Good day, everyone, and welcome to the SAIL Q2 FY 2023 earnings conference call, which Nuvama Wealth Management is hosting. Please be aware that every participant line is currently in listen-only mode, and once the presentation wraps up, you'll have a chance to pose questions. If you require help at any point during this call, just press star followed by zero on your touchtone phone to signal an operator. Kindly be advised that this conference is being recorded. At this time, I'll turn the conference over to Mr. Ashish Kejriwal of Nuvama Wealth Management. Thank you, and the floor is yours.

Ashish Kejriwal

analyst
#2

Much appreciated, Aman. Hello and good afternoon to all of you. Nuvama Wealth Management is glad to have everyone join us for the Q2 FY23 post-result conference call of Steel Authority of India. It's a pleasure to host Mr. Anil Tulsiani, Director of Finance, together with his team, and they will be representing SAIL on this call. At this point I'd like to invite Mr. Tulsiani to give his opening remarks, and after that we will open the floor for Q&A. The floor is yours, sir.

Anil Tulsiani

executive
#3

Thanks, Ashish. Good afternoon, everybody. I'm glad to have all of you join this investor conference call covering SAIL's financial results for Q2 and H1 of financial year 2023. Can you hear me?

Operator

operator
#4

Yes, sir, we can hear you. Go ahead.

Anil Tulsiani

executive
#5

Thank you. For economies around the world in general, and for the steel industry specifically, the past few months have proven rather difficult. Although steel demand within India has held up somewhat better, the combination of declining steel prices and sharp increases in raw material and input costs has placed severe pressure on margins for Indian steelmakers, which is evident from the results published by companies thus far. Before we move to your questions, I'll give you a brief walkthrough of our company's results. Let me begin with the economic picture. In the post-COVID period, the global economy has been fighting a hard battle against inflationary pressures. As economies such as the U.S. respond with corrective steps by tightening fiscal and monetary policy, GDP growth rates have kept declining. Matters have been deteriorating further, with China's growth decelerating amid an issue tied to the real estate sector. The Russia-Ukraine conflict has worsened the inflation problem through disruptions to supply chains. Institutions including the IMF and World Bank have marked down their projected GDP for a range of economies. In its most recent world economic outlook, the IMF has cut its global GDP forecast to 3.2% for calendar year 2022, and that rate is expected to decelerate further to 2.7% in calendar year 2023.

Anil Tulsiani

executive
#6

Growth projections are also being cut considerably in the major advanced economies, which include the U.S., Germany, Japan, the U.K., and France. Emerging economies are doing only somewhat better than their advanced peers. Our bright spot, though, lies in how the Indian economy is trending. Its position is considerably stronger, with various reports — the IMF World Economic Outlook, World Bank projections, the Monetary Policy Committee, and the Committee of RBI — pegging growth in the 6%-7% range over the coming year. Although the Indian economy, much like the global economy, has been experiencing a downward trend in GDP projections, growth forecasts in the 6%+ range still mean India will stay among the fastest-growing major economies. Domestic industry, though, will need to protect itself against import threats. The global steel industry has witnessed weakening demand and a corresponding decline in realization over the past few months. As China appears to be reducing its production amid environmental concerns, that has affected iron ore prices. There is also concern around coking coal, which continues to be quite volatile. This fossil fuel, a key input for the steel industry, previously hit unprecedented highs of $670-$680 per ton for HCC between February and May after the Russia-Ukraine war.

Anil Tulsiani

executive
#7

After that, from June-July onward, prices dropped considerably, falling to around INR 200 per ton. Now, though, they have begun rising again little by little. Inflation, uncertainty, and similar factors have all weighed negatively on steel industries worldwide. That effect has spread into the Indian market too. Steel prices, which peaked in April, have fallen significantly by roughly 25%-30%, and flat products have felt a relatively much larger adverse effect than longs, since international markets drive them. In the long segment as well, prices have softened recently, because one of the key inputs — scrap used in the EAF/DRI route — has lately seen its price drop to the $350 level CFR Turkey. Demand forecasts for steel in India, however, stay upbeat, with the domestic steel industry posting 5.3% growth in crude steel production from April to October 2023 versus CPLY. Steel consumption in the country rose 11.4% during this period. The company achieved its best ever H1 production performance for hot metal, crude steel, and saleable steel in H1 financial year 2023. Domestic market sales by CMO increased 9% in H1 financial year 2023.

Anil Tulsiani

executive
#8

That said, total sales were impacted by reduced export volumes in the quarter. We shipped roughly 5.5 lakh tons fewer abroad during this stretch. Here's how H1 and Q2 of financial year 2023 compare with CPLY. Crude steel output for H1 2022 to 23 came in at 8.63 million tons. For H1 2021 to 22, it was 8.24 million tons. Q2 2022 to 23 stood at 4.3 million tons. Q2 2021 to 22 was 4.47 million tons. Saleable steel for H1 2022 to 23 reached 8.17 million tons. H1 2021 to 22 was 8.09 million tons. Q2 2022 to 23 came to 4.09 million tons. Q2 2021 to 22 was 4.32 million tons. Sales volume for H1 2022 to 23 was 7.36 versus 7.61 in H1 2021 to 22. On the financial side, the top line grew while profitability was hit, consistent with what the industry is seeing. Revenue from operations for H1 2022 to 23 is INR 50,275 crores against INR 47,469 crores. EBITDA for H1 stands at INR 3,780 crores versus INR 13,921 crores in H1 2021 to 22. PBT is INR 523 crore against INR 10,898 crores in CPLY. Profit after tax is INR 391 crores against INR 8,154 crores in H1 2021 to 22.

Anil Tulsiani

executive
#9

Realizations on average across H1 are still above what we saw in the CPLY period, even though they came down substantially over the period. That supported revenue growth in H1 versus CPLY. Profitability, on the other hand, took a hit from higher costs, particularly coking coal. As coking coal prices decline, we anticipate production costs will correct as well, which should let us post improved results next quarter. With that, I'll turn things back to Mr. Kejriwal to open the Q&A session. I'm sure all of you have plenty of questions about how we performed. Thank you.

