Stabilis Solutions, Inc. (SLNG) Earnings Call Transcript & Summary
November 5, 2026
Earnings Call Speaker Segments
Andy Puhala
executiveGood morning, everyone, and thank you for joining us for Stabilis Solutions' conference call on the results of our third quarter of 2026. I'm Andy Puhala, and I serve as Senior Vice President and CFO of Stabilis. With me today is Casey Crenshaw, our Executive Chairman and Interim President and CEO. Yesterday, after the market closed, we put out a press release that lays out the operational and financial results for our third quarter. You can access that release publicly in the Investor Relations section of our corporate website, stabilis-solutions.com. Before we go further, I want to remind everybody that this conference call today will include forward-looking statements as defined under the Private Securities Litigation Reform Act of 1995 and other securities laws. Such forward-looking statements rest on the company's expectations and beliefs as of today, November 5th, 2026. Risks and uncertainties surround forward-looking statements, and those may lead actual results to differ materially from what has been projected. The company assumes no obligation to update or revise any forward-looking statements made during today's call. You can find additional information about factors that could cause those differences in our SEC filings and in the press release announcing our results. We caution investors against placing undue reliance on any forward-looking statements. Also, please be aware that we may reference certain non-GAAP financial information on today's call. Reconciliations of the non-GAAP financial measures to the most comparable GAAP measures are available in our earnings press release. Today's call is being recorded and will be available for replay. With that, I'll turn things over to Casey Crenshaw for his remarks.
Casey Crenshaw
executiveThanks, Andy, and good morning everyone joining us. Our third-quarter results landed in line with what we anticipated and were consistent with the guidance shared during the previous call. Revenue was up 25% versus the prior quarter, while adjusted EBITDA reached $1.9 million. Following the completion of several sizable contracts at the close of 2025, we've now moved past that turning point, and momentum continues to grow as we head toward what we anticipate will be a record 2027 for Stabilis. The sequential improvement over the second quarter was driven by the short-term behind-the-meter power generation contract secured earlier this year to assist with commissioning a U.S. data center. LNG deliveries under that arrangement began in August. So data-center-related revenue made up 17% of total revenue in Q3, compared with under 1% in Q2, and that project finishes up in Q4. Going forward, our attention is firmly on 2027. Our multi-year deal to provide LNG for behind-the-meter bridge power at a U.S. data center — which we expect to be the largest contract in company history so far — remains on schedule to begin in Q1 2027 and will ramp up across Q2 and Q3. Pre-commissioning activities on that project are progressing as expected, and we've ordered over $15 million in project-specific equipment that is due to arrive ahead of start-up. The investment required to get ready is completely covered by customer advance payments under the contract. In addition, we're wrapping up LNG supply agreements for this project, plus backup supply options that help ensure dependable delivery. Demand for small-scale LNG serving behind-the-meter power at data centers stays robust, over and above the contracts we already have in hand. We see these opportunities unfolding in four phases: construction, commissioning, bridge power, and long-term backup. Our commercial team is pursuing additional work spanning multiple phases of data center demand; we believe our position is strong for extending the growth runway well beyond 2027 and the contract starting next year. Aerospace remains the other major growth engine for our business outside the data center market. Aerospace client revenue rose 49% compared with a year earlier during Q3, fueled by quicker launch and testing work and a rising count of commercial space buyers; those buyers have rigorous purity and delivery demands, and the operational record we have established with them is difficult to duplicate. Right now we are holding talks with several space customers regarding long-term offtake arrangements. Moving to Galveston, we keep working with potential customers and financing partners, and we view the project as an appealing long-term growth prospect for Stabilis. Even so, we are not prepared to set a date for FID, since it still depends on putting a final financing structure in place and obtaining adequate commercial offtake. Our confidence in the project's long-term worth and the value it can generate—and, in our view, will generate—remains strong. That said, aerospace and behind-the-meter data center power projects continue to represent our primary avenues for growth in the short and near term. To wrap up, Q3 marked the beginning of a transformative period for Stabilis. Our short-term data center project will be completed in fourth quarter revenues, while meaningful revenue growth is anticipated in 2027. Net income profitability has been restored, funding is secured for our largest contract, which remains on schedule, and our growth end markets are getting bigger. We anticipate that this momentum will strengthen in 2027, and through disciplined capital allocation and focused execution, we are dedicated to creating value for our customers and shareholders. With that said, I'll turn the call over to Andy, who will walk through our financials in detail.
