Jennifer Hills
executiveThanks, operator. With me on the call today are John Hopkins, our President and Chief Executive Officer, and Ramsey Hamady, NuScale's Chief Financial Officer. We'll start with an update on the business, then walk through our financial results. After that, we'll open up the phone lines for your questions; this afternoon we posted supplemental slides on our Investor Relations website. As the safe harbor statement on slide 2 reflects, the information in the presentation and covered in our remarks and the Q&A session that follows includes forward-looking statements, which reflect how we currently view existing trends and are subject to a variety of risks and uncertainties. For a detailed discussion of the risk factors that could lead to differences in our expectations, please refer to our Form 10-K for the year ended December 31st, 2025, along with our subsequent SEC filings. I'll now hand the call over to John.
John Hopkins
executiveThank you, Jennifer, and hello everyone this afternoon. As Slide 3 shows, over the past few quarters we've discussed NuScale's intense concentration on being commercially ready in our capacities as both technology provider and original equipment manufacturer; this quarter brought a significant step that advances that objective. We transitioned from development work into actual manufacturing. Signing a historic deal with Doosan Enerbility for first article production of the NuScale Power Module is something we're proud of, and it represents a definite move from preparation to execution. Our design and planning phases are complete — manufacturing is underway now. This achievement demonstrates real headway toward commercial-scale delivery of the sole SMR technology holding NRC approval. NuScale isn’t sitting idle while ENTRA1 Energy, the partner handling our commercialization, continues working to complete the arrangements needed for project development. We are deliberately expanding our OEM capabilities, improving supply chain readiness, and preparing the company for full-scale production. Our strategy is straightforward and consistent with shareholder interests: stay disciplined with capital, reach the milestones we control, and ensure that after commercial agreements are finalized, NuScale can deliver without needless delay or extra risk. That is how regulatory leadership and manufacturing progress become lasting value. In short, we are ready. We stand prepared with the sole SMR technology holding NRC approval within the United States, prepared with fuel technology that is proven, prepared with engineering, a regulatory basis, strategic partnerships, and a worldwide supply chain required to enable commercial deployment. These actions are being taken by us at a time when demand is rising and support is strong for nuclear energy, particularly SMRs. A fundamental transformation is underway across the global energy landscape. Artificial intelligence, rapid expansion of data centers, growing industrial energy needs, and the heightened significance of energy security are coming together, producing unprecedented demand for baseload power that is reliable, affordable, and carbon-free. This quarter, I'd like to cover our achievements, explain why they matter to shareholders, and describe how NuScale is getting ready for its next stage of growth. We're already putting plans into action. The company is shifting from signed commercial deals toward being ready to deliver. While ENTRA1 keeps building out its customer relationships, we're pushing detailed engineering forward, finalizing commitments with critical suppliers, obtaining the regulatory clearances that reduce risk along the way, and getting set to assist with the construction and operating license application. At the same time, we're getting ready to carry out the OEM agreement through which NuScale will provide its power modules. Those moves accomplish more than simply bringing us nearer to our first delivery. Those steps lower the risk on future execution, give us a repeatable model for deployment, and position NuScale to turn commercial orders into revenue. From a shareholder's perspective, that provides a clear path from contracted demand to module sales, the services that go with them, and long-term value creation. We are making these investments on purpose, and they will continue. The goal is to lay the groundwork for repeatable deployment, to safeguard and build on NuScale's competitive edge as the sole SMR technology provider with NRC approval, and to make sure the company can convert future commercial agreements into revenue with as little delay as possible once those agreements are signed. Our licensing team is already preparing to support the construction and operating license application for the prospective Tennessee Valley Authority project; NuScale is very familiar with this kind of work. We possess an NRC design certification along with standard design approvals, and we carried out significant COLA work for the Carbon Free Power Project. A substantial share of that earlier work can be used directly for TVA or for any other domestic projects in the future, and that ought to shorten both the timeline and the expense compared with an application being filed for the first time. Our engineering teams are engaged in much the same way, pulling on know-how from RoPower and from other programs. After an EPC contractor has been chosen, NuScale will back that effort through a separate contract that covers our proprietary design. This arrangement keeps NuScale involved in design integrity and in execution support while the EPC takes the lead on delivering the project overall. Later on the timeline, we are likewise positioned to assist with operator