Operator

operator
#10

Thank you so much. We'll start the question and answer portion at this point. Anybody who would like to pose a question can press star and one on their touchtone phone. Should you want to take yourself out of the question queue, just press star and two. We ask participants to use handsets when posing the question. Ladies and gentlemen, we'll pause for a moment while the question queue is put together. Our first question comes from Amit Dixit at ICICI Securities. Go right ahead.

Amit Dixit

analyst
#11

Hi there, good afternoon everybody, and thank you for giving me the chance to ask. There are two things I want to cover. My first one relates mainly to that waterfall chart you showed on slide 29. Looking at it, what stands out is that, in contrast to your competitors, you recorded a gain on raw material usage as well as on input price cost. As a matter of fact, the input price cost item is a gain of almost INR 1,994 crores. So I just wanted to get a clearer picture of where that gain actually originated, since coking coal prices, at least for your competitors, did not come down meaningfully. And on raw material usage as well, I'd like to know where that benefit came from. That's my first question.

Anil Tulsiani

executive
#12

So actually, if we look at the quarterly numbers, coal prices declined in the second quarter relative to Q1. Let me share the figures with you. Imported coal prices, which stood at roughly INR 39,000 in Q1, were at levels of about INR 33,000 in Q2.

Amit Dixit

analyst
#13

All right, that INR 1,994 crore figure was the main factor behind this.

Anil Tulsiani

executive
#14

Yeah.

Amit Dixit

analyst
#15

And on the raw material side — where does that INR 550 crores benefit actually come from? Is it technical and techno-commercial improvements, or is it something else?

Anil Tulsiani

executive
#16

Right. That was mainly down to the techno-commercial and techno-economic parameters.

Amit Dixit

analyst
#17

Sir, when it comes to coking coal, what type of costs should we be looking at for Q3, starting from that base level of INR 33,000?

Anil Tulsiani

executive
#18

We're anticipating a decrease of roughly INR 5,000.

Amit Dixit

analyst
#19

That comes to INR 5,000.

Anil Tulsiani

executive
#20

Regarding Q3 — and this is about Q3.

Amit Dixit

analyst
#21

All right. Moving on to the next question.

Anil Tulsiani

executive
#22

Roughly $50.

Amit Dixit

analyst
#23

Alright, that's fair. Understood, sir. Thanks. My next question concerns the working capital buildup. If I look at your debt, it has risen considerably — I mean, comparing it with the first half of the year — and the working capital buildup is also rather significant. What sort of relief should we expect in H2? And what debt level would you guide to by the end of FY 2023?

Anil Tulsiani

executive
#24

So the debt level actually went up by roughly about nearly INR 9,000 crore during the first quarter. Then in the second quarter, it rose by approximately about INR 5,000 crore. For the third quarter, we're not expecting much of a rise in debt levels, and in the fourth quarter, we'll definitely try to bring it down to some extent. It might not get back to the levels we had at March 2022. We'll certainly make an effort to reduce it to somewhere around, let's say, INR 25,000-INR 26,000 crore.

Amit Dixit

analyst
#25

Excellent, sir. That is very helpful. Thanks, and all the best.

Anil Tulsiani

executive
#26

Thanks.

Operator

operator
#27

Thanks. Our next question comes from Pinakin at JP Morgan. Your line is open.

Pinakin Parekh

analyst
#28

Yes, sir. Thanks a lot. First question from my side: when I examine profitability at the plant level, it's surprising that Durgapur and IISCO turned in positive EBIT against a negative EBIT in the prior quarter, whereas the remaining plants posted negative EBIT. Could you take us through the factors behind that better profitability at Durgapur and IISCO? After all, historically those two are plants in the long product segment, you know.

Anil Tulsiani

executive
#29

What actually took place is that long product prices haven’t been hit much, given the thermal power shortage. The secondary steel producers who also make these long products were unable to cut their prices. Flat product prices, on the other hand, were greatly affected in this particular quarter. That’s why our other flat product plants — Rourkela, Bokaro and, to some degree, Bhilai — have been severely hurt by this decline in steel product prices. Long product prices, by contrast, haven’t fallen to that extent.

Pinakin Parekh

analyst
#30

Thank you, sir. For my second question: we're moving into the seasonally busy stretch for construction demand in India. There were some reports about companies raising prices during the month of October. Against that backdrop, sir, how do you expect sales realizations to trend over the next few months compared with the average realizations the company recorded in the second quarter?

Anil Tulsiani

executive
#31

Relative to the second quarter, realizations might not improve. In the third quarter, we may aim to hold them around those same levels.

Pinakin Parekh

analyst
#32

Got it, and thanks a lot, sir.

Operator

operator
#33

Thanks. The next question comes from Sumangal Nevatia at Kotak Securities. Please go ahead.

Sumangal Nevatia

analyst
#34

Good afternoon, and thanks for the opportunity. My first question concerns that other expense line, which shows a steep drop of roughly INR 1,000 crores. On top of that, the trend rate for employee cost is lower in this quarter as well. Were there any one-offs involved, or is this a sustainable gain? Could you just walk us through what the drivers are?

Anil Tulsiani

executive
#35

There's also a one-off item, and it relates to royalty. What's been happening with royalty is that for our Odisha group of mines, we were paying at the highest rate — for lumps, and for fines as well. In July or August, the government issued a notification stating that the highest rate for lumps would no longer apply to fines; instead, the highest rate for fines would apply to fines alone. This carries a one-time impact. It applies only from April onwards — April 2022 onwards. It had an impact of around INR 400 crore in this particular quarter. Of course, out of 400 you can say 200 is for this quarter and the 200 is for the earlier quarter. The other thing is that, because of the rising dollar rate, we had a foreign currency loss of around about INR 570 crore in Q1, which we could reduce to around about INR 280 crore in the second quarter. These are the main major things behind the decline in miscellaneous expenditures. As for salaries and wages, this should be the gradual trend of a gradual reduction in salaries and wages over the years.

Sumangal Nevatia

analyst
#36

All right, just so I have this straight — the Forex, as you put it, moved from INR 570 down to INR 280. That INR 290 difference is a one-off gain, and it shows up in other expense.