Andy Puhala
executiveThanks, Casey. I'll begin by taking you through our third-quarter results, and after that I'll update you on cash flow, the balance sheet, liquidity, and capital spending. Third-quarter revenue was $14.8 million, a decline of 27% compared with the third quarter of 2025. Just as in the first two quarters of this year, that year-over-year decrease reflects the sizable marine and power generation contracts that concluded in the fourth quarter of 2025, partially offset by continued growth in aerospace, where revenue climbed 49% versus the same period a year earlier, as well as expansion in our legacy industrial business. On a sequential basis, revenue increased $2.9 million, or 25%, from $11.9 million in the second quarter. The primary factor was the short-term data center contract whose deliveries began in August, which took data center-related revenue from below 1% of the total in the second quarter to 17% in the third. Adjusted EBITDA was $1.9 million in the third quarter, compared with $2.9 million in the prior year period, and that decrease stems from the two large multi-year contracts reaching completion in the fourth quarter of 2025. Sequentially, adjusted EBITDA improved to $1.9 million from $0.1 million in the second quarter, largely on the strength of the higher revenues. Net income was $0.2 million, or $0.01 per diluted share, versus net income of $1.1 million in the third quarter of 2025 and a net loss of $4.6 million in the second quarter. I'd also note that SG&A for the quarter was $2.5 million, essentially unchanged from the second quarter and below the $2.8 million reported a year ago. Turning to cash flow, operating cash flow in the third quarter was $3.9 million, compared with $2.4 million a year ago, and it included a $5 million customer advance payment tied to our 2027 data center contract. Operating cash flow in the second quarter was $7.1 million, which likewise included a $5 million advance payment, and the sequential decline mainly reflects changes in working capital. Year-to-date, cash flow from operations totaled $23.4 million, reflecting the full $25 million of advance payments we have now received under the contract. At quarter end, cash, cash equivalents, and restricted cash totaled $18.4 million, compared with $18.9 million at the close of the second quarter. Of that $18.4 million, $16.8 million is restricted to support equipment purchases and other preparations for the 2027 data center contract, while $1.5 million is unrestricted. Capital expenditures were $4 million during the quarter, versus $2.3 million in the second quarter, bringing year-to-date capital spending to $11.5 million. Those expenditures were mainly related to equipment and infrastructure for the upcoming data center contract. Looking ahead, we expect to continue investing to secure equipment and guaranteed supply ahead of the first quarter 2027 start, and we expect those investments to keep being funded by the advance payments already received. Just before I finish, let me quickly revisit the points we raised last quarter about how earnings should behave as the business keeps scaling. Nothing here is new, and we're not providing guidance for 2027, but with the third quarter now completed, these points are worth calling to mind. First, most of our fixed cost base is already in place, and when the 2027 contract comes online, we don't expect those costs to climb in proportion to revenue, which should generate considerable operating leverage. Second, a large portion of the added demand for power generation will be met through third-party LNG, which requires only limited incremental capital and leaves our plant capacity free to support continued growth with aerospace and our other existing customers. Equipment for the 2027 contract is being funded by advance payments we've already received. Third, under our contracts, all commodity price risk is passed through. Taken together, and against a materially larger revenue base in 2027, all of this should deliver meaningful growth in adjusted EBITDA dollars, plus margin expansion into the high teens, as execution accelerates — and that includes $0.01 per diluted share. That concludes our prepared remarks. Operator, please open the line for the Q&A session.