training, startup consulting, and fuel preparation work, coordinated with Framatome. These opportunities sit further out in time, but we are preparing the ground now so NuScale will be ready when the program calls for them. Taken together, these efforts mean we are already at work actively across licensing, engineering, and later-stage services instead of waiting around for one downstream milestone. It matters to note that many of these steps happen in parallel rather than in sequence. Although backing a TVA power purchase agreement stays our near-term priority, our commercial opportunities reach past TVA. We keep engaging utilities, hyperscalers, and large industrial customers who want reliable, carbon-free baseload power. Such discussions show a widening recognition that technology readiness, regulatory certainty, and the capacity to execute are factors of growing importance when nuclear energy solutions are chosen. Our business model pairs ENTRA1's commercial development capabilities with NuScale's NRC-approved technology, our established supply chain, and our advanced manufacturing readiness. That is a compelling mix that we believe sets us apart in a market that grows more competitive by the day. We're actively chasing opportunities in a number of markets, and we expect to share more updates as those talks turn into concrete commercial commitments. For NuScale shareholders, this isn't about one project alone. It's the chance to build a scalable global OEM business that can serve many customers and deployments over decades. Now, if we go to slide 4, let me explain what last week's agreement with our longtime partner Doosan Enerbility to manufacture components for the first NuScale Power Modules means. NuScale's decision to keep manufacturing key long-lead parts—something our NRC-approved design makes possible—reflects how confident we are that commercialization is coming soon and how committed we are to shortening deployment timelines for customers. For shareholders, this investment means NuScale can move forward as soon as orders come in, and we expect to recover component costs through the owner's contractual payment schedule under a future OEM agreement. I'd also like to highlight our supply chain, which reflects years of intentional groundwork. We have ties to more than 60 specialized suppliers covering every major area of the module—fuel, safety instrumentation and controls, major forgings, module handling, cranes, valves, and more. So once we sign an OEM agreement, a lot of the critical components are already designed, scaled, and tested — and in some cases already in production — which lowers schedule risk and speeds up the path to generating power. As you can see on slide 5, several strategic relationships are already taking long-lead risks off our critical path. Framatome, a world-class supplier of nuclear fuel, is finishing the NuScale fuel design well ahead of customer commitments under a dedicated agreement, which eliminates a classic schedule bottleneck before we even need it. Paragon has won a contract to complete production development of our safety instrumentation and control systems, and NuScale jointly owns the underlying intellectual property. Throughout our broader supplier network, we're working hard to establish two or three sources for the majority of packages, ensuring that no individual vendor turns into a bottleneck. During this quarter, we likewise reached two specific milestones showing the supply chain shifting from planning into actual execution; we rolled out AI tools built specifically for nuclear work from leading technologies throughout our engineering and knowledge management teams, which accelerates design efforts and preserves institutional knowledge. Together with Milani Tech, we achieved a first-of-a-kind manufacturing milestone on the passive emergency core cooling system. On Romania — now that the new government is in place, we continue talking with our Romanian partners. As things move ahead, what matters most to us is that any deal assigns risk in a sensible way, brings commercial value, and safeguards shareholder interests. Our E2 Centers are seeing robust demand — enough that we've built a business model to fuel their expansion and keep the program updated. We signed another center this quarter, and before long we'll have 13 of them around the world. Through these E2 Centers, people learn about small modular reactor controls and our technology, and we also train and get the next wave of engineers, operators, and technicians ready for the nuclear sector. Before I turn things over to Ramsey for the financial update, I want to restate that NuScale is past the stage of merely getting ready for nuclear energy's future. We're starting to carry it out. Our supply chain is under contract, key components are moving into production, and our engineering work is largely finished. With these milestones in place, we're well positioned to turn our commercial pipeline into binding customer commitments, bring in revenue from project development and deployment, and grow an expanding base of long-term recurring revenue. We keep moving forward with deployment of our first NuScale Power Module and are locking in a supply chain so that we're ready for commercialization as our customers' opportunities advance. NuScale owns the only SMR design approved by the NRC anywhere in the world. The technology we have runs on standard nuclear fuel that’s on the market right now, builds in passive safety systems that are already well established, and can be sited wherever customers require dependable power; at this point, I’ll hand things over to Ramsey Hamady, our Chief Financial Officer, for the financial update on this quarter.
