operatorGood morning, everyone, and thanks for being here for our Q3 2022 results presentation. We'll walk through the presentation, and once we've finished it, we'll have some time for questions and answers. So with that, I'll turn things over to our CFO, José Núñez. José, please go ahead.
José Núñez Jiménez
executiveThank you, Meritxell. Good morning, and I sincerely appreciate everyone taking the time to be with us today. We're going to walk you through an update on where the company stands financially, along with additional specifics regarding what we've been doing. To kick things off, let's turn to slide four and review the main highlights for the period. Our third quarter of the year turned out to be quite strong, and that came down to three things. First, robust demand seen across the global landscape — particularly in renewables — is driving renewable energy buildout, and against that backdrop the tracker's value proposition has only grown stronger. Second, we saw logistics and raw material costs come down around the world. Third, there are the steps we've implemented to confront cost inflation and to rework our processes around the various disruptions. Consolidated revenues during the third quarter came in at EUR 158.8 million, powered by solid activity levels across every region, higher tracker ASP, and favorable performance in our construction services. Adjusted EBITDA came to EUR 13.6 million. Net profit for the third quarter was a positive EUR 14.5 million. Turning to the nine months results, consolidated revenues totaled EUR 403.4 million. EBITDA was a positive EUR 8.5 million, and net profit likewise came in positive at EUR 4.5 million.
José Núñez Jiménez
executiveOperational metrics are holding up well too: at September 30, our industrial division's backlog stood at EUR 308 million, while the pipeline exceeded EUR 3.6 billion. Meanwhile, the project development division's project pipeline topped 13.7 GW across eight different countries, giving us good diversification. Slide five shows we're on the right track toward hitting this year's targets. Industrial division revenues for the first nine months came in at EUR 423.4 million — the highest annual sales figure Soltec has ever posted, achieved in only nine months. EBITDA margin stayed solid in Q3, at 3% for the quarter and 1.5% for the first nine months of the year. We're on course to hit the 2%-3% target by the end of the period. Turning to project development, during Q3 2022 we rotated 340 MW in Italy to ACEA. EBITDA for that division came to EUR 5.2 million by the close of the first nine months. And consolidated Adjusted EBITDA was EUR 8.5 million. On the strength of all these numbers, our guidance for the year is unchanged. Let's now turn to slide seven and take a look at our operational indicators.
José Núñez Jiménez
executiveOn the industrial side, our track record keeps expanding — it now stands at 14.4 GW of tracker supplied, and 2.6 GW of that came in the first nine months of the year. As we pointed out at the Capital Markets Day, we anticipate closing out 2022 with a track record between 15 GW and 16 GW. Turning to project development, the pipeline keeps growing too, hitting 13.7 GW by the close of Q3 2022 — which means we have already met this year's goal of 13 GW-15 GW. On our operational indicators at Soltec Industrial, backlog and pipeline figures remained strong. We are now on slide eight. In our industrial business, as you are aware, backlog means projects that are signed but not yet fully executed, where some revenue recognition is still pending. Pipeline, by contrast, refers to potential future contracts where we believe there is a certain likelihood of success. Delivery volumes were high during the period, since projects in backlog are converting into revenues. Meanwhile, sales activity stayed robust, bringing backlog to EUR 308 million at the end of September. By geography, LATAM was the biggest market in our backlog at 51% of the total, with North America next at 26% and Europe at 23%.
José Núñez Jiménez
executiveTurning to our pipeline, it stood at nearly EUR 3.7 billion as Q3 2022 came to a close. Geographically, Europe accounts for the largest share at 46% of the total — chiefly Spain and Italy — whereas LATAM makes up 25% and North America, essentially the U.S., 15%. Moving to slide 10, let's take a closer look at the project development pipeline. It has kept expanding, hitting 13.7 GW by the end of September. As you can see, we operate in eight countries, with exposure split between Europe at 46% and the Americas at 54%. Slide 11 shows that our project development business not only has a bigger pipeline but one of better quality too. As you can see, projects span the whole development funnel, and if we zero in on the backlog portion specifically, 117 MW is already in operation across Spain and Brazil. In addition, 313 MW is being built in Brazil and 5 MW in Spain. The remaining backlog, 488 MW, consists of Ready-to-Build projects in Brazil. Slide 12 gives a brief overview of the key projects already operating or being built.