Martin Malloy
analystMorning, and thanks for taking the time to answer my questions.
Casey Crenshaw
executiveMorning to you, Marty.
Andy Puhala
executiveGood morning.
Martin Malloy
analystFor my first question, I wanted to ask a little about the aerospace market. In your prepared remarks, you sounded increasingly positive about what's going on there. Could you talk a bit more about the volumes involved in these talks with customers for long-term offtake contracts versus your current business? Might that possibly lead to investments in extra liquefaction capacity?
Casey Crenshaw
executiveMarty, I'll start, and again, thank you for joining today's call and for covering the company. I'll take it from a high level, and then I'll let Andy come in and answer anything additional. To be clear, we see Stabilis competing in three highly dynamic arenas. The first is behind-the-meter power, serving hyperscaler data centers and distributed power markets across a range of end markets. The second is a massive marine bunkering infrastructure opportunity. And the third is aerospace, where we've been deeply engaged since roughly 2018 or 2019 — quite a while now. There we deliver high-purity, dependable supply, mainly tied to rockets and rocket launches, largely for telecom satellites and similar applications. While we don't have complete visibility into all their activities, those end markets are the primary focus. What we're observing is the business maturing, with more customers coming on board—genuine clients who purchase and require product—alongside expansion and growing launch and testing efforts across all those clients. Growth is being driven by both the broadening of the customer base and its maturation, plus heightened activity among every customer in that industry. Our track record is what has positioned us to succeed in certain parts of the market. We obviously don't possess everything in full, though we're close to certain clients and have past ties with others, and we anticipate this becoming a significant area of growth for us. A difficulty with the customers stems from how new some of the programs are—you get anomalies, shifts in timing, and regulatory matters that everyone is navigating, which alters how much visibility there is into the cadence of it all. We're beginning to see clients request multi-year offtake arrangements, and we're engaged with several customers on that. Meanwhile, there's talk circulating about certain clients wanting to vertically integrate. There's a great deal of noise in the market, yet the expansion we're seeing outpaces all of that negative chatter. I addressed it at a very broad level, and then I'll let Andy chime in if there's anything he wants to add. We anticipate that it will keep expanding in volume and revenue as a share of the total company. Given the new behind-the-meter activity under contract, that segment may grow—when you look at percentages, it could actually exceed that growth rate next year. Across aerospace, we're seeing an exceptionally robust pace of growth together with multi-year contracting taking shape. Your previous question asked whether we will have sufficient demand or term contracts in order to add capacity. We believe we hope so, and if they wish to contract that, we are in certain discussions aimed at adding infrastructure and capacity. We have discussed contracting even at the Galveston facility so as to bring it inland from that location. We have discussed further expansion possibilities involving infrastructure; we are actively engaged in that, yet we have nothing to provide in the way of forward guidance on it apart from multiple customers at present and multiple negotiations for term contracting underway. Really positive movement in the overall market.
Barry Haimes
analystThank you. Congratulations on the quarter. I had a couple of questions. First, regarding that new data center contract beginning in the first quarter, does it have an end date, or could you give us a bit more sense of the term there? That's my first question. I have a couple more, but that's the first one.
Casey Crenshaw
executiveThanks for joining the call. It's a multi-year contract, but I'll let Andy walk through the details of what we can share on that.
Andy Puhala
executiveBarry, good morning. What we’ve said publicly is that it’s a contract worth about $200 million across two years, and it will ramp beginning at the start of next year. Now, this is bridge power, and many of these bridge power contracts hinge on when the data center receives its permanent connections. The initial contracts run for two years. I think there’s a possibility that it gets extended, depending on the timing of grid connections and that kind of thing, but we simply don’t know yet.