Anil Tulsiani

executive
#37

This isn’t some one-time benefit. In fact, it was a cost. Last quarter, that cost was a significant one. Since then, it has decreased.

Sumangal Nevatia

analyst
#38

Understood — apologies. That INR 400 royalty you mentioned is the one-off gain booked in 2Q.

Anil Tulsiani

executive
#39

Sure. Essentially, the standard royalty will now decrease by INR 200 crores each quarter, so to speak. We received that benefit in the first quarter as well as in this quarter, the second quarter.

Sumangal Nevatia

analyst
#40

All right, understood. Regarding the second question about working capital rising to nearly INR 15,000 crores — what kind of normalized working capital level should we be anticipating? Since an increase of this sort isn't something we've observed at any of the peers. If we look back at the fourth quarter of last year, or the whole of last year, we had brought our working capital down very substantially. So if you could explain, sir, what level is sustainable?

Anil Tulsiani

executive
#41

Actually, the way this has played out, the rise stems mainly from imported coking coal costing more. We had moved over to payments on an LC basis. There was a payment cycle that got stretched out, you know. So on account of that, working capital went up. If you look at it really, I think from Q1 onward, the situation has gotten slightly better.

Sumangal Nevatia

analyst
#42

Okay, understood. And finally, for the full year CapEx, what guidance do you have for this year and the next one?

Anil Tulsiani

executive
#43

Up to this point, we've laid out roughly INR 6,000 crores in CapEx. For the full year, we've set a target of about INR 6,000 crores.

Sumangal Nevatia

analyst
#44

Alright, just one final minor point to clear up. There's a cash tax figure of roughly INR 300 odd crore on our side. Our understanding had been that accumulated losses exist. So what's our guidance when it comes to the cash tax payout?

Anil Tulsiani

executive
#45

No, that one has already been adjusted in full.

Sumangal Nevatia

analyst
#46

So all told, on a cash basis, we won't be paying any tax at all this year, correct?

Anil Tulsiani

executive
#47

No, starting this year we'll pay tax on a cash basis.

Sumangal Nevatia

analyst
#48

Starting this year onward—what, 25% is the figure we should build in?

Anil Tulsiani

executive
#49

Yes, yes — 25.

Sumangal Nevatia

analyst
#50

Alright. Thanks, and best of luck.

Anil Tulsiani

executive
#51

Yeah.

Operator

operator
#52

Thanks. Our next question comes from Abhishek at HDFC AMC. Your line is open, please go ahead.

Abhishek Poddar

analyst
#53

Thank you, sir, for taking my question. I have just one question, sir. If you consider how steel prices have moved over the last three to six months, there has been a very sharp reduction in prices in the international market, including China, Japan and Korea. If you look at domestic prices, the correction has been limited. Because of that, there is a high premium that domestic prices are kind of commanding, especially in the flat side. I just wanted to understand your view, you know, how the situation should pan out, and how do you see the steel prices moving from here?

Anil Tulsiani

executive
#54

For Q3, pricing should be roughly consistent with what we saw in Q2. In Q2, there was a steep drop relative to Q1. Our view is that Q3 should land at more or less those same Q2 levels.

Abhishek Poddar

analyst
#55

That's based on October and November prices. How do you think pricing should move in December and January? Will things line up with import prices, or would you expect prices to stay at a strong premium to import parity prices?

Anil Tulsiani

executive
#56

It's quite early to make any of those calls, since the key point is that for long products we ought to see pricing strengthening somewhat. All of this hinges on one more variable as well, namely coal prices. Should coal prices begin climbing sharply too — and they have risen considerably over the last month and a half, by roughly $60-$70 — then if that pattern carries on, it will most likely affect steel prices as well.

Abhishek Poddar

analyst
#57

Got it. Sir, only one further question from me. Regarding coking coal, we observed a drop that took place two to three months ago, and your guidance points to reduced coking coal in 3Q. Yet spot prices have climbed once more. So how are we meant to view coking coal, you know, with it rising at this point? Will that effect show up in the fourth quarter?

Anil Tulsiani

executive
#58

Yes, it'll land in the fourth quarter. The third quarter probably won't see it, since this cycle runs roughly three months, you could say. When you bring coal in from the USA, it takes about three months, and Australian coal runs about two to two and a half months. So the benefit of the imports we've made in, say, August and September will come through to us. Perhaps whatever coal we're buying at present will roll over into the fourth quarter.

Abhishek Poddar

analyst
#59

Sir, regarding the spot price at which we're purchasing — you said it will reach 28,000 INR per third quarter. By what amount are spot prices higher, sir?

Anil Tulsiani

executive
#60

More than 300. In the 30 to 31,000 range. It ought to be roughly 31,000. Approximately 31,000.

Abhishek Poddar

analyst
#61

Oh, alright. Thank you, sir. Best of luck to you, sir. Thanks.

Operator

operator
#62

Thanks. Our next question comes from Arijit Dutta at Kotak Mutual Fund. The line is yours — please go ahead.

Arijit Dutta

analyst
#63

Hello, sir. I have one question. From what we understand, on the government contracts we sell to the government directly, pricing tends to be somewhat sticky, and adjustments arrive with a delay. So if you could guide us, what government price contract should we expect over the coming years, particularly for the railways? Have we already taken the hike from when steel prices were skyrocketing, or did we take that hike and a date is still coming? Any clear view on that.

Anil Tulsiani

executive
#64

Is it the rail pricing you mean?

Arijit Dutta

analyst
#65

which we provide to a government agency, like the railway, for instance.

Anil Tulsiani

executive
#66

Look, the bulk of what we supply them comes as rails. We provide close to 1 million tons of rails to the government. On top of that, they make some smaller purchases, but those aren't really significant. Pricing on these rails is actually set once a year. Right now, we're getting it on a somewhat ad hoc basis. We receive a price at the start of the year. That ad hoc price has been set at roughly INR 67,500. As for the final price, we'll be submitting it for 2022 to 2023 during 2023 to 2024. And we'll be submitting the price for 2021 to 2022 shortly. Whichever price gets finalized between the railways and us — that benefit, or any reduction, will land in the year when we actually receive the final pricing from the railways.