José Núñez Jiménez
executiveSoltec has either already built, installed, and developed—or is currently doing so for—the four projects shown on these slides. We'll begin with La Asomada. Situated in Murcia, Spain, it's the first project we have in operation. Powertis developed it from scratch, while Soltec Industrial supplied the SF7 trackers and handled construction services. This project forms part of our joint venture with TotalEnergies. The La Isla project is the second one with Total, and construction has recently gotten underway. As I mentioned, it too belongs to the joint venture we share with our partner Total, and we estimate COD for 2023. Turning to Brazil, construction of the Araxá and Pedranópolis projects has been completed. Soltec handled construction services and supplied the trackers—in this instance, the 1P tracker SFOne. Pedranópolis has already been connected to the grid, and we expect Araxá to be connected soon. PPAs are 100% secure on both projects. We take pride in how these assets were executed in a very challenging environment in Brazil. Let's now move to the next section of the presentation on slide 14, the Q3 2022 financial results. As I commented earlier, consolidated revenues reached EUR 403.4 million for the period, a 16% increase versus Q3 2021, which was mostly driven by an increase in our activity levels during 2022 compared to the previous year.
José Núñez Jiménez
executiveOn a quarterly basis, consolidated revenues have risen both sequentially and versus a year earlier, coming in at just under EUR 159 million for Q3 2022 — that's a 59% year-on-year gain over the Q3 2021 number. Adjusted EBITDA across the first nine months of the year came to EUR 8.5 million, which is EUR 31 million more than in 2021, and the Q3 number also showed a big step up, hitting EUR 13.6 million, EUR 70 million above Q3 2021. Lastly, consolidated net profit was positive at EUR 4.5 million for the first nine months of 2022, versus a negative EUR 20 million during the same stretch last year, and the Q3 2022 figure came in at EUR 14.5 million, up EUR 14.6 million from Q3 2021. Back in Q2, we began to observe a meaningful upturn in our results. As you can see, that momentum carried through into Q3. So we anticipate delivering on our full year guidance. The main drivers of this improvement are the actions we took to cushion the disruptions our industrial division encountered, along with the contribution from our project development business. Turning to our industrial division on slide 15, revenues kept climbing and hit a record EUR 423.4 million by the close of Q3 2022, which is 124% higher than Q3 2021.
José Núñez Jiménez
executiveQ3 2022 revenues also rose substantially both quarter-over-quarter and year-over-year, hitting EUR 157.8 million. Profitability likewise strengthened over the year, helped by steps we took to soften the worldwide disruptions. For the first nine months of 2022, adjusted EBITDA came to EUR 6.6 million, an EBITDA margin of 1.5%. Looking just at third quarter numbers, we achieved EBITDA of EUR 4.6 million, an EBITDA margin of 2.9%. As expected, the projects we signed with the new measures put in place have let us lift our profitability in 2022, and we are already seeing our margins normalize. Moving to slide 16, we can see how sales and EBITDA margins in the industrial division have evolved each quarter since the start of 2018. First, on revenues, a clear recovery of activity is visible from the middle of last year, driven by strong demand. Then, on EBITDA margins, an inflection point appears in Q2 2022, when margins began to recover, and that trend consolidated in Q3 at a 2.9% margin, in line with our full year guidance of 2%-3%.
José Núñez Jiménez
executiveThis makes it very clear that we are heading in the right direction — the steps taken to soften the disruptions are already paying off, and margins have begun to normalize as contracts signed under the new conditions introduced last year move into execution. Our full attention is on restoring margins in the industrial division, so we keep taking action across the whole value chain to get there. Now let's turn to slide 18 and our project development division. EBITDA came in at EUR 5.2 million for the first nine months of the year and EUR 8.2 million in the third quarter, lifted by the rotation of 340 MW under the agreement signed with ACEA to co-develop solar PV projects in Italy. ACEA took 51% of the equity in these projects, with the remaining 49% held by Soltec. Powertis will carry on developing the transferred project portfolio, and Soltec Industrial holds certain rights to supply trackers and construction services once those projects reach Ready-to-Build status. Moving to slide 19, we can see our debt profile as of September 2022. The debt splits between corporate debt tied to the industrial business and debt tied to projects the company has developed, mainly in Brazil.
