial, which is 2.5%, then the EBITDA margin implied for the second half works out to 4.5%. But the second quarter 2022 margin came in at 6.4%, and as a rule, the second semester outperforms the first. Is there some one-off item in Q2 behind that cautious stance? And how is Q3 shaping up? Second question: what's your view on net debt at December 2022? Okay, I'll take the first one. Well, basically, when all is said and done, the EBITDA margins we report each quarter rest on a differing mix of projects, activities, and geographies, so having two quarters that look alike is very hard. Okay? It's true the second quarter of the year has been very strong, and we expect the third and fourth quarter to be quite good as well, but the guidance for the year won't change for now. I mean, we believe EBITDA margins will land around 2%-3%, at the end of December 31, 2022. Okay? Now, second question: what's your view on net debt at December 2022? First of all, let me begin by saying that although we calculate net debt as a total figure for the group as a whole, in reality, we're talking about distinct facilities that are different on its own.
José Núñez
executiveSo when we look at Soltec Industrial, that working capital facility — the revolver we hold — is essentially drawn on solely by Soltec Industrial, and the only guarantor is Soltec Industrial, which makes it highly tied to that activity. Right? The figure there is EUR 90 million. After that, we move to project debt, and that is clearly dedicated entirely to one particular project. Right? In this case, what we essentially have is the facility BNDES extended for the 2 Brazilian projects. Then Soltec Asset Management steps in toward the close of this year, and we hope it will expand what it does, which means it will take on extra debt as well. To put it briefly, our expectation is that, in aggregate — the consolidated number, as I mentioned — we land at roughly EUR 200 million. Right.
Raúl Morales
executiveCan you go into more detail on Soltec Industrial's gross margin for H1 2022? What I'd say is that gross margin is on the rise. In Q2, we're seeing EBITDA margins of about 5%-7%, which is in line with our target. The question is why our EBITDA at year-end won't be 5%-7% as it should be. As we said in our guidance, it will be 2%-3% in Industrial. In Soltec Industrial, that's because we still have some projects coming from 2021. What we're seeing is that new projects are recovering margins, especially the ones where we updated ASPs. ASPs in 2022 are higher than the ones we had in 2021, so we are increasing the gross margin. Also, just as a reminder, we have locked the steel prices and the logistics costs. At the same time, we see moderation in prices, stabilization or even a slight decrease in costs.
Pablo Otín
analystMorning, Jorge. Pablo here. I’ll take your questions—all three of them. First, how many megawatts do you expect to sell in rotating power in 2022? 300 MW—and tell me how much more. I’ll begin there. We reaffirm the guidance we gave at the CMD: 600–700 MW, which essentially implies we’ll deliver another 300–400 MW in the second semester, and we’re on track for that. Your second question: in the CMD presentation, you cited equity IRR targets of 7%–9% for Spain and 10%–13% for Brazil. With the recent move in interest rates, have those targets been revised? The answer is no. When we set those ranges, we were probably at the low end for both countries—certainly for Spain—and now we still expect equity IRRs for projects in that category, most likely toward the high side. More like 9% in Spain, and certainly in Brazil. Brazil has already implemented many fiscal measures, and we’ve probably seen the peak in the country’s interest rate, so 10%–13% looks right on target for where the market stands now.
Meritxell Pérez
executiveThanks, Pablo. Our next questions come from Flora Trindade at CaixaBank BPI.
José Núñez
executiveAlright, good morning, Flora. Regarding the first question, it notes that H1 figures appear to point toward a 4% or 5% EBITDA margin for Industrial in the second half of the year. Given the 6.4% recorded in Q2, do you see any upside potential relative to your targets? And what could keep you from coming in above? I believe the response here mirrors the one Jorge from JB Capital Markets raised. The EBITDA margins we deliver each quarter reflect a mix of various projects, various activities, tracker supply, products — sorry, services — and then clearly various geographies. What we are observing is that although Q3 and Q4 are going to be quite strong, the guidance for the full year is going to stay exactly where it is at present. Okay.
Pablo Otín
analystNext question. Regarding the Inflation Reduction Act in the US, might that prompt you to raise your exposure there? I'd like to return to the CMD, where we laid out the group's strategy for the years ahead. In that presentation, we already flagged that we're aiming for close to 2-3 GW in the US by 2025, and essentially what the IRA means is that we were headed in the right direction when we gave that guidance, and that now is the moment to execute. Well, it basically confirms our direction was correct. Then on Powertis, could you speak to returns given today's context of higher prices, but also higher inflation and interest rates? I think they offset each other. For sure, prices are much higher than we expected at this point last year. For sure, CapEx is higher, so each offsets the other. On the whole, we aren't seeing a major effect on equity IRRs over time, especially in Southern Europe, where competition is intense and appetite for projects is even stronger. On the other side of the Atlantic, we believe we're on target with what we have. I think the two basically balance each other out.
Meritxell Pérez
executiveThanks, Pablo. Our following round of questions is from Edward Bottomley at Berenberg. José, over to you for the first one.