Arijit Dutta

analyst
#67

So in that scenario, when finalization happens at the close of the year in April — sorry, I mean 1Q of FY 2024 — we'll have some prior year adjustment showing up there, correct, sir?

Anil Tulsiani

executive
#68

We're going to submit it now. In fact, we've already submitted for 2021, so we'll likely receive the final pricing on that during this financial year.

Arijit Dutta

analyst
#69

That will land on our gain side, in case—if I assume that—your price gets accepted.

Anil Tulsiani

executive
#70

We've submitted a higher price to the railways, so let's see. We'll finalize that mutually, then. We expect a higher price — no doubt about that.

Arijit Dutta

analyst
#71

All right, thank you very much. That covers everything I had to say. Thanks.

Operator

operator
#72

Thanks. The next question comes from Vishal Chandak at Motilal Oswal. You have the floor.

Vishal Chandak

analyst
#73

Appreciate the chance to ask, sir. I wanted to ask about the CapEx plan. You said roughly INR 2,000 crore has been spent so far, and the target for the year is around INR 8,000 crore. So that means INR 6,000 crore will be spent in the interim.

Anil Tulsiani

executive
#74

Yeah. No, no. It's 6,000. Around 6,000.

Vishal Chandak

analyst
#75

Is that INR 6,000? So INR 6,000 crores applies to the whole year?

Anil Tulsiani

executive
#76

Yeah.

Vishal Chandak

analyst
#77

Is that clear?

Anil Tulsiani

executive
#78

Yeah, for the full year.

Vishal Chandak

analyst
#79

Regarding that extra INR 4,000 crore you plan to lay out from October through March — could you walk us through the types of projects that money is going toward? That would help a lot, since from what I understand, no further volume expansion projects remain in the pipeline. What sort of productivity improvement should we expect, sir?

Anil Tulsiani

executive
#80

We're actually installing our casters in Bhilai, and in Bokaro as well. In Rourkela too. On top of that, we have a few blast furnace refurbishment projects — some significant refurbishing work on blast furnaces and coke ovens as well — that are coming up this year. Beyond this, what normally happens is that there are a great many small-scale jobs being taken up across all the steel plants. There are some other major projects too, such as certain water pipeline projects with the government and supplying additional power for our plants on a deposit term basis, which are also being taken up this year.

Vishal Chandak

analyst
#81

Got it. One quick follow-up on that. We've spent roughly INR 50,000+ crore on modernization and expansion. My assumption is that this would have taken in the blast furnace, the caster, and the coke oven batteries.

Anil Tulsiani

executive
#82

No, those are the ones.

Vishal Chandak

analyst
#83

You can see that we still have quite a few more modernization plans pending, right?

Anil Tulsiani

executive
#84

Well, no — what's really going on here is that under the modernization plan, three blast furnaces were commissioned. One at IISCO, Burnpur; the second at Rourkela; and the third at Bhilai. As for the remaining blast furnaces — at Bokaro, for instance, plus one at Durgapur, and in the other units too, and even at Bhilai and elsewhere — wherever blast furnaces exist, the older ones are being refurbished, since they must be refurbished within set timelines as well. Take 20 to 20 years down the line: you have to refurbish it fully. Beyond that, we're also undertaking certain capacity enhancements to raise the volumes of the blast furnaces too. Those are ongoing projects currently under way.

Vishal Chandak

analyst
#85

Sir, rather than refurbishing those old blast furnaces, wouldn't it make more sense to build a new large blast furnace with casting capacity to match? And then—

Anil Tulsiani

executive
#86

No, what should be done with the casting we already have?

Vishal Chandak

analyst
#87

That's something you ought to have examined too.

Anil Tulsiani

executive
#88

No — so how should I handle the casting capacity we already have in place? That has to be utilized as well.

Vishal Chandak

analyst
#89

Adding more casters is something we're able to do, correct? In the end, the material moves from SMS into casting. Bringing on additional casters would also contribute to, you know, resolving the problem that's already there.

Anil Tulsiani

executive
#90

Look, our own expansion is something we already have.

Vishal Chandak

analyst
#91

We can also deploy the new caster.

Anil Tulsiani

executive
#92

We have our own expansion plans across all the plants. Within that, only the new blast furnaces are going to come up with matching casters and matching mills and everything.

Vishal Chandak

analyst
#93

What I was really getting at is this: rather than refurbishing the smaller blast furnaces, which costs more, couldn't we consider, you know, building larger blast furnaces that would be more economical down the road?

Anil Tulsiani

executive
#94

Yeah, those are in the pipeline. That's part of our expansion plan. Basically, these involve removing some bottlenecks or, you know, refurbishing the blast furnaces we already have.

Vishal Chandak

analyst
#95

Sure, sir. Yes. Thank you very much.

Operator

operator
#96

Thanks. Our next question comes from Ritesh Shah at Investec. Go ahead, please.

Ritesh Shah

analyst
#97

Hello, sir. Thank you for giving me the chance, sir. I have two questions — actually, three. The first one is: what is our view of the government's PLI scheme? Have you submitted any proposals? How should we interpret this?

Anil Tulsiani

executive
#98

Yeah. For this, the applications we've submitted are primarily for our Rails.

Ritesh Shah

analyst
#99

All right. Sir, could you give us a sense of the amount of capacity and CapEx we're looking at here, and what kind of benefits we might expect from it?

Anil Tulsiani

executive
#100

So really, this is already something that exists, and we're working on new products within it. The head-hardened rails are out there—they're being made, and we're developing them. There are also new profiles in the mix. That's essentially where we're coming from, and it's on that basis that we applied under the PLI scheme.

Ritesh Shah

analyst
#101

Sir, if this proposal is approved, what kind of benefits should we expect?

Anil Tulsiani

executive
#102

We’ll also see a better NSR on that. For those specific rails, the rail price is going to be considerably higher.

Ritesh Shah

analyst
#103

Thanks, that helps. Sir, my second question concerns the export taxes. Do you have any views on that? It has been hanging around for a good while now.

Anil Tulsiani

executive
#104

On export taxes, the decision rests entirely with the government — it's up to them what gets done. We've consistently asked the government to waive these taxes, but ultimately it's the government that has to make that call, not us.