José Núñez Jiménez
executiveTurning to Soltec Industrial, its debt of EUR 89 million stems primarily from the revolving credit facility that was signed last year and comes due in February 2024. On the project development side, the debt is largely tied to projects currently being built in Brazil, which represented EUR 53.4 million as of the end of September. Financing for the Araxá and Pedranópolis projects has been secured through BNDES to the tune of BRL 323 million in total, equivalent to roughly EUR 60 million. On top of that, our project development business carries other liabilities amounting to EUR 16 million. Gross financial debt came to EUR 180.4 million at the close of Q3 2022, and cash plus cash equivalents amounted to EUR 25 million. Consequently, net financial debt stood at EUR 155.4 million as of September 2022. Before opening things up to the Q&A, allow me to briefly offer a few closing remarks. Both the industrial and the project development divisions enjoyed a very good quarter. In the industrial division, we have witnessed a turning point, driven by robust demand and fewer supply chain disruptions, which has supported the recovery of positive margins. The strong pipeline and progress in the project development business also deserve a mention, with 117 MW already in operation. Lastly, to close out, we are very pleased with how our businesses have evolved in 2022, and I want to emphasize that our guidance for the year is confirmed.
José Núñez Jiménez
executiveMuch appreciated.
Operator
operatorMoving on to the Q&A portion. Our first question comes from Ignacio Domenech at JB Capital. He has one for Soltec Industrial: could you walk us through how the EBITDA margin moved in the third quarter versus what was recorded in the second quarter?
José Núñez Jiménez
executiveGood morning, and thank you, Ignacio, for that question. Basically, as we said during our previous meeting in September, the margins we report each quarter are clearly a weighted average across various projects, activities, and components, which is why they fluctuate from one quarter to the next. In this instance, as we have already explained, the industrial division's average margin came to 1.5% overall across the first nine months of the year. As we have also already explained, our goal for the year is essentially to achieve an EBITDA margin of between 2%-3%.
Operator
operatorAlright, one more question. As we look at 2023, should we be anticipating inflationary pressures, specifically when it comes to personnel costs?
José Núñez Jiménez
executiveWe haven’t observed those yet. In any event, if that turns out to be true, provided we can pass those fundamental increases along to our customers, that ought to be fine. We’ve done so previously with certain other essentially components or for tracker items like steel, for example, and this ought not to be any different.
Operator
operatorMoving on to the next question, which is for Soltec Industrial as well. Could you share what your EBITDA margin guidance is for 2023?
José Núñez Jiménez
executiveWe’ll share more specifics on the 2023 guidance, likely when we report the full-year 2022 results. What I can say is that, as margins naturally normalize, you should expect them to move closer to that 6%-7% range we’ve consistently referenced.
Operator
operatorNow, on Powertis — moving to the next round of questions. Is there any expectation that Powertis will divest projects during Q4? And in Italy, what target would apply to projects sold at RTB/COD?
José Núñez Jiménez
executiveSo for 2022, the plan on asset rotation was essentially to divest somewhere between 600 MW and 700 MW to third parties by the time the year wrapped up. We remain on track to hit that target. As you're aware, 340 MW has already been transferred, and multiple processes are currently underway in various parts of the world. We anticipate getting to that number — that goal — before year-end.
Operator
operatorOn the Araxá asset in Brazil, is the expectation that this project will move over to SAM, or do you see this asset being rotated?
José Núñez Jiménez
executiveSo both Araxá and Pedranópolis are going to be moved over to Soltec Asset Management, all right? They're going to be included among our portfolio projects.