Ramsey Hamady
executiveThank you, John, and good afternoon to all of you. The details of our financial results can be found in our filings, so what I'll do is walk through the key line items. NuScale posted revenue of $0.3 million for the three months ending September 30th, 2026, versus $8.2 million during the third quarter of last year. That prior-year figure reflects front-end engineering and design Phase 2 work supporting the RoPower project, and no comparable work took place in the current quarter. Moving to liquidity, NuScale ended the third quarter with roughly $1.9 billion in liquidity, against approximately $916 million at the close of the third quarter last year. As we start funding first article fabrication activity with Doosan and keep pushing engineering and licensing readiness forward ahead of an ENTRA1 OEM agreement, our liquidity is sufficient to fund these activities, and we anticipate capital deployment will proceed at a measured and disciplined pace. Regarding operating expenses, we are reporting $65 million this quarter, versus operating expenses of $549 million in the same period last year; with that, thank you for joining us today and for your continued support of NuScale as we move from readiness to execution. Operator, please open the line for questions.
George Gianarikas
analystHello everybody. Good afternoon, and thanks for asking my questions. If I could begin with TVA, and you brought up other commercial activity as well. It's clear that buying some long-lead items suggests you have a degree of confidence in how that will conclude. Could you give us a timeline for when we might expect a possible commercial agreement, and perhaps a timeline for the others you referred to on this call? Thank you.
John Hopkins
executiveGeorge, this is John. Thanks for the question. That process is ongoing, and in the end we're optimistic about this opportunity. What we're able to do, and what lies within our control, George, is precisely what we said today, which is to keep building out our capacity to execute. As we said, this step to first article is a significant milestone for us as we move ahead in readiness for a project like TVA; in essence it takes our SMR design into physical hardware. It also assists in reducing risk as we go from engineering to commercial delivery. We're enthusiastic about it, and we're prepared to move. Our customers and investors require proof that modules truly can be manufactured to nuclear-quality standards and on schedule, and these first articles help supply that proof. Beyond that, they bring early problems to the surface that can be fixed prior to series production. We're doing all we can, George, on our side. We're set to go, as I mentioned earlier; it is a process. It has taken a long time, we know, but we're doing what we can and what we have control over.
George Gianarikas
analystThanks. I'd like to ask a follow-up for Ramsey regarding opex — I'm wondering how much expansion we might see in that line item, given there could also be a decrease there. My understanding is that quarterly opex sits at roughly $65 million. Thank you.
Ramsey Hamady
executiveGeorge, good to speak with you, and thanks for the questions. As a rule we don't give guidance, and we haven't done so previously, but our opex ought to stay relatively flat. I'd say there's a shift happening in opex right now as we concentrate on projects and on further development, and the growth you'll see is, I believe, once we get involved in a project — we're hoping with TVA and with ENTRA1 — at that point additional growth will appear; some of that might flow through opex, and a portion could flow through cost of goods sold; it will be distributed across the income statement, but that is where the higher spending will show up.
George Gianarikas
analystThank you.
John Hopkins
executiveThanks, George.
Nate Pendleton
analystGood afternoon, and thank you for taking my questions. I'd like to return to what you said in your prepared remarks about the macro opportunity, given how volatile the market has been lately. How lasting is the demand growth for new nuclear power, and if hyperscaler spending slows down, how would that shift your view of demand for SMRs?
John Hopkins
executiveI can recall, back when I first joined NuScale, and I'll never forget the date — December 12th, 2013. At that time, NuScale had submitted a funding opportunity assessment while Ernie Moniz was Secretary of Energy in the Obama administration. That day, December 12th, I got a call from Ernie's office telling me NuScale had knocked it out of the park, and that we were the sole-source recipient of that highly competitive award. Looking ahead, NuScale has performed well. In fact, advanced nuclear as a whole has performed well across every administration. What we're seeing, and what we can tell you, is that we live on the Hill, and we enjoy bipartisan backing from both D's and R's. Now, they might differ in their opinions on one thing, but both sides agree that we need reliable, clean, carbon-free power 24/7. As for where we stand today with data centers, it's probably too early to say. We're aware there's a bipartisan push regarding NIMBY and all the rest, but we don't depend on data centers. Going forward, we keep marketing aggressively. We're having conversations with process-oriented companies. You've heard this before — we need process heat, we need district heat. Our Chief Technology Officer, Jose Reyes, is out on the street at numerous conferences right now, explaining how NuScale can deliver that, again, with an approved design that lets our emergency planning zone sit at the fence line of any given project, so we could be right beside the end user. In fact, we're ramping up marketing right now to get out there, and we have a series of invitations to visit within the next 2 weeks from parties that are both process-oriented and utilities.