Ritesh Shah

analyst
#105

Alright, fair enough. Sir, the previous question concerned integrating iron ore, and we had said before that we would be considering an additional 13 to 15 million tons of capacity. If you could specify, mine by mine, how things are progressing on iron ore in particular. It has been quite a while since I last heard anything from management on this variable. To be specific, could you address Meghahatuburu, Bolani and Goa. I believe those are the three bigger ones, along with the incremental expansion plans of roughly 15 million tons. Thank you.

Anil Tulsiani

executive
#106

So let me start with Bolani. At present, Bolani's capacity stands at nearly 7 to 7.5 million tonnes. Our plan for a 10 million tonne plant there — 10 million tonne capacity there — is still moving forward. It's underway. In roughly two years' time, we should be producing at that capacity. Turning to Kiriburu and Meghahatuburu, the resources and reserves there have been depleted. So we're now moving into — there are two new areas there, the south and central blocks. Once those blocks are opened, the capacities at these mines are ready. For instance, Kiriburu's capacity is 5.5 million tonnes, and Meghahatuburu's capacity is 6.5 million tonnes. Both capacities can be run once those new blocks open. There too we have a good number of clearances, and we expect production to begin there in about a year or so. On Goa, we already have — as the board has approved — a mega project there to operate the mine via a mine developer and operator, where production will be 10 million tonnes, of which 4 million tonnes will be pellets, 4 million tonnes will be fines, and 2 million tonnes will be lumps.

Anil Tulsiani

executive
#107

On this project as well, the board has given in-principle approval, and we're in the process of tendering it out.

Ritesh Shah

analyst
#108

Got it. Rowghat and Chiria, sir?

Anil Tulsiani

executive
#109

Chiria has become a non-mining zone at this point, so we're working to persuade them to let us conduct some mining there. Rowghat is progressing nicely right now. We've brought a contractor on board there. We engaged a contractor to carry out interim mining at that site. Already quite a bit — I believe a couple of rakes of iron ore have been dispatched from there as well. We're in the process, and more or less most of our clearances are in hand. We've also appointed an MDO there. Things will move quickly at that location. The one issue is the rail line, which needs to be extended all the way to Rowghat. There too, substantial work has been finished up to the 60 km mark. It's a 93-km line in total. Up to the 60 km mark, and then from 83 to 93 km, the line has been completed. The remaining portion will likely be finished in a year or so.

Ritesh Shah

analyst
#110

Thanks. Sir, my final question concerns the incremental expansion of 15 to 17 million tons that we mentioned previously. Is there any update on that?

Anil Tulsiani

executive
#111

A consultant has already been brought on board for this. We've hired a product consultant. That product consultant will outline what will be, you know, essentially the future requirements for the products, let's say from 2030 onward. He has been providing his input. On top of that, we have also already engaged a consultant for our IISCO Steel Plant, Burnpur, where we are—he will likewise be submitting his report on the means by which we move forward with expansion at IISCO Steel Plant, Burnpur.

Ritesh Shah

analyst
#112

Of course, sir. Thanks a lot for those thorough responses. I really appreciate it.

Operator

operator
#113

Thanks. We'll take our next question from Prashanth Kota at Emkay Global Financial Services. Your line is open.

Prashanth Kota

analyst
#114

Good afternoon, sir, and thank you for taking my question. Regarding this quarter, sir, how much would the inventory losses have amounted to? Is roughly INR 500 to 800 crore the correct figure, or is it higher or lower — if you could give us some guidance on that. We saw the high-cost inventory get liquidated. And please also come back on that.

Anil Tulsiani

executive
#115

Can you walk us through what you mean when you refer to inventory losses?

Prashanth Kota

analyst
#116

Since we started the quarter with that more expensive inventory on hand, that stock would have been sold off during this quarter.

Anil Tulsiani

executive
#117

My guess is that we can follow up with you about that outside this call.

Prashanth Kota

analyst
#118

All right, sir, no problem. Sir, moving to my second question. Sir, if my memory serves me right, three quarters back, there was an acceptances line, or some sort of facility, for coking coal, and owing to that, our working capital debt was somewhat — it helped our working capital debt by bringing it down. So, sir, has that line been discontinued, that acceptances line which doesn't necessarily need to be shown as debt? Is there any shift in strategy on that front, or am I on the right track?

Anil Tulsiani

executive
#119

No. In fact, when it comes to coal, our payment terms remain the same.

Prashanth Kota

analyst
#120

Mm-hmm.

Anil Tulsiani

executive
#121

Which existed before that. In other words, we have 2–3 months of credit line from the coal suppliers, and that is still going on now.

Prashanth Kota

analyst
#122

All right, that stays the same. Fine. Got it.

Anil Tulsiani

executive
#123

There's no change.

Prashanth Kota

analyst
#124

Sir, one final request, if you would. Given that the sector itself is in a difficult space, wherever it's feasible, please try to align your CapEx so that it reflects asset profitability on the P&L side, sir. That would be a help to everyone.

Anil Tulsiani

executive
#125

Certainly, that's not a problem.

Prashanth Kota

analyst
#126

I mean, that applies to SAIL as a business and to the investors too. Is that the right way to put it?

Anil Tulsiani

executive
#127

Okay, okay, we hear you on that.

Prashanth Kota

analyst
#128

Thank you, sir. I understand, sir. I wish you all the best.

Anil Tulsiani

executive
#129

Thanks.

Operator

operator
#130

Thanks. Our next question comes from Raina Somaya at Spark Capital. You have the floor.

Raina Somaya

analyst
#131

Yes, I appreciate the chance to ask, sir. My first question concerns the 4 million tons of sales we completed this quarter. What portion of that volume was contracted? I'm simply trying to get a handle on how prices move from quarter to quarter. To what degree — you know — has the contract insulation meant the quantity itself wasn't really affected? You mentioned rails at 1 million tons. I assume that figure is annual. That likely wouldn't have been affected. In a similar vein, how much of our business is under contract, and you know, what lengths of time do those contracts run for?

Anil Tulsiani

executive
#132

Look, the reality is that contracts like that are few and far between for us. For the most part, our pricing runs on a monthly basis.