Barry Haimes
analystUnderstood. All right, second question. Can you provide a bit more of an update regarding the marine market, and do you still retain the cruise customer you previously had, plus perhaps a little extra detail on that market? Thanks.
Casey Crenshaw
executiveYeah. I'll start at a high level, and then let Andy chime in afterward. Marine bunkering is a business we've been engaged in. We discuss it frequently. There's a particular project we've spoken about often in the Houston Ship Channel, specifically Galveston, tied to a couple of different cruise customer opportunities. We hold one contract with a long-term customer relationship. Looking at the macro picture today, and considering the options available to our very strong, high-creditworthy cruise customers, they can use marine gas oil, which is a diesel-based product, or LNG, and their vessels have switching capability. Given global disruptions and the higher cost surrounding those alternatives, their demand is high for a fit-for-purpose asset to produce LNG molecules and then have fit-for-purpose delivery capability plus a bunkering vessel. The macro environment is stronger than it has ever been for us to secure financing for an asset with sufficient adequate offtake to help that process occur. One challenge with these offtake agreements for obtaining project financing is the contracting duration and how the contracting structure must work to make project financing function. This project is a $350 million total project, and it needs significant committed offtake across a significant span of time to make project financing work for everyone; we're simply working through those processes. The macro is really strong for advancing that project. Stabilis's project is the furthest along, and we believe it's the most efficiently cost process in the Gulf Coast region. We believe we lead the pack in that area, but we still haven't brought the project to final FID.
Barry Haimes
analystGreat. One quick follow-up on that, if I could. When it comes to how much offtake has been committed, just roughly speaking, are we talking a third, half, two-thirds? Where exactly do you sit in that process? What inning are we in, so to speak?
Casey Crenshaw
executiveYeah. At the moment, roughly 25% of that facility's offtake is committed — the 350,000 gallons a day production; we don't require 100% offtake, but we do need more than we currently have.
Barry Haimes
analystUnderstood. That's fair. So, only one more question then. Those three main markets you brought up — behind-the-meter, marine bunkering, and aerospace — could you give me a rough idea of what share of revenues each one accounted for, and whichever figure you feel is most representative: the third quarter we just reported, year-to-date, or your '27 estimates? I don't need precision, just a ballpark. Thanks.
Casey Crenshaw
executiveLet me give you that ballpark quickly. I think the best approach is to consider '27 and '28, and what we've booked and contracted as we sit here today. We've already made it public that we hold one contract worth about $200 million, give or take, so think of that as $100 million of revenue per year. There are additional behind-the-meter power opportunities we're bidding on and actively pursuing, and we intend to execute on them; then comes the aerospace market, which is expanding very rapidly, though from a smaller base when you consider growth-rate percentages; then we get to marine. The place where we truly expect marine to be very strong for Stabilis is out beyond not next year, but hopefully we start getting some real revenue and earnings back during 2028. Looking at the 10 years ahead there, we're genuinely excited about that serving as an anchor term duration while we ride the ups and downs from both aerospace and behind-the-meter projects. That explanation isn't perfectly clear, but we see those sorts of percentages occurring in the short term. Then, looking 3 years out and beyond, and you begin discussing how that backup power for behind-the-meter demand starts to materialize, where you need peaking opportunities with LNG around large behind-the-meter projects, and you keep seeing aerospace grow, those can be major, major long-term contributors, consistently. Obviously, once we bring the asset in on an FID, the marine project, that would represent a meaningful percentage of revenue at that point in time, but that isn't part of our roughly next year plan, which we expect to be a record year for Stabilis.
Matt Dane
analystGreat, thanks. I had a couple of questions. The first one concerns the data center contract that begins here in Q1 of '27 — I was just hoping for a bit more detail. Does it kick off in the January timeframe, or does it start later in the quarter? Then secondly, please confirm I heard correctly: it ramps over Q2 and Q3, so does that mean Q4 is finally the full run rate for that contract?