José Núñez
executiveAlright, I’ll take the first one. Good morning, Edward. For H2, what amount of tracker supply in gigawatts should we be looking at? For the whole year, we’re expecting roughly 3.5 gigawatts—around that number. Since we had already delivered about 1.7 gigawatts as of June 30, that leaves roughly 1.8 gigawatts for the second half. Okay? The next question is about your Q2 EBITDA margins, which were very strong, particularly versus Q1. Could you lay out the main drivers behind that sharp improvement? And what should we anticipate for EBITDA margins over the remainder of the year? Well, as we’ve already said, the primary factor behind the Q2 increase is essentially the execution of the 2022 projects. If you recall, when we held the Capital Markets Day back in May, we explained that Q1 of the year had no execution from 2022 projects included. What has clearly changed since then is that during Q2, we’ve already begun seeing revenue from those projects, and the margin those projects generate is far higher than what we’ve had previously. Okay? The third question, I believe, is whether you could give us some details on the financials related to the 304 MW rotated with ACEA?
José Núñez
executiveWe'll share more specifics during the Q3 results presentation, but what I can say is that we've brought in about EUR 7 million in cash inflow, and the effect on EBITDA comes to roughly EUR 5 million, okay? EUR 5 million.
Meritxell Pérez
executiveThanks, José. We have another round of questions, and this one comes from Virginia Sanz de Madrid at Santander. To start with, once again, José.
José Núñez
executiveMorning, Virginia. To start with, what portion of Soltec Industrial's backlog and pipeline is tied to Powertis? So basically, of the EUR 353 million sitting in our backlog, roughly EUR 2 million comes from Powertis. And of the EUR 2.9 billion total in our pipeline, EUR 874 million originates from Powertis. That works out to about 30%. I think this is shown on slide 10 of the presentation. As I mentioned, roughly 1% of backlog is from Powertis, and about 30% of the pipeline is from Powertis. Of Soltec Industrial's 2022 revenues, how much do you expect to come purely from tracker deliveries? Like I said earlier, on a gigawatt basis we're figuring around 3.5 gigawatts, which would translate to roughly EUR 350 million by year-end, okay? What's your take on net debt for full year 2022? As I said earlier, taking into account the debt generated by the industrial division, Powertis, and then Soltec asset management, it should be around EUR 200 million.
Raúl Morales
executiveThe following question is about what ASP you anticipate for trackers and what your outlook is for 2023. For 2022, tracker ASP is expected to come in at roughly EUR 0.10 per watt. Then in 2023, prices may moderate a bit, though they should stay in the EUR 0.09-ish area — only somewhat lower, reflecting some easing in steel and logistics. The next question asks which markets you feel more optimistic about for your business in 2023 and 2024, given current regulatory and macro developments. Essentially, we'll keep a strong presence in the markets where we already operate. Mainly Europe and the Americas — and by Americas I mean the US and Latin America. Soltec is going to be quite active in Brazil and elsewhere, and we anticipate the US will matter a great deal because of the IRA, the Inflation Act. Europe, obviously, will also be very important, since we'll see permitting processes accelerate in Spain and Italy. The next question: do you provide construction services at Soltec Industrial to clients other than Powertis? Broadly, no. Only for certain tier one customers we've selected. These will mostly be carried out by Soltec Industrial for Powertis projects that will be owned by Soltec Asset Management or sold to third parties, with the construction services included in the same contract alongside the EPCs, together with the permit and licenses.
Pablo Otín
analystRegarding the megawatts in Powertis with ACEA, is it possible for you to develop those megawatts that you retain for your IPP? The response is that this is precisely something we'll explore a bit in discussion, since the structure of our transactions has been altered. Previously, we would sell 51%, and we gave buyers options either to hold or to buy us out. In this instance, going forward, we're going to keep that interest moving along, and so all of these megawatts could potentially become part of our IPP, or we could decide what to do — but it's within our control. Here we are shifting the strategy in line with our long-term view as a company. The next question is, what do you intend to do with the two projects in Brazil that you are building right now? Well, the first thing is that we're especially excited to have managed to complete these projects in an incredibly challenging environment. These are among the very few utility scale projects completed in Brazil in recent months, and kudos to the whole team. As we said through the webcast, these are essentially the foundation for the future Soltec Asset Management, and we will review what to do with either or both over time.
Pablo Otín
analystThen, is COD going to be achieved by them so they can sell power at IPP, or is selling them your intention? Power from both of those projects is already sold. Under the PPAs, 100% is take or pay. Those contracts are in place, so beyond delivering supply and staying compliant with what we committed and owe under the PPA, there isn't much left to do.
Meritxell Pérez
executiveThanks a lot. There are no further questions coming in on the platform. Many thanks for being with us this morning. That brings the results presentation to a close. Have a great day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Soltec Power Holdings, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Soltec Power Holdings, S.A. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Soltec Power Holdings, S.A. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.