Nate Pendleton
analystThat's genuinely excellent. I appreciate the detail; and then, if I may, turning to the four— Oh, sorry, please continue.
John Hopkins
executiveNo, no. Go right ahead.
Nate Pendleton
analystSure. Regarding the fourth bullet on slide 6, as we consider those possible first-of-a-kind deployments, could you envision a scenario in which NuScale assumes a portion of the cost or performance risk so those deployments could be accelerated?
John Hopkins
executiveBeing an OEM supplier, our performance risk really centers on this: we have the pressure and steam requirements that we claim we can deliver, and that is the risk we are prepared to accept; we have a supply chain with warranties that backstop us, and we feel quite comfortable. Whatever we are able to deliver, we can stand behind.
Nate Pendleton
analystUnderstood. Appreciate it.
John Hopkins
executiveYou bet.
Eric Stine
analystHi, Luca here, sitting in for Eric. Appreciate you taking our questions. To start, are there other areas besides module fabrication and, more recently, the coolant system where you anticipate using Doosan? And how do you see this partnership evolving overall, and how important it is over the long term?
John Hopkins
executiveDoosan and we have worked together since 2019 — it's a genuine strategic partnership. Beyond being strategic, they're an investor in NuScale as well. What I value about Doosan is their strong willingness to collaborate with us as we expand capacity and capability. To reiterate, when we signed our initial agreements, they were conditional: every supplier we engage still has to demonstrate competitiveness. As we mentioned before, we now have more than 60 suppliers, and that base keeps growing, both across the U.S. and internationally. Should Doosan keep delivering, we'll keep working with them and awarding them work. What suppliers want isn't one-off deals — it's a sustainable supply chain. Take forgings as a good illustration from when we first began outreach in the U.S.: a lot of suppliers told us, "We won't tool up until we have an order book." Many are now growing more confident working with NuScale, and as they see what we're doing on the manufacturing side, they're engaging with us. We keep broadening our supplier pool so that we won't depend on any single supplier. We'll have tertiary or dual options through working with additional suppliers.
Eric Stine
analystUnderstood. Thanks for all that detail, it's really useful. So I suppose, pivoting to my second question, the
John Hopkins
executiveReturning to Doosan, my apologies, I cut you off. Please continue.
Eric Stine
analystNo, please, you go ahead. No, no, carry on, finish up.
John Hopkins
executiveNo, no, please. No, no, I was merely saying that all of us have just returned from Korea. This first article had us excited, Doosan is eager about that first article, and our whole supply chain is glad that we're taking that standard plant design, which the NRC has approved, and that manufacturing hardware means we're genuinely de-risking this project now.
Eric Stine
analystRight, thanks. As a quick follow-up, I'd like a bit more detail on which portions of the COLA work you did with the Carbon Free Project you expect can be repeated for other applications, along with the broader knowledge you've picked up from engaging with the NRC over all these years. You mentioned it briefly in the prepared remarks, but I'd like to hear some expanded thoughts on that.
John Hopkins
executiveDuring that first FOA process, one of the conditions was that we needed a customer. We had one — the Carbon Free Power Project. Without that customer, we probably wouldn't have had much of the first; we might not even have made it through the NRC licensing process, if not for having that customer. As the process matured, we were the OEM, and they had an EPC provider. We assembled a construction operations license agreement, and we believe roughly 50% to 60% of what we did can be transferred to another customer. Looking at what we're aiming to do, once these contracts are in place, we'll immediately begin work on our COLA; we're looking at revenue streams from engineering fees service, and then obviously, in parallel, we'll be putting together our OEM contract.
Eric Stine
analystUnderstood. That helps. I'll hand it over now. Thanks.
Chris Souther
analystHi, appreciate you taking my questions. Good to see the ongoing progress on long-lead items. You said opex stays fairly flat. I'm wondering, is there some kind of pickup in activity picking up speed with Doosan, or is there another line where more spending could flow through them? And could you walk through other milestones we should watch for on the things you control to get ready for deployments beyond ENTRA1 and TVA?