Raina Somaya

analyst
#133

Beyond rail, for the most part we can consider it on a monthly basis. Is that correct to—

Anil Tulsiani

executive
#134

Yes, it's mostly about the monthly pricing system. There could be a few contracts involved, though in reality that volume is quite small.

Raina Somaya

analyst
#135

Quantity.

Anil Tulsiani

executive
#136

There's a very small amount that might exist, but apart from that, it's mostly a monthly pricing system.

Raina Somaya

analyst
#137

Got it, sir. The second item on the rail, the one you brought up. On the accounting side, suppose the prices end up being revised upward — does the whole accounting hit land in a single quarter, at the point when we receive confirmation of the price? Is that how it works?

Anil Tulsiani

executive
#138

Yeah, that’s exactly how it is.

Raina Somaya

analyst
#139

Understood. Regarding FY 2022 through 2023, have those been filed by us, or are they still pending? They've been filed. You mentioned that for 2021-

Anil Tulsiani

executive
#140

We've already filed for 2021, and that filing is close to being finalized. We'll also be submitting for 2021 to 22 shortly. Actually, the usual practice is that Railways tells the Chief Adviser Cost to obtain the information from us, and only after that are we meant to submit it. Railways passed this information along to the Chief Adviser Cost at the end of October, so we'll be filing it soon.

Raina Somaya

analyst
#141

Understood, sir. One last question from me. Regarding realization, our NSR has fallen by roughly INR 14,000 per ton quarter over quarter, going from INR 76,000 to around INR 62,000. Across flat, semis, and long, could you give us some color on where the biggest hit landed during the quarter and how things are trending at present?

Anil Tulsiani

executive
#142

And at this point in Q2, flats and longs are pretty much equal.

Raina Somaya

analyst
#143

What I was trying to find, during the quarter, was the INR 14,000 — I mean, the gap that showed up in the quarter — and I mean, it was largely driven by, you know, flat, and to a small degree by longs, since you did say that long prices haven't corrected. I was trying to work out which one had really weighed heavily on that 14K impact.

Anil Tulsiani

executive
#144

What essentially took place is that flat-rolled prices, which had been sitting around INR 70,000 and higher, dropped sharply, while longs stayed roughly at the same levels.

Raina Somaya

analyst
#145

Understood. Thanks. Thanks.

Operator

operator
#146

Thank you. Our next question comes from Pritam Roy at B&K Securities. Pritam, you have the floor.

Pritam Roy

analyst
#147

Okay. Hello, sir, and thanks for giving me the chance. I just have a few questions. First, inventory has risen and right now it sits at roughly INR 28,000 crore, correct? Working capital has also increased considerably. In the range you cited during the presentation, that suggests we are receiving a benefit on average raw material prices. What I want to know is how these things will play out. In other words, are we carrying some high-value inventory that we intend to release in the next quarter, or perhaps the quarter after that, or are we buying at current prices and blending that so the margin can be maintained? If you could shed some light on that.

Anil Tulsiani

executive
#148

To be clear, we account for raw material inventories using the weighted average cost method. Across the full year, that tends to even things out.

Pritam Roy

analyst
#149

All right, so across the year it’s going to ease out gradually, correct?

Anil Tulsiani

executive
#150

Right. That's correct.

Pritam Roy

analyst
#151

All right. What's the NSR at present that you were just referring to? And is INR 62,000 the right way to understand it?

Anil Tulsiani

executive
#152

Right now, for the H1, the NSR stands at.

Pritam Roy

analyst
#153

Regarding the quarter.

Anil Tulsiani

executive
#154

Regarding the quarter.

Pritam Roy

analyst
#155

Yes.

Anil Tulsiani

executive
#156

During the quarter, that figure came in at somewhere between 57 and 58 thousand.

Pritam Roy

analyst
#157

Alright.

Anil Tulsiani

executive
#158

In my answer a moment ago, I sort of revised those figures — long product prices had dropped by roughly INR 6,000, while flat product prices, you could say, declined by approximately INR 13,000.

Pritam Roy

analyst
#159

Alright, that currently trades at INR 56 thousand to INR 57 thousand rupees.

Anil Tulsiani

executive
#160

Yeah.

Pritam Roy

analyst
#161

One final question, sir. Just on the change contribution, the inventory piece — how much of that is raw material inventory and how much is finished goods inventory the company holds at present? Do you have that data available?

Anil Tulsiani

executive
#162

The finished figure comes to roughly INR 16,000 crore, while raw material stands at INR 12,000 crore.

Pritam Roy

analyst
#163

Alright, alright. Thanks, sir. Appreciate it.

Operator

operator
#164

Thanks. Thanks. Our next question comes from Kirtan Mehta at BOB Capital Markets. Please go ahead. Kirtan, your line is unmuted. Please proceed with your question. It appears there is no response from Kirtan's line, so we will move on to our next question. That comes from Chirag Singhal at First Water Capital. Please go ahead.

Chirag Singhal

analyst
#165

Appreciate the question, sir. I have a couple of things to ask. First, regarding employee expense: that's running at INR 1,800 crores per quarter. If I annualize that and use FY 2022 as the base, it comes to roughly 1,600-odd crores of savings per annum. Can we go forward using that figure?

Anil Tulsiani

executive
#166

No, that’s not something you should do.

Chirag Singhal

analyst
#167

Alright.

Anil Tulsiani

executive
#168

If you look at last year for comparison, there was also a one-time payment tied to wage revision arrears. That made a big difference. And if you take a QoQ view within this particular year, it comes out to roughly INR 2,800-odd crores each quarter. We can carry that forward. INR 2,800, actually.

Chirag Singhal

analyst
#169

All right, sir, thank you. My second question concerns the INR 550 crores per quarter in raw material usage savings. In the quarter we've just reported, there's a savings of INR 550 crores from raw material usage. Could you shed a bit more light on that? What precisely is it, and is it a structural kind of savings that will carry on in the quarters ahead as well?

Anil Tulsiani

executive
#170

In fact, coal usage has gone down.

Chirag Singhal

analyst
#171

By using the coke ratio.