Operator
operatorNow we have another round of questions, and these come from Virginia Sanz de Madrid at Santander. The first one is for Powertis: do you anticipate that the company will hit the EBITDA target by carrying out an additional asset rotation?
José Núñez Jiménez
executiveYeah. Actually, that question is somewhat like the one we just addressed. All right, so at this moment we have multiple M&A processes underway, and we anticipate additional rotation ahead of year-end.
Operator
operatorNext up, a question for Soltec Industrial. When it comes to the IRA in the U.S., are you anticipating gains through new orders, or would you say that market is already taken by Nextracker and Array Technologies?
José Núñez Jiménez
executiveNo. I mean, clearly we are. Our expectations are obviously substantial when it comes to the new legislation that passed in the United States. We think it's going to boost the volume of activity in the US even beyond what we're seeing right now, and so we see it as a positive for all of us. Okay? There'll be room for everyone.
Operator
operatorThere's one more question here. With cost inflation and higher rates, does a potential slowdown in renewables installations concern you?
José Núñez Jiménez
executiveAlright. Higher rates are something we are seeing right now, and everybody does grasp how they might affect renewable energy development. That said, at the same time, power prices are extremely high across the globe, and those are offsetting that particular effect. When it comes to cost inflation, things are beginning to shift. That is what we are observing in the market, not only in the project development business but in the industrial business as well. And basically, what we are seeing is that raw materials, components, and logistics are starting to return to their historical average. They are perhaps still above pre-COVID levels, but over time things are getting normalized.
Operator
operatorAlright. We have another question coming in for Soltec Industrial. Are you anticipating that Soltec Industrial will achieve normalized EBITDA margins in the mid-single-digit range for 2023?
José Núñez Jiménez
executiveLike I mentioned earlier, additional details on the 2023 guidance will be coming soon. As I noted previously, assuming nothing unusual occurs, and with conditions clearly settling down out there, we ought to land nearer the 6%-7% EBITDA margins we have referenced before.
Operator
operatorOn the final question, what was your expectation for where net debt would finish at the end of 2023?
José Núñez Jiménez
executiveSo as we laid out during the previous meeting, we expect net debt to sit above EUR 200 million when the year closes. Clearly, a meaningful share of that net debt number is going to come from project financing, so it will be tied to projects. Yeah, we're expecting net financial debt to land a bit above EUR 200 million.
Operator
operatorThanks, José. We have a further question coming from Edward Bottomley at Berenberg. For Q4, what number of gigawatts in tracker sales should we be expecting?
José Núñez Jiménez
executiveOkay, hi Ed. Basically, when it comes to tracker sales, what we have in mind is adding roughly another gigawatt, alright? By year's end, we'll go from 2.6 up to somewhere in the range of 3.5 GW to 4 GW.
Operator
operatorHow much of a lift did ASP give you in Q3, and how meaningful was it?
José Núñez Jiménez
executiveI mean, I wouldn't focus solely on the ASP tailwinds. There are other situations, probably, in the market under the current environment that are helping as well. We've discussed the measures we put in place. We've discussed the fact that basically cost inflation when it comes to logistics and raw materials is improving. That, combined with higher ASPs, is clearly helping us boost profitability, not only in Q3 but in Q2 as well. Obviously, this trend should carry on in the periods ahead.
Operator
operatorEdward had one final question: what are you seeing on pricing for the projects you plan to divest?
José Núñez Jiménez
executiveHonestly, not a great deal has shifted over these past months. What I mean is, it's basically the same picture as on our previous call in mid-September. Pricing in Spain and Italy is holding at roughly the same level, and interest and demand for those specific assets continue to run strong. When it comes to appetite in Brazil, things look much the same. There's plenty of appetite there, as I say. Prices are somewhat lower in that market, as you're aware. Since we last spoke, nothing meaningful has changed.
Operator
operatorAll right. Thanks, José. There are no further questions coming in on the platform. So with that, we'll bring the presentation of the Q3 2022 results to a close. Thank you so much.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Soltec Power Holdings, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Soltec Power Holdings, S.A. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Soltec Power Holdings, S.A. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.