Ramsey Hamady
executiveSure, Ramsey Hamady here. To start, thank you for asking. We can dig into the opex point a bit further. What NuScale really did is, looking at 2024 and 2025, we stayed highly disciplined; we demonstrated strong capability to keep opex inside a plus or minus 5% band across eight consecutive quarters; that's the same management team currently in place. I mention that because we're extremely intentional about how we handle opex. As we came into this year, certain RoPower work tapered off, which shows up in our revenues. We decided to keep some of that essential intellectual talent and hold onto them inside the company, so they transition off projects, off cost of goods sold, and then shift over to the opex line. That's intentional. Our opex rose because of deliberate decisions to retain intellectual talent. As we move forward developing projects, and actually with Doosan, those expenses will flow through the balance sheet as we accrue, just like today; we have long-lead materials sitting under WIP on our balance sheet. You've watched those climb slightly each quarter as we keep investing in that WIP, that work-in-progress, that inventory, and you'll see that accruing on the balance sheet too as we build out the Doosan work. After we sell those assets under an OEM contract, you'll then see them expensed through cost of goods sold on our income statement; it's all tightly controlled. It's all very intentional, and it's all part of a deliberate plan of action. The best part is that management pulled $1.9 billion of cash onto the balance sheet, and we've kept it there. That gives us a highly conservative, very solid liquidity position built for the long term.
Chris Souther
analystUnderstood. Oh, that helps a great deal, Ramsey. Thanks. So perhaps just a little on ENTRA1 and TVA. I realize you don't want to speak on your customer's behalf, but roughly a year ago ENTRA1 was brought into the US-Japan framework agreement. I'm wondering whether you can point to any update regarding that type of framework agreement, and any discussion of the funding around it would be useful.
Ramsey Hamady
executiveCertainly, Ramsey Hamady here. I'm delighted you raised our strategic investors from Korea and Japan. Just as John Hopkins and Carl Fisher were in Korea lately collaborating with Doosan and signing the first articles, I was in Japan collaborating with JBIC, speaking with METI, and with our JNI strategic investors, among them IHI, JGC, and Chubu, as well as JBIC. A key piece of this, and John said it earlier, I believe, is that we've been collaborating with our Asian strategics for a great many years. They belong to our original investors, they hold positions, our equity base, and they keep backing us from a strategic standpoint. The alliance between the US and Japan is extremely strong, it stays extremely strong, keeps seeing investment, and we stay backed by those critical Asian, Korean and Japanese strategic investors.
Craig Shere
analystGood afternoon, and thanks for taking the questions. It sort of feels like, beyond obviously guaranteeing deliverability and the major equipment as soon as an order comes in, you're really setting up the cost side of this whole thing so that once you have an ENTRA1 order, you should be able to give fairly quickly some definitive clarity on margin. Is that right?
Ramsey Hamady
executiveI believe that's right. Once we have an order and work out an OEM agreement, we'll have more clarity on margins. These agreements involve longer delivery schedules, but this is part of a deliberate business plan; we have a good sense of cost, and we're further refining that sense of cost. The first article will continue to do that, and we'll be able to give guidance soon. That's our objective; we want to be able to give guidance to the street; we want to help the street understand our profitability and to assess the true value of NuScale.
Craig Shere
analystGreat. You brought up that thanks to deals with Doosan and other parties, capex or major equipment payments are going to rise somewhat. Normally I just check the cash flow statement each quarter, and I believe there was a sizable spike in long lead time material work-in-process during second quarter '25, but it amounted to only just over $19 million, which isn't huge. Do you anticipate anything significantly more material than that on a quarterly basis going forward? Is there anything particularly chunky ahead of final orders?
Ramsey Hamady
executiveThe spike you'd have noticed, I believe, would have been the task order for producing long-lead materials for modules 7 through 12, since earlier, with regard to the CFPP project, that was a project of six modules. We began long-lead materials for six six modules. Once we understood that customer demand was for gigawatt-sized, 12-module power plants, we started producing long-lead materials for modules 7 through 12. What lies ahead? We keep investing in building these modules. We've signed first article with Doosan. We've signed with additional supply chain partners. We'll keep investing in supply chain. I think what matters to understand is that when we build these modules, when we put money into it, and when you see that capex rising, this isn't truly capex in the sense of constructing factories, correct? These are investments in inventory; this is all cash that we'll get back through module sales under an OEM agreement; with $1.9 billion in cash and a capability to keep very close monitoring on opex, we're in good shape to do this.
Craig Shere
analystUh-huh. The assumption is that we'll begin to see quarterly numbers that carry more meaningful weight. So what you're going to do is take those cash assets of yours and shift a larger portion of them into inventory.