Anil Tulsiani

executive
#172

Right. Coal usage has dropped quite a bit. And there's another thing—we've begun using somewhat more indigenous coal, CDI. That has had a sizable effect on how much coal we use. Beyond that, in the other items too, such as iron ore and the like, there's been some enhancement in the consumption pattern.

Chirag Singhal

analyst
#173

Got it. All right, of course. Thank you. Sir, only one final item from me. It's really just a point of clarification. You provided certain figures regarding coking coal, and I wanted to check on that. Was it stated that spot coking coal prices stand at roughly INR 31,000 per ton?

Anil Tulsiani

executive
#174

Hold on a moment. Yes. Essentially, the price we mentioned — INR 32,000 — applies to the imported coal, and CDI is not included in that.

Chirag Singhal

analyst
#175

Correct — that's the spot price.

Anil Tulsiani

executive
#176

The figure we're talking about isn't the spot price — it's essentially the average cost of consumption for imported coal.

Chirag Singhal

analyst
#177

What we're looking at here is consumption cost at the current price.

Anil Tulsiani

executive
#178

When it comes to coal that's imported. Correct.

Chirag Singhal

analyst
#179

Okay, so you expect that to come down by INR 5,000 per ton this quarter?

Anil Tulsiani

executive
#180

Yes, that should.

Chirag Singhal

analyst
#181

All right, could you tell me what the spot price is for imported coking coal?

Anil Tulsiani

executive
#182

Roughly $300 or so. $310 as of now.

Chirag Singhal

analyst
#183

Hard coal.

Anil Tulsiani

executive
#184

That figure applies to hard coking coal. That covers the flats as well.

Chirag Singhal

analyst
#185

Absolutely.

Anil Tulsiani

executive
#186

The Platts index for hard coking coal.

Chirag Singhal

analyst
#187

Got it. That’s clear. Thanks very much, and all the best to everyone.

Anil Tulsiani

executive
#188

Thanks.

Operator

operator
#189

Thanks. Our next question comes from Falguni Dutta at Jet Age Securities. Please go ahead.

Falguni Dutta

analyst
#190

Yeah, just a couple of things I wanted to ask. First off, what's the HRC price right now, at this moment?

Anil Tulsiani

executive
#191

For India, the price is roughly INR 55,500.

Falguni Dutta

analyst
#192

Hello?

Anil Tulsiani

executive
#193

Yes, that's right. At the moment it's roughly 56,000.

Falguni Dutta

analyst
#194

All right. Sir, what guidance would you give us on production and sales for the year and for FY 2024?

Anil Tulsiani

executive
#195

Output is going to land somewhere in the neighborhood of 17 to 17.5 million tons. As for sales, they should track along similar lines. At this point, roughly 16 million tons.

Falguni Dutta

analyst
#196

Alright.

Anil Tulsiani

executive
#197

Sixteen to sixteen point five.

Falguni Dutta

analyst
#198

Regarding fiscal year 2024, do we happen to have that figure?

Anil Tulsiani

executive
#199

Nothing has been locked in just yet. In fact, we'll simply take a look at what extra capacity exists, or if we're facing any significant shutdowns or anything like that, and then we'll settle it during the month of.

Falguni Dutta

analyst
#200

With the capacity we have now, sir, how high could we go? If we suppose every plant runs at full capacity, what should our production amount be?

Anil Tulsiani

executive
#201

Crude capacity stands at roughly 19.5. And saleable steel production, we can figure on approximately 18.5 million.

Falguni Dutta

analyst
#202

Alright. Thank you, sir. That's everything from me.

Operator

operator
#203

Thanks. Thanks. Our next question comes from Raashi Chopra at Citigroup. Go ahead, please.

Raashi Chopra

analyst
#204

Thanks. On the debt levels specifically, what level of net debt EBITDA would you feel comfortable with, and where does it stand right now?

Anil Tulsiani

executive
#205

Broadly speaking — look, we always feel very comfortable when there's no debt, but we can't accept that as of today's date. Our plan is that we should bring it down to around about INR 25,000 crore levels by the year end.

Raashi Chopra

analyst
#206

Right now, it's sitting at roughly INR 26,700, is that correct?

Anil Tulsiani

executive
#207

Yeah, 27,400. That’s the figure as of 30th September.

Raashi Chopra

analyst
#208

Alright, thank you. And then, on top of that, what's the inventory level you're carrying right now?

Anil Tulsiani

executive
#209

We have about 1.1 million tons. The present stock of completed goods sits at roughly 1.1 million tons.

Raashi Chopra

analyst
#210

You released about 200 KT?

Anil Tulsiani

executive
#211

Sorry, what was that?

Raashi Chopra

analyst
#212

So you sold off roughly 200 KT in the course of the quarter?

Anil Tulsiani

executive
#213

Right.

Raashi Chopra

analyst
#214

Alright, thanks.

Operator

operator
#215

Thanks. Our following question comes from Rajesh Majumdar at B&K Securities, who is on the line. Kindly proceed.

Rajesh Majumdar

analyst
#216

Good afternoon, sir, and thank you for taking my call. I just wanted to get one thing clarified regarding NSR and the long-term rates. If I understand correctly, aside from the rail rates and the long term, all of the sales are on spot. The 57 to 58 you mentioned for NSR excludes the 1.2 million tons on all the other sales. Is that right? Is that the correct assumption?

Anil Tulsiani

executive
#217

That figure covers it as well. The Rails price is part of that too, though it makes up only a very small piece. Out of 16 million tons of saleable steel, it's roughly about 1 million tons within total sales. Beyond that, we don't get into many long-term contracts at all. The sole contracts we do sign are with some PSUs and others who want us on a long-term basis. Apart from those, our business runs mainly month to month.

Rajesh Majumdar

analyst
#218

Okay, sir. The 57 to 58 does take in the rail, but my point is this: when you give guidance on similar prices for Q3, you're essentially referring to the spot market, correct? Largely the spot market.

Anil Tulsiani

executive
#219

Yes. Spot is what we’re discussing.

Rajesh Majumdar

analyst
#220

Sure, and sorry to keep coming back to this. Regarding the rail mill once more: when will we begin producing head hardened rails, and what realization difference should we expect once a sizable quantity of head hardened rails is being sold from there?