Andy Puhala
executiveYeah. Good morning, Matt. Appreciate you being on the call today. Taking your second question first: it'll ramp over the first three quarters of the year, and so by the fourth quarter of next year, yes, we expect that to be at the full run rate, so to speak; as for startup, it'll begin the middle of the first quarter; it'll begin with equipment mobilization and testing and some things like that. Then the LNG deliveries will start to ramp from there; that's roughly the schedule, and really the level of detail we can go into at this point.
Matt Dane
analystGreat, thanks for that, Andy. I'd also like a bit more detail, if possible, about the pipeline of data center opportunities. You mentioned the four different buckets they fall into. I'm just curious — first, how would you characterize the pipeline overall? Is it still growing, or has it stayed roughly steady compared with last quarter? And which bucket holds the largest share of those opportunities? My guess is bridge, simply given how big the contracts are, but if you could give more detail on where things tend to land within the pipeline, that would help.
Casey Crenshaw
executiveLet me try to add some color. I'm not sure we can share every detail of our sales funnel, but I'd say the first three categories are the largest; that's construction, where they're trying to move away from diesel. That's a really strong opportunity, and we're educating customers and showing them how that works. Commissioning has turned into a somewhat new and now robust area, where they say they need the construction and projects commissioned even before permanent power solutions are in place. Bridge is pretty extreme in size, and customers aren't really anticipating it; it's becoming an increasingly needed area when disruptions hit their schedules for grid connections or pipeline interconnections into the facility. That's becoming a growing issue as delays or unexpected events occur. The area where we're probably seeing the most activity in the last quarter, and which we think will grow going forward, is this backup area, where we provide long-term backup solutions for clients active in behind-the-meter activity around data centers; that's the newest area where we're starting to see ramped-up activity and questions. Very excited about that. If you're asking about increased activity, that's the one rising the most; next, I'd say, is bridge activity, because of delays and so many projects coming online and having connection delays. Hope I answered that without giving specifics. All four of those areas are active and exciting for us, and obviously, with diesel prices and the intent on environmental compliance, with construction being a focus for communities, having LNG and a better environmental footprint on construction matters to the facility owners.
Matt Dane
analystThat's useful. How would you describe the pipeline's overall size at quarter end, or as things stand today, compared with where it stood, say, 3 to 6 months back — let's take 3 months ago? Is it simply continuing to grow the opportunities you're bidding on and discussing with people?
Casey Crenshaw
executiveYes, substantially.
Matt Dane
analystAll right. Wonderful. Thanks. I appreciate that.
Casey Crenshaw
executiveNo, and once more, a pipeline is not something you can invoice against. A pipeline remains just a pipeline. What I'm referring to is that there are substantial projects out there; we don't need to secure a large number of those opportunities to be extremely successful in this area, this growth area for our company. That's how we're sort of viewing this area. The opportunities are quite extreme. There's a wide, deep need for infrastructure and execution in this space. I'd say we're somewhat more tightly focused in marine, where we're far more concentrated on a particular project in a particular region, whereas this area is drawing us in exactly where they're experiencing problems on behind-the-meter or where they believe they hold a cost advantage.
Matt Dane
analystHey, I get it. Still, I hope you come out ahead more often than not.
Casey Crenshaw
executiveOur hope is to secure enough wins to keep our shareholders pleased.
Matt Dane
analystThanks.
Andy Puhala
executiveI want to thank all of you for being on today's call. We value the time you've given us, along with your ongoing interest in and backing of Stabilis. Should you wish to find out more, feel free to contact me through our Investor Relations phone lines, and we'll gladly speak with you further. Thanks.
Operator
operatorThanks, everyone. That brings us to the end of the Stabilis Solutions Third Quarter 2026 Earnings Conference Call for today. You can go ahead and disconnect your line now, and we hope you have a wonderful day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Stabilis Solutions, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Stabilis Solutions, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Stabilis Solutions, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.