Ramsey Hamady
executiveThe way I'd put it is that NuScale is constructing NPMs. We will construct NPMs, since our purpose here is to sell NPMs.
Craig Shere
analystThanks.
Ramsey Hamady
executiveThe money's there for us to make it happen. Yeah. Appreciate it.
Derek Soderberg
analystThanks for taking my questions. Once that TVA PPA gets signed, could you remind us what steps remain before the binding module order is truly secured? Does signing the PPA itself actually set a module order in motion in any way? Could you walk us through that process again? Then I have a follow-up. Thanks.
John Hopkins
executiveThat's a great question. Yes is the answer, once that PPA is initiated. That's exactly why we're doing everything within our control at this moment to be ready for it, so we can move quickly into the areas we mentioned earlier: the COLA and long-lead items. As I said earlier, long-lead items are precisely what we stated: long-lead items. Manufacturing these things takes years. We've been working with Doosan, as we stated, on those six modules for some time. They're ready to come off the production line pretty soon. As much as we can to be ready, once that PPA, we're ready to move now.
Derek Soderberg
analystUnderstood. John, I suppose what I'd like to hear is your take on how the midterm elections turned out. Do you see anything shifting on your side, and does it affect possible funding? I'm just interested in your perspective. Thank you.
John Hopkins
executiveNo, as I mentioned before, I've been at this since our first award came through in 2012. One lesson from working the Hill is that while you do get outliers, by and large both the D's and the R's back nuclear. In 2025, according to what I believe was the Pew analysis, more than 60% of the current U.S. population now supports nuclear, compared with 40% back in 2020. That momentum keeps growing. People want power that is clean, reliable, and available 24/7. Even during that stretch, we held many conversations with renewable companies, and we wrote technical papers about our ability to partner with renewables and to follow load. Back in the early days, when the duck curve was the topic, we can ramp up and ramp down as needed when the wind isn't blowing, and the same holds for solar. We've even talked with those companies about ways to collaborate. My expectation is that this will keep moving forward.
Ramsey Hamady
executiveLet me also clarify something on your second question—I think what you were asking is whether the PPA would result in a module sale. Our expectation is that the PPA is the following step, and that step ultimately does lead to modules being sold, but the PPA by itself—I’m not sure clarification is even needed here—is not a module sale. The PPA sits between ENTRA1 and TVA. What we anticipate is that work will follow the PPA: pre-engineering, pre-delivery services, COLA work, potentially a whole range of engineering work, and after that the module sale would occur under an OEM agreement between NuScale and ENTRA1. That’s just to make the sequencing clear.
Derek Soderberg
analystGot it. Thanks, guys.
Ramsey Hamady
executiveThank you.
Seth Basham
analystMuch appreciated. Good afternoon, and thank you for the chance to ask. My first question concerns RoPower — could you bring us up to date on where that project stands and what we should expect in the coming few months?
John Hopkins
executiveWe have been waiting. A new administration has just taken office. I'm aware there have been some public announcements; we keep an ongoing dialogue with both RoPower and Nuclearelectrica, which is one of their major shareholders. Not long ago I sent a request to go visit with the current administration so as to gain some insight into where this government is headed. At this time, that's all we know.
Seth Basham
analystAll right, that makes sense. Then, to pick up separately on a few of the other questions raised earlier: as you think about what comes next regarding the strategic investments required to get to full-scale production, could you point to any other major investments you're planning apart from the work with Doosan? What's the timing on those?
Ramsey Hamady
executiveAt this point, there aren't any other major investments that we're publicly communicating.
Seth Basham
analystOkay, that's fair. Thanks very much.
Ramsey Hamady
executiveThanks.
John Hopkins
executiveThank you. As we said before, we're moving toward commercial deployment right now, whereas other companies are still in the early phases of regulatory review, technology development, and fuel qualification. That puts us in position to create shareholder value as demand keeps rising for scalable, carbon-free energy. NuScale's priorities are straightforward: lock in customer commitments, hit manufacturing deployment milestones, turn backlog into revenue, and build a scalable, profitable business. As we said, we're ready, we're executing, and the next chapter for us won't be judged just by milestones achieved — it will be judged by revenues generated, projects delivered, and lasting value created for our shareholders. Thank you for your continued confidence and support.
Operator
operatorThis concludes today's call. Thank you for attending. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete NuScale Power Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to NuScale Power Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in NuScale Power Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.