Anil Tulsiani

executive
#221

The head hardened rail trials, in fact, are still underway.

Rajesh Majumdar

analyst
#222

Alright.

Anil Tulsiani

executive
#223

On the pricing side, discussions with the railways are still ongoing, since the price will be agreed by both parties and will reflect our cost, any extra cost involved, and — as you can imagine — the effect it will certainly have on our productivity as well. Taking all of that into account, we remain in negotiations with the railways. Finalizing it is going to take some time.

Rajesh Majumdar

analyst
#224

Sure, no problem. I was simply trying to get a sense of the volumes we should expect from the head hardened rails in, let's say, 1 or 2 years, whenever that stabilizes or gets finalized. What sort of volumes are you anticipating on the HSR side, considering that NSRs sit almost 10K above where rail prices currently are? Unless I'm wrong about that.

Anil Tulsiani

executive
#225

Yes. It’ll be higher. Basically, that will hinge on what the railways require and how much they want from us.

Rajesh Majumdar

analyst
#226

Our capability covers all of that 1.4 million tons — with 1.2 million tons in head hardened rails, or.

Anil Tulsiani

executive
#227

No, no.

Rajesh Majumdar

analyst
#228

Regarding PSU capacity, here's where things stand.

Anil Tulsiani

executive
#229

That can’t be done.

Rajesh Majumdar

analyst
#230

Yeah. Yeah.

Anil Tulsiani

executive
#231

That can’t be done.

Rajesh Majumdar

analyst
#232

All right, what's the capacity at that location? That's the thing I was after. Right.

Anil Tulsiani

executive
#233

It'll come from those same mills—not from some other mill. The only difference is that operations are going to change, and that will affect productivity. On that piece, we're also in discussions with the railways, though the volume won't be all that large. For instance, not the full 1.4 million tons. It'll be a modest amount—perhaps a couple of lakh tons, something along those lines.

Rajesh Majumdar

analyst
#234

All right. Between 200 and 300 KT — is that the right assumption?

Anil Tulsiani

executive
#235

A figure of 200 to 300 would be fair to mention.

Rajesh Majumdar

analyst
#236

Alright, thank you very much.

Operator

operator
#237

Thanks. The next question comes from Mohit Bhansali at Bonanza Portfolio Limited. Please go ahead.

Mohit Bhansali

analyst
#238

Thanks for the chance to ask. My first question, sir, concerns employee cost — you seem to be steadily cutting back on your highly paid staff. Would it be reasonable to expect that declining pattern to keep going for another 2 to 3 years?

Anil Tulsiani

executive
#239

Yes, it ought to carry on. It definitely ought to carry on. Each year, our typical retirement figure will land somewhere around 2,500 to 3,000. That effect will definitely be felt. Naturally, there's one point we need to bear in mind: pay keeps rising — the DA goes up each quarter, as you know — plus there are regular increments along with promotion-related increments. Those will more or less cancel out whichever retirements are occurring.

Mohit Bhansali

analyst
#240

Sir, at this moment, what's the current headcount as of the quarter ending?

Anil Tulsiani

executive
#241

Around 60,700 — roughly 60,000.

Mohit Bhansali

analyst
#242

Alright, so my second question concerns coking coal. If you see any gains from your own mining — say output at Tasra and Mozambique — or are you pursuing other opportunities in coking coal, given that it is such a high-cost raw material for your production?

Anil Tulsiani

executive
#243

Tasra, we're moving into being a mine developer and operator. It's currently at the tendering stage. That's at the tendering stage, and Mozambique is performing well. It's steadily improving, and I think we're getting roughly 1 to 1.2 million tons from them. That material is being used by us as well as by RINL.

Mohit Bhansali

analyst
#244

Sir, is there any partnership or tie-up with BCCL, an Indian company — BCCL — for the production of coking coal?

Anil Tulsiani

executive
#245

Yes, that's right. We do have a partnership in place with them. Long-term agreements are in place with them covering the coal they supply to us. The washing happens at our washeries and at BCCL's washeries too. There's a co-washery involving Tatas that is helping with and handling the washing of the coal supplied by BCCL and CCL.

Mohit Bhansali

analyst
#246

So sir, from Mozambique and Tasra you're getting 1 million tons. And you'll also be getting — will that be beneficial, or will the cost land around the same as what you're paying in the spot market?

Anil Tulsiani

executive
#247

No. Actually, when it comes to Mozambique, the Platts and Argus index is what governs it. There's a specific discount applied to that Platts and Argus index, which exists. For our mines, such as Tasra and our coal, pricing will be based on cost. That's going to truly change the game going forward.

Mohit Bhansali

analyst
#248

Right, sir, thank you very much. Thank you. Wishing you all the best.

Operator

operator
#249

Thanks. Everyone, that brings us to the final question for today. I'll now turn the conference back over to Mr. Ashish Kejriwal for his closing remarks. Thanks, and over to you.

Mohit Bhansali

analyst
#250

Thanks, Aman. Speaking for Nuvama Wealth Management, we’d like to thank Steel Authority of India’s management once more for the chance to host this call. Sir, would you like to offer any closing remarks?

Anil Tulsiani

executive
#251

No, that's fine. We're just crossing our fingers that NSR holds or rises in this particular quarter, and that coal prices steady or ease somewhat. That would also help lift the bottom lines not just for us but for other companies too.

Mohit Bhansali

analyst
#252

Regarding our output and our debt.

Anil Tulsiani

executive
#253

Our intention is to reduce our borrowings somewhat by the end of this year. As for production, naturally, at this point in the second quarter and into the second half, typically every steel manufacturer simply ramps up output. We will also be working to achieve the best possible in this second half. Thank you.

Mohit Bhansali

analyst
#254

Appreciate it, and I hope everything goes well for you going forward, sir. Thanks to all of you.

Anil Tulsiani

executive
#255

I appreciate that.

Operator

operator
#256

Thanks so much. Everyone, that brings today's call to a close on behalf of Nuvama Wealth Management. We appreciate all of you for being with us, and you can go ahead and disconnect your lines now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Steel Authority of India Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Steel Authority of India Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Steel Authority